Sie sind auf Seite 1von 51

Project Title: PROPOSED 1-UNIT COMFORT ROOM AT ST.

JOSEPH PARISH
Project Location: ST. JOSEPH PARISH, BRGY. POBLACION, POLILLO, QUEZON

II. EARTHWORKS
1.0 Excavation Works/Backfill and Compaction
Qty 2.40 cu.m
A. LABOR COST
Project Engineer @ Php 600.00 /day Php -
1 Construction Foreman Php 500.00 /day Php 500.00
H.E. Operator Php 500.00 /day Php -
1 Laborer Php 300.00 /day Php 300.00
Php 800.00
Php 800.00 x 1.0 day Php 800.00

SUMMARY
A. LABOR COST Php 800.00
B. EQUIPMENT EXPENSES (RENTAL) Php -
Php 800.00

plus: 7% OCM Php


8% CP Php
12% VAT Php
Php 800.00

Unit Cost = Php 800.00 / 2.40 cu.m Php 333.33


Total Item Cost = Php 333.33 x 2.40 cu.m Php 800.00

III. CONCRETE WORKS w/ WATERPROOFING


Qty 0.45 cu.m
A. MATERIAL COST
5.0 bags Portland Cement @ Php 280.00 /bag Php 1,400.00
0.5 cu.m Screened Gravel Php 600.00 /cu.m Php 300.00
0.3 cu.m Washed Sand Php 1300.00 /cu.m Php 390.00
5.0 bags Sahara Php 150.00 /bags Php 750.00
Php 2,840.00
B. LABOR COST
Project Engineer @ Php 600.00 /day Php -
1.0 Construction Foreman Php 500.00 /day Php 500.00
1.0 Mason Php 450.00 /day Php 450.00
1.0 Laborer Php 300.00 /day Php 300.00
Php 1,250.00
Php 1,250.00 x 0.5 days Php 625.00
C. EQUIPMENT EXPENSES (RENTAL)
1 unit One Bagger Concrete Mixer Php 400.00 /day Php 400.00
Fuel, oil, lub.,etc Php 100.00 /day Php 100.00
Php 500.00
Php 500.00 x days Php -

SUMMARY
A. MATERIAL COST Php 2,840.00
B. LABOR COST Php 625.00
C. EQUIPMENT EXPENSES (RENTAL) Php -
Php 3,465.00

plus: 7% OCM Php


8% CP Php
12% VAT Php
Php 3,465.00

Unit Cost = Php 3,465.00 / 0.45 cu.m Php 7,638.89


Total Item Cost = Php 7,638.89 x 0.45 cu.m Php 3,465.00

VI. MASONRY WORKS (CHB laying w/ Plastering)


Qty 2.45 sq.m
A. MATERIAL COST
6.0 bags Portland Cement @ Php 280.00 /bag Php 1,680.00
0.6 cu.m Washed sand @ Php 600.00 /cu.m Php 360.00
34.0 pcs 4" CHB @ Php 12.00 /pc Php 408.00
7.4 kgs 10mmØ Def. bars @ Php 60.00 /kg Php 444.00
1.0 kgs # 16 G.I. tie wire @ Php 85.00 /kg Php 85.00
Php 2,977.00

B. LABOR COST
Project Engineer @ Php 600.00 /day Php -
1 Construction Foreman Php 500.00 /day Php 500.00
1 Mason Php 450.00 /day Php 450.00
1 Laborer Php 300.00 /day Php 300.00
Php 1,250.00

Php 1,250.00 x 1.0 day Php 1,250.00

SUMMARY

A. MATERIAL COST Php 2,977.00


B. LABOR COST Php 1,250.00
Php 4,227.00

plus: 7% OCM Php


8% CP Php
12% VAT Php
Php 4,227.00

Unit Cost = Php 4,227.00 / 2.45 sq.m Php 1,725.31


Total Item Cost = Php 1,725.31 x 2.45 sq.m Php 4,227.00

VII. TILE WORKS


Qty 20.85 sq.m
A. MATERIAL COST
15.0 bags Tile Adhessive @ Php 190.00 /bag Php 2,850.00
0.5 cu.m Washed sand @ Php 600.00 /cu.m Php 300.00
1.0 pc 4"Ø Diamond cutter @ Php 450.00 /pc Php 450.00
16.7 sq.m 30x60 Wall Tiles @ Php 683.00 /sq.m Php 11,371.95
4.2 sq.m 30x30 Floor Tiles @ Php 1000.00 /sq.m Php 4,200.00
20.0 kgs Tile Grout @ Php 25.00 /kg Php 500.00
Php 19,671.95

