Work Status
Pile
Bridge Boring Casting End
SI. No. Pile Id Chainage Length Time
Name Start Date Date
(m)
1 BR-03 Near A1 0+308.000 38.00 8/15/2018 6:20 AM 8/16/2018
2 BR-04 Near P6 0+576.630 43.00 9/18/2018 8:45 PM 9/19/2018
3 BR-15 Near A1 8+138.470 38.00 11/3/2018 7:50 AM 11/4/2018
4 BR-13 Near A1 6+503.640 32.00 2/11/2019 8:30 AM 2/12/2019
296.00
Total Piling Length (m) Concrete Volume (Cum)
Pilot Pile Work
Work Status
Concrete Reinforcem Design Applied
Time Volume ent QTY PIT Date Date of Loading Load Load
(cum) (Ton) (Ton) (Ton)
1:25 AM 45.00 10.757 9/21/2018 10/1/2018 270 675
8:30 PM 60.00 10.435 10/19/2018 11/3/2018 400 1000
1:00 AM 45.00 10.413 11/22/2018 12/6/2018 300 750
2:15 AM 38.00 6.522 2/20/2019 3/11/2019 320 800
366.000 68.679
Concrete Volume (Cum) Reinforcement QTY (Ton)
Remarks
3 P2 0+399.650 18-Mar-19 8.00 28-Mar-19 87 20.315 3-4-19(15.5) 05-04-19(14.0) 15.0+7.0 51.5 10..880 5/18/2019 112 12.631
4 P3 0+441.925 10-Mar-19 8.00 23-Mar-19 87 20.315 29-3-19(8) 02-04-19(8.0) 11-04-19(8.5) 24.5 10.285 5/16/2019 43 6.014
5 P4 0+484.200 7-Mar-19 8.00 17-Mar-19 85 20.315 22-3-19(15.5) 29-3-19(15) 01-04-19(12) 42.5 9.517
6 P5 0+526.475 13-Feb-19 4.50 8-Mar-19 89 20.315 12-03-19(8) 17-03-19(8) 26-03-19(5) 21 9.263 4/20/2019 42 6.014
7 P6 0+568.750 7-Feb-19 5.00 27-Feb-19 85 20.315 06-03-19(15) 11-03-19(14) - 29 8.153 10/7/2019 110 12.631
30/Apr/19
23/May/19
load Test
Bridge No: 17 (Canal)
30/Apr/19
19/May/19
Bridge No: 36 (Culvert)
Bridge No: 36 (Culvert)
Bridge No: 37 (Canal)
05-10-2019
1 A1 0+316.850 28-Jun-19 5.50 30-Jul-19 89 13.211 22.50
(22.50)
2 P1 0+357.375
3 P2 0+399.650
8 A2 0+610.500