This document discusses a fiberglass tank recertification program that complies with industry standards. The program provides recertification for all styles, sizes, and manufacturing processes of fiberglass tanks and structures. It recommends inspection intervals of every 5 years for hazardous substance tanks, every 10 years for non-hazardous tanks over 10,000 gallons, and immediate inspection for any signs of distress, leaks, or changes in service or operating conditions. An email address is provided to request a tank inspection checklist.
This document discusses a fiberglass tank recertification program that complies with industry standards. The program provides recertification for all styles, sizes, and manufacturing processes of fiberglass tanks and structures. It recommends inspection intervals of every 5 years for hazardous substance tanks, every 10 years for non-hazardous tanks over 10,000 gallons, and immediate inspection for any signs of distress, leaks, or changes in service or operating conditions. An email address is provided to request a tank inspection checklist.
This document discusses a fiberglass tank recertification program that complies with industry standards. The program provides recertification for all styles, sizes, and manufacturing processes of fiberglass tanks and structures. It recommends inspection intervals of every 5 years for hazardous substance tanks, every 10 years for non-hazardous tanks over 10,000 gallons, and immediate inspection for any signs of distress, leaks, or changes in service or operating conditions. An email address is provided to request a tank inspection checklist.
FIBERGLASS TANKS, STRUCTURES AND COMPONENT RECERTIFICATION PROGRAM
Design of fiberglass tanks
All styles All sizes All laminate constructions All manufacturing processes o Filament wound o Contact molded o Chop and wind o All chop spray
FIBERGLASS TANK RECERTIFICATION PROGRAM
Complies with FRP Tank and Pipe Institute FTPI 2007-1 recommended practice
Send email for FRP tank checklist to jmc@clark-engineers.com
Recommended inspection intervals
Environment/size/condition Interval Hazardous substance 5 years Non-hazardous > 10,000 gal 10 years Evidence of distress Immediate Leaking Immediate Change of service for dissimiliar materials or increase in operating Immediate temperature Tank to be relocated - in service Prior to placing in new site