Sie sind auf Seite 1von 107

Steam turbine power generation

arrangement overview and vibration type and location


Sensor type Tag initial ID
D-xxxx Eddy current, vibration signal was retreived from vibration console and captured by Bentley Nevada ADRE DAIU-208 and Technekon STD-3300
V-xxxx Velocity, vibration signal was retreived from vibration console and captured by Bentley Nevada
Technekon ADRE DAIU-208 and Technekon STD-3300
STD-3300
A-xxxx Acceleration, separated ICP vibration sensor, signal was detected by Portable vibration analyzer, Technekon STD-3300
Steam tutbine and HS pinion shaft speed, 5791 RPM
Gear, HS gear 43 T X-spectrum X-spectrum X-spectrum X-spectrum Photo tool used
Gear, LS gear 166 T Y-spectrum Y-spectrum Y-sepctrum Y-spectrum
Gen and LS shaft speed 1500 rpm Orbit Orbit Orbit Orbit
Gear service factor AGMA 421-06>1.3 Waterfall 160-5791rpm Waterfall 160-5791rpm Waterfall 160-5791rpm Waterfall 160-5791rpm
Power 43 MW Waterfall 0-160 rpm Waterfall 0-160 rpm Waterfall 0-160 rpm Waterfall 0-160 rpm
DC gap 160-5791 rpm DC gap 160-5791 rpm DC gap 160-5791 rpm DC gap 160-5791 rpm
Please move cursor over the Text block click DC gap 0-160 rpm DC gap 0-160 rpm DC gap 0-160 rpm DC gap 0-160 rpm
to see vibration details Trend 160-5791 rpm Trend 160-5791 rpm Trend 160-5791 rpm Trend 160-5791 rpm
Trend 0-160 rpm Trend 0-160 rpm Trend 0-160 rpm Trend 0-160 rpm
X Y
NDE-2 DE-2 DE-1 NDE-1
Turning A B
A A'
motor
HS Top view
X Y
A' B'
D B B'
C
LS
Top view

C' D'
Oil pump
HS-NDE HS-DE
Waveform Waveform
Spectrum Spectrum C C'
NDE-4 DE-4 DE-3 NDE-3 Waterfall Waterfall
Waveform Waveform Waveform Waveform Resolution 1,25 Hz/line
Spectrum Spectrum Spectrum Spectrum
Resolution 0,156 Hz/line Resolution 10 Hz/line

LS-DE LS-NDE
Waveform Waveform D D'
Home

Spectrum Spectrum
Waterfall Waterfall
Resolution 1,25 Hz/line
TREND PLOT PLOT NO._______ Home
COMPANY: Bently Nevada Corp. PLANT: EGGO cogeneration
MACHINE TRAIN: Steam turbine Non-subtract slow roll JOB REFERENCE: Steam turbine

POINT: Channel 1 45 Left DIRECT 1.04 micro m pp


POINT: Channel 2 45 Right DIRECT 0.980 micro m pp
MACHINE: Machine 23JUL2013
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup 10:18:24.0
Started
D-NDE-1 100
80
80
See waterfall
60
60
40 40
20 20
160 rpm
0 0
10:19 0 rpm 10:21 10:23 10:25 10:27 10:29 10:31
23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 30 Secs /div
POINT: Channel 3 45 Left DIRECT 1.04 micro m pp
POINT: Channel 4 45 Right DIRECT 0.914 micro m pp
MACHINE: Machine 23JUL2013
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup 10:18:24.0

80 100
D-DE-1
80
60
60
40
40
20 20

0 0
10:19 10:21 10:23 10:25 10:27 10:29 10:31
23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 30 Secs /div
POINT: Channel 5 45 Left DIRECT 1.04 micro m pp
POINT: Channel 6 45 Right DIRECT 0.914 micro m pp
MACHINE: Machine 23JUL2013
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup 10:18:24.0
150 D-DE-2 60

100
40

50 20

0 0
10:19 10:21 10:23 10:25 10:27 10:29 10:31
23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 30 Secs /div
POINT: Channel 7 45 Left DIRECT 0.914 micro m pp
POINT: Channel 8 45 Right DIRECT 0.914 micro m pp
MACHINE: Machine 23JUL2013
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup 10:18:24.0
200
D-NDE-2
150 100

100
50
50

0 0
10:19 10:21 10:23 10:25 10:27 10:29 10:31
23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 30 Secs /div

COMMENTS

0 rpm 160 rpm

BENTLY R

NEVADA
TREND PLOT PLOT NO._______
COMPANY: Bently Nevada Corp. PLANT: EGGO cogeneration Home
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1 45 Left GAP -10.2 Volts


POINT: Channel 2 45 Right GAP -10.1 Volts
MACHINE: Machine 23JUL2013
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup 10:18:24.0 Started
0 0
NDE-1, X-Y
-2 -2

-4 -4
Click here to see
-6 -6
shaft center position
-8 -8
-10 -10
10:19 10:21 10:23 10:25 10:27 10:29 10:31
23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 30 Secs /div
POINT: Channel 3 45 Left GAP -8.59 Volts
POINT: Channel 4 45 Right GAP -9.47 Volts
MACHINE: Machine 23JUL2013
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup 10:18:24.0
0 0
DE-1, X-Y
-2 -2
Click here to see -4
-4
shaft center position
-6
-6
-8
-8

10:19 10:21 10:23 10:25 10:27 10:29 10:31


23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 30 Secs /div
POINT: Channel 5 45 Left GAP -11.5 Volts
POINT: Channel 6 45 Right GAP -11.5 Volts
MACHINE: Machine 23JUL2013
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup 10:18:24.0
0 0
DE-2, X-Y
-2 -2
-4 Click here to see -4
-6 shaft center position -6

-8 -8

-10 -10

10:19 10:21 10:23 10:25 10:27 10:29 10:31


23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 30 Secs /div
POINT: Channel 7 45 Left GAP -10.7 Volts
POINT: Channel 8 45 Right GAP -10.4 Volts
MACHINE: Machine 23JUL2013
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup 10:18:24.0
0 0
NDE-2, X-Y
-2 -2
Click here to see
-4 -4
shaft center position
-6 -6

-8 -8

-10 -10

10:19 10:21 10:23 10:25 10:27 10:29 10:31


23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 30 Secs /div

COMMENTS
160 rpm
0 rpm

BENTLY R

NEVADA
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______
COMPANY: Bently Nevada Corp. PLANT: EGGO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1 45 Left REF: -10.2 Volts 0


