MATERIAL REQUISITION FOR FLEXIBLE HOSE Rev.: A
CONNECTIONS
1. SCOPE
This document covers the technical and commercial requirements for the
flexible hose connections to be installed in the fuel storage and supply
system within the scope of Reconstruction Of The International Airport
Astana.
2. DEFINITIONS
Supplier: The Bidder becomes the Supplier when his Bid is accepted and
a Purchase Order or a Supply Agreement is made between the Bidder and
the Contractor.
Contract: The main Contract between the Employer and the Contractor.
3. TECHNICAL REQUIREMENTS
4. COMMERCIAL REQUIREMENTS
Page 1 / 5
Doc. No. Reconstruction Of The International Airport Astana Prep.By:
MATERIAL REQUISITION FOR FLEXIBLE HOSE Rev.: A
CONNECTIONS
APPENDIX – I
General requirements related with the manufacture and supply of the flexible
hose connections include:
Low: -40°C
High: +50°C
1.2. Material:
2. CONSTRUCTION
2.1. General
Page 2 / 5
Doc. No. Reconstruction Of The International Airport Astana Prep.By:
MATERIAL REQUISITION FOR FLEXIBLE HOSE Rev.: A
CONNECTIONS
3. CERTIFICATION:
4. MARKING:
Supplier shall insure that flange finishes are protected from damage during
shipping and storage. The ends of socket, threaded and weld ends fittings
and flanges shall be protected by securely fastened tight fitting plastic caps.
Vent and drain valves may be dismantled and shipped in the same
container with the relevant strainer.
6. DOCUMENTATION:
The Supplier shall provide the following documentation and reports along
with the shipment:
Page 3 / 5
Doc. No. Reconstruction Of The International Airport Astana Prep.By:
MATERIAL REQUISITION FOR FLEXIBLE HOSE Rev.: A
CONNECTIONS
APPENDIX-II
COMMERCIAL DOCUMENTS
1. BID BASIS
The Bidder will propose their best prices, best possible delivery, transport and
payment.
3. COMPLIANCE STATEMENT
The Bidder shall certify submittals forwarded to SMLA with the following
certifying statement:
"I hereby certify that the (equipment) (material) (article) shown and marked in
this bid is that proposed to be incorporated with Astana Airport
Reconstruction Project, is in compliance with the attached specification and is
submitted for the SMLA approval”.
Page 4 / 5
Doc. No. Reconstruction Of The International Airport Astana Prep.By:
MATERIAL REQUISITION FOR FLEXIBLE HOSE Rev.: A
CONNECTIONS
Bidder must sign and stamp all the pages of specification and its attachments
and provide with the compliance statement.