Sie sind auf Seite 1von 2

South Dhahran Home Ownership Project(SDHOP) Rev 0

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Grounding - GES - Power Ground Electrode System (GES) -
SAIC-P-3719 ELECT-
Installation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
SOUTH DHARAN HOMEOWERSHIP PROJECT BRANCH OF SINOHYDRO
28-00014-0002
ELEMENTARY SCHOOLS , KG AND SPECIAL SCHOOL CORPORATION COMPANY LTD.

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A. General Requirements
The ground electrode for system grounding shall consist of either:
(1) rod or
pipe electrode(s), or SAES-P-111
A1
(2) a combination of Sec. 7.1.3
rod or pipe electrodes and a grid or loop of bare copper conductors
buried a minimum of 460 mm.
Check that the rod or pipe is free from nonconductive coatings such as
SAES-P-111
A2 paint or enamel prior to being driven to the ground.
Sec. 4.1
[NEC 250.53 (A)]
Where practicable, rod and pipe electrodes shall be embedded below SAES-P-111
A3
permanent moisture level. [NEC 250.53 (A)] Sec. 4.1
Multiple rod or pipe electrodes shall be interconnected by bare or
SAES-P-111
A4 insulated copper conductors using thermite welding or approved
Sec. 7.1.3
connectors.
Conductors used to interconnect rod or pipe electrodes shall be buried a SAES-P-111
A5
minimum of 460 mm. Sec. 7.1.3
Conductor size shall not be less than 70 mm² (2/0 AWG), if buried and SAES-P-111
A6
used for grids and/or interconnection of ground rods. Sec. 5.1 (g)

REMARKS:

REFERENCE DOCUMENTS:
1. SAES-P-111 -- Grounding, 16 July 2006
2. NFPA 70 -- National Electrical Code (NEC), 2008 Edition

NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the manufacturer
indicates compliance with appropriate standards or performance in a specified manner.

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others

Page 1 of 2
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2

Das könnte Ihnen auch gefallen