POINT: Channel 2 45 Right REF: -10.1 Volts 0
MACHINE: Machine (0, 0)
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

(not orbit or polar plot) UP


300
NDE-1 Back

200

160 rpm

100

0
0 rpm

-100
-200 -100 0 100 200

20 micro m /div

COMMENTS

BENTLY R

NEVADA
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______
COMPANY: Bently Nevada Corp. PLANT: EGGO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 3 45 Left REF: -8.59 Volts 0


POINT: Channel 4 45 Right REF: -9.47 Volts 0
MACHINE: Machine (0, 0)
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

(not orbit or polar plot) UP


300
DE-1 Back

200

100

160 rpm

0 0 rpm at 0th minute

0 rpm started
to 160 rpm 0 rpm at 10th minute

-100
-200 -100 0 100 200

20 micro m /div

COMMENTS

BENTLY R

NEVADA
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______
COMPANY: Bently Nevada Corp. PLANT: EGGO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 5 45 Left REF: -11.5 Volts 0


POINT: Channel 6 45 Right REF: -11.5 Volts 0
MACHINE: Machine (0, 0)
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

(not orbit or polar plot) UP


300
DE-2 Back

200

160 rpm

100

0 rpm

0 0 rpm

-100
-200 -100 0 100 200

20 micro m /div

COMMENTS

BENTLY R

NEVADA
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______
COMPANY: Bently Nevada Corp. PLANT: EGGO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 7 45 Left REF: -10.7 Volts 0


POINT: Channel 8 45 Right REF: -10.4 Volts 0
MACHINE: Machine (0, 0)
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup

(not orbit or polar plot) UP


300
NDE-2 back

160 rpm

200

100 0 rpm

0
0 rpm

-100
-200 -100 0 100 200

20 micro m /div

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: Bently Nevada Corp. PLANT: EGGO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1 45 Left


MACHINE: Machine Home
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 Startup 10:18:24.8
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz Back
D-NDE-1-X

10:30:13.1 160
10:28:13.1 160
10:26:13.1 160
10:24:13.1 160
10:22:13.1 160
10:20:13.1 160
10:18:24.8 160
0 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div

POINT: Channel 2 45 Right


MACHINE: Machine
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 Startup 10:18:24.8
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
D-NDE-1-Y

10:30:13.1 160
10:28:13.1 160
10:26:13.1 160
10:24:13.1 160
10:22:13.1 160
10:20:13.1 160
10:18:24.8 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div

POINT: Channel 3 45 Left


MACHINE: Machine
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 Startup 10:18:24.8
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
D-DE-1-X

10:30:13.1 160
10:28:13.1 160
10:26:13.1 160
10:24:13.1 160
10:22:13.1 160
10:20:13.1 160
10:18:24.8 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div

POINT: Channel 4 45 Right


MACHINE: Machine
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 Startup 10:18:24.8
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
D-DE-1-Y

10:30:13.1 160
10:28:13.1 160
10:26:13.1 160
10:24:13.1 160
10:22:13.1 160
10:20:13.1 160
10:18:24.8 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: Bently Nevada Corp. PLANT: EGGO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 5 45 Left


MACHINE: Machine
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 Startup 10:18:24.8 Home
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
D-DE-2-X

10:30:13.1 160
10:28:13.1 160
10:26:13.1 160
10:24:13.1 160
10:22:13.1 160
10:20:13.1 160
10:18:24.8 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div

POINT: Channel 6 45 Right


MACHINE: Machine
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 Startup 10:18:24.8
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
D-DE-2-Y

10:30:13.1 160
10:28:13.1 160
10:26:13.1 160
10:24:13.1 160
10:22:13.1 160
10:20:13.1 160
10:18:24.8 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div

POINT: Channel 7 45 Left


MACHINE: Machine
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 Startup 10:18:24.8
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
D-NDE-2-X

10:30:13.1 160
10:28:13.1 160
10:26:13.1 160
10:24:13.1 160
10:22:13.1 160
10:20:13.1 160
10:18:24.8 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div

POINT: Channel 8 45 Right


MACHINE: Machine
From 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 Startup 10:18:24.8
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
D-NDE-2-Y

10:30:13.1 160
10:28:13.1 160
10:26:13.1 160
10:24:13.1 160
10:22:13.1 160
10:20:13.1 160
10:18:24.8 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine Home
POINT: Channel 1 45 Left
MACHINE: Machine Connect to
From 23JUL2013 17:29:25.3 To 23JUL2013next
18:25:55.4
plot Startup 18:20:25.4
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz Back to trend Click here to see
D-NDE-1-X D-NDE-1-Y

18:25:25.4 160
18:24:25.4 160
18:23:25.4 160
18:22:25.4 160
18:21:25.4 160
18:20:25.4 160
18:19:25.4 160
18:18:25.4 160
18:17:25.4 160
18:16:25.4 160
18:15:25.4 160
18:14:25.4 160
18:13:25.4 160
18:12:25.4 160
18:11:25.4 160
18:10:25.4 160
18:09:25.4 160
18:08:25.4 160
18:07:25.4 160
18:06:25.4 160
18:05:25.4 160
5791 rpm
18:04:25.4 160
18:03:25.4 160
18:02:25.4 160
18:01:25.4 160
18:00:25.4 160
17:59:25.4 160
17:58:25.4 160
17:57:25.4 160
17:56:25.4 160
17:55:25.4 160
17:54:25.4 160
17:53:25.4 160
17:52:25.4 160
17:51:25.4 160
17:50:25.4 160
17:49:25.4 160
17:48:25.4 160
17:47:25.4 160
17:46:25.4 160
17:45:25.4 160
17:44:25.4 160
17:43:25.4 160
17:42:25.4 160
17:41:25.4 160
17:40:25.4 160
17:39:25.4 160
17:38:25.4 160
17:37:25.4 160
17:36:25.4 160
17:35:25.4 160
17:34:25.4 160
17:33:25.4 160
17:32:25.4 160
17:31:25.4 160
17:30:25.4 160
17:29:25.3 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div 1.83@ 96 Hertz

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1 45 Left


MACHINE: Machine
From 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 Startup 18:26:31.1
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
Back

