Details of field inspection by both Executive Engineers

( Executive Engineer, Division No. 4 of GVC-IV, LMD Colony and Executive Engineer, QC & I, Division No. 7, Karimnagar).

Name of Work : SRSP-Stage-1-Estimate of Repairs on Minors and sub-minors in DBM 1 to DBM-5 of Kakatiya Main
canal, Below L.M.D., SRSP
Estimate Amount : Rs. 27.10 Lakhs Date Of Inspection :

As per Estimate As per Field Observation

S.No Condition/
Description of Work/Struture
Condition Field Remarks
Main Components
Observation

1L-DBM-4 Linning patches from Km.0.000 to


1 B
Km.2.000 L/s and R/s ( 3.835 C/s)

1L-DBM-4 Repairs to Head wall cart bridge/Super


2 B
passage at km 0.090 ( 3.835 C/s)

1L-DBM-4 Repairs to Head wall cart bridge/Super


3 B
passage at km 0.517 ( 3.835 C/s)

1L-DBM-4 Repairs to Head wall cart bridge/Super


4 B
passage at km 1.327 ( 3.835 C/s)

1L-DBM-4 Repairs to Head wall cart bridge/Super


5 B
passage at km 1.427 ( 3.835 C/s)

2L-DBM-4 Linning patches from Km.0.000 to


6 B
Km.2.160 L/s and R/s (6.406 C/s)

2L-DBM-4 Repairs to Head wall cart bridge/Super


7 B
passage at km 0.05 (6.406 C/s)

2L-DBM-4 Repairs to Head wall cart bridge/Super


8 B
passage at km 0.260 (6.406 C/s)

2L-DBM-4 Repairs to Head wall cart bridge/Super


9 B
passage at km 0.400 (6.406 C/s)

2L-DBM-4 Repairs to Head wall cart bridge/Super


10 B
passage at km 0.600 (6.406 C/s)
2L-DBM-4 Repairs to Head wall cart bridge/Super
11 B
passage at km 0.850 (6.406 C/s)

2L-DBM-4 Repairs to Head wall cart bridge/Super


12 B
passage at km 0.980 (6.406 C/s)

1R-DBM-3 Linning patches from Km.0.000 to


13 B
Km.3.000 L/s and R/s (3.683 C/s)

1R-DBM-3 Repairs to Head wall cart bridge/Super


14 B
passage at km 2.509 (3.683 C/s)

1R-DBM-3 Repairs to Head wall cart bridge/Super


15 B
passage at km 2.839 (3.683 C/s)

A.E/A.E.E Dy.Executive Engineer Executive Engineer


Construction Construction Construction

A.E/A.E.E Dy.Executive Engineer Executive Engineer


QC&I/SD1/LMD QC&I/SD1/LMD QC&I/Dvn. 7/KNR
Details of field inspection by both Executive Engineers
( Executive Engineer, Division No. 4 of GVC-IV, LMD Colony and Executive Engineer, QC & I, Division No. 7,
Karimnagar).

Name of Work :Estimate for Repairs to Distributaries from DBM-6 to DBM-7of and their minors and sub minors
Kakathiya main canal below LMD SRSP.
Estimate
Rs. 54.00 Lakhs Date Of Inspection :
Amount :

As per Field Observation

S.No Description of
Remarks by Field
Work/Struture Category Category Condition observed at site
staff
Main Components

1L-of Dbm-6@km0.150
1 D
L/s wall (5.939 C/s)

2L-Repairs to Drop@
2 D
km 0.900 (8.475 C/s)

2L-Repairs to Drop@
3 D
km 1.050 (8.475 C/s)

2L-Repairs to Drop@
4 D
km 1.550 (8.475 C/s)

2L-Repairs to Drop@
5 D
km 2.00 (8.475 C/s)

2L-Repairs to Drop@
6 D
km 2.250 (8.475 C/s)

3L-Repairs to Linning
paches @ km 0.00 to
7 B
2.900
(22.03 C/s)

2R-3L-Repairs to
8 Drop@ km 0.100 (7.582 D
C/s)

7L-Repairs to Drop@
9 D
km 0.550 (2.33 C/s)

7L-Repairs to Drop@
10 km 1.125 D
(2.33 C/s)

8L-Repairs to Linning
paches @ km 0.00
11 B
to1.500
(9.18 C/s)

8L-Repairs toDrop @
12 km 0.175 B
(9.18 C/s)
10L-Repairs to Linning
paches @ km 0.00
13 C
to2.500
(3.39 C/s)

10L-Repairs toDrop @
14 km 2.350 D
(3.39 C/s)

18R-Repairs to Linning
paches @ km 0.00
15 B
to1.700
(7.13 C/s)

21L-Repairs to Linning
paches @ km 0.00
16 B
to1.670
(17.69 C/s)

Reconstruction of
17 SLRBridge of DBM- D
6(main)@km12.150

Reconstruction of Drops
of 2R Hume Pipe
18 D
converted to SLRB @
Km. 0.500

A.E/A.E.E Dy.Executive Engineer Executive Engineer


Construction Construction Construction

A.E/A.E.E Dy.Executive Engineer Executive Engineer


QC&I/SD1/LMD QC&I/SD1/LMD QC&I/Dvn. 7/KNR
Details of field inspection by both Executive Engineers
( Executive Engineer, Division No. 4 of GVC-IV, LMD Colony and Executive Engineer, QC & I, Division No. 7, Karimnagar).

