#REF! Supply and Fixing of ISI 20mm outer dia medium (1.55mm thickness) grade with IS:9537 part 3 regid PVC pipe with PVC / Metallic
Junction boxes and all accessories fixing on chromium plated metallic base saddles including Supply and Fixing of suitable size
decolam board for fixing flush type switches for Light, Fan and separate plug point including all labour charges etc., complete.(Data No.
1.1.1)
#REF! Supply and Fixing of ISI 25mm outer dia heavy (2.20mm thickness) grade with IS:9537 part 3 regid PVC pipe with PVC / Metallic
Junction boxes and all accessories fixing on chromium plated metallic base saddles including Supply and Fixing of suitable size
decolam board for fixing flush type switches for Light, Fan and separate plug point including all labour charges etc., complete.(Data No.
1.1.4)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 11 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Fixing of Non ISI 19mm outer dia 1.80mm thickness regid PVC pipe with PVC / Metallic Junction boxes and all accessories
fixing on chromium plated metallic base saddles including Supply and Fixing of suitable size decolam board for fixing flush type switches
for Light, Fan and separate plug point including all labour charges etc., complete.(Data No. 1.5.2)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 11 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Fixing of Non ISI 25mm outer dia 1.50mm thickness regid PVC pipe with PVC / Metallic Junction boxes and all accessories
fixing on chromium plated metallic base saddles including Supply and Fixing of suitable size decolam board for fixing flush type switches
for Light, Fan and separate plug point including all labour charges etc., complete.(Data No. 1.5.3)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 11 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Fixing of Non ISI 25mm outer dia 1.80mm thickness regid PVC pipe with PVC / Metallic Junction boxes and all accessories
fixing on chromium plated metallic base saddles including Supply and Fixing of suitable size decolam board for fixing flush type switches
for Light, Fan and separate plug point including all labour charges etc., complete.(Data No. 1.5.4)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 11 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Fixing of Non ISI 19mm outer dia 1.50mm thickness regid PVC pipe with PVC / Metallic Junction boxes and all accessories
fixing on chromium plated metallic base saddles including Supply and Fixing of suitable size metallic box for fixing flush type switches
for Light, Fan and separate plug point including all labour charges etc., complete.(Data No. 1.5.5)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
7/21 PVC PIPE DATAS
Data No Description Quantity Unit Rate
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 11 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Fixing of Non ISI 25mm outer dia 1.50mm thickness regid PVC pipe with PVC / Metallic Junction boxes and all accessories
fixing on chromium plated metallic base saddles including Supply and Fixing of suitable size metallic box for fixing flush type switches
for Light, Fan and separate plug point including all labour charges etc., complete.(Data No. 1.5.7)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 11 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Fixing of Non ISI 25mm outer dia 1.80mm thickness regid PVC pipe with PVC / Metallic Junction boxes and all accessories
fixing on chromium plated metallic base saddles including Supply and Fixing of suitable size metallic box for fixing flush type switches
for Light, Fan and separate plug point including all labour charges etc., complete.(Data No. 1.5.8)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 11 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Fixing of Non ISI 19mm outer dia 1.50mm thickness regid PVC pipe with PVC / Metallic Junction boxes and all accessories fixing on
chromium plated metallic base saddles including Fixing of suitable size modular box for fixing flush type switches for Light, Fan and
separate plug point including all labour charges etc., complete.(Data No. 1.6.1)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 11 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Fixing of Non ISI 25mm outer dia 1.50mm thickness regid PVC pipe with PVC / Metallic Junction boxes and all accessories fixing on
chromium plated metallic base saddles and Fixing of suitable size modular box for fixing flush type switches for Light, Fan and separate
plug point including all labour charges etc., complete.(Data No. 1.6.3)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 11 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Fixing of Non ISI 25mm outer dia 1.80mm thickness regid PVC pipe with PVC / Metallic Junction boxes and all accessories fixing on
chromium plated metallic base saddles and Fixing of suitable size modular box for fixing flush type switches for Light, Fan and separate
plug point including all labour charges etc., complete.(Data No. 1.6.4)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
9/21 PVC PIPE DATAS
Data No Description Quantity Unit Rate
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 1.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Fixing of Non ISI 19mm outer dia 1.80mm thickness regid PVC pipe with PVC / Metallic junction boxes fixing on chromium
