1.1 EXCAVATION
1.2 EARTHWORK SUPPORT
1.3 SURFACE TREATMENT
2. CONCRETE WORK
4. REINFORCEMENT
5. MASONRY
6. FINISHES
6.1 PLASTERING
6.2 TILING
6.3 CEILING
7. PAINTING
8. ROOFING
10. PLUMBING
A. HAULING (DATA)
COLOUR CODES
Excavation The rate given is applicable to excavation undertaken upto 5' below ground level. From there onwards every 5' dep
Floor wise appreciation for the rates compared to that of ground floor rates will be as follows
Concrete 3% 5% 7%
225mm thk Brickwork (Area) 5% 7% 9%
225mm thk Brickwork (Cube) 5% 7% 10%
112.5mm thk Brickwork (Area) 5% 7% 10%
Reinforcement 2.5% 5% 7%
Plastering 5% 10% 15%
Painting 3% 6% 9%
Floor Tiling 2% 4% 6%
Wall tiling 2% 4% 6%
Roof calicut Tiles 3% 6% 9%
Roof Asbestos 3% 5% 7%
Ceiling work 3% 5% 7%
The common items that make up the overhead costs are listed below. The cost of the overhead items involved on a job is ass
In the case of the construction Agencies executing building construction works the overheads component may be listed as bel
3 Temporary works:
(a) Access Road and Maintenance
(b) Site buildings for accommodation of part labour
(c) Central stores building
(d) Fencing and protection
(e) Provision of water, lights etc.
(f) Clearing and tidying up
(g) Collection of building materials including cement and steel
General Overheads
13 Head office and rent, lights, telephone, stationary supplies, furniture etc. for same
14 Salaries of Head Office staff, Engineers, TO, Draughtsman, Clerks, Stenos, Minor staff and Drivers
19 Salaries of workshop & yard storekeepers, Drivers, Foremen Mechanics & workmen
% of Basic Cost
1.0
4.0
0.2
0.7
0.6
0.3
0.3
0.2
0.4
0.8
0.9
0.5
0.2
1.0
0.9
1.2
0.4
0.3
0.5
1.6
3.0
19.0
0.6
1.2
1.0
0.4
0.2
2.2
0.4
6.0 6
Basic rates for Items
1.1 Excavation
2 CONCRETE WORK
2.1 Mixing 1:3:6 (40) concrete (3m³) - Grade 15. 25724.60 19843.00 4720.00
2.2 Mixing 1:2:4 (25) concrete (3m³) - Grade 20. 26778.10 20896.50 4720.00
2.3 Mixing 1:2:4 (20) concrete (3m³) - Grade 20. 29067.60 23186.00 4720.00
2.4 Mixing 1:1½:3 (20) concrete (3m³) - Grade 25. 32180.60 26299.00 4720.00
2.10 Placing 150mm thick mass concrete ground floor slab (10m²). 1207.50 0.00 1150.00
Placing 125mm R.C.C. floor slab at 1st floor level including curing
2.13 (1.50m³). 7399.00 28.00 5700.00
3.1.3 Dismantling, cleaning and repairing - Per Use. 367.50 0.00 350.00
3.2 Form work to under side of 1st floor slab (20.0m² contact area).
3.2.1 Making Panels (4 Uses) including 20% repair cost). 2764.00 1294.00 1400.00
3.3.1 Making the Mould Per Use (4 Uses). 1151.00 468.50 650.00
3.3.2 Assembling - Per use. 3239.57 1139.57 2000.00
4 REINFORCEMENT
5 MASONRY
5.1.1 Brickwork in cement sand 1:5 in foundation up to D.P.C (3m³). 10509.30 4885.50 5460.00
5.1.2 Brickwork cement & sand 1:8 in foundation up to D.P.C (3m³). 10106.30 4482.50 5460.00
Brickwork 225mm thk in ground floor cement sand 1:8 mortar (10m²).