B. LABOR COST
Project Engineer @ Php 600.00 /day Php -
1 Construction Foreman @ Php 500.00 /day Php 500.00
1 Mason @ Php 450.00 /day Php 450.00
1 Laborer @ Php 300.00 /day Php 300.00
Php 1,250.00
Php 1,250.00 x 4.0 day Php 5,000.00
C. EQUIPMENT EXPENSES (RENTAL)
1 unit Electric Grinder Php 150.00 /day Php 150.00
Php 150.00
Php 150.00 x 4.0 days Php 600.00

SUMMARY

A. MATERIAL COST Php 19,671.95


B. LABOR COST Php 5,000.00
C. EQUIPMENT EXPENSES (RENTAL) Php 600.00
Php 25,271.95

plus: 7% OCM Php


8% CP Php
12% VAT Php
Php 25,271.95

Unit Cost = Php 25,271.95 / 20.85 sq.m Php 1,212.08


Total Item Cost = Php 1,212.08 x 20.85 sq.m Php 25,271.95

XIV. ELECTRICAL WORKS


Qty 1.00 lot
A. MATERIAL COST
1.0 sets Single pole switch @ Php 120.00 /set Php 120.00
1.0 pcs 4"x4" Junction box @ Php 35.00 /pc Php 35.00
1.0 pcs 2"x4" Utility box @ Php 35.00 /pc Php 35.00
5.0 pcs 1/2"Ø PVC pipe x 3.00 mts. @ Php 61.00 /pc Php 305.00
20.0 mts #14 THHN wire @ Php 45.00 /mt Php 900.00
1.0 pc 7W LED Light @ Php 250.00 /pc Php 250.00
2.0 rolls Electrical tape @ Php 45.00 /roll Php 90.00
Php 1,735.00
B. LABOR COST
Project Engineer @ Php 600.00 /day Php -
1 Construction Foreman @ Php 500.00 /day Php 500.00
1 Electrician @ Php 450.00 /day Php 450.00
1 Laborer @ Php 300.00 /day Php 300.00
Php 1,250.00
Php 1,250.00 x 0.5 day Php 625.00
C. EQUIPMENT EXPENSES (RENTAL)
1 unit Electric drill Php 150.00 /day Php 150.00
Php 150.00
Php 150.00 x 0.5 days Php 75.00

SUMMARY
A. MATERIAL COST Php 1,735.00
B. LABOR COST Php 625.00
C. EQUIPMENT EXPENSES (RENTAL) Php 75.00
Php 2,435.00

plus: 7% OCM Php


8% CP Php
12% VAT Php
Php 2,435.00

Unit Cost = Php 2,435.00 / 1.00 lot Php 2,435.00


Total Item Cost = Php 2,435.00 x 1.00 lot Php 2,435.00

XV. PLUMBING WORKS


Qty 1.00 lot
A. MATERIAL COST
146.0 l.m. 1/2" PVC pipe with fittings and accessories @ Php 70.00 /lm Php 10,220.00
1.0 set Faucet @ Php 120.00 /pc Php 120.00
1.0 set Floor Drain @ Php 200.00 /pc Php 200.00
1.0 set Water Closet (w/ fittings and accessories) @ Php 3,900.00 /pc Php 3,900.00
1.0 set Lavatory (w/ fittngs and accessories) @ Php 1,900.00 /pc Php 1,900.00
3.0 m 3" Sewer Line @ Php 350.00 /lm Php 1,050.00
1.0 set HDPE Sepic Tank @ Php 11,000.00 /roll Php 11,000.00
1.0 set PVC Door with lockset and hinges @ Php 2,000.00 /roll Php 2,000.00
Php 30,390.00
B. LABOR COST
Project Engineer @ Php 0.00 /day Php -
1 Construction Foreman @ Php 500.00 /day Php 500.00
1 Plumber @ Php 400.00 /day Php 400.00
1 Laborer @ Php 300.00 /day Php 300.00
Php 1,200.00
Php 1,200.00 x 3.0 day Php 3,600.00

