1. EXCAVATION, EARTHWORK AND SURFACE TREATMENT

1.1 EXCAVATION
1.2 EARTHWORK SUPPORT
1.3 SURFACE TREATMENT

2. CONCRETE WORK

3. FORM WORK (TIMBER)

4. REINFORCEMENT

5. MASONRY

5.1 BRICK WORK


5.2 HOLLOW BLOCK MASONRY
5.3 RANDOM RUBBLE MASONRY

6. FINISHES

6.1 PLASTERING
6.2 TILING
6.3 CEILING

7. PAINTING

8. ROOFING

9. GUTTERS AND DOWN PIPES

10. PLUMBING

10.1 GENERAL PLUMBING


10.2 ROOF PLUMBING

11. SANITARY FITTINGS

12. IRON MONGERY

13. DOORS AND WINDOWS


OTHER DATA

A. HAULING (DATA)
COLOUR CODES

RED Quantities derived by BSR


GREEN Quantities derived by HSR
BLUE Quantities derived by Practical data

Excavation The rate given is applicable to excavation undertaken upto 5' below ground level. From there onwards every 5' dep

Concrete If water not readily available transportation cost needs to be considered

Formwork Reusability is assumed to be 4 times

Floor wise appreciation for the rates compared to that of ground floor rates will be as follows

Trade First floor Second floor Third floor

Concrete 3% 5% 7%
225mm thk Brickwork (Area) 5% 7% 9%
225mm thk Brickwork (Cube) 5% 7% 10%
112.5mm thk Brickwork (Area) 5% 7% 10%
Reinforcement 2.5% 5% 7%
Plastering 5% 10% 15%
Painting 3% 6% 9%
Floor Tiling 2% 4% 6%
Wall tiling 2% 4% 6%
Roof calicut Tiles 3% 6% 9%
Roof Asbestos 3% 5% 7%
Ceiling work 3% 5% 7%

The common items that make up the overhead costs are listed below. The cost of the overhead items involved on a job is ass
In the case of the construction Agencies executing building construction works the overheads component may be listed as bel

Job Overheads (Site Overheads)

1 Supervision of work (wages of work supervisors)

2 Supervision of labour (wages of Gangers)

3 Temporary works:
(a) Access Road and Maintenance
(b) Site buildings for accommodation of part labour
(c) Central stores building
(d) Fencing and protection
(e) Provision of water, lights etc.
(f) Clearing and tidying up
(g) Collection of building materials including cement and steel

4 Watchers for field stores and security of sites.

5 Tools and implements for miscellaneous work

6 (a) Setting out and measurements


(b) Providing samples for testing

7 Transportation of supervisory staff

8 Job office, furniture, stationary, supplies, water, lights etc.

9 Wages of job office staff

10 Transportation of job office staff

11 (a). Bonds for Bid performance and fidelity Guarantee


(b). Insurance of work and workmen’s compensation

12 (a). Interest in Capital Investment


(b). Business Turnover Tax

General Overheads

13 Head office and rent, lights, telephone, stationary supplies, furniture etc. for same

14 Salaries of Head Office staff, Engineers, TO, Draughtsman, Clerks, Stenos, Minor staff and Drivers

15 Transportation and subsistence of Head office staff

16 Insurance, Interest and Taxes on business

17 Legal expenses and Consultancy fees

18 Workshop & Yard rents, sheds, garages & supplies

19 Salaries of workshop & yard storekeepers, Drivers, Foremen Mechanics & workmen

The volume of a 50kg bag is 0.035m³.


there onwards every 5' depth will require a additional unskill labour

ms involved on a job is assessed as a percentage of the Basic cost of the job.


onent may be listed as below:

% of Basic Cost

1.0

4.0

0.2
0.7
0.6
0.3
0.3
0.2
0.4

0.8

0.9

0.5
0.2

1.0

0.9

1.2

0.4

0.3
0.5

1.6
3.0

19.0

0.6

1.2

1.0

0.4

0.2

2.2

0.4

6.0 6
Basic rates for Items

Description Basic Basic


Item Basic Rate
Material Labour
Number (Rs.)
Cost (Rs.) Cost (Rs.)

EXCAVATION, EARTHWORK AND SURFACE TREATMENT


1

1.1 Excavation

Removing Top soil to a depth not exceeding 6” & deposition as directed


1.1.1 within site. (100m²) 6864.00 0.00 6600.00

Excavation over site to reduce level, in any material except rock


1.1.2 requiring blasting including depositing and leveling as directed up to 1092.00 0.00 1050.00
distance not exceeding 30’ 0”. (3m³)

Excavation in trenches for walls/column pits in soft/loose soil from 0’


0” to 5’ 0” deep and depositing excavated material to distance not
1.1.3 exceeding 30’ 0” (Earth work support to be paid separately where 686.40 0.00 660.00
necessary). (3m³)

Excavation in trenches for walls/column pits in ordinary soil form o’ 0’’


to 5’ 0’’ deep and depositing excavated material not exceeding 30’ 0’’
1.1.4 (Earth work support to be paid separately where necessary). (3m³) 1497.60 0.00 1440.00

Excavation in trenches for walls/column pits in Hard/dense soil up to a


depth of 5’ 0’’ and depositing excavated material up to a distance not
1.1.5 exceeding 30’ 0’’ (Earth work support to be paid separately where 2340.00 0.00 2250.00
necessary). (3m³)

Excavation in trenches for walls/column pits in Mud/wet soil up to a


depth of 5’ 0’’ and depositing excavated material to distance not
1.1.6 exceeding 30’ 0’’ (Earth work support to be paid separately where 1996.80 0.00 1920.00
necessary) (3m³).

Excavation in trenches for walls/column pits in Soft disintegrated rock


(not requiring blasting) up to a depth of 5’ 0’’ and depositing excavated
1.1.7 material to distance not exceeding 30’ 0’’ (Earth work support to be 1765.50 0.00 1650.00
paid separately where necessary) (3m³).

Excavation in trenches for walls/column pits in Hard rock requiring


blasting up to a depth of 5’ 0’’ and depositing excavated material to a
1.1.8 distance not exceeding 30’ 0’’ (Earth work support to be paid 2565.20 0.00 2420.00
separately where necessary) (3m³).

Benching rock in foundation in 3’’-6’’ steps. (Blasting prohibited)


1.1.9 (1m²) 3302.40 0.00 2560.00
Backfilling and compacting to trenches with selected earth available at
1.1.10 site. (3m³) 686.40 0.00 660.00

Back filling and compacting to trenches with imported material (3m³)


1.1.11 873.60 0.00 840.00

Filling under floors including leveling, watering & compacting in 75mm


1.1.12 layers with available and selected earth at site. (3m³) 1372.80 0.00 1320.00

Filling under floors including leveling, watering & compacting in 3”


1.1.13 layers with imported selected earth. (3m³) 1372.80 0.00 1320.00

Cutting turf sods, loading to hand carts and transporting up to 30 yards,


laying and watering for 30 days. (Royalty for turf, pegging and transport
1.1.14 beyond 30 yards paid separately). (10m²) 3120.00 0.00 3000.00

1.2 Earthwork support

Earthwork support (open planking) in trenches up to a depth of 5’ 0’’


1.2.1 per use (4 uses) (14m²) 10605.00 7875.00 2600.00

Earthwork support (close plunking) in trenches up to 5’ 0’’ depth per


1.2.2 use (4 uses). (14m²) 18847.50 13387.50 5200.00

Earth work support (close planking) in deep excavation in trenches up


1.2.3 to 15’ 0’’ depth. (42m²) 64050.00 44730.00 18400.00

1.3 Anti-termite treatment

Anti-termite treatment using DDT on excavated foundation and


1.3.1 compacted soil under floors. (10m²) 312.00 0.00 300.00

Anti-termite treatment Copper Naphthenate on excavated foundation


1.3.2 and compacted soil under floors. (10m²) 312.00 0.00 300.00

Anti-termite treatment using Sodium Arsenate on excavated


1.3.3 foundation and compacted soil under floors. (10m²) 312.00 0.00 300.00

Anti-termite treatment using Dieldrine on excavated foundation and


1.3.4 compacted soil under floors. (10m²) 312.00 0.00 300.00

2 CONCRETE WORK

2.1 Mixing 1:3:6 (40) concrete (3m³) - Grade 15. 25724.60 19843.00 4720.00

2.2 Mixing 1:2:4 (25) concrete (3m³) - Grade 20. 26778.10 20896.50 4720.00

2.3 Mixing 1:2:4 (20) concrete (3m³) - Grade 20. 29067.60 23186.00 4720.00
2.4 Mixing 1:1½:3 (20) concrete (3m³) - Grade 25. 32180.60 26299.00 4720.00

2.5 Mixing 1:1:2 (20) concrete (3m³) 39288.10 33406.50 4720.00

Procuring and Placing 50mm thick cement concrete screed in


2.6 foundation at depths not exceeding 1.5m. (10m²) 420.00 0.00 400.00

Placing 50mm thick cement concrete screed in foundation at depths


2.7 not exceeding 1.5m. (10m²) 420.00 0.00 400.00

Procuring and Placing 75mm thick cement concrete screed in


2.8 foundation at depths not exceeding 1.5m. (10m²) 577.50 0.00 550.00

Placing 75mm thick cement concrete screed in foundation at depths


2.9 not exceeding 1.5m. (10m²) 577.50 0.00 550.00

2.10 Placing 150mm thick mass concrete ground floor slab (10m²). 1207.50 0.00 1150.00

Placing 225 x 225 R.C.C. column on ground floor including curing


2.11 (1.25m³). 6191.00 56.00 4500.00

Placing 225x225 R.C.C. beam at 1st floor level including curing


2.12 (1.25m³). 7427.00 56.00 5700.00

Placing 125mm R.C.C. floor slab at 1st floor level including curing
2.13 (1.50m³). 7399.00 28.00 5700.00

3 FORM WORK (TIMBER)

Form work to floor 225x225 columns in ground (1.40m² contact area)


3.1

3.1.1 Making Mould Per Use (4 Uses). 338.60 154.85 175.00

3.1.2 Assembling Per Use. 450.00 82.50 350.00

3.1.3 Dismantling, cleaning and repairing - Per Use. 367.50 0.00 350.00

3.2 Form work to under side of 1st floor slab (20.0m² contact area).

3.2.1 Making Panels (4 Uses) including 20% repair cost). 2764.00 1294.00 1400.00

3.2.2 Assembling - Per Use. 5475.97 2115.97 3200.00

3.2.3 Dismantling and cleaning Per Use. 1680.00 0.00 1600.00

3.3 Form work to beams in ground floor (5m² contact area).

3.3.1 Making the Mould Per Use (4 Uses). 1151.00 468.50 650.00
3.3.2 Assembling - Per use. 3239.57 1139.57 2000.00

3.3.3 Dismantling and cleaning - Per use 1680.00 0.00 1600.00

4 REINFORCEMENT

Mild steel/ Tor steel reinforcement to lintols slab beams or columns


4.1 bent to shape laid in position & tied with G.L. wires (50Kg.). 7322.44 5642.44 1600.00

5 MASONRY

5.1 Brick work

5.1.1 Brickwork in cement sand 1:5 in foundation up to D.P.C (3m³). 10509.30 4885.50 5460.00

5.1.2 Brickwork cement & sand 1:8 in foundation up to D.P.C (3m³). 10106.30 4482.50 5460.00

Brickwork in cement and sand 1:5 in 112.5mm thick walls in ground


5.1.3 floor (10m²). 4667.40 1719.00 2730.00

Brickwork 225mm thick in cement sand 1:5 in ground floor. (10m²).


5.1.4 8634.15 3768.75 4590.00

Brickwork 337.5mm thick in cement sand 1:5 in superstructure in


5.1.5 ground floor(10m²). 12895.50 5634.75 6915.00

Brickwork 225mm thk in ground floor cement sand 1:8 mortar (10m²).
5.1.6 7823.10 3466.50 4110.00

Brick work (wire cut) in 1:5 cement sand mortar in 112.5mm thick walls
5.1.7 in ground floor (10m²). 4478.90 1530.50 2730.00

Brick work (wire cut) in 1:5 cement sand mortar in 225mm thick walls
5.1.8 in ground floor (10m²). 8114.90 3249.50 4590.00

Brick work (wire cut) in 1:5 cement sand mortar in 337.5mm thick walls
5.1.9 in ground floor (10m²). 13179.00 5634.75 7185.00

Extra over for facing including raised painting 3mm thick in cement &
5.1.10 sand 1:1 misture in ground floor (10m²). 7842.55 519.25 7110.00

5.1.11 75mm thk floor paved in lime mortar 2:5 in ground floor (10m²) 4462.50 1552.50 2910.00

Steps 338x150mm in brick in cement & sand 1:5 with 12.5mm thick
5.1.12 cement & sand 1:2 rendering inclusive necessary excavation (3m). 1462.00 689.50 750.00
Brick drains in cement and sand 1:5, 9” wide and 150-225 average
depth including cement rendering 112.5mm thick 1:2 to exposed faces
5.1.13 with 450mm ramp including necessary excavation. (3m) 2879.50 917.35 1905.00

Brick drains in cement and sand 1:5, 9” wide and 150-225 average
depth including cement rendering 12.5mm thick 1:2 to exposed faces
5.1.14 without ramp including necessary excavation (3m) 2528.25 797.85 1680.00

5.2 HOLLOW BLOCK MASONRY

8” thick Hollow block work in cement and sand mortar 1:5 in ground
5.2.1 floor (cavities unfilled) Size of a block 400mm X 200mm X 200mm 8806.13 5559.35 3063.00
(10m²)

4” thick Hollow block masonry in cement and sand mortar 1:5 with
5.2.2 cavities unfilled, Size of a block 400mm X 200mm X 100mm (10m²) 2966.01 523.05 2262.00

5.3 RANDOM RUBBLE MASONRY

Random Rubble masonry in cement, sand mortar 1:5 in foundation


5.3.1 (350 mm thk) (2.83m³) 19475.28 11620.50 7626.00

Random Rubble masonry in cement, sand mortar 1:5 in


5.3.2 superstructure (350 mm thk) (2.83m³) 15228.84 5965.50 8739.00

6 FINISHES

6.1 PLASTERING

Rendering, 19mm thick D.P.C. in cement & sand 1:2 finished with 2
6.1.1 coats hot tar & blinded with sand (10m²). Using firewood. 5050.21 2560.70 2417.00

Rendering to walls, 16mm thick Plastering to wall in lime & sand 2:5
6.1.2 including floating with lime putty (10m²). 3200.24 1288.00 1804.00

Rendering to walls, 16mm thk cement & sand 1:3 including cement
6.1.3 floating (10m²). 3292.99 1523.85 1669.00

10mm thick Plastering to soffit slab cement & sand 1:3 including
6.1.4 floating with lime putty (10m²). 4781.67 1074.85 3497.00

10mm thick plastering to sides and soffit of beams in cement and


6.1.5 sand 1:3 including floating with lime putty (10m²) 4037.55 1074.85 2795.00

16mm thick plastering to walls in lime, cement & sand 1:1:5 finished
6.1.6 semi-rough with wooden float (10m²). 2988.39 1362.35 1534.00
16mm thick plastering to walls in lime cement and sand 1:1:5 finished
6.1.7 smooth with lime putty floating (10m²) 3707.43 1488.85 2093.00

12mm thick rendering in cement & sand 1:3 finished smooth (10m²).
6.1.8 2909.32 1190.25 1669.00

12mm thick rendering in cement and sand 1:2 in floors, finished


6.1.9 smooth (10m²) 3386.47 1528.35 1804.00

19mm thick rendering in cement & sand 1:3 finished smooth (10m²).
6.1.10 4284.26 1933.80 2282.00

19mm thick rendering in cement & sand 1:2 in floors, finished smooth
6.1.11 (10m²). 4681.16 2330.70 2282.00

19mm thick rendering in cement & sand 1:2 coloured cement floors
6.1.12 finished smooth (10m²). 4673.81 2323.35 2282.00

12.5mm X 150mm skirting in cement & sand 1:3 projected or flushed to


6.1.13 walls finished with floating including forming groove (3m). 561.03 96.50 451.00

6.2 TILING

Glazed wall tiles including bedding in cement mortar 1:2 & pointing in
ground floor (specials measured separately). (Rates exclude tile
6.2.1 prices, grout measured for 150 X 150 mm tiles). (10m²) 9541.70 2759.15 6585.00

Terrazzo floor tiles in 12.5mm thick cement & sand 1:2 in ground floor.
6.2.2 (Rates exclude tile prices, grout measured for 300 X 300 mm tiles). 7833.30 1467.90 6180.00
(10m²)

Pressed floor tiles bedded in 12.5mm cement motar 1:2 & pointing in
6.2.3 neat cement in ground floor. (Rate exclude tile prices, grout 8389.50 1467.90 6720.00
measured for 200 X 200 mm sized tiles). (10m²)

6.3 CEILING

Timber frame work for 1.2x1.2m flat asbestos ceiling (sheet


6.3.1 measured separately) comprising of 100x50mm joists and 50x50mm 4647.65 391.75 4015.00
bearers in class I timber (20m²).