5.1.6 7823.10 3466.50 4110.00
Brick work (wire cut) in 1:5 cement sand mortar in 112.5mm thick walls
5.1.7 in ground floor (10m²). 4478.90 1530.50 2730.00
Brick work (wire cut) in 1:5 cement sand mortar in 225mm thick walls
5.1.8 in ground floor (10m²). 8114.90 3249.50 4590.00
Brick work (wire cut) in 1:5 cement sand mortar in 337.5mm thick walls
5.1.9 in ground floor (10m²). 13179.00 5634.75 7185.00
Extra over for facing including raised painting 3mm thick in cement &
5.1.10 sand 1:1 misture in ground floor (10m²). 7842.55 519.25 7110.00
5.1.11 75mm thk floor paved in lime mortar 2:5 in ground floor (10m²) 4462.50 1552.50 2910.00
Steps 338x150mm in brick in cement & sand 1:5 with 12.5mm thick
5.1.12 cement & sand 1:2 rendering inclusive necessary excavation (3m). 1462.00 689.50 750.00
Brick drains in cement and sand 1:5, 9” wide and 150-225 average
depth including cement rendering 112.5mm thick 1:2 to exposed faces
5.1.13 with 450mm ramp including necessary excavation. (3m) 2879.50 917.35 1905.00
Brick drains in cement and sand 1:5, 9” wide and 150-225 average
depth including cement rendering 12.5mm thick 1:2 to exposed faces
5.1.14 without ramp including necessary excavation (3m) 2528.25 797.85 1680.00
8” thick Hollow block work in cement and sand mortar 1:5 in ground
5.2.1 floor (cavities unfilled) Size of a block 400mm X 200mm X 200mm 8806.13 5559.35 3063.00
(10m²)
4” thick Hollow block masonry in cement and sand mortar 1:5 with
5.2.2 cavities unfilled, Size of a block 400mm X 200mm X 100mm (10m²) 2966.01 523.05 2262.00
6 FINISHES
6.1 PLASTERING
Rendering, 19mm thick D.P.C. in cement & sand 1:2 finished with 2
6.1.1 coats hot tar & blinded with sand (10m²). Using firewood. 5050.21 2560.70 2417.00
Rendering to walls, 16mm thick Plastering to wall in lime & sand 2:5
6.1.2 including floating with lime putty (10m²). 3200.24 1288.00 1804.00
Rendering to walls, 16mm thk cement & sand 1:3 including cement
6.1.3 floating (10m²). 3292.99 1523.85 1669.00
10mm thick Plastering to soffit slab cement & sand 1:3 including
6.1.4 floating with lime putty (10m²). 4781.67 1074.85 3497.00
16mm thick plastering to walls in lime, cement & sand 1:1:5 finished
6.1.6 semi-rough with wooden float (10m²). 2988.39 1362.35 1534.00
16mm thick plastering to walls in lime cement and sand 1:1:5 finished
6.1.7 smooth with lime putty floating (10m²) 3707.43 1488.85 2093.00
12mm thick rendering in cement & sand 1:3 finished smooth (10m²).
6.1.8 2909.32 1190.25 1669.00
19mm thick rendering in cement & sand 1:3 finished smooth (10m²).
6.1.10 4284.26 1933.80 2282.00
19mm thick rendering in cement & sand 1:2 in floors, finished smooth
6.1.11 (10m²). 4681.16 2330.70 2282.00
19mm thick rendering in cement & sand 1:2 coloured cement floors
6.1.12 finished smooth (10m²). 4673.81 2323.35 2282.00
6.2 TILING
Glazed wall tiles including bedding in cement mortar 1:2 & pointing in
ground floor (specials measured separately). (Rates exclude tile
6.2.1 prices, grout measured for 150 X 150 mm tiles). (10m²) 9541.70 2759.15 6585.00
Terrazzo floor tiles in 12.5mm thick cement & sand 1:2 in ground floor.
6.2.2 (Rates exclude tile prices, grout measured for 300 X 300 mm tiles). 7833.30 1467.90 6180.00
(10m²)
Pressed floor tiles bedded in 12.5mm cement motar 1:2 & pointing in
6.2.3 neat cement in ground floor. (Rate exclude tile prices, grout 8389.50 1467.90 6720.00
measured for 200 X 200 mm sized tiles). (10m²)
6.3 CEILING
7 PAINTING
Painting, Prepare surface of steel truss and apply two coats of anti-
7.2 corrosive primer (10m²). 2607.25 0.00 2576.00
Painting, Apply one coat of anti-corrosive primer and two coats enamel
7.3 paint on already shop primed and erected steel Roof truss (10m²). 3488.14 0.00 3338.00
Painting, Prepare and apply two coats of primer and finishing coat of
7.4 enamel paint to mild steel (angle/flat) gate (10m²). 2146.00 0.00 2046.00
Prepare and painting wood work with primer and two coats of enamel
7.7 paint (10m²). 1999.00 40.00 1934.00
Painting, Prepare & apply one coat of alkali resistant primer and two
7.10 coat of emulsion paint to internal wall (10m²). 2301.50 943.00 1250.00
Painting, Prepare & apply one coat of alkali resistant primer and two
7.11 coat of emulsion paint to soffit slab (10m²). 2841.00 967.50 1750.00
Painting, Prepare & apply one coat of alkali resistant primer and two
7.12 coat of weathershield paint to external wall (10m²). 2574.50 1216.00 1250.00
Painting, Prepare & apply one coat of shell coat, one coat alkali
7.13 resistant primer and two coat of weathershield paint to external wall 0.00 0.00 0.00
(10m²).