plated metallic base saddles including all required materials and labour charges etc., complete for run of mains.(Data No. 1.7.2)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 1.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Fixing of Non ISI 25mm outer dia 1.50mm thickness regid PVC pipe with PVC / Metallic junction boxes fixing on chromium
plated metallic base saddles including all required materials and labour charges etc., complete for run of mains.(Data No. 1.7.3)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 1.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Fixing of Non ISI 25mm outer dia 1.80mm thickness regid PVC pipe with PVC / Metallic junction boxes fixing on chromium
plated metallic base saddles including all required materials and labour charges etc., complete for run of mains.(Data No. 1.7.4)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 1.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
10/21 PVC PIPE DATAS
Data No Description Quantity Unit Rate
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 1.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Fixing of Non ISI 40mm outer dia 2.00mm thickness regid PVC pipe with PVC / Metallic junction boxes fixing on chromium
plated metallic base saddles including all required materials and labour charges etc., complete for run of mains.(Data No. 1.7.6)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 1.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 4 #REF! 200.00 Nos 100 Nos #REF!
#REF! 5 #REF! 200.00 Nos 100 Nos #REF!
#REF! 6 #REF! 5.00 kg 1 Kg #REF!
#REF! 7 #REF! 200.00 Nos 100 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 No #REF!
#REF! 9 #REF! 12.00 Nos 1 No #REF!
#REF! 10 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Laying of Non ISI 19/20mm width and 12.5mm height Casing and Caping (PVC) with double locking arrangements with
groover trunking with all accessories, duly sealed at points and errected on wall / ceiling including cost of all materials and labour
charges etc., complete.(Data No. 1.8.1)
#REF! Supply and Laying of Non ISI 32mm width and 12.5mm height Casing and Caping (PVC) with double locking arrangements with
groover trunking with all accessories, duly sealed at points and errected on wall / ceiling including cost of all materials and labour
charges etc., complete.(Data No. 1.8.3)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! 4 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 Nos #REF!
#REF! 9 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 10 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! 4 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 Nos #REF!
#REF! 9 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 10 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and laying of Non - ISI 25mm 1.50mm thick regid PVC pipe concealed in wall with PVC / Metallic junction boxes and all required
accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size well seasoned wooden
deep box including all labour charges etc., complete.(Data No. 1.14.3)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! 4 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 Nos #REF!
#REF! 9 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 10 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and laying of Non - ISI 25mm 1.80mm thick regid PVC pipe concealed in wall with PVC / Metallic junction boxes and all required
accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size well seasoned wooden
deep box including all labour charges etc., complete.(Data No. 1.14.4)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! 4 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 Nos #REF!
#REF! 9 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 10 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and laying of Non - ISI 19mm 1.50mm thick regid PVC pipe concealed in wall with PVC / Metallic junction boxes and all required
accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size metallic deep box
including all labour charges etc., complete.(Data No. 1.14.5)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! 4 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
18/21 PVC PIPE DATAS
Data No Description Quantity Unit Rate
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! 4 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 Nos #REF!
#REF! 9 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 10 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and laying of Non - ISI 25mm 1.50mm thick regid PVC pipe concealed in wall with PVC / Metallic junction boxes and all required
accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size metallic deep box
including all labour charges etc., complete.(Data No. 1.14.7)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! 4 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 Nos #REF!
#REF! 9 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 10 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and laying of Non - ISI 25mm 1.80mm thick regid PVC pipe concealed in wall with PVC / Metallic junction boxes and all required
accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size metallic deep box
including all labour charges etc., complete.(Data No. 1.14.8)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! 4 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 Nos #REF!