19:18:01.1 160
19:17:01.1 160
19:15:31.1 160
19:14:31.1 160
19:13:31.1 160
19:12:31.1 160
19:11:31.1 160
19:10:31.1 160
19:09:31.1 160
19:08:31.1 160
19:07:31.1 160
19:06:31.1 160
19:05:31.1 160
19:04:31.1 160
19:03:31.1 160
19:02:31.1 160
19:01:31.1 160
19:00:31.1 160
18:59:31.1 160
18:58:31.1 160
18:57:31.1 160
18:56:31.1 160
18:55:31.1 160
18:54:31.1 160
18:53:31.1 160
18:52:31.1 160
18:51:31.1 160
18:50:31.1 160
18:49:31.1 160
18:48:31.1 160
18:47:31.1 160
18:46:31.1 160
18:45:31.1 160
18:44:31.1 160
18:43:31.1 160
18:42:31.1 160
18:41:31.1 160
18:40:31.1 160
18:39:31.1 160
18:38:31.1 160
18:37:31.1 160
18:36:31.1 160
18:35:31.1 160
18:34:31.1 160
18:33:31.1 160
18:32:31.1 160
18:31:31.1 160
18:30:31.1 160
18:29:31.1 160
18:28:31.1 160
18:27:31.1 160
18:26:31.1 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div
Connecting point

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine Home
POINT: Channel 2 45 Right
MACHINE: Machine
Connect to
From 23JUL2013 17:29:25.3 To 23JUL2013next plot Startup
18:25:55.4 18:18:25.4
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz Back to
Back to trend
D-NDE-1-Y D-NDE-1-X

18:25:25.4 160
18:24:25.4 160
18:23:25.4 160
18:22:25.4 160
18:21:25.4 160
18:20:25.4 160
18:19:25.4 160
18:18:25.4 160
18:17:25.4 160
18:16:25.4 160
18:15:25.4 160
18:14:25.4 160
18:13:25.4 160
18:12:25.4 160
18:11:25.4 160
18:10:25.4 160
18:09:25.4 160
18:08:25.4 160
18:07:25.4 160
18:06:25.4 160
18:05:25.4 160
18:04:25.4
5791 rpm
160
18:03:25.4 160
18:02:25.4 160
18:01:25.4 160
18:00:25.4 160
17:59:25.4 160
17:58:25.4 160
17:57:25.4 160
17:56:25.4 160
17:55:25.4 160
17:54:25.4 160
17:53:25.4 160
17:52:25.4 160
17:51:25.4 160
17:50:25.4 160
17:49:25.4 160
17:48:25.4 160
17:47:25.4 160
17:46:25.4 160
17:45:25.4 160
17:44:25.4 160
17:43:25.4 160
17:42:25.4 160
17:41:25.4 160
17:40:25.4 160
17:39:25.4 160
17:38:25.4 160
17:37:25.4 160
17:36:25.4 160
17:35:25.4 160
17:34:25.4 160
17:33:25.4 160
17:32:25.4 160
17:31:25.4 160
17:30:25.4 160
17:29:25.3 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div 2.74@ 192 Hertz

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 2 45 Right


MACHINE: Machine
From 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 Startup 18:26:31.1
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
Back

19:18:01.1 160
19:17:01.1 160
19:15:31.1 160
19:14:31.1 160
19:13:31.1 160
19:12:31.1 160
19:11:31.1 160
19:10:31.1 160
19:09:31.1 160
19:08:31.1 160
19:07:31.1 160
19:06:31.1 160
19:05:31.1 160
19:04:31.1 160
19:03:31.1 160
19:02:31.1 160
19:01:31.1 160
19:00:31.1 160
18:59:31.1 160
18:58:31.1 160
18:57:31.1 160
18:56:31.1 160
18:55:31.1 160
18:54:31.1 160
18:53:31.1 160
18:52:31.1 160
18:51:31.1 160
18:50:31.1 160
18:49:31.1 160
18:48:31.1 160
18:47:31.1 160
18:46:31.1 160
18:45:31.1 160
18:44:31.1 160
18:43:31.1 160
18:42:31.1 160
18:41:31.1 160
18:40:31.1 160
18:39:31.1 160
18:38:31.1 160
18:37:31.1 160
18:36:31.1 160
18:35:31.1 160
18:34:31.1 160
18:33:31.1 160
18:32:31.1 160
18:31:31.1 160
18:30:31.1 160
18:29:31.1 160
18:28:31.1 160
18:27:31.1 160
18:26:31.1 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div
Connecting point

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine connect to JOB REFERENCE: Steam turbine
next plot Home
POINT: Channel 3 45 Left
MACHINE: Machine
From 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 Startup 18:12:25.4
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz Back to trend Click here to see
D-DE-1-X D-DE-1-Y

18:25:25.4 160
18:24:25.4 160
18:23:25.4 160
18:22:25.4 160
18:21:25.4 160
18:20:25.4 160
18:19:25.4 160
18:18:25.4 160
18:17:25.4 160
18:16:25.4 160
18:15:25.4 160
18:14:25.4 160
18:13:25.4 160
18:12:25.4 160
18:11:25.4 160
18:10:25.4 160
18:09:25.4 160
18:08:25.4 160
18:07:25.4 160
18:06:25.4 160
18:05:25.4 160
5791 rpm
18:04:25.4 160
18:03:25.4 160
18:02:25.4 160
18:01:25.4 160
18:00:25.4 160
17:59:25.4 160
17:58:25.4 160
17:57:25.4 160
17:56:25.4 160
17:55:25.4 160
17:54:25.4 160
17:53:25.4 160
17:52:25.4 160
17:51:25.4 160
17:50:25.4 160
17:49:25.4 160
17:48:25.4 160
17:47:25.4 160
17:46:25.4 160
17:45:25.4 160
17:44:25.4 160
17:43:25.4 160
17:42:25.4 160
17:41:25.4 160
17:40:25.4 160
17:39:25.4 160
17:38:25.4 160
17:37:25.4 160
17:36:25.4 160
17:35:25.4 160
17:34:25.4 160
17:33:25.4 160
17:32:25.4 160
17:31:25.4 160
17:30:25.4 160
17:29:25.3 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div 1.18@ 25 Hertz

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 3 45 Left


MACHINE: Machine
From 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 Startup 18:26:31.1
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
Back

