Technical report prepared by: Eng. Confirmation J.M & Kayeta E.H
1
Table of Contents
Table of Contents......................................................................................................................................................................
List of figures.............................................................................................................................................................................
List of tables..............................................................................................................................................................................
1.0 Scope of work......................................................................................................................................................................
2.0 Executive summary.............................................................................................................................................................
3.0 Introduction........................................................................................................................................................................
4.0 Resource Estimation (RE) Procedures.................................................................................................................................
4.1 Drilling..................................................................................................................................................6
4.2 Data Verification...................................................................................................................................8
4.3 Geological Interpretation....................................................................................................................10
4.4 Solid Model Validation........................................................................................................................16
5.0 RESOURCE STATEMENT.....................................................................................................................................................1
6.0 INTERPRETATION AND RECOMMENDATION.....................................................................................................................1
7.0 CONCLUSION..................................................................................................................................................................... 1
8.0 REFERENCES...................................................................................................................................................................... 1
List of figures
Figure 5: Geology for oxidised and fresh zones at Ulanga Marble Project, Mahenge area....11
Figure 6: Geology showing different zones of intrusive features at Ulanga Marble Project,
Mahenge area...................................................................................................................................12
2
List of tables
Table 4: Detailed global resources for Ulanga marble study area based on fresh and
oxidised zones..................................................................................................................................16
XXX, a drilling and geological consultancy, was contracted by S & T Marble and
Mining Company, to drill and compile Exploration and Preliminary resource
3
estimate report on a marble deposit located at Ulanga, Mahenge District in
Morogoro Region.
This report summarises the Resource Estimation for Ulanga marble, project in Morogoro
Region. The Geological Resource in the study area consists of extensive marble resource.
This vast extensive zone of marble was modelled producing geology wireframes for
marble. All other geology rocks in the project area were also modelled. Topography was
modelled by using normal GPS surveyed collar coordinates in Leapfrog Geo.
Four diamond drill holes were drilled and all of them were involved in the modelling
process. The modelling method involved importing data, Drillhole locations, Drillhole
Survey Information and Downhole information for geology. Validation of the
modelling constraints was not required as the geology zones were modelled by implicit
modelling method in leapfrog geo software.
4
Densities Used:
The densities were applied to the model using solid wireframes representing the
geology domains identified in the drill hole logging.
3.0 Introduction
XXX, a drilling and geological consultancy, was contracted by S & T Marble and Mining
Limited, to drill and compile Exploration and Preliminary Resource Estimate Report on a
marble (CaCO3) deposit located at Ulanga Village, Mahenge District in Morogoro Region.
The information has been derived from drilling 6 exploration drill holes totaling 240.30
meters carried at 40 meters down dip. No samples were sent to Laboratory for Marble
(CaCO3) analysis
This report summarizes the data and methods used to produce the marble resources
report for Ulanga area. The scope of work that reported the resource modelling at Ulanga
area was as follows:
Importing data.
Drillhole locations.
Drillhole Survey Information and Downhole information for geology.
Solid Modelling, Resource Estimation and Resource Statement
5
4.0 Resource Estimation (RE) Procedures
4.1 Drilling
Total number of for (4) diamond drillholes totalling 122.30 metres (Diamond drillholes
namely BHID (01 to BHID04) were drilled at Ulanga Village in Mahenge by XXX(Figure 1
6
Figure 2: Drillholes coverage at Ulanga village, Mahenge area
7
Table 2: Drillholes completed at Ulanga area, Mahenge
DEPTH AZIMUT
BHID X Y Z (m) DIP H
904314
BHID01 246944 0 940 24.8 -90 0
904315
BHID02 246876 4 914 42.5 -90 0
904315
BHID03 246777 6 926 40 -90 0
904308
BHID04 246761 3 926 15 -90 0
TOTAL 122.3
4.2 Data Verification
The data verification which did not take considerable amount of time was mainly verified in two
ways.
i. The first means of verification was to check back all the original exploration data from
the Exploration Database. The data checked included collar coordinates, down-hole
surveys and lithology. The verification revealed NO deviations in collar data. In the
assay data, blanks and zeros within the Access database were omitted.
ii. Every hole was re-visited once again in section and plan during the displaying
process, and their validity was checked visually in relation to surrounding drillholes
8
D
9
Figure 4: Topography of Ulanga village, Mahenge area in Oblique sectional view
10
Figure 5: Geology for oxidised and fresh zones at Ulanga village, Mahenge area
11
Figure 6: Geology showing different zones of intrusive features at Ulanga village,
Mahenge area (Plan View)
12
Figure 7: Geology of the Ulanga marble, at Mahenge area (South Looking View)
13
Figure 8: Geology Section zones at Ulanga Marble, Mahenge area (Section through
Drillholes BH03 and BH06)
14
Figure 9: Geological zones at Ulanga village, Mahenge area (Oblique View of the
Geology)
Densities Used:
The densities were applied to the model using solid wireframes representing the
geology domains identified in the drill hole logging.
15
4.4 Solid Model Validation
An important step in any resource estimation is to validate the solid models after they have been
created. Mahenge marble project geology resources models were validated by implicitly
COMMODITY TONNES
GLOBAL RESOURCE
Marble MAR 2,472,242
Table 4: Detailed global resources for Ulanga marble study area based on fresh and
oxidised zones.
COMMODITY TONNES
GLOBAL RESOURCE
317,492
Oxide Marble MAR
2,154,750
Fresh Marble MAR
2,472,242
TOTAL MAR
16
6.0 INTERPRETATION AND RECOMMENDATION
Drillhole spacing involved in this resource estimation is NOT sufficient enough. So, the Ulanga
marble project estimated resource category is an inferred resource, therefore needs much more
7.0 CONCLUSION
The Ulanga marble deposit whose resources has been estimated in this report shades light to
marble deposit which can warrant investment. However, to increase the level of investment
confidence on the resources estimated, more drilling within the project area is recommended.
8.0 REFERENCES
17
9.0 APPENDICES
18
19
20
Figure 11: Regional Geological Map of Mahenge project.
21
Figure 12: Log Profiles for Drillholes BH01 to BH06
22