SUMMARY
A. MATERIAL COST Php 30,390.00
B. LABOR COST Php 3,600.00
C. EQUIPMENT EXPENSES (RENTAL) Php
Php 33,990.00

plus: 7% OCM Php


8% CP Php
12% VAT Php
Php 33,990.00

Unit Cost = Php 33,990.00 / 1.00 lot Php 33,990.00


Total Item Cost = Php 33,990.00 x 1.00 lot Php 33,990.00

TOTAL CONSTRUCTION COST Php 70,188.95


Project Title: PROPOSED 1-UNIT COMFORT ROOM AT ST. JOSEPH PARISH
Project Location: ST. JOSEPH PARISH, BRGY. POBLACION, POLILLO, QUEZON

SUMMARY OF ITEM WORKS


Item No. DESCRIPTION UNIT QTY UNIT COST AMOUNT
II EARTHWORKS cu.m 2.40 333.33 800.00

III. CONCRETE WORKS cu.m 0.45 7,638.89 3,465.00

VI MASONRY WORKS sq.m 2.45 1,725.31 4,227.00

VII TILE WORKS sq.m 20.85 1,212.08 25,271.95

XIV ELECTRICAL WORKS lot 1.00 2,435.00 2,435.00

XV PLUMBING WORKS lot 1.00 33,990.00 33,990.00


TOTAL PROJECT COST 70,188.95
less DISCOUNT (all labor costs): (11,900.00)
ADJUSTED PROJECT COST: ₱ 58,288.95
EARTHWORKS
EXCAVATION WORKS
FOR ONE (1) STRUCTURE NO. OF TOTAL
MARK LENGTH WIDTH HEIGHT SIMILAR VOLUME
(m.) (m.) (m.) STRUCTURE (m³)
F-1 1.50 0.80 1.00 1.00 1.20
FTB

GB

TOTAL 1.20

BACKFILL/COMPACTION
FOR ONE (1) STRUCTURE NO. OF TOTAL
MARK LENGTH WIDTH HEIGHT SIMILAR VOLUME
(m.) (m.) (m.) STRUCTURE (m³)
F-1 0.00
FTB 0.00
0.00
GB 0.00
0.00
COLUMN 0.00
TOTAL 0.00

Excavation = 1.20
Backfill/Compaction 1.20 cu.m

GRAVEL BEDDING
FOR ONE (1) STRUCTURE NO. OF TOTAL
MARK LENGTH WIDTH HEIGHT SIMILAR VOLUME
(m.) (m.) (m.) STRUCTURE (m³)
F-1 1.50 0.80 0.10 1.00 0.12
FTB 0.00
0.00
GB 0.00
0.00
Area-1 0.00
Area-2 0.00
TOTAL 0.12
5.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
V - MASONRY WORKS

GROUND FLOOR
perimeter wall 3.50 0.70 1.00 2.45
less opening 0.00
Total area 2.45
2.45

perimeter wall 1.00 0.00


1.00 0.00
1.00 0.00
less opening 0.00
Total area 0.00

No. of pcs 6” CHB 31.85 say 34.00 pcs

Cement 2.48 say 3.00 bags

Sand 0.21 say 0.30 m³

Vert. Reinforcement 5.22


Hor. Reinforcement 5.27
10.49 / 5.7m = 1.83964912280702
say 2 pcs 10mmØ 7.40

GI Tie Wire 0.06 say 1 kgs

Plastering

perimeter wall 2.45 0.00 1.00 2.45

4.90
4.90

Cement 2.11 say 3 bags


Sand 0.12 say 0.3 cu.m.