19:18:01.1 160
19:17:01.1 160
19:15:31.1 160
19:14:31.1 160
19:13:31.1 160
19:12:31.1 160
19:11:31.1 160
19:10:31.1 160
19:09:31.1 160
19:08:31.1 160
19:07:31.1 160
19:06:31.1 160
19:05:31.1 160
19:04:31.1 160
19:03:31.1 160
19:02:31.1 160
19:01:31.1 160
19:00:31.1 160
18:59:31.1 160
18:58:31.1 160
18:57:31.1 160
18:56:31.1 160
18:55:31.1 160
18:54:31.1 160
18:53:31.1 160
18:52:31.1 160
18:51:31.1 160
18:50:31.1 160
18:49:31.1 160
18:48:31.1 160
18:47:31.1 160
18:46:31.1 160
18:45:31.1 160
18:44:31.1 160
18:43:31.1 160
18:42:31.1 160
18:41:31.1 160
18:40:31.1 160
18:39:31.1 160
18:38:31.1 160
18:37:31.1 160
18:36:31.1 160
18:35:31.1 160
18:34:31.1 160
18:33:31.1 160
18:32:31.1 160
18:31:31.1 160
18:30:31.1 160
18:29:31.1 160
18:28:31.1 160
18:27:31.1 160
18:26:31.1 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div
connecting point

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine connect to JOB REFERENCE: Steam turbine Back
next plot
POINT: Channel 4 45 Right
MACHINE: Machine
From 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 Startup 18:16:25.4
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz Back to trend Back to
D-DE-1-Y D-DE-1-X

18:25:25.4 160
18:24:25.4 160
18:23:25.4 160
18:22:25.4 160
18:21:25.4 160
18:20:25.4 160
18:19:25.4 160
18:18:25.4 160
18:17:25.4 160
18:16:25.4 160
18:15:25.4 160
18:14:25.4 160
18:13:25.4 160
18:12:25.4 160
18:11:25.4 160
18:10:25.4 160
18:09:25.4 160
18:08:25.4 160
18:07:25.4 160
18:06:25.4 160
18:05:25.4 160
5791 rpm
18:04:25.4 160
18:03:25.4 160
18:02:25.4 160
18:01:25.4 160
18:00:25.4 160
17:59:25.4 160
17:58:25.4 160
17:57:25.4 160
17:56:25.4 160
17:55:25.4 160
17:54:25.4 160
17:53:25.4 160
17:52:25.4 160
17:51:25.4 160
17:50:25.4 160
17:49:25.4 160
17:48:25.4 160
17:47:25.4 160
17:46:25.4 160
17:45:25.4 160
17:44:25.4 160
17:43:25.4 160
17:42:25.4 160
17:41:25.4 160
17:40:25.4 160
17:39:25.4 160
17:38:25.4 160
17:37:25.4 160
17:36:25.4 160
17:35:25.4 160
17:34:25.4 160
17:33:25.4 160
17:32:25.4 160
17:31:25.4 160
17:30:25.4 160
17:29:25.3 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div 0.784@ 25 Hertz

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 4 45 Right


MACHINE: Machine
From 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 Startup 18:26:31.1
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
Back

19:18:01.1 160
19:17:01.1 160
19:15:31.1 160
19:14:31.1 160
19:13:31.1 160
19:12:31.1 160
19:11:31.1 160
19:10:31.1 160
19:09:31.1 160
19:08:31.1 160
19:07:31.1 160
19:06:31.1 160
19:05:31.1 160
19:04:31.1 160
19:03:31.1 160
19:02:31.1 160
19:01:31.1 160
19:00:31.1 160
18:59:31.1 160
18:58:31.1 160
18:57:31.1 160
18:56:31.1 160
18:55:31.1 160
18:54:31.1 160
18:53:31.1 160
18:52:31.1 160
18:51:31.1 160
18:50:31.1 160
18:49:31.1 160
18:48:31.1 160
18:47:31.1 160
18:46:31.1 160
18:45:31.1 160
18:44:31.1 160
18:43:31.1 160
18:42:31.1 160
18:41:31.1 160
18:40:31.1 160
18:39:31.1 160
18:38:31.1 160
18:37:31.1 160
18:36:31.1 160
18:35:31.1 160
18:34:31.1 160
18:33:31.1 160
18:32:31.1 160
18:31:31.1 160
18:30:31.1 160
18:29:31.1 160
18:28:31.1 160
18:27:31.1 160
18:26:31.1 160 rpm
0 100 200 300 400 500
connecting point FREQUENCY: 20 Hertz/div

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine Home
POINT: Channel 5 45 Left Connect to
MACHINE: Machine next plot
From 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 Startup 18:16:25.4
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz Back to trend Click to see
D-DE-2-X D-DE-2-Y

18:25:25.4 160
18:24:25.4 160
18:23:25.4 160
18:22:25.4 160
18:21:25.4 160
18:20:25.4 160
18:19:25.4 160
18:18:25.4 160
18:17:25.4 160
18:16:25.4 160
18:15:25.4 160
18:14:25.4 160
18:13:25.4 160
18:12:25.4 160
18:11:25.4 160
18:10:25.4 160
18:09:25.4 160
18:08:25.4 160
18:07:25.4 160
18:06:25.4 160
18:05:25.4 160
5791 rpm
18:04:25.4 160
18:03:25.4 160
18:02:25.4 160
18:01:25.4 160
18:00:25.4 160
17:59:25.4 160
17:58:25.4 160
17:57:25.4 160
17:56:25.4 160
17:55:25.4 160
17:54:25.4 160
17:53:25.4 160
17:52:25.4 160
17:51:25.4 160
17:50:25.4 160
17:49:25.4 160
17:48:25.4 160
17:47:25.4 160
17:46:25.4 160
17:45:25.4 160
17:44:25.4 160
17:43:25.4 160
17:42:25.4 160
17:41:25.4 160
17:40:25.4 160
17:39:25.4 160
17:38:25.4 160
17:37:25.4 160
17:36:25.4 160
17:35:25.4 160
17:34:25.4 160
17:33:25.4 160
17:32:25.4 160
17:31:25.4 160
17:30:25.4 160
17:29:25.3 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div 10.1@ 96 Hertz

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 5 45 Left


MACHINE: Machine
From 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 Startup 18:26:31.1
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
Back

