Sie sind auf Seite 1von 9

International

Krommedijk 10
P.O. Box 46
3214 ZG Zuidland
The Netherlands
Contact
Tel. : +31 (0) 181 451166
Fax. : +31 (0) 181 452858

B
e-mail : info@breeman.nl
web : www.breeman.nl

VAT No. : NL001376500B01


Ch. Of comm. : 24213565 R’dam
Breeman International Supplies
Quality by People
Breeman Special Products b.v.
Local (Maldives)
Ma. Blue Grass
Keneree Magu, 20194
Maldives

Contact (Maldives)
Tel. : +960 779 4630
Fax. : +960 300 4861
e-mail : mustafaT@breeman.nl
web : www.breeman.nl

TIN No. : 1060480


Client : Reg No : C-0995/2015

Rixos Maldives

Dredging and Reclamation of Rixos Lagoon

Project Proposal
B
Breeman International Supplies Dredging and Reclamation of Rixos Lagoon

Document Control

Client : Rixos Maldives


Proposal No : 1002BEM/2015
Title : Dredging and Reclamation of Rixos Lagoon
Docuemnt Type : Proposal
Document No : 1002
Date : 16- November 2015
Classification : Commercila and Confidence
Approved By : Hassan Nizar

Key Reviewers

Name Date
Dr. Ahmed Shamheed 16-November 2015
Tassaduq mustafa 16-November 2015

Approved By
Name Date
Hassan Nizar 16-November 2015
Kees Breeman 16-November 2015

Prepared by : Ali Muaz Proposal No: 1002BEM/2015


Approved by : Hassan Nizar Date : 16-November 2015
Classification : Commercila and Confidence Document Title : Dredging and Reclamation of Rixos Lagoon
B
Breeman International Supplies Dredging and Reclamation of Rixos Lagoon

Contents

Document Control .......................................................................................................................................... 2


Project Outline............................................................................................................................................................ 4
Customer Requirement ............................................................................................................................................ 4
Scope of Project .......................................................................................................................................................... 4
Key Assumptions ........................................................................................................................................................ 4
Dependencies ............................................................................................................................................................. 4
Solution of Description............................................................................................................................................... 5
Appendix A- CSD Borrow Areas .................................................................................................................................. 5
Appendix B- THSD Borrow Areas ................................................................................................................................ 6
Rock Revetment A & B................................................................................................................................................ 7
Proposed Pricing ......................................................................................................................................................... 8
Term & Conditions...................................................................................................................................................... 9

Prepared by : Ali Muaz Proposal No: 1002BEM/2015


Approved by : Hassan Nizar Date : 16-November 2015
Classification : Commercila and Confidence Document Title : Dredging and Reclamation of Rixos Lagoon
B
Breeman International Supplies Dredging and Reclamation of Rixos Lagoon

1. Project Outline
1.1. Customer Requirement
Dredging locations proposed for a cutter-suction dredger is shown in Annex A. The location proposed is
the northern end of the reef away from the main island. The maximum distance between this site and
the furthest extent of the island is about 2.5 km. The quantity of good quality sand is not known and
geological survey is required to confirm it. Alternative sites have been proposed but all these sites have
varying risks to the reef and the proposed island.

1.2. Scope of Project

Feature Specification
Island Size at Low Tide 35 Ha
Reclamation Height +1.7 m MSL
Reclamation Design Height +1.5 m MSL
Average Depth at Site -1 m MSL
Beach Width 20-25 m
Voulme Required ( Approx ) 850,000 – 900,000 cbm

1.3. Key Assumptions

A. Client settles the advance payment as stated


B. No legal issues are pending or unresolved
C. Minimal hindrance to project progress due to unforeseen circumstances
D. Availability of sand in allocated borrow areas

1.4. Dependencies

A. Timely receipt of advance payment


B. Weather Condition
C. Timely transportation of vehicles to the site
D. Permissions from government authorities

Prepared by : Ali Muaz Proposal No: 1002BEM/2015


Approved by : Hassan Nizar Date : 16-November 2015
Classification : Commercila and Confidence Document Title : Dredging and Reclamation of Rixos Lagoon
B
Breeman International Supplies Dredging and Reclamation of Rixos Lagoon

2. Solution of Description

2.1 Appendix A- CSD Borrow Areas

Breeman will use a CSD 350-450 Dredger, Which can Displace 2,500 to 3,500 cmb/H

Prepared by : Ali Muaz Proposal No: 1002BEM/2015


Approved by : Hassan Nizar Date : 16-November 2015
Classification : Commercila and Confidence Document Title : Dredging and Reclamation of Rixos Lagoon
B
Breeman International Supplies Dredging and Reclamation of Rixos Lagoon

2.2 Appendix A- THSD Borrow Areas

Prepared by : Ali Muaz Proposal No: 1002BEM/2015


Approved by : Hassan Nizar Date : 16-November 2015
Classification : Commercila and Confidence Document Title : Dredging and Reclamation of Rixos Lagoon
B
Breeman International Supplies Dredging and Reclamation of Rixos Lagoon

3. Rock Revement A,B & C

Prepared by : Ali Muaz Proposal No: 1002BEM/2015


Approved by : Hassan Nizar Date : 16-November 2015
Classification : Commercila and Confidence Document Title : Dredging and Reclamation of Rixos Lagoon
B
Breeman International Supplies Dredging and Reclamation of Rixos Lagoon

4.Proposed Pricing

Our Pricing is baside on as per borrowing areas.

Bill Duration Rate


Description Unit Qty Amount (US$)
No. Month (US$)
4 General Requirement
4.1 Survey Works Item 1
5,500.00 5,500.00
4.2 Site investigation Item 1
2,500.00 2,500.00
1.3 Mobilization & Demobilization Item 1
90,000.00 90,000.00
Dredging, Reclamation/ replenishing the
5
beach
- Including pre & post dredging surveys,
safety and disposal
- Transportation of dredged materials &
filling
CSD Borrow Area and Alternative Borrow
5.1 4 m3 900000
Area A,B & C 6.80 6,120,000.00

5.3 THSD Borrow Area Site G 5 to 10 Km 2 m3 900000


8.50 7,650,000.00
THSD Borrow Area Site A,D & B 10 to 20
5.4 2 m3 900000
km 13.00 11,700,000.00
6 Rock Revetment
6.1 Concept A, Rate for Material and Labour m 1
2,100.00 2,100.00
6.2 Concept B, Rate for Material and Labour m 1
1,564.00 1,564.00
6.3 Concept C, Rate for Material and Labour m 1
2,950.00 2,950.00

Prepared by : Ali Muaz Proposal No: 1002BEM/2015


Approved by : Hassan Nizar Date : 16-November 2015
Classification : Commercila and Confidence Document Title : Dredging and Reclamation of Rixos Lagoon
B
Breeman International Supplies Dredging and Reclamation of Rixos Lagoon

5.Terms and Conditions for the Construction work at the proposed site

1) GST of 6% is applicable on the above mentioned amount.


2) 35% of Payment upon Singing the Contract.
3) 55% of Payment progressively within 07 days upon receipt of invoice for the portions of
work completed monthly or weekly.
4) 10% Payment within 30 days upon Signing the Final Acceptance Certification
5) Valadity of the Quoatation is 15 days.
6) Client need to provide Nesssary permissions.

Assumptions

 Good Availabity of Sand

Prepared by : Ali Muaz Proposal No: 1002BEM/2015


Approved by : Hassan Nizar Date : 16-November 2015
Classification : Commercila and Confidence Document Title : Dredging and Reclamation of Rixos Lagoon

Das könnte Ihnen auch gefallen