TABLE OF CONTENT
Page No.
A REPORT OF DPR 1-41
1 Financial Statement
1.1 Form -J Comprehensive 42
1.2 Form -J 43
1.3 General Abstract Of Cost For I & D Works 44
1.4 Abstract Civil 45
1.5 Abstract E&M 46
1.6 Abstract Of Operation And Maintenance Cost 47
1.7 Details Of Annual Operation & Maintenance Cost 48
2 Technical Statement
2.1 Population Projection 49-53
2.2 Ward Wise Population Forecast 54-56
2.3 Hydraulic Statement Of Circular Pipe For Sewerage Network 57
2.4 Design Of Main Sewage Pumping Station 58-61
2.5 Design Of Equipment 62-65
3 Estimates
3.1 Bill Of Quantity Of Gravity Sewers 66-68
3.2 Earthwork Calculation 69
3.3 Break Up Of Cost Of Sewage Treatment Plant 70
3.4 Estimate Of 210 Mld Capacty Sewage Treatment Plant 71
3.5 Detailed Esimate Of Training Works Of Abu Nala-2 & Odean Nala 72-75
3.6 Estimate Of Rising Main - Mps 76
3.7 Detailed Measurement Of Screen Channel 77-78
3.8 Detailed Estimate Of Screen Channel 79-80
3.9 Detailed Estimate Of Diversion of treated water of MDA 81-83
3.10 Detailed Estimate Of Chemical Cost. 84
3.11 Cost Estimate For Screen & Sluice Gate 85
3.12 Cost Estimate For Pumping Plants 86-87
3.13 Cost ESTIMATE OF POWER CONNECTION AND SUB-STATION 88-89
3.14 Detailed For E&M Works for D.G Set 90-91
3.15 Cost Estimate for automation of MPS. 92-93
3.16 Cost Estimate for solar plant 94
3.17 Cost Estimate Electricity Generation 95
3.18 Estimate of Biogas generation 96
3.19 Cost Estimate of staff quarters. 97
3.20 Cost Estimate of Manpower. 98
3.21 Estimate For Trial And Run Of Pumping Plants 99-101
3.22 Detailed Measurement Of Transformer Yard 102
3.23 Detailed Estimate Of Transformer Yard 103
3.24 Detailed Measurement Of Mep Building 104-106
3.25 Detailed Estimate Of Mep Building 107-109
3.26 Detailed Measurement Of H.T. / Metering Room 110-112
3.27 Detailed Estimate Of H.T. / Metering Room 113.115
3.28 Detailed Measurement Of D.G. Plateform + Control Room 116.118
3.29 Detailed Estimate Of D.G. Plateform + Control Room 119-121
3.30 Detailed Measurement Of Wet Well & Dry Well 122-125
3.31 Detailed Estimate Of Wet Well & Dry Well 126-129
3.32 Abstract Of Cost Of Manhole 130
3.33 Estimate For Man Hole 131-132
4.00 Annexure
2 Rising Mains
(i) Rising Mains 56.00 56.00
3 STPs
220 MLD 1.No 18480.00 12320.00 30800.00
Prepared By
Recommended By
(G. S. Srivastava)
Chief Engineer(Gzb. Zone)
U.P Jal Nigam Ghaziabad
OFFICE OF THE PROJECT MANAGER URBAN WORK UNIT-II UP JAL NIGAM MEERUT
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack Ettinger process in
Meerut city under NMCG programme.
FORM - "J" Rs in Lakhs
Sr.
Description Cost % Total Amount GOI GoUP
No.
1 2 3 4 5 6 7
A
1 Basic Cost of Project 37272.94 - 37272.94 37272.94 0.00
2 GST 12.00% 4472.75 4472.75
3 Labour Cess 37272.943 1.00% 372.73 372.73 0.00
Sub Total(A) 42118.43 42118.43 0.00
B Power Connection 357.22 357.22 0.00
C Solar Power Plant to improve 223.00 223.00
sustainability
G NOC from NHAI 37272.943 0.50% 186.36 186.36 0.00
G Environmental Sanitation and 37272.943 1.50% 559.09 559.09 0.00
Management Plan
H Third party inspection, quality control 37272.943 1.00% 372.73 372.73 0.00
and Vetting of design
I Public participation & public awareness 37272.943 1.00% 372.73 372.73 0.00
including stake holder consultations
Work Cost 44189.56 44189.56 0.00
J Departmental centage
Cost of centage @ 8% borne by GOI 37272.943 8.00% 2981.84 2981.84 0.00
Cost of centage @ 4.50% borne by State 37272.943 4.50% 1677.28 - 1677.28
Government
Sub Total (J) 4659.12 2981.84 1677.28
Sub Total(A to K) 48848.68 47171.40 1677.28
L Operation & Maintenance for 15 year
Operation Cost 3762.37 3762.37 0.00
Maintenance Cost 10745.24 10745.24 0.00
Sub Total 14507.61 14507.61 0.00
M Electricity Cost 18276.69 18276.69 0.00
Sub Total (O&M 15 Years) 32784.30 32784.30 0.00
Project Cost including Electricity Rs. (in Lacs) 81632.99 79955.70 1677.28
Project Cost excluding Electricity Rs. (in Lacs) 63356.29 61679.01 1677.28
Say Rs in Crore 633.56 616.79 16.77
Prepared By
(G.S. Srivastava)
Chief Engineer(Gzb. Zone)
U.P Jal Nigam Ghaziabad
OFFICE OF THE PROJECT MANAGER URBAN WORK UNIT-II UP JAL NIGAM MEERUT
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack Ettinger process in Meerut
city under NMCG programme.
