Sie sind auf Seite 1von 60

MAINTENANCE 3-MONTH INSPECTION 3

Contents

Conlenls
Page

General Information 5
Scope 01 Oocument 5
Purpose of Inspeclion 5
Prerequisites 5
Safety Precautions 7
Instructions 10
Mechanical Portion Setvp 10
CleaninliElectrical COI'Inection Tightness Checks 10
Electrica\ Portion Setup 18
Eleclrical Checks 18
Spare Parts Kit Inventory 21
Wrap-up 21
Oiscrepancy log 21
Completion 21
Checklist 22

Siemen$ MedicaI Syslems, Inc . , 9 44 326 SOO3V Convenlional MEVATRON


Oncology Cara Sy$lems RIY. B 10195 Sy. tem
6 MAINTENANCE 3-MONTH INSPECTION
Generallnformation

Requlred TUI Equipm ent Basie service 1001 klt


CaJibrated ociHoscope
50 or 60 foa! BNC cable (1)
Calibrated Fluke or equivalent dgital mltimeter (OMM)
Cs libraleó hlgh voltage probe
Calibrated water conductivity meter
l ock-outltag-out kil
Grease guo
Rubber gloves (4)
Vacuum deaner
Cleaning solution (409 glass & saface cleaner)
2 rolls of paper towt!ls
lint-free cloth (6)
Cortoo swabs (20)
Antistatic mal and wrist strap
AppliC<lble machine schernaties
Applicable adjustmenVcalibratlon Instructions
Appr.cable Teknotes
PMl lubricant kit, part number 86 75 033

Requlted Parts
SMS-OCS
Item Oesgiotion part N umber

Filler, air, 16)C 16 x 1 in. 2893345 3


Battery, Ni·Cad 77 05 437 3
Checldist. 3·month inspection 1944326 1

Siemens Medicai S)'$tems. lne. 1944 326 ,SIKI1U Conv.ntlon.l MEVATRON


OI\cology Cat. Systams 1DII5 S)'$t.m
MAINTENANCE 3-MONTH INSPECTION 7 .
Generallr;lformation

SAFETY PRECAUTlONS
Radiallon Haurd ih WARNING: RADIATlON HAZARO
Potentlal ra dlaUon exposure to saNlca per$onnel may oceur If lhe
doer Intertocks lall.

&. CAUTION: RADIAll0N HAZARO


A d lteel monltorlng devlce. sueh.s a chlrper,ls recommended to
Ind lcate radlation .

.& CAUTlON: RADlATlON HAZARD


Dark current eltposure can aceur l o serviu perlDnnel durin; RF Of
AFC Iroubleshooting wllh lhe Af on. Use, direct monltorlng devlce
to 81el1 lervlce personnel lhal radlatlon 15 oçcurrlng.

When operating ai hl9h power leveis, lhe klystron, Ihyratron, and lelroc:M
regulator can produce X rays, aven with lhe Ifljeclor and electron guri
disabled.

When lesting lhe microwave (AF) system ai high power levais. aari(
currenl can be generalad in lh e eccelerating waveguTda, aven if lhe
electron gun e.nd irljeelor are nol operating. "it becomes neeessary to
havo pef$()tlnel in the ecceleralor rcom wllh RF power In lhe wavegu.o. ••
Is done lor observing hlgh voItage arcing, modulalor testing, ate., II i5
Importan! lha! lhe l ollowing preeautions be taken to prevllllt radiation
exposure.

• Bypassing 01 Inlerlocks should 'oe aulhorized by lhe unil radialion


safety offieer as speçi!iad by lha Nalionallnstitute 01 Slandards Ind
TechnoIogy (NIST). Tha rac!iation safety officer should be nolilied
wh en lhe preventive mainlenanee or serviee is to be perlormed. The
riOdiation safely Otfl«!f need nol be presenl duting service, but shoul d
be nolified when overriding 01interlocks beçomes necessary. The
reason l or inlerlock bypass should be givan lo tnal pG($()fI. 11 lhis
per$Ol1ls not avallabte, then lhe physleist andlor departmenl head
should be nolified.

• Note lhe l ollowing inl ormalion on lhe applicable service fe~rt:

1. Time e.nd date of tha interlock bypass Installatior'l

2. Aeasoo l or lhe Interlock bypass

3. Time and dale 01 removal 01 lhe Ir\lerlock bypas$

Sóemet\$ Medicai Syslems. Inc.


Oocology Care Systems
1'«326S003U
flav. B ..
,, Conventiolllll MEVATRON
S,.tem
8 MAINTENANCE 3-MONTH INSPECTION
Generallnformation

• II som8Oll8 in the departrnent is !lvailable, ask hlm ar heI to slop in lhe


100m ai varlous Il"Ilervals to ensura yoo r safety. 11 no one Is available,
ask security l o stop in lhe roem ai various irltervals l o enSU fe your
salety.

• Obtaln a calibraled survey meter il possible. A/ways waar a ,adiatiao


lilm badg8. Obtaln a chlrpe r paIsana! doslmeter il a calib rated surve y
meler is nOI available.

• When enlering lhe aocelere tor room , make SUfa lhe Jaw$ are cIosed
ali lhe way, and survey lhe machine, continuous1y monilorirlg lhe
radialion leveI wh~e lha machine is operaling (high voItage oondition).
11 lhe radiation levei ex ceeds 50 mradlhr (0.05 eGylhr), leave lt1e
accelerator room immedialely.

Actlvatloll Warnlng ih WARNING: RADIATlON HAZARO


RadlaUon .cUv.ted componenla (e.g. l arg el s) can be present. Th.
hospital and local q ualified radlaUon experts must determine when 11 ..
sale t o h anclle .ny acUval ed componenl • •

Opelltion 01 lhe accelerator ai or above 10 MV will activale belmlin.


componenls to varying degrees. Obtain a calibfated survey melei belQt I
working in lhe dofining head area. Plan actions to mlnimlza e~posurl la wII
100 olhers. The targel can remain aclive for days. Use lhe provided \.11'941'
cask IOf sloong a largai lha! Is coaIlng. Arran" a l ar lha cask 10 be kapllfl '
radium va u" if pD$sibla.

Vulnerablllty 01 Dual Wh(ln lhe dual pholon head is puOed OI replaced, it should firSI be
Ph oton Head positioned In lhe X·ray Lo moda. This aClion minimizes lhe ris k of damage
lo l he head.

Definlng Head DO NOT remove.01 head usemb~es OI lead without install!n" lhe ganlry
Maln tenance anti·rotalional pin o Damage l o equlpmerlt and !)perator can "sull 110m
attempling 10 rotale or work wilh an unbalanced ganiry.

Static Sensltive Oevk:es Observe ESQ precaulioos ai lU times. Use an extended groundstrap
Whenever possible l o provide adequale mobility. Use oIlhl exlended
groundsltap keaps you 110m hlvir,g lo constantly co/meti and discoonect
lha strap, wh ich wi lllead to l orgatting lhe groond strap. Any PCBs that are
removed must be pla ced on a properly grOundad antistatic mal. Do no! use
ESC equipment whlle working on OI near high vollage.

Siemens MedK:al Syslems, lne.


Oneology car. SystelTl$
1944326,5003U
Rev. B .
, ,
ConvenUonat MEVATRON
5yllem
10 MAINTENANCE 3-MONTH INSPECTION
Instructions

INSTRUCTIONS

1.0 Mechai'l!cal Portlon Salup


1. Prepare lhe table lor cleaninglinspeclion.
• Remove treatment labIa exterior cevers.
• Raise labIa to isocenter and rolate lhe labIa column to 90",
2. Prepare lhe machine for clearlirl!Yinspeçtion.
•Remove lhe protraclor, anel ODl covem.
3. Remove power Itom lhe MEVATRON.
• Tum righl-hand contrai console keyswitch to lhe of! pasitioo.
• Tum centro! roam breakar oH•

.& CAUTiON: ELECTR1CAL HAZARO


An Isoration transformer may be InstaJled. lf power remalns on after l he control room
breaker Is oH, lnstall lock-outlla51-out devlce 1\ neX! disconnect or dlstrlbutlon pane!
beforl lhe transformer.

4. Replael back cova r air fillers (S MS -OCS P/N 26 93 345 qly 4).

2.0 CleanlngfElectrlc.1 Connectlon Ti!ijhlnen Checks

2.1 M MocIulatof Assembly


1. Opan laft side modulator pal"lel.
2. Remove Iighl5ide modulalor cove. plale.
3. Check hookstick g.ound conneclions for liglllness.
4. Using hookslick, discharge lhe PFN end luva 11grounding lhe PFN.
5. Verify Ihallhe cu.renl PFN taps are clearly malked.
6. VaCt.lum dusl Irom assembly.
7. Using clean ing soIution and paper towels. clean ALL modula tor sections. (Spray solution
on papar towef ONL Y.)
8. ChecJt ALL electr.cal connections, Including ground connections. fo r tightne ss.
9. Vlsually Inspect a~ areas lor any signs 01 arcing OI' carbon build·up.
tO. Visually inspe<:t PFN capacitor for oi! leaks.
1 t . Remove hookstick and place in ils holder.

1944 326.S003U ConvenlJonsl MEVATRON


Slemens Medicar SY$lems. Inc.
Oncology C.re SY$lems Rev. e ,,,.,, Syslem
MAINTENANCE 3-MONTH INSPECTlON 11
Instructions

2.2 S7lens Coil Power Supply


,. Vacuum dust Irom power supply.
2. Check ALL e!edrical eonnectioos, i ncluding ground coonections, lor lighlness.

2.3 S7PSt Magl1etron FiLamon! Power Sopply


1. Vacuum dus! Irom power supply.
2. Check ALl electrical coMections, incloong ground connections, lor lightness.

2.4 55 Steering Coit Power Supply


I. Vacuum dU$t from chassis.
2. Cheek ALL electrical connections, incllJÓing grOllnd conneClions, for tightn.ess.

2.5 SlO(M)lS\8(K) Bending Magnat, Mag Fil, Lens Program Assemb/y


1. Openpanelassembly.
2. Vacuum dUl.I from chassis.
3. Check ALL electrical eonnections, including ground conn8C1ions, lor tightness.

2.6 $2 Rotalion Orive Contro!


,. Open panel assembly.
2. Vacuum dus! from chassis .
3. Check ALL eleclrical eonneCliOl'l$, including ground coonections, l or lighlness.
4. VisuaUy inspecl 82·)(3 cootactor (gant:y rolalioo) lor pittil\~exce$Sive we ar. Orde r
coolaclor (S MS·QCS PIN 30 32 158) if necessary, anel schedure replacemenl.
.
2.7 53 Interlock Panel Assembly
,. Open panel assembly.
2. Vacuum dus! l rom panel assembly.
3. Check ALL electric.al conn.ections, induding ground conneclioos, lor lighlnass.

2.6 522lntelconnecl Pa nel Assembly


,. Vacuum dusl l rom assembly.
2. Check ALL electrical connections. in cluding ground connectioos , lor lightnass.

2.9 5 14 Gantry Rotation Oriva Assembly


1. Using deaning solution anel paper towals. claan ali al aas 01 assembly.
2. Cl1eck ALL electrlcal connec~on s, includ ing ground connectioos, for tightness.
3. Visually inspect gantry ge8rbo~ l or 8ny signs of oil leaks.
4 . Check gearbox oU leveI.
5. Check driva chaln tension.
6. Clean and lubticate chein.

Siemens Metal Syseems. Inc. " 44 325 s003U Convtntion.al MEVATAON


OncoIogy Care SysteJ!\$ Aev. B 10195 System
12 MAINTENANCE 3·MONTH INSPECTION
InstrucUons

2.10 51 Power Oislnbution Penei Assembly


,. Open breaker, SI, and CBI panel assemblles.
2. VacU\Jm dusl Irom chassis.
3. Check AlL electricaJ conneclions, iocluding grouod COMoclions, fOf tlghtness.
4. Visually inspect ali con!actors l or piningle xcessive weer.l! nece ssary, order
replacement(s) and schedule ropa!r.
5. Reinstall CBI breakar panel assembly.

2.11 527 Steeril'l9 Coil Reversal Assemblv


,. Externally vacuum dust from as sembly.
2. Chedc AlL eledrical connections, includinlillilround connectioos, lor tightness.

2.12 513 Electromagnel Powor Supp/y


,. Vacuum dust Irom pol'l8r supply and cooling fan.
2. Check ALl electrical conooclioos, induding ground connections, fOI' tighllloSS.

2.13 56 Bending Magrlet Dower Supply


1. VaCtJum dust from power supply. induding cooHng fan.
2. Check AlL electricaT connec tions, irlc1udin!il9found coonecllons. IOf ligtltness.

2.14 59 Card Caga Assembly


t. Open panel assambly.
2. Vacuum dust Irom aS5embly.
3. Cheek All eleClrical c:oonectioos, including ground comedioos. lor tighltlass.

2.15 S 4 Au)(iliary Con trol Panal


1. Opan panel assembly.
2. Vacuum dust Irom a5sembly.
3. Chaek ALL electrical c:oonections. incIuding ground connections. lor Iightr1ess.

2.16 S8 Auxmary Power Supp/y CMssis


I. Open panel a55embly.
2. Vacuum dusl Irom a5sembly.
3. Cheek ALL e1eelrica1 cooneelions. including ground c:oonections, for tlghtness.

2.17 S26 5teering CoiI Power Supply


1. Vacwm dust Irom power supplV.
2. Check All eleetrical cOMoctions. including ground connections. IOf lightnass.

Slemens Medicat SYSlems,lnc. 19 « 326 SOO3U


fi..,. 8 ,..., COIlvenUonal MEVATROH
Syl\lm
MAINTENANCE 3-MONTH INSPECTION 13
Instructions

2.18 SI 5 Miscellaneoos Interlocks anel Gani!)' Shaft Encoder


1. Vacuum dust Irom assembly.
2. Visually inspecl steel cable for si9ns of fa~gve or Irayiog. Qrder cabia (SMS·OCS PIN
79,10250,20 ft) II natessal)', and Ichedule replacement
3. Visually Inspect sector switch l or physical damage.

2.19 K5 Solenoid Power Supplles


1. Vacuum dust lrom power supplies anel cooIing laos.
2. Check ALL eleetrieal cOMectlons, lncluding 9rooOO cormections, for ~gh!neS$.

2.20 K4 PfNlModulator Assembly


1. Check hookstick groond connections fOf IightneS$.
2. Using lhe hookstick, ensure lha! ali assemb~es are dis.charged. laa"'8 lhe
hookslick 0t'I lhe PFN.
3. Verity lhe shorting $witch bar is conlaCling boIh tenninals of CI .
4. Remove and clean alr fille rs. Replace II dirt carmo! be removed.
{Fillers can be ardere<! from KooItronicS, 609-466·3400 (part '8751F))
5. Ensure Ihal cumml PFN l ap posiUons are clearly marked.
6. Vacuum dusl ltom assemb/y.
7. Removo lelrode I rom tetrode deck and clean ~nt oul 01 cooIing fins.
6. Using clealling sottllLon and paper toWels, dean an areas of lhe modulator.
9. Check ALL elo ctrical connecliorls, Inçluding ground cormectlons, l or lighlness.
10. VlsuaUy Inspecl ali àreas l or signs 0/ arcing/flashover.
t t. Visually Inspect PFN capacitor assembly lor o il leaks.
12. Relnslall ait" fill ors.
13. Remove lhe hooksticloi and placa il in i\5 hotder.

2.21 Kl Power OistribuliOn


,. Vacuum dust from assambly.
2. Check ALl electricaJ eonnecliOns, lncIuding ground connections, for tightness.
3. Visually mspect conlaclors l or excessive wearlp ltting 01 contacl$.

2.22 K4-Tl High Volta9&: Transformer Assembly


,. Swing down Kl p ane! assembly lo gain aecess lo high voltaga transformer.
2. VaC\Jum dustlrom assembly.
3. Using cleaning solulion and paper lowels, clean al\ areas of lhe assembty.
4. Check ALL e!ectrical COMeetionS, including ground connections, l or tightneu.

2.23 K9 Klyslron Filamenl Power Supply


1. VaC\Jum dusllrom power supply and <:OOIlng lan.

Siemens Medicai Systems. lnc.


Oncology Care Sy$tem$
1944 32fi SOOJU
A,v. B ..
,, Con .... ntionll MEVATRON
Sy.t.m
14 MAINTENANCE 3-MONTH INSPECTION
Instructions

2. Check AlL elecltical oonnections, Including ground connections, lor lighlnoss.

2.24 K2 Auxiliary ' nlelloel< Chassis Assembly


1. Sllde K2 Chassis Assembly OUI to galn aecess lo ali are as.
2. Remove bonom covor 01 assombly, end bypass l he cover iolerlock switch.
3. Vacuum dust Irom ossembly.
4. Check ALL electrical connections, including ground cooM!ctions, IOf tighlness.
5. Ensure ALl PC boards aro seated properly (il epplicable).

2.25 K7 AF Oriver Assembly


1. SIicIe K7 chassis assembly oul lo gain lecess lo ali ereas.
2. Remove bonam chassis cover, bypass cever inlerlock switch.
3. Vacuurn dustlrom assembly.
4. Chei;k AlL elec1rical conoections, iocll.lding ground coMections. IOf tililhllless.
5. Cheek RF cavity lurJr'lg belts lor cracklngloxcessive wear (ti applicable).

2.26 Kl0 Klystron Area Assemblies


1. Vacuum dus\ !rom 8ssemblio$.
2. Uslng cleaning solulion and paper 10werS, crean an areas of Ihis section.
3. Ctieck ALL eteelricar connections, indooing glOund conneetloos, for tighlness.
4. Inspe:cI po/y·flo cooIinglines for aglng, eracks, etc. $ehedule repraeement 1I neeessary.
5. Inspeel klystron water gaskel for cracks, dry-rotting, etc. Order new gasket 11 cfilcked
(SMS·OCS PIN 56 87 553) and schedule replacement
6. Remove partidas adhering lo lhe Ion pump magne\.
7. Verily mechanical cenlering 01lhe ion pump maíjf1el assembly wilh ralarance lo lhe ion
pump.

2 .27 K6 Solenold Assembly


1. Vacu um (lust Irem assembly.
2. Ctieck All electrical oonnections, Including ground connections, lar Ughtness.
3. Inspeel poty-110 tubing for signs of water leaks, aging, cracks, ele. Schedule replacement
il necessary.

2.28 K8 Pulse Transformer Assembty


1. Vacuum dust Irom assembly.
2. Uslng cleaning $OIution and paper towals, clean ali areal 01 lhe IIssembly.
3. Check ALl electrlcal connecticns, Including ground conneetions, la r tightness.
4. Check oil level.
5. Check for oil leaks arOllnd gaskets, elc.

Slemens Medicai SY$lems, Inc. 19« 326. SOO3U Con~ntlonal MEVATRON


DrIcoIoov Cara Syslems , ." Syslem
MAINTENANCE 3-MONTH INSPECTION 15
Instructions

6. Visually inspect pulse tank oil lor impurilies (Le., such 8$ waler, carbon palhs, etc.)
through lron! view window.

2.29 C l Control Console


1. AemOveCOO$Oletop~r.
2. Tum control console 01'1 ils side.
3. Remove bottom cover.
4. Vacuum dustlrom console.
5. Remove excIss dos! Irom cooIing lan.
6. Relnstall bottom cover.
7. Tum console back lo its original position.
8. Replace Ihre8 Ni·Cad banenes (SMS OCS P/N 71 05 (37) on CCPCI (S MS OCS PIN 56
6331S).
9. Ensure ali PC8s are lully Inserted.
10. Check All electrical coMed ions, Including ground conne<:tions, for ~ghtness.

2.30 Tteatment Tablas


A. ZIV Treatmenl Tabla
• RemoVil lable Il001 pil cove r.
• Remove cover from El l abia power supply assembly.
• Vac\JUm dustlrom power supply 8uombly.
• Check ALL electrlcal connections, including ground cormeclions, for tightness.
• Reinstan Et power $Upply cover.
• Vacuum dust Irom ali areas 01 the tabletop .
• lnspeet ali hand paddle hinge components lor physical damage. Order
replacement parts as necessary (see figure I 10r part numbers). and schec1ule
replacement.
o Clean mechanical height scale.
• Apply a small amounl olLPS- l lo a lint-free cJolh and lubricale lhe scale.
o Vacuum dust lrom bollom of lable.
• Wipe oH an
used grease Irem vertical Uft wl)m1SCrew shaft
• Apply grease (SM$-OC$ PIN 34 73 267) to wormscrew usiflg grease gun.
• Inspect vertical lift belts for c rackinglexcessive W9ar.
• Inspect vertical brake strap pad for excesslve wear.
• Vac\JUm tlusl Irom labia 11001' piL
• Check ALL electrical cOnnections. including ground comections, lor IIghtness.
• Inspeet isoc:enter rOla tioo (z axis) brake assembly lor excessive wea r and/or
physlcal damage.
o Inslall lable lIoor pit cover.

Sfe mens MedicaI Sy5lems. Inc. 19 44 326 s003U Con ....nllonal MEVATRON
o. K:OIogy Care Syslems Rev.B 1MS System
16 MAINTENANCE 3-MONTH INSPECTION
Instructions

-
3517D

Figure 1. ZlV Trntmerll T.ble H.nd Pa<ldle P.rt Numberl

Slemens Medieal Sy,tem" Inc. 1944 32fi sorou ConnnUona. MEVATRON


On<:oIogy Care Systems Rlv. B 11l/9S 5yltlm
MAINTENANCE 3-MONTH INSPECTION 17
Instru ctions

B. ZXT Treatment labia


• Remove lable fIoor pit covar.
• Vacuum excass dust Irom ali areas of lhe tabletop.
• Check remota hand conIn:>! eonnections.
• Inspect vt!r1ical height sleal cabia IOf physical damage/wear.
• Verify thal lhe steel cable bearing I$sembly rotates freely .
• Check vertical electriCal connections.
• Grease lhe Zer!< fittlngs on lhe vertical lift assembly.
• Inspeel ai hydraulic valvas fOf OIl lealcs.
• Vacuum dus\ Irom lable Iloor pit.
o Chad< ALL electrical connections,lncluding ground connecUons, fOf Ughtl'\ess.
• Inspect hydrau~c reservoir and pump lor 0I1leaks.
• Install lable II00r pit cever.

C. ZUTreatmen t labia
• Remove labia fIoor pi! covar.
• VacllUrn excess dus\ Irom ali areas 01 lhe lablelQ9.
• Chock transversa and longltudirlal irea floal connections. Inspecl for cabia
damage. OI' 8JfCess strain on cabia.
• Remove column covers.
• Vacuult, dus! Irom c:olumn assembly.
o Remove ell.cess grease rrom bearings anel ,ans.
• Inspecl bearing rails for excessive wear, damage, elc.
o Check lor excessive sag in lablelop ( lablelop rocks back anel lorth or side lo
side). Schedule replacement II necessary.
o Lubricate bearings afld raits.
o Check vertical safety chain lor damage, etc.
o Chock ALL Cllaelrieal eonneclions. Inclvding ground connections, l or lightnoss.
o Check vertical lift chain l or any damage, etc.
o Va cuum dus! Irom lable 11 00r pil.
• Check All electrical connections, Including grounel connections, lor tighlness.
o Install labia lloor pit caver.

,...,
Siemel"l$ MedicaI Sys!ems. Inc. 111 44 326 SOO3U Convt rlllonal MEVATRO N
Oncology cara System, Sytlem
18 MAINTENANCE 3-MONTH INSPECTlON
Instructions

3.0 Electrlcal Partlon Selup


1. Bypass any open chassis In!erlock $witches requlred for VQltage measurements.

&CAUTION: ElECTRICAl SHOCK


Chassis Interlock swltches are bypassed. Use extreme cautlon when worklng around
hlgh voltag. assembUel.

2. Tum control room breakar 011.


3. Check operatiorl 01 AlL emergency oH and shun! Irip push bullons (pIb).
• Press lhe yellow rasei pib on lhe SI panel. lhe bunOn should illuminale.
• Press lhe rigtll strueture door panel emer!;lElncy olt pIb. lhe $ 1 yenow resel pIb
should go oul.
o Pross lhe yellow resel pIb 01'1 lhe SI panel. lhe bunan should IlIumlnata.
• Press lhe laft struetur. doar panel emergency oH pIb. lhe SI yenow fasel p/b
should go oul.
o Press lhe yellow resel pIb 01'1 lhe SI panel. The bvttOll should IIh,lminate.
• Prass lhe room emergency oH pIb. The SI yellow raseI pIb should go OVI.
• 1I a shunt trip circui! breaker Is used, resel!he circult breaker.
• Press lhe yel\Ow resel pIb on lhe 5 1 panel. The bunan should inurnina!e.
• Pre ss lhe conlt~ area emergency oH p/b. The SI yellow re sel pIb should go OA
• Jf a shunl lrip tircuil breaker is used, resellhe ti rcui! breaker.
• Press lhe yellow resel pIb on lhe SI pane!. The bvtton 5hould ~Iuminale .
• Repeat Ihls test for ali emergency oH push bunons.
4. Tum lhe MEVATRON on.

4.0 EleelrlcaJ Checks

4.1 M Modulator Assembly


1. Connect DVM dlleetfy lo magnetron filamenl C
· to cathode).
2. Check lhe magnetrofl filament voltage in slandby and cutback.
• Adjustmenlsare made on tha 5 101518 pes. Sei values l o:

Magnelron Type Slandby Cutback


M5193 8 .5V 4V
MS34 9 14 V 7V

Siemens Med"ocal Syslems, Inc.


Oncoloav C<lre SYSlems
1944 326 SOO3U
R'v. B .
, , conftnlional MEVATRON
MAINTENANCE 3-MONTH INSPECTION 19
Instruclions

4.2 S7 lens Cail Power Supply


1. Verify powar supply is In voltage regulation mode.
2. Verify powar supply cooIing lan 1$ working properly, II applicable.

4.3 S7P$t Magnetron Filament Power Supply


,. Verify power supply 1$ In current regulation moda.
2. Verily powar $Upply cooIing lan 1$ wornng properly. il applicable.
4.4 $ IQ(M)/S 18(K) Ber"ldir"lg Magnat, Mag FiI, Ler"ls Program Assembly
1. Verity culback operaliOn lor magnelron lilamenl power supply.
2. Verify lens coil power t Upp!)' turns 0/1 when lhe pu5h butlon S t OPC21$ pressed.

4.5 $13 Eleetromagnet Power Supply


1. Verify power supply 15 In currenl regulation rl'IOde.
2. Verity power 5upply coeling l an 1$ working properly, II applicable.

4.6 56 Bending Magnel Power Supply


1. Verity power supp!)' 15 In currerlt regulation mode.
2. Verity power ' vpply c:ooI1n9 lan Is working properly, II applicabte .

4.7 5 12 Pump stand Assembty


1. Check All water COfloections lor leaks.
2. Check tI1e wate r IIow through the deionizer cartrldg.e.
3. Record pump pressuro on the para meter sheet.
4. Check lhat tI1e wa ler temperature Is al l04' F (40' C) after approximately 15 minutes.
• Reeord temperature alter warm-up on parameter $heet.
5. Check the water conductivity, anel record values In lhe checld ist.