Horizontal ceiling lining using 1.2x1.2mm flat asbestos cement sheets


fixed with and including beading and cove mouldings on timber frame
6.3.2 work (Timber frame work and painting measured separately) (20m²). 2930.90 0.00 2765.00
19mm thick tongued and grooved Lunumidella ceiling boards fixed
6.3.3 horizontal on 100x50mm class I timber joists at 600mm centres with 10035.95 321.05 9165.00
38mm brass nails (20m²).

19x150mm wide tongued & grooved Lunumidella ceiling boards fixed to


underside of rafters, (existing) with 38mm brass nails including
6.3.4 leveling with timber strips where necessary (18m²). 6842.30 0.00 6455.00

7 PAINTING

Prepare and apply one coat of preservative (oil type) to structural


7.1 timber including touching up cut ends etc, after fixing (10m²) 1842.00 708.00 1134.00

Painting, Prepare surface of steel truss and apply two coats of anti-
7.2 corrosive primer (10m²). 2607.25 0.00 2576.00

Painting, Apply one coat of anti-corrosive primer and two coats enamel
7.3 paint on already shop primed and erected steel Roof truss (10m²). 3488.14 0.00 3338.00

Painting, Prepare and apply two coats of primer and finishing coat of
7.4 enamel paint to mild steel (angle/flat) gate (10m²). 2146.00 0.00 2046.00

Painting steel on new work With 2 coats of anti-corrosive paint


7.5 (10m²). 1660.00 0.00 1610.00

Painting new timber work with 2 coats wood preservative (10m²).


7.6 1175.60 585.60 540.00

Prepare and painting wood work with primer and two coats of enamel
7.7 paint (10m²). 1999.00 40.00 1934.00

White or colour washing two coats in single storey building (100m²).


7.8 4354.30 0.00 4000.00

White or colour washing two coats in two storey building (100m²).


7.9 5178.30 0.00 4800.00

Painting, Prepare & apply one coat of alkali resistant primer and two
7.10 coat of emulsion paint to internal wall (10m²). 2301.50 943.00 1250.00

Painting, Prepare & apply one coat of alkali resistant primer and two
7.11 coat of emulsion paint to soffit slab (10m²). 2841.00 967.50 1750.00

Painting, Prepare & apply one coat of alkali resistant primer and two
7.12 coat of weathershield paint to external wall (10m²). 2574.50 1216.00 1250.00
Painting, Prepare & apply one coat of shell coat, one coat alkali
7.13 resistant primer and two coat of weathershield paint to external wall 0.00 0.00 0.00
(10m²).

7.14 Cement washing to walls of single storey building (100m²). 3759.05 463.05 3200.00

7.15 Painting walls with two coats of emulsion paint (10m²). 1746.50 903.00 750.00

Varnishing two coats with copal vanish after sand papering (10m²).
7.16 864.00 40.00 864.00

7.17 Wax polishing to timber in panels & floors (10m²). 520.00 120.00 520.00

8 ROOFING

Timber frame work for calicut pattern tile hip Roof in single storey
building consisting of wall plate beam, ridge plate, rafters etc.
8.1 (preservative treatment to be measured separately). (60m²) 16022.50 2951.80 12690.00

Roof covering with calicut pattern clay tiles in single storeyed building
8.2 (Timber frame work & ridge covering measured separately). (60m²). 5323.04 0.00 5168.00

Timber frame work for corrugated asbestos sheet Roof in single


8.3 storeyed building (36m²). 31766.84 27000.00 4628.00

Roof covering with corrugated asbestos sheets (Timber frame work


8.4 & ridge covering measured separately). (36m²). 22385.10 19944.00 2370.00

Roof covering, One layer half round clay tiles over corrugated
8.5 asbestos Roof covering (10m²). 1328.70 0.00 1290.00

Asbestos close fittings ridging fixed complete with Roofing screws or


8.6 bolts (hook) (4m). 540.00 128.00 400.00

Ridge covering with calicut pattern ridge tiles bedded in cement lime
8.7 mortar 1:1:4 (4m). 4688.50 4276.50 400.00

Valance board 19 X 225mm high, fixed with brass screws to ends of


8.8 rafters (for tiles roofing) (30m). 5097.60 0.00 4720.00

Barge board 19 X 225mm high, fixed with brass screws at 600mm


8.9 centres to sides of rafters. (30m) 5097.60 0.00 4720.00

9 GUTTERS AND DOWNPIPES

9.1 Half round PVC eaves gutter 150mm dia fixed to timber valance board
including gutter joiner and brackets fixed at 450mm centres (Other 864.00 0.00 800.00
specials paid separately) (8m).
9.2 PVC gutter head, 150mm dia (1 Nr.). 224.64 0.00 208.00

9.3 PVC mitres, 150mm dia (1 Nr.). 224.64 0.00 208.00

9.4 PVC end caps, 150mm dia (1 Nr.). 103.68 0.00 96.00

9.5 PVC rain water down pipes, 87mm dia fixed to brick wall with wooden
plugs buried in wall (specials paid separately) (8m). 570.24 570.24 528.00

9.6 PVC elbow, 87mm dia 103.68 103.68 96.00

9.7 PVC shoe, 87mm dia 103.68 103.68 96.00

10 PLUMBING

10.1 GENERAL PLUMBING

PVC pipes, 20mm Dia fixed to walls (specials paid separately) (3m).
10.1.1 200.85 0.00 195.00

PVC pipes, 25mm Dia fixed to walls (specials paid separately) (3m).
10.1.2 200.85 0.00 195.00

PVC pipes, 30mm Dia fixed to walls (specials paid separately) (30m).
10.1.3 772.50 0.00 750.00

PVC pipes, 40mm Dia fixed to walls (specials paid separately) (30m).
10.1.4 1158.75 0.00 1125.00

PVC pipes, 50mm Dia fixed to walls (specials paid separately) (30m).
10.1.5 1158.75 0.00 1125.00

PVC pipes, 63mm Dia fixed to walls (specials paid separately) (30m).
10.1.6 1158.75 0.00 1125.00

PVC pipes, 90mm Dia fixed to walls (specials paid separately) (30m).
10.1.7 1545.00 0.00 1500.00

PVC pipes, 110mm Dia fixed to walls (specials paid separately)


10.1.8 (30m). 1545.00 0.00 1500.00

Excavation for laying 20mm to 90mm diameter PVC pipes in ground


10.1.9 not less than 450mm deep, back filing & compacting (30m). 1133.00 0.00 1100.00

Chasing brick work for laying 20mm to 50mm dia PVC pipes and
10.1.10 making good average depth 50mm (pipes & specials paid separately) 3950.05 0.00 3835.00
(30m).
Chasing brick work for laying 50mm to 90mm dia PVC pipes in ground
10.1.11 or floor & making good average depth 75mm - ditto - (30m). 4619.55 0.00 4485.00

10.1.12 PVC specials, 20mm dia viz-elbows/bends/sockets (10 Nos) 257.50 0.00 250.00

10.1.13 PVC specials, 25mm dia viz-elbows/bends/sockets (10 Nos) 257.50 0.00 250.00

10.1.14 PVC specials, 32mm dia viz-elbows/bends/sockets (10 Nos) 257.50 0.00 250.00

10.1.15 PVC specials, 40mm dia viz-elbows/bends/sockets (10 Nos) 257.50 0.00 250.00

10.1.16 PVC specials, 50mm dia viz-elbows/bends/sockets (10 Nos) 515.00 0.00 500.00

10.1.17 PVC specials, 63mm dia viz-elbows/bends/sockets (10 Nos) 515.00 0.00 500.00

10.1.18 PVC specials, 75mm dia viz-elbows/bends/sockets (10 Nos) 515.00 0.00 500.00

10.1.19 PVC specials, 90mm dia viz-elbows/bends/sockets (10 Nos) 515.00 0.00 500.00

10.1.20 PVC specials, 20mm dia viz - Tee (10 Nos) 515.00 0.00 500.00

10.1.21 PVC specials, 25mm dia viz - Tee (10 Nos) 515.00 0.00 500.00

10.1.22 PVC specials, 32mm dia viz - Tee (10 Nos) 515.00 0.00 500.00

10.1.23 PVC specials, 40mm dia viz - Tees (10 Nos) 515.00 0.00 500.00

10.1.24 PVC specials, 50mm dia viz - Tees (10 Nos) 1030.00 0.00 1000.00

10.1.25 PVC specials, 63mm dia viz - Tees (10 Nos) 1030.00 0.00 1000.00

10.1.26 PVC specials, 75mm dia viz - Tees (10 Nos) 1030.00 0.00 1000.00

10.1.27 PVC specials, 90mm dia viz - Teess (10 Nos) 1030.00 0.00 1000.00

10.2 ROOF PLUMBING

18 B.W.G. (1.2mm) galvanized iron sheet valley gutter 900mm girth


10.2.1 overall once bend with end caps not less than 225mm with including 2744.95 0.00 2665.00
25mm tongued & grooved planks laid to slope and profile on timber
members (4.5m).

18 B.W.G. (1.2mm) galvanized iron flashing 450mm girth overall 3


times bend with end caps not less than 150mm lead soldered, turned
10.2.2 and tacked up to not less than 150mm in to chase cut in wall & pointed 989.83 0.00 961.00
in cement mortar 1:2 lower end dressed over Roof covering not less
than 300mm wide (4.5m).
11 SANITARY FITTINGS

Wash basin, 550 X 400mm glazed fireclay with 20mm diameter


chromium plated pillar tap, waste plug, chromium plated waste chain
11.1 and stay, including fixing wash basin on brackets (water supply & 927.00 0.00 900.00
waste water connection measured separately) (1 Nr.).

Sink, 600x375x175mm overall vitreous china with rubber plug and


chromium plate & chain waste carried on iron brackets painted & fixed
11.2 to walls (water supply & waste water connection measured separately) 669.50 0.00 650.00
(1 Nr.)

Closet, pedestal type with L/L flushing cistern, flush pipe double
11.3 plastic seat cover, 20mm diameter stop cock, trap supplied & fixed 1751.00 0.00 1700.00
complete to working order (1 Nr.).

Closet, Squatting type with trap including high level cistern fixed
11.4 complete with flush pipe and 20mm diameter stop cock, all complete 1957.00 0.00 1900.00
with working order.(1 Nr)

11.5 Bidet suite, vitreous china fixed complete to working order (1Nr). 1545.00 0.00 1500.00

Urinal, Bowl type with trap and 9 Ltre capacity automatic flushing
11.6 cistern and spreaders complete to working order (4 Nr.) 1751.00 0.00 1700.00

12 IRON MONGERY

12.1 Butt hinges 125 X 63mm (3Nr.) 386.25 0.00 375.00

12.2 Tee hinges (2Nr.) 386.25 0.00 375.00

12.3 Rim lock (1Nr.) 386.25 0.00 375.00

12.4 Mortice lock (1Nr.) 772.50 0.00 750.00

12.5 Casement stays (4Nr.) 386.25 0.00 375.00

12.6 Door closer (Hydranlic) (1Nr.) 386.25 0.00 375.00

12.7 Tower/skeleton brass bolts (1Nr.) 92.70 0.00 90.00

12.8 Barrel bolt 100mm (1Nr.) 92.70 0.00 90.00

12.9 Casement fasteners (6Nr.) 92.70 0.00 90.00

12.10 Fanlight catches spring loaded (6Nr.) 92.70 0.00 90.00

12.11 Draw rings (6Nr.). 200.85 0.00 195.00


13 DOORS AND WINDOWS

Door, single hung 975 X 2100mm high overall with frame having 31mm
13.1 thick sash and 94 X 69mm timber frame (glazing, iron mongery & 5922.50 0.00 5750.00
painting measured separately) (2.10m²).

Door, glazed & panelled double hung 1200x2100mm high overall with
frame including 38mm thick sash and 94x69mm timber frame (glazing
13.2 iron mongery & painting measured separately) (2.60m²). 7210.00 0.00 7000.00

Plywood door, single hung 938 X 2088mm overall with frame having
13.3 31mm thick sash and 94x69mm frame (Iron-mongery and painting 1302.95 0.00 1265.00
measured separately). (2.02m²)

Door ledged, braced & battened single hung 750 X 1950mm overall,
with frame having 22mm thick tongued & grooved planks & 94 X 69mm
13.4 frame (Iron mongery & painting measured separately) (1.51m²). 3167.25 0.00 3075.00

Window, glazed 2100 X 1200mm high overall with frame comprising 3


Nr. openable sashes and 94 X 69mm frame & mullions.(glazing, iron
13.5 mongery and painting measured separately). (2.6m²). 8137.00 0.00 7900.00

3mm clear sheet glass panes exceeding 0.09m² but not exceeding
0.38m² cut and fixed with timber beadings to doors & windows
13.6 (consider sash 900 X 1200mm high with 75 X 31mm style & 4 Nos. 772.50 0.00 750.00
glass panes). (0.84m²)
Basic Rate per Basic Rate per Unit Basic Rate per Unit Site
Quantity Unit Rate
Unit (Rs) (Material only) (Rs) (Labour only) (Rs) Overheads

