Sie sind auf Seite 1von 4

Steps for Uploading Digital Logs in APPS9

Step 1 – Save the given Excel template with file name as PLANT_FECILITY_ID ( e.g.
105H.xlsx for Chamera-I) for which data is to be uploaded.

Step2 - Enter hourly log data in the different sheets (L001, L002, L003.. etc) of the
given Excel template and save it.

Note : Please update Plant_Oprn_Msr_Hdr_ID in DailyHdr sheet (In Shift S1, S2, S3
only Plant_OPRN_MSR_HDR_ID is required. In Shift S4 other values such as DSACP_Rate,
Gen_Sch_Rev_No, DGR_Dispatch_No are also mandatory for uploading of data.

Format of DailyHdr sheet is shown above. All values are mandatory in this sheet.

SEQ PARAMETER VALUE UPLOAD_STATUS

1 Plant_OPRN_MSR_HDR_ID 105H2019OP0829

2 DSACP_Rate (INR/MWh) 3215

3 Gen_Sch_Rev_No 14

4 DGR_Dispatch_No LOKTAK

(Note:- Please do not copy paste data in DailyHdr sheet. All values in this sheet to be
entered from keyboard so that format of cell remain unchanged)

Step 3- Enter Shift wise Data in Excel templates and save it. Generation Schedule and
Line data (“15 Min Logs”) to be entered in “Log96” Sheet in given format. In Last
Shift “S4” data is to be entered in DailyHdr, Outage, DailyPrm also.
Entering/Uploading Meter Readings & Outage Data through DigiLog Uploader

Uploading DAILYPRM (L012) : DailyPrm (Meter Readings) to be entered in Excel Template and uploaded in
Shift-S4 before confirming data of Shift-S4.

Steps are follows:-

1. Enter data in VALUE column against parameters.

These value may be entered/view in LOG012-DGR Daily Misc Data by MHT3-RMB->FW05-Daily Entry Log

Uploading OUTAGE : Outage data to be entered in Excel Template and uploaded in Shift-S4 before
confirming data.

Steps are follows:-

1. Select UNIT_ID from dropdown list


2. Select OUTAGE_TYPE from dropdown list
3. Enter TRIP_TIME in format hh:mm:ss
4. Enter RESTORATION_TIME in format hh:mm:ss
(NET TIME will be calculated and displayed automatically)
Step3 : to Upload Data in ERP
Goto Intranet (10.1.0.4) Home Page

Click ->Quick Link -> DigiLog Uploader

Enter ERP User ID & Password in Log-in Form

Enter Plant_Fecility_ID : for example : 105H

(Note: Active shift not to be entered here. Active shift will be displayed by system
automatically)

If not selected, Select the “Upload Excel Template Option” radio button

Click on “Choose File”button and select the Excel Template where log data is
saved.
Click on “P02-FETCH TEMPLATE DATA” button

This will display the template data in the same screen which can be viewed before
uploading.

Click P03-UPLOAD TEMPLATE DATA

Click UPLOAD TEMPLATE DATA and wait for the response. The Upload Status will be
displayed In the last column of every parameter row as shown in the following
sceenshot.

Note : In case, “Object Reference…” or similar type error occurs during upload,
please close the “DigiLog Uploader” and login again from “Quick Link” and then
retry to upload excel template.

----------------

Das könnte Ihnen auch gefallen