RESOUCE ESTIMATION OF

THE ULANGA MARBLE


DEPOSIT AT MAHENGE,
MOROGORO, TANZANIA.
Submitted to:
S & T MARBLE AND MINING LIMITED

Technical report prepared by: Eng. Confirmation J.M & Kayeta E.H

1
Table of Contents

Table of Contents......................................................................................................................................................................
List of figures.............................................................................................................................................................................
List of tables..............................................................................................................................................................................
1.0 Scope of work......................................................................................................................................................................
2.0 Executive summary.............................................................................................................................................................
3.0 Introduction........................................................................................................................................................................
4.0 Resource Estimation (RE) Procedures.................................................................................................................................
4.1 Drilling..................................................................................................................................................6
4.2 Data Verification...................................................................................................................................8
4.3 Geological Interpretation....................................................................................................................10
4.4 Solid Model Validation........................................................................................................................16
5.0 RESOURCE STATEMENT.....................................................................................................................................................1
6.0 INTERPRETATION AND RECOMMENDATION.....................................................................................................................1
7.0 CONCLUSION..................................................................................................................................................................... 1
8.0 REFERENCES...................................................................................................................................................................... 1

List of figures

Figure 1: Drillholes coverage at Ulanga Marble Project, Mahenge area.....................................6

Figure 2: Drillholes coverage at Ulanga Marble Project, Mahenge area.....................................7

Figure 3: Topography of Ulanga Marble Project, Mahenge area in plain view.........................9

Figure 4: Topography of Ulanga Marble Project, Mahenge area in sectional view.................10

Figure 5: Geology for oxidised and fresh zones at Ulanga Marble Project, Mahenge area....11

Figure 6: Geology showing different zones of intrusive features at Ulanga Marble Project,
Mahenge area...................................................................................................................................12

Figure 7: Geology of the Ulanga Marble Project, at Mahenge area...........................................13

Figure 8: Geology Section zones at Ulanga, Mahenge area........................................................14

Figure 9: Geological zones at Ulanga village, Mahenge area.....................................................15

2
List of tables

Table 1: Detailed global resource for Ulanga Marble study area................................................5

Table 2: Drillholes completed at Ulanga area, Mahenge..............................................................8

Table 3: Detailed global resources for Ualanga marble study area...........................................16

Table 4: Detailed global resources for Ulanga marble study area based on fresh and
oxidised zones..................................................................................................................................16

1.0 Scope of work

XXX, a drilling and geological consultancy, was contracted by S & T Marble and
Mining Company, to drill and compile Exploration and Preliminary resource
3
estimate report on a marble deposit located at Ulanga, Mahenge District in
Morogoro Region.

Scope of work from exploration entails the following:

 Plan drilling on the targeted area.


 Log the core samples, correct measurement for: Lithologies, mineralization,
alteration, core structure measurement, Geotech logging, specific gravity
and sampling the core.
 Establish the drilled mineralized zones and it intercepts.
 Establish the geological continuity in relation to marble zones.
 Preliminary Resource Estimation on Marble (CaCO3) for Ulanga.

2.0 Executive summary.

This report summarises the Resource Estimation for Ulanga marble, project in Morogoro
Region. The Geological Resource in the study area consists of extensive marble resource.
This vast extensive zone of marble was modelled producing geology wireframes for
marble. All other geology rocks in the project area were also modelled. Topography was
modelled by using normal GPS surveyed collar coordinates in Leapfrog Geo.

Four diamond drill holes were drilled and all of them were involved in the modelling
process. The modelling method involved importing data, Drillhole locations, Drillhole
Survey Information and Downhole information for geology. Validation of the
modelling constraints was not required as the geology zones were modelled by implicit
modelling method in leapfrog geo software.

4
Densities Used:

Air and Voids = 0.0

Clayey Sand with Marble = 2.30

Fresh Marble = 2.50

The densities were applied to the model using solid wireframes representing the
geology domains identified in the drill hole logging.

Table 1: Detailed global resource for Ulanga study area


GLOBAL RESOURCE COMMODITY TONNES
Oxide Marble Mar 317,492
Fresh Marble Mar 2,1504,750
Total 2,472,242

3.0 Introduction

XXX, a drilling and geological consultancy, was contracted by S & T Marble and Mining
Limited, to drill and compile Exploration and Preliminary Resource Estimate Report on a
marble (CaCO3) deposit located at Ulanga Village, Mahenge District in Morogoro Region.
The information has been derived from drilling 6 exploration drill holes totaling 240.30
meters carried at 40 meters down dip. No samples were sent to Laboratory for Marble
(CaCO3) analysis

This report summarizes the data and methods used to produce the marble resources
report for Ulanga area. The scope of work that reported the resource modelling at Ulanga
area was as follows:

 Importing data.
 Drillhole locations.
 Drillhole Survey Information and Downhole information for geology.
 Solid Modelling, Resource Estimation and Resource Statement

5
4.0 Resource Estimation (RE) Procedures

4.1 Drilling
Total number of for (4) diamond drillholes totalling 122.30 metres (Diamond drillholes

namely BHID (01 to BHID04) were drilled at Ulanga Village in Mahenge by XXX(Figure 1

& 2) and (Table 2).

