OWNER MAIN CONTRACTOR CONTRAKTOR

PROYEK SUPERMALL PAKUWON SURABAYA

MONITORING SHOP DRAWING


PAKET PEKERJAAN : FIRE FIGTHING, PLUMBING & ELEKTRIKAL

PENGAJUAN I PENGAJUAN II
NO NAMA GAMBAR NO. SHOP DRAWING NO. TRANSMITTAL PEKERJAAN KIRIM KEMBALI KIRIM KEMBALI KETERANGAN
RENCANA AKTUAL TANGGAL STATUS RENCANA AKTUAL TANGGAL STATUS
1 ZONA B FIRE PROTECTION LAYOUT BASSEMENT 3 FLOOR SD-JTI-FP-201.B

2 ZONA B FIRE PROTECTION LAYOUT BASSEMENT 2 FLOOR SD-JTI-FP-202.B

3 ZONA B FIRE PROTECTION LAYOUT BASSEMENT 1 FLOOR SD-JTI-FP-203.B 001/SD-MEP/MPK-JTI-HTL/VIII/2018 Fire Figthing 24-Aug-18 11-Oct-18 B
4 ZONA B FIRE PROTECTION LAYOUT LOWER GROUND FLOOR SD-JTI-FP-204.B
5 ZONA A FIRE PROTECTION LAYOUT LOWER GROUND FLOOR SD-JTI-FP-204.B
6 HOTEL 6 TH FLOOR - DECK PODIUM FLOOR FIRE PROTECTION LAYOUT SD-JTI-FP-214A
006/SD-MEP/MPK-JTI-HTL/VIII/2018 Fire Figthing 28-Aug-18 11-Oct-18 B
7 HOTEL 6 TH FLOOR - DECK PODIUM FLOOR DETAIL CORIDOR SD-JTI-FP-214A.1
8 PUMP ROOM DETAIL SD-JTI-FP-400 B
9 POTONGAN A-A & B-B PUMP ROOM SECTION SD-JTI-FP-401 008/SD-MEP/MPK-JTI-HTL/VIII/2018 Fire Figthing 29-Aug-18 12-Sep-18 B
10 DETAIL PONDASI POMPA SD-JTI-FP-401.A B
11 BASEMENT 1 - FIRE PROTECTION LAYOUT SD-JTI-FP-203
12 BASEMENT 1 - FIRE PROTECTION LAYOUT (Parsial-1) SD-JTI-FP-203.1
13 BASEMENT 1 - FIRE PROTECTION LAYOUT (Parsial-2) SD-JTI-FP-203.2
012/SD-MEP/MPK-JTI-HTL/IX/2018 Fire Figthing 7-Sep-18 17-Oct-18 B
14 GROUND FLOOR - FIRE PROTECTION LAYOUT SD-JTI-FP-205
15 GROUND FLOOR - FIRE PROTECTION LAYOUT (Parsial-1) SD-JTI-FP-205.1
16 GROUND FLOOR - FIRE PROTECTION LAYOUT (Parsial-2) SD-JTI-FP-205.2
17 M FLOOR-FIRE PROTECTION LAYOUT SD-JTI-FP-209.A B
18 M FLOOR-FIRE PROTECTION LAYOUT (PARSIAL-1) SD-JTI-FP-209.A.1 B
19 M FLOOR-FIRE PROTECTION LAYOUT (PARSIAL-2) SD-JTI-FP-209.A.2 B
20 M & E TRANSFER FLOOR FIRE PROTECTION LAYOUT SD-JTI-FP-210 014/SD-MEP/MPK-JTI-HTL/IX/2018 Fire Figthing 18-Sep-18 7-Nov-18 B
21 M2 FLOOR-FIRE PROTECTION LAYOUT SD-JTI-FP-211E B
22 7TH FLOOR-DECK PODIUM FLOOR FIRE PROTECTION LAYOUT SD-JTI-FP-215 B
23 8-12TH & 15-17TH FLOOR-DECK PODIUM FLOOR FIRE PROTECTION LAYOUT SD-JTI-FP-216 B
24 MOCK UP-4STAR HOTEL UNIT SK2 & ST2 FIRE PROTECTION LAYOUT SD-JTI-FP-404 B
25 POTONGAN A & GAMBAR DETAIL SD-JTI-FP-404.1 C
26 MOCK UP-4STAR HOTEL UNIT ST1 FIRE PROTECTION LAYOUT POTONGAN & DETAIL GAMBAR SD-JTI-FP-405 015/SD-MEP/MPK-JTI-HTL/IX/2018 Fire Figthing 18-Sep-18 24-Oct-18 B
27 MOCK UP-4STAR HOTEL UNIT PS & SQ FIRE PROTECTION LAYOUT SD-JTI-FP-406 C
28 MOCK UP-4STAR HOTEL UNIT PK FIRE PROTECTION LAYOUT SD-JTI-FP-407 C
29 HOTEL BASEMENT 1-FIRE PROTECTION LAYOUT SD-JTI-FP-203
