Sie sind auf Seite 1von 9

TECHNICAL REPORT

CUSTOMER PT.Mitra pembangkit Indonesia DATE OF 9-Mei-2019


INSPECTION
MACHINE MODEL Bulldozer Shantui SD08U MACHINE S/N CHSD08AUNF3000094
ENGINE MODEL DEUTZ ENGINE S/N 4B15F001493

HOUR METER 1602,7 WARRANTY STATUS NON Warranty


LOCATION Ketapang PLTU YEAR OF PRODUCT 2015
MACHINE Loading material JOB DESCRIPTION Install New Transmisi
APPLICATION
CO PERSON SITE Bpk.sajid INSPECTED BY Pramadya & Rido

Problem Area Engine Steering Hydraulic v Transmission

Electrical Undercarriage Other


Kind Of Trouble :

Analysis Of Trouble :

Decision of Trouble shooting :

Fatigue Material Defect Material Mis-Modification Mis-Assembly

Bad Quality Of Parts Mis-Operation Mis-Disassembly MisInstallation

Lifetime Of Parts Mis-Maintenance Design Or Factory Workmanship

Part Recomendation :

Finished v

Not Finished By Part Tools


Others
Reported By Approved By
Total Hours Effecting In Repair Hours Field
Hours Workshop

Signed Signed

Date : Date ;
PICTURE DATA
WORKING CONDITION
FRONT VIEW RIGHT VIEW

Remark : Remark :

REAR VIEW LEFT VIEW

Remark : Remark :

NAME PLATE OF MACHINE


POSITION OF NAME PLATE CLOSE UP VIEW

Remark : Remark : CHSD08AUNF3000094


NAME PLATE OF ENGINE
POSITION OF NAME PLATE CLOSE UP VIEW

Remark : Remark : 4B15F001493

Remark : Remark : HM awal 1602,7

Remark : transmisi baru tampak samping kiri Remark : transmisi baru tampak samping kanan
Remark : transmisi baru tampak depan Remark : transmisi baru tampak belakang

Remark : transmisi baru tampak atas Remark : name plat modulating baru

Remark : name plate transmisi baru. Remark :transmisi bekas.,tampsk samping


kanan
Remark : transmisi bekas,tampak belakang Remark : transmisi bekas,tampak atas

Remark : transmisi bekas,tampak samping kiri Remark : name plate transmisi bekas

Remark : proses pemasangan transmisi baru Remark :posisi bevel gear&ring gear yg
tepat/lurus
Remark : step remove and install transmisi Remark : posisi unit untuk remove install transmisi

Remark : perakitan utk cable throotle Remark : pemasangan cable throotle at upper

Remark : pemasangan cable throotle at lower Remark :removing old ppc valve assy
Remark : new PPC valve Remark : Revove connector from old ppc valve

Remark : Pemasangan Hose PPC Valve Remark : pemasangan NEW PPC Valve

Remark : check and cleaning new modulating Remark : check and cleaning modulating valve
valve
Remark : pressure transmisi 2mpa (Over view) Remark : pressure transmisi 2 mpa (Close up view)

Remark : pressure IN 2mpa (Overview) Remark : Pressure IN 2mpa (Close up view)

Remark : posis port pressure brake RH Remark : Result Pressure brake RH 1,5mpa
Remark : posisi port pressure brake LH Remark : result prssure brake LH 2mpa

Remark : posisi port preesure steering LH Remark : result pressure steering LH 2mpa

Remark : posisi port pressure steering RH Remark :result pressure steering RH 2mpa