Figure 1: Drillholes coverage at Ulanga village, Mahenge area

6
Figure 2: Drillholes coverage at Ulanga village, Mahenge area

(NORTH LOOKING VIEW OF THE DRILLHOLE LAYOUT)

7
Table 2: Drillholes completed at Ulanga area, Mahenge

DEPTH AZIMUT
BHID X Y Z (m) DIP H
904314
BHID01 246944 0 940 24.8 -90 0
904315
BHID02 246876 4 914 42.5 -90 0
904315
BHID03 246777 6 926 40 -90 0
904308
BHID04 246761 3 926 15 -90 0
TOTAL 122.3
4.2 Data Verification
The data verification which did not take considerable amount of time was mainly verified in two

ways.

i. The first means of verification was to check back all the original exploration data from

the Exploration Database. The data checked included collar coordinates, down-hole

surveys and lithology. The verification revealed NO deviations in collar data. In the

assay data, blanks and zeros within the Access database were omitted.

ii. Every hole was re-visited once again in section and plan during the displaying

process, and their validity was checked visually in relation to surrounding drillholes

in Leapfrog Geo, MapInfo Professional and Flat database.

8
D

Figure 3: Topography of Ulanga village, Mahenge area in plain view

9
Figure 4: Topography of Ulanga village, Mahenge area in Oblique sectional view

4.3 Geological Interpretation


The wireframes/solids were created for the geology domains to be used in the resource
estimation. With Mahenge project four geology zones were delineated based on Soil, Mica Schist,
Residual Marble and Marble lithologies using implicit modelling method in leapfrog Geo.
Weathering profiles of the geology rocks was also modelled as oxide and fresh zones.

10
Figure 5: Geology for oxidised and fresh zones at Ulanga village, Mahenge area

11
Figure 6: Geology showing different zones of intrusive features at Ulanga village,
Mahenge area (Plan View)

12
Figure 7: Geology of the Ulanga marble, at Mahenge area (South Looking View)

13
Figure 8: Geology Section zones at Ulanga Marble, Mahenge area (Section through
Drillholes BH03 and BH06)

14
Figure 9: Geological zones at Ulanga village, Mahenge area (Oblique View of the
Geology)

Densities Used:

Air and Voids = 0.0

Clayey Soil = 2.3

Alternating Weathered and Fresh Marble = 2.50

The densities were applied to the model using solid wireframes representing the
geology domains identified in the drill hole logging.

15
4.4 Solid Model Validation
An important step in any resource estimation is to validate the solid models after they have been

created. Mahenge marble project geology resources models were validated by implicitly

modelling in leapfrog geo.

5.0 RESOURCE STATEMENT

The resource estimates for Ulanga study area is indicated below:

Resources were based on six diamond drillholes.

Table 3: Detailed global resources for Ulanga marble study area

  COMMODITY TONNES
GLOBAL RESOURCE
Marble MAR 2,472,242

Table 4: Detailed global resources for Ulanga marble study area based on fresh and
oxidised zones.
  COMMODITY TONNES
GLOBAL RESOURCE    
317,492
Oxide Marble MAR
2,154,750
Fresh Marble  MAR

2,472,242
TOTAL MAR

16
6.0 INTERPRETATION AND RECOMMENDATION

Drillhole spacing involved in this resource estimation is NOT sufficient enough. So, the Ulanga

marble project estimated resource category is an inferred resource, therefore needs much more

drilling to improve the confidence level of the resource.

7.0 CONCLUSION

The Ulanga marble deposit whose resources has been estimated in this report shades light to

marble deposit which can warrant investment. However, to increase the level of investment

confidence on the resources estimated, more drilling within the project area is recommended.

8.0 REFERENCES

Mario E Rossi, Clayton V. Deutsch—2014, Mineral Resource Estimation

17
9.0 APPENDICES

Figure 10: Strip Log Profiles for Drillholes BH01 to BH06

18
19
20
Figure 11: Regional Geological Map of Mahenge project.

21
Figure 12: Log Profiles for Drillholes BH01 to BH06

BHID FROM TO LITH


BH01 0 5.95 Clay Soil
BH01 5.95 19 Alternating Weathered and Fresh Marble
BH01 19 38 Marble
BH02 0 40 Marble
BH03 0 40 Marble
BH04 0 40 Marble
BH05 0 42.3 Marble
BH06 0 6.8 Clay Soil
BH06 6.8 11 Alternating Weathered and Fresh Marble
BH06 11 40 Marble

22