Summary

Cement 6.00
Sand 0.60
No. of pcs 6” CHB 34.00
RSB Reinforcement 7.40
GI Tie Wire 1.00
kgs
10MMØ
0.616 6.00 3.70
0.616 7.50 4.62
0.616 9.00 5.54
0.616 10.50 6.47
0.616 12.00 7.39
REBAR WORKS
FOR 1 STRUCTURE NO. OF
TOTAL
BAR SIMILAR
MARK LOCATION ONE BAR NUMBER OF NO.OF
SIZE STRUCT
LENGTH PCS PCS
URE
F1 top-tranverse 16 1.50 8.00 0.00 0.00
bottom-longitudinal 12 1.50 8.00 0.00
Footing

C1 vertical bar 16 9.00 8.00 0.00 0.00


0.00 outer ties 10 1.20 0.00 0.00
inner ties 10 1.00 0.00 0.00
C2 vertical bar 16 9.00 8.00 0.00 0.00
0.00 outer ties 10 1.20 0.00 0.00
inner ties 10 1.00 0.00 0.00
C3 vertical bar 16 9.00 8.00 0.00 0.00
0.00 outer ties 10 1.20 0.00 0.00
inner ties 10 1.00 0.00 0.00

FTB straight bars 16 6.00 6.00 0.00 0.00


0.00 stirrups 10 1.10 36.00 0.00
FTB straight bars 16 4.50 6.00 0.00 0.00
0.00 stirrups 10 1.20 27.00 0.00

GB straight bars 16 6.00 4.00 0.00 0.00


0.00 stirrups 10 0.90 36.00 0.00
GB straight bars 16 4.50 4.00 0.00 0.00
0.00 stirrups 10 0.90 27.00 0.00