#REF! 9 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! 10 #REF! 3.00 Nos 1 No #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and laying of Non - ISI 19mm 1.50mm thick regid PVC pipe concealed in wall with PVC / Metallic junction boxes and all required
accessories including masonary work for light, fan and separate plug point including including Fixing of existing suitable size moduler
box for fix the Modular type switches including all labour charges etc., complete.(Data No. 1.15.1)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! 4 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 Nos #REF!
#REF! 9 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and laying of Non - ISI 25mm 1.50mm thick regid PVC pipe concealed in wall with PVC / Metallic junction boxes and all required
accessories including masonary work for light, fan and separate plug point including Fixing of existing suitable size moduler box for fix
the Modular type switches including all labour charges etc., complete.(Data No. 1.15.3)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! 4 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 Nos #REF!
#REF! 9 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and laying of Non - ISI 25mm 1.80mm thick regid PVC pipe concealed in wall with PVC / Metallic junction boxes and all required
accessories including masonary work for light, fan and separate plug point including Fixing of existing suitable size moduler box for fix
the Modular type switches including all labour charges etc., complete.(Data No. 1.15.4)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! 4 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 Nos #REF!
#REF! 9 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and laying of Non - ISI 19mm 1.50mm thick regid PVC pipe concealed in wall with all required PVC / Metallic Junction Boxes
including masonary work and labour charges etc., complete for Run of mains.(Data No. 1.16.1)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! b) Material
#REF! 5 #REF! 50.00 kg 1 Kg #REF!
#REF! 6 #REF! 200.00 Nos 100 Nos #REF!
#REF! 7 #REF! 12.00 Nos 1 Nos #REF!
#REF! 8 #REF! 12.00 Nos 1 Nos #REF!
#REF! 9 #REF! 100.00 Mtr 1 Mtr #REF!
#REF! Material Rate for 100 Mtrs
#REF! Material Rate for 1 Mtr
#REF! Total Cost of Material + Labour Charges
#REF! Supply and Laying of Non - ISI 19mm 1.80mm thick regid PVC pipe concealed in Roof Slabs with all required PVC / Metallic Deep
Boxes including masonary work and labour charges etc., complete.(Data No. 1.17.1)
#REF! Makes: Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast
#REF! a) Labour charges :
#REF! 1 #REF! 2.00 day 1 day #REF!
#REF! 2 #REF! 2.00 day 1 day #REF!
#REF! 3 #REF! 2.00 day 1 day #REF!
#REF! Labour Rate Per 100 Rm
#REF! Labour Rate for 1 Mtr
#REF! b) Material
#REF! 5 #REF! 12.00 Nos 1 Nos #REF!
#REF! 6 #REF! 12.00 Nos 1 Nos #REF!
#REF! 7 #REF! 100.00 Mtr 1 Mtr #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
ing of suitable size
complete.(Data No.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
ing of suitable size
complete.(Data No.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
suitable size metallic
ata No. 1.1.5)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
suitable size metallic
ata No. 1.1.5)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
suitable size metallic
ata No. 1.1.7)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
suitable size metallic
ata No. 1.1.8)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
uitable size moduler
e.(Data No. 1.2.1)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
uitable size moduler
e.(Data No. 1.2.2)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
uitable size moduler
e.(Data No. 1.2.3)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
25/21 PVC PIPE DATAS
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
uitable size moduler
e.(Data No. 1.2.4)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
tc., complete for run
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
tc., complete for run
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
tc., complete for run
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
tc., complete for run
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
tc., complete for run
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
with PVC / Metallic
tc., complete for run
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ements with groover
labour charges etc.,
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ements with groover
labour charges etc.,
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ements with groover
labour charges etc.,
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ements with groover
labour charges etc.,
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
and all accessories
g flush type switches
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
and all accessories
g flush type switches
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
and all accessories
g flush type switches
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
and all accessories
flush type switches
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
29/21 PVC PIPE DATAS
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
and all accessories
flush type switches
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
and all accessories
flush type switches
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
and all accessories
flush type switches
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ccessories fixing on
s for Light, Fan and
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ccessories fixing on
ht, Fan and separate
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ccessories fixing on
ht, Fan and separate
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ccessories fixing on
ht, Fan and separate
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
31/21 PVC PIPE DATAS
Amount
#REF!