Name of Work : Emergent Repairs to Structures and Lining in Distributories DBM-7B to DBM-13 and their minors , sub-minors
of Kakatiya Main Canal, Below L.M.D., SRSP ( PHASE-II)
Estimate Amount : Rs. 143 Lakhs Date Of Inspection :

As per Estimate As per Field Observation

S.No Condition/
Description of Work/Struture
Condition Field Remarks
Main Components
Observation

Repairs to damaged patches on DBM-7B, DBM -


1 C
7C & DBM-8

2 Reconstruction of DP @KM 0.670 OF DBM-8 D

Reconstruction of DPS @KM 2.612 P3(L/S) &


3 D
P4(R/S) OF DBM-9

Reconstruction of Drops at km 0.11 on 1L,


4 D
KM5.117, KM5.38, KM6.04, on DBM-9 (4 NO.S)

Damaged Lining patch From km 6.350 to km 6.40 on


5 C
DBM-9

6 Pipe Culvert to SLRB @km 4.875 on DBM-9 D

Reconstruction of DPS @KM 2.572 & KM2.763 OF


7 D
DBM-11

Reconstruction of Drops at km 2.852, KM 2.955,


8 D
KM 3.34, KM 3.63 on DBM-11 (4 NO.S)
Pipe Culvert to SLRB@km 1.140 & @km 2.763 on
9 D
DBM-11

10 Pipe Culvert to SLRB @km 0.420 on DBM-12 D

11 Reconstruction of DP @KM0.835 OF DBM-12 D

Damaged Lining patch From km 1.350 to km 1.400


12 C
on DBM-12

New Lining From km 1.575 to km 1.625 on DBM-


13 C
12A

14 SLRB @km 6.99 on DBM-13 D

Reconstruction of Drops at km 6.650, KM 8.125,


15 D
KM 8.200, KM 8.550 on DBM-13 (4 NO.S)

Reconstruction of DPS @KM 7.200 & KM8.64 OF


16 D
DBM-13

Reconstruction of DPS @KM 0.960 & KM1.24 OF


17 D
3L of DBM-13

Reconstruction of Drops at km 0.025, KM0.125,


18 D
KM0.625, KM1.800 on 7R OF DBM- 13(4 NO.S)
Reconstruction of Drops at km 0.012, KM0.020,
19 D
KM0.025, KM2.025 on 9R OF DBM- 13(4 NO.S)

Reconstruction of DPS @KM 0.900 & KM1.525


20 D
OF 9R of DBM-13

Reconstruction of Drops at km 4.125, KM 5.350,


21 D
KM 6.015, KM 7.550 on 6L OF DBM-13 (4 NO.S)

Damaged Lining patch From km 2.00 to km 2.200 on


22 C
6L of DBM-13

Damaged Lining patch From km 0.450 to km 0.500


23 D
on 8L OF 6L of DBM-13

Pipe Culvert to SLRB @km 2.500 on 8L of DBM-


24 D
13

Pipe Culvert to SLRB @km 4.025 on 8L of DBM-


25 D
13

Reconstruction of Drops at km 2.650, KM 3.120,


26 D
KM 5.62, KM 6.200 on 8L OF DBM-13 (4 NO.S)

Reconstruction of DPS @KM 2.900 & KM 6.315


27 D
OF 8L DBM-13

A.E/A.E.E Dy.Executive Engineer Executive Engineer


Construction Construction Construction

A.E/A.E.E Dy.Executive Engineer Executive Engineer


QC&I/SD1/LMD QC&I/SD1/LMD QC&I/Dvn. 7/KNR
Details of field inspection by both Executive Engineers
( Executive Engineer, Division No. 4 of GVC-IV, LMD Colony and Executive Engineer, QC & I, Division No. 7, Karimnagar).

Name of Work : Balance Estimate forEmergent Repairs and Re-construction of Structures and Linings on Distributories incuding
Minors of DBM-14A,DBM-14 and DBM-15 of kakatiya Canal,Below L.M.D ,SRSP
Estimate Amount : Rs. 60 Lakhs Date Of Inspection :

As per Estimate As per Field Observation

S.No Condition/
Description of Work/Struture
Condition Field Remarks
Main Components
Observation

Pipe Culvert to SLRB at km 0.812 on 4L of DBM-


1 D
15 (30 C/s)

Pipe Culvert to SLRB at km 5.410 on 4L of DBM-


2 D
15

Pipe Culvert to SLRB at km 7.900 on 4L of DBM-


3 D
15

Pipe Culvert to SLRB at km 8.250 on 4L of DBM-


4 D
15

5 DP-3 L/S at km 0.500 on 4L of DBM-15 D

6 DP-2 R/S at km 1.900 on 4L of DBM-15 D

7 DP-6 L/S at km 1.950 on 4L of DBM-15 D

8 DP-7 L/S at km 2.00 on 4L of DBM-15 D

9 DP-14 L/S at km 5.00 on 4L of DBM-15 D

Pipe Culvert to SLRB at km 1.45 on 12L of DBM-


10 D
15
Pipe Culvert to SLRB at km 14.565 on 4L of DBM-
11 D
15

A.E/A.E.E Dy.Executive Engineer Executive Engineer


Construction Construction Construction

A.E/A.E.E Dy.Executive Engineer Executive Engineer


QC&I/SD1/LMD QC&I/SD1/LMD QC&I/Dvn. 7/KNR