19:18:01.1 160
19:17:01.1 160
19:15:31.1 160
19:14:31.1 160
19:13:31.1 160
19:12:31.1 160
19:11:31.1 160
19:10:31.1 160
19:09:31.1 160
19:08:31.1 160
19:07:31.1 160
19:06:31.1 160
19:05:31.1 160
19:04:31.1 160
19:03:31.1 160
19:02:31.1 160
19:01:31.1 160
19:00:31.1 160
18:59:31.1 160
18:58:31.1 160
18:57:31.1 160
18:56:31.1 160
18:55:31.1 160
18:54:31.1 160
18:53:31.1 160
18:52:31.1 160
18:51:31.1 160
18:50:31.1 160
18:49:31.1 160
18:48:31.1 160
18:47:31.1 160
18:46:31.1 160
18:45:31.1 160
18:44:31.1 160
18:43:31.1 160
18:42:31.1 160
18:41:31.1 160
18:40:31.1 160
18:39:31.1 160
18:38:31.1 160
18:37:31.1 160
18:36:31.1 160
18:35:31.1 160
18:34:31.1 160
18:33:31.1 160
18:32:31.1 160
18:31:31.1 160
18:30:31.1 160
18:29:31.1 160
18:28:31.1 160
18:27:31.1 160
18:26:31.1 160 rpm
0 100 200 300 400 500
Connecting point FREQUENCY: 20 Hertz/div

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine Home
POINT: Channel 6 45 Right
MACHINE: Machine Connect to
next
From 23JUL2013 17:29:25.3 To 23JUL2013 plot Startup
18:25:55.4 18:25:55.4
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz Back to trend Back to
D-DE-2-Y D-DE-2-X

18:25:25.4 160
18:24:25.4 160
18:23:25.4 160
18:22:25.4 160
18:21:25.4 160
18:20:25.4 160
18:19:25.4 160
18:18:25.4 160
18:17:25.4 160
18:16:25.4 160
18:15:25.4 160
18:14:25.4 160
18:13:25.4 160
18:12:25.4 160
18:11:25.4 160
18:10:25.4 160
18:09:25.4 160
18:08:25.4 160
18:07:25.4 160
18:06:25.4 160
18:05:25.4 160
18:04:25.4 5791
160 rpm
18:03:25.4 160
18:02:25.4 160
18:01:25.4 160
18:00:25.4 160
17:59:25.4 160
17:58:25.4 160
17:57:25.4 160
17:56:25.4 160
17:55:25.4 160
17:54:25.4 160
17:53:25.4 160
17:52:25.4 160
17:51:25.4 160
17:50:25.4 160
17:49:25.4 160
17:48:25.4 160
17:47:25.4 160
17:46:25.4 160
17:45:25.4 160
17:44:25.4 160
17:43:25.4 160
17:42:25.4 160
17:41:25.4 160
17:40:25.4 160
17:39:25.4 160
17:38:25.4 160
17:37:25.4 160
17:36:25.4 160
17:35:25.4 160
17:34:25.4 160
17:33:25.4 160
17:32:25.4 160
17:31:25.4 160
17:30:25.4 160
17:29:25.3 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div 7.18@ 14 Hertz

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 6 45 Right


MACHINE: Machine
From 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 Startup 18:26:31.1
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
Back

19:18:01.1 160
19:17:01.1 160
19:15:31.1 160
19:14:31.1 160
19:13:31.1 160
19:12:31.1 160
19:11:31.1 160
19:10:31.1 160
19:09:31.1 160
19:08:31.1 160
19:07:31.1 160
19:06:31.1 160
19:05:31.1 160
19:04:31.1 160
19:03:31.1 160
19:02:31.1 160
19:01:31.1 160
19:00:31.1 160
18:59:31.1 160
18:58:31.1 160
18:57:31.1 160
18:56:31.1 160
18:55:31.1 160
18:54:31.1 160
18:53:31.1 160
18:52:31.1 160
18:51:31.1 160
18:50:31.1 160
18:49:31.1 160
18:48:31.1 160
18:47:31.1 160
18:46:31.1 160
18:45:31.1 160
18:44:31.1 160
18:43:31.1 160
18:42:31.1 160
18:41:31.1 160
18:40:31.1 160
18:39:31.1 160
18:38:31.1 160
18:37:31.1 160
18:36:31.1 160
18:35:31.1 160
18:34:31.1 160
18:33:31.1 160
18:32:31.1 160
18:31:31.1 160
18:30:31.1 160
18:29:31.1 160
18:28:31.1 160
18:27:31.1 160
18:26:31.1 160 rpm
0 100 200 300 400 500
connecting point FREQUENCY: 20 Hertz/div

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine Home
POINT: Channel 7 45 Left
MACHINE: Machine Connect to
From 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 Startup 18:25:55.4
next plot
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz Back to trend Click to see
D-NDE-2-X D-NDE-2-Y

18:25:25.4 160
18:24:25.4 160
18:23:25.4 160
18:22:25.4 160
18:21:25.4 160
18:20:25.4 160
18:19:25.4 160
18:18:25.4 160
18:17:25.4 160
18:16:25.4 160
18:15:25.4 160
18:14:25.4 160
18:13:25.4 160
18:12:25.4 160
18:11:25.4 160
18:10:25.4 160
18:09:25.4 160
18:08:25.4 160
18:07:25.4 160
18:06:25.4 160
18:05:25.4 160
18:04:25.4 5791
160 rpm
18:03:25.4 160
18:02:25.4 160
18:01:25.4 160
18:00:25.4 160
17:59:25.4 160
17:58:25.4 160
17:57:25.4 160
17:56:25.4 160
17:55:25.4 160
17:54:25.4 160
17:53:25.4 160
17:52:25.4 160
17:51:25.4 160
17:50:25.4 160
17:49:25.4 160
17:48:25.4 160
17:47:25.4 160
17:46:25.4 160
17:45:25.4 160
17:44:25.4 160
17:43:25.4 160
17:42:25.4 160
17:41:25.4 160
17:40:25.4 160
17:39:25.4 160
17:38:25.4 160
17:37:25.4 160
17:36:25.4 160
17:35:25.4 160
17:34:25.4 160
17:33:25.4 160
17:32:25.4 160
17:31:25.4 160
17:30:25.4 160
17:29:25.3 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div 3.00@ 14 Hertz

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 7 45 Left


MACHINE: Machine
From 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 Startup 18:26:31.1
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
Back

