DESCRIPTION
The intent of this PROCEDURE is to describe how the CONTRACTOR shall isolate, pu
rge the lines and then execute the tie-in F07-001 (Fluid: Wet Crude) to be perfo
rmed during the shutdown.
Reference documents:
F07-A-NA-F55074-001-16A
F07-A-NA-F55073-001-15
Symbols on P&ID
* Circuit limit
UPGRADE ABU ALI PLANT
DOCUMENT No.
IDL-SA1201-092LC
BREV
01DATE
04/04/10
SHEET
PAGE 2/5CLIENT
SAUDI ARAMCOCONTRACT No:
6600021677LOCATION:
ABU ALIBI/JO
10-00441 Bonatti JOB Code
SA-1201