Project Name : TWO - STOREY RESIDENTIAL BUILDING

Location : Barangay Lantic, Carmona, Cavite


Owner : Mr. & Mrs. Trinidad
Date Covered : Januaryn 05 - June 30, 2016

ACTIVITY #2 - CONSTRUCTION ROJECT SCHEDULE

Select a period to highlight at right. A legend desc Period Highl 1 Plan Duration Actual Start % Complete Actual (beyond plan) % Complete (beyond plan)
EQ. WEIGHED Number of Days
ACTIVITY START DURATION
PERCENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144

I. GENERAL REQUIREMENTS

Mobilization & Demobilization 1 1.4 0.965

Temporary facilities/Fencing 2 1 0.643

Temporary Utilities 4 1.4 0.965

Site Clearing 4 0.5 0.322

Survey and Lay-out 4 0.5 0.322

Insurance , Permits & Construction


Bond 4 4.5 3.216
II. EARTHWORKS

Excavation 5 1 0.558

Backfilling 5 1.5 1.002

Gravel Bedding 5 3.5 2.410


III. REBARS

Foundation 6 2 1.058

Columns 6 5 3.263

Beams 9 5 3.263

Slabs 9 6 3.616

Stairs 9 1 0.314

Counter & Bar 9 0.5 0.049


IV. FORMWORKS

Foundation 10 1.5 0.931

Columns 11 3.5 2.292

Beams 12 3.5 2.318

Slabs 12 2.5 1.528

Stairs 14 0.5 0.218

Counter & Bar 14 0.5 0.131


V. CONCRETE WORKS

Foundation 14 5 3.374

Columns 15 3.5 2.301

Beams 4 2.487

Slabs 15 12.5 8.430

Stairs 1.5 0.830

Counter & Bar 15 1 0.434


VI. MASONRY WORKS
CHB LAYING

Ground Floor 15 8.5 5.891

Second Floor 15 2 1.331

.
Counter & Bar 15 0.5 0.189
VII. PLASTERING

Ground Floor 15 6 4.127

Second Floor 15 1.5 1.000

Stairs, Counter & Bar 15 1 0.391


VIII. CEILING

Ground Floor 15 2.5 1.513

Second Floor 15 2.5 1.513


IX. PAINTING

Exterior Wall 15 4.5 3.121

Interior Wall 15 7 4.741


X. TILE SETTING

Ground Floor 15 3 3.536

Second Floor 15 2 1.257


XI. DOORS AND WINDOWS

Doors 15 5.5 5.092

Windows 15 3.5 4.960


XII. PLUMBING WORKS

Toilet Fixtures 15 2.5 1.604

Waterline Pipes and Fittings 15 1 0.447

Sanitary System 15 1.5 0.923

Septic Vault 15 5 3.157

Drainage 15 2 1.126
XIII. ELECTRICAL WORKS

Electrical Works 15 6.5 4.308


XIV. STEEL WORKS

Terrace 15 1.5 0.965

Stair 15 3.5 2.251

Page 1 of 2
EQ. WEIGHED Number of Days
ACTIVITY START DURATION
PERCENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144

Roofing 15 2 1.126
XV. TINSMITH

Roofing 20 5 3.377

10519%
Prepared by : Checked by : Approved by :

(YOUR Name) Engr. Ida P. Mandawe (Owner)