Transformer Details:

Rating: 750KVA

No load Voltage: 6600/433V

Current: 65.60/1000.02

Cooling: ONAN

% Impedance Voltage: 4.60

Vector Group: DYn11

Current Transformer Details:

Transformer NCT: 600/1A, 15VA, CL-5P10

PCC I/C: 1200/1A, 15VA, CL-5P10

6.6KV O/G from HT2021 to PARC: 250/5A, 15VA, 5P10

HT 2021 I/C CT: 2000/5A, 15VA, 5P10

Fault Current feed by Trafo:1000/0.0460=21739.13Amp.

Relay Setting:

1. PCC Incomer: (415V) Relay : P143 Alstom


a. Transformer Standby E/F:50Ns
This setting is considering 40%.
600*0.4=240Amp.
Sec. Setting: 0.4Amp
Time Setting: 0.9s.
b. PCC Incomer E/F:51N:
This setting is considering 20%.
1200*0.2=240Amp.
Sec. Setting: 0.2Amp
Time Dial: 0.8
IEC Curve: Very Inverse (VI)
Dropout Characteristic: Instantaneous
c. O/C Protection: (51)
This setting is considering 105% of FLC.
1000*1.05=1050Amp
Sec Setting: 0.875Amp
Time Dial: 0.5
Dropout Characteristic: Instantaneous
DRAFT COPY: Relay Setting PARC

IEC Curve: Very Inverse (VI)


Fault Clear time: 0.36S (21.739KA)

2. 6.6KV O/G to PARC (HT 2021) :Relay : REF 615 ABB


a. Phase O/C Protection: (51)
This setting is considering 105% of FLC.
65.60*1.05=68.88Amp.(68.88/250=0.275*5=1.377)
Sec. Setting: 1.38
Time Dial: 1
Dropout Characteristic: Instantaneous
IEC Curve: Very Inverse (VI)
Fault clearing time: 0.66 (1427.39Amp)
b. High Set Phase O/C Setting: (50-1)
Fault current reflected on HV Side: 1427.39Amp
Transformer Current: 12*FLC=787.2Amp
Sec Current: 787.2/250=3.148 (Set Value: 5*3.148=15.74Amp)
Time Setting: 100ms
c. E/F Protection:( 50N)
This setting is considering 10%.
600*0.1=60Amp
Sec Value: 0.24*5=1.2Amp
Time Setting: 100ms

NOTE:

1. Transformer is of Delta/Star configuration with delta is on HV side, this configuration is thereby


isolating the HV side from LV side and hence there is no grading required between these two
sides for Earth fault protection.
2. For setting up High set phase O/C setting 12times FLC value is considered.
3. Consideration of grading time is 250ms.
4. Stand by E/F & Transformer auxiliary protection (OTI/WTI/Buchholz) will trip Upstream and
downstream CB.
5. As Transformer is a limiting component, Current value is consider for transformer rather than
PCC incomer CT rating.
6. Above mentioned settings are coordinated with I/C & B/C of HT 2021 Board.(S/S-20)
DRAFT COPY: Relay Setting PARC

SINGLE LINE DIAGRAM

HT 2021
IC Relay Setting: REF 615:2000/5Amp BC Relay Setting: REF 615:2000/5Amp
51- 1A/0.4TD/SI 51- 1A/0.3 (TD)/SI
50- 2.75A/0.55 (TD) 50- 2.75A/0.35 (TD)
51N: 0.2A/1S (TD) 51N: 0.2A/1S (TD)

Sec “A” 6.6 KV Sec “B”


IC1 IC2

B/C
Relay Setting: REF 615: 250/5Amp
Phase O/C: (A) 51: (I) 0.28A, (TD) 1, VI (B) 50-1 :(I)15.74Amp,100ms
P7-PARC O/G CB Earth O/C:50N: (I) 1.2, (TD) 100ms, DT

Standby E/F: P143 D


CT: 600/1Amp Transformer: 750KVA, %Imp: 4.60,
Y 6.6KV/0.433KV, 65.60/1000.2Amp,DYn11
(I) 0.4A, (TD) 0.9, DT

Relay Setting: P143:1200/1Amp


CB Phase O/C:51: (I) 0.875A, (TD) 0.5, VI
Earth O/C:51N: (I) 0.2, (TD) 0.8, VI
415V
DRAFT COPY: Relay Setting PARC

Alstom P143 Relay Setting:


DRAFT COPY: Relay Setting PARC

ABB REF 615 Relay Setting: