TU COATING TU COATING
STARBOARD
FLAT BOTTOM
MIDSHIP STARBOARD
STARBOARD
FLAT
FORWARD
BOTTOM
DATE: 24 NOV – 02 DEC 13
8 VESSEL’S PHOTOGRAPHS PREPARED: JN
APPROVED: BST
LOCATION: ST MARINE
SINGAPORE
EXECUTIVE SHIP MANAGEMENT
M.T. KAMOME PTE LTD
VICTORIA
BOTTOM
PROPELLER
PLUGDROP
VACUUM
CHECK
TEST BOTTOM PLUG CEMENTING
DATE: 24 NOV – 02 DEC 13
9 VESSEL’S PHOTOGRAPHS PREPARED: JN
APPROVED: BST
LOCATION: ST MARINE
SINGAPORE
EXECUTIVE SHIP MANAGEMENT
M.T. KAMOME PTE LTD
VICTORIA
SEA CHEST AFTER BLASTING AND SEA CHEST AFTER BLASTING AND
TOUCH UP TOUCH UP
DATE: 24 NOV – 02 DEC 13
11 VESSEL’S PHOTOGRAPHS PREPARED: JN
APPROVED: BST
LOCATION: ST MARINE
SINGAPORE
EXECUTIVE SHIP MANAGEMENT
M.T. KAMOME PTE LTD
VICTORIA
ANCHOR
MAINCABLE AFTER
ENGINE MARKING
OVERHAUL MAIN
MAIN ENGINE
ENGINE OVERHAUL
OVERHAUL
DATE: 24 NOV – 02 DEC 13
16 VESSEL’S PHOTOGRAPHS PREPARED: JN
APPROVED: BST
LOCATION: ST MARINE
SINGAPORE
EXECUTIVE SHIP MANAGEMENT
M.T. KAMOME PTE LTD
VICTORIA
FIRE EXTINGUISHER
NO. 1 CARGO PUMP
SERVICE NO 1 CARGO PUMP OVERHAUL
DATE: 24 NOV – 02 DEC 13
25 VESSEL’S PHOTOGRAPHS PREPARED: JN
APPROVED: BST
LOCATION: ST MARINE
SINGAPORE
EXECUTIVE SHIP MANAGEMENT
M.T. KAMOME PTE LTD
VICTORIA
NO. 1 INERT GAS BLOWER OVERHAUL NO. 1 INERT GAS BLOWER OVERHAUL
6S CARGO TANK INERT GAS LINE 6S CARGO TANK INERT GAS LINE
MODIFICATION MODIFICATION
DATE: 24 NOV – 02 DEC 13
32 VESSEL’S PHOTOGRAPHS PREPARED: JN
APPROVED: BST
LOCATION: ST MARINE
SINGAPORE
EXECUTIVE SHIP MANAGEMENT
M.T. KAMOME PTE LTD
VICTORIA
6S CARGO TANK INERT GAS LINE 6S CARGO TANK INERT GAS LINE
MODIFICATION MODIFICATION
DATE: 24 NOV – 02 DEC 13
33 VESSEL’S PHOTOGRAPHS PREPARED: JN
APPROVED: BST
LOCATION: ST MARINE
SINGAPORE
EXECUTIVE SHIP MANAGEMENT
M.T. KAMOME PTE LTD
VICTORIA