4.8 K5 SoIenoid Power Supproe$


1. Verity thal ALl powar $upplies are in current regullltion mede.
2. Verity operation of cooling fans, if appbble.

4.9 K9 Klystron Filamont Power Supply


1. Verity lha! power supply is ., current regulation modo.
2. Verily operation 01 cooling lan, 11 applicable.

Siemens Medicai Syslems. IrII:. 1\1 &4 326 SOO3U ConvenUonal MEVATRO!.l
Oncology caro Systems R,v.e ",.." Sy.t.m
20 MAINTENANCE 3-MONTH INSPECTION
Instructions

4.10 K7 RF Driver Assembly


• lhe followirlQ steps require a crystal detector, and a 5().ohm Ioad. Measuremenl s
era made ai lhe fronl panel of lhe RF driver with lhe driver in internai triggering.
1. Me?-sure RF drlver oulput pulse wldlh. Adjust l a 7 ~S Ii necesse!)'.
2. Meesure RF driver oolpvl pulse repetilion rate. Adjusllo 7 nulfisecoods Ii necessary.

4.11 Cl Corllrol Console


I. lIerify cooling lan ope ration.
2. Check operalion 01 ALL energias and oplional cIose rale modas. A~$I applicable
paramelers as required to obrain slabla operalion.
3. Measure lhe gun filamen! vol!a ge ar'ld record on lhe parameler sneat.
• 11 gun Illamenl voltage is difterenl lrom latesl paramoler sheet, li. Schonky plol wil!
need to be scheduled as soon as possible.
4. Complete a paramaler shea! for ali energias and optional dose rate modas.
5. Walching lhe dose ralo meler, press lha X-ray push button. Noto noedla deflection.
6. Repea! slep 410r eleClron mode. 1/ excessive needla deflection In one or both modas is
I ncountered, schedule zlrOing ortsets wilh phys!cist.

4 .12 Treatment Tables


A. ZIV Treatment Tabla
• Verify mechanical vertical neight scale indicalor calibfatioo aI isoc:enler. Schedule
serviee il adjustm ent is required .
• Chlek Al l lunelions II I Al L hanel paddles.
• Verify lhal when lhe emerçency hand erank is Inslalled, lhe mlltorized vertlcal lift
is. disabted. ImmedialeJy repair iI necessary.
• Verify lunction Oi emergeflC)' remote handconlrot.
• Verify operation 01 green lable Iock push txrtton.
• Verily motion stop operation.
o Verlty funetion 01 513, and lho uppar and lower limit cafety switehes.
o Aeinstal1 anel clean lhe c:overs .

B. ZXTTreatmenlTabla
• Verify lha! All Oisplays ini tializa ai the inilialization points, or schadule re pair.
o Verify vertical heighl calibratlon aI isocenter, OI' schedule adjustment.
• Cheek ALl l unctions 01 lhe two remote handCOnlrols.
• Verify lripping 01 lhe mOlion deleetion Inlerlock circuit when lhe lable Is m oved and
mllliOo is nol enabled.
o Cheek l unction 01 lhe emerger.cy slop/reset push button.

Siemens Me<:fOC<'lI Sy$teln$. fne. 1i44326 .S003U Convenllolllll MEVATRON


Onoolog)' Care Syuems Rev. B ' 0.." System
MAINTENANCE 3-MONTH INSPECTION 21
Instructions

C. ZU Treatment Tabla
• Verify vertical mechanical heigot indicatOt calibra~on ai isocenl er. Schedule
adjustme nl lf required.
• Verify proper lunctiorl 01 ali $witches and brakes.

5.0 Spare Parts Klt Invenlory


1. Inventory $pare paiU kit stock a ~alnst ris! for completeMU. Order any pa rts nOI found in
kit. Record parts mi ssing Irom kit In lhe table proWled.

'.0 Wrap-up ..
1. Cr ese anel reinstall ali chassis covars.
2. ReinstaJl anel dean ali machine cavem.
3. Program and run ALL energias to ve rify luoction bolOfe Ireatments re Stlme.

7.0 Dlscreptlnc:y Log


1. Log any discrepancies faund, In lhe lable provided In lhe checkli st.
• Indicate whether lhe disaepaocy is c:orrected ar nol
• 11 service 15 to be scheduled, Qp(!n an incidenl number IOf aR01 lhe di$(:repancies
(~ded "discrepancies l oond durlng PM").

8.0 Completlon
I. Complete lhe Inspection completion ce rtilicate (Ias! paga 01 lhe theckJisl).
2. Send lhe certilicale lo your area manager.

Siemerl$ Medicai Syslems, Inc. 1a 44 326.S00JU Conv.nUona l MEVATRON


Oncology Cara Systems R.v. B ,." Syslem
22 MAINTENANCE 3-MONTH INSPECTION '
Checkllst

CHECKLlST

1.0 Mecha nlcel Portion Setup


Inslalllock-outltag-out device and lock. Inilial, dale ar'ld lill in lhe time tl1e lock-out
device Is installed. 1I mole lhan ano pe rson will be working 00 lhe equlpment, then each
additional worker &hal! install hislher Iock.

• Initlals: Oale: Time:


• Inllials: Dale: Tim e:
• Imllals: Dale: Trne:

2.0 Cl eanlng/Electrlcal Connection TI ghtness Cnecks

2.1 Clean/inspeel lhe modularol assembty M Class N/A O


Inltl'll o.t. complot od

2.2 CleaMllspect lhe S1lens roir power supply


0.1. çompllted

2.3 Cleal'.lit1spect lha S7PS t magnetron litam enl powar supply M Class N/A O
Inll1.1. D.t. c omploto"

2.4 Cleanlinspe<:t lhe 55 slearing coil power supply N/A O

2.5 Cleanlinspect lhe SIO(MYSI8(K) bending magoei, mag fil,lens PfOgram~.~,~,,~m~b~'~'~~=~~


["1\1.1. O.te compro,. 1I

2.6 CleanfLrlspect the 52 rotation drive cootrol

Siemens Medica! Syslems. tnc. 19« 326 sorou Conventlonat MEVATRON


Rev. B Sy51. m
Oncolopy cale Syslems
"""
MAINTENANCE 3-MONTH INSPECTION 23 .-
Checklist

2.7 Clearvínspect lhe 53 intal10ck panel 8ssombly


1· . .u.I. I o.t, ÇO"f!.ted I
2.8 Clearvínspect lhe 522 iterconl'\E!CI panel assembly
!1nru.11 IO'IH~tedl

2.' Claanlinspecl lhe 5 14 gantry rotation d rive assembly

1
1n1t lS
1.l ID.t. C~~!

2.10 ClesrVlI'I$ped lhe SI power distribution panel 8$$emb/y


ItnUlal. I Olt. ccmp'tl-.ll
2.11 Clean/inspecl lhe 527 sle1lling rol reversal essembly K Class N/AO
]InIUIII 10 1'1 compltl.d I

2.12 Cleanlinspecl lhe 513 ek! ctromagne t power supply M"'~ '. -N/A O
Inlll. 1. 0111 compll'td

2.13 Clearvinsped lhe 56 bendi nç magne! powar supply


111111.11 D,t. compltttd

2.14 Cleanlinspect l he 59 card caga assembly


1n!tl.I. D,t, complfllld

2.15 ClearVinspect lhe 54 auxiliary contrai panel


Inltltla Olt, ÇOmpleled

2.16 Cleanflnspect lhe 58 auxiliary power $l.IPply chassis

5iemeru; Mexa' Syslems. lne. 1t 44 326 spo3U Con~nllonal MEVATRON


OIocology ca ... Systems R.v. e 1MlS Spt.."
24 MAINTENANCE 3-MONTH INSPECTION '
Checklist

2.17 Cleanlinspecllhe S2B steering ceU power supply M Class N/AO

2.18 Cleanlinspect lhe 515 miscellaneous inlerlocks and gantry shaft encoder
11II11I.r. Io.,. e llmp!oll'd I
2.19 Cl eanlinspect the K5 soIenoid powar supplies K Class N/AO
11'\111.1. D.'. complett<l

2.20 Cleanfll'lspect lhe K4 PFN/modulator assemtlly K Class N/AO


11nft'-1oo Io.t. c:omplotlOd I
2.21 Cleanlinspect lhe Kl powar distribution K elass N/AO
Inlll.l. O.t. compl.t."

2.22 Clean/inspect lhe K4-T l hlgh voltage translormer assembly KCla ss N/AO
1"'ltI~. IDel. ço ....... 'K I
2.23 Cleanlinspecllhe K9 kJys l ron fdament power supply K Class N/AO
1nlll.I. 0.1. compl. t. "

2.24 Cleanlinspecl lhe K2 auxi li ary Interlock chassis assembly K Class N/AO
Ilnlll... IDat. co ....... '-4 I
2.25 Cleanflflspoct lhe K7 RF driver assemb/y KClass N/AO
Inlll.l. o.,. compl.t."

2.26 ClearVlnspect lhe Kl0 klystron area assemblies K Clas$ N/AO


[INII.I. I
o.t.I «Mnp~ted I

Siemens Medicai Syslems, Inc. 19 44 32$ SOO3U CO"Yltn ljo~1 MEVATROH


~v r ... ", !':v ~ t&m!; R,v, B 10/95 Syllem
MAINTENANCE 3-MONTH INSPECTION
Checklist

2.27 CleaMnspect lhe K6 soIenoid usembly KClass NrÁO

2.28 Cle arJinspect lhe K8 pulse Iral'lSlormar essembly


10111.1, 0 111 complel. d

2.29 Cl eanlinspect lhe control console


I Lnlllal, I
Dal, tOmptoled I
2 .30 Cte anflllSjlect lhe lreatmenl table
IlnlU'1I I
tult compll~ I
3.' Elecl rfea l PartioM Setup
Remove lock-oulllag-oul device. Initial, date and fi Uin lhe time tI'Ie Iock-out device Is
remove d. II more lhan 008 person had InSlallod hisfner lock., thor'l lhe Ioc:k(s) mus! be
remc;wed lirs!.

Time rem oved:


InmaIS::,=== Date:
IniUals:
Inilials:
Doi":=::=:
Dale:
T ime removed :
Time removed:

4 .' Electrlcal Checks

4 .1 Tes! lhe M modulatOl essembly M "'M N/Á O


InlU,," o. t. compl.,.d

4.2 Tes! lhe 57 lens coil power supply


1101111011 I
Dat. COIT4'leted I
4.3 Tesl lhe S7PSt magnetron Illamenl power supply M elass O
I
N/Á

111'1111101' Dal, CO"",lel'" t

Siemens Mexal Syslems. Inc, 1t 44326 SD03U Co nvlnlional MEVATRO N


OoooIogy Clre Syslems Rev. B 1C119S Sysllm
26 MAINTENANCE 3·MONTH INSPECTION
Checklisl

4.4 Tas! lhe SI0(M)lS I 8(K) bending magoeI, ma9lil, tens program a$sembIQ'~~1~~~~~
Lnltl.," 0111 ç0"'l'II.ad

4.' Tes! lhe 5 13 electromagnet power wpply MC ~ss NJA O


l\niua'l , IIho'_ c~t.cl l

4.' T asl lha 56 bending magnel power supply


InUlal a DI'I completo"

4.7 Tes! lhe 5 12 pumpstand Issemb!y


• Record waler conductivlly values in lhe blanks below:
System Water; Mnrcrn~ Stored Water;

4.8 Tas! lhe K5 soIenoid powar supplies K elass


IlnlU.I. I NJA O
O,t, cornpl.1ed
I
4.' Tes! lhe K9 klystron fil amen! power supply K Class NJA O
InIU.11 0.1. completad

4.10 TestlheK7RFdrivera ssembly

4.11 Tas! lhe cootrol console


IlnItlal. IDat. complllltCl !
4.12 Tes! lhe treatment lable
11'11\1111 011. completad

$iemens Medicai Syslems, Inc.


Oncology C.Te Syslems
IS 44 326 S0G3U
Rev. B ..
, , Convention.IUEVATRON
5y.tam
MAINTENANCE 6-MONTH INSPECTION 3
Conlents

Contents
Page

General Information 5
ScOpê of Document 5
Purpose of Inspeclion 5
Prerequisites 5
Sa fety Precautions 7
Instruclions 10
Mechanical Portion Selup 10
CleaninglElectrical Conneclion Tighlness Checks 10
Electncal Portion Setup 13
E lectrical Checks 14
Wrap-up 23
Oisc repancy l og 23
Comprarion 23
Checkllst 24

Sit!men, Medicai Systems, Ir.e. 1944342S003U Convenllon.1 MEVATAON


OocoIogy C.rl Syslems Alv. A 2.195 Sy,tem
6 MAINTENANCE 6-MONTH INSPECTION
Generallnformation

Flequlred Te sl Equlpment

Basic seMel 1001 kil


Calibrated oscilloscope
50 Of 60 1001BNC cabltl <I >
Calibral ed Fluke or equivalen! digital mullimeler (OMM)
Calibraled high voltage proba
Calíbrated 'tIa ter conductivity meter
Lock-outltag-out ki!
Grease oun
Rubber gk>ves (4)
Va cuu m cleaner
Cleaning soel/tion (409 gla!>S & sunaca deansr)
2 lon, 01 papel towels
Unl-free cIoth (6)
CottOfl $wabs (20)
Anll$talic mal and wriS! strap
Applicable mactW1e schematics
Applicable acljustmenVcalibratiOn instruClions
Applicable Teknotes

Requlred Parta
SMS.QCS
rtem DesgiptTOI1 Part Number ~

Fitter,air,1 5x 15x l h 2893345 3


Pipa sealant , 7990615 1
Anode , zinc: 7982598 2
Cartridge, doionizer 56 54 S20 I
Filler, li ne mash, while B4 97 687 1
Tempera l\Jl e 58nsors 1993728 2
Lamp, 12V50W 7988991 1
EP., glease 1953632 1
lubrlcant, l PS- l A400 0 10 1
Chaek!isl, 6·month inspaction 1944 342 1

S" mens M~I Systems, Inc:. li« 342 SOO3U Convenllonal MEVATRON
Rev. A 2/95 Sy,lem
10 MAINTENANCE 6-MONTH INSPECTION
Instructions

INSTRucnONS

1.0 Mechanlcal Partlon Setup


1. Posltion lhe lable 101 lh e Inspection.
• Aaise tabla lo Isocente/, and rolate column 10 90 dagraes.
2. Prepa re machine IOf clean~nspection.
• Remove lhe prol/ador, 001, end oounterweigflllbeam$hield oovers.
• Remove prolracto!" assembly.
• Tum l acilily wat8r orf.
3. Remove power Irom lhe MEVATRON.
• Tum right-hand COf1trol console keyswltch to of!.
o Tum conlnll room breaker off.