GENERAL ABSTRACT OF COST
Estimated Cost. In Lacs
S.No. Particulars
CW EM Total
A Items on which centage is admissible
1 Sewage Pumping Stations(SPS)
(i) I&D works 1603.68 3168.82 4772.50
2 Rising Mains
(i) Rising Main 56.00 56.00
3 STPs
220 MLD 18480.00 12320.00 30800.00
4 Diversion of treated water of MDA STP 1503.39 1503.39
5 Staff quarters 141.06 141.06
SUB TOTAL 21784.12 15488.82 37272.94
Add GST @ 12% 2614.09 1858.66 4472.75
OFFICE OF THE PROJECT MANAGER URBAN WORK UNIT-II UP JAL NIGAM MEERUT
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack Ettinger
process in Meerut city under NMCG programme for E&M works
FORM-J (COMPREHENSIVE)
Amount Centage Total (Rs. In Lacs)
Sr.No. Description
(Rs in Lacs)
1 Total cost of work 37354.89 - 37354.89
Prepared By Recommended By
Approved By
(G.S. Srivastava)
Chief Engineer(Gzb. Zone)
U.P Jal Nigam
Ghaziabad
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack
Ettinger process in Meerut city under NMCG programme for CIVIL works
FORM-J
Amount Centage Total (Rs. In Lacs)
Sr.No. Description
(Rs in Lacs)
1 Total cost of work 20139.68 - 20139.68
Prepared By Recommended By
Approved By
(G.S. Srivastava)
Chief Engineer(Gzb. Zone)
U.P Jal Nigam
Ghaziabad
Detailed project report for I & D and 220 MLD STP based on Modified
Ludzack Ettinger process in Meerut city under NMCG programme for
E&M works
FORM-J
Amount Centage Total (Rs. In Lacs)
Sr.No. Description
(Rs in Lacs)
1 Total cost of work 15711.82 - 15711.82
Prepared By Recommended By
Approved By
(G.S. Srivastava)
Chief Engineer(Gzb. Zone)
U.P Jal Nigam
Ghaziabad
OFFICE OF THE PROJECT MANAGER URBAN WORK UNIT-II UP JAL NIGAM MEERUT
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack Ettinger process in
Meerut city under NMCG programme
Project Engineer
5 DG Sets 265.00
Assistant Engineer
Project Engineer
5 DG Sets 265.00
Assistant Engineer
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack Ettinger
process in Meerut city under NMCG programme for E&M works
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack Ettinger
process in Meerut city under NMCG programme for E&M works
OPERATION AND MAINTENANCE INFLATION
Amount
S.N. Particulars
(in Lakhs)
1 2 3 4
Civil E&M
ANNUAL OPERATION &
1 Operation Maintenance Operation Maintenance
MAINTENANCE COST
134.58 202.81 39.84 464.80
5% inflation on Operation
3rd year Operation and & 1% inflation on
4 maintenance per year 148.36 206.87 43.92 474.13
maintenance cost
5% inflation on Operation
4th year Operation and & 1% inflation on
5 maintenance per year 155.77 208.93 46.11 478.87
maintenance cost
5% inflation on Operation
5th year Operation and & 1% inflation on
6 maintenance per year 163.55 211.01 48.41 483.65
maintenance cost
5% inflation on Operation
6th year Operation and & 1% inflation on
7 maintenance per year 171.72 213.12 50.83 488.48
maintenance cost
5% inflation on Operation
7th year Operation and & 1% inflation on
8 maintenance per year 180.30 215.25 53.37 493.36
maintenance cost
5% inflation on Operation
8th year Operation and & 1% inflation on
9 maintenance per year 189.31 217.40 56.03 498.29
maintenance cost
5% inflation on Operation
9th year Operation and & 1% inflation on
10 maintenance per year 198.77 219.57 58.83 503.27
maintenance cost
5% inflation on Operation
10th year Operation and & 1% inflation on
11 maintenance per year 208.70 221.76 61.77 508.30
maintenance cost
5% inflation on Operation
11th year Operation and & 1% inflation on
12 maintenance per year 219.13 223.97 64.85 513.38
maintenance cost
5% inflation on Operation
12th year Operation and & 1% inflation on
13 maintenance per year 230.08 226.20 68.09 518.51
maintenance cost
5% inflation on Operation
13th year Operation and & 1% inflation on
14 maintenance per year 241.58 228.46 71.49 523.69
maintenance cost
5% inflation on Operation
14th year Operation and & 1% inflation on
15 maintenance per year 253.65 230.74 75.06 528.92
maintenance cost
5% inflation on Operation
15th year Operation and & 1% inflation on
16 maintenance per year 266.33 233.04 78.81 534.20
maintenance cost
Operation Maintenance
Total(in Lakhs) 3,762.37 10,745.24
Assistant Engineer
Detail Project Report For I D And STP Works In Meerut City
Assistant Engineer
Population forecasting
Appropriate estimation of population through the project period is of prime importance for any exercise on utility services. For arriving at the most
realistic future population figures for the design period all available data as described in the ongoing paras has been analyzed in detail.