#REF!
#REF!
#REF!
fixing on chromium
a No. 1.7.1)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
fixing on chromium
a No. 1.7.2)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
fixing on chromium
a No. 1.7.3)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
fixing on chromium
a No. 1.7.4)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
32/21 PVC PIPE DATAS
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
fixing on chromium
a No. 1.7.5)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
fixing on chromium
a No. 1.7.6)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
g arrangements with
materials and labour
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
arrangements with
materials and labour
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
arrangements with
materials and labour
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
g arrangements with
materials and labour
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
oncealed in wall with
ug point with supply
1)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ncealed in wall with
ug point with supply
2)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
oncealed in wall with
ug point with supply
3)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ncealed in wall with
ug point with supply
4)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
oncealed in wall with
ug point with supply
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ncealed in wall with
ug point with supply
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
oncealed in wall with
ug point with supply
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ncealed in wall with
ug point with supply
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
d power plug boards
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
power plug boards
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
oncealed in wall with
plug point Including
complete.(Data No.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
36/21 PVC PIPE DATAS
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ncealed in wall with
plug point including
complete.(Data No.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
oncealed in wall with
plug point including
complete.(Data No.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ncealed in wall with
plug point including
complete.(Data No.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
oncealed in wall with
of mains.(Data No.
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ealed in wall with all
s.(Data No. 1.12.2)
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
oncealed in wall with
of mains.(Data No.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ealed in wall with all
s.(Data No. 1.12.4)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
oncealed in wall with
of mains.(Data No.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
cealed in Roof Slabs
1.13.1)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
cealed in Roof Slabs
1.13.1)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
cealed in Roof Slabs
1.13.1)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
ll seasoned wooden
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
ll seasoned wooden
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
ll seasoned wooden
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
ll seasoned wooden
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
e metallic deep box
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
40/21 PVC PIPE DATAS
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
e metallic deep box
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
e metallic deep box
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
e metallic deep box
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
uitable size moduler
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
e moduler box for fix
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
e moduler box for fix
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xes and all required
e moduler box for fix
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
allic Junction Boxes
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
allic Junction Boxes
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
allic Junction Boxes
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
allic Junction Boxes
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
allic Junction Boxes
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PVC / Metallic Deep
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PVC / Metallic Deep
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PVC / Metallic Deep
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Name of the Work:- Urgent Repairs to E.I of (R&B) Executive Engineer Quarter at Kakinada
in East Godavari District.
PVC PIPE Makes: VIP /Bestoplast /GoldMedal / Million plast /GM / Sudhakar/ Polyline
2 17-18- Supply and laying of ISI 25mm outer dia medium (1.80mm thickness) grade with IS:9537 80 70.3 Mts 5624.00
5.1.2 part 3 regid PVC pipe consealed in wall with all required PVC / Metallic Junction Boxes
including masonary work and labour charges etc., complete for Run of mains.
PVC PIPE Makes: VIP /Bestoplast /GoldMedal / Million plast /GM / Sudhakar/ Polyline
3 17-18-1.1.1 Supply and Fixing of ISI 20mm outer dia medium (1.55mm thickness) grade with IS:9537 40 57 Mts 2280.00
part 3 regid PVC pipe on surface of wall with PVC / Metallic Junction boxes and all
accessories fixing on chromium plated metallic base saddles including Supply and Fixing of
suitable size Decolam board / MS metal box / Modular box for fixing flush type / Mini
Modular / Modular switches for Light, Fan and separate plug point including all labour
charges etc., complete. (Data No. )
PVC PIPE Makes: VIP /Bestoplast /GoldMedal / Million plast /GM / Sudhakar/ Polyline
4 17-18- Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR / ZHFR PVC insulated flexible 40 565.1 Pts 22604.00
11.1.1 ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo
N.R.B. Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and
cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of
all material and all labour charges etc., complete for light and bell points in N.R.B
Accessories Makes: Legrand Arteor / Schneider Zen celo / Crabtree Murano / GM-
Zenova/Goldmedal(i-Push).