&. CAUTION: ElECTRICAL HAZARO


An ISQlatlon transformer may be Installed. II power rema ln, 01'1 after l he control room
breaker I. otf, lnstallloek·ouVlag-out devlce ai next disconnect or distrlbutlon panel
belore lha trlns/ormer.

4. Replaca back COVIl a i, ftltels (SMS-OCS PIN 28 93 345 qty 4).

2.0 Cleanln;I'Electrlcal ConnecUon TIghtness Checks

2.1 5 12 Pumpstand Assembly


1. Vaewm dust from pumpsland assembly.
2. U sing cleaning soIutiorlend paper l owels, elean ellareas of the pumpslancl as.sembly
area.
3. Cheek ALL eleclrical eOMeelions, Ineluding ground conneellQr1s, l or tightness .
4. Change lhe zine eroodes (SMS·OCS PIN 79 82 598) In lhe heat exchange r.
5. Chanoe lhe deionizer cartrid~ (SMS·QCS PIN 56 54 520). Initial and date lhe Inslalled
cartridge.
8. Change lhe while fine mesh filler (SM5-QCS PIN 84 97 687) for the deionlzer eartridge.

2.2 Floor Drain (Under the MEVATAON)


1. Add two tupS of water InlO lhe drain lo ensu re lhe Irap does nol dry up.

Siemens Medicai Syslem.s, Ir.:. 1!i 44 342 SOO3U ConvenllONol MEVATRON


Clroc:%i) Care Sys,lems Rev. A. 2I9S Sya\em
MAINTENANCE 6-MONTH INSPECTION 11
Instructions

2.3 G1S Beamshield Assembly (il appr.cable)


1. Vacuum oUl excess dust Itom 8ssembly.
2. Uslng deanlng solution anel papel lOWels, dean aUareas cf lhe beamshield assembly.
3. C~eck AlL eratlrical confl8dions, incll.lding glound tonnectioos, lor lightness,
4. Visually Inspatl bEamshield drlve surlaces IOf excessive we ar 8l'ldlar corrosion .
5. Check lhe allen screws on lhe bearinglor ~ghtne ss.
6. Check lhe inlegrily 01 lhe beamshield mechaiVeal stop.
7. Change lhe badlpointer lamp (SMS..QCS PIN 79 88 991).
8. Uslng versilube, lubricate bearing and raHs.

2.4 G16 Counterweight Assemb/y


1. Vacuum ou! e. cess dos! Irom assembly.
2. Using çleaning solution and papel lowels, etean counterweight assembly.
3. Ch eck ali screws and bolts l ar ~ghtness .

2.5 G13 Sparll. Gap Assembly {il app/icable)


,. Vacuum ou1 e. cess dosl 110m assemb/y.
2. Vlsual1y inspect capacitors 101 signs 01 arci ng, cracks, ar earbon build·up.
3. Chee!< All elec:tlical connections. indudirog ground OOMectionS. 104' ~ ghtn ess.

2.6 G2 1nject04' Assembly


1. Va cuum oul excess dust Irom Bssembly.
2. Checll All elec:!licar connectioos . iocIudirog groond OOMeçtions. l or Ughtnes$.
3. Check lha! AlL PCB mounUng sere ...... s eOO standoffs ere not Ioose.
4. Chec:k flber optic cable for proper coonection.

2.7 G12 Pul se Transformer


1. Vacuum out excess dust!tom essemb/y.
2. Ctleó: ALL e!cctlical connections. induding ground connec1ÍONi. lor tlghtness.
3. Inspect oil line for eir inside line.

2.8 G I O Magnetron Fllamenl F~ter

1. Vacuum ou! excess dusllrom assembly.


2. Check AlL electrical connecUons. Including ground connections, l or tighlness.

Siemens Medicai Syslems, Inc. 1944 342S003U Co nvenUonal MEVATRON


Sy.üm
0ne0I0gy CaTe Syst.nos RIV. A
""
12 MAINTENANCE 6-MONTH INSPECTION
Instructions

2.9 G Ganlry Hub Alea


1. Vacuum OU! ellcess dust !rom ass embly.
2. Using cleaning soluUon end paper towels, elean an areas cf lhe ganlry.
3. Cheek All eleelrical coonectlons, Iocluding ground coooections, IOf tightness.
4. Visually Inspect ali poly-11o water !ines for waler leaks, signs Df 89109, discoloration or
cracking. Schedule replacement II n&Cessal)'.
5. VisuaDy Inspecl gentry welds lor cracklng Ot $lgns of fatigue. lnlorm Centra l Service 0 1
eny problems notod.

2.10 G l Protractor Assembly


1. Vacuum assembty exlemalty l a remove exceS$ dust Irom assembty.
2. Check ALL aleetrlcal connections, lneJuding ground conoections, for tightno$$.

2.11 H4 Accesso/y HoIder


1. Check Ihal accessorles securely loek Into lhe eccessory 5101s.
2. Remove I!IXOs.sory hoIder.
3. Vacuum OuS! 110m acce:ssory holder.
4. Using cleaning solutio n and cotton swabs, clean ali eccassory ralls.
5. IIlSpect an switches fOI" any damage, Intermiltent actuation, etc.
6. Using l PS·l, lubricale acc8ssory rails.
7. Check Al l elactrical connec~ons, InCluding ground connections, lor ~ghtness.
8. Inspect cable hamesses IOf pinched, eKpOSed, OI" damaged wires. Repair II necessary.

2.12 H Prlmary Collimating Systam


1. Replace lhe temperatura sensors (SMS-OCS PIN 79 93 726, 2 ea.).

2.13 Isolation Translormer (il app lieable)


1. Using a DVM, verlfy lhal power is r.ot applied to the transformer usembly.
2. Remove covers.
3. Vacuum dust Irom transformer assemb1y.
4. Check AlL electrical COMCctÍOflS, IncJuding ground connections, for Ughtl1ess.
5. Rcinstall e)('!erÍOl' covers.

2.14 laser$IPaUeflt Setup Devices (If applieable)


1. Vacuum laser assembly externany lo remove excess dustlrorn laser.
2. Check externai powe r connections, in cluding ground connections, for ~ghlness.

2.15 A12 Handcontrol and Overhead Suspel'lSion


1. Remove ovemead suspel'lsion cover.
2. Vaouum dustlrom assembly.

Siemen$ Medicai Systems, Inc. 1944 342 s003U ConvenHo", t MEVATRON


Oncolo<lv Gare Srstems Rev. A 2195 Sy.tem
MAINTENANCE 6-MONTH INSPECTION 13
Inslruclións

3. Clean lhe overhead suspension assembly.


4. Check All electrical coooectioos, incIuding grouncl conneclions, lor tightness.
5. Verify lhe 53lety ehail'! between lhe mounting base and <»ver is pfOper1y Installed.
6. Inspeel ALL mounting hardware connections, including ali hardware above ceiling
mounting plale.
7. Visually inspect tensioo springs lor metal faUgue, cracks, etc. Order spriogs (SM S-OCS
P/N 26 93 006 qty 2) II necessary and schedule replacement.
e. Check spring tensloo of susp ensl on armo
9 . Verity lhe 53lery wire anaching lhe 3 suspension moonting boIts is intacto
10. Verify lhe safe ty wire anachlog lhe 2 suspension arm bearing re taining screws is Inlatt
11 . Using cleaning solution 8nd paper towels, extemally elean lhe harldcootrol assemb/y.
(Spray solution on paper towel ONl Y.)
12. Reins tall ovelhead suspeosion cover.

3.0 Eleel!ica! Portlon Salup


, . Bypass opan cha ssis Intetlocl< lwitches (for voItage measurements).
2 . Remove tM !ock-outl!ag-oul deYice.

&CAUTlON : ElECTR1CAl 5HOCK


ChassIs lnterlock swltehes .re bypassed. Exe relse extreme c:autlon when worklng
around hlgh voltage t.uembliu .

3. Tum contrai room breaker 00.


4. Check operation of ALl emergency off and snunl trip push bunoos (pib).
o Press lhe yellow resel pJb on lha 5 1 pane l. TM button $houId mumina.le.
o Press lha rlght structuro door panel emergency olt pfo. lhe SI yenow resel p.rb
should 90 ou!.
o Press lhe yellow resol ~ on lhe S I pa nel. lhe buttoo ~ illuminale.
o Press lhe lell strueture door panel emergency olt pib. The 5 1 yeDow re sel pItI
should 90 out.
• Press lhe yellow fesel ~ Of\ lhe 51 pane!. The button shoukI illuminale.
o Press lhe room emergency oH pib. lhe SI yellow resel ~ should 90 ou!.
o If. shunl Irlp c; rcuil breaker is usad, raseI lhe circuil breaker.
• Press lhe yetlow resel pib on lhe S I panel. The button $houId illuminale.
• Pre ss lhe conlral alaa amergency oH pib. The SI yeltow resel pIb should go out.
o 11 a shun! trip circuil braaker Is used, resel lhe circui! breaker.
• Press lhe yellow resal pio on lha S I panal. Tha bunon should ~lum lnale.

Siemens Medleel Systems. lnc. 19 « 342 SOOJU Conventlonal MEVATRON


Flev. A 5yllem
0nc0I0gy CIo r. Systems
""
14 MAINTENANCE 6-MONTH INSPECTION
Instructions

• Rapeal Ihis tas! for ali emergency oH push buttons.


5. Tum l he MEVATRON 00.

4.0 Electrlcat Checks

4.1 53 tnlerlock Panel Assembly


Check lhe lunction 01 lhe S3 inler\od($ as follows:
, . DCCP (de control power)
• Remove luse S8· F3 (3 Aj.
o Verity tha! all lamps 0Il lhe 5 3 panel are OU! (OCe ? tripped).
• Relnstan luse se·F3 (3 Aj .
2. Water levei
• Oisconnect waler levei switch.
• Verity lhe water level lamp 1$ OUI.
• Reeonnect lhe water leveI swltch.
• Pre" S31oea1leseI pvsh Mon.
3. Waler M (water overtemperature)
• SIlu! l aci lity water pressure 011.
o Altar a short lime, water OIT lamp should be oul (water temperalure should be
8ppt'Oll;mately 112°F).
• Tu rn l acility water pressure on.
• Ve rify Ihal water temp eratura retums to normal (approximately 104"F).
4. Structura lIow
• Turn S l -Ce· l1 (pump molor) 011.
o Verily lhe structure Ilow lamp i$ extingulshed.
• TumSl ·CBll (pumpmotor)on.
• Press S3locat rese! posh buttOfl.
5. WG Vae (waveguide vaC\Jum)
• Tu m Sl -CB5 (Vac ion pumpldose preamp power) ot!.
o' Verify lhat WG Vae lamp Is IIldinguished.
• Tum Sl-cB5 (Vae ion pumpldose preamp power) an.
• Press contlol console Iron! panel rese l pu$h butloo.
6. InjeetorlhookstiC)(
• Tum $ 1-CBa (ifljeetor power) orf.
• Ve rify lha! lhe Injector hQoIo;stiek lafll) Is eKtinguished.
• Turn $ l -CBS (injeetor power) 00.

Siemens Medicai Systems. Inc; , 19 «342 s003U ConVlnllONI MEVA.TRON


0. ............ Cu.. Svs!ems Rn. A. V95 Sy. tem
MAINTENANCE 6-MONTH INSPECTION 15
Inslructions

7. Sector,lf applicable
• Rota!!! lhe gantsy lo 11 prohibited sectOl'.
• Relfacl lhe bea mshield.
• Verity lha! lhe SectOf lamp Is eKtinguished anel radia.1ion cal'V1Ot be Inltiated.
8. Motion Sslop
• Check lhe l unction of a~ motion stop switch es.
• Veri/y lha! no motion can be iniliated with lhe motlon stop Intel10ck activated.
• Verity lha! radiation cannot be lnll18led.
• Press 51 resel push bunon.
9. Arx fllad la ul! (acces.scwy read laull)
• Insert an accBssory jnto lhe ecx:essory holder.
• PartiaBy remove lhe accessory.
• Verity lha! lhe At;e read laul! lamp Is IIJ(tiflgUished.
• Verify lha! radialion cannol be Inltiated.
10. F.eld si:e
• Insert an electron applicator (100 em 10 x 10 c()fIe) Inlo lhe accesSOf)' hoIdel.
• Sei lhe fleId sizlI to 19 x 19 em.
• rleld S ize lamp 5h00!d be ijluminated.
• Reduco field sizo to 18.4 x 18.4 em.
• Field Size lamp should be extinguished,
• Il'\Crease fleld size l o 19 x 19 em.
• F.eld Size lamp should be 1Jluminated.
• Intrease field sile 10 19.6)( ' 9.6 tm.
• Field Size lamp should be extinllulshed.
• Verity uldiation canno! bo lnitia!ed with lhe field sÍZe lamp eru,guislled.

NOTE
The Inlerlotk wlndow Is normatly.;!:5 mm. Il ls no l untommon l o.te +6 Ind -4 mm
o r vltl!--ver$8.lIll ls outsld e Ih ls wl ndow, st hedule Interlotk w lndow .dj ultment.