The population of the Merrut city for past six decades is as follows
Year Population
1951 239440
1961 294853
1971 371760
1981 536615
1991 849799
2001 1161716
2011 1305429
The method is generally applicable to large and old cities. This method usually gives lower population and may be adopted only when
the future growth of the city is expected to be very slow.increase in population per decade is calculated & then the average increase in
population per decade is calculated by dividing total increase in population with the number of decades considered.
Projected population
2019 1305429+177664.83 x 0.8 = 1447560.864
2022 1305429+177664.83 x 1.1 = 1500860.313
2037 1305429+177664.83 x 2.6 = 1767357.558
2052 1305429+177664.83 x 4.1 = 2033854.803
Geometric mean is calculated for finding the rate of growth.This method is normally applicable for the cities where expected growth may be very
high.
1951 239440
1961 294853 55413 0.231
1971 371760 76907 0.261
1981 536615 164855 0.443
1991 849799 313184 0.584
2001 1161716 311917 0.367
2011 1305429 143713 0.124
Projected population
2019 1305429x(1+0.299)^0.8 = 1609313
2022 1305429x(1+0.299)^1.1 = 1740698
2037 1305429x(1+0.299)^2.6 = 2577134
2052 1305429x(1+0.299)^4.1 = 3815494
In this method the increment in arthmetical is determined from the past decades and the average of that increment is added to the
average increase. This method predicts increased population as compared to the arithmentical increase method.
Increamental
Year Population Increament X
Increase Y
1951 239440
1961 294853 55413
1971 371760 76907 21494
1981 536615 164855 87948
1991 849799 313184 148329
2001 1161716 311917 -1267
2011 1305429 143713 -168204
Total 1065989 90834
Average 177664.83 17660
Projected population
2019 1305429+0.8x177664.83+0.8x(0.8+1)17660/2 = 1460276
2022 1305429+1.1x177664.83+1.1x(1.1+1)17660/2 = 1521258
2037 1305429+2.6x177664.83+2.6x(2.6+1)17660/2 = 1850006
2052 1305429+4.1x177664.83+4.1x(4.1+1)17660/2 = 2218490
1951 239440
1961 294853 55413 0.23
1971 371760 76907 0.26
1981 536615 164855 0.44
1991 849799 313184 0.58
2001 1161716 311917 0.37
2011 1305429 143713 0.12
Projected population
2019 1305429x(1+0.335)^0.8 = 1644895
2022 1305429x(1+0.335)^1.1 = 1793836
2037 1305429x(1+0.335)^2.6 = 2766971
2052 1305429x(1+0.335)^4.1 = 4268020
Projected population
2019 1305429x(1+0.124)^0.8 = 1433396
2022 1305429x(1+0.124)^1.1 = 1484555
2037 1305429x(1+0.124)^2.6 = 1769073
2052 1305429x(1+0.124)^4.1 = 2108119
Projected population
2019 exp( ln(1305429)+0.028x0.8) 1335001
2022 exp( ln(1305429)+0.028x1.1) 1346262
2037 exp( ln(1305429)+0.028x2.6) 1404009
2052 exp( ln(1305429)+0.028x4.1) 1464233
Y= m X + C----------(i)
N∑Y = mN∑ X + CN--------------(ii)
N∑XY= mN∑ X2 + C N∑ X-------(iii)
Where Y= Population ,X= no of decades ,m= slope, C=Constant ,N=No of observations
Solving equation (ii) and (iii) by cross multiplication method
m = (∑X. ∑Y-N∑X Y)/((∑X)2-N(∑ X2))
C = (∑X. ∑Y- ∑X2. ∑Y )/((∑X)2-N(∑ X2))
Population Projection Formula P = m x N + C
∑X 21
∑Y 4759612
∑X Y 19688568
(∑X)2 441
N 7
∑ X2 91
Projected population
2019 193205x11.8 + 100330 = 2380149
2022 193205x12.1 + 100330 = 2438111
2037 193205x13.6 + 100330 = 2727918
2052 193205x15.1 + 100330 = 3017726
Pop= A + BY----------(i)
N∑Pop = AN + BN∑ Y --------------(ii)
N∑YPop= AN∑Y+ BN∑ Y2 -------(iii)
Where Y= Year , B= slope, A=Constant, N=No of observations