12 17-18- Supply and fixing of Modular TV antenna out let of makes GM / Legrand Myrius / L & T / 1 223 Nos 223.00
12.1.8 North West / M K / Salzer / Indo Simon / ABB /Schneider ZEN celo on existing wooden /
N.R.B. / Metallic deep box in existing surface / consealed pipe wiring including cost and coveyance
R.B. of all material and all labour charges etc., complete in N.R.B. / R.B. (Data No. )
Accessories Makes: Legrand Arteor / Schneider Zen celo / Crabtree Murano / GM-
Zenova/Goldmedal(i-Push).
13 17-18- Supply and fixing of 3 Nos 6A ISI mark Modular type switch with 3Nos 6A 3/2 pin wall 1 1142 Nos 1142.00
12.1.5 plug socket on suitable size Modular deep box with cover frame including cost and
N.R.B. / coveyance of all material and all labour charges etc., complete for Computers in N.R.B. /
R.B. R.B. (Data No.16-17-12.1.5)
Accessories Makes: Legrand Arteor / Schneider Zen celo / Crabtree Murano / GM-
Zenova/Goldmedal(i-Push).
14 17-18- Supply and Run of 3 of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR / ZHFR P.V.C. insulated 50 62.3 Mts 3115.00
13.1.17 flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges
etc., complete.(Data No. )
Copper cable Makes: Finolex / RR Kabel / Havells.
15 17-18- Supply and Run of 3 of 36/0.3mm (2.50 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible 200 88.35 Mts 17670.00
13.1.18 ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc.,
complete.
17 17-18- Supply and Run of 5 of 84/0.3mm (6.0 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible 5 306.4 Mts 1532.00
13.1.24 ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc.,
complete.(Data No. )
18 17-18- Supply and fixing of Calling Bell on 4"x7" decolam block including giving connections, cost 1 133 Nos 133.00
15.1.1 of all accessories and labour charges etc., complete.
19 17-18- Supply and fixing of buzzer on 4"x7" decolam block including giving connections, cost of 1 124 Nos 124.00
15.1.1 all accessories and labour charges etc., complete
24 Labour charges for fixing of 40W tube light luminaire on wall / Ceiling with including 5 54 Nos 270.00
giving connections and all labour charges etc., complete.(Skilled Electricianx0.1)540x0.1
25 17-18- Supply, Transportation and Fixing of 48" (1200mm) Sweep 5Star rated Ceiling Fan, with 5 2140 Nos 10700.00
23.1.1-A double ball bearings without Regulator including all standard accessories and all
labour charges etc., complete.
5 star Rated Fan Makes:Crompton HSDecora / Bajaj Regal Star /Havells Fusion 50 / 0.00
Orient summer crown / Usha technix decorative
26 17-18- Supply and fixing of 19/20mm dia steel tube down rod for ceiling fan of 1 Mtr Length with 10 105 Mts 1050.00
23.1.10 bolts and nuts duly painted with matching colour of fan including all labour charges etc.,
complete.
27 17-18- Supply and fixing of fan hook of 12/15mm dia MS Rod / bar grouted in RCC slab with 10 202.9 Nos 2029.00
23.1.8 making the slab as original.(Data No. 17-18-23.1.8)
28 17-18- Supply and fixing of resistance type / Flush type Stepped electronic/ Modular type 10 385 Nos 3850.00
23.1.3 Stepped electronic regulator for sweep AC ceiling fans of 900mm / 1200mm / 1400mm.
Accessories Makes: Legrand Arteor / Schneider Zen celo / Crabtree Murano / GM-
Zenova/Goldmedal(i-Push).