11 . Rad II/jaws open


• Completely tlose both seis 01 jaws.
• Program RAD li, 9 MU. press ac:cepL
• Ve rily radiation carvlOl be lni tiated unlil lhe jaws are Iullyopen.
' 2 . Ate holder (accessory holder)
• Clear lhe console.
• Verily Ihat lhe acc hoIder lamp is extinlluished am! ra~ation cannot be lnitiated.

Siemens Medital Systems.. Inc. '9« 342 SOOlU C<:o.wentional MEVATR ON


()nçoIoQv Cara Systems Rev. A S1· tem
""
MAINTENANCE 9·MONTH INSPECTION 3
Contents

Conlenls
pag e

General !"farmalian 5
Scope or Document 5
Purpose of Inspection 5
Prerequisites 5
Safety Precautions 7
Instructions 10
Mechanical Portion Setup 10
CleaninglElectrical Connection Tightness Checks 10
Electrical Portion Setup 18

"21"
Eleclrical Checks
Spare Parts Kit Invenlory
Wrap-up
Discrepancy Log 21
Completion 21
Checklist 23

SOe....... lAe 1kal Syst.ms. lne. 19« 367 s003U COI\venUonaJ MEVATRON
()nçoIggy c••• SY$t.... Rol". A 2195 5y.tem
6 MAINTENANCE 9-MONTH INSPECTION
Generallnformation

Requlred Tesl Equlpment

Basic service 1001 kit


Calibrilted oscilloscope
Calibl'ated FkJke or equival en! dillllal mutlimeter (DMM)
Calibraled high vai/age probe
Calibrated water conduclivity meler
lock-outllag-out kit
Grease gun
RubtJer gloves (4)
Vacuum cleaner
Cleaning soll.ltion (409 glass & sur1ace dean,,)
2 rons 01 paper towers
Linl-free clolh (6)
Cottoo swabs
Applicable machine schematic$
AppIleable adj~tmenVcalibration iostructions
Applicable Teknotes

Requlred Parts
SMS-OCS
nem Description Part Number ~

Filler, air, 16x 16 x 1 In. 2893345 3


Relay, contactor 3032158 1
EPt1 grease 1953632 1
ZlV wormgear glease 34 73 287 1
Lubricant, lPS· , A4 00 010 1
Checklisl. 9-month lnspection 1944 367 1

Siemens Medicai Systems, Inc:. '944 367 SOOJU Convenllonal MEVATRON


ClncoIogy C.f. Sysletl\l 51· tem
""
10 MAINTENANCE 9-MONTH INSPECTION
Instructions

INSTRUCTIONS

1.0 Meehanlcal,Portlon Setup


1. Prepare lable lor cleanirl!y1nspeclion.
• Remove Iteatmer'lt table exterior cove r!.
• Ra ise labia to isocenter and rolat e lhe table colUlTlll to 90' ,
2. Prepara lhe machioe lor deaninl1inspection.
• Remove lhe protractor, and 001 covers.
3. Remove power 'tom lhe MEVATRON.
• Tum right-hancl control console keyswitch l o off.
• Tum cootrol room bteaker ofl.

ih. CAUTION: ELECTRICAL. HAZARO


An Ilolallon transformer may be Inslalled.1f powlr rema ln. on after lhe contro! room
breaker Is off,lnstalllock-outllag-olJl devlce ai nex! dlsconnecl or dlstrlbulion pane!
balore lhe transformer.

4. Replace back covar air fi llers (SMS-OCS PlN 28 93 345 qty 4).

2.0 CleanlnglEleclrlcal Conneetlon Tlghlness Checks

2.1 M Modulator Assembly


1. Open 10ft 5ide rnodulator pane!.
2. Remova tlght sido modulator cava r plate.
3. Check hookstick ground oonnections fOf ~ghlness.
4. Using hookstick, dischalge lhe PFN and leave il grounding lhe PFN.
5 . Ve rily Ihal lhe C\J rranl PFN l aps are clearly marked .
6. Vacuum dusl from assembly.
7. Using c1e aning soIution anel paper lowels, elean ALL modulal Çlf ~ons. (Spray soIution
on paper lowel ONL Y.)
8. Check ALL ele<:trical conneclions. rouding ground coonections . for tighl ness.
9. Visually Inspecl ali are as for any signs of areing or ca rbon build-up.
10. Vi suaUy Inspect PFN capacitor for oilleaks.
11 . Remove hookslido: and place in its hoIder.

Siemens Medicai Syslems, Inc. 19« 367 s003U Convenllonal MEVATRON


0nc0I0gy Ca ra Syslems fln. A 2195 Splem
,
MAINTENANCE 9-MONTH INSPECTlON 11
Inslructions -
2.2 57 Lens Coil Power Supply
1. Vacoum dos! from power supply.
2. Check ALL eleclrlcal connections, incluc:ling ground cormections, Iof tighlness.

2.3 57PSl Magnetron F.amenl Power Supply


1. Vacuum dust Irem power $UPply.
2. Check ALl eleclrical conneclions, Includirtg ground COIlnections, for lighllless.

2.4 55 Sleering Co!l Powar Supply


1. Vacul,ll'Tl dl,lsllrom chassis.
2. Check ALl e lectrical cool'Ieclions, including g round COMections, for tightness.

2.5 S10(Mys18(K) Bending Magna!. Mag Fil, l ens Program Assemb/y


1. Opel'l panel essembly.
2. Vacuum dust from cha ssis.
3. Cheek ALL electrical connections , Including ground connections, for tightness.

2.6 52 Rota~on Drive Conlre!


1. Open pane! assemb/y.
2. Vacuum dust from chassis.
3. Check ALl electrical conneclions, incIuding ground connections, for lightoess.
4. Replace S2-K3 contaclor (gantry (otaITon) (SM$-OCS P/N 30 32 158).

2.7 53 Interlock Panel Assembty


,. Open panel assembly.
2. Vacuum duSllrom powar $UPPIy and eooIing lan.
3. Ctleck ALL electrical connections, including groond connections, for tightness .

2.8 S22lnterCOMaet Pane! Assombly


1. VaClNm dusl from assembly.
2. Check ALL electrical oonnections. Incll.II.iing IiIrOl.lnd connec~ons , for ~liIhlness .

2.9 514 Gantry Rotation Drive Assembly


1. Visually inspecf gantry gear box l or any signs OI oiI leaks.
2. Chacl< gearboK oiI lav el.
3. Check drive ehaln tensioo.
4. C1ean anel lubricale lhe driva chai n assembly.

2.10 SI Power Distr'bution Panel Assemb\y


1. Open bre ake r panaI 8::;semb1y.

Si.mens Meáocat Sysloms, Inc. 19 44 $7 SOO3U ConnnllONlI MEVATRON


0nc:<;>I0gy e;.,. Syst" .... Rov. A 21'95 sy".m
12 MAINTENANCE 9·MONTH INSPECTION
Instructions

2, Vacuum dus! 110m chassis .


3. Check All electrical conditions, lnclucJing ground COMeetionS, IOf ~ghtness.
4. Opell 5 1 panel assemb/y.
5. Vacuum dusl 110m chassis.
6. Cheek ALL electrieal cOnditions, Ineli,lding ground 00(1080110ns, l or tlghtness.
7. Visually inspect aM contactors fO( pittin!1excesslve wear. Order replacement(s) eM
schedule rapair iI necessary.
8. Remove CBl breaker panel essembty.
9. Vacuum dus! Irom chassis.
10. Check main power COIlnections, includil'lg main frame grO\.lnd connections, for
tightness.
1,. Reinstall CBl breaker panel assefTlb/y.

2.11 527 Sleering Coil Reversal Assembly


1. Extemany vacuum d\.ls! from assembly.
2. Check AlL electrical COMections, ilcIuding ground eonnections, lor tightness.

2.12 5 13 Electromagnet Power Supply


1. Vacuum (lus! l rom power Sl4lP/Y and oooIing lan.
2. Check ALL electrical conneclions, incloding ground connections, IOf l ighlness.

2.13 56 Bending Magnel Power 5upply


,. Vacuum dusllrom power supply end cooling lan.
2. Check Ali e lectrical conne<:liOns. ilcluding grQYOO ÇOMeçtions, lor tightness.

2.14 59 Card Caga Assembly


,. Open pane l assembly.
2. Vacuum dust Irom assambly.
3. Ctled< Ali e lectrical connections, inc luding ground coMectiQr'I$, lor tightness.

2.15 54 Auxiliary COntro! Panel


1. Open panel assembly.
2. Vacuum dust l rom assambly.
3. Ctledc All e lectrical connections, including ground connections, lor tighlfless.

2.16 S8 AuxiliaI'{ Power 5upply Chassis


1. Opan panel assembly.
2. Vacuum dust Irom assemb\y.
3. Cheek All elactrical connections, including ground connections, lor tightness.

SierMns Medicai Systems. Inc. 19 44 361 SOO3U Conventlon~t MEVATRON


Or.coklqv Gare 5ystems R.v. A Sy.tem
""
MAINTENANCE 9-MONTH INSPECTION 13
Instruclions

2.17 528 Steering Coil Power Supply


1. VaCIJUm dust 1rom assembly.
2. Cheek Al l electrical COI'lfleetions, induding grouncl conoections, for tiglltness.

2.18 S 15 Miscellal"leous Interlocks anel Ganlry Shaft Enooder


1. Vacuum dus! from assembly.
2. Visua~y irlspeç\ steel cabia lor $igns 01 fatigue Of lraying. Order cabia (SMS-QCS PIN 79
10250,20 ft) i! nacessary and schedule replaceme nt.
3. Visually inspecl sacler $witch for physical damage.

2.1g K5 SoIenoid Power Supplies


1. Vacuum dust Irom powar supplies and coo/i ng l ans.
2. Chedl: AlL elewical connections, induding ground coonectioI'Is.lor Iightness.

2.20 K4 PFNfModulatOf Assembly


1. Check hookstick ground cormectioos lor tightness.
2. Using hookstick, ensure lhal ali assemblies ara discharged.
3. Check thal lhe shorting $witch bar is contacting bolh term inal$ 01 C I .
4. Remove and dean air l illers. Reptace il dirt caMQI bfI removed.
(Fillers tan be ordered Irom KooI trooics, 609-4 66-3400 (paI!' 875 1F»
5. En5ure lha! current PFN lap position5 aro clearly markoo.
6. Vacuum dust Irom assombl)'.
7. Remove tetrode 110m letrode.Geck end clean ~ rlt O!;t 01cooIing fins.
8. Uslrlg cle!lning sotution and paper towals, ctean aR areas of lhe modulator.
9. Check ALL eleetrlcal COl\llectlons, lncIuding groood coonections, for tlghtne5s.
10. Visuall)' irl$pect ali areas 10r 61gn5 oI arcin9"flashover.
11. Vl$l.laJly inspect PFN ~pacilor a55ombl)' for oiI leaks.
12. Reirl stall air lilters.
13. Remove hookstick and placo in lts hoIder.

2.21 Kl Powor Dislrlbution


1. Vacuum dusl lrom essembly.
2. Check: All electrical connections, Including ground connoctions, for tighlness.
3. Visuatly inapeel eontactOfS l or excessivo waar/pilting 01 contacts.

2.22 K4·T1 High Vollage TransfOtmar Assembly


1. Swi ng down Kl panel assombly to gain aeceu to high voltago transformer.
2. Vacuum dust 110m assembfy.
3. Using cleanlng soIution and paper lowels, elean ali areas 01 lhe assembly.
4. Check ALL electriaol connection$. incIuding ground coonections, for tightneS$.

Siemens Medical Syslems. Inc. 1944361.500JU Convenllonal MEVATRON


Oncology Care Systems Rev. A 219 5 sy.t.m
14 MAINTENANCE 9-MONTH INSPECTION
Instructions

2.23 K9 Klystron Fi\ament Power Supp\y


1. VaCIJum dust Irom power supply and cooIing lan..
2. Check AlL electrical connec~ons, including groul'ld coonections, for tightrless.

2.24 K2 AuxiliaI)' Interlock Chassis Assembly


1. SUde K2 chassis assembly oul to gaio aeçass lo. nluaas.
2. Remove bottom cova! cf !,-ssemb1v . bypass cover interlock switch.
3. Va cuum dust 110m essembly.
4. Chedl All electncal connectiotls, ioduding grouod eoooeclions, lor tig/llness.
5. Ensure ALl printed circult boards (PCBs) are selted proper1y (01 applicable).

2.25 K7 RF Driver Assemb/y


1. Slide K7 chassis assembly oul lo gain access to aI! arus.
2. Remove bottom chassis cover, bypass CQver interlock swilch.
3. Vacuum dust lrom l15Sembly.
4. Check ALl electrical connections, including ground connectioos, lor lighlness.
5. Check RF cavily tuning belts for crackingfexcessive wear (il epplicable).

2.26 Kl 0 Klystron Alea Assemblies


,. VaCtlum dust Irom assemblies.
2. Uslng cleanino soIuUon ancr papor towels, elean ai BrBas of this &eelion.
3. Check All electrieal wnnections, including grouncr COMecUons, lor Ughtness.
4. Inspect po/y·!lo oooIing ~"es l or aging ar cracM. Sct!edule ,eplacamen! if nacessal)'.
5. Inspect klystron wa ter gas.ket lo, c:,acks. dry·,otling. etc. Order new gaskel il
c,acked (SMS·QCS PIN 56 87 SS3) and sc:hedule replacemenl.
6. Remove partic:Jes adhering to lhe ioo pump magneL
7. Verity mechanical cenlerin9 01 lhe 101' pump magnet eS$tlmbly with relerence lo tha
iao pump.

2.27 K6 SoIeooId Assemb/y


I. Vacuum dusI Irom assamb/y.
2. Check AlL electrical connections.lncIlKIing ground COMections, lo, Ughlness.
3. Inspecl poly·llo tubing lor signs 01 water laaks, aging, cracks, ele. Schedula raplacamenl
11 oecessal)'.

