Production (Material

Deptt. / Section
Handling)
Procedure No LCE/SOP/MH/07
Lakheri Cement Works
Date Issued
SOP for OPERATION OF EOT Date Last Reviewed
Next Review Due on
Page No 1 of 3

OBJECTIVE :- SOP for OPERATION OF EOT(ELETRICAL OVERHEAD CRANE)

SCOPE :- 1. Application to all persons including Employees, contractors, Labours &


Third party.

2. Location : COAL & GYPSUM GANTRY

RESPONSIBILITY

1. HOD (Production) – Overall responsible for the implement of procedure,


including sanction of manpower. .
2. Incharge (Material Handling) – Responsible for providing tools & material ,
environment for safe working,
3. EOT CRANE OPERATOR

REQUIREMENT

QUALIFICATION OF EOT CRANE OPERATOR –

DESCRIBTION OF EOT CRANE

EOT crane have a) Bridge grinders,b)End carriages c)Hoisting trolley Crab d)Long
travel machinery e) Driver cabi
Production (Material
Deptt. / Section
Handling)
Procedure No LCE/SOP/MH/07
Lakheri Cement Works
Date Issued
SOP for OPERATION OF EOT Date Last Reviewed
Next Review Due on
Page No 2 of 3

EOT CRANE has 3 Mechanism

Lifting Mechanism for Vertically Lifting component consists of trolley frame, lifting
mechanism and trolley traveling mechanism.

Trolley travelling Mechanism Laterally move with LOAD consists of motor, brake,
reducer, coupling, transmission shaft, angle bearing box, wheels and other component
parts.
Crane travelling Mechanism_Lifiting trolley _longitudinal move

EOT crane driver’s cabin: the crane operator work place. Inside equipped with control
device (linkage or cam controller), power protection box, signal equipment and lighting
device

PROCEDURE

Initial inspection checklist

1. All guard fitted


2. Hoist mechanism working

3.ACITIVITY
Warning device in order HAZARDS CONTROL MEASURE
4.1.starting of EOT
Emergency stop operable 1. JERCK
5. Crane light in order
6. Crane rope free from damages
7. Fire extinguisher filled
8. Walkway free from loose material
9. Hoist brake in order
10 Condition of crane
.