100 m² 68.64 0.00 66.00

3 m³ 364.00 0.00 350.00

3 m³ 228.80 0.00 220.00

3 m³ 499.20 0.00 480.00

3 m³ 780.00 0.00 750.00

3 m³ 665.60 0.00 640.00

3 m³ 588.50 0.00 550.00

3 m³ 855.07 0.00 806.67

1 m² 3302.40 0.00 2560.00


3 m³ 228.80 0.00 220.00

3 m³ 291.20 0.00 280.00

3 m³ 457.60 0.00 440.00

3 m³ 457.60 0.00 440.00

10 m² 312.00 0.00 300.00

14 m² 757.50 562.50 185.71

14 m² 1346.25 956.25 371.43

42 m² 1525.00 1065.00 438.10

10 m² 31.20 0.00 30.00

10 m² 31.20 0.00 30.00

10 m² 31.20 0.00 30.00

10 m² 31.20 0.00 30.00

3 m³ 8574.87 6614.33 1573.33

3 m³ 8926.03 6965.50 1573.33

3 m³ 9689.20 7728.67 1573.33


3 m³ 10726.87 8766.33 1573.33

3 m³ 13096.03 11135.50 1573.33

10 m² 42.00 0.00 40.00

10 m² 42.00 0.00 40.00

10 m² 57.75 0.00 55.00

10 m² 57.75 0.00 55.00

10 m² 120.75 0.00 115.00

1.25 m³ 4952.80 44.80 3600.00

1.25 m³ 5941.60 44.80 4560.00

1.50 m³ 4932.67 18.67 3800.00

1.4 m² 241.86 110.61 125.00

1.4 m² 321.43 58.93 250.00

1.4 m² 262.50 0.00 250.00

20 m² 138.20 64.70 70.00

20 m² 273.80 105.80 160.00

20 m² 84.00 0.00 80.00

5 m² 230.20 93.70 130.00


5 m² 647.91 227.91 400.00

5 m² 336.00 0.00 320.00

50 Kg 146.45 112.85 32.00

3 m³ 3503.10 1628.50 1820.00

3 m³ 3368.77 1494.17 1820.00

10 m² 466.74 171.90 273.00

10 m² 863.42 376.88 459.00

10 m² 1289.55 563.48 691.50

10 m² 782.31 346.65 411.00

10 m² 447.89 153.05 273.00

10 m² 811.49 324.95 459.00

10 m² 1317.90 563.48 718.50

10 m² 784.26 51.93 711.00

10 m² 446.25 155.25 291.00

3 m 487.33 229.83 250.00


3 m 959.83 305.78 635.00

3 m 842.75 265.95 560.00

10 m² 880.61 555.94 306.30

10 m² 296.60 52.31 226.20

2.83 m³ 6881.72 4106.18 2694.70

2.83 m³ 5381.22 2107.95 3087.99

10 m² 505.02 256.07 241.70

10 m² 320.02 128.80 180.40

10 m² 329.30 152.39 166.90

10 m² 478.17 107.49 349.70

10 m² 403.76 107.49 279.50

10 m² 298.84 136.24 153.40


10 m² 370.74 148.89 209.30

10 m² 290.93 119.03 166.90

10 m² 338.65 152.84 180.40

10 m² 428.43 193.38 228.20

10 m² 468.12 233.07 228.20

10 m² 467.38 232.34 228.20

3 m 187.01 32.17 150.33

10 m² 954.17 275.92 658.50

10 m² 783.33 146.79 618.00

10 m² 838.95 146.79 672.00

20 m² 232.38 19.59 200.75

20 m² 146.55 0.00 138.25


20 m² 501.80 16.05 458.25

18 m² 380.13 0.00 358.61

10 m² 184.20 70.80 113.40

10 m² 260.73 0.00 257.60

10 m² 348.81 0.00 333.80

10 m² 214.60 0.00 204.60

10 m² 166.00 0.00 161.00

10 m² 117.56 58.56 54.00

10 m² 199.90 4.00 193.40

100 m² 43.54 0.00 40.00

100 m² 51.78 0.00 48.00

10 m² 230.15 94.30 125.00

10 m² 284.10 96.75 175.00

10 m² 257.45 121.60
10 m² 0.00 0.00

100 m² 37.59 4.63 32.00

10 m² 174.65 90.30 75.00

10 m² 86.40 4.00 86.40

10 m² 52.00 12.00 52.00

60 m² 267.04 49.20 211.50

60 m² 88.72 0.00 86.13

36 m² 882.41 750.00 128.56

36 m² 621.81 554.00 65.83

10 m² 132.87 0.00 129.00

4 m 135.00 32.00 100.00

4 m 1172.13 1069.13 100.00

30 m 169.92 0.00 157.33

30 m 169.92 0.00 157.33

8 m 108.00 0.00 100.00


1 Nr 224.64 0.00 208.00

1 Nr 224.64 0.00 208.00

1 Nr 103.68 0.00 96.00

8 m 71.28 71.28 66.00

1 Nr 103.68 103.68 96.00

1 Nr 103.68 103.68 96.00

3 m 66.95 0.00 65.00

3 m 66.95 0.00 65.00

30 m 25.75 0.00 25.00

30 m 38.63 0.00 37.50

30 m 38.63 0.00 37.50

30 m 38.63 0.00 37.50

30 m 51.50 0.00 50.00

30 m 51.50 0.00 50.00

30 m 37.77 0.00 36.67

30 m 131.67 0.00 127.83


30 m 153.99 0.00 149.50

10 Nr 25.75 0.00 25.00

10 Nr 25.75 0.00 25.00

10 Nr 25.75 0.00 25.00

10 Nr 25.75 0.00 25.00

10 Nr 51.50 0.00 50.00

10 Nr 51.50 0.00 50.00

10 Nr 51.50 0.00 50.00

10 Nr 51.50 0.00 50.00

10 Nr 51.50 0.00 50.00

10 Nr 51.50 0.00 50.00

10 Nr 51.50 0.00 50.00

10 Nr 51.50 0.00 50.00

10 Nr 103.00 0.00 100.00

10 Nr 103.00 0.00 100.00

10 Nr 103.00 0.00 100.00

10 Nr 103.00 0.00 100.00

4.5 m 609.99 0.00 592.22

4.5 m 219.96 0.00 213.56


1 Nr 927.00 0.00 900.00

1 Nr 669.50 0.00 650.00

1 Nr 1751.00 0.00 1700.00

1 Nr 1957.00 0.00 1900.00

1 Nr 1545.00 0.00 1500.00

4 Nr 437.75 0.00 425.00

3 Nr 128.75 0.00 125.00

2 Nr 193.13 0.00 187.50

1 Nr 386.25 0.00 375.00

1 Nr 772.50 0.00 750.00

4 Nr 96.56 0.00 93.75

1 Nr 386.25 0.00 375.00

1 Nr 92.70 0.00 90.00

1 Nr 92.70 0.00 90.00

6 Nr 15.45 0.00 15.00

6 Nr 15.45 0.00 15.00

6 Nr 33.48 0.00 32.50


2.10 m² 2820.24 0.00 2738.10

2.60 m² 2773.08 0.00 2692.31

2.02 m² 645.02 0.00 626.24

1.51 m² 2097.52 0.00 2036.42

2.60 m² 3129.62 0.00 3038.46

0.84 m² 919.64 0.00 892.86


Plant and Material Price list (Updatable)

Plant Hire charges

Item
Description Unit Quantity Price
Number

P1 Concrete mixtures 7/10 Day 1 3000.00


P2 Concrete vibrator Day 1 1500.00
P3 Compressor h 1
P4 Excavator h 1 3500.00
P5 Concrete breaker h 1
P6 Pump h 1
P7 Bulldozer h 1 2000.00
P8 Crane h 1
P9 Welding plant h 1
P10
P11

Material Prices

Item
Description Unit Quantity Price
Number

General materials

M1 Cement 50 kg 1 735.00
M2 Colour powder kg 1
M3 Lime (Slaked) 50 kg 1 575.00
M4 Lime (Boiled) 50 kg 1
M5 Ochre 1
M6 Powder pigment kg 1
M7 Rubble 6" X 9" m3 1 1450.00
M8 Salt kg 1
M9 Sand m3 1 2300.00
M10 Earth (Imported) Cube 1
M11 Water Gal. 1
M12 Jute hessian m2 1 10.00
M13 Polythene (500) kg 1
M14 Soldering lead kg 1
Ready-mix concrete m3 1

Blocks

M15 Blocks 100mm ( solid ) Nos. 1


M16 Blocks 150mm ( solid ) Nos. 1
M17 Blocks 200 mm ( solid ) Nos. 1
M18 Blocks 100mm ( Hollow ) Nos. 1
M19 Blocks 150mm ( Hollow ) Nos. 1
M20 Blocks 200 mm ( Hollow ) Nos. 1

Bricks

M21 Ordinary Bricks Nos. 1


M22 Engineering Bricks Nos. 1
M23 Wire cut bricks Nos. 1

Excavation and earthworks

Blast powder kg 1
Fuse m 1
Lump steel kg 1
Sods (200mm X 200mm) Nos 1
Red earth with coir dust m3 1
D.D.T. powder kg 1
Tape m 1

Metal

M24 Metal ⅛" ( Chips ) Cube 1 2150.00


M25 Metal ¾" Cube 1 2150.00
M26 Metal 1" Cube 1 2150.00
M27 Metal 1¼" Cube 1 2150.00
M28 Metal 1⅛" Cube 1 2150.00
M29 Metal 2" Cube 1 2150.00

Timber

M30 Timber (Class I) Cu.ft 1


M31 Timber (Class II) for asbestos roof structure Cu.ft. 1 60000.00
M32 Timber (Class II) for calicut tile roof structure Cu.ft. 1
M33 Timber planks 1/2" thk (Width 6") Sq.ft. 1
M34 Timber planks 3/4" thk (Width 8") Sq.ft. 1
M35 Timber planks 1" thk (Width 8") Sq.ft. 1
M36 Timber planks 1 1/8" thk (Width 8") Sq.ft. 1
M37 Timber planks 1¼" thk (Width 8") Sq.ft. 1
M38 Timber planks 1½" thk (Width 8") Sq.ft. 1
M39 Sawn timber 1" thk (Class II ) (Shutering) Sq.ft. 1 35.00
M40 Sawn timber 3/4" thk (Class II ) (- do - ) Sq.ft. 1
M41 Timber (Formwork) (2" x 1") L.ft. 1 10.00
M42 Timber (Formwork) (2" x 2") L.ft. 1 22.00
M43 Timber (Formwork) (4" x 2") L.ft. 1 75.00
M44 Timber (Class 1) (2" x 1") L.ft. 1
M45 Timber (Class II) (2" x 1") L.ft. 1 10.00
M46 Timber (Class III) (2" x 1") L.ft. 1
M47 Timber (Class I) (2" x 2") L.ft. 1
M48 Timber (Class II) (2" x 2") L.ft. 1
M49 Timber (Class III) (2" x 2") L.ft. 1
M50 Timber (Class I) (3" x 1½") L.ft. 1
M51 Timber (Class II) (3" x 1½") L.ft. 1
M52 Timber (Class III) (3" x 1½") L.ft. 1
M53 Timber (Class I) (3" x 2") L.ft. 1
M54 Timber (Class II) (3" x 2") L.ft. 1
M55 Timber (Class III) (3" x 2") L.ft. 1
M56 Timber (Class I) (4" x 2") L.ft. 1
M57 Timber (Class II) (4" x 2") L.ft. 1
M58 Timber (Class III) (4" x 2") L.ft. 1
M59 Timber (Class I) (4" x 3") L.ft. 1
M60 Timber (Class II) (4" x 3") L.ft. 1
M61 Timber (Class III) (4" x 3") L.ft. 1
M62 Timber (Class I) (5" x 2") L.ft. 1
M63 Timber (Class II) (5" x 2") L.ft. 1
M64 Timber (Class III) (5" x 2") L.ft. 1
M65 Timber (Class I) (5" x 3") L.ft. 1
M66 Timber (Class II) (5" x 3") L.ft. 1
M67 Timber (Class III) (5" x 3") L.ft. 1
M68 Timber (Class I) (6" x 4") L.ft. 1
M69 Timber (Class II) (6" x 4") L.ft. 1
M70 Timber (Class III) (6" x 4") L.ft. 1
M71 Timber (Class I) (7" x 2") L.ft. 1
M72 Timber (Class II) (7" x 2") L.ft. 1
M73 Timber (Class III) (7" x 2") L.ft. 1
M74 Timber (Class I) (8" x 4") L.ft. 1
M75 Timber (Class II) (8" x 4") L.ft. 1
M76 Timber (Class III) (8" x 4") L.ft. 1

M76 Timber Beading (½" x ½") L.ft. 1


M77 Timber Strips (2" x 1¼") L.ft. 1
M78 Halmilla beading (1½" x ½") L.ft. 1
M79 Halmilla cove moulding (2" x 2") L.ft. 1
M80 Lunumidella ceiling planks Sq.ft. 1

M81 Plywood sheet (12mm thk) (8' X 4') Nos. 1


M82 Plywood sheet (15mm thk) (8' X 4') Nos. 1
M83 Plywood sheet (18mm thk) (8' X 4') Nos. 1
M84 Plywood sheet (25mm thk) (8' X 4') Nos. 1
M85 Plywood sheet (30mm thk) (8' X 4') Nos. 1
M86 Marine Plywood sheet (33mm thk) (8' X 4') Sq.ft. 1

M87 Wedges (Timber) Nos. 1

Screws, bolts and Nails


M88 Wire nails kg 1 140.00

M97 Brass screw (½") Nos. 1


M98 Brass screw (3/4") Nos. 1
M99 Brass screw (1") Nos. 1
M100 Brass screw (1¼") Nos. 1
M101 Brass screws (1 ½") Nos. 1
M102 Brass screws (4")
M103 Brass screw (8") Nos. 1
M104 Brass nails (1½") Nos. 1
M105 Iron screws ( 3/4" ) Nos. 1
M106 Roofing screws and bolts Nos. 1 8.00
M107 Plastic / fiber plug Nos. 1

Reinforcement

M108 M.S. / Tor steel rods 50Kg 1 4750.00


M109 16 BWG Binding wire kg 1 140.00

Building fabric

M110 Glazed tiles (6" x 6") Nos. 1


M111 Ceramic tiles (4" x 4") (white) Nos. 1
M112 Ceramic tiles (6" x 6") Nos. 1
M113 Press cement tiles (8" x 8") Nos. 1
M114 Ceramic tiles (12" x 12") Nos. 1
M115 Terra-cotta (8" x 8") Nos. 1
M116 Vinyl tile (1' x 1') Nos. 1
M117 Terrazzo tile (12" x 12") Nos. 1
M118 Rubble tile Nos. 1
M119 Tile Grout Nos. 1
M120 Tile Adhesive Ltr. 1

M121 Flat clay tiles Nos. 1


M122 Calicut tiles Nos. 1
M123 Calicut pattern Ridge tiles Nos. 1
M124 Half round clay tiles Nos. 1
M125 Flat asbestos sheet Sq.ft. 1
M126 Fiber glass roofing sheet Sq.ft. 1
M127 Asbestos corrugated sheets. m2 1 460.00
Asbestos close fitting ridge Pair 1
M128 G.I sheets ( 8' x 4' ) Sq.ft. 1

Paints, preservatives and accessories

M129 Wood preservatives Ltr. 1 240.00


M130 Wood primer Ltr. 1
M131 Masonry sealer Ltr. 1
M132 Alkali primer Ltr. 1
M133 Turpentine Ltr. 1
M134 Thinner Ltr. 1
M135 Anti-corrosive primer Ltr. 1
M136 Primer / Filler Ltr. 1
M137 Emulsion paint Ltr. 1 645.00
M138 Enamel paint Ltr. 1
M139 Weather-shield paint Ltr. 1 840.00
M140 Anti-corrosive paint Ltr. 1
M141 Varnish Ltr. 1
M142 Wax polish kg 1
M143 Flannel cloth m 1

M144 Cotton waste m 1


M145 1" Inch brush Nos. 1
M146 2" Inch brush Nos. 1 250.00
M147 3" brush Nos. 1
M148 4" Inch brush Nos. 1
M149 6" Inch brush Nos. 1 710.00
M150 Wire brush Nos. 1
M151 6" coir brush Nos. 1
M152 Floor brush Nos. 1
M153 Sand papers Nos. 1 20.00

Pipes, valves and accessories

M154 PVC pipes (⅛" dia) L.ft. 1


M155 PVC pipes (¾" dia / 20mm) L.ft. 1
M156 PVC pipes (1" dia / 25mm) L.ft. 1
M157 PVC pipes (1¼" dia / 32mm) L.ft. 1
M158 PVC pipes (1⅛" dia) L.ft. 1
M159 PVC pipes (2" dia) L.ft. 1
M160 PVC pipes (2⅛" dia) L.ft. 1
M161 PVC pipes (3" dia) (Drain pipes) L.ft. 1
M162 PVC pipes (3⅛" dia) L.ft. 1
M163 PVC pipes (4" dia) (Drain pipes) L.ft. 1
M164 PVC pipes (4" dia) L.ft. 1
M165 PVC pipes (6" dia) L.ft. 1
M166 PVC Elbows (⅛" dia) Nos. 1
M167 PVC Bends (⅛" dia) Nos. 1
M168 PVC Sockets (⅛" dia) Nos. 1
M169 PVC Elbows (¾" dia / 20mm) Nos. 1
M170 PVC Bends (¾" dia / 20mm) Nos. 1
M171 PVC Sockets (¾" dia / 20mm) Nos. 1
M172 PVC Elbows (1" dia / 25mm) Nos. 1
M173 PVC Bends (1" dia / 25mm) Nos. 1
M174 PVC Sockets (1" dia / 25mm) Nos. 1
M175 PVC Elbows (1¼" dia / 32mm) Nos. 1
M176 PVC Bends (1¼" dia / 32mm) Nos. 1
M177 PVC Sockets (1¼" dia / 32mm) Nos. 1
M178 PVC Elbows (1⅛" dia) Nos. 1
M179 PVC Bends (1⅛" dia) Nos. 1
M180 PVC Sockets (1⅛" dia) Nos. 1
M181 PVC Elbows (2" dia / 25mm) Nos. 1
M182 PVC Bends (2" dia / 25mm) Nos. 1
M183 PVC Sockets (2" dia / 25mm) Nos. 1
M184 PVC Elbows (2⅛" dia) Nos. 1
M185 PVC Bends (2⅛" dia) Nos. 1
M186 PVC Sockets (2⅛" dia) Nos. 1
M187 PVC Elbows (3" dia) Nos. 1
M188 PVC Bends (3" dia) Nos. 1
M189 PVC Sockets (3" dia) Nos. 1
M190 PVC Tees (⅛" dia) Nos. 1
M191 PVC Tees (¾" dia / 20mm) Nos. 1
M192 PVC Tees (1" dia / 25mm) Nos. 1
M193 PVC Tees (1¼" dia / 32mm) Nos. 1
M194 PVC Tees (1⅛" dia) Nos. 1
M195 PVC Tees (2" dia / 25mm) Nos. 1
M196 PVC Tees (2⅛" dia) Nos. 1
M197 PVC Tees (3" dia) Nos. 1

M198 Hume pipes (12" dia) Nos. 1


M199 Clips and nails Nos. 1
M200 Solvent cement Gram 1
M201 GI pipes (⅛" dia) L.ft. 1
M202 GI pipes (¾" dia / 20mm) L.ft. 1
M203 GI pipes (1" dia / 25mm) L.ft. 1
M204 GI pipes (1⅛" dia) L.ft. 1
M205 GI pipes (2" dia) L.ft. 1

M206 Brass bib tap (⅛" dia) Nos. 1


M207 Brass bib tap (¾" dia / 20mm) Nos. 1
M208 Brass stop cock (¾" dia / 20mm) Nos. 1
M209 Brass stop cock (1" dia / 25mm) Nos. 1
M210 Chromium plated tap (⅛",¾",1"and 2") Nos. 1

Sundry Items

M211 DPC tar Ltr. 1


M212 Pudlo Ltr. 1
M213 Shieidkote (Shell coat) Ltr. 1
M214 Mould oil Ltr. 1
16mm dia 450mm bolt for formwork Nos. 1
M215 (H2SO4) acid Ltr. 1
M216 Tarnap Ltr. 1
M217 Skim coat
Ironmongery

M218 Draw rings Nos. 1


M219 Fanlight catches Nos. 1
M220 Casement fasteners Nos. 1
M221 Barrel bolts Nos. 1
M222 Tower / Skeleton Nos. 1
M223 Hydraulic door closer Nos. 1
M224 Casement stays Nos. 1
M225 Mortice lock with screws Nos. 1
M226 Rim lock Nos. 1
M227 Tee hinges Nos. 1
M228 Butt hinges Nos. 1
M229 Iron screws Nos. 1
M230 Pannel pins Nos. 1
M231 5/8" mild steel dowels Nos. 1
M232 Spur stones Nos. 1

Glass and glazings

M233 3 mm plain sheet glass m2 1


M234 4 mm plain sheet glass m2 1
M235 5 mm plain sheet glass m2 1
M236 6 mm plain sheet glass m2 1
M237 5 mm float bronze glass m2 1
Last
updated

Last
Additional Description
updated
Using 2X2 @ Rs.25, 4X2 @ 125 etc
Using 2X1 @ Rs.10, 2X2 @ Rs.25, 4X2 @ 125 etc

Rubber

Ginisappu
Actonia
Actonia
Ginisappu
Rs.170 per kg, A kilo may contain 20 nos.
Excavation, earthwork and surface treatments
Labour Rates

Special skilled labour (Blasting) Rs 1000.00


Special skilled labour (Benching) Rs 1000.00
Skilled labour (Carpenter) Rs 800.00
Unskilled labour Rs 600.00

1.1 EXCAVATION

(1) Labour (days)


EXCAVATION
i ii iii
Special
Items Price (Rs) Skilled. Price (Rs) Unskilled
Skilled.