2.28 K8 Pulse Transforme r Assembly


,. Vacuum duSllrom assembly.
2. Using c:leaning soIulion and paper lowels, dean an areas 01 lhe assembly.
3. Check ALL eloctrical cOrlOections, Including ground c:onnections, l or tightne ss.
4. Check orllevel.

Siemens Medicai 5ystem:s . Inç. 19« 367 SOOlU Connntlo....1MEV,,"TRON


QrolCOlogt c.,. Systems Reli. "" 2105 SYltem
MAINTENANCE 9·MONTH INSPECTlON 15
Instructions

5. Check for 01\ leaks around gaskets, etc.


6. Visually inspect pulse 13nl< oU lor Impurities (waler. earbon pa!hs) !hrough fronl view
wlndow.

2.29 C I ContrOl Console


1. Remove centro! console top covar.
2. Tum contrai console on 11$ side.
3. Remove bottom covar.
4. Vacuum dlJst Irom console.
5. Remove eltcess dust from cooIing lan.
6. AeinstaU bottom cover.
7. T um console back to IIS original position.
8. Ensure ali peBa are lully inserted.
9. Check AlL electrical coonections, h:ll.Iding grourld c:onnections, lor Ughtness.

2.30 Treatmenl Tablas


A ZIV Treatment Table
• Remove lable floof pit cover.
• Remove cover Irom fi labia powor aupply as.sembly.
• Vacuum dus! from power aupply assembly.
• Cheel<. ALL eleclrical connections, including grovnd conrlections, for Iighlness.
• Reinstan El power supply ÇOVer.
• Vacwrn dust Irom ali areas of lhe lablelop.
• Inspect ali hal'ld paddle hinge plns lor physical dam.age. Order replacemenl parts
as necessary (see figure 1 lor part numbers) and s.ched1,lle replacement.
o Clean mectlaf'.ical helght seala. . •
o Applya sma ll amoun l 01 LPS·l to a rint-rree cIolh and Itbricale lhe seare.
• Yacuum duSI Irom bottom 01 lable. ~

• W ipe olt aU used glease Irom verticallift wo rmsçrew shatl.


o Apply grease (S MS·OCS "IN 34 73 287) lo wormsçrew using grease gun.
o Inspect venical fil1 bells for crackinWexcessive wear.
• InspecI vertical brake strap pad for excessive wear .
o Yacuum dus! Irom table ~00f pit.
o Check ALL ereclric:al connectioos, indoding groond connect.ions, lor ti~tness.
• InspecI lsocen!er rotation (Z axls) brake Issembly for excessiva wear andlor
physical damage.
o rnslaa lable I\oor pil cover.

SiemelUl Medicai Sysle<ns. Inc . 19 44 367.S003U CoovenUONl MEVATRON


OI I«IIosIr c... Syslems Rev. A 2J95 Sy.lem
16 MAINTENANCE 9-MONTH INSPECTION
Instructions

8435893
U-&ackel

84 35919
La''''
3S 17838
IsoIation
~""
8435 901
Hinge pin 8344236
Hinge pin

W,_
3525714

3387768
L.ock washer 3343910
(qty 10) Sa_

Note: Erlangen part numbers

Figu re 1. ZIV Treatment Table H.nó Paddl. Par1 Number.

so.mens Med"1C3I S)"tems. Inc. 1944361 SOOl.U Convenllon" MEVATRON


~ Care Systams Rev. A 2I9S Syslem
MAINTENANCE 9-MONTH INSPECTION 17
Instructions

B. ZXTTreatment l abia
• Remova labia flocr pit cover.
• Vacuum Ouse lrom ali areas 01 lhe tabJetop •
•' Check remota handcootrol con nections.
• Inspect vertical height sleel cabia lor physlcal damageJwear.
• Verify Ihal lhe 6\eel cabia bearing assemb/y rotates !reely.
o Check vertical eJectrical connection$.
• Greaso lhe Zer\!; littings 00 l he vertical ~h assembly.
• Inspect ali hydraulic valves lor oU lealts.
• Vacuum dus! Irom table f100r pij t.
• Check ALl e!ectrical COOIlBctions, lncludinlj ground cormectioos, for tighlnes$.
• Inspect hydraulic reserveir and pump l or oi! !eau.
• Install tabla Ilocr pit cover.

C. ZII TreatmentTable
• Remove ta ble IIoot pit cover.
• Vacuum dust Irom an areas of lhe tabletop.
• Check l1ansverse and Iongitudi nallrae float connectioos. Inspeel for cabia
damage, or excess strain an cabia.
• Remove column oovers.
• Vacuum dus! lrom coIumn 8ssemb/y.
• Remove eXCBSS greasa Irom bearlngs and rails.
• Inspect bearing rans Ior excessive wear, damage, etc.
• Check for excessiva sag in labletop (tabletop rocks back In<! forth or side to
$!de). Schedole bearing alignmenl jl nealssary.
• lobricate bearlngs and rails.
• Check vertical safety ct\afl for damage.
• Check verti cal lill cha ln for any damage.
• Vacuom dvst Irom lable fI()()( pit.
• Check ALl eleçtlical coonectioos, inctuding ground connections, for lightness.
• InslaUtablelloorpitcover.

Síemens Medicai Systems, Ire. 19« 367 SDO:IU Conventional MEVATRON


OncoIogy Cale Systems Flev.A 2195 5y.tem
,
18 MAINTENANCE 9-MONTH INSPECTION
Inslructions

3.0 Eleetrleal Portlon Setl.lp


1. Bypass any cpen chassis interlock switche s roquired for voltage measurements .

.& CAUTIO~: ELE CTR1CAL SHOCK


Chassis lnterloek swltehes IIl e bypassed.. Use extreme cautlon w hen wor klng around
h19h vollage .5sembUes.

2. Tum centro! 100m breaker 01'1.


3. Check operation 01 All emergency off 800 shunl trip push butlons (pfb) .
• Press lho yebow lesei po'b on lhe 5 1 panel. lhe button should iIIuminate.
• Press lhe tigh! slructure doer pane l eme rgency of! p,rb. The SI yollow resel p.rb
should go OU\.
• Press lho yellow resel p!b on lhe 5 1 panel. The butlon should IlIuminale.
• Press lhe lell. structure doar panel emergency oH pib. The 5 1 yellow l esei p!b
should go oul
• Press lhe yellow resel pJb on tlle 51 pane l. lhe bunon should illuminate.
• Press the 100m emergency cM pIb. lhe 51 yeHow lesei pIb should 90 oul.
• 1/ a shunt trip Circuil b reaker Is uSad, lesei lhe a teui! bfeaker.
• Press lhe yenow reset p;b on t hf:l 5 1 pane!. lhe button sh Ol.lld ~Iumirlate.
• Press lhe con trol area emergency of! pIb. The 5 1 y ellow resel pIb should go 0I.lt.
• II a $hunt ITip clrcuit breaker is usad. resel lhe ci rc:uil breaker.
• Press lhe yallow resel pIb on lhe SI pane!. The bul10n shoulcl iIIuminale.
• Aepea l Ihis l est l or ali emergency 011 push buttons.
4. Tum l he MEVATAON on.

Siernens M&dical Systenu, Inc:. U 44 361 SOO3.U Conv.nUonal MEVATRON


0ne0I0gy c.re ~telTl$ R..,. A 2/95 Sy,lem
MAINTENANCE 9-MONTH INSPECTION 19
Instructions

4.0 Eleetrlcal Checks

4.1 M Modulalor M$emb/y


1. Connect OVM directly to magnetro n filamEm! (- lo calhode).
2. Check lh e magnelron filament voltage in standby Ind cutback.
• Adjustments a re made Of\ lhe 5101$18 PeS. Sei values to:
Magnelron T ype Standby Culback
M5193 8.5 V <V
M5349 " V 7V
3. Measu fa lhe thyratron mam en! vol ta 98.
• 11 lhe thyrattoo lilameo! voltage i5 greater lhan 6.5 V, remove jumper Ictos.s R2
(5 ohm, 20 watt).
• Aechack lIo'laga anel reeord lhe value in lhe checldist.

4.2 57 Lens Coil Power SuppIy


,. Verify powe r supplY'5 in voltage regulation rnode.
2. Verify power supply cooIing fan Is worIdng propelly. if applicable.

4.3 S7PSl Magnetron F~ am ent Power Supply


1. Verify powef supply as In vohage l egu1alion moda.
2. Varify power supply cooling fan 1$ worldn g prope~y," applicable.

4.4 SI0(Mys I 8{K) Beroding Magno t, Mag FlI, Leos Program Assembly
1. Verify cUlback operation for magnetroo fil ament power 5UPPIy.
2. Verify lens roil power 6Upply tums on when lhe push buttoo on 5 10PC21s depressed.

4.5 513 Electromagnet Power Supply


1. Verify power supply ;$ in current regulation mode.
2. Ve rify power supply cooIing fan 1$ working property. ~ appllcable.

4.6 56 Bending Magne! Power Sopply


1. Verify power supply is in current regulation mode.
2. Verify power supply cooIing fan 1$ wOfking property, 11 app~bIe.

4 .7 512 Pumpstar.d A$semb\y


1. Check All waler CQnnections for leaks.
2. Check water now lhrough the deiO!1izer cartridge.
• Momentarily removo lhe white cap Irom the bottom 01 lhe white fine me sh fIIler.
3. Check lhe waler conduc:livity, record values In lhe checklist.

Si.mens Medica! Systems, Inc . 19 44 367 SOO3U Conventlonl l MEVATRON


Oncology Caro Systoms Rev. A Sr.tem
20 MAINTENANCE 9-MONTH INSPECTION
Instructlons

4.8 K5 SoIenoid Power Supplles


, . Verily lha! ALL power supplles are in curren! regulation moda.
2. Verity operation 01 cooIing fans. if applicable.

<U K4 PFN/ModtJIator Assembly


1. Maasure lhe Ihyratron filamen! voItage
• 1/ above 6.6 V, lhen remove Jumper actoss R2 (5 n. 2() W)
• Record lilamen! voltage in lhe inspection checklist.

4.1 D K9 Klystron Filamen! Power Supply


1. Verify Ihel power supply is in currenl fegUlation moda.
2. Verify operation of cooling l an, il applicable.

4.11 K2 Auxi liary Interlock Chassis Assembly


1. Measure lhe klyslron Ion pump high voItage, end record In lhe checldist.

4.12 1(7RF Oriver Assemb/y


The fol lowing steps requi re a crystal detector and a 5O-ohm toad. Measurements are mede ai
lhe front pano! of lhe AF driver with lhe driver In internai t rlggering.
1. Measure RF driver output pulse wictth. Adjust lo 7 ~S 11 nocessary.
2. Measura RF dl'lver OUlpul pulse repetition rale. Adjusllo 7 milliseconds I1 nece5Sary.

4.13 C I Control Console


I . Verily COQ!ing lan operatioo.
2. Check operalion 01ALL energias and oplional dose rata modes. Adjust applicable
paramotors as requir&d to obIain stablo operalion.
3. Complete a parameter sheel lor ali energies and opU onal dose rate modes.
4 . Watching lhe dose rale me ter. press lhe X-ray push bunon. Note needla delJection.
5 . Repea! s!cp 4 for electron modo. If el(cossive needle delleclion in ane or both modos Is
enoounlered. scnodule zerolng otfsets wilh physicisl.

4.14 TraatmentTables
A. ZIV Treatment Tablo
• Verify mechanical vertical height &cale lndicator ca~bralion ai isoconter. Schedwlo
service i1 adjuslment Is required.
• Check ALL lunclions of ALL hand paddtes.
• Verily Ihat when emergeney hand crank is inSlalled, moIorized vertical lift is
disabled. lmmediately repalr i1 necessary.
• Verify lund ion oI omergency remoia handconlrol.
• Verify operation of graen lable Iock push button.

~ Medicai SystetnS. In::. 19 44 367 SOO3U Conventlonal MEVATRON


0nc0I0gy Cara Systlms Rlv. A 2195 System
MAINTENANCE 9-MONTH INSPECTlON 21
Instructions

• Verify motion 6!op operation.


• Verily lurICtioo of 513, arod lhe upper and Iower Umil safety switches.
• Reinstall anel clean covers.

B. ZXT Treatment l abia


• Verity Ihal ALL displays initiaTize aI lhe Initialization pOints, Hnot, schedule repair.
• Verify vertieal height ealibratioo aI isocanter. Schedule adjustmerlt 1I requlred.
• Cheek ALL lunclions o! lhe two remota hanclconlrols.
• Verily tripping of lhe motion detection Inle~ock circuitry when lhe couch 1$ moved
end moCion is nol enabled.
• Check func tion 01 lhe eme rgency litoplresel push butlon.

C. ZU Treatment l abia
• Verlly vertical mecharlical helght indicator calibration ai isocenter. Schedule
adjustment 11 require<!.
• Verify proper 'ul'\Ction 01an switche s and brakes.

5.0 Spare Parts Klt Invenlory


1. Inventory spara pariS kit stock agalrlSt tist lor compleler'leSs, Orde r any parts no! lound ifl
kil . R9COId parts mis.sin ~ l rom killn lhe lable provided.

6.0 Wrap Up
1. Close and relnslalt an chassis coven.
2. Reinslall arld elean In machine covers.
3. Pragram and run All er.ergles 10 verify lunction before treatmenls resume.

7.0 Ollcrepancy Lo ~
I . Log any discrspancies lound. In the lable provided In lhe cheddist.
• Indicale wh elher lhe discrepancy ls correcl ed or nol.
• 11 service Is 10 be scheduled, open an Incident number l or lU of lhe di:;crepar.cies (titled .
"discrepancies folK'od during PM1.

8.0 CompletJon
1. Complete l he Inspeclion complelion celtillca te (lasl page of lhe chcckfi$t).
2. Send lhe certificale to your afea manager.

