Beruflich Dokumente
Kultur Dokumente
19MECH20H
PRACTICAL ASSIGNMENT
2020
Module Title
Energy Conversion
Module Leader
Dr. Hesham Safwat
2- (1)Hospital buildings each 800 bed on the four corners of the city
3.- (1) OFFICE buildings each is 4 floors divided on the four districts each floor is one company
5- 100 residential buildings
6- (1) school buildings each 5000 students with 250 Class rooms 50 admirative rooms
7- (1) Mall buildings divided on the four district areas each mall has 200 retail shops, and four floors
Two alternative choices of the below systems is proposed for the city
( one is traditional and the other is with renewable resource) from the below systems:
(1) cogeneration of back pressure steam turbine type
(2) combined cycle.
(3) Gas turbine
(4) Internal combustion engine generatosr
(5) Gas turbine combined with renewable energy system
(6) Solar renewable energy
(7) Wind renewable energy
(1) That utilization factor for the cogeneration if it will be used and not to be less than 59% make your
proposed design
(2) Calculate the thermal efficiency for the actual cycle
(3) Conduct a complete design of the condenser in the combined cycle including cooling tower
pumps( if used) , piping, selection and cost analysis.
(4) Propose your detail design and type for the generator for the city
(5) What is the city electric load , which type would be better and ,implement the size with corrected
values of the above data
(6) calculate the capacity factor and the net heat rate and make a table of cost analysis based on the
data of technical document (electric power generation) attached in the e-learning
(7) Analyze the plant for a partial load in excel sheet for 75%,50%,25% part load Vs. daily, weekly
and ,monthly analysis of the year of the year
Instructions:
1.) This practical problem will be presented by a group work in a 15-pages report supported by
necessary calculations, relevant background information, graphs, tables, and references.
2.) The final outcome of this project will be a report submitted in Week 12 followed by oral discussion
3.) This practical problem is worth 20% of the overall grade for the module.
4.) This practical problem is a team-work and you are required to select your own groups. Group sizes
are to be between 4 and 5 students.
5.) Marking strategy:
a. Progress report 20% in week 7
a. 15% for introduction and background
b. 35% for calculations
c. 30% for discussions and presentation of the results
6.) The overall mark will depend upon evaluation of individual contributions to the practical problem.
7.) Plagiarism of any form will NOT be tolerated. Any work found to be plagiarized will receive a
‘ZERO’ mark. Any group submitting work where plagiarism is suspected will be required to provide
copies of source material and/or original calculations; it is the group’s responsibility to provide this
information if requested. A soft copy will be submitted via Turn It In. This soft copy must be the same
one that will be submitted during
End of Exam
19MECH20H Energy conversion Practical assignment – 2020
Model Answer
1- The selection of the Power plant type depend on the price and the availability of water according
to that each city has a different environment
2- The electric load Calculation according to the reference guide "Generation of electric
Power Hesham E. Shaalan, Georgia southern university"
3- Calculating the power plant system components with the guide support of Siemens Catalogues
4- Draw the Cycle of the the plant on the T-S ,and sketch the flow diagram,calculating the values
of its main points
4- Calculate the Cost analysis estimation according to the reference guide Generation of electric
Power Hesham E. Shaalan, Georgia southern university", and supplier prices guide lines