1.1.1 Removing Top soil to a depth not exceeding 6” &


deposition as directed within site. (100m²) 11.00

1.1.2 Excavation over site to reduce level, in any material


except rock requiring blasting including depositing and
leveling as directed up to distance not exceeding 30’ 0”. 1.75
(3m³)

1.1.3 Excavation in trenches for walls/column pits in soft/loose


soil from 0’ 0” to 5’ 0” deep and depositing excavated
material to distance not exceeding 30’ 0” (Earth work 1.10
support to be paid separately where necessary). (3m³)

1.1.4 Excavation in trenches for walls/column pits in ordinary


soil form o’ 0’’ to 5’ 0’’ deep and depositing excavated
material not exceeding 30’ 0’’ (Earth work support to be 2.40
paid separately where necessary). (3m³)

1.1.5 Excavation in trenches for walls/column pits in


Hard/dense soil up to a depth of 5’ 0’’ and depositing
excavated material up to a distance not exceeding 30’ 0’’ 3.75
(Earth work support to be paid separately where
necessary). (3m³)

1.1.6 Excavation in trenches for walls/column pits in Mud/wet


soil up to a depth of 5’ 0’’ and depositing excavated
material to distance not exceeding 30’ 0’’ (Earth work 3.20
support to be paid separately where necessary) (3m³).
1.1.7 Excavation in trenches for walls/column pits in Soft
disintegrated rock (not requiring blasting) up to a depth
of 5’ 0’’ and depositing excavated material to distance not 2.75
exceeding 30’ 0’’ (Earth work support to be paid
separately where necessary) (3m³).

1.1.8 Excavation in trenches for walls/column pits in Hard rock


requiring blasting up to a depth of 5’ 0’’ and depositing
excavated material to a distance not exceeding 30’ 0’’ 1.10 1000.00 2.20
(Earth work support to be paid separately where
necessary) (3m³).

1.1.9 Benching rock in foundation in 3’’-6’’ steps. (Blasting


1.60 1000.00 1.60
prohibited)

1.1.10 Backfilling and compacting to trenches with selected earth


available at site. (3m³) 1.10

1.1.11 Back filling and compacting to trenches with imported


material (3m³) 1.40

1.1.12 Filling under floors including leveling, watering &


compacting in 75mm layers with available and selected 2.20
earth at site. (3m³)

1.1.13 Filling under floors including leveling, watering &


compacting in 3” layers with imported selected earth. 2.20
(3m³)

1.1.14 Cutting turf sods, loading to hand carts and transporting


up to 30 yards, laying and watering for 30 days. (Royalty
for turf, pegging and transport beyond 30 yards paid 5.00
separately). (10m²)

1.2 EARTHWORK SUPPORT

(1) Labour (days)


EARTHWORK SUPPORT
i ii iii
Special
Items Price (Rs) Skilled. Price (Rs) Unskilled
Skilled.

1.2.1 Earthwork support (open planking) in trenches up to a


depth of 5’ 0’’ per use (4 uses) (14m²) 1.00 800.00 3.00

1.2.2 Earthwork support (close plunking) in trenches up to 5’


0’’ depth per use (4 uses). (14m²) 2.00 800.00 6.00
1.2.3 Earth work support (close planking) in deep excavation
in trenches up to 15’ 0’’ depth. (42m²) 8.00 800.00 20.00

1.3 SURFACE TREATMENT

(1) Labour (days)


Anti-termite treatment
i ii iii
Special
Items Price (Rs) Skilled. Price (Rs) Unskilled
Skilled.
*Please refer to appendices as well

1.3.1 Anti-termite treatment using DDT on excavated


foundation and compacted soil under floors. (10m²) 0.50

1.3.2 Anti-termite treatment Copper Naphthenate on


excavated foundation and compacted soil under floors. 0.50
(10m²)

1.3.3 Anti-termite treatment using Sodium Arsenate on


excavated foundation and compacted soil under floors. 0.50
(10m²)

1.3.4 Anti-termite treatment using Dieldrine on excavated


foundation and compacted soil under floors. (10m²) 0.50

BACK TO CONTENTS PAGE


(2) Materials
iii i ii iii iv v
Blast Jumper 200 x 200
Price (Rs) Price (Rs) Fuse Price (Rs) Price (Rs) Earth Price (Rs)
Power Steel Sods
Kg. m Kg. m³ Nr.

600.00

600.00

600.00

600.00

600.00

600.00
600.00

600.00 0.35 0.00 3.05 0.00 0.50 0.00

600.00

600.00

600.00 3.75 0.00

600.00

600.00 3.75 0.00

600.00 263.00

(2) Materials
iii i ii iii iv v
Class II
Price (Rs) Price (Rs) Wedges Price (Rs) Price (Rs) Price (Rs)
timber
m3 % of 2(i)

600.00 0.50 15000.00 0.05 7500.00

600.00 0.85 15000.00 0.05 12750.00


600.00 2.84 15000.00 0.05 42600.00

(2) Materials
iii i ii iii iv v
DDT Copper Sodium
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Dieldrine Price (Rs) Water
powder Naphthenate Arsenate
kg gal

600.00 7.30 0.00 20

600.00

600.00

600.00
(3) Plant and Machinery
v vi vii i ii iii
Red-earth & Steel Fuel & Price Fuel Tools
Price (Rs) Price (Rs) Water Price (Rs) Price (Rs) Price (Rs)
coir dust Forge (Rs) & Forge Etc.
m³ % of (i) % of (i) % of (i)

0.04 6600.00

0.04 1050.00

0.04 660.00

0.04 1440.00

0.04 2250.00

0.04 1920.00
0.07 1650.00

0.02 2420.00 0.04 2420.00

0.25 2560.00 0.04 2560.00

0.04 660.00

0.04 840.00

0.04 1320.00

0.04 1320.00

0.00 0.75 0.00 60.00 0.00 0.04 3000.00

(3) Plant and Machinery


v vi vii i ii iii
Tools
Price (Rs) Price (Rs) Price (Rs) Price (Rs)
Etc.
% of 1

0.05 2600.00

0.05 5200.00
0.05 18400.00

(3) Plant and Machinery


v vi i ii iii
Tools
Price (Rs) Fuel Oil Price (Rs) Price (Rs) Price (Rs)
Etc.
% of 1

0.00 0.04 300.00

0.04 300.00

0.04 300.00

0.04 300.00
Basic labour Basic Material Basic Plant Basic Total
Cost Cost Cost Cost

6600.00 0.00 264.00 6864.00

1050.00 0.00 42.00 1092.00

660.00 0.00 26.40 686.40

1440.00 0.00 57.60 1497.60

2250.00 0.00 90.00 2340.00

1920.00 0.00 76.80 1996.80


1650.00 0.00 115.50 1765.50

2420.00 0.00 145.20 2565.20

2560.00 0.00 742.40 3302.40

660.00 0.00 26.40 686.40

840.00 0.00 33.60 873.60

1320.00 0.00 52.80 1372.80

1320.00 0.00 52.80 1372.80

3000.00 0.00 120.00 3120.00

Basic labour Basic Material Basic Plant Basic Total


Cost Cost Cost Cost

2600.00 7875.00 130.00 10605.00

5200.00 13387.50 260.00 18847.50


18400.00 44730.00 920.00 64050.00

Basic labour Basic Material Basic Plant Basic Total


Cost Cost Cost Cost

300.00 0.00 12.00 312.00

300.00 0.00 12.00 312.00

300.00 0.00 12.00 312.00

300.00 0.00 12.00 312.00


2. CONCRETE WORK

Labour Rates

Special skilled labour (Benching) Rs 1000.00


Skilled labour Rs 800.00
Unskilled labour Rs 600.00

(1) Labour (days)


CONCRETE WORK
i ii iii
Special
Items Skilled.
Price (Rs) Skilled. Price (Rs) Unskilled Price (Rs)

2.1 Mixing 1:3:6 (40) concrete (3m³) -


Grade 15. 1.10 800.00 6.40 600.00

2.2 Mixing 1:2½:5 (25) concrete (3m³) -


Grade 20. 1.10 800.00 6.40 600.00

2.3 Mixing 1:2:4 (20) concrete (3m³) -


Grade 20. 1.10 800.00 6.40 600.00

2.4 Mixing 1:1½:3 (20) concrete (3m³) -


Grade 25. 1.10 800.00 6.40 600.00

2.5 Mixing 1:1:2 (20) concrete (3m³) - Grade


30. 1.10 800.00 6.40 600.00

2.6 Procuring and Placing 50mm thick cement


concrete screed in foundation at depths not 0.125 800.00 0.50 600.00
exceeding 1.5m. (10m²)

2.7 Placing 50mm thick cement concrete screed


in foundation at depths not exceeding 1.5m. 0.125 800.00 0.50 600.00
(10m²)

2.8 Procuring and Placing 75mm thick cement


concrete screed in foundation at depths not 0.125 800.00 0.75 600.00
exceeding 1.5m. (10m²)

2.9 Placing 75mm thick cement concrete screed


in foundation at depths not exceeding 1.5m. 0.125 800.00 0.75 600.00
(10m²)

2.10 Placing 150mm thick mass concrete ground


floor slab (10m²). 0.50 800.00 1.25 600.00
Columns

2.11 Placing 112.5 x 150 R.C.C. column on


ground floor including curing (1.25m³). 4½" X 3.00 800.00 3.50 600.00
6" X 10' - 24 Nos.

2.12 Placing 150 x 150 R.C.C. column on ground


floor including curing (1.25m³). 6" X 6" X 10' 3.00 800.00 3.50 600.00
- 18 Nos.

2.11 Placing 225 x 225 R.C.C. column on ground


floor including curing (1.25m³). 9" X 9" X 10' 3.00 800.00 3.50 600.00
- 8 Nos.

2.12 Placing 300 x 300 R.C.C. column on ground


floor including curing (1.45m³). 12" X 12" X 3.00 800.00 4.50 600.00
10' - 5 Nos.

2.13 Placing 337.5 x 337.5 R.C.C. column on


ground floor including curing (1.45m³). 13½" 3.00 800.00 4.50 600.00
X 13½" X 10' - 5 Nos.

Beams

2.14 Placing 150 x 150 R.C.C. beam at 1st floor


level including curing (1.25m³). 6" X 6" - 3.00 800.00 5.50 600.00
180ft

2.15 Placing 225 x 150 R.C.C. beam at 1st floor


level including curing (1.25m³). 9" 3.00 800.00 5.50 600.00
X 6" - 120ft

2.16 Placing 225 x 225 R.C.C. beam at 1st floor


level including curing (1.25m³). 9" 3.00 800.00 5.50 600.00
X 9" - 80ft

Slabs

2.17 Placing 125mm R.C.C. floor slab at 1st floor


level including curing (1.45m³). (5" thk 3.00 800.00 5.50 600.00
slab - 120 ft²)

2.18 Placing 150mm R.C.C. floor slab at 1st floor


level including curing (1.45m³). (6" thk 3.00 800.00 5.50 600.00
slab - 100 ft²)

Lintels

2.19 Placing 112.5 x 150 lintels in ground floor


level including curing (1.25m³). 3.00 800.00 5.50 600.00
4½" X 6" - 240ft
2.20 Placing 225 x 225 lintels in ground floor level
including curing (1.25m³). 9" 3.00 800.00 5.50 600.00
X 9" - 80ft

2.21 Placing 225 x 300 lintels in ground floor level


including curing (1.25m³). 9" 3.00 800.00 5.50 600.00
X 12" - 60ft

2.22 Placing 300 x 375 lintels in ground floor level


including curing (1.25m³). 12" 3.00 800.00 5.75 600.00
X 15" - 36ft

BACK TO CONTENTS PAGE


(2) Materials
i ii iii iv v vi
40mm 25mm 20mm
Cement Price (Rs) Sand Price (Rs) Price (Rs) Price (Rs) Price (Rs) Water
Metal Metal Metal
50 Kg. m³ m³ m³ m³ gal.

13.80 735.00 1.60 2300.00 2.80 2150.00 117.00

14.90 735.00 1.80 2300.00 2.70 2150.00

19.10 735.00 1.50 2300.00 2.65 2150.00 127.20

24.40 735.00 1.30 2300.00 2.50 2150.00 159.00

32.90 735.00 1.30 2300.00 2.90 2150.00 212.00


170.00

140.00

100.00

100.00

100.00

180.00

150.00

120.00

90.00

90.00

90.00
90.00

90.00

90.00
(3) Plant and Machinery
vi vii viii i ii iii
Jute Mixed 10/7 Tools
Price (Rs) Price (Rs) Price (Rs) Vibrator Price (Rs) Price (Rs) Price (Rs)
Hessian Concrete Mixer Etc.
m² m³ Day Day % of (1)

0.00 0.34 3000.00 0.03 4720.00

0.34 3000.00 0.03 4720.00

0.00 0.34 3000.00 0.03 4720.00

0.00 0.34 3000.00 0.03 4720.00

0.00 0.34 3000.00 0.03 4720.00

0.52 0.00 0.05 400.00

0.05 400.00

0.80 0.00 0.05 550.00

0.05 550.00

1.50 0.00 0.05 1150.00


0.00 1.00 10.00 1.40 0.00 1.00 1500.00 0.03 4500.00

0.00 7.50 10.00 1.40 0.00 1.00 1500.00 0.03 4500.00

0.00 5.60 10.00 1.40 0.00 1.00 1500.00 0.03 4500.00

0.00 3.80 10.00 1.50 0.00 1.00 1500.00 0.03 5100.00

0.00 4.20 10.00 1.55 0.00 1.00 1500.00 0.03 5100.00

0.00 8.40 10.00 1.40 0.00 1.00 1500.00 0.03 5700.00

0.00 7.00 10.00 1.40 0.00 1.00 1500.00 0.03 5700.00

0.00 5.60 10.00 1.40 0.00 1.00 1500.00 0.03 5700.00

0.00 2.80 10.00 1.60 0.00 1.00 1500.00 0.03 5700.00

0.00 2.50 10.00 1.60 0.00 1.00 1500.00 0.03 5700.00

0.00 1.00 10.00 1.40 0.00 1.00 1500.00 0.03 5700.00


0.00 5.50 10.00 1.40 0.00 1.00 1500.00 0.03 5700.00

0.00 5.50 10.00 1.40 0.00 1.00 1500.00 0.03 5700.00

0.00 4.00 10.00 1.40 0.00 1.00 1500.00 0.03 5850.00


Basic labour Basic Material Basic Plant Basic Total
Cost Cost Cost Cost

4720.00 19843.00 1161.60 25724.60

4720.00 20896.50 1161.60 26778.10

4720.00 23186.00 1161.60 29067.60

4720.00 26299.00 1161.60 32180.60

4720.00 33406.50 1161.60 39288.10

400.00 0.00 20.00 420.00

400.00 0.00 20.00 420.00

550.00 0.00 27.50 577.50

550.00 0.00 27.50 577.50

1150.00 0.00 57.50 1207.50


4500.00 10.00 1635.00 6145.00

4500.00 75.00 1635.00 6210.00

4500.00 56.00 1635.00 6191.00

5100.00 38.00 1653.00 6791.00

5100.00 42.00 1653.00 6795.00

5700.00 84.00 1671.00 7455.00

5700.00 70.00 1671.00 7441.00

5700.00 56.00 1671.00 7427.00

5700.00 28.00 1671.00 7399.00

5700.00 25.00 1671.00 7396.00

5700.00 10.00 1671.00 7381.00


5700.00 55.00 1671.00 7426.00

5700.00 55.00 1671.00 7426.00

5850.00 40.00 1675.50 7565.50


3. FORM WORK (TIMBER)

Labour Rates

Special skilled labour Rs 1000.00


Skilled labour (Carpenter) Rs 800.00
Unskilled labour Rs 600.00

(1) Labour (days)


FORM WORK (TIMBER)
i ii iii i

25mm
Special Price Price Price
Items Skilled. Unskilled thick
Skilled. (Rs) (Rs) (Rs)
Planks


Column

3.1 Form work to floor 225 X 225 columns in


ground (1.40m² contact area)

3.1.1 Making Mould Per Use (4 Uses). 0.13 800.00 0.125 600.00 0.45

3.1.2 Assembling Per Use. 0.25 800.00 0.25 600.00

3.1.3 Dismantling, cleaning and repairing - Per


Use. 0.25 800.00 0.25 600.00

Slab

3.2 Form work to under side of 1st floor slab


(20.0m² contact area).