29 17-18- Supply, Transportation and Fixing of light duty 12" (300mm) ISI, Fresh Air fan with metallic 3 3002.1 Nos 9006.30
23.1.11 body and blades including making hole in wall and masonary work and all labour charges
etc., complete.
Makes: Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.
30 17-18- Supply and Run of 4 of 16.0 Sq.mm WPSC (Whether Proof Single Core) Aluminium cable of 50 138.8 Nos 6940.00
20.1.6 ISI mark along with No.10 SWG G.I bearer wire through PVC cleats with all accessories
including labour charges etc., complete for service mains.
32 17-18- Supply and Run of No. 10 SWG copper wire including cost of all accessories and labour 20 28.6 Mts 572.00
28.1.3 charges etc., complete. (0.028Kgs/1Mtr)
33 Supply and fixing of 3 Nos 63A 415V porcelain rewirable fuse units of makes Gold Medal / 1 2182 Nos 2182.00
HPL / Sputnik / Vimal / Standard / Star on 18" x 24" peta board with 63A N Link with
connections and labour charges etc complete.
153978.70
153978.70
153978.70
WORKING ESTIAMTE
Name of the Work:- Urgent Repairs to E.I of (R&B) Executive Engineer Quarter at Kakinada in East Godavari District. Est:Rs1.8Lakhs.
PVC PIPE Makes: VIP /Bestoplast /GoldMedal / Million plast /GM / Sudhakar/ Polyline
2 Supply and laying of ISI 25mm outer dia medium (1.80mm thickness) grade with IS:9537 part 80 70.3 5624.0 0 70.3 0.0 5624.00 0.00 Deleted
3 regid PVC pipe consealed in wall with all required PVC / Metallic Junction Boxes including Since
masonary work and labour charges etc., complete for Run of mains. surface pipe
used
PVC PIPE Makes: VIP /Bestoplast /GoldMedal / Million plast /GM / Sudhakar/ Polyline
3 Supply and Fixing of ISI 20mm outer dia medium (1.55mm thickness) grade with IS:9537 part 40 57 2280.0 120 57 6840.0 0.00 4560.00 As per
3 regid PVC pipe on surface of wall with PVC / Metallic Junction boxes and all accessories execution
fixing on chromium plated metallic base saddles including Supply and Fixing of suitable size
Decolam board / MS metal box / Modular box for fixing flush type / Mini Modular / Modular
switches for Light, Fan and separate plug point including all labour charges etc., complete.
(Data No. )
PVC PIPE Makes: VIP /Bestoplast /GoldMedal / Million plast /GM / Sudhakar/ Polyline
4 Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR / ZHFR PVC insulated flexible ISI 40 565.1 22604.0 0 565.1 0.0 22604.00 0.00 Deleted
mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling since
rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in 1.0sqmm
existing Surface or Concealed pipe wiring including cost and conveyance of all material and all wire is used
labour charges etc., complete for light and bell points in N.R.B
9 Wiring with run of 3 of 14/0.3mm (1.0 Sqmm) / 22/0.3mm (1.5 Sqmm) FRLS / HFFR / ZHFR 4 634.9 2539.6 0 634.9 0.0 2539.60 0.00 Deleted as
PVC insulated flexible ISI mark copper cable in existing PVC Surface / Consealed conduit pipe per site
wiring including supply and fixing of 6A/10A ISI Mark 3/2 pin Modular socket, 6A/10A 1way Condition
Modular switch, 3 Module box with required cover frame including cost and conveyance of all
material and all labour charges etc., complete for seperate plug points in N.R.B. / R.B.