19:18:01.1 160
19:17:01.1 160
19:15:31.1 160
19:14:31.1 160
19:13:31.1 160
19:12:31.1 160
19:11:31.1 160
19:10:31.1 160
19:09:31.1 160
19:08:31.1 160
19:07:31.1 160
19:06:31.1 160
19:05:31.1 160
19:04:31.1 160
19:03:31.1 160
19:02:31.1 160
19:01:31.1 160
19:00:31.1 160
18:59:31.1 160
18:58:31.1 160
18:57:31.1 160
18:56:31.1 160
18:55:31.1 160
18:54:31.1 160
18:53:31.1 160
18:52:31.1 160
18:51:31.1 160
18:50:31.1 160
18:49:31.1 160
18:48:31.1 160
18:47:31.1 160
18:46:31.1 160
18:45:31.1 160
18:44:31.1 160
18:43:31.1 160
18:42:31.1 160
18:41:31.1 160
18:40:31.1 160
18:39:31.1 160
18:38:31.1 160
18:37:31.1 160
18:36:31.1 160
18:35:31.1 160
18:34:31.1 160
18:33:31.1 160
18:32:31.1 160
18:31:31.1 160
18:30:31.1 160
18:29:31.1 160
18:28:31.1 160
18:27:31.1 160
18:26:31.1 160 rpm
0 100 200 300 400 500
Connecting point FREQUENCY: 20 Hertz/div

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration Home
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 8 45 Right


MACHINE: Machine Connect to
From 23JUL2013 17:29:25.3 To 23JUL2013
next18:25:55.4
plot Startup 18:25:55.4
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz Back to trend Back to
D-NDE-2-Y D-NDE-2-X

18:25:25.4 160
18:24:25.4 160
18:23:25.4 160
18:22:25.4 160
18:21:25.4 160
18:20:25.4 160
18:19:25.4 160
18:18:25.4 160
18:17:25.4 160
18:16:25.4 160
18:15:25.4 160
18:14:25.4 160
18:13:25.4 160
18:12:25.4 160
18:11:25.4 160
18:10:25.4 160
18:09:25.4 160
18:08:25.4 160
18:07:25.4 160
18:06:25.4 160
18:05:25.4 160
18:04:25.4 5791 rpm
160
18:03:25.4 160
18:02:25.4 160
18:01:25.4 160
18:00:25.4 160
17:59:25.4 160
17:58:25.4 160
17:57:25.4 160
17:56:25.4 160
17:55:25.4 160
17:54:25.4 160
17:53:25.4 160
17:52:25.4 160
17:51:25.4 160
17:50:25.4 160
17:49:25.4 160
17:48:25.4 160
17:47:25.4 160
17:46:25.4 160
17:45:25.4 160
17:44:25.4 160
17:43:25.4 160
17:42:25.4 160
17:41:25.4 160
17:40:25.4 160
17:39:25.4 160
17:38:25.4 160
17:37:25.4 160
17:36:25.4 160
17:35:25.4 160
17:34:25.4 160
17:33:25.4 160
17:32:25.4 160
17:31:25.4 160
17:30:25.4 160
17:29:25.3 160 rpm
0 100 200 300 400 500
FREQUENCY: 20 Hertz/div 3.53@ 14 Hertz

COMMENTS

BENTLY R

NEVADA
HALF SPECTRUM WATERFALL PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 8 45 Right


MACHINE: Machine
From 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 Startup 18:26:31.1
WINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
Back

19:18:01.1 160
19:17:01.1 160
19:15:31.1 160
19:14:31.1 160
19:13:31.1 160
19:12:31.1 160
19:11:31.1 160
19:10:31.1 160
19:09:31.1 160
19:08:31.1 160
19:07:31.1 160
19:06:31.1 160
19:05:31.1 160
19:04:31.1 160
19:03:31.1 160
19:02:31.1 160
19:01:31.1 160
19:00:31.1 160
18:59:31.1 160
18:58:31.1 160
18:57:31.1 160
18:56:31.1 160
18:55:31.1 160
18:54:31.1 160
18:53:31.1 160
18:52:31.1 160
18:51:31.1 160
18:50:31.1 160
18:49:31.1 160
18:48:31.1 160
18:47:31.1 160
18:46:31.1 160
18:45:31.1 160
18:44:31.1 160
18:43:31.1 160
18:42:31.1 160
18:41:31.1 160
18:40:31.1 160
18:39:31.1 160
18:38:31.1 160
18:37:31.1 160
18:36:31.1 160
18:35:31.1 160
18:34:31.1 160
18:33:31.1 160
18:32:31.1 160
18:31:31.1 160
18:30:31.1 160
18:29:31.1 160
18:28:31.1 160
18:27:31.1 160
18:26:31.1 160 rpm
0 100 200 300 400 500
Connecting point FREQUENCY: 20 Hertz/div

COMMENTS

BENTLY R

NEVADA
TREND PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1 45 Left DIRECT 10.9 micro m pp


POINT: Channel 2 45 Right DIRECT 10.6 micro m pp Home
MACHINE: Machine 23JUL2013
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup 17:29:25.0

20 See waterfall-X See waterfall-Y


20
15

10
10
5
D-NDE-1-X-Y
0 0
17:30 17:40 17:50 18:00 18:10 18:20
23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 2 Mins /div
POINT: Channel 3 45 Left DIRECT 8.49 micro m pp
POINT: Channel 4 45 Right DIRECT 9.08 micro m pp
MACHINE: Machine 23JUL2013
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup 17:29:25.0
20
See waterfall-X See waterfall-Y 20
15
15
10 10

5 5
D-DE-1-X-Y
0 0
17:30 17:40 17:50 18:00 18:10 18:20
23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 2 Mins /div
POINT: Channel 5 45 Left DIRECT 23.4 micro m pp
POINT: Channel 6 45 Right DIRECT 18.4 micro m pp
MACHINE: Machine 23JUL2013
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup 17:29:25.0

60 D-DE-2-X-Y See waterfall-X See waterfall-Y


60

40
40

20 20

0 0
17:30 17:40 17:50 18:00 18:10 18:20
23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 2 Mins /div
POINT: Channel 7 45 Left DIRECT 39.2 micro m pp
POINT: Channel 8 45 Right DIRECT 20.6 micro m pp
MACHINE: Machine 23JUL2013
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup 17:29:25.0
25
40 See waterfall-X See waterfall-Y
20
30
15
20
10
10 5
D-NDE-2-X-Y
0 0
17:30 17:40 17:50 18:00 18:10 18:20
23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 2 Mins /div