B-1 straight bars 16 6.00 4.00 0.00 0.00


0.00 top cut bars 16 1.50 2.00 0.00
bott. Cut bars 16 3.00 1.00 0.00
stirrups 10 1.20 36.00 0.00
B-1 straight bars 16 4.50 4.00 0.00 0.00
0.00 top cut bars 16 1.20 2.00 0.00
bott. Cut bars 16 2.50 1.00 0.00
stirrups 10 1.20 27.00 0.00
B-2 straight bars 16 6.00 4.00 0.00 0.00
0.00 top cut bars 16 1.50 4.00 0.00
bott. Cut bars 16 3.00 2.00 0.00
stirrups 10 1.40 36.00 0.00
B-3 straight bars 16 6.00 4.00 0.00 0.00
0.00 top cut bars 16 1.50 2.00 0.00
bott. Cut bars 16 3.00 1.00 0.00
stirrups 10 1.10 36.00 0.00
B-4 straight bars 16 2.50 4.00 0.00 0.00
0.00 top cut bars 16 0.75 2.00 0.00
bott. Cut bars 16 1.50 1.00 0.00
stirrups 10 0.90 15.00 0.00
LB-1 straight bars 12 2.50 4.00 0.00 0.00
0.00 stirrups 10 1.00 15.00 0.00
CB-1 straight bars 12 1.50 4.00 1.00 4.00
0.00 stirrups 10 1.00 9.00 9.00
RB-1 straight bars 12 6.00 4.00 0.00 0.00
0.00 top cut bars 12 1.50 2.00 0.00
bott. Cut bars 12 3.00 1.00 0.00
stirrups 10 0.90 36.00 0.00
straight bars 12 4.50 4.00 0.00 0.00
0.00 top cut bars 12 1.20 2.00 0.00
bott. Cut bars 12 2.50 1.00 0.00
stirrups 10 0.90 27.00 0.00
RB-2 straight bars 16 6.00 4.00 0.00 0.00
0.00 top cut bars 16 1.50 2.00 0.00
bott. Cut bars 16 3.00 1.00 0.00
stirrups 10 1.10 36.00 0.00
RB-3 straight bars 12 6.00 4.00 0.00 0.00
0.00 stirrups 10 0.70 36.00 0.00
straight bars 12 2.50 4.00 0.00 0.00
0.00 stirrups 10 0.70 15.00 0.00
LB-2 straight bars 12 2.50 4.00 0.00 0.00
0.00 stirrups 10 0.80 15.00 0.00
CB-2 straight bars 12 1.50 4.00 0.00 0.00
0.00 stirrups 10 0.80 9.00 0.00
SLAB ON FILL longitudinal 10 0.00 0.00 0.00 0.00
cross section 10 0.00 0.00 0.00
SUSPENDED SLAB top bars(longitudinal) 10 5.00 16.67 1.00 16.67
top bars (cross section) 10 8.00 26.67 26.67
cut bars(longitudinal) 12 1.25 10.00 10.00
cut bars (cross section) 12 4.00 10.00 10.00
bent up bars(longitudinal) 10 5.00 16.67 16.67
two way bent up bars (cross section) 10 8.00 26.67 26.67
MB-1 (30.00m) straight bars 16 30.83 4.00 3.00 12.00
@ GL A web bars 12 30.83 2.00 6.00
stirrups 10 1.40 784.00 2,352.00
MB-2(20.00m) straight bars 16 20.83 4.00 3.00 12.00
@ GL 1 web bars 12 20.83 2.00 6.00
stirrups 10 1.40 162.00 486.00
MB (30.00m) straight bars 16 30.83 4.00 1.00 4.00
@ GL A web bars 12 30.83 2.00 2.00
stirrups 10 1.40 184.00 184.00
Midbeam
RB-1 (20.00m) straight bars 16 20.83 4.00 1.00 4.00
@ GL 1 web bars 12 20.83 2.00 2.00
top cut bars-end support 16 0.93 2.00 2.00 4.00
top cut bars-middle support 16 1.65 2.00 2.00 4.00
top cut bars-middle support 16 2.90 2.00 1.00 2.00
top cut bars-middle support 16 2.28 2.00 2.00 4.00
bottom cut bars 16 1.50 2.00 4.00 8.00
bottom cut bars 16 3.00 2.00 2.00 4.00
stirrups 10 1.40 162.00 162.00
RB-1 (30.00m) straight bars 16 30.83 4.00 1.00 4.00
web bars 12 30.83 2.00 2.00
top cut bars-end support 16 1.98 2.00 1.00 2.00
top cut bars-middle support 16 1.78 2.00 1.00 2.00
top cut bars-middle support 16 1.90 2.00 23.00 46.00
top cut bars-middle support 16 1.55 2.00 7.00 14.00
bottom cut bars 16 1.80 2.00 24.00 48.00
bottom cut bars 16 1.50 2.00 8.00 16.00
stirrups 10 1.40 784.00 784.00
RB-2 (20.00m) straight bars 16 20.83 4.00 4.00 16.00
web bars 12 20.83 2.00 8.00
top cut bars-end support 16 0.93 2.00 2.00 16.00
top cut bars-middle support 16 1.65 2.00 2.00 16.00
top cut bars-middle support 16 2.90 2.00 1.00 8.00
top cut bars-middle support 16 2.28 2.00 2.00 16.00
bottom cut bars 16 1.50 2.00 4.00 32.00
bottom cut bars 16 3.00 2.00 2.00 16.00
stirrups 10 1.40 162.00 648.00
S.Angle (20.00m) straight bars 16 20.83 4.00 4.00 16.00
@ GL A web bars 12 20.83 2.00 8.00
top cut bars-end support 16 0.93 2.00 2.00 16.00
top cut bars-middle support 16 1.65 2.00 7.00 56.00
bottom cut bars 16 1.50 2.00 8.00 64.00
stirrups 10 1.40 184.00 736.00
roofbeam
Ground Slab transverse 12 92.00 41.00 1.00 41.00
92 x 20 longitudinal 12 20.00 185.00 185.00
Ground Slab transverse 12 42.00 41.00 1.00 41.00
42 x 20 longitudinal 12 20.00 85.00 85.00
Ground Slab
12MMØ 16MMØ
0.888 6.00 5.33 1.578 6.00 9.47
0.888 7.50 6.66 1.578 7.50 11.84
0.888 9.00 7.99 1.578 9.00 14.20
0.888 10.50 9.32 1.578 10.50 16.57
0.888 12.00 10.66 1.578 12.00 18.94