Solving equation (ii) and (iii)
B = (∑YPop-Popmean x ∑Y)/(∑Y2-Ymean∑ Y)
A=Popmean -BxYmean
Population Projection Formula P= A+ B x Y
∑Y Pop = 9482888692
Popmean = 679944.57
∑Y = 13867
∑Y2 = 27473327
Ymean = 1981
Projected population
2019 -37592975+19320 x 2019 = 1414105
2022 -37592975+19320 x 2022 = 1472065
2037 -37592975+19320 x 2037 = 1761865
2052 -37592975+19320 x 2052 = 2051665
1400000 y = 19,320.47x - 37,593,909.33
1305429
1200000
1161716
1000000
849799
800000
600000
536615
400000
371760
294853
239440
200000
0
1940 1950 1960 1970 1980 1990 2000 2010 2020
1000000 y = 7.0315E-197x61.24132599
a 7.0315 10^-197
100000
b 61.244
10000
Series1
1000 2018 1.79324E+54 Power (Series1)
2028 2.42727E+54
100 2033 2.82237E+54
10
2048 4.42731E+54
1
1940 1960 1980 2000 2020
∑Y Log(Pop) = 79790
Log(Pop)mean = 5.75
∑Y = 13867
∑Y2 = 27473327
Ymean = 1981
a 1.000E-21
b 3.092E-02
2019 1288871
2022 1414139
2037 2248564
2052 3575348
Projected Population
S.No Projection Method
2019 2022 2037 2052
Arithmetical
1 Progression 1447561 1500860 1767358 2033855
Method
Geometric
2 Progression 1609313 1740698 2577134 3815494 Say
Method
incremental
3 1460276 1521258 1850006 2218490
Increase method
Average Decadal
4 1644895 1793836 2766971 4268020
Growth method
Last Decadal
5 1433396 1484555 1769073 2108119
Growth method
Uniform
6 Percentage 1335001 1346262 1404009 1464233
Increase method
Least Square
7 2380149 2438111 2727918 3017726
method
Simple Graph
8 1414105 1472065 1761865 2051665
method
9 Semi Log method 1288871 1414139 2248564 3575348
1 NAi BASTI LALLA PUR 68.00 3869 21173 311 364 442 529 653 25807 29283 41587 59140
2 BHAGWAT PURA 48.00 3018 16864 351 411 498 597 737 20783 23131 34271 50112
3 MALIYANA 240.00 2319 13612 57 69 83 99 129 17615 19147 29375 45696
4 PILANA SOFIPUR 496.00 3806 19720 40 48 58 70 90 24863 27995 40335 59376
5 MEDICAL COLLEGE 225.00 3962 20757 92 111 134 160 208 26030 29377 41615 61536
6 SHOBHA PUR 640.00 3270 19060 30 36 44 52 68 24095 27387 38895 58256
7 LISARI 924.00 3688 23054 25 30 37 44 57 28775 33415 46271 67404
8 SHIVLOK PURI 48.00 2637 14274 297 347 422 505 624 17711 19483 29855 44688
9 ANUP NAGAR FAZALPUR 74.00 3475 17926 242 283 344 411 508 21997 24683 36029 52328
10 GALABARH 164.00 3760 19418 118 143 172 205 267 24507 27435 39235 58524
11 SUNDRA URF PUTHA 1583.00 5266 28576 18 22 26 31 41 35881 40385 54688 79639
12 SHER GARHI 176.00 3242 16931 96 116 140 167 217 21471 23867 35007 52928
13 RITHANI(EAST) 916.00 4695 24884 27 33 39 47 61 31283 34951 48667 70612
14 ABDULLA PUR 272.00 4205 23977 88 106 128 153 199 29887 34043 47231 68864
15 KALIA GARHI 46.00 3776 19630 427 491 564 645 752 23641 25171 35285 49328
16 JATAULI 512.00 3492 17742 35 42 51 61 79 22559 25339 36847 55184
17 PALLAV PURAM 19200.00 3706 16603 1 1 1 2 2 20255 18427 44015 53136
18 GOVIND PURI 68.00 3428 18212 268 314 381 456 563 22407 25135 36623 53020
19 HAFIZABAD MEVLA 148.00 2856 15001 101 122 147 176 228 19111 20983 31663 48480
20 MULTAN NAGAR 110.00 3244 17485 159 192 232 277 359 22175 24747 36085 54226
21 AJANTA COLONY 76.00 32282 17780 234 274 332 398 491 21879 24459 35863 52052
22 SUBHASH NAGAR 22.00 2144 12091 550 633 726 831 968 14981 15199 23897 36032
23 BADHERA ZAHID PUR 848.00 3514 21345 25 30 37 44 57 26495 30603 42927 63072
24 QASIM PUR 252.00 3193 16653 66 80 96 115 149 21215 23419 34595 52284