3.2.1 Making Panels (4 Uses) including 20%


repair cost). 1.00 800.00 1.00 600.00 6.20

3.2.2 Assembling - Per Use. 1.00 800.00 4.00 600.00

3.2.3 Dismantling and cleaning Per Use. 0.50 800.00 2.00 600.00

Beams

3.3 Form work to 225 X 300 beams in ground


floor (5m² contact area).

3.3.1 Making the Mould Per Use (4 Uses). 0.40 800.00 0.55 600.00 1.50

3.3.2 Assembling - Per use. 1.00 800.00 2.00 600.00 0.10

3.3.3 Dismantling and cleaning - Per use 0.50 800.00 2.00 600.00
BACK TO CONTENTS PAGE
(2) Materials
i ii iii iv v vi vii
16 dia.
100x 50x 50x
Price Price Price Price Price Mould Price 450mm
50mm 50mm 25mm Wedges Etc.
(Rs) (Rs) (Rs) (Rs) (Rs) Oil (Rs) long
Timber Timber Timber
Bolts
m m m % of timber Ltr. Nr.

35.00 1.30 22.00 1.25 10.00

1.10 75.00 0.50 0.00 0.60

35.00 11.00 75.00

25.00 75.00 4.50 22.00 0.001 1974.00 5.00 0.00

35.00 2.50 75.00 3.75 22.00 2.00 10.00

35.00 12.00 75.00 7.50 22.00 0.001 1068.50 2.25 0.00


(3) Plant and Machinery
vii viii i ii
Basic labour Basic Material Basic Plant
Cost Cost Cost
Price Wire Price Tools Price
(Rs) Nails (Rs) Etc. (Rs)

Kg. % of 1

0.70 140.00 0.05 175.00 175.00 154.85 8.75

0.00 0.05 350.00 350.00 82.50 17.5

0.05 350.00 350.00 0.00 17.5

1.80 140.00
0.05 1400.00 1400.00 1294.00 70.00

1.00 140.00 0.05 3200.00 3200.00 2115.97 160.00

0.05 1600.00 1600.00 0.00 80.00

0.90 140.00 0.05 650.00 650.00 468.50 32.50

0.50 140.00 0.05 2000.00 2000.00 1139.57 100.00

0.05 1600.00 1600.00 0.00 80.00


Basic Total
Cost

338.60

450.00

367.50

2764.00

5475.97

1680.00

1151.00

3239.57

1680.00
4. REINFORCEMENT

Labour Rates

Special skilled labour (Bar bender) Rs 1000.00


Skilled labour Rs 800.00
Unskilled labour Rs 600.00

(1) Labour (days)


REINFORCEMENT
i ii iii i
M.S./
Special Price Price Price
Items Skilled. Unskilled Tor
Skilled. (Rs) (Rs) (Rs)
steel
50Kg.

4.1 Mild steel/ Tor steel reinforcement to


lintols slab beams or columns bent to
shape laid in position & tied with G.L. 1.00 1000.00 1.00 600.00 1.15
wires (50Kg.).

BACK TO CONTENTS PAGE


(2) Materials (3) Plant and Machinery
i ii iii iv i ii
Basic labour
Price Binding Price Spacers Price Tools Cost
Price (Rs)
(Rs) wire (Rs) of Chairs (Rs) Etc.

Kg. % of (2)i % of (1)

4750.00 0.70 140.00 0.015 5462.50 0.05 1600.00 1600.00


Basic Material Basic Plant Basic Total
Cost Cost Cost

5642.44 80.00 7322.44


5. MASONRY

Labour Rates

Special skilled labour Rs 1000.00


Skilled labour (Mason) Rs 900.00
Unskilled labour Rs 600.00

5.1 BRICK WORK

(1) Labour (days)


BRICK WORK
i ii iii
Special Price Price Price
Items Skilled. Unskilled
Skilled. (Rs) (Rs) (Rs)

5.1.1 Brickwork in cement sand 1:5 in foundation up


to D.P.C (3m³). 3.20 900.00 4.30 600.00

5.1.2 Brickwork cement & sand 1:8 in foundation up


to D.P.C (3m³). 3.20 900.00 4.30 600.00

5.1.3 Brickwork in cement and sand 1:5 in 112.5mm


thick walls in ground floor (10m²). 1.60 900.00 2.15 600.00

5.1.4 Brickwork 225mm thick in cement sand 1:5 in


ground floor. (10m²). 2.40 900.00 4.05 600.00

5.1.5 Brickwork 337.5mm thick in cement sand 1:5


in superstructure in ground floor(10m²). 3.75 900.00 5.90 600.00

5.1.6 Brickwork 225mm thk in ground floor cement


sand 1:8 mortar (10m²). 2.40 900.00 3.25 600.00

5.1.7 Brick work (wire cut) in 1:5 cement sand


mortar in 112.5mm thick walls in ground floor 1.60 900.00 2.15 600.00
(10m²).

5.1.8 Brick work (wire cut) in 1:5 cement sand


mortar in 225mm thick walls in ground floor 2.40 900.00 4.05 600.00
(10m²).

5.1.9 Brick work (wire cut) in 1:5 cement sand


mortar in 337.5mm thick walls in ground floor 4.05 900.00 5.90 600.00
(10m²).

5.1.10 Extra over for facing including raised painting


3mm thick in cement & sand 1:1 misture in 5.40 900.00 3.75 600.00
ground floor (10m²).
5.1.11 75mm thick floor paved in lime mortar 2:5 in
ground floor (10m²). 1.40 900.00 2.75 600.00

5.1.12 Steps 338x150mm in brick in cement & sand


1:5 with 12.5mm thick cement & sand 1:2
rendering inclusive necessary excavation 0.50 900.00 0.50 600.00
(3m).

5.1.13 Brick drains in cement and sand 1:5, 9” wide


and 150-225 average depth including cement
rendering 112.5mm thick 1:2 to exposed faces
with 450mm ramp including necessary 1.27 900.00 1.27 600.00
excavation. (3m)

5.1.14 Brick drains in cement and sand 1:5, 9” wide


and 150-225 average depth including cement
rendering 12.5mm thick 1:2 to exposed faces 1.02 900.00 1.27 600.00
without ramp including necessary excavation
(3m)

5.2 HOLLOW BLOCK MASONRY

(1) Labour (days)


HOLLOW BLOCK MASONRY
i ii iii
Special Price Price Price
Items Skilled. (Rs)
Skilled.
(Rs)
Unskilled
(Rs)

5.2.1 8” thick Hollow block work in cement and sand


mortar 1:5 in ground floor (cavities unfilled)
Size of a block 400mm X 200mm X 200mm 1.61 900.00 2.69 600.00
(10m²)

5.2.2 4” thick Hollow block masonry in cement and


sand mortar 1:5 with cavities unfilled, Size of
a block 400mm X 200mm X 100mm (10m²) 1.08 900.00 2.15 600.00

5.3 RANDOM RUBBLE MASONRY

(1) Labour (days)


RANDOM RUBBLE MASONRY
i ii iii
Special Price Price Price
Items Skilled. (Rs)
Skilled.
(Rs)
Unskilled
(Rs)
5.3.1 Random Rubble masonry in cement, sand
mortar 1:5 in foundation (350 mm thk) 4.24 900.00 6.35 600.00
(2.83m³)

5.3.2 Random Rubble masonry in cement, sand


mortar 1:5 in superstructure (350 mm thk) 4.77 900.00 7.41 600.00
(2.83m³)

BACK TO CONTENTS PAGE


(2) Materials
i ii iii iv v vi
Price Price Price Slaked
Brick Price (Rs) Sand Cement Wire Cut Bricks Price (Rs) Acids
(Rs) (Rs) (Rs) lime
1000 m³ 50Kg. 1000 Ltr. 50Kg.

1.61 0.00 0.75 2300.00 4.30 735.00

1.61 0.00 1.15 2300.00 2.50 735.00

0.62 0.00 0.30 2300.00 1.40 735.00

1.25 0.00 0.60 2300.00 3.25 735.00

1.85 0.00 0.90 2300.00 4.85 735.00

1.25 0.00 0.90 2300.00 1.90 735.00

0.25 2300.00 1.30 735.00 0.60 0.00

0.55 2300.00 2.70 735.00 1.20 0.00

0.90 2300.00 4.85 735.00 1.80 0.00

0.05 2300.00 0.55 735.00 0.45 0.00


0.40 0.00 0.35 2300.00 1.30

0.12 0.00 0.14 2300.00 0.50 735.00

0.14 0.00 0.14 2300.00 0.81 735.00

0.11 0.00 0.12 2300.00 0.71 735.00

(2) Materials
i ii iii iv v vi
Blocks 400x Price Price Blocks 400x Price
Price (Rs) Sand Cement Price (Rs) Water
200 x 200mm (Rs) (Rs) 200 x 100mm (Rs)
1000 M³ 50Kg. 1000

0.13 35000.00 0.18 2300.00 0.81 735.00

0.09 2300.00 0.43 735.00 0.13

(2) Materials
i ii iii iv v vi
150-200mm Price Price
Price (Rs) Sand Cement Water Price (Rs)
Rubble (Rs) (Rs)
m³ m³ 50Kg. gals.

3.90 1450.00 0.90 2300.00 5.30 735.00 100.00

3.90 0.90 2300.00 5.30 735.00 100.00


(3) Plant and Machinery
vi vii i ii iii Basic labour Basic Material
Cost Cost
Price Price Tools Price Scaffo- Price
Water
(Rs) (Rs) Etc. (Rs) ldings (Rs)
gal % of (1) % of (1)

160.00 0.03 5460.00 5460.00 4885.50

160.00 0.03 5460.00 5460.00 4482.50

55.00 0.03 2730.00 0.05 2730.00 2730.00 1719.00

120.00 0.03 4590.00 0.03 4590.00 4590.00 3768.75

180.00 0.03 6915.00 0.02 6915.00 6915.00 5634.75

120.00 0.03 4110.00 0.03 4110.00 4110.00 3466.50

30.00 0.03 2730.00 0.05 2730.00 2730.00 1530.50

110.00 0.03 4590.00 0.03 4590.00 4590.00 3249.50

160.00 0.03 7185.00 0.02 7185.00 7185.00 5634.75

11.00 0.03 7110.00 7110.00 519.25


575.00 50.00 2910.00 2910.00 1552.50

16.00 0.03 750.00 750.00 689.50

21.00 0.03 1905.00 1905.00 917.35

16.00

0.03 1680.00 1680.00 797.85

(3) Plant and Equipment


vi vii i ii iii Basic labour Basic Material
Tools Price Scaffo- Price Cost Cost
Etc. (Rs) ldings (Rs)
% of (1) % of (1)

0.03 3063.00 0.03 3063.00 3063.00 5559.35

0.03 2262.00 0.05 2262.00 2262.00 523.05

(3) Plant and Machinery


vi vii i ii iii Basic labour Basic Material
Tools Price Scaffo- Price Cost Cost
Etc. (Rs) ldings (Rs)
% of (1) % of (1)

0.03 7626.00 7626.00 7626.00 11620.50

0.03 8739.00 0.03 8739.00 8739.00 5965.50


Basic Plant Basic Total
Cost Cost

163.8 10509.3

163.8 10106.3

218.4 4667.4

275.4 8634.15

345.75 12895.5

246.6 7823.1

218.4 4478.9

275.4 8114.9

359.25 13179

213.3 7842.55
0 4462.5

22.5 1462

57.15 2879.5

50.4 2528.25

Basic Plant Basic Total


Cost Cost

183.78 8806.13

180.96 2966.01

Basic Plant Basic Total


Cost Cost
228.78 19475.28

524.34 15228.84
6. FINISHES

Labour Rates

Special skilled labour (Tiler) Rs 1000.00


Special skilled labour Rs 1000.00
Skilled labour (Mason) Rs 800.00
Unskilled labour Rs 500.00

6.1 PLASTERING

(1) Labour (days)


PLASTERING
i ii
Special
Items Price (Rs) Skilled Price (Rs)
Skilled

6.1.1 Rendering, 19mm thick D.P.C. in cement & sand 1:2


finished with 2 coats hot tar & blinded with sand (10m²). 1.34 800.00
Using firewood.

6.1.2 Rendering to walls, 16mm thick Plastering to wall in lime &


sand 2:5 including floating with lime putty (10m²). 1.08 800.00

6.1.3 Rendering to walls, 16mm thk cement & sand 1:3


including cement floating (10m²). 1.08 800.00

6.1.4 10mm thick Plastering to soffit slab cement & sand 1:3
including floating with lime putty (10m²). 2.69 800.00

6.1.5 10mm thick plastering to sides and soffit of beams in


cement and sand 1:3 including floating with lime putty 2.15 800.00
(10m²)

6.1.6 16mm thick plastering to walls in lime, cement & sand


1:1:5 finished semi-rough with wooden float (10m²). 1.08 800.00

6.1.7 16mm thick plastering to walls in lime cement and sand


1:1:5 finished smooth with lime putty floating (10m²) 1.61 800.00

6.1.8 12mm thick rendering in cement & sand 1:3 finished


smooth (10m²). 1.08 800.00

6.1.9 12mm thick rendering in cement and sand 1:2 in floors,


finished smooth (10m²) 1.08 800.00

6.1.10 19mm thick rendering in cement & sand 1:3 finished


smooth (10m²). 1.34 800.00
6.1.11 19mm thick rendering in cement & sand 1:2 in floors,
finished smooth (10m²). 1.34 800.00

6.1.12 19mm thick rendering in cement & sand 1:2 coloured


cement floors finished smooth (10m²). 1.34 800.00

6.1.13 12.5mm X 150mm skirting in cement & sand 1:3 projected


or flushed to walls finished with floating including forming 0.37 800.00
groove (3m).

6.2 TILING

(1) Labour (days)


GLAZED TILES & TERRAZZO TILES
i ii
Special
Items Price (Rs) Skilled. Price (Rs)
Skilled.

6.2.1 Glazed wall tiles including bedding in cement mortar 1:2 &
pointing in ground floor (specials measured separately).
(Rates exclude tile prices, grout measured for 150 X 150 4.30 1000.00
mm tiles). (10m²)

6.2.2 Terrazzo floor tiles in 12.5mm thick cement & sand 1:2 in
ground floor. (Rates exclude tile prices, grout measured 4.30 1000.00
for 300 X 300 mm tiles). (10m²)

6.2.3 Pressed floor tiles bedded in 12.5mm cement motar 1:2 &
pointing in neat cement in ground floor. (Rate exclude tile
prices, grout measured for 200 X 200 mm sized tiles). 4.30 1000.00
(10m²)

6.3 CEILING

(1) Labour (days)


CEILING
i ii
Special
Items Price (Rs) Skilled. Price (Rs)
Skilled.