7.14 Cement washing to walls of single storey building (100m²). 3759.05 463.05 3200.00
7.15 Painting walls with two coats of emulsion paint (10m²). 1746.50 903.00 750.00
Varnishing two coats with copal vanish after sand papering (10m²).
7.16 864.00 40.00 864.00
7.17 Wax polishing to timber in panels & floors (10m²). 520.00 120.00 520.00
8 ROOFING
Timber frame work for calicut pattern tile hip Roof in single storey
building consisting of wall plate beam, ridge plate, rafters etc.
8.1 (preservative treatment to be measured separately). (60m²) 16022.50 2951.80 12690.00
Roof covering with calicut pattern clay tiles in single storeyed building
8.2 (Timber frame work & ridge covering measured separately). (60m²). 5323.04 0.00 5168.00
Roof covering, One layer half round clay tiles over corrugated
8.5 asbestos Roof covering (10m²). 1328.70 0.00 1290.00
Ridge covering with calicut pattern ridge tiles bedded in cement lime
8.7 mortar 1:1:4 (4m). 4688.50 4276.50 400.00
9.1 Half round PVC eaves gutter 150mm dia fixed to timber valance board
including gutter joiner and brackets fixed at 450mm centres (Other 864.00 0.00 800.00
specials paid separately) (8m).
9.2 PVC gutter head, 150mm dia (1 Nr.). 224.64 0.00 208.00
9.4 PVC end caps, 150mm dia (1 Nr.). 103.68 0.00 96.00
9.5 PVC rain water down pipes, 87mm dia fixed to brick wall with wooden
plugs buried in wall (specials paid separately) (8m). 570.24 570.24 528.00
10 PLUMBING
PVC pipes, 20mm Dia fixed to walls (specials paid separately) (3m).
10.1.1 200.85 0.00 195.00
PVC pipes, 25mm Dia fixed to walls (specials paid separately) (3m).
10.1.2 200.85 0.00 195.00
PVC pipes, 30mm Dia fixed to walls (specials paid separately) (30m).
10.1.3 772.50 0.00 750.00
PVC pipes, 40mm Dia fixed to walls (specials paid separately) (30m).
10.1.4 1158.75 0.00 1125.00
PVC pipes, 50mm Dia fixed to walls (specials paid separately) (30m).
10.1.5 1158.75 0.00 1125.00
PVC pipes, 63mm Dia fixed to walls (specials paid separately) (30m).
10.1.6 1158.75 0.00 1125.00
PVC pipes, 90mm Dia fixed to walls (specials paid separately) (30m).
10.1.7 1545.00 0.00 1500.00
Chasing brick work for laying 20mm to 50mm dia PVC pipes and
10.1.10 making good average depth 50mm (pipes & specials paid separately) 3950.05 0.00 3835.00
(30m).
Chasing brick work for laying 50mm to 90mm dia PVC pipes in ground
10.1.11 or floor & making good average depth 75mm - ditto - (30m). 4619.55 0.00 4485.00
10.1.12 PVC specials, 20mm dia viz-elbows/bends/sockets (10 Nos) 257.50 0.00 250.00
10.1.13 PVC specials, 25mm dia viz-elbows/bends/sockets (10 Nos) 257.50 0.00 250.00
10.1.14 PVC specials, 32mm dia viz-elbows/bends/sockets (10 Nos) 257.50 0.00 250.00
10.1.15 PVC specials, 40mm dia viz-elbows/bends/sockets (10 Nos) 257.50 0.00 250.00
10.1.16 PVC specials, 50mm dia viz-elbows/bends/sockets (10 Nos) 515.00 0.00 500.00
10.1.17 PVC specials, 63mm dia viz-elbows/bends/sockets (10 Nos) 515.00 0.00 500.00
10.1.18 PVC specials, 75mm dia viz-elbows/bends/sockets (10 Nos) 515.00 0.00 500.00
10.1.19 PVC specials, 90mm dia viz-elbows/bends/sockets (10 Nos) 515.00 0.00 500.00
10.1.20 PVC specials, 20mm dia viz - Tee (10 Nos) 515.00 0.00 500.00
10.1.21 PVC specials, 25mm dia viz - Tee (10 Nos) 515.00 0.00 500.00
10.1.22 PVC specials, 32mm dia viz - Tee (10 Nos) 515.00 0.00 500.00
10.1.23 PVC specials, 40mm dia viz - Tees (10 Nos) 515.00 0.00 500.00
10.1.24 PVC specials, 50mm dia viz - Tees (10 Nos) 1030.00 0.00 1000.00
10.1.25 PVC specials, 63mm dia viz - Tees (10 Nos) 1030.00 0.00 1000.00
10.1.26 PVC specials, 75mm dia viz - Tees (10 Nos) 1030.00 0.00 1000.00
10.1.27 PVC specials, 90mm dia viz - Teess (10 Nos) 1030.00 0.00 1000.00
Closet, pedestal type with L/L flushing cistern, flush pipe double
11.3 plastic seat cover, 20mm diameter stop cock, trap supplied & fixed 1751.00 0.00 1700.00
complete to working order (1 Nr.).