TOTAL NO. OF NO. OF NO. OF TOTAL BAR


COMML
COMML VER/LONG HOR/TRANS INTERSECTI
LENGTH
LENGTH BAR BAR ON

0.00 6.00 0.00 0.00 0.00 0.00 0.00


0.00 6.00
0.00 0.00 86
16MMØ 0.00
TIE WIRE 0.00
0.00 9.00 0.00 16.00 0.00 227.23 0.00
0.00 6.00 0.00 20.00 73.92
0.00 6.00 0.00 17.00 62.83
0.00 9.00 0.00 16.00 0.00 227.23 0.00
0.00 6.00 0.00 21.00 77.62
0.00 6.00 0.00 17.00 62.83
0.00 9.00 0.00 16.00 0.00 227.23 0.00
0.00 6.00 0.00 21.00 77.62
0.00 6.00 0.00 18.00 66.53
1,103.04 0.00
16MMØ 681.70
10MMØ 421.34
TIE WIRE -
0.00 6.00 0.00 18.00 0.00 170.42 0.00
0.00 6.00 0.00 20.00 73.92
0.00 9.00 0.00 12.00 0.00 170.42 0.00
0.00 6.00 0.00 22.00 81.31
496.08 0.00
16MMØ 340.85
10MMØ 155.23
TIE WIRE -
0.00 6.00 0.00 12.00 0.00 170.42 0.00
0.00 6.00 0.00 17.00 62.83
0.00 9.00 0.00 8.00 0.00 113.62 0.00
0.00 6.00 0.00 17.00 62.83
409.70 0.00
16MMØ 284.04
10MMØ 125.66
TIE WIRE -
0.00 6.00 0.00 8.00 0.00 75.74 0.00
0.00 6.00 0.00 1.00 9.47
0.00 6.00 0.00 1.00 9.47
0.00 6.00 0.00 15.00 55.44
0.00 9.00 0.00 8.00 0.00 151.49 0.00
0.00 6.00 0.00 2.00 18.94
0.00 7.50 0.00 2.00 18.94
0.00 6.00 0.00 22.00 81.31
0.00 6.00 0.00 4.00 0.00 37.87 0.00
0.00 6.00 0.00 1.00 9.47
0.00 6.00 0.00 1.00 9.47
0.00 6.00 0.00 9.00 33.26
0.00 6.00 0.00 4.00 0.00 37.87 0.00
0.00 6.00 0.00 1.00 9.47
0.00 6.00 0.00 1.00 9.47
0.00 6.00 0.00 7.00 25.87
0.00 7.50 0.00 1.50 0.00 17.75 0.00
0.00 6.00 0.00 0.50 4.73
0.00 6.00 0.00 0.50 4.73
0.00 6.00 0.00 3.00 11.09
0.00 7.50 0.00 1.50 0.00 6.93 0.00
0.00 6.00 0.00 3.00 11.09
6.00 6.00 1.00 1.00 36.00 5.33 0.20
9.00 6.00 1.50 2.00 7.39
0.00 6.00 0.00 8.00 0.00 42.62 0.00
0.00 6.00 0.00 1.00 5.33
0.00 6.00 0.00 1.00 5.33
0.00 6.00 0.00 11.00 40.66
0.00 9.00 0.00 8.00 0.00 85.25 0.00
0.00 6.00 0.00 2.00 10.66
0.00 6.00 0.00 2.00 10.66
0.00 6.00 0.00 17.00 62.83
0.00 6.00 0.00 4.00 0.00 37.87 0.00
0.00 6.00 0.00 0.50 4.73
0.00 6.00 0.00 0.50 4.73
0.00 6.00 0.00 7.00 25.87
0.00 6.00 0.00 4.00 0.00 21.31 0.00
0.00 6.00 0.00 5.00 18.48
0.00 7.50 0.00 2.00 0.00 13.32 0.00
0.00 6.00 0.00 2.00 7.39
0.00 7.50 0.00 1.50 0.00 9.99 0.00
0.00 6.00 0.00 2.00 7.39
0.00 6.00 0.00 2.00 0.00 10.66 0.00
0.00 6.00 0.00 2.50 9.24
1,096.91 0.20
16MMØ 472.22
12MMØ 227.38
10MMØ 397.32
TIE WIRE 0.20
0.00 5.60 0.00 18.00 0.00 66.53 0.00
0.00 6.00 0.00 17.00 62.83
133.33 6.00 22.22 23.00 988.89 85.01 5.60
133.33 5.60 23.81 24.00 88.70
40.00 6.00 13.33 14.00 74.59
12.50 6.00 4.17 5.00 26.64
133.33 6.00 22.22 23.00 85.01 0.00
133.33 5.60 23.81 24.00 88.70
578.02 5.60
12MMØ 101.23 18.99
10MMØ 476.78 128.86
TIE WIRE 5.60