25 KASERU BAKSAR 120.00 5168 25350 211 247 300 359 443 30695 35227 48695 67896
26 KANSI 1468.00 3688 21485 15 18 22 26 34 27479 31523 43783 64648
27 NAGLA TANSHI 376.00 5164 27472 73 88 107 127 165 34143 39459 53367 76776
28 DEFENCE COLONY 198.00 4106 20507 104 126 152 181 235 26003 29323 41453 61266
29 JAGIRITI VIHAR 48.00 3127 15155 316 370 449 537 664 18815 20779 31391 46608
30 BRAHAM PURI(EAST) 26.00 4184 21660 833 883 941 1008 1133 24013 23693 31823 44194
31 L-BLOCK SHASTRI NAGAR 88.00 3464 17344 197 238 288 343 445 21999 24571 35799 53896
32 SABUN GODAM 48.00 2639 14066 293 343 416 498 615 17519 19195 29519 44256
33 PAROLI 700.00 3620 21863 31 38 45 54 70 27655 30727 43415 63736
34 CIVIL LINE 508.00 3584 17197 34 41 50 59 77 21883 24627 35587 53852
35 PRUWA MAHAVIR 58.00 2275 12219 211 247 300 359 443 15381 16627 26437 40430
36 MOHON PURI 108.00 2313 11892 110 133 161 191 249 15419 16615 26243 41628
37 SHAHPIR GATE 20.00 2322 13260 663 736 815 908 1014 15775 15527 23775 35016
38 SHIV SHAKTI NAGAR 44.00 1906 9849 224 262 318 381 470 12583 13219 22379 35416
39 MODI PURAM 364.00 3283 16074 44 53 64 77 99 20347 22523 33643 50772
40 JAI DEVI NAGAR 128.00 1964 11126 87 105 127 151 197 14495 15483 24943 39952
41 BHOPAL SINGH ROAD 192.00 2831 13653 71 86 104 124 160 17567 19195 29423 45456
42 SHASTRI NAGAR SCH-7 16.00 2354 11871 742 824 913 1017 1135 14239 13835 21887 32896
43 TEJ GARHI 56.00 2477 12067 215 252 305 366 452 15167 16307 26111 40048
44 BAGHPAT GATE 14.00 1614 8737 624 693 768 855 955 10757 9979 17585 28106
45 SURAJ KUNO 138.00 2128 10854 79 96 115 137 179 14303 15097 24521 39438
46 JAN NAGAR 76.00 3104 15747 207 242 294 352 435 19447 21571 32367 47796
47 SHASTRI NAGAR SC:7 SEC-2 22.00 2939 14965 680 755 836 932 1040 17665 17619 26119 37616
48 PEHLAD NAGAR 12.00 1694 10180 848 899 958 1026 1153 11843 10723 17927 28572
49 NAGLA BATTO 38.00 3104 15594 410 472 541 619 722 18991 19785 29137 42172
50 THAPER NAGAR 46.00 2304 11780 256 300 364 435 538 14855 15971 25625 39484
51 SARAI LAL DAS 26.00 1910 9903 381 446 541 648 800 12651 13293 22463 35536
52 PHOOI BAGH COLONY 22.00 2729 15075 685 760 843 938 1048 17775 17773 26251 37792
53 BRAHAM PURI(WEST) 74.00 2453 12175 165 200 241 287 373 15855 17061 26853 42338
54 PURWA ILAN, BUKSH 10.00 2119 12665 1267 1330 1406 1495 1622 14355 13287 20565 30956
55 MORI PARA 18.00 1409 8096 450 518 594 680 792 10379 9919 17855 28992
56 SARAI BEHLM 10.00 2124 13414 1341 1408 1489 1582 1716 15135 14117 21435 31896
57 MADHAV PURAM SC-10 104.00 4125 20263 195 236 285 339 441 25599 28867 40871 60600
58 MAQBARA ABBU 18.00 2498 14511 806 854 911 975 1096 16427 15625 23165 34464
59 SADDIQ NAGAR 56.00 1674 11061 198 240 289 345 447 14495 15411 24935 39768
60 KELASH PURI 88.00 2564 13581 154 186 225 268 348 17423 19027 29199 45360
61 KHER NAGAR 1200.00 1990 12162 10 12 15 17 23 15455 17227 26015 42336
62 ISLAMABAD (EAST) 40.00 1957 12453 311 364 442 529 653 15615 16907 26775 40856
63 JAMNA NAGAR 3200.00 3057 20480 6 7 9 10 14 23455 28027 37615 59536
64 SAWAMI PARA 14.00 2126 10916 780 866 959 1069 1193 13179 12653 20581 31438
65 QIWAI NAGAR 15.00 1844 13303 887 940 1002 1073 1206 15155 14257 21710 32826
66 ISMAIL NAGAR 24.00 1877 11121 463 532 611 699 815 13823 13891 22391 34296
67 SHYAM NAGAR 34.00 3418 23441 689 765 847 944 1054 27065 28025 37711 50572