Closet, Squatting type with trap including high level cistern fixed
11.4 complete with flush pipe and 20mm diameter stop cock, all complete 1957.00 0.00 1900.00
with working order.(1 Nr)
11.5 Bidet suite, vitreous china fixed complete to working order (1Nr). 1545.00 0.00 1500.00
Urinal, Bowl type with trap and 9 Ltre capacity automatic flushing
11.6 cistern and spreaders complete to working order (4 Nr.) 1751.00 0.00 1700.00
12 IRON MONGERY
Door, single hung 975 X 2100mm high overall with frame having 31mm
13.1 thick sash and 94 X 69mm timber frame (glazing, iron mongery & 5922.50 0.00 5750.00
painting measured separately) (2.10m²).
Door, glazed & panelled double hung 1200x2100mm high overall with
frame including 38mm thick sash and 94x69mm timber frame (glazing
13.2 iron mongery & painting measured separately) (2.60m²). 7210.00 0.00 7000.00
Plywood door, single hung 938 X 2088mm overall with frame having
13.3 31mm thick sash and 94x69mm frame (Iron-mongery and painting 1302.95 0.00 1265.00
measured separately). (2.02m²)
Door ledged, braced & battened single hung 750 X 1950mm overall,
with frame having 22mm thick tongued & grooved planks & 94 X 69mm
13.4 frame (Iron mongery & painting measured separately) (1.51m²). 3167.25 0.00 3075.00
3mm clear sheet glass panes exceeding 0.09m² but not exceeding
0.38m² cut and fixed with timber beadings to doors & windows
13.6 (consider sash 900 X 1200mm high with 75 X 31mm style & 4 Nos. 772.50 0.00 750.00
glass panes). (0.84m²)
Basic Rate per Basic Rate per Unit Basic Rate per Unit Site
Quantity Unit Rate
Unit (Rs) (Material only) (Rs) (Labour only) (Rs) Overheads
10 m² 257.45 121.60
10 m² 0.00 0.00
Item
Description Unit Quantity Price
Number
Material Prices
Item
Description Unit Quantity Price
Number
General materials
M1 Cement 50 kg 1 735.00
M2 Colour powder kg 1
M3 Lime (Slaked) 50 kg 1 575.00
M4 Lime (Boiled) 50 kg 1
M5 Ochre 1
M6 Powder pigment kg 1
M7 Rubble 6" X 9" m3 1 1450.00
M8 Salt kg 1
M9 Sand m3 1 2300.00
M10 Earth (Imported) Cube 1
M11 Water Gal. 1
M12 Jute hessian m2 1 10.00
M13 Polythene (500) kg 1
M14 Soldering lead kg 1
Ready-mix concrete m3 1
Blocks
Bricks
Blast powder kg 1
Fuse m 1
Lump steel kg 1
Sods (200mm X 200mm) Nos 1
Red earth with coir dust m3 1
D.D.T. powder kg 1
Tape m 1
Metal
Timber
Reinforcement
Building fabric
Sundry Items
Last
Additional Description
updated
Using 2X2 @ Rs.25, 4X2 @ 125 etc
Using 2X1 @ Rs.10, 2X2 @ Rs.25, 4X2 @ 125 etc
Rubber
Ginisappu
Actonia
Actonia
Ginisappu
Rs.170 per kg, A kilo may contain 20 nos.
