1. Compute for the development length provided in both the short and long directions and
compare it with the required development length. Determine if the development lengths
provided are adequate.
= 240 𝑘𝑃𝑎 − 23.5 𝑘𝑁⁄𝑚3 (0.65 𝑚) − 15.735 𝑘𝑁⁄𝑚3 (0.55 𝑚) = 216.07 𝑘𝑃𝑎
One-Way Shear
𝐿 𝑐 3.75 𝑚 0.45 𝑚
𝑉𝑢 = ( − − 𝑑) 𝑞𝑢 𝑏 = ( − − 0.5375 𝑚) (291.41 𝑘𝑃𝑎)(2.5 𝑚)
2 2 2 2
= 810.48 𝑘𝑁
1000𝑁
6𝑉𝑢 6(810.48 𝑘𝑁)( 1𝑘𝑁 )
𝑑𝑅𝑒𝑞𝑢𝑖𝑟𝑒𝑑 = = = 473.51 𝑚𝑚
𝜙√𝑓𝑐′𝑏 0.75√30 𝑀𝑃𝑎(2500 𝑚𝑚)
2
Two-Way Shear
𝑐 + 𝑑 = 450 𝑚𝑚 + 537.5 𝑚𝑚 = 987.5 𝑚𝑚
𝑏𝑜 = 4(987.5 𝑚𝑚) = 3950 𝑚𝑚
𝑉𝑢 = 𝑃𝑢 − 𝑞𝑢 (𝑐 + 𝑑 )2 = 2732 𝑘𝑁 − 291.41 𝑘𝑃𝑎(0.9875 𝑚)2 = 2447.83 𝑘𝑁
1 2
𝑉𝑐 = (1 + ) √𝑓𝑐 ′ 𝑏𝑜 𝑑
6 𝛽𝑐
1000𝑁 1 2
2447.83 𝑘𝑁 ( ) = (0.75) ( ) (1 + ) √30 𝑀𝑃𝑎(3950 𝑚𝑚)𝑑1
1𝑘𝑁 6 1
𝑑1 = 301.71 𝑚𝑚 < 537.5 𝑚𝑚 ∴ 𝐀𝐃𝐄𝐐𝐔𝐀𝐓𝐄
1 ∝𝑠 𝑑
𝑉𝑐 = ( + 2) √𝑓𝑐 ′ 𝑏𝑜 𝑑
12 𝑏𝑜
1000𝑁 1 40𝑑2
2447.83 𝑘𝑁 ( ) = (0.75) ( ) ( + 2) √30 𝑀𝑃𝑎(3950 𝑚𝑚)𝑑2
1𝑘𝑁 12 3950 𝑚𝑚
𝑑2 = 335.43 𝑚𝑚 < 537.5 𝑚𝑚 ∴ 𝐀𝐃𝐄𝐐𝐔𝐀𝐓𝐄
1
𝑉𝑐 = √𝑓𝑐 ′ 𝑏𝑜 𝑑
3
1000𝑁 1
2447.83 𝑘𝑁 ( ) = (0.75) ( ) √30 𝑀𝑃𝑎(3950 𝑚𝑚)𝑑3
1𝑘𝑁 3
𝑑3 = 452.57 𝑚𝑚 < 537.5 𝑚𝑚 ∴ 𝐀𝐃𝐄𝐐𝐔𝐀𝐓𝐄
Steel Reinforcements
Long Direction:
1 𝐿 𝑐 2 1 3.75 0.45 2
𝑀𝑢 = (𝑞𝑢 ) ( − ) (𝑏) = (291.41 𝑘𝑃𝑎) ( − ) (2.5 𝑚) = 991.70 𝑘𝑁 − 𝑚
2 2 2 2 2 2
1000 𝑁 1000 𝑚𝑚
𝑀𝑢 (991.70 𝑘𝑁 − 𝑚) ( )( )
𝐾𝑢 = 2 = 1 𝑘𝑁 1𝑚 = 1.373
𝑏𝑑 (2500 𝑚𝑚)(537.5 𝑚𝑚)2
𝜌𝑓𝑦 𝜌(400 𝑀𝑃𝑎)
𝐾𝑢 = 𝜙𝜌𝑓𝑦 (1 − ) = (0.90)𝜌(400 𝑀𝑃𝑎) (1 − ) = 1.373
1.7𝑓′𝑐 1.7 (30 𝑀𝑃𝑎)
3
𝜌 = 0.0039
1.4 1.4
𝜌𝑚𝑖𝑛 = = = 0.0035
𝑓𝑦 400 𝑀𝑝𝑎
𝑓𝑐 ′ 600 30 𝑀𝑃𝑎 600 𝑀𝑃𝑎
𝜌𝑏 = 0.85𝛽1 ( )( ) = 0.85(0.836) ( )( ) = 0.0319
𝑓𝑦 600 + 𝑓𝑦 400 𝑀𝑃𝑎 600 𝑀𝑃𝑎 + 400 𝑀𝑃𝑎
𝑓𝑦 400 𝑀𝑃𝑎
0.003 + 𝐸 0.003 + 200000 𝑀𝑃𝑎
𝑠
𝜌𝑚𝑎𝑥 = ( ) 𝜌𝑏 = ( ) (0.0319) − 0.02
0.008 0.008
𝒖𝒔𝒆 𝝆 = 𝟎. 𝟎𝟎𝟑𝟗
𝐴𝑠 = 𝜌𝑏𝑑 = 0.0039 (2500 𝑚𝑚)(537.5 𝑚𝑚) = 5240.625 𝑚𝑚2
Using 25 mm diameter bars, 𝐴25 = 490.87𝑚𝑚2
𝐴𝑠 5240.625 𝑚𝑚2
𝑛= = = 10.68 𝑠𝑎𝑦 12 𝑝𝑐𝑠.