16MMØ 151.52
12MMØ 53.30
10MMØ 55.50
TIE WIRE 4.00
168.00 7.50 6.00 784.00 14,112.00 1,988.70 95.86
84.00 7.50 559.65
588.00 6.00 2,175.60
24.00 12.00 6.00 162.00 2,916.00 454.56 19.81
12.00 12.00 127.92
41.00 6.00 151.70
8.00 12.00 6.00 184.00 1,104.00 151.52 7.50
4.00 12.00 42.64
46.00 6.00 170.20
5,822.49 387.48 69
8.00 12.00 8.00 162.00 1,296.00 151.52 8.80
4.00 12.00 42.64
1.00 6.00 9.47
1.00 7.50 11.84
1.00 6.00 9.47
1.00 10.50 16.57
2.00 6.00 18.94
2.00 6.00 18.94
41.00 6.00 151.70
56.00 7.50 8.00 784.00 6,272.00 662.90 42.60
28.00 7.50 186.55
1.00 7.50 11.84
0.00
16.00 6.00 151.52
2.00 12.00 37.88
10.00 9.00 142.05
4.00 6.00 37.88
196.00 6.00 725.20
32.00 12.00 8.00 162.00 5,184.00 606.08 35.21
16.00 12.00 170.56
4.00 6.00 37.88
4.00 7.50 47.35
4.00 6.00 37.88
4.00 10.50 66.29
8.00 6.00 75.76
8.00 6.00 75.76
41.00 6.00 151.70
32.00 12.00 8.00 41.00 1,312.00 606.08 8.91
16.00 12.00 170.56
16.00 6.00 151.52
8.00 12.00 151.52
16.00 6.00 151.52
184.00 6.00 680.80
5,568.17 95.53 92
328.00 12.00 41.00 185.00 7,585.00 3,496.48 51.52
370.00 10.50 3,451.18
246.00 7.50 41.00 85.00 3,485.00 1,638.98 23.67
170.00 10.50 1,585.68
10,172.31 75.19 76
#REF!
#REF!
FINISHING WORKS
PLASTERING WORKS
NO. OF
MARK LENGTH HEIGHT SIMILAR FACE
STRUCTURES
walls

Exterior/Interior Plastering

Total
Computation:
Cement 834.98 say 835.00 bags
Sand 46.39 say 50.00 m³

TILE WORKS
(length) no. of
MARK LENGTH WIDTH say
pcs.
Ground Floor
24"x24"Homogenous floor tiles
Library 10.00 7.00 16.67 17.00
Moot Court 9.30 7.00 15.50 16.00
SBO/SAS office 4.25 7.00 7.08 8.00
Deans office 6.75 5.00 11.25 12.00
12"x12"Homogenous floor tiles
Comport room (floor) 6.75 5.00 22.50 23.00
Comport room (floor) 6.75 5.00 22.50 23.00

Comport room (wall) 14.00 2.20 46.67 47.00


Comport room (wall) 10.00 2.20 33.33 34.00
Comport room (wall) 4.60 2.20 15.33 16.00
Comport room (wall) 5.00 2.20 16.67 17.00
24"x24"Homogenous floor tiles
Class room 10.00 7.00 16.67 17.00
4.00 10.00 6.67 7.00
9.30 7.00 15.50 16.00
9.30 7.00 15.50 16.00
hallways 3.00 50.00 5.00 5.00
lobbies 5.15 7.00 8.58 9.00
porch 2.00 6.00 3.33 4.00
platform 10.00 4.20 16.67 17.00
balcony 6.20 6.00 10.33 11.00
Entry along canopy area 6.00 6.00 10.00 10.00
fire scape areas 2.00 5.00 3.33 4.00
stair & landing 7.00 4.50 11.67 12.00
3.70 4.50 6.17 7.00
2nd Floor
24"x24"Ceramic floor tiles
area-1 8.00 7.00 13.33 14.00

cement fin. w/ h2o proofing


area-1 3.00 4.50
3rd Floor
24"x24"Ceramic floor tiles
area-1 8.00 7.00 13.33 14.00

cement fin. w/ h2o proofing


area-1 3.00 4.50
roof deck
cement fin. w/ h2o proofing 8.00 7.00
area-1 3.00 4.50