Excavation, earthwork and surface treatments
Labour Rates
1.1 EXCAVATION
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00 263.00
(2) Materials
iii i ii iii iv v
Class II
Price (Rs) Price (Rs) Wedges Price (Rs) Price (Rs) Price (Rs)
timber
m3 % of 2(i)
(2) Materials
iii i ii iii iv v
DDT Copper Sodium
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Dieldrine Price (Rs) Water
powder Naphthenate Arsenate
kg gal
600.00
600.00
600.00
(3) Plant and Machinery
v vi vii i ii iii
Red-earth & Steel Fuel & Price Fuel Tools
Price (Rs) Price (Rs) Water Price (Rs) Price (Rs) Price (Rs)
coir dust Forge (Rs) & Forge Etc.
m³ % of (i) % of (i) % of (i)
0.04 6600.00
0.04 1050.00
0.04 660.00
0.04 1440.00
0.04 2250.00
0.04 1920.00
0.07 1650.00
0.04 660.00
0.04 840.00
0.04 1320.00
0.04 1320.00
0.05 2600.00
0.05 5200.00
0.05 18400.00
0.04 300.00
0.04 300.00
0.04 300.00
Basic labour Basic Material Basic Plant Basic Total
Cost Cost Cost Cost
Labour Rates
Beams
Slabs
Lintels
140.00
100.00
100.00
100.00
180.00
150.00
120.00
90.00
90.00
90.00
90.00
90.00
90.00
(3) Plant and Machinery
vi vii viii i ii iii
Jute Mixed 10/7 Tools
Price (Rs) Price (Rs) Price (Rs) Vibrator Price (Rs) Price (Rs) Price (Rs)
Hessian Concrete Mixer Etc.
m² m³ Day Day % of (1)
0.05 400.00
0.05 550.00
Labour Rates
25mm
Special Price Price Price
Items Skilled. Unskilled thick
Skilled. (Rs) (Rs) (Rs)
Planks
m²
Column
3.1.1 Making Mould Per Use (4 Uses). 0.13 800.00 0.125 600.00 0.45
Slab
3.2.3 Dismantling and cleaning Per Use. 0.50 800.00 2.00 600.00
Beams
3.3.1 Making the Mould Per Use (4 Uses). 0.40 800.00 0.55 600.00 1.50
3.3.3 Dismantling and cleaning - Per use 0.50 800.00 2.00 600.00
BACK TO CONTENTS PAGE
(2) Materials
i ii iii iv v vi vii
16 dia.
100x 50x 50x
Price Price Price Price Price Mould Price 450mm
50mm 50mm 25mm Wedges Etc.
(Rs) (Rs) (Rs) (Rs) (Rs) Oil (Rs) long
Timber Timber Timber
Bolts
m m m % of timber Ltr. Nr.
Kg. % of 1
1.80 140.00
0.05 1400.00 1400.00 1294.00 70.00
338.60
450.00
367.50
2764.00
5475.97
1680.00
1151.00
3239.57
1680.00
4. REINFORCEMENT
Labour Rates
Labour Rates
(2) Materials
i ii iii iv v vi
Blocks 400x Price Price Blocks 400x Price
Price (Rs) Sand Cement Price (Rs) Water
200 x 200mm (Rs) (Rs) 200 x 100mm (Rs)
1000 M³ 50Kg. 1000
(2) Materials
i ii iii iv v vi
150-200mm Price Price
Price (Rs) Sand Cement Water Price (Rs)
Rubble (Rs) (Rs)
m³ m³ 50Kg. gals.
16.00
163.8 10509.3
163.8 10106.3
218.4 4667.4
275.4 8634.15
345.75 12895.5
246.6 7823.1
218.4 4478.9
275.4 8114.9
359.25 13179
213.3 7842.55
0 4462.5
22.5 1462
57.15 2879.5
50.4 2528.25
183.78 8806.13
180.96 2966.01
524.34 15228.84
6. FINISHES
Labour Rates
6.1 PLASTERING
6.1.4 10mm thick Plastering to soffit slab cement & sand 1:3
including floating with lime putty (10m²). 2.69 800.00
6.2 TILING
6.2.1 Glazed wall tiles including bedding in cement mortar 1:2 &
pointing in ground floor (specials measured separately).
