Sie sind auf Seite 1von 5
JOBSAPETY ANALYSIS Job Step “Potential Hazard Rak “Rating ‘Control Method Secure necessary ‘work permit ‘Work witout Authorization ‘Secure appropiate Hot Work Permit om ethorizeé TRSA work pet iser Ens tha al th region iste the permit re Compiled riorto star tho wok Sct compliance tall writen proedues Fem TR wok perm Aaa writen pecastions mist he completed and sien ‘pha afr the wor sta. plemenston of No Femi No West” Syste, Permitto work mist be alae on st. ear nfomiton rears the work mus be explained in el, Sopervisor mast eavareand understand ofthe pemiting system, Supervisor st be atetv nd gall responsible, Supervisor mst be avar ofthe dation of the pert (Renewal, Revalidation & Closure st be on tine) Lost permit wil at be ‘TRolnemunber sal = wtahot sate inthe work pei (053-398-2200, Heat suss infomation and weather codtion (oi or extremely ‘not svarnes sal be enti in werk pei ‘Key personel rangi ad sit supervisor contact mumer shal e mentioned in he work pei. E Pretask bring Task of infrmaion ‘Super foe sal be responsible for condocing THT ‘pele to the stv inclear manne, sing this JSA 8 referees Supervise! fran sha translate the TAT in ngage ha Page 209 Job Step ‘Potent Hazard (Control Method ‘CONTINUES OF Pr-task CONTINUES OF Lasko infomation tid awareness ‘warren ey wnderand Supervise! foreman sallcheck penonal protective equipment of ‘ach ere prior to st ofthe stv Proper an lest Insrction must be vest workers on What tools and qupmen' ae going 1b used Ensure tat work dtribaion and gation ae well Ensure tat woes to pom the task are well tind and ow edgeble Genera instruction: tere is ny doubt, don’ hese to ask General preparation ctor + Cataary wi se “Alle workers shal be signed wit designated person to ‘iether andra ten with the war, the place ed the + Taco Medial Arie Ensure at ae ft ler and ambulance sal aval la Ensure tat TRambulnc nd nurse contact nner must be ses to al ivoved peso "TR & GAC emergency cc umber shal be posted tothe working rea + Pear Pang ob plating sal io consideration oTal SE epoca ad revenive measures when conduction te oi site is rier to planning All spproved and reer! docamentation an prtinent informatio sal be avaible (Method Steet, Job Suey ‘Anyi et). All works mos be pana nd cel coordinaod «day before the work st Ensure proper supervision by freman, supervisor, engineer & HSE ocr mst be pees ital eine + ang of nappopr PPE Tor these Ensure workers must wor proper PPE when exeoag ome activity (hard hats, safety hs, fies, car plugs, espa, Tener gloves, rubber gloves, disposable cover al rubber bots Page 3018 ‘CONTINUES OF General reparation of work ‘thse oe and veto vest Ensure PPE sal est ANST requirement. + Eipnaat Fale uipent ll ve avald CONTRACTOR iapcton sicker ort deploy onsite, Presse inspections. Inpetos sal nude chucks the untnaly of safety devs. guipnt tall be used ir accordance with he manufactures ineracons (Check ist for agupment must be filed up rior stat the cuipment in daily basis [Tanned Worker Ess ta all iavoled psoel ae aibed and wal cevperinc rir arto Ere tht workers have sted lng that conducted by TR. Towing Shing of |» Unni worry Ensure divers must be sompetent nd wll experienced. Equipment by Ena vers must ave valid Sa Arabian dive’ ene ‘Towing Vehicle and metic! Snes report + Lack of Aco Eee ‘Safe soress al be minslned at is Tor all ve + Sia by ovina asim fr Vehicle Vehicle human ‘terse “Trane bake wih heh ily vests all accompany aad dla the movement of equpment veicle ‘Reverse alarm nd Mashing igs shal be used while moving. Pedestrian sey pecsties sal be iacuze in diy TBT Ensue all employees shallbe weaving ih bit eiectve ‘vests fl patsonal prove equipment. Equipments vehicles sal have PWAS Proximity Wang System) Euipments vehicles sl ave RVCCS Rear View Close iru Sy + Gass Towing oF gpk Essur ony Ton6d one epee Enso wing estipment al be able fr towing in arms of ‘CONTINUES OF Towing ‘Shing of Equipment by ‘CONTINUES OF Unsafe Towing of Eauipnet 1 suspension stem end rani, Ensue toved equipment shal not be exceeded the ross combination weight ating (GCWR) of towing vehi Engr safe looks propery fix. “Ensure only appropiate toving veil i llowed io tansfer pment. Ensue to follow se peli, Ensure coupling devices sal be suitable for ype and capacity of the towed equipment. Ensue towing vehicle sal ot be used to anspor personne > Damaged aod Dt Ties Ensure owing vehi & toed euipment es re propery nated. Eure tht al ties are in good woking condition and fe fr any iri or steel aking, cuts longer thn 3.0m side ‘wall bulging or ssn nd red depth ies han 3.2 man. And make ue only se the that we same sie ype. > Brakes Tow Lag Bas Sey ‘Ensure tw lag Bars and owing ionguc of towing vehicle and Devices towed equipment mst bet fom sty damaged Ensue safety devices are god conden and connect rope + Por Iuninaon ding Night ‘Ensure drag Sing of equpmen arog w ig ake ware Shine proper ilumimaion in oa acess mus be povie Ensretha al owing vies shall have eectivesype yellow sok onl four ie. Ensure bake ight henon ight an tun sgl ighs mst be functioning ane vise, + Velie resdown dete Improper lespezion sue veces most ave valid TR inspesonwlcker ior smoblze st ste, Dally nsctons checklist mst be roped - w. sure periodic inspections and maintenance mut be conde snd documenta = Coping © Uneouplng of| + Canned Warkes Ensue peronnel an owing waned a manual Kalinga line of fe tining Page 58 iment by Manta Handling ‘Teemnigues Peon mt have est fr te pei ak Ensue tat proper body pstonng mst bellowed. ‘Buddy syst sal be imgemened especially fr all hey Fiing oad obec Tack of apenion Ensure foreman, supevn and HSE ofc call ses ithe towed equipment. Nat Weaiag PPE Tsar proper PPE mast worn (ard as ay gas wty shoes leather gloves, reetv ves) Ensure PPE shall meet ANSI equiements ‘Unie Unieveled Ground Ens only u-owed a sae ground to prevent moving oF uthng personel by owing Vehicle ote equipment. ‘Waring i ine of Fre Uns Hand Pleo Tavares ever eoved towed eipnen witout supervision of supervisor, foreman and HSE officer. Ene workers shold eter pt his hn or Snges nie the to lg bar while ashing and removing Howseoning Soi conned ‘Contained ol aba! becloposed at designed =e Dei ey must be avallable Sine ‘Conduct proper Pousskespng and aaa manage 7. Working during wight {ht extended hours, ‘REFER TO APPROVED NIGHT WORK ISA FOR OTHER REQUIREMENTS Closing oF Work Permit Fale cose ware pai Pel eeiver, sue, susvisor charg, salty officer and ll “workes most now and vate dantion of her wk pri Permit work mate lsd in compliance by coatracor PTW 9. Bierganey Response Tradeqane Bmerganey Response Eplojes/ Visors Veron mast know and undertnd te HSE regimens ofthis jrocedare tht appt the work they pean row and understand terol inthe event of emergency row te lncaton of Safe Assembly Points (SAP) an Saad stato. Report fo designed Safe Assembly Point as deed Page 6or8

Das könnte Ihnen auch gefallen