Siemens Medieal SY$!erTl$. tnc:. 19 44 3&7 SQ03U Convenllonal MEVATRON


00 ocologj Cara Systeml Rav. A 2195 Sy.1Mn
MAINTENANCE 9·MONTH INSPECTION 23 "

Checklist

CHECKL1ST

1.0 Complete lhe Mechanlcal Partlon Selup


• 1I'lSlalllock-outllag-out óevice and Iock, Initial, date, snd Im in lhe time lhe locI<-out
device 15 Installad. 11 mora Ihan one persan will be working co lhe equipment, Ihen
eaeh addilional wor1<er shall install lhelr lock.

·•

Il'1itiar,:~===
I ni~ a\s:
lnitials:
0"',;=,
Dale:
Oale:
== Time:
Time:
Time:

2.0 CleanlnglEleetrlcal ConnectJon Tlghtness Checks

I I
2.1 CleatVínspecl the modulalor assembty M elass
I
tOA O
LnlU"I. o",. eompl.lood

2.2 Cleanflnspecl lhe 571ens roi! power supply


!lnItl... I~t. comple'-<l I
2.3 ClealVinspect lhe S7PSI magne lron "Iamen! power SlJpply M e las! tOA O
I WtloJ, IDto,. complete<! I
2.4 Clearvinspect lhe 55 steering coil po~er supply K Class

1'"1tIo1I I tOA O
Dlt. compleled I
2.5 ClearVinspect lhe SI0[M)lS18(K) bending magnel, mag lil, lons program as.sembly
I "'1IlI1. ID• •• c~1ed I
2.6 Cleanfll1spect lhe S2 rotation drive cootrol
Ilnllttt. I0.'- compleltd I

Siemens MedicaJ Sysletn$. Inc. 19 U 367 SOO3U ConVlnllonal MEVATRON


OncoIogy Care SYSlems Rev. A 2J'9S Sysl2m
24 MAINTENANCE 9-MONTH INSPECTION
Checklist

2.7 Cleanlinspect lhe 53 inlerlod< panel as sembty


lnltl.11 Dote compllted

2.8 CieaNlI1spect lhe 522lnterCOl'1nect pane! assambly

I"'111". I Oat. compll'td I


2.9 ClearVlflSpecllhe 514 ganlry l otation drive assemb/y
llnullll IDaI'C~.~ I
2.10 ClearVinspeCI lhe SI power distribution panel assemb/y
IlnJli<otl I
Dal. compllttd I
KClass
I I
2.11 CleanflflspeQ lhe 527 sleering COil reversaJ assemb/y N/A O
l,nIUaI. 011. compltoled

2.12 Cleanflnspeet l he 513 electromagnet pÕwer suppty M Class N/A O


Inlllll. 01'0 comp"*'

2.13 Cleanlinspect lhe 56 bending magna! power supply

2.14 Clearv'inspect lhe 59 card cage essembly

2.15 Clearvinspect lhe S4 auxiliary eontrol panel


!lnltlall I
0.11 compll tecl I
2.16 ClearVInspect lhe 58 auxiliaI)' power 5Upply chassis

Siemens Medical Syslems. Inc. 1944 367 SOO3U Conv.nUon~1 MEVATRON


00 .c:oIogy Care SysteR'l$ Rlv. A 2/95 Syslem
MAINTENANCE 9-MONTH INSPECTION 25 .'
Checklist
,
2.11 Clearv'"lllSpect lhe 526 steering coil power supply M elas, N/AO
l1n/11a11 !
Date complete<! I
2.18 Cleanlinspeçl lhe 5 15 mis.cellaneous Inl erlocks and ganlly shaft enc:ooer
!InIUII. I
D.II tompll'-<l I
I
2.19 Cleanlil"lSpect l he K5 $(Ile n~d pcwer supplies KC lass N/AO
Inlllll. 0.1, compl.l~

2.20 Cleanlinspect lhe K4 PFNlmodulalor assembly K Cla ss N/AO


l nl ll. IDat'~~1
2.21 Cleanlinspect lhe Kl pc ..... er distributlon K Class N/AO
IInIILll1 I
o.tl complllod I
2.22 Clearv'inspect 100 K4.T1 high voItage transforme r assemb/y KClass N/A O
Inlllot. Olt, compl'locI

2.23 Cleanlinspect lhe K9 klystron fil amen! powor eupptr K Cleu N/AO
Ilnlll.11 I
0111 ~Jet..s I
2.24 Cleanfln$pect lhe K2 audial)' inler\o(:!c; chassis a ssembly K Class N/AO
llnlll
... I
Dal. coml'i*ttd I
2.25 Cleanlinspect lhe K7 RF driver assemb/y K Cless N/AO
lniU,t, D,t. complel..!

2.26 Cleanlil"lSpeel lhe Kl 0 klystron area assemblies K Class N/A O

Siemens MedicaI System$, Ine. 1944 367 SD03U Conv.ntlona! MEVATR ON


Orw:oIogy ~re Syslems Rr<'. A 2195 Systlm
"
26 MAINTENANCE 9-MONTH INSPECTION
Checklist

2.27 Clearvínspect lhe K6 solenoid assembly K elass


Ilnltlatl I N/AO
Dita complet..t I
2.28 Clearvínspect lhe K8 pulse transformer usemb/y

I I
2.29 Cleanlinspect lhe control console
I lnlCla.. Oet. complt1ecl

2.30 Cleanfll1spect lhe Irealmen! labia


111>1111 11 I
DoI. co mplt;liOCI I
3.0 Electrlcal PortiOfl Setup
Remove Iock-oulltag-out devlce. Initial, date, em! lill ln lhe time lha lock-ouI devi<:e 1$
. removed. II more Ihan ofle persan had installed thair lock, Ihen the ir IOCk(s) must be removed
filsl.

Injlial~
tnitlalS'f===
!nitial$: 0""==
Oate:
Date:
Time removed:
TlITIe removed:
Time remove<!;

4.0 Electrleat Checks

4,1 Tes! lhe modulalOI assemb/y M Class N/A O


• Measure lhe thyratron fi lamen! voItagB. 11 greater Ihan 6.5 V. remove oi
jumper across R2 (5 ohm. 20 watt). Recheck end 1900rd below.

Thyra tron lilamenl voItage: V

4.2 Tes! lhe 571el'l$ coil power supply

Siernens Medieal Sy$lemS, Inc. 1944 367 SOO3U Conventlonll MEV"TRON


o. ocology eare S)lSlems Rev. A 2/95 5ystem
..
MAINTENANCE 9-MONTH INSPECTlON 27
Checkli st

4.3 Test lhe S7PSl magnetron filamenl power sopply M Class N/A O
Ilnllllol' 10." ConIJ' leltd I
4 .4 Tes! lhe Sl O{M)/SI B{K) bending magne!, mag fil, tens program assembly

I lnltl.oll 10.1' COft'4I)Ieted I


4.5 Tes! lhe $ 13 eleclrornagnet power $Upply M Class N/A O
IlnIu.r. 10.·1 comp!.tlld I
4.6 Tes! lhe 56 bendirlg magne! power supply

"
4.7 Tes! lhe S 12 p~pstand assembly
• Record water conduclivlty values in lhe blanks be low:
MWcm1 Malcm1
Systom water: Slored waler:
!lnllll.1 IIlat, ~omp"lo<ll

4.8 Tes! lhe K5 solenold power supplies K Clas$ N/A O


'nlllal,

4.9 Tes! lhe K4 PFNfmodulalor assembty


• Measura lhe thyratron filamenl voltage. II greater
6.5 V, remove jumper acrou R2 (5 ohm, 20 watl).
Recheçk voItage and reCOfd below.

Thyralron Illameol voItage: _ _ V

4.10 Tas! lhe K9 klystron filamenl power supply K Class N/A O


IInIU.!1 IDa'- compltltd I

Siemerl$ Me<lleal Syslems, Inc. '9 44 367 SOQJU Convenllonat MEVATRON


0ncQI0gy Care Syslems R..... A 2/95 5y,lIm
28 MAINTENANCE 9-MONTH INSPECTION
Checklist

4 .11 T8S1 the K2 auxiliary inter10ck chassis K e lass N/A O


• Aecord lhe k1ystrM ion pump high YOIlage below.

K1yslrorl km pump high voltage kV


Inltlatl o.t, compllll'd

K Class
4.12 Tasl lhe 10 RF driver assembly
Ilftlll.l. I N/A O
Da'a comp\eted I
4 .13 Tn llhe contrai console
11n1l..1oI I
0... eompll'MII

4.14 Tes! lhe trealrrient labia


IntU.t. Olt. eom tateei

Slemens Medicai $yslems,lnc. l' 44 367 SOO3U Convlntlonal MEVATAO N


OncoIogy Cara Sy$lelTl$ R.... A 2/95 Syltem
MAINTENANCE 9-MONTH INSPECTION 31
Chec klis.t

INSPEcnON COMPLETION CERTIFICATE

• l(we) certify ltIe presclibed nine-monlh preventiva mainlenanee inspection IOf


maeMine number_ __ _ _ _ was performed on lhe dale below.

Testing Perforrned By Date

Testing PenofTlled By Date

Tesling Performed By
"'''
The pre scrlbed nine-rnol1tn preventive maintenanee Inspection 10r machine numbe,::::",,;:-
_ was pelformed by the abQve engineer(s)on tI1e date noted. Piease sigl1 anel retum lhis
101m 101 OU! records, .nd retain a copy 10r yours. The lwelYe-monlh preventive malnlenance
inspeetion for Ih!s machine is duo on ___ _ __

Area Manager Oale

• I acknowledge recelp! of Ihis certiflcate.

Cuslomer Representativa Ti~e Date

Siemens Medicai Syslems. inc::. 19 . 4 361 SOQJU Convlntiomll MEVATR ON


Oncology Cere Systems Rlv. . 219S Syslem
MAINTENANCE 12·MONTH INSPECTION 3
Contenls '

Contents
Page

Generallnlormation 5
Scope of Documenl 5
Purpose of Inspection 5
Prerequisites 5
Salely Precaulions 7
Inspectlon Instructions 10
Mechanical Portion Selup 10
CleaninglElectrical Comection Tightness Checks 10
Etectrical Portion Setup 12
Electrical Checks 13
Wrap-up 14
DiscrepallCy Log 14
CompIetion 14
Checklist 15

Siemen.s Medicai Systams. Inc. 1944 383 SQ03U Convlnllonal MEVATRO N


0nc0I0gy Cale Sys1etnS Rev. A. 2.195 Syalem
6 MAINTENANCE 12-MONTH INSPECTlON
General lnformation

Requlred Tes! Equlpment

Basie service 1001 kil


Calibratod oscinoscope
50- or 6().foot BNC cable (1)
CaJibfated Fluke Cf equivalenl digital multimeler (DMM)
Calibraled high vo/tage probe
Calibraled water conductivity meter
l ock-QUVlag-ou1ki1
Grease gun
Rubber gloves (4)
H ead lifting lixture
112-I0I'l chain hoist
Llfting slraps (m lnimum 500 Ib rati ng) (2)
114 1n.-20 eyebolts (4)
5116 in.-18 eyebolts (4)
112 In.-13 eyebolls (4)
Vacuum cleaner
C1eaning soIution (409 gins & surface deaner)
2 rells cf paper towels
Unl·free cIoth (6)
Cotlon swabs (20)
Anti stalic mal a nd wrist slrap
Applicable machine schemalics
AppIicable adjustmantlcalibration instructions
Applicable Teknotes

Requlred PartI
SMS-OC S
Item pe sçription Pa rt Numbor
º"
Filter, air. 16 x 16 x 1 in.
Pipa sealanl
2893345
79908 15
3
,,
Cartridge , deionizor 56 54 520
Lamp, 12V5QW
Lamp, 15V 150W
798899 1
9428517
•,
TubirIQ. la rgai wa ter line
Filting, feflUle aod nul
7989262
2851673 ,,'"
Temperature sensors
Sockel, lield lamp
7993 728
9413949 ,,
EP" grease
Lubricant, LP$-1
1953532
A4 00 010 ,,
Lubricanl, GE varsill.lbe
Cheddist, 12 -month inspection
9428229
1944383 ,

SiImens Me<feal Syslems, Inc:.


~ Ca,e 5yster'r'l$ AeY. A .,
11144 38J SOOJU Convenllonal MEVATRON
System
10 MAINTENANCE 12-MONTH INSPECTION
Inslructions

INSTRUCTIONS

1.0 l.4eehanieal PorUon Selup


1. Position lhe lab ia for lhe inspection.
• Ralse labia l o ISOC81'1ter and rolate lhe labia column to 90",
2. Prepara lhe mach.,o lor cleanin~nspection.
• Remove lhe prolractor, Ihroat, anel counterweightlbeamshield COVllrs.
• Ensure tha! lhe head is prog ram med l or X-LO.
• Rotate lhe ganlry lo counte rclockwise 180 G ,
• Install lhe ganl'Y antirotational pi n.
• Close A (imer) jaws ~ Ietely. cIose B (outer) jaWS !O 3 em.
• Remove protractor assembly.
3. Aemovepowerfromlho MEVATRON.
• Tum right-hand CQnlIoI console keyswilch to off.
o TUfO COfltrol room break" olf .

.&. CA1ITIO N: E1.ECTRICAL HAZARD


Ao Isotatlon transformer may be Inst.lled. 1I powar rema lo. on after lhe contrai room
breaker is oH, Installlock-outllag-out device aI neXl clisconnect Of dlSlrlbutlon panel
befo re lhe tranSf o rmer.

4. Replace back COYer air lilIers (SMS-OCS PIN 28 93 34S qty 4).

2.0 CleaninglElectrlcal Connectlon Tlghtnen Chec k ,

2. t 5 12 Pumpstand Assembfy
1. Vacuum dust Irom pumpstand assembly.
2. Using clearllng solution and paper towals. clearl ali areas 01 lhe pumpstand assembly.
3. Check ALl electrical connections, IrlCluding ground coonectloos, Iof tighlness .
4. Change lhe deionizer cartridge (SMS-OCS P/N 56 54 520). lnilial and date lhe installed
cartridge.