(Rates exclude tile prices, grout measured for 150 X 150 4.30 1000.00
mm tiles). (10m²)
6.2.2 Terrazzo floor tiles in 12.5mm thick cement & sand 1:2 in
ground floor. (Rates exclude tile prices, grout measured 4.30 1000.00
for 300 X 300 mm tiles). (10m²)
6.2.3 Pressed floor tiles bedded in 12.5mm cement motar 1:2 &
pointing in neat cement in ground floor. (Rate exclude tile
prices, grout measured for 200 X 200 mm sized tiles). 4.30 1000.00
(10m²)
6.3 CEILING
6.3.1
Timber frame work for 1.2x1.2m flat asbestos ceiling 2.75 1000.00 0.55 800.00
(sheet measured separately) comprising of 100x50mm
joists and 50x50mm bearers in class I timber (20m²).
(1) Labour (days)
CEILING
i ii
Special
Items Price (Rs) Skilled. Price (Rs)
Skilled.
6.3.2
Horizontal ceiling lining using 1.2x1.2mm flat asbestos
cement sheets fixed with and including beading and cove 1.66 1000.00
mouldings on timber frame work (Timber frame work and
painting measured separately) (20m²).
6.3.3
19mm thick tongued and grooved Lunumidella ceiling 4.42 1000.00 1.10 800.00
boards fixed horizontal on 100x50mm class I timber joists
at 600mm centres with 38mm brass nails (20m²).
6.3.4
19x150mm wide tongued & grooved Lunumidella ceiling
boards fixed to underside of rafters, (existing) with 38mm 3.23 1000.00
brass nails including leveling with timber strips where
necessary (18m²).
Unskilled Price (Rs) Fire wood Price (Rs) Bitumen Price (Rs) Sand Price (Rs) Cement
Unskilled Price (Rs) Timber Class I Price (Rs) 50mm wire nails Price (Rs) Fibre Plastic plugs Price (Rs) Cement
m m 50Kg. m³
735.00
1.40 575.00
735.00
735.00
735.00
735.00
735.00
735.00 2.43
735.00 0.11
106.00
Kg. M Kg.
2300.00 4.42
% of (1) % of (1)
Labour Rates
7.1
Prepare and apply one coat of preservative 0.81 1000.00 0.54 600.00
(oil type) to structural timber including
touching up cut ends etc. after fixing (10m²).
7.3
Painting, Apply one coat of anti-corrosive
primer and two coats enamel paint on 2.69 1000.00 1.08 600.00
already shop primed and erected steel
Roof truss (10m²).
2.95 240.00
2.42 0.16
0.72
2.44 240.00
0.81 2.69
(2) Materials
i ii iii iv v
Yellow
Boiled lime Price (Rs) Cement Price (Rs) Salt Price (Rs) Price (Rs) Blue Price (Rs)
Ochre
0.63 735.00
(2) Materials
i ii iii iv v
Wax Flannel
Varnish Price (Rs) Price (Rs) Sand Paper Price (Rs) Price (Rs)
Polish Cloth
Ltr. Ltr. Nr. Yard
0.20 250.00
0.20 250.00
0.20 250.00
0.33 0.00
0.10
(3) Plant and Machinery
iii v Basic labour Basic Basic Plant Basic Total
75mm Cost Material Cost Cost Cost
Price (Rs) Scaffolding Price (Rs)
brush
Nr. % of (1)
% of (1)
% of (1)
Labour Rates
807.00 0.00
0.45 60000.00
(2) Materials
i ii iii iv v
Colouring
Ridge tiles Price (Rs) Cement Price (Rs) Sand Price (Rs) Slaked lime Price (Rs) Price (Rs)
powder
Nr. 50Kg. m³ Kg. Kg.
700.00 0.00
(2) Materials (
vi vii viii ix i
38mm brass
25mm planks Price (Rs) Price (Rs)
screws
m² Nr.
Labour Rates
9.2 PVC gutter head, 150mm dia (1 Nr.). 0.13 Rs 1000.00 0.13
9.4 PVC end caps, 150mm dia (1 Nr.). 0.06 Rs 1000.00 0.06
9.5
PVC rain water down pipes, 87mm dia
fixed to brick wall with wooden plugs 0.33 Rs 1000.00 0.33
buried in wall (specials paid separately)
(8m).
Rs 600.00 12.00
(2) Materials
iii i ii iii iv
88mm dia 88mm dia 25mm Brass
Price (Rs) Price (Rs) Price (Rs) PVC straps Price (Rs) Price (Rs)
pipes jointer screws
m Nr Nr. Nr.