11 Supply and fixing of Modular telephone Jack with connector on modular box with cover frame 1 185 185.0 1 185 185.0 0.00 0.00 As per
in existing surface / consealed pipe wiring including cost and coveyance of all material and all execution
labour charges etc., complete in N.R.B. / R.B.
Accessories Makes: Legrand Arteor / Schneider Zen celo / Crabtree Murano / GM-
Zenova/Goldmedal(i-Push).
12 Supply and fixing of Modular TV antenna out let of makes GM / Legrand Myrius / L & T / North 1 223 223.0 1 223 223.0 0.00 0.00 As per
West / M K / Salzer / Indo Simon / ABB /Schneider ZEN celo on existing wooden / Metallic execution
deep box in existing surface / consealed pipe wiring including cost and coveyance of all
material and all labour charges etc., complete in N.R.B. / R.B. (Data No. )
Accessories Makes: Legrand Arteor / Schneider Zen celo / Crabtree Murano / GM-
Zenova/Goldmedal(i-Push).
13 Supply and fixing of 3 Nos 6A ISI mark Modular type switch with 3Nos 6A 3/2 pin wall plug 1 1142 1142.0 1 1142 1142.0 0.00 0.00 Deleted as
socket on suitable size Modular deep box with cover frame including cost and coveyance of all per site
material and all labour charges etc., complete for Computers in N.R.B. / R.B. (Data No.16-17- Condition
12.1.5)
Accessories Makes: Legrand Arteor / Schneider Zen celo / Crabtree Murano / GM-
Zenova/Goldmedal(i-Push).
14 Supply and Run of 3 of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR / ZHFR P.V.C. insulated flexible ISI 50 62.3 3115.0 0 62.3 0.0 3115.00 0.00 Deleted as
mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete. per site
(Data No. ) Condition
16 Supply and Run of 3 of 56/0.3mm (4.00 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI 150 126.42 18963.0 0 126.42 0.0 18963.00 0.00 Deleted
mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete. since
1.0sqmm
earthwire is
Copper cable Makes: Finolex / RR Kabel / Havells. used
11 Supply and Run of 5 of 56/0.3mm (4.0 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI 213.9 0.0 0 213.9 0.0 0.00 0.00 Deleted
mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete. since
1.0sqmm
earthwire is
used
Copper cable Makes: Finolex / RR Kabel / Havells.
17 Supply and Run of 5 of 84/0.3mm (6.0 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI 5 306.4 1532.0 0 306.4 0.0 1532.00 0.00 Deleted
mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete. since
(Data No. ) 2.5sqmm
earthwire is
used
Copper cable Makes: Finolex / RR Kabel / Havells.
13 Supply and fixing of Ding Dong Bell on 4"x7" decolam block including giving connections, cost 206 0.0 1 206 206.0 0.00 206.00 As per
of all accessories and labour charges etc., complete execution
22 Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and 1 6271.5 6271.5 1 6271.5 6271.5 0.00 0.00 As per
suitable for 12 Nos S.P. out goings and for 1 No 4 pole Incommer with 1 No 100A A FP Isolator execution
and 12 Nos 6-32 A 10kA SP MCBs of including internal connections and labour charges for
FLUSH Mounting etc., complete.
23 Supply and Transportation of 18W/20W, 1200mm length LED batten light with extruded 5 938 4690.0 20 938 18760.0 0.00 14070.00 As per
alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with PF>0.9, execution
Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700K,
minimum CRI>70, .etc., complete.
Makes: Wipro / Phillips /Lighting Technologies(LT) / GE / Crompton / Bajaj / VIN
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG.
24 Labour charges for fixing of 40W tube light luminaire on wall / Ceiling with including giving 5 54 270.0 20 54 1080.0 0.00 810.00 As per
connections and all labour charges etc., complete.(Skilled Electricianx0.1)540x0.1 execution
25 Supply, Transportation and Fixing of 48" (1200mm) Sweep 5Star rated Ceiling Fan, with 5 2140 10700.0 10 2140 21400.0 0.00 10700.00 As per
double ball bearings without Regulator including all standard accessories and all execution
labour charges etc., complete.