6.3.1
Timber frame work for 1.2x1.2m flat asbestos ceiling 2.75 1000.00 0.55 800.00
(sheet measured separately) comprising of 100x50mm
joists and 50x50mm bearers in class I timber (20m²).
(1) Labour (days)
CEILING
i ii
Special
Items Price (Rs) Skilled. Price (Rs)
Skilled.

6.3.2
Horizontal ceiling lining using 1.2x1.2mm flat asbestos
cement sheets fixed with and including beading and cove 1.66 1000.00
mouldings on timber frame work (Timber frame work and
painting measured separately) (20m²).

(1) Labour (days)


CEILING
i ii
Special
Items Price (Rs) Skilled. Price (Rs)
Skilled.

6.3.3
19mm thick tongued and grooved Lunumidella ceiling 4.42 1000.00 1.10 800.00
boards fixed horizontal on 100x50mm class I timber joists
at 600mm centres with 38mm brass nails (20m²).

6.3.4
19x150mm wide tongued & grooved Lunumidella ceiling
boards fixed to underside of rafters, (existing) with 38mm 3.23 1000.00
brass nails including leveling with timber strips where
necessary (18m²).

BACK TO CONTENTS PAGE


bour (days) (2) Materials
iii i ii iii iv

Unskilled Price (Rs) Fire wood Price (Rs) Bitumen Price (Rs) Sand Price (Rs) Cement

Kg. Ltr. m³ 50Kg.

2.69 500.00 4.90 6.83 0.34 2300.00 2.42

1.88 500.00 0.21 2300.00

1.61 500.00 0.18 2300.00 1.51

2.69 500.00 0.15 2300.00 0.86

2.15 500.00 0.15 2300.00 0.86

1.34 500.00 0.21 2300.00 0.86

1.61 500.00 0.21 2300.00 0.86

1.61 500.00 0.15 2300.00 1.15

1.88 500.00 0.15 2300.00 1.61

2.42 500.00 0.24 2300.00 1.88


2.42 500.00 0.24 2300.00 2.42

2.42 500.00 0.24 2300.00 2.41

0.31 500.00 0.01 2300.00 0.10

bour (days) (2) Materials


iii i ii iii iv
150x150mm White
Unskilled Price (Rs) Price (Rs) Cement Price (Rs) Sand Price (Rs)
Glazed Tles Cement
Nr. 50Kg. m³ Kg.

4.57 500.00 473.00 2.69 735.00 0.34 2300.00 0.49

3.76 500.00 1.34 735.00 0.21 2300.00

4.84 500.00 1.34 735.00 0.21 2300.00

bour (days) (2) Materials


iii i ii iii iv

Unskilled Price (Rs) Timber Class I Price (Rs) 50mm wire nails Price (Rs) Fibre Plastic plugs Price (Rs) Cement

m³ Kg. Nr. 50Kg.

1.65 500.00 0.25 0.50 140.00 29.00 0.25


bour (days) (2) Materials
iii i ii iii iv
6mm
Flat asbe-stos 50x50mm Halmilla 38x 12mm Halmilla
Unskilled Price (Rs) Price (Rs) Price (Rs) Price (Rs) clout
sheets cove mouldings beadings
nails
M² M M Kg.

2.21 500.00 21.54 20.19 42.06 0.13

bour (days) (2) Materials


iii i ii iii iv
100x50mm 150x 38mm
Unskilled Price (Rs) Price (Rs) Price (Rs) Cement Price (Rs) Sand
timber joists Lunumidella planks

m m 50Kg. m³

7.73 500.00 39.15 22.05 0.03 735.00 0.13

6.45 500.00 21.97


(2) Materials (3) Plant and M
iv v vi vii viii i
Powder
Price (Rs) Slaked lime Price (Rs) Price (Rs)
pigment
50Kg. Kg.

735.00

1.40 575.00

735.00

735.00 0.17 575.00

735.00 0.17 575.00

735.00 0.43 575.00

735.00 0.65 575.00

735.00

735.00

735.00
735.00

735.00 2.43

735.00 0.11

(2) Materials (3) Plant and M


iv v vi vii viii i
300x 300mm Coloured Wax Cotton
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Price (Rs)
Terrazzo Tiles Pigment Polish Waste
Nr. Kg. Kg. Kg.

113.00 0.97 0.24 0.97

0.12 0.12 0.97

(2) Materials (3) Plant and M


iv v vi vii viii i
50mm
Price (Rs) Sand Price (Rs) Tarnap Price (Rs) Price (Rs)
brush
m³ Ltr. Nr.

735.00 0.06 2300.00 1.67 0.25


(2) Materials (3) Plant and M
iv v vi vii viii i
38mm brass
Price (Rs) Price (Rs)
screws
Nr.

106.00

(2) Materials (3) Plant and M


iv v vi vii viii i
38mm brass 50 x 6mm 19mm
Price (Rs) Price (Rs) Price (Rs) Price (Rs)
nails Timber strips nails

Kg. M Kg.

2300.00 4.42

4.30 13.11 2.15


(3) Plant and Machinery
ii iii
Basic labour Basic Basic Plant Basic Total
Tools Cost Material Cost Cost Cost
Price (Rs) Scaffoldings Price (Rs)
Etc.
% of (1) % of (1)

0.03 2417.00 2417.00 2560.70 72.51 5050.21

0.03 1804.00 0.03 1804.00 1804.00 1288.00 108.24 3200.24

0.03 1669.00 0.03 1669.00 1669.00 1523.85 100.14 3292.99

0.03 3497.00 0.03 3497.00 3497.00 1074.85 209.82 4781.67

0.03 2795.00 0.03 2795.00 2795.00 1074.85 167.70 4037.55

0.03 1534.00 0.03 1534.00 1534.00 1362.35 92.04 2988.39

0.03 2093.00 0.03 2093.00 2093.00 1488.85 125.58 3707.43

0.03 1669.00 1669.00 1190.25 50.07 2909.32

0.03 1804.00 1804.00 1528.35 54.12 3386.47

0.03 2282.00 2282.00 1933.80 68.46 4284.26


0.03 2282.00 2282.00 2330.70 68.46 4681.16

0.03 2282.00 2282.00 2323.35 68.46 4673.81

0.03 451.00 451.00 96.50 13.53 561.03

(3) Plant and Machinery


ii iii
Basic labour Basic Basic Plant Basic Total
Tools Cost Material Cost Cost Cost
Price (Rs) Scaffoldings Price (Rs)
Etc.
% of (1)

0.03 6585.00 6585.00 2759.15 197.55 9541.70

0.03 6180.00 6180.00 1467.90 185.40 7833.30

0.03 6720.00 6720.00 1467.90 201.60 8389.50

(3) Plant and Machinery


ii iii Basic labour Basic Basic Plant Basic Total
Tools Cost Material Cost Cost Cost
Price (Rs) Scaffolding Price (Rs)
Etc.
% of (1) % of (1)

0.03 4015.00 0.03 4015.00 4015.00 391.75 240.90 4647.65


(3) Plant and Machinery
ii iii Basic labour Basic Basic Plant Basic Total
Tools Cost Material Cost Cost Cost
Price (Rs) Scaffo-ldings Price (Rs)
Etc.
% of (1) % of (1)

0.03 2765.00 0.03 2765.00 2765.00 0.00 165.90 2930.90

(3) Plant and Machinery


ii iii
Basic labour Basic Basic Plant Basic Total
Tools Cost Material Cost Cost Cost
Scaffo-ldings
Etc.

% of (1) % of (1)

0.03 9165.00 0.03 9165.00 9165.00 321.05 549.90 10035.95

0.03 6455.00 0.03 6455.00 6455.00 0.00 387.30 6842.30


7. PAINTING

Labour Rates

Special skilled labour (Painter) Rs 1000.00


Skilled labour Rs 800.00
Unskilled labour Rs 600.00

(1) Labour (days)


PAINTING & DECORATION
i ii iii
Special
Items Price (Rs) Skilled Price (Rs) Unskilled Price (Rs)
Skilled

7.1
Prepare and apply one coat of preservative 0.81 1000.00 0.54 600.00
(oil type) to structural timber including
touching up cut ends etc. after fixing (10m²).

7.2 Painting, Prepare surface of steel truss and


apply two coats of anti-corrosive primer 1.61 1000.00 1.61 600.00
(10m²).

7.3
Painting, Apply one coat of anti-corrosive
primer and two coats enamel paint on 2.69 1000.00 1.08 600.00
already shop primed and erected steel
Roof truss (10m²).

7.4 Painting, Prepare and apply two coats of


primer and finishing coat of enamel paint to
mild steel (angle/flat) gate (10m²). 1.08 1000.00 1.61 600.00

7.5 Painting steel on new work With 2 coats of


anti-corrosive paint (10m²). 1.61 1000.00

7.6 Painting new timber work with 2 coats


wood preservative (10m²). 0.54 1000.00

7.7 Prepare and painting wood work with


primer and two coats of enamel paint 1.61 1000.00 0.54 600.00
(10m²).

(1) Labour (days)


PAINTING & DECORATION
i ii iii
Special
Items Price (Rs) Skilled Price (Rs) Unskilled Price (Rs)
Skilled

7.8 White or colour washing two coats in single


2.50 1000.00 2.50 600.00
storey building (100m²).

7.9 White or colour washing two coats in two


3.00 1000.00 3.00 600.00
storey building (100m²).

7.10 Painting, Prepare & apply one coat of alkali


resistant primer and two coat of emulsion 1.25 1000.00
paint to internal wall (10m²).

7.11 Painting, Prepare & apply one coat of alkali


resistant primer and two coat of emulsion 1.75 1000.00
paint to soffit slab (10m²).

7.12 Painting, Prepare & apply one coat of alkali


resistant primer and two coat of
weathershield paint to external wall (10m²). 1.25 1000.00

7.13 Painting, Prepare & apply one coat of shell


coat, one coat alkali resistant primer and two
coat of weathershield paint to external wall
(10m²).

7.14 Cement washing to walls of single storey


2.00 1000.00 2.00 600.00
building (100m²).

7.15 Painting walls with two coats of emulsion


0.75 1000.00
paint (10m²).

(1) Labour (days)


PAINTING & DECORATION
i ii iii
Special
Items Price (Rs) Skilled Price (Rs) Unskilled Price (Rs)
Skilled

7.16 Varnishing two coats with copal vanish after


0.50 1000.00 0.50 600.00
sand papering (10m²).

7.17 Wax polishing to timber in panels & floors


0.40 1000.00
(10m²).
BACK TO CONTENTS PAGE
(2) Materials
i ii iii iv v
Wood Anti- Primer Mineral Enamel Anti-corrosive
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Price (Rs)
Preservative corrosive turpentine Paint Paint
Ltr. Ltr. Ltr. Ltr. Ltr.

2.95 240.00

2.42 0.16

0.22 0.22 1.43

3.23 0.43 1.43

0.72

2.44 240.00

0.81 2.69

(2) Materials
i ii iii iv v
Yellow
Boiled lime Price (Rs) Cement Price (Rs) Salt Price (Rs) Price (Rs) Blue Price (Rs)
Ochre

50Kg 50Kg lbs lbs Ozs

0.50 0.00 2.00 0.50 2.00

0.50 0.00 2.00 0.50 2.00

0.63 735.00

(2) Materials
i ii iii iv v
Wax Flannel
Varnish Price (Rs) Price (Rs) Sand Paper Price (Rs) Price (Rs)
Polish Cloth
Ltr. Ltr. Nr. Yard

1.80 0.00 2.00 20.00

0.75 0.00 6.00 20.00 0.50


s (3) Plant and Machinery
vi vii viii ix i ii
Sand Wire 50mm
Price (Rs) Price (Rs) Price (Rs)
Papers brush brush
Nr. Nr. Nr.

1.00 0.13 250.00

0.20 250.00

1.00 0.40 250.00

0.20 250.00

0.20 250.00

2.00 20.00 0.10 250.00

s (3) Plant and Machinery


vi vii viii ix i ii
150mm
Primer/ Emulsion Sand 150mm
Water Price (Rs) Price (Rs) Price (Rs) Price (Rs) Price (Rs) Coir Price (Rs)
Filler paint Paper brush
brush
gls. Ltr. Ltr. Nr. Nr. Nr.

10.00 0.00 0.33 710.00

10.00 0.00 0.33 710.00

0.10 0.00 0.90 1.40 645.00 2.00 20.00 0.10 710.00

0.90 1.50 645.00 0.10 710.00

0.10 0.00 0.90 1.40 840.00 2.00 20.00 0.10 710.00

5.00 0.00 1.00

0.10 0.00 1.40 645.00 0.10 710.00

s (3) Plant and Machinery


vi vii viii ix i ii
75mm Floor
Price (Rs) Price (Rs)
brush Brush
Nr. Nr.

0.33 0.00

0.10
(3) Plant and Machinery
iii v Basic labour Basic Basic Plant Basic Total
75mm Cost Material Cost Cost Cost
Price (Rs) Scaffolding Price (Rs)
brush
Nr. % of (1)

0.10 1134.00 708.00 0.00 1842.00

2576.00 0.00 31.25 2607.25

0.03 3338.00 3338.00 0.00 150.14 3488.14

2046.00 0.00 100.00 2146.00

1610.00 0.00 50.00 1660.00

540.00 585.60 50.00 1175.60

1934.00 40.00 25.00 1999.00

(3) Plant and Machinery


iii iv
Basic labour Basic Basic Plant Basic Total
Cost Material Cost Cost Cost
Basic labour Basic Basic Plant Basic Total
Cost Material Cost Cost Cost
Scaffolding Price (Rs)

% of (1)

0.03 4000.00 4000.00 0.00 354.30 4354.30

0.03 4800.00 4800.00 0.00 378.30 5178.30

0.03 1250.00 1250.00 943.00 108.50 2301.50

0.03 1750.00 1750.00 967.50 123.50 2841.00

0.03 1250.00 1250.00 1216.00 108.50 2574.50

0.03 3200.00 3200.00 463.05 96.00 3759.05

0.03 750.00 750.00 903.00 93.50 1746.50

(3) Plant and Machinery


iii iv Basic labour Basic Basic Plant Basic Total
Cost Material Cost Cost Cost
Scaffolding Price (Rs)

% of (1)

0.03 800.00 800.00 40.00 24.00 864.00

400.00 120.00 0.00 520.00


8. ROOFING

Labour Rates

Special skilled labour (Carpenter) Rs 1000.00


Skilled labour Rs 800.00
Unskilled labour Rs 600.00

(1) Labour (days)


ROOFING
i ii iii
Special
Items Skilled
Price (Rs) Skilled Price (Rs) Unskilled Price (Rs)

8.1 Timber frame work for calicut pattern tile


hip Roof in single storey building
consisting of wall plate beam, ridge plate,
rafters etc. (preservative treatment to be 7.53 Rs 1000.00 8.60 600.00
measured separately). (60m²).

8.2 Roof covering with calicut pattern clay


tiles in single storeyed building (Timber
frame work & ridge covering measured 3.23 Rs 1000.00 3.23 600.00
separately). (60m²).

8.3 Timber frame work for corrugated


asbestos sheet Roof in single storeyed 2.69 Rs 1000.00 3.23 600.00
building (36m²).

8.4 Roof covering with corrugated asbestos


sheets (Timber frame work & ridge
covering measured separately). (36m²). 1.08 Rs 1000.00 2.15 600.00

8.5 Roof covering One layer half round clay


tiles over corrugated asbestos (10m²). 2.15 600.00

8.6 Asbestos close fittings ridge fixed


complete with Roofing screws or bolts
(hook) (4m). Length of a ridge -3' 8" and 0.25 Rs 1000.00 0.25 600.00
length of lap - 3.5"

(1) Labour (days)


ROOFING
i ii iii
Special
Items Skilled
Price (Rs) Skilled Price (Rs) Unskilled Price (Rs)

8.7 Ridge covering with calicut pattern ridge


tiles bedded in cement lime mortar 1:1:4 0.25 Rs 1000.00 0.25 600.00
(3.65m).

8.8 19 X 225mm high valance board fixed


with brass screws to ends of rafters (for 2.95 Rs 1000.00 2.95 600.00
tiles roofing) (30m).