Rs 600.00
Rs 600.00
(2) Materials (3) Plant a
v vi vii viii ix i
PVC gutter Gutter Gutter Mitre
Price (Rs) Price (Rs) Price (Rs) Price (Rs) End caps Price (Rs)
head jointer Brackets Bend
Kg. m² Nr. Nr. Nr
1.00
1.00
30.00
32.00 1.00
15.00 1.00
(3) Plant and Machinery
i ii iii
Basic labour Basic Material Basic Plant Basic Total
Tools Cost Cost Cost Cost
Price (Rs) Scaffolding Price (Rs)
Etc.
% of (1) % of (1)
Labour Rates
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled
10.1.6 PVC pipes, 63mm Dia fixed to walls
(specials paid separately) (30m). 0.75 Rs 1000.00 0.75
10.1.9
Excavation for laying 20mm to 90mm
diameter PVC pipes in ground not less 2.20
than 450mm deep, back filing &
compacting (30m).
10.1.10
Chasing brick work for laying 20mm to
50mm dia PVC pipes and making good 2.95 Rs 800.00 2.95
average depth 50mm (pipes & specials
paid separately) (30m).
10.1.11
Chasing brick work for laying 50mm to
90mm dia PVC pipes in ground or floor & 3.45 Rs 800.00 3.45
making good average depth 75mm - ditto
- (30m).
10.2.1
10.2.2
m Nr Nr. Grams
Rs 500.00 3.90
Rs 500.00 32.00
(2) Materials
iii i ii iii iv
m Nr Nr. m
Rs 500.00 32.00
(2) Materials
iii i ii iii iv
Rs 500.00 32.00
Rs 500.00 32.00
Rs 500.00
(2) Materials
iii i ii iii iv
Bags m3
(2) Materials
iii i ii iii iv
20mm 25mm 32mm 40mm
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Price (Rs)
special specials specials specials
Nr. Nr. Nr. Nr.
10.00
10.00
10.00
10.00
(2) Materials
iii i ii iii iv
Price (Rs) 20mm Tee Price (Rs) 25mm Tee Price (Rs) 32mm Tee Price (Rs) 40mm Tee Price (Rs)
10.00
10.00
10.00
10.00
(2) Materials
iii i ii iii iv
Wood
Price (Rs) G.I. Sheets Price (Rs) Price (Rs) Cement Price (Rs) Slaked lime Price (Rs)
presevative
m2 ltr Bags Bags
2.00
3.00 3.00
(2) Materials
v vi vii viii ix
64.00
(2) Materials
v vi vii viii ix
112.00
(2) Materials
v vi vii viii ix
Solvent
Price (Rs)
cement
Grams
(2) Materials
v vi vii viii ix
50mm 63mm 75mm 90mm Solvent
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Price (Rs)
specials specials specials special cement
Nr. Nr. Nr. Nr. Grams
20
30
40
60
10.00 80
10.00 140
10.00 200
10.00 240
(2) Materials
v vi vii viii ix
Solvent
50mm Tee Price (Rs) 63mm Tee Price (Rs) 75mm Tee Price (Rs) 90mm Tee Price (Rs) Price (Rs)
cement
Nr. Nr. Nr. Nr. Grams
30
45
60
90
10.00 120
10.00 210
10.00 300
10.00 360
(2) Materials
v vi vii viii ix
38mm wire Soldering
Sand Price (Rs) Planks Price (Rs) Price (Rs) Price (Rs)
nails lead
m3 m² Kg Kg
0.03 0.45
(3) Plant and Machinery
i ii iii
Basic labour Basic Material Basic Plant
Tools Cost Cost Cost
Price (Rs)
Etc.
% of (1)
% of (1)
200.85
200.85
772.50
Basic Total
Cost
1158.75
1158.75
Basic Total
Cost
1158.75
1545.00
1545.00
1133.00
Basic Total
Cost
3950.05
4619.55
Basic Total
Cost
257.50
257.50
257.50
257.50
515.00
515.00
515.00
515.00
Basic Total
Cost
515.00
515.00
515.00
515.00
1030.00
1030.00
1030.00
1030.00
Basic Total
Cost
2744.95
989.83
11. SANITARY FITTINGS
Labour Rates
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled
11.1
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled
11.2
11.3
Closet, pedestal type with L/L flushing
cistern, flush pipe double plastic seat
cover, 20mm diameter stop cock, trap 1.00 1000.00 0.25 800.00 1.00
supplied & fixed complete to working
order (1 Nr.).
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled
11.4
Closet, Squatting type with trap including
high level cistern fixed complete with flush 1.00 1000.00 0.50 800.00 1.00
pipe and 20mm diameter stop cock, all
complete with working order.(1 Nr)
11.6
Urinal, Bowl type with trap and 9 Ltre
capacity automatic flushing cistern and 1.00 1000.00 0.25 800.00 1.00
spreaders complete to working order (4
Nr.).