68 PURWA FAYYAZ ALI 24.00 2393 16118 672 746 827 921 1028 18959 19075 27719 39408
69 RASHID NAGAR 44.00 2158 13433 305 357 433 519 641 16763 18279 28451 42940
70 SHAKOOR NAGAR 40.00 1713 11208 280 328 398 476 588 14175 15147 24655 38256
71 TARA PURI 77.00 3794 24596 319 373 453 542 670 29776 34108 47349 66326
72 SHYAM NAGAR(EAST) 64.00 2932 19324 302 353 429 513 634 23647 26683 38447 55312
FAQRUDDIN AU AHMAD-
73 62.00 3330 25368 409 470 540 618 720 30195 32707 43931 59376
(WEST)
74 FAQRUDDIN ALI AHMAD-(EAST) 61.00 1879 14004 230 269 327 391 483 17464 19174 29466 44199
75 LAKHI PURA 44.00 2654 19391 441 507 582 666 776 23363 24835 34919 48880
76 ZAKIR HUSAIN (NORTH) 24.00 1722 13774 574 660 758 867 1010 16895 17419 26423 38976
77 ZAKIR HUSAIN(SOUTH) 28.00 2480 17218 615 683 756 843 941 20179 20395 29219 41084
78 KARIM NAGAR 24.00 2482 17904 746 828 918 1022 1141 20927 21259 30143 42120
79 MANZOR NAGAR 40.00 1957 12808 320 374 454 544 672 16015 17387 27375 41616
80 ISLAMABAD (SOUTH) 12.00 1573 10928 911 966 1029 1102 1239 12647 11575 18839 29604
Design of Sewer
(a) Sewer Design from ABU Nala-02 to Existing Manhole in Boundary
Average Design Flow 110 MLD
1.273 m3/sec
Peak Factor 2
Design Peak Flow 220
2.546 m3/sec
Manning's n 0.011
Ground Level (Abu nala-02) 219.17 m
Bed Level 214.42 m
Ground Level Of existing manhole 219.26 m
Invert Level Of existing manhole 211.46 m
Length of sewer 300 m
Fall Available 2.96 m in 200 m
Gradient available S 1 in 101
Gradient proposed 1 in 1500
Proosed Diameter D 1800 mm
1.8 m
Hydraulic Radius,R = D/4 0.45
2/3
R 0.5872301
1/2
S 0.0258199
Velocity at full flow Qf 1.3783834 m/sec
Discharge at full flow Vf 3.5057803 m3/sec
q/Qf 0.7263137
d/D 0.63
V/Vf 1.08
Hence velocity at designed peak flow 1.4886541 m/sec
(b) Sewer Design from odean drain to underlaying 1800 mm dia pipe Manhole
Average Design Flow 110 MLD
1.273 m3/sec
Peak Factor 2
Design Peak Flow 220
2.546 m3/sec
Manning's n 0.011
Ground Level (Starting Node, Odean nala) 221.06 m
Bed Level 214.86 m
Ground Level Of existing manhole(MH-80) 219.90 m
Invert Level Of existing manhole 214.77 m
Length of sewer 160 m
Fall Available 0.09 m in 150 m
Gradient available S 1 in 1778
Gradient proposed 1 in 1800
Proosed Diameter D 1800 mm
1.8 m
Hydraulic Radius,R = D/4 0.45
2/3
R 0.5872301
1/2
S 0.0235702
Velocity at full flow Qf 1.2582861 m/sec
Discharge at full flow Vf 3.2003249 m3/sec
q/Qf 0.7956368
d/D 0.675
V/Vf 1.11
Hence velocity at designed peak flow 1.3966976 m/sec
(d) Sewer Design of underlaying 1800 mm dia pipe from Manhole -78 to Manhole-92
Length 763 m
Zone-6 sewage generation in 2050 119.119 MLD
Average Design Flow 119.119 MLD
1.379 m3/sec
Peak Factor 2
Design Peak Flow 238.238
2.757 m3/sec
Manning's n 0.011
Ground Level (MH-78) 221.199 m
Invert Level 214.84 m
Ground Level Of existing manhole(MH-92) 219.17 m
Invert Level 214.331 m
Length of sewer 763 m
Fall Available 0.509 m in 763 m
Gradient available S 1 in 1499
Gradient proposed 1 in 1500
Proosed Diameter D 1800 mm
1.8 m
Hydraulic Radius,R = D/4 0.45
2/3
R 0.5872301
1/2
S 0.0258199
Velocity at full flow Qf 1.3783834 m/sec
Discharge at full flow Vf 3.5057803 m3/sec
q/Qf 0.7865251
d/D 0.675
V/Vf 1.11
Hence velocity at designed peak flow 1.5300056 m/sec
Discharge Carrying Capacity of underlaying 1800 mm dia pipe line is 350 MLD
Catchment area of zone 6 sewrage zone and odean drain overlap.