30 HOTEL BASEMENT 1-FIRE PROTECTION LAYOUT (PARSIAL - 1) SD-JTI-FP-203.1 017/SD-MEP/MPK-JTI-HTL/IX/2018 Fire Figthing 18-Sep-18 29-Oct-18 B
31 HOTEL BASEMENT 1-FIRE PROTECTION LAYOUT (PARSIAL - 2) SD-JTI-FP-203.2
32 HOTEL BASEMENT 2-FIRE PROTECTION LAYOUT SD-JTI-FP-202
33 HOTEL BASEMENT 2-FIRE PROTECTION LAYOUT (PARSIAL - 1) SD-JTI-FP-202.1
34 HOTEL BASEMENT 2-FIRE PROTECTION LAYOUT (PARSIAL - 2) SD-JTI-FP-202.2
018/SD-MEP/MPK-JTI-HTL/IX/2018 Fire Figthing 18-Sep-18 7-Nov-18 B
35 POTONGAN A SD-JTI-FP-202.3
36 POTONGAN B SD-JTI-FP-202.4
37 POTONGAN C SD-JTI-FP-202.4
38 DETAIL SHAFT A FIRE PROTECTION TYPICAL FLOOR SD-JTI-FP-501
39 DETAIL ACV SHAFT A FIRE PROTECTION SD-JTI-FP-501.1
40 DETAIL PRV SHAFT A FIRE PROTECTION SD-JTI-FP-501.2
022/SD-MEP/MPK-JT-HTL/IX/2018 Fire Figthing 29-Sep-18 13-Nov-18 B
41 POTONGAN SHAFT A SD-JTI-FP-501.3
42 POTONGAN SHAFT A SD-JTI-FP-501.4
43 POTONGAN SHAFT A SD-JTI-FP-501.5
44 ZONE B FIRE PROTECTION LAYOUT LOWER GROUND FLOOR SD-JTI-FP-204C 023/SD-MEP/MPK-JT-HTL/IX/2018 Fire Figthing 29-Sep-18 7-Nov-18 B
45 5 STAR-HOTEL-29TH,30TH & 31TH FLOOR (FIRE PROTECTION LAYOUT) SD-JTI-FP-218
46 PARSIAL - 1 SD-JTI-FP-218.1
034/SD-MEP/MPK-JT-HTL/X/2018 Fire Figthing 17-Oct-18 7-Nov-18 B
47 PARSIAL - 2 SD-JTI-FP-218.2
48 POTONGAN A SD-JTI-FP-218.3
49 5 STAR-HOTEL-32TH,35TH,36TH & 38TH FLOOR (FIRE PROTECTION LAYOUT) SD-JTI-FP-219
50 PARSIAL - 1 SD-JTI-FP-219.1
035/SD-MEP/MPK-JT-HTL/X/2018 Fire Figthing 17-Oct-18 7-Nov-18 B
51 PARSIAL - 2 SD-JTI-FP-219.2
52 POTONGAN GAMBAR SD-JTI-FP-219.3
53 DETAIL DENAH SHAFT B FIRE PROTECTION SD-JTI-FP-502
036/SD-MEP/MPK-JT-HTL/X/2018 Fire Figthing 17-Oct-18 30-Nov-18 B
54 POTONGAN SHAFT B 6TH - 17TH FLOOR SD-JTI-FP-502.1
55 5 STAR MOCK UP ROOM 17,19 & 22ND FL REFLECTED CEILING PLAN LIGHTING LAYOUT SD-JTI-EL-505 (H)
56 5 STAR MOCK UP ROOM 17,19 & 22ND FL FLOOR PLAN LIGHTING LAYOUT SD-JTI-EL-506 (H) 039/SD-MEP/MPK-JTI-HTL/X/2018 Fire Figthing 24-Oct-18
57 SD-JTI-EL-603 (H)
4 STAR HOTEL UNITS : SK 2a & SK 2b POWER LAYOUT (5 STAR MOCK UP ROOM 17,19 & 22ND POWER LAYOUT) SALAH JUDUL
58 SINGLE LINE DIAGRAM OF FIRE PUMP (HOTEL) FCP-H-HB2 SD-JTI-FP-500 047/SD-MEP/MPK-JTI-HTL/XI/2018 Fire Fighting 9-Nov-18 4-Dec-18 A

JTI - Monitoring Approval Material Page 1 of 2


OWNER MAIN CONTRACTOR CONTRAKTOR
PROYEK SUPERMALL PAKUWON SURABAYA

MONITORING ASBUILT DRAWING ( FIRE FIGHTING )


PAKET PEKERJAAN : FIRE FIGTHING, PLUMBING & ELEKTRIKAL

PENGAJUAN I PENGAJUAN II
NO NAMA GAMBAR NO. SHOP DRAWING NO. TRANSMITTAL PEKERJAAN KIRIM KEMBALI KIRIM KEMBALI KETERANGAN
RENCANA AKTUAL TANGGAL STATUS RENCANA AKTUAL TANGGAL STATUS
1

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

JTI - Monitoring Approval Material Page 2 of 2