Nr Nr Nr.
(2) Material
iii i ii iii
Price (Rs) Sink Price (Rs) "L" iron brackets Price (Rs) Cement Price (Rs)
Nr Nr Nr.
Rs 500.00 0.91
(2) Material
iii i ii iii
(2) Material
iii i ii iii
Price (Rs) Bidet Price (Rs) Urinal bowls Price (Rs) 9 Ltr. Cistern Price (Rs)
Rs 500.00 1.00
38mm brass
Wooden plugs Price (Rs) Price (Rs) Cement Price (Rs)
screws
Nr Nr Bags
(2) Materials
iv v vi vii viii
50mm thk tapered 38mm brass Low level suite 20mm stop
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Sand
wooden blocks screws complete cock
Nr Nr Bags
2.00 8.00
(2) Materials
iv v vi vii viii
38mm brass
Wooden plugs Price (Rs) Price (Rs) 20mm stop cocks Price (Rs) Cement Price (Rs) Metal
screws
(2) Materials
iv v vi vii viii
38mm brass
Rawl plugs Price (Rs) Spreader Price (Rs) Wooden plugs Price (Rs) Price (Rs) Cement
screws
% of (1)
% of (1)
Basic labour
Cost
viii ix i ii iii
Basic labour
Tools Cost
Price (Rs) Sand Price (Rs) Price (Rs)
Etc.
Labour Rates
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled
125x 63mm Butt 150x 300 mm Tee Rim lock with Mortice lock with
Price (Rs) Price (Rs) Price (Rs) Price (Rs)
Hinges Hinges screws screws
Nr Nr Nr. Nr
Rs 500.00 3.00
Rs 500.00 2.00
Rs 500.00 1.00
Rs 500.00 1.00
Rs 500.00
(2) Materials
iii i ii iii iv
Door closer Tower skeleton 100mm Casement
Price (Rs) Price (Rs) Price (Rs) Price (Rs)
(Hydrolic) brass bolts barrel bolt fasteners
Nr Nr Nr. Nr
Rs 500.00 1.00
Rs 500.00 1.00
Rs 500.00 1.00
Rs 500.00 6.00
Rs 500.00
Rs 500.00
(2) Materials
iv v vi vii viii
Nr Nr Nr Nr
24.00
18.00
4.00 16.00
(2) Materials
iv v vi vii viii
12mm Brass 19mm Brass Brass fan light
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Draw rings Price (Rs)
screws screws catches
Nr Bags
8.00
10.00
8.00
24.00
24.00 6.00
12.00 6.00
(3) Plant and Machinery
ix i ii iii
Basic labour Basic Material
Tools Cost Cost
Price (Rs)
Etc.
% of (1)
11.25 386.25
11.25 386.25
11.25 386.25
22.50 772.50
11.25 386.25
11.25 386.25
2.70 92.70
2.70 92.70
2.70 92.70
2.70 92.70
5.85 200.85
13. DOORS AND WINDOWS
Labour Rates
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled
m³ Nr Nr. Nr
(2) Materials
iii i ii iii iv
m³ Nr Nr. Nr
(2) Materials
iii i ii iii iv
12x
3mm
12mm
Price (Rs) thick glass Price (Rs) Price (Rs) Brass panel pins Price (Rs)
bead-
panes
ings
m³ Nr Nr.
1.00
(2) Materials
v vi vii viii ix
Nr m² m² Nr
(2) Materials
v vi vii viii ix
(3) Plant and Machinery
ix i ii iii
Basic labour Basic Material
Tools Cost Cost
Price (Rs)
Etc.
% of (1)
% of (1)
% of (1)
172.50 5922.50
210.00 7210.00
37.95 1302.95
92.25 3167.25
237.00 8137.00
22.50 772.50
A. HAULING (DATA)
Labour Rates
*WD - Workday
0 - 40 10.50 210
40 - 60 8.00 160
60 - 80 6.50 130
80 - 100 5.50 110
100 - 150 4.50 90
*Excavator efficiency can vary from 35m3 per hour for loose soil to 20m3 per hour for firm soil
*For mucking out rock after drilling and blasting can also be considered as performed at the rate of 20m3 per hour
Loading soil
10.4 Transporting
BACK TO CONTENTS PAGE
e rate of 20m3 per hour
B. Drilling and Blasting (Rock excavation)