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack Ettinger
process in Meerut city under NMCG programme for E&M works
LPM 80400.00
Total head (Static head including terminal head
m 20
, Pump house loss ,Rising main loss)
Hence provide 2 nos of DG set of 1250 KVA , Each DG set will be capable for run 2 nos of pump set simultaneously ,
During peak hour , 4 pump set will be running simultaneously with the help of synchronizing panel.
Design of Transformer (To Ensure peak efficiency at about 75% of the rating , margine is taken as 20% )
Selected rating of 2 Nos Transformer 3MVA and Operating Voltage 33KV/6.6KV for MPS Load
2 Nos Transformer 63 KVA and Operating Voltage 6.6 KV/.415 KV for Misc Load of MPS
CHECK FOR STARTING LOAD
Total current when three pumps are running 38.39*3+1.03+115.16 232.37
and 50% of fourth started plus Aux. Load
= 115.16 AMP
(i) Cable Size for HT & LT Panel of Substation for MPS Load
Incoming current on LT Panel of Substation = 262.42 AMP
Including derating factor=0.87 Current = 301.64 AMP
Size of cable from Transformer to LT Panel = 500 SQ.MM Al Armoured XLPE Cable
Outgoing current from LT Panel = Starting current of motor
= 115.16 AMP
Including derating factor=0.87 Current = 132.37 AMP
Size of cable from LT Panel to Starters = 120 sq.mm Al ARMORED XLPE INSULATED
Assistant Engineer
Earthwork Calculation
Head Tail
2000
mm Dia
Abu Nala 300 1800 2200 6.77 3.30 1.50 3.30 1485.00 1.50 3.30 1485.00 1.50 3.30 1485.00
pipe
Manhole
1800 mm
Odean Drain to dia pipe 160 1800 2200 6.16 3.30 1.50 3.30 792.00 1.50 3.30 792.00 1.50 3.30 792.00
manhole
Existing Manhole MPS 100 2400 2600 8.11 3.70 1.50 3.70 555.00 1.50 3.70 555.00 1.50 3.70 555.00
Rs.Crore 308.00
@ 1% of (165+468+7.29+9.6+2.16+2.44)=654.50m3
kg
58646.7 69.57 4080048.35
Installation of M.S.Coarse screen of 40 mm spacing
and bar thickness of 10 mm at a distance of 100 m
6
upstream of diversion point( i.e.at the start of pacca
section) (10.6 +16) x 5.5 125.875 sq.mtre 3500.00 440562.50
7 Approach road to Pucca Section 75 m 2000.00 150000.00
8 Unforeseen Items 25747.74
Total 25209420.52
Rs.Lac 252.094
@ 1% of (165+468+7.29+9.6+2.16+2.44)=654.50m3
kg
58797.5 69.57 4090540.77
Installation of M.S.Coarse screen of 40 mm spacing
and bar thickness of 10 mm at a distance of 100 m
6
upstream of diversion point( i.e.at the start of pacca
section) (10.6 +16) x 5.5 164.3 sq.mtre 3500 575050.00
7 Approach road to Pucca Section 75 m 2000 150000.00
8 Unforeseen Items 25747.74
Total 25384483.37
Rs.Lac 253.845
(a) Raft foundation BGL 7.50-9.00 1.00 24.90 13.50 0.30 100.85
(b) R.C.C Wall BGL 7.50-9.00m 2.00 22.80 0.40 0.50 9.12
6.00 – 7.50m 2.00 22.80 0.40 1.50 27.36
4.50 – 6.00m 2.00 22.80 0.40 1.50 27.36
3.00 – 4.50m 2.00 22.80 0.30 1.50 20.52
1.50 – 3.00m 2.00 22.80 0.30 1.50 20.52
0.00 – 1.50m 2.00 22.80 0.30 1.50 20.52
Partition Wall for Screens 7.00-9.00m BGL 2.00 17.80 0.20 0.50 3.56
6.00 – 7.50m 2.00 17.80 0.20 1.50 10.68
4.50 – 6.00m 2.00 17.80 0.20 1.50 10.68
3.00 – 4.50m 2.00 17.80 0.20 1.50 10.68
1.50 – 3.00m 2.00 17.80 0.20 1.50 10.68
0.00 – 1.50m 2.00 17.80 0.20 1.50 10.68
600 mm dia
(a) 0.00 to 1.50 m m 6000 652.81 3916860.00
(b) 01.50 to 03.00 m m 600 652.81 391686.00
Constrution of SPS & Installing of pumbs
6 etc. for diversion treated water of MDA STP MLD 18 2500000 45000000
into Irrigation channel.