COMMENTS
480 rpm

5100 rpm and lower 5791 rpm


Crank mode steam mode
BENTLY R

NEVADA
TREND PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1 45 Left GAP -9.69 Volts


POINT: Channel 2 45 Right GAP -9.35 Volts
MACHINE: Machine 23JUL2013 Home
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup 17:29:25.0
0 0
NDE-1-X-Y
-2 -2
Click here to see
-4 -4
shaft center position
-6 -6
-8 -8
-10
17:30 17:40 17:50 18:00 18:10 18:20
23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 2 Mins /div
POINT: Channel 3 45 Left GAP -7.69 Volts
POINT: Channel 4 45 Right GAP -8.47 Volts
MACHINE: Machine 23JUL2013
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup 17:29:25.0
0 0
DE-1-X-Y
-2 -2
Click here to see
shaft center position -4
-4
-6
-6
-8

17:30 17:40 17:50 18:00 18:10 18:20


23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 2 Mins /div
POINT: Channel 5 45 Left GAP -10.4 Volts
POINT: Channel 6 45 Right GAP -11.2 Volts
MACHINE: Machine 23JUL2013
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup 17:29:25.0
0 0
DE-2-X-Y
-2 -2
Click here to see -4
-4
shaft center position
-6 -6
-8
-8
-10
-10
17:30 17:40 17:50 18:00 18:10 18:20
23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 2 Mins /div
POINT: Channel 7 45 Left GAP -8.84 Volts
POINT: Channel 8 45 Right GAP -9.84 Volts
MACHINE: Machine 23JUL2013
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup 17:29:25.0
0 0
NDE-2-X-Y
-2 -2
Click here to see
-4
shaft center position -4

-6
-6
-8
-8

17:30 17:40 17:50 18:00 18:10 18:20


23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013 23JUL2013
TIME: 2 Mins /div

COMMENTS

BENTLY R

NEVADA
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 1 45 Left REF: -9.69 Volts 0


POINT: Channel 2 45 Right REF: -9.35 Volts 0
MACHINE: Machine (0, 0)
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

(not orbit or polar plot) UP


300
NDE-1-X-Y Back

200

100

time 17:59:40, 5100 rpm

0 time 17:29:34, 160 rpm time 18:22:34, 5719 rpm

time 17:34:43, 360 rpm

-100
-200 -100 0 100 200

20 micro m /div

COMMENTS

BENTLY R

NEVADA
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 3 45 Left REF: -7.69 Volts 0


POINT: Channel 4 45 Right REF: -8.47 Volts 0
MACHINE: Machine (0, 0)
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

(not orbit or polar plot) UP


300
DE-1-X-Y Back

200

100 time 18:05:07, 5791 rpm


time 17:59:31, 4920 rpm

time 18:13:07, 57910


time 17:55:01, 3660 rpm

time 17:39:40, 1860 rpm

0 time 17:29:25, 160 rpm

time 17:34:43, 300 rpm

-100
-200 -100 0 100 200

20 micro m /div

COMMENTS

BENTLY R

NEVADA
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 5 45 Left REF: -10.4 Volts 0


POINT: Channel 6 45 Right REF: -11.2 Volts 0
MACHINE: Machine (0, 0)
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

(not orbit or polar plot) UP


300
DE-2-X-Y Back

200

time 18:00:34, 5100 rpm

100

time 18:09:34, 5791 rpm time 17:45;31, 1860 rpm

time 18:22:31, 5791 rpm

time 17:29:25, 160 rpm


0

-100
-200 -100 0 100 200

20 micro m /div

COMMENTS

BENTLY R

NEVADA
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______
COMPANY: ESSGROUP PLANT: EGCO cogeneration
MACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine

POINT: Channel 7 45 Left REF: -8.84 Volts 0


POINT: Channel 8 45 Right REF: -9.84 Volts 0
MACHINE: Machine (0, 0)
From 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup

(not orbit or polar plot) UP


300
NDE-2-X-Y Back

200

100

time 18:10:25, 5791 rpm time 18:00:01, 5100 rpm


time 17:36:37, 1560 rpm

0 time 17:29:25, 160 rpm

-100
-200 -100 0 100 200

20 micro m /div

COMMENTS

BENTLY R

NEVADA
D-NDE-1-X Back
D-NDE-1-X Click to see waveform Home

Turbine, HS shaft, 96 Hz

See detail
2X..............3X.................................................................................................................. NX

639,96 Hz
D-NDE-1-X Back

Gen, LS shaft 25 Hz

50 Hz

Turbine, HS shaft 96 Hz
D-NDE-1-Y Back
D-NDE-1-Y Click to see waveform Home

Turbine, HS shaft, 96 Hz

2X..............3X.................................................................................................................. NX

See detail

639,96 Hz
D-NDE-1-Y Back

Gen, LS shaft 25 Hz

50 Hz

Turbine, HS shaft 96 Hz
D-DE-1-X Back
D-DE-1-X Click to see waveform Home

Turbine, HS shaft, 96 Hz

See detail 2X..............3X.................................................................................................................. NX