𝐴25 490.87 𝑚𝑚2
Development Length
𝑆𝑖𝑛𝑐𝑒 25𝑚𝑚 𝑑𝑖𝑎𝑚𝑒𝑡𝑒𝑟 𝑏𝑎𝑟𝑠, 𝑎𝑛𝑑 𝑖𝑛 𝑡𝑒𝑛𝑠𝑖𝑜𝑛,
𝑙𝑑𝑅𝑒𝑞𝑢𝑖𝑟𝑒𝑑 = 48𝑑𝑏 = 48 (25 𝑚𝑚) = 𝟏𝟐𝟎𝟎 𝒎𝒎
𝐿 𝑐 3750 𝑚𝑚 450 𝑚𝑚
𝑙𝑑 = − − 𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 𝑐𝑜𝑣𝑒𝑟 = − − 75 𝑚𝑚
2 2 2 2
= 1575 𝑚𝑚 > 1200 𝑚𝑚 ∴ADEQUATE
Since development Length is adequate, we do not need to add a hook.
Short Direction:
1 𝐿 𝑐 2 1 2.5 0.45 2
𝑀𝑢 = (𝑞𝑢 ) ( − ) (𝑏) = (291.41 𝑘𝑃𝑎) ( − ) (3.75 𝑚) = 574.05 𝑘𝑁 − 𝑚
2 2 2 2 2 2
1000 𝑁 1000 𝑚𝑚
(574.05 𝑘𝑁 − 𝑚) (
𝑀𝑢
𝐾𝑢 = 2 = 1 𝑘𝑁 ) ( 1 𝑚 ) = 0.530
𝑏𝑑 (3750 𝑚𝑚)(537.5 𝑚𝑚)2
𝜌𝑓𝑦 𝜌(400 𝑀𝑃𝑎)
𝐾𝑢 = 𝜙𝜌𝑓𝑦 (1 − ) = (0.90)𝜌(400 𝑀𝑃𝑎) (1 − ) = 0.530
1.7𝑓′𝑐 1.7 (30 𝑀𝑃𝑎)
𝜌 = 0.0015
4
1.4 1.4
𝜌𝑚𝑖𝑛 = = = 0.0035
𝑓𝑦 400 𝑀𝑃𝑎
𝒖𝒔𝒆 𝝆 = 𝟎. 𝟎𝟎𝟑𝟓
𝐴𝑠 = 𝜌𝑏𝑑 = 0.0035(3750 𝑚𝑚)(537.5 𝑚𝑚) = 7054.69 𝑚𝑚2
Using 25 mm diameter bars, 𝐴25 = 490.87𝑚𝑚2
𝐴𝑠 7054.69 𝑚𝑚2
𝑛= = = 14.37 𝑠𝑎𝑦 15 𝑝𝑐𝑠.
𝐴25 490.87 𝑚𝑚2
Development Length
𝑆𝑖𝑛𝑐𝑒 25𝑚𝑚 𝑑𝑖𝑎𝑚𝑒𝑡𝑒𝑟 𝑏𝑎𝑟𝑠, 𝑎𝑛𝑑 𝑖𝑛 𝑡𝑒𝑛𝑠𝑖𝑜𝑛,
𝑙𝑑𝑅𝑒𝑞𝑢𝑖𝑟𝑒𝑑 = 48𝑑𝑏 = 48 (25 𝑚𝑚) = 𝟏𝟐𝟎𝟎 𝒎𝒎
𝐿 𝑐 2500 𝑚𝑚 450 𝑚𝑚
𝑙𝑑 = − − 𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 𝑐𝑜𝑣𝑒𝑟 = − − 75 𝑚𝑚
2 2 2 2
= 950 𝑚𝑚 < 1200 𝑚𝑚 ∴INADEQUATE
Since development Length is inadequate, we need to add a hook.
The minimum diameter of the bend is
𝐷 = 6𝑑𝑏 = 6(25 𝑚𝑚) = 150 𝑚𝑚