Provide and open timbering in trenches for
the depth as specified below G.L. consisting
7 of 40 mm thick approved country wood
plank for polling board 125 x 75 mm Indian
Sal Wood wallers and 100 mm dia sal wood
ballies for shuttering at 1.5 m C/C including
all labour etc , complete
800 mm dia
Cost of Chemicals
3a Hand operated cast iron single faces sluice Gate. nos 4 20.00 80.00
Rising spindle type as per IS 13349 Calss-I, having
cast iron frame & door fitted with CF-8M faces. MS
extension rod with coupling & CI guide brackets
suitable to a required distance. Sluice gate shall be
provided with C.I. Geared head stock with hand
wheel & supporting M.S channel. The sluice gate
shall be effective againest negative as well as
positive pressure & shall be 2000mm x 1500mm
wide size and the outlet of collection chamber as per
site requirement.
Assistant Engineer
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack Ettinger process in Meerut city
under NMCG programme for E&M works
ESTIMATE FOR SUPPLY AND INSTALLATION OF PUMPING PLANTS ALONG WITH OTHER ACCESSORIES
Rate Amount
S.No. Particulars UNIT Qty
(in lacs.) (in lacs.)
1 2 3 4 5 6
1 Pumping Plant
Supply of vertical Stool Mounted ,dry sump Non clog,
centrifugal sewage pumps suitable for handling raw sewage of
specific gravity 1.03 driven by induction electric motor suitable
for operation on 6.6kv± 6 % volt, 3 phase, 50 Hz, AC supply
system following specification-
Capacity -1340 LPS
1 Set 6 40.00 240.00
Total head -20 mtr.
RPM - 750
MOC- Casing-2% NiCi as per IS 210
Impeller-ss CF 8 M
Bearing-Antifriction
Shaft-SS -AISI 410
ESTIMATE FOR SUPPLY AND INSTALLATION OF PUMPING PLANTS ALONG WITH OTHER ACCESSORIES
Rate Amount
S.No. Particulars UNIT Qty
(v)Thermal over load protection - 1 No.
(vi)Reverse rotation trip device - 1 No.
(vii) Automatic start / stop device according to level in the sump
- 1 No.
(viii)Indicating lamps(Auto/manual/low level/ reverse rotation)
- 1 Set
Mono rail traveling trolley with chain pulley block
Mono rail of 20 M Span traveling crane with side rail andchain
6 pulley block of 10 Ton capacity having 18 mtr. lift complete with Set 1 25.00 25.00
Actuator and hand chain for installation of pumping plants .
The gantry girder shall be supported on concrete complete in
all respect for installation .
Power and control cable
The 500 sqmm 3.5 core size of cables required for power
7 38.96
wiring from L.T. panel of sub station to L.T. panel of pump mtr 400 0.097
house
The 120 sqmm 3.5 core size of cables required for power
8 mtr 600 0.037 22.14
wiring from L.T. panel of pump house to starters
Earthing
Double earthing of all electrical equipments as per latest
9 21.00
IER/PWD specification complete with salt, charcoal, G.I. earth
pit 30 0.70
electrodes, watering pipe, C.I. earth boxes and G.I. earth strips
of adequate size.
Construction of foundation for pumping plants, starters and
10 panels. Job 1 18.00 18.00
ASSISTANT ENGINEER
Rate Amount
S.No. Items Qty Unit (in
(in Lakhs.)
Lakhs.)
1 2 3 4 5 6
1 Power Connection
1.3 Cost of H.T. metering panel to be installed at Proposed Site 1 No 3.00 3.00
ASSISTANT ENGINEER
Rate Amount
S.No. Items Qty Unit (in
(in Lakhs.)
Lakhs.)
1 2 3 4 5 6
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack Ettinger process in
Meerut city under NMCG programme for E&M works
2.5 6.6KV / .415 KV, 100 KVA outdoor, step down transformers 2 Nos 2.25 4.50
2.7 33 KV XLPE cable of 3.5 x70 sqmm size Al. armoured cable 200 M 0.005 1.00
ASSISTANT ENGINEER
Asstt. Engineer
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack
Ettinger process in Meerut city under NMCG programme for E&M works
5 Auto phase reversal unit - Auto phase reversal unit/ 1 No. 60.00 60.00
automatic transfer switch with inbuilt time delay &
enclosure of 4000 Ampere rating . Complete system
should be SCADA compatible for required feedbacks.
6 CE & BIS approved manufacturer's large video screen of 1 Set 35.00 35.00
50 inch with latest configuration of cubes/controller/wall
management software with Matrix 1x1
7 Desktop / PC FOR MCS 1 No. 1.25 1.25
12 Internet connection via lease line as per availability in 1 year 8.00 8.00
current location city
13 CE / UL approved manufacturer’s Smart Pressure 6 No. 7.00 42.00
Transmitter
14 CE / UL approved manufacturer's Ultrasonic level 2 No. 1.50 3.00
transmitter for sump wet well
15 CE / UL approved manufacturer's capacitive level switch 2 No. 0.60 1.20
ASSISTANT ENGINEER
EXCEUTIVE ENGINEER YANTRIK KHAND UP JAL NIGAM MEERUT
Detailed project report for I & D and 220 MLD STP based on Modified Ludzack
Ettinger process in Meerut city under NMCG programme for E&M works
Assistant Engineer