8.9 19 X 225mm high barge board fixed with


brass screws at 600mm centres to sides 2.95 Rs 1000.00 2.95 600.00
of rafters (30m)

BACK TO CONTENTS PAGE


(2) Materials
i ii iii iv v
50 X 25mm Wire Nails Wire Nails
Timber Price (Rs) Price (Rs) Roof Tiles Price (Rs) Price (Rs) Price (Rs)
reeper 6" long 2" long
m³ m Nr. Kg. Kg.

1.14 0.00 227.00 10.00 3.90 140.00 0.97 140.00

807.00 0.00

0.45 60000.00

(2) Materials
i ii iii iv v
Colouring
Ridge tiles Price (Rs) Cement Price (Rs) Sand Price (Rs) Slaked lime Price (Rs) Price (Rs)
powder
Nr. 50Kg. m³ Kg. Kg.

9.00 0.00 0.35 735.00 0.06 2300.00 6.75 575.00 0.25


Materials (3) P
vi vii viii ix i
Asbes. Corrugated Roofing screws & Half round 1.12m long
Price (Rs) Price (Rs) Price (Rs) Price (Rs)
sheets washer clay tiles Ridges
m² Nr. Nr. Pair

42.00 460.00 78.00 8.00

700.00 0.00

16.00 8.00 4.00 0.00

(2) Materials (
vi vii viii ix i
38mm brass
25mm planks Price (Rs) Price (Rs)
screws
m² Nr.

7.30 70.00 0.00

7.30 50.00 0.00


(3) Plant and Machinery
i ii iii Basic labour Basic Material Basic Plant Basic Total
Tools Cost Cost Cost Cost
Price (Rs) Scaffolding Price (Rs)
Etc.
% of (1)

0.03 12690.00 12690.00 2951.80 380.70 16022.50

0.03 5168.00 5168.00 0.00 155.04 5323.04

0.03 4628.00 4628.00 27000.00 138.84 31766.84

0.03 2370.00 2370.00 19944.00 71.10 22385.10

0.03 1290.00 1290.00 0.00 38.70 1328.70

0.03 400.00 400.00 128.00 12.00 540.00

(3) Plant Etc.


i ii iii Basic labour Basic Material Basic Plant Basic Total
Cost Cost Cost Cost
Basic labour Basic Material Basic Plant Basic Total
Tools Cost Cost Cost Cost
Price (Rs) Scaffo-ldings Price (Rs)
Etc.
% of (1) % of (1)

0.03 400.00 400.00 4276.50 12.00 4688.50

0.03 4720.00 0.05 4720.00 4720.00 0.00 377.60 5097.60

0.03 4720.00 0.05 4720.00 4720.00 0.00 377.60 5097.60


9. GUTTERS AND DOWNPIPES

Labour Rates

Special skilled labour Rs 1000.00


Skilled labour Rs 800.00
Unskilled labour Rs 600.00

(1) Labour (days)


GUTTERS AND DOWNPIPES
i ii iii
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

9.1 Half round PVC eaves gutter 150mm dia


fixed to timber valance board including
gutter joiner and brackets fixed at 450mm
0.50 Rs 1000.00 0.50
centres (Other specials paid separately)
(8m).

9.2 PVC gutter head, 150mm dia (1 Nr.). 0.13 Rs 1000.00 0.13

9.3 PVC mitres, 150mm dia (1 Nr.). 0.13 Rs 1000.00 0.13

9.4 PVC end caps, 150mm dia (1 Nr.). 0.06 Rs 1000.00 0.06

(1) Labour (days)


GUTTERS AND DOWNPIPES
i ii iii
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

9.5
PVC rain water down pipes, 87mm dia
fixed to brick wall with wooden plugs 0.33 Rs 1000.00 0.33
buried in wall (specials paid separately)
(8m).

9.6 PVC elbow, 87mm dia 0.06 Rs 1000.00 0.06

9.7 PVC shoe, 87mm dia 0.06 Rs 1000.00 0.06

BACK TO CONTENTS PAGE


(2) Materials
iii i ii iii iv
150mm Gutter 19mm Brass Solvent
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Price (Rs)
Gutter Brackets screws cement
m Nr Nr. Grams

Rs 600.00 8.00 17.00 34.00 20.00

Rs 600.00 4.00 12.00

Rs 600.00 4.00 12.00

Rs 600.00 12.00

(2) Materials
iii i ii iii iv
88mm dia 88mm dia 25mm Brass
Price (Rs) Price (Rs) Price (Rs) PVC straps Price (Rs) Price (Rs)
pipes jointer screws
m Nr Nr. Nr.

Rs 600.00 8.00 1.00 4.00 8.00

Rs 600.00

Rs 600.00
(2) Materials (3) Plant a
v vi vii viii ix i
PVC gutter Gutter Gutter Mitre
Price (Rs) Price (Rs) Price (Rs) Price (Rs) End caps Price (Rs)
head jointer Brackets Bend
Kg. m² Nr. Nr. Nr

1.00

1.00 2.00 2.00

2.00 2.00 1.00

1.00

(2) Materials (3) Plant a


v vi vii viii ix i
Solvent 60/80 60/80
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Price (Rs)
cement elbow shoe
Grams Nr Nr.

30.00

32.00 1.00

15.00 1.00
(3) Plant and Machinery
i ii iii
Basic labour Basic Material Basic Plant Basic Total
Tools Cost Cost Cost Cost
Price (Rs) Scaffolding Price (Rs)
Etc.
% of (1) % of (1)

0.03 800.00 0.05 800.00 800.00 0.00 64.00 864.00

0.03 208.00 0.05 208.00 208.00 0.00 16.64 224.64

0.03 208.00 0.05 208.00 208.00 0.00 16.64 224.64

0.03 96.00 0.05 96.00 96.00 0.00 7.68 103.68

(3) Plant and Machinery


i ii iii Basic labour Basic Material Basic Plant Basic Total
Tools Cost Cost Cost Cost
Price (Rs) Scaffolding Price (Rs)
Etc.
% of (1) % of (1)

0.03 528.00 0.05 528.00 528.00 0.00 42.24 570.24

0.03 96.00 0.05 96.00 96.00 0.00 7.68 103.68

0.03 96.00 0.05 96.00 96.00 0.00 7.68 103.68


10. PLUMBING

Labour Rates

Special skilled labour Rs 1000.00


Skilled labour Rs 800.00
Unskilled labour Rs 500.00

10.1 GENERAL PLUMBING

(1) Labour (days)


PLUMBING
i ii iii

Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

10.1.1 PVC pipes, 20mm Dia fixed to walls


(specials paid separately) (3m). 0.13 Rs 1000.00 0.13

10.1.2 PVC pipes, 25mm Dia fixed to walls


(specials paid separately) (3m). 0.13 Rs 1000.00 0.13

10.1.3 PVC pipes, 30mm Dia fixed to walls


(specials paid separately) (30m). 0.50 Rs 1000.00 0.50

(1) Labour (days)


PLUMBING
i ii iii

Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

10.1.4 PVC pipes, 40mm Dia fixed to walls


(specials paid separately) (30m). 0.75 Rs 1000.00 0.75

10.1.5 PVC pipes, 50mm Dia fixed to walls


(specials paid separately) (30m). 0.75 Rs 1000.00 0.75

(1) Labour (days)


PLUMBING
i ii iii

Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled
10.1.6 PVC pipes, 63mm Dia fixed to walls
(specials paid separately) (30m). 0.75 Rs 1000.00 0.75

10.1.7 PVC pipes, 90mm Dia fixed to walls


(specials paid separately) (30m). 1.00 Rs 1000.00 1.00

10.1.8 PVC pipes, 110mm Dia fixed to walls


(specials paid separately) (30m). 1.00 Rs 1000.00 1.00

10.1.9
Excavation for laying 20mm to 90mm
diameter PVC pipes in ground not less 2.20
than 450mm deep, back filing &
compacting (30m).

(1) Labour (days)


PLUMBING
i ii iii
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

10.1.10
Chasing brick work for laying 20mm to
50mm dia PVC pipes and making good 2.95 Rs 800.00 2.95
average depth 50mm (pipes & specials
paid separately) (30m).

10.1.11
Chasing brick work for laying 50mm to
90mm dia PVC pipes in ground or floor & 3.45 Rs 800.00 3.45
making good average depth 75mm - ditto
- (30m).

(1) Labour (days)


PLUMBING
i ii iii
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

10.1.12 PVC specials, 20mm dia viz-


elbows/bends/sockets (10 Nos) 0.25 Rs 1000.00

10.1.13 PVC specials, 25mm dia viz-


elbows/bends/sockets (10 Nos) 0.25 Rs 1000.00

10.1.14 PVC specials, 32mm dia viz-


elbows/bends/sockets (10 Nos) 0.25 Rs 1000.00
10.1.15 PVC specials, 40mm dia viz-
elbows/bends/sockets (10 Nos) 0.25 Rs 1000.00

10.1.16 PVC specials, 50mm dia viz-


elbows/bends/sockets (10 Nos) 0.50 Rs 1000.00

10.1.17 PVC specials, 63mm dia viz-


elbows/bends/sockets (10 Nos) 0.50 Rs 1000.00

10.1.18 PVC specials, 75mm dia viz-


elbows/bends/sockets (10 Nos) 0.50 Rs 1000.00

10.1.19 PVC specials, 90mm dia viz-


elbows/bends/sockets (10 Nos) 0.50 Rs 1000.00

(1) Labour (days)


PLUMBING
i ii iii
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

10.1.20 PVC specials, 20mm dia viz - Tee (10


Nos) 0.5 Rs 1000.00

10.1.21 PVC specials, 25mm dia viz - Tee (10


Nos) 0.50 Rs 1000.00

10.1.22 PVC specials, 32mm dia viz - Tee (10


Nos) 0.50 Rs 1000.00

10.1.23 PVC specials, 40mm dia viz - Tees (10


Nos) 0.50 Rs 1000.00

10.1.24 PVC specials, 50mm dia viz - Tees (10


Nos) 1.00 Rs 1000.00

10.1.25 PVC specials, 63mm dia viz - Tees (10


Nos) 1.00 Rs 1000.00

10.1.26 PVC specials, 75mm dia viz - Tees (10


Nos) 1.00 Rs 1000.00

10.1.27 PVC specials, 90mm dia viz - Teess (10


Nos) 1.00 Rs 1000.00
10.2 ROOF PLUMBING

(1) Labour (days)


PLUMBING
i ii iii
Special Skilled
Items Price (Rs) Price (Rs) Unskilled
Skilled (Tinker)

10.2.1

18 B.W.G. (1.2mm) galvanized iron


sheet valley gutter 900mm girth overall 1.48 Rs 1000.00 0.25 Rs 800.00 1.97
once bend with end caps not less than
225mm with including 25mm tongued &
grooved planks laid to slope and profile on
timber members (4.5m).

10.2.2

18 B.W.G. (1.2mm) galvanized iron


flashing 450mm girth overall 3 times bend
with end caps not less than 150mm lead 0.49 Rs 1000.00 0.12 Rs 800.00 0.75
soldered, turned and tacked up to not less
than 150mm in to chase cut in wall &
pointed in cement mortar 1:2 lower end
dressed over Roof covering not less than
300mm wide (4.5m).

BACK TO CONTENTS PAGE


(2) Materials
iii i ii iii iv

20mm 20mm clips &


Price (Rs) Price (Rs) 25mm Pipes Price (Rs) 30mm Pipes Price (Rs) Price (Rs)
Pipes nails

m Nr Nr. Grams

Rs 500.00 3.90 3.00

Rs 500.00 3.90

Rs 500.00 32.00

(2) Materials
iii i ii iii iv

40mm 40mm clips


Price (Rs) Price (Rs) 40mm sockets Price (Rs) Price (Rs) 50mm pipes Price (Rs)
Pipes & nails

m Nr Nr. m

Rs 500.00 32.00 8.00 35.00

Rs 500.00 32.00

(2) Materials
iii i ii iii iv

63mm 63mm clips


Price (Rs) Price (Rs) 63mm sockets Price (Rs) Price (Rs) 90mm pipes Price (Rs)
Pipes & nails
m Nr Nr. m

Rs 500.00 32.00 8.00 35.00

Rs 500.00 32.00

Rs 500.00 32.00

Rs 500.00

(2) Materials
iii i ii iii iv

Price (Rs) Cement Price (Rs) Sand Price (Rs)

Bags m3

Rs 500.00 0.10 0.03

Rs 500.00 0.20 0.08

(2) Materials
iii i ii iii iv
20mm 25mm 32mm 40mm
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Price (Rs)
special specials specials specials
Nr. Nr. Nr. Nr.

10.00

10.00

10.00
10.00

(2) Materials
iii i ii iii iv

Price (Rs) 20mm Tee Price (Rs) 25mm Tee Price (Rs) 32mm Tee Price (Rs) 40mm Tee Price (Rs)

Nr. Nr. Nr. Nr.

10.00

10.00

10.00

10.00
(2) Materials
iii i ii iii iv
Wood
Price (Rs) G.I. Sheets Price (Rs) Price (Rs) Cement Price (Rs) Slaked lime Price (Rs)
presevative
m2 ltr Bags Bags

Rs 500.00 5.85 1.12 0.10 0.05

Rs 500.00 2.93 0.05


(2) Materials
v vi vii viii ix

25mm clips & 30mm clips 32mm Solvent


Price (Rs) Price (Rs) Price (Rs) Price (Rs)
nails & nails sockets Cement

Kg. m² Nr. Grams

2.00

3.00 3.00

35.00 8.00 32.00

(2) Materials
v vi vii viii ix

50mm 50mm clips Solvent


Price (Rs) Price (Rs) Price (Rs)
sockets & nails cement

Nr. Nr. Grams

64.00

8.00 35.00 64.00

(2) Materials
v vi vii viii ix

90mm 90mm clips Solvent


Price (Rs) Price (Rs) Price (Rs)
sockets & nails cement
Nr Nr. Grams

112.00

8.00 35.00 200.00

8.00 35.00 300.00

(2) Materials
v vi vii viii ix
Solvent
Price (Rs)
cement
Grams

(2) Materials
v vi vii viii ix
50mm 63mm 75mm 90mm Solvent
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Price (Rs)
specials specials specials special cement
Nr. Nr. Nr. Nr. Grams

20

30

40
60

10.00 80

10.00 140

10.00 200

10.00 240

(2) Materials
v vi vii viii ix
Solvent
50mm Tee Price (Rs) 63mm Tee Price (Rs) 75mm Tee Price (Rs) 90mm Tee Price (Rs) Price (Rs)
cement
Nr. Nr. Nr. Nr. Grams

30

45

60

90

10.00 120

10.00 210

10.00 300

10.00 360
(2) Materials
v vi vii viii ix
38mm wire Soldering
Sand Price (Rs) Planks Price (Rs) Price (Rs) Price (Rs)
nails lead
m3 m² Kg Kg

0.03 4.57 0.89

0.03 0.45
(3) Plant and Machinery
i ii iii
Basic labour Basic Material Basic Plant
Tools Cost Cost Cost
Price (Rs)
Etc.

% of (1)

0.03 195.00 195.00 0.00 5.85

0.03 195.00 195.00 0.00 5.85

0.03 750.00 750.00 0.00 22.50

(3) Plant and Machinery


i ii iii
Basic labour Basic Material Basic Plant
Tools Cost Cost Cost
Price (Rs)
Etc.