2.2 G4 AFC Preamp Assamb/y


1. Vacuum as.sembly externally to remove exce$$ dust lrom assembly.
2. Check ALL electrical connection$, incIuding ground connectiOns, for tightness.
3. Verify ali RF oonnections are l ight, Including lhe line slrelcher.

SOemen, Medicai Syslema. Inc. 1t« 383 SOO3U Convlntlonill MEVATRON


0n0:0I0sIY c. .. S)'SIems Rf:v. A 5y.tem
""
"
MAINTENANCE 12-MONTH INSPECTION 11
Instructions

2.3 GS 100 Pump Assembly


1. Remove partidos adhering to magnel.
2. lnspect high voItage COMector fOf any signs of arcing.

2.5 G7/G40'FronlpOinter and Rangelinde r Assembly


1. Va cuum dus! Irom assembly.
2. Check ALl electrical conneclionS, Including grolXld conooctions, fOf tightness.
3. Repleco Ironlpoinler end rangefincler lamps (SMs.ocS PIN 79 88 991 qly 3).

2.6 G3 Dose Pre~ljfier


1. Extemally vacwm dusl lrom 8ssembly.
2. Check ALL eleclrical conneclions, lncluding ground oonnections, for tlghlness.
3. Visuany inspect ALL dose chamber leads IOf damall&'exposed wires, etc.

2.7 H Lower Oeflning Head (HPC Jaws)


1. Remove defining head covor,
2. Vacuum dos! 110m jaw 115Semb/y.
3. Vi suaRy Inspectell bearings end tracks lor excessiva wear anG'or corro~on.
4. AppIy I lhin coai 01 versl\ube to lhe Jaw $halt assemblles.
5. Placa I drop cIolh on lhe f100r neX1 to lhe heed.
6. Using lilting lixlure,li tt lhe Iower dafining head.
7. Suspend lhe jaw assembly over thc drop cloth.
8. Using LPS-l . elaan main coIlimatof rotation bearing.
9. Once eKcess lubrication has drained. Iower lhe jam onto lhe drop cloth .

2.8 H Lowe' Oefining Head (Standard Jaws)


1. Remove definir1g head cover.
2. Vacuum dust from jaw assembly.
3. Clean ALL metal fdings from ali areas 01 lhe jaw assernbfy.
4 . Visual1y inspeet ali bearings and tracks for eKceSSive wea r and'or corroslon.
5. ApplyathincoatoflPS-l tothejawshafta ssembfles.
6. PLace a drop cIolh on lhe noor next to lhe head.
7. Using ~fting fixture. lift Iower dêlinlng head.
8. Suspend lhe jaw 8ssembly over lhe drop clOIh.
9. Using LPS·1, clean maln coIfimatOf retalion bearing.
10. Once excesslublication has drained. Iower the jaws onto lhe drop cloth.

2.9 H1IHDl Prima'Y CoIimating Syslem


1. Vacuum dusllrom ali areas 01 l he prima'Y coUimalor.
2. Checl<. ALL ele<:\~cal conneçlions, Inçluding grO\Jnd connec:tions, for ~9htneSlS.

Siemens Ue;:Iil;al Syste"". Inc:. 1944383 5OO3U Convlntionll MEVATRON


o. lCOIogy Car. Sys\ems Rev. A 2I'9S 5yslem
12 MAINTENANCE 12-MONTH INSPECTION
Inslructions

3. InspecI cabia hamesses for pinched. damaged or exposed wires.


• lllhere are any damaged wires repai r temporarily it possible, and schedule ropai r,
or raplacamon\.
4. Inspect aO assembties for BlCcessive corfosion or wear.
5. Remove slde lead plecas.
6. Remove largai sllda lrom drive assemb.Jy.
7. Ctean largai slida bearings and bearing surfaces.
e. Visually inspect lha largai 101 pitting andlor corro$ion.
9. ReplIca largel waler line (SMS-OcS P1N 79 89 262, 20 It) and ferl1,lles (SMS-OCS PIN
2851 673qty2).
10. Apply a smal! amoun! of LPS. , to lhe m icroslide bearings, targe l $lide bearings, elc. Wipe
oH 8ny excess lubr~nt.
11. Reinstal targel sJlde assembly.
12. Aeinsta" side lead pieces.
13. Replaca fiald lamp (SMS-OcS P/N 94 28 517) and socket assembty (SMS·OCS PIN 94
13949).
14. Clean mirror with a 1~I ·flee doth.
15. Aeinslalllower delining head.
16. Reirn;taU clefininliJ head covar.
17. Aeinstall accessory hoIder.
18. Aemove gantry antirotational pino

3.0 EJectrlcal Portlon 5elup


I. Bypass open chassis Inter10ck switches (Ior voItage meaSUfements).

&. CAUTION: ELECTAICAL 5HOCK


Cha ..lalnterloek .wltehe. IIrll bypassed . USII elClrem. eaution when worklng around
hlgh '1oltage ...embUtI.

2. Tum conllQl room bleaker 00.


3. Check operation 01 ALL emergency of! and shunt trip push buttons (pIb).
• Press lhe yellow re sel pIb on the 51 pane!. The bunon should illuminale.
• Press lhe right slJucIure doer panel emergeocy oH~. The S I yellow resel pib
should extinguish.
• Press lhe yeHow reset pIb on the SI pane!. The button should iIlumlnate.
• Press lhe leI! structure doer panel emergeocy 011 p.Ib. Th. S I yellow reset p."b
should extinguish.
• PrO$$ lho yotlow rOSOI pIb on lha 5 1 pane\. The bullon shou ld illumlnale.

Siemena V p1ie,t $)'IItem$, Inç. 194.( m SOO3U ConvlH\\JoNl MEV'"TAON


OncoloiY Care S)'IItems Rev. A 2195 Sy.~m
"
MAINTENANCE 12-MONTH INSPECTION 13
Instructions

• Press lhe treatment 100m omergency oH pJb. The 51 yellow rasei pi1:Ishould
extinguish.
• 11 li Shunt lrip cjrcuit breaker is usad, resel the circuit tNeaker.
• Pres$ lhe yellow resel plb on lhe SI panel. The button silould illuminate.
• Pres$ lhe cootrol area emergency of! pIb. l he 51 yellow resel p;b should
elClinguish.
• lIa shunt trip circuit bre aker is usad, resel the cifCUil breaker.
• Press lhe yellow resel pIb on lhe $ 1 panel. lhe button should iIIumlnate.
• Aepeatlhis tE/st/Cf aU emer geocy olt push buttons.
4. Tum lhe MEVATRON 011.

4.0 El ectrlcal CheckIJ

4.1 SI2PumpslandAssembty
1. Check ALl water connectioos l ar leaks.
2. Verity lhe water ftow Ihrough the deiooizer cartiridge .
3. Record pump pt'essUf8 on lhe parameter sheet.
4. Check Ihel lhe water temperatura ls aI 1 04' F (40'C) .lIer approximately 15 mir'llJl es.
Aecord temperatura after warm-up on parameter 6heet.
5. Check water conductivity. rBCOfd values in lhe blanks in lhe cheddist

4.2 G7/G 4Q frontpointer and Aa nge!indor Asse mbly


1. Check IrontpOinter end rangelinder calibra~on .

4.3 H4 Accessory HoIder


1. Check lhat accessory codes are verilied eo<l clear elllnterlocl<s.

4.4 H3 1 Primary Co!~matiog System


1. Ouring IItop 2 of this seetion. lubricate gantry bearing using grease gun, lhroughoul lhe
fou r quadrants (180· , 270·. O·, 90· ).
2: Verify operaliOn of ali moda positions in eaeh of thelour quadrants
(IS00, 270", 0", 90°).
3. Ye rify propor operation of the temperatura com pensation cireuitry with physlcs.

4.5 H Lower Delining Head (HPD OI' Standard Jaws)


1. Yo rify opl imum illumina tion of the IIght fi eld. Adjust it necessary.
2. Check ~ght lield size versus displayed l ield sizes (10 l( l Oem).
3. Cheek X·ray·to-light rlllld coincidooce lor. 10)( 10 em field. Record er'lEltgy. MU
delivered, date. and Ini~al s on film . Adjus! if necessary.

S<emens MedieIol SysII!1TlS. Inc. l!a 44 383 SOO3U Convenllonal MEVATRON


R.v. • Sy.lem
0n0:0I0gy Care Syslems
""
.'
14 MAINTENANCE 12-MONTH INSPECTION
Inslructions

4.6 KS Solenoid Power Supp!les


1. Ve rify Ihal ALl power supplies are In curren! regulation mode.
2. Verify operalion 01 eooIing lans. Happlicable.

4.7 K9 KIySlron Filament Pow er Supply


,. Verify Ihal power supply Is in currenl ragulatlon mode.
2. Verify operation 01 cooIing lan, if epplicable.

4.8 K2 Auxi üary Interlock Chassis Assembly


1. Measure end record lhe k1ystron lon pump hlgh voltage in lhe checldist.

5.0 Wrap-up
1. Reinslall ali chassis covars.
2. Ciosa ali chassis 8558mblies, etc.
3. Reinstan machine covers.
4. Clean AlL o)(!emal mactWle COV8fS,
5. Program 800 run ALl energ ias to veri1y Il,rIctiorI belore traatm ents resuma.

6.0 Olscrepancy l og
1. Log any discrepaneioslound, in lhe labia provided in th8 ehecIdisl
• tncica le whether lhe dserepancy is cotrected or not.
• 1I sarvica Is to be schodulad, opan an Incident number lor ali 01 lhe discrepancies
(~ded "discrepancies found during PM").

7.0 Completlon
1. Complete lhe inspeClion completion cerul icate (Iast pago 01 lhe chacklist) .
2. Sanei lho carulicate to your area managar.

Siemens Medicai Syslem_: Inc. 111 44 3&3 s003U Convlfltlornol MEVATRON


0rIc0I0gy c..e Systems Rev. A. Sy_tem
""
MAINTENANCE 12-MONTH INSPECTION 15 '
Checklist

CHECKlIST
1.0 Complete lhe Mechanlcal Portlon 5etup.
• Insta,a Iock-ootllag-out device and Iock. Initial, date, anel f~1 in lhe time lhe
Iock-Clllt device i5 inSlalled. 11 more Ihan one person will be working 00 lhe
equlpment, Ihen each eódilional worker shlll install lheir Iock,

IniIlaIS:==== Dale:====
In l~ als:
Irlitials:
Date:
Oale:
Tim,,=
Time:
Time:

2.0 CleanlnglEleclrlcal Connecllon TIghlnell Check.

2.1 Cleanr."spect lhe S12 pumpstand essembly


IlnII'-lI loncomp-I
2.2 ClearVinspect lhe G4 AFC preamp assembly
!Inill.', IDa~~~~1

2.3 Clearv'inspecllhe G5 ion pump assembly


I I
1n1tlJl1, 0.11 compl-'td t

2.4 Clearvinspecl lhe G7/G 40 IronlpOinter anel rangefinder assembly


Ilnltlal. I Da'e c.........1ed I
Cleanlinspect lhe G3 dose preamplifier 8ssemb/y

2.' ClearVinsped lhe H Iower defiring head (HPC jaws) N/A O

Siemens MelfICaI Syslems. Ine. 1944363 SOO3U Convlnllonel MEVATRON


0ne0I0gy Call Syslems R,v. A 2195 $plltm
16 MAINTENANCE 12-MONTH INSPECTION
Checklist

' .7
I I
ClearJinspe<:t lhe H Iower defininç head (star.dard jaws) N/A O
111'1"11111 De" COftlple'~

2.8 ClearJinspeet lhe Hl primary collimating s~stem

3.0 Electrlcl' Partion Selup


• Remove Iock-QUt/\ag-out devlce. lnitial, date. anel fiR in lhe tima thelock-out devlce Is
remov&d. 11 more than 008 person had l nsta lled !heir Iock, then Iheir Iock(s) musl be
re moved lirsl.

InitiaJS:~.
Iflitials:
11'I111a1s:
=== 0"':.===
Data:
Date:
TIme removed:
TIme removed:
rwne removed:

4.0 Electrlcal Checks

4.1 l éSl lhe S I2 pumpsland assembty


• Record water conduc:tivity values in lhe blanks below:
System water: MílIcm' $tored water: MílIcm3
11'1111,1, DI'I compll led

•., Tesl lhe G7/G40 fronlpoinler anel rangefinder l$$Ombly


l,nlUa" I
0..1 compI!'''' I
' .3
I
Te s! lhe H4 Iccessory helder essembly
IlnltlaI. Dal, comple'''' I
••• Tesl lhe H31 primary collimating system
Itlllll'e Olt. com letecl

Siem&ns Medicai Systems, lne. 19« 3&3 S./103U Connnllo nal MEVATRON
0nc0I0gy Care $ys!ems RIJV. A 21'95 Sy . t.m
MAINTENANCE 12-MONTH INSPECTION 17 .'
Checklist

4.5 Check lhe H Iower4efii'Wlg head (HPO or standard Jaws)

4.6 Tesl lhe K5 soIenoid power $upplies K elaS$ N/A D


1,,111.1. Oat, complel*l

4.7 Tesl lhe K9 klystron l ilam(lrll power supply K Class N/A O


IlnItlel. I
D.ta C~t.d I
4.' Tes! lhe K2 allXÍliary inle~ock chassis assembly K Class N/A D
• Record lhe kly$lron ion pump high voItage ...aloo below:

Klysllon ion p..-np high voItage: kV


IlnillMa I
0.. comp"tlOd !
,., Perform l he Inspecllon WTap-IJp.

Siemeos l.4edical Syslema, Inc. Conv.nl lon'l MEVATRON


Oncology Cal' Sysle_ s .. _

Das könnte Ihnen auch gefallen