639,96 Hz
D-DE-1-X Back

Gen, LS shaft 25 Hz

50 Hz

Turbine, HS shaft 96 Hz
D-DE-1-Y Back
D-DE-1-Y Click to see waveform Home

Typical vibration signsture

See detail
D-DE-1-Y Back

Turbine, HS shaft 96 Hz

Gen, LS shaft 25 Hz

50 Hz
D-DE-2-X Back
D-DE-2-X Click to see waveform Home

See detail Typical vibration signsture


D-DE-2-X Back

Turbine, HS shaft 96 Hz

Gen, LS shaft 25 Hz

14 Hz 50 Hz 75 Hz
D-DE-2-Y Back
D-DE-2-Y Click to see waveform Home

See detail
Typical vibration signsture
D-DE-2-Y Back

Turbine, HS shaft 96 Hz

Gen, LS shaft 25 Hz

14 Hz 50 Hz

1,09 Hz to 75 Hz
1,33 Hz
D-NDE-2-X Back
D-NDE-2-X Click to see Home
waveform

See detail
D-NDE-2-X Back

1,6 Hz
D-NDE-2-Y Back
D-NDE-2-Y Click to see waveform Home

See detail
D-NDE-2-Y Back

1,6 Hz
D-NDE-1-X Back

Overall signal

See D-NDE-1-Y

Band pass filter 40-300 Hz,


Running freq = 96 Hz
D-NDE-1-Y Back

Overall signal

Band pass filter 40-300 Hz,


Running freq = 96 Hz
D-DE-1-X Back

Overall signal

See D-DE-1-Y

Band pass filter 40-300 Hz,


Running freq = 96 Hz
D-DE-1-Y Back

Overall signal

Band pass filter 40-300 Hz,


Running freq = 96 Hz
D-DE-2-X Back

Overall signal

See D-DE-2-Y

Band pass filter 40-200 Hz,


Running freq = 96 Hz
D-DE-2-Y Back

Overall signal

Band pass filter 40-200 Hz,


Running freq = 96 Hz
D-NDE-2-X Back

Overall signal

See D-NDE-2-Y

Band pass filter 40-200 Hz,


Running freq = 96 Hz
D-NDE-2-Y Back

Overall signal

Band pass filter 40-200 Hz,


Running freq = 96 Hz
Move cursor above orbit plot, then click to see waveform

NDE-1

DE-1

16 microns

DE-1 & NDE-1 Vibration signal was band pass filtered 40-300 Hz, while 1X is 96 Hz

DE-2
Home

NDE-2

4 microns

DE-2 & NDE-2 Vibration signal was band pass filtered 40-300 Hz, while 1X is 96 Hz

Notice.
Sensor orientation 45°set up is not available, these images are attempted to rotate 45°.
Orbit plots are not subtracted slow roll.
Only Band pass filter 40-300 Hz for DE-1 & NDE-1, and 40-200 Hz for DE-2 & NDE-2
Orbit group DE-1& NDE-1 and DE-2 & NDE-2 are not scale.
Home

A-HS-V-DE See Acceleration signal

GMF, 4150 Hz

Gen, LS shaft 25 Hz
A-HS-A-DE Zoom
Home

A-HS-A-DE Back

See detail
Home

GMF

14Hz sidebands

25 Hz sidebands
A-HS-V-DE
See band pass filter waveform

GMF, 4150 Hz

25 Hz

1062 Hz
Home
A-HS-V-DE

Overall signal

GMF 4150 Hz, band pass filter 4100-4200 Hz

Gen, LS shaft 25 Hz, band pass filter 0-100 Hz


A-HS-V-NDE See Acceleration signal

2,5 Hz and lower

GMF 4150 Hz
Gen, LS shaft 25 Hz

See X axis log scale


A-HS-V-NDE See Acceleration signal

2,5 Hz and lower

Gen, LS shaft 25 Hz GMF 4150 Hz


A-HS-A-NDE Back

GMF

GMF orders.... N
See detail
Home

A-HS-A-NDE

GMF

25 Hz sidebands 25 Hz sidebands
Home
A-HS-A-NDE See GMF waveform

96 Hz
GMF

GMF...........N
1062,5 Hz
unknown
Home

A-HS-A-NDE

Overall

Zoom 96 Hz

GMF, bandpass filter 4100-4200 Hz

25 Hz
Home
A-HS-A-NDE

Overall

GMF, bandpass filter 4100-4200 Hz


Home
A-LS-V-DE Back

GMF

Gen, LS shaft 25 Hz

See X axis log scale


A-LS-V-DE Back

GMF

Gen, LS shaft 25 Hz

See detail
Home

A-LS-V-DE Back

GMF

25 Hz sideband 25 Hz sideband
Home

A-LS-V-DE See GMF waveform

See spectrum detail


Home
A-LS-V-DE Back

Overall

96 Hz
GMF, bandpass filter 4100-4200 Hz

25 Hz

Gen, LS shaft 25 Hz, bandpass filter


0-100 Hz
A-LS-V-NDE

2,5 Hz or lower

Gen, LS shaft 25 Hz GMF

See X axis in log scale

See detail
A-LS-V-NDE

2,5 Hz or lower

Gen, LS shaft 25 Hz GMF

See detail
Home
A-LS-V-NDE

GMF

25 Hz sidebands 25 Hz sidebands
Home
A-LS-A-NDE See GMF waveform

GMF
Home
A-LS-A-NDE

Overall

GMF, bandpass filter 4100-4200 Hz


V-NDE-3 See detail

GMF

3950 Hz, unknown


GMF

GMF
V-NDE-3

Signal seemed to be high pass


filter at Bentley Nevada
vibration console, thus no < 50
Hz signal appear.

3950 Hz, unknown

See detail
Home
V-NDE-3

GMF, 4150 Hz

50 Hz, from center frequency


50 Hz, from center frequency
3950 Hz
Home
V-NDE-3

Overall

GMF 4150 Hz, bandpass filter 4100-4200 Hz


V-DE-3 See waveform to
Spectrum

Typical signal with V-NDE-3

1730 Hz GMF, 2X

See detail
Home
V-DE-3

50 Hz, from center frequency 50 Hz side band the as V-NDE-3


V-DE-3 Zoom in m/S^2

Overall

50 Hz
GMF 4150 Hz, bandpass filter 4100-4200 Hz
V-DE-3 See waveform to
spectrum

Overall

GMF 4150 Hz, bandpass filter 4100-4200 Hz


V-DE-3 Back to spectrum Home

50 Hz

GMF
V-DE-4 See order and
sideband

Back to V-NDE-4
2X

Gen speed 25 Hz

3X
NX......
4X
6X
8X

Frequency order with sideband ~ 6,88 - 7,03 Hz


Home

V-DE-4

4X
Gen speed 25 Hz
3X
2X

6,88-7,03 Hz

6,88-7,03 Hz 4,2 Hz 6,88-7,03 Hz


V-DE-4

2X

Gen speed 25 Hz
3X
4X NX......................................................................
See sideband detail

Other spectrum view


6,88-7,03 Hz
V-DE-4

See sideband
V-NDE-4

Typical vibration signature the same as V-DE-4

See
Spectrum detail
V-NDE-4 See detail

2X

Gen speed 25 Hz
3X

4X 6X

8X......................NX

17,81 Hz
Home

V-NDE-4

6,88 - 7,03 Hz 6,88 - 7,03 Hz

6,88 - 7,03 Hz
17,81 Hz
V-NDE-4

See detail
Next

Bentley Nevada vibration console


Next

Retrieve vibration data from


Bentley Nevada buffered output,
using Technekon STD-3300
portable data collector
Home

Vibration data was parallel


retrieving with Technekon
STD-3300 and ADRE DAIU-208.

Das könnte Ihnen auch gefallen