5 star Rated Fan Makes:Crompton HSDecora / Bajaj Regal Star /Havells Fusion 50 / Orient
summer crown / Usha technix decorative
26 Supply and fixing of 19/20mm dia steel tube down rod for ceiling fan of 1 Mtr Length with 10 105 1050.0 10 105 1050.0 0.00 0.00 As per
bolts and nuts duly painted with matching colour of fan including all labour charges etc., execution
complete.
27 Supply and fixing of fan hook of 12/15mm dia MS Rod / bar grouted in RCC slab with making 10 202.9 2029.0 10 202.9 2029.0 0.00 0.00 As per
the slab as original.(Data No. 17-18-23.1.8) execution
28 Supply and fixing of resistance type / Flush type Stepped electronic/ Modular type Stepped 10 385 3850.0 10 385 3850.0 0.00 0.00 As per
electronic regulator for sweep AC ceiling fans of 900mm / 1200mm / 1400mm. execution
Accessories Makes: Legrand Arteor / Schneider Zen celo / Crabtree Murano / GM-
Zenova/Goldmedal(i-Push).
29 Supply, Transportation and Fixing of light duty 12" (300mm) ISI, Fresh Air fan with metallic 3 3002.1 9006.3 3 3002.1 9006.3 0.00 0.00 As per
body and blades including making hole in wall and masonary work and all labour charges etc., execution
complete.
Makes: Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.
30 Supply and Run of 4 of 16.0 Sq.mm WPSC (Whether Proof Single Core) Aluminium cable of ISI 50 138.8 6940.0 50 138.8 6940.0 0.00 0.00 As per
mark along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including execution
labour charges etc., complete for service mains.
31 Providing independent earthling by excavating a pit to a depth of 2.25Mt in all soils, as per size 1 2892 2892.0 1 2892 2892.0 0.00 0.00 As per
specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary No.8 execution
G.I. double earth wire and accessories with 18" dia 2" thick hume pipe ring duly providing
staggered holes including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder
in layers and all labour charges etc., complete.
32 Supply and Run of No. 10 SWG copper wire including cost of all accessories and labour charges 20 28.6 572.0 10 28.6 286.0 286.00 0.00 As per
etc., complete. (0.028Kgs/1Mtr) execution
33 Supply and fixing of 3 Nos 63A 415V porcelain rewirable fuse units of makes Gold Medal / 1 2182 2182.0 1 2182 2182.0 0.00 0.00 As per
HPL / Sputnik / Vimal / Standard / Star on 18" x 24" peta board with 63A N Link with execution
connections and labour charges etc complete.
SUPPLEMENTAL ITEMS
1 Supply and Fixing of ISI 25mm outer dia medium (1.80mm thickness) grade with IS:9537 part 75 60.40 4530.0 0.00 4530.00 As per
3 regid PVC pipe on surface of wall with PVC / Metallic junction boxes fixing on chromium execution
plated metallic base saddles including all required materials and labour charges etc., complete
for run of mains.(Data No.16-17-2.1.2 )
PVC PIPE Makes: VIP /Bestoplast /GoldMedal / Million plast /GM / Sudhakar/ Polyline
2 Wiring with run of 2 of 14/0.3mm (1.0 Sqmm) / 22/0.3mm (1.5 Sqmm) FRLS / HFFR / ZHFR 46 500.40 23018.4 0.00 23018.40 As per
PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and execution
fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular
box and cover frame in existing Surface or Concealed pipe wiring including cost and
conveyance of all material and all labour charges etc., complete for light and bell points in
R.B. (Data No. 17-18-11.1.3
R.B. )
4 Supply and Run of 2 of 56/0.3mm (4.0 Sq.mm) FRLS / HFFR / ZHFR PVC insulated flexible ISI 110 89.50 9845.0 0.00 9845.00 As per
mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete. execution