% of (1)

0.03 1125.00 1125.00 0.00 33.75

0.03 1125.00 1125.00 0.00 33.75

(3) Plant and Machinery


i ii iii
Basic labour Basic Material Basic Plant
Tools Cost Cost Cost
Price (Rs)
Etc.
% of (1)

0.03 1125.00 1125.00 0.00 33.75

0.03 1500.00 1500.00 0.00 45.00

0.03 1500.00 1500.00 0.00 45.00

0.03 1100.00 1100.00 0.00 33.00

(3) Plant and Machinery


i ii iii Basic labour Basic Material Basic Plant
Tools Cost Cost Cost
Price (Rs)
Etc.
% of (1)

0.03 3835.00 3835.00 0.00 115.05

0.03 4485.00 4485.00 0.00 134.55

(3) Plant and Machinery


i ii iii Basic labour Basic Material Basic Plant
Tools Cost Cost Cost
Price (Rs)
Etc.
% of (1)

0.03 250.00 250.00 0.00 7.50

0.03 250.00 250.00 0.00 7.50

0.03 250.00 250.00 0.00 7.50


0.03 250.00 250.00 0.00 7.50

0.03 500.00 500.00 0.00 15.00

0.03 500.00 500.00 0.00 15.00

0.03 500.00 500.00 0.00 15.00

0.03 500.00 500.00 0.00 15.00

(3) Plant and Machinery


i ii iii Basic labour Basic Material Basic Plant
Tools Cost Cost Cost
Price (Rs)
Etc.
% of (1)

0.03 500.00 500.00 0.00 15.00

0.03 500.00 500.00 0.00 15.00

0.03 500.00 500.00 0.00 15.00

0.03 500.00 500.00 0.00 15.00

0.03 1000.00 1000.00 0.00 30.00

0.03 1000.00 1000.00 0.00 30.00

0.03 1000.00 1000.00 0.00 30.00

0.03 1000.00 1000.00 0.00 30.00


(3) Plant and Machinery
i ii iii Basic labour Basic Material Basic Plant
Tools Cost Cost Cost
Price (Rs)
Etc.
% of (1)

0.03 2665.00 2665.00 0.00 79.95

0.03 961.00 961.00 0.00 28.83


Basic Total
Cost

200.85

200.85

772.50

Basic Total
Cost

1158.75

1158.75

Basic Total
Cost
1158.75

1545.00

1545.00

1133.00

Basic Total
Cost

3950.05

4619.55

Basic Total
Cost

257.50

257.50

257.50
257.50

515.00

515.00

515.00

515.00

Basic Total
Cost

515.00

515.00

515.00

515.00

1030.00

1030.00

1030.00

1030.00
Basic Total
Cost

2744.95

989.83
11. SANITARY FITTINGS

Labour Rates

Special skilled labour Rs 1000.00


Skilled labour Rs 800.00
Unskilled labour Rs 500.00

(1) Labour (days)


SANITARY FITTINGS
i ii iii

Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

11.1

Wash basin, 550 X 400mm glazed fireclay


with 20mm diameter chromium plated
pillar tap, waste plug, chromium plated 0.50 Rs 800.00 1.00
waste chain and stay, including fixing
wash basin on brackets (water supply &
waste water connection measured
separately) (1 Nr.).

(1) Labour (days)


SANITARY FITTINGS
i ii iii

Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

11.2

Sink, 600x375x175mm overall vitreous


china with rubber plug and chromium 0.50 800.00 0.50
plate & chain waste carried on iron
brackets painted & fixed to walls (water
supply & waste water connection
measured separately) (1 Nr.)

11.3
Closet, pedestal type with L/L flushing
cistern, flush pipe double plastic seat
cover, 20mm diameter stop cock, trap 1.00 1000.00 0.25 800.00 1.00
supplied & fixed complete to working
order (1 Nr.).

(1) Labour (days)


SANITARY FITTINGS
SANITARY FITTINGS
i ii iii

Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

11.4
Closet, Squatting type with trap including
high level cistern fixed complete with flush 1.00 1000.00 0.50 800.00 1.00
pipe and 20mm diameter stop cock, all
complete with working order.(1 Nr)

(1) Labour (days)


SANITARY FITTINGS
i ii iii
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

11.5 Bidet suite, vitreous china fixed complete


1.00 1000.00 1.00
to working order (1Nr.).

11.6
Urinal, Bowl type with trap and 9 Ltre
capacity automatic flushing cistern and 1.00 1000.00 0.25 800.00 1.00
spreaders complete to working order (4
Nr.).

BACK TO CONTENTS PAGE


(2) Material
iii i ii iii

Wash basin Waste plug


Price (Rs) Price (Rs) 20mm tap Price (Rs) Price (Rs)
including brackets and chain

Nr Nr Nr.

Rs 500.00 1.00 1.00 1.00

(2) Material
iii i ii iii

Price (Rs) Sink Price (Rs) "L" iron brackets Price (Rs) Cement Price (Rs)

Nr Nr Nr.

Rs 500.00 1.00 2.00 0.91

Rs 500.00 0.91

(2) Material
iii i ii iii

Squatting pan with Cistern, 40mm dia. flush pipe,


Price (Rs) Price (Rs) Price (Rs) Clips Price (Rs)
trap chain & over flow pipe

Rs 500.00 1.00 1.00 1.00

(2) Material
iii i ii iii

Price (Rs) Bidet Price (Rs) Urinal bowls Price (Rs) 9 Ltr. Cistern Price (Rs)

Rs 500.00 1.00

Rs 500.00 4.00 1.00


(2) Materials
iv v vi vii viii

38mm brass
Wooden plugs Price (Rs) Price (Rs) Cement Price (Rs)
screws

Nr Nr Bags

4.00 6.00 0.91

(2) Materials
iv v vi vii viii

50mm thk tapered 38mm brass Low level suite 20mm stop
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Sand
wooden blocks screws complete cock

Nr Nr Bags

2.00 8.00

2.00 1.00 1.00 0.01

(2) Materials
iv v vi vii viii

38mm brass
Wooden plugs Price (Rs) Price (Rs) 20mm stop cocks Price (Rs) Cement Price (Rs) Metal
screws

5.00 12.00 1.00 0.25 0.02

(2) Materials
iv v vi vii viii
38mm brass
Rawl plugs Price (Rs) Spreader Price (Rs) Wooden plugs Price (Rs) Price (Rs) Cement
screws

8.00 1.00 4.00 4.00 1.81


(3) Plant and Machinery
viii ix i ii iii
Basic labour
Tools Cost
Price (Rs)
Etc.

% of (1)

0.03 900.00 900.00

(3) Plant and Machinery


viii ix i ii iii
Basic labour
Tools Cost
Price (Rs) Price (Rs)
Etc.

% of (1)

0.03 650.00 650.00

0.03 1700.00 1700.00

(3) Plant and Machinery

Basic labour
Cost
viii ix i ii iii
Basic labour
Tools Cost
Price (Rs) Sand Price (Rs) Price (Rs)
Etc.

0.01 0.03 1900.00 1900.00

(3) Plant and Machinery


viii ix i ii iii Basic labour
Tools Cost
Price (Rs) Sand Price (Rs) Price (Rs)
Etc.

0.03 1500.00 1500.00

0.01 0.03 1700.00 1700.00


Basic Material Basic Plant Basic Total
Cost Cost Cost

0.00 27.00 927.00

Basic Material Basic Plant Basic Total


Cost Cost Cost

0.00 19.50 669.50

0.00 51.00 1751.00

Basic Material Basic Plant Basic Total


Cost Cost Cost
Basic Material Basic Plant Basic Total
Cost Cost Cost

0.00 57.00 1957.00

Basic Material Basic Plant Basic Total


Cost Cost Cost

0.00 45.00 1545.00

0.00 51.00 1751.00


12. IRON MONGERY

Labour Rates

Special skilled labour Rs 1000.00


Skilled labour Rs 800.00
Unskilled labour Rs 500.00

(1) Labour (days)


IRON MONGERY
i ii iii

Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

12.1 Butt hinges 125 X 63mm (3Nr.) 0.25 Rs 1000.00 0.25

12.2 Tee hinges (2Nr.) 0.25 Rs 1000.00 0.25

12.3 Rim lock (1Nr.) 0.25 Rs 1000.00 0.25

12.4 Mortice lock (1Nr.) 0.50 Rs 1000.00 0.50

12.5 Casement stays (4Nr.) 0.25 Rs 1000.00 0.25

(1) Labour (days)


IRON MONGERY
i ii iii
Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

12.6 Door closer (Hydranlic) (1Nr.) 0.25 Rs 1000.00 0.25

12.7 Tower/skeleton brass bolts (1Nr.) 0.06 Rs 1000.00 0.06

12.8 Barrel bolt 100mm (1Nr.) 0.06 Rs 1000.00 0.06

12.9 Casement fasteners (6Nr.) 0.06 Rs 1000.00 0.06

12.10 Spring loaded fanlight catches (6Nr.) 0.06 Rs 1000.00 0.06

12.11 Draw rings (6Nr.). 0.13 Rs 1000.00 0.13


(2) Materials
iii i ii iii iv

125x 63mm Butt 150x 300 mm Tee Rim lock with Mortice lock with
Price (Rs) Price (Rs) Price (Rs) Price (Rs)
Hinges Hinges screws screws

Nr Nr Nr. Nr

Rs 500.00 3.00

Rs 500.00 2.00

Rs 500.00 1.00

Rs 500.00 1.00

Rs 500.00

(2) Materials
iii i ii iii iv
Door closer Tower skeleton 100mm Casement
Price (Rs) Price (Rs) Price (Rs) Price (Rs)
(Hydrolic) brass bolts barrel bolt fasteners
Nr Nr Nr. Nr

Rs 500.00 1.00

Rs 500.00 1.00

Rs 500.00 1.00

Rs 500.00 6.00

Rs 500.00

Rs 500.00
(2) Materials
iv v vi vii viii

12mm Brass 19mm Iron 19mm Brass


Price (Rs) Casement stay Price (Rs) Price (Rs) Price (Rs) Price (Rs)
screws screws screws

Nr Nr Nr Nr

24.00

18.00

4.00 16.00

(2) Materials
iv v vi vii viii
12mm Brass 19mm Brass Brass fan light
Price (Rs) Price (Rs) Price (Rs) Price (Rs) Draw rings Price (Rs)
screws screws catches
Nr Bags

8.00

10.00

8.00

24.00

24.00 6.00

12.00 6.00
(3) Plant and Machinery
ix i ii iii
Basic labour Basic Material
Tools Cost Cost
Price (Rs)
Etc.

% of (1)

0.03 375.00 375.00 0.00

0.03 375.00 375.00 0.00

0.03 375.00 375.00 0.00

0.03 750.00 750.00 0.00

0.03 375.00 375.00 0.00

(3) Plant and Machinery


ix i ii iii Basic labour Basic Material
Tools Cost Cost
Price (Rs)
Etc.
% of (1)

0.03 375.00 375.00 0.00

0.03 90.00 90.00 0.00

0.03 90.00 90.00 0.00

0.03 90.00 90.00 0.00

0.03 90.00 90.00 0.00

0.03 195.00 195.00 0.00


Basic Plant Basic Total
Cost Cost

11.25 386.25

11.25 386.25

11.25 386.25

22.50 772.50

11.25 386.25

Basic Plant Basic Total


Cost Cost

11.25 386.25

2.70 92.70

2.70 92.70

2.70 92.70

2.70 92.70

5.85 200.85
13. DOORS AND WINDOWS

Labour Rates

Special skilled labour Rs 1000.00


Skilled labour Rs 800.00
Unskilled labour Rs 500.00

(1) Labour (days)


DOORS AND WINDOWS
i ii iii

Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

13.1 Door, single hung 975 X 2100mm high


overall with frame having 31mm thick
sash and 94 X 69mm timber frame
(glazing, iron mongery & painting 5.00 1000.00 1.50
measured separately) (2.10m²).

13.2 Door, glazed & panelled double hung


1200x2100mm high overall with frame
including 38mm thick sash and 94x69mm
timber frame (glazing iron mongery & 6.00 1000.00 2.00
painting measured separately) (2.60m²).

13.3 Plywood door, single hung 938 X


2088mm overall with frame having 31mm
thick sash and 94x69mm frame (Iron- 0.75 Rs 1000.00 0.25 Rs 800.00 0.63
mongery and painting measured
separately). (2.02m²)

(1) Labour (days)


DOORS AND WINDOWS
i ii iii

Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

13.4 Door ledged, braced & battened single


hung 750 X 1950mm overall, with frame
having 22mm thick tongued & grooved
planks & 94 X 69mm frame (Iron mongery
2.25 1000.00 0.25 800.00 1.25
& painting measured separately) (1.51m²).
13.5 Window, glazed 2100 X 1200mm high
overall with frame comprising 3 Nr.
openable sashes and 94 X 69mm frame
& mullions.(glazing, iron mongery and 6.00 1000.00 0.50 800.00 3.00
painting measured separately). (2.6m²).

(1) Labour (days)


DOORS AND WINDOWS
i ii iii

Special
Items Price (Rs) Skilled Price (Rs) Unskilled
Skilled

13.4 3mm clear sheet glass panes exceeding


0.09 but not exceeding 0.38m² cut and
fixed with timber beadings to doors &
windows (consider sash 900 X 1200mm
0.50 1000.00 0.50
high with 75 X 31mm style & 4 Nos. glass
panes). (0.84m²)
(2) Materials
iii i ii iii iv

100 X 75mm Spear Fibre/ Plastic 100mm long


Price (Rs) Price (Rs) Price (Rs) Price (Rs) Price (Rs)
Timber stones plugs Brass screws

m³ Nr Nr. Nr

Rs 500.00 0.04 2.00 6.00 6.00

Rs 500.00 0.05 2.00 6.00 6.00

Rs 500.00 0.05 2.00 6.00 6.00

(2) Materials
iii i ii iii iv

100 X 75mm Spear Fibre/ Plastic 100mm long


Price (Rs) Price (Rs) Price (Rs) Price (Rs) Price (Rs)
Timber stones plugs Brass screws

m³ Nr Nr. Nr

Rs 500.00 0.05 2.00 6.00 6.00


Rs 500.00 0.09 4.00 4.00

(2) Materials
iii i ii iii iv
12x
3mm
12mm
Price (Rs) thick glass Price (Rs) Price (Rs) Brass panel pins Price (Rs)
bead-
panes
ings
m³ Nr Nr.

Rs 500.00 0.84 9.14 48.00


(2) Materials
v vi vii viii ix
2025 X
16mm M.S. dowels 38mm thick 25mm thick 825mm
Price (Rs) Price (Rs) Price (Rs) Price (Rs)
100mm long planks planks plywood
sash
Nr m² m² Nr

2.00 1.30 0.47

2.00 1.49 0.65

1.00

(2) Materials
v vi vii viii ix

16mm M.S. dowels 25mm thick 31mm long 75 X 38mm


Price (Rs) Price (Rs) Price (Rs) Price (Rs)
100mm long planks Brass Screws timber

Nr m² m² Nr

2.00 1.95 36.00


0.86

(2) Materials
v vi vii viii ix
(3) Plant and Machinery
ix i ii iii
Basic labour Basic Material
Tools Cost Cost
Price (Rs)
Etc.

% of (1)

0.03 5750.00 5750.00 0.00

0.03 7000.00 7000.00 0.00

0.03 1265.00 1265.00 0.00

(3) Plant and Machinery


ix i ii iii
Basic labour Basic Material
Tools Cost Cost
Price (Rs)
Etc.

% of (1)

0.03 3075.00 3075.00 0.00


0.03 7900.00 7900.00 0.00

(3) Plant and Machinery


ix i ii iii
Basic labour Basic Material
Tools Cost Cost
Price (Rs)
Etc.

% of (1)

0.03 750.00 750.00 0.00


Basic Plant Basic Total
Cost Cost

172.50 5922.50

210.00 7210.00

37.95 1302.95

Basic Plant Basic Total


Cost Cost

92.25 3167.25
237.00 8137.00

Basic Plant Basic Total


Cost Cost

22.50 772.50
A. HAULING (DATA)

Labour Rates

Unskilled labour Rs 500.00

*WD - Workday

10.1 Hauling using the wheelbarrow

* Volume of the weelbarrow is 0.05m³ Compacted material or 0.07m³ loose material


* Task rate for hauling and tripping only, exclude loading and spreding
* Good haul route is available

Hauling Distance Task Rate No. of Trips


(m) (m³/WD)

0 - 40 10.50 210
40 - 60 8.00 160
60 - 80 6.50 130
80 - 100 5.50 110
100 - 150 4.50 90

10.2 Excavator efficiency

*Excavator efficiency can vary from 35m3 per hour for loose soil to 20m3 per hour for firm soil
*For mucking out rock after drilling and blasting can also be considered as performed at the rate of 20m3 per hour

10.3 Loading and unloading

Loading soil

Manual loading 0.33 labour days per 1m3

Loader 1.00 machine hour per 29.93m3


(Operator and banks man required)

10.4 Transporting
BACK TO CONTENTS PAGE
e rate of 20m3 per hour
B. Drilling and Blasting (Rock excavation)

*Quantity requirement for 32m³ of rock excavation

Item Description Unit Quantity


*Practical data from site

Compressor (250 CFM)


Rock Drill (Hand held)
Drill Bits
Black powder Kg 0.50
Electrical Detonator Nr 42
Normal Detonator Nr 13
Ammonium nitrate Kg 15.40
Dynamite Kg 13.50
Fuse wire m 20.00
Fuel and forge (2% of labour)
Tools (4% of labour)
C. Anti-termite treatement

Possible alternate mixtures to DDT

Copper Naphthenate (5% in 4 to 8 gallons of fuel oil)


Sodium Arsanate (10% in 12 to 20 gallons of water)
Dieldrine (0.3% in 19 gals of water)
D. Headcarrying Details

Rate per 10m


Material name Unit
(Labour Days)

Aggregate (20, 25 mm) m3 0.15


Aggregate (40 mm) m3 0.15
Rubble (225mm X 150mm) m3 0.35
Sand m3 0.13
Cement bag 0.02