CEILING WORKS
(length) no. of
MARK LENGTH WIDTH say
pcs.
2nd floor hardiflex ceiling board
open ceiling 8.50 5.00
1.20 2.00
total
(length) no. of
MARK LENGTH WIDTH say
pcs.
2nd floor double furring channel
open ceiling 8.50 5.00 21.25 22.00
1.20 2.00 1.20 2.00
total
(length) no. of
MARK LENGTH comm'l. length say
pcs.
2nd floor wall angle
open ceiling 42.40 3.00 14.13 15.00
total
(length) no. of
MARK LENGTH WIDTH say
pcs.
2nd floor carrying channel
open ceiling 8.50 5.00 7.08 8.00
total
PAINTING WORKS ceiling area 89.80
mark 1st coating 2nd coating 3rd coating
Flat latex paint 3.59 2.99 2.57
Masonry putty 4.49
latex color 0.45
sand paper 5.99
roller brush
paint brush
stupa rug

PAINTING WORKS wall area 4.90


mark 1st coating 2nd coating 3rd coating
Flat latex paint 0.20
Semi-gloss Latex 0.20 0.16 0.16
Easytite with hardener
latex color 0.05
sand paper 0.98
roller brush
paint brush
stupa rug

Painting door area 27.00


mark 1st coating 2nd coating 3rd coating
QDE paint 0.90 0.54
Easytite with hardener 0.36
Paint thinner 0.50
tinting color 0.11
sand paper 5.40
roller brush
paint brush
stupa rug

Painting Metal 336.34


mark 1st coating 2nd coating 3rd coating
QDE paint 11.21 6.73
Easytite with hardener 3.36
Paint thinner 84.09
tinting color
sand paper
roller brush
paint brush
stupa rug
Painting Exterior wall 1,640.16
mark 1st coating 2nd coating 3rd coating
Flat latex paint 54.67
Semi-gloss Latex 54.67 41.00 32.80
latex color 8.20
Patching Compound
sand paper 164.02
roller brush
paint brush
stupa rug

Painting Exposed Conc. 56.89


mark 1st coating 2nd coating 3rd coating
Flat latex paint 1.90
Semi-gloss Latex 1.90 1.42 1.14
latex color 0.28
sand paper 5.69
roller brush
paint brush
stupa rug

TOILET PARTITIONS
total no. of total
MARK LENGTH WIDTH
unit Area (m²)
Phenolic board
female 1.50 1.60 4.00 20.16
0.20 1.60 2.00 1.34
0.40 1.60 3.00 4.03
male 1.50 1.60 2.00 10.08
0.20 1.60 2.00 1.34
0.40 1.60 1.00 1.34
urinal partitions 0.45 0.90 6.00 5.10
total 43.41

DOORS
total no. of total
MARK LENGTH WIDTH
unit Area (m²)
Phenolic board
female 0.60 1.60 4.00 8.06
male 0.60 1.60 2.00 4.03
total 12.10

DECORATIVE STONE
MARK LENGTH WIDTH total Area (m²) say
wall angle
Area-1 9.00 1.00 36.00 36.00
Area-2 1.75 5.00 17.50 18.00
Area-3 9.50 2.00 38.00 18.00
Area-4 9.50 1.00 19.00 19.00
Area-5 9.00 0.60 10.80 11.00
total 102.00
25.50
ALUM. CLADDING

MARK LENGTH WIDTH total Area (m²) say


wall angle
Area-1 5.70 1.50 34.20 18.00
5.70 0.50 11.40 3.00

Area-2 17.70 1.50 53.10 54.00


total 75.00

FINISHING WORKS(Second floor)


PLASTERING WORKS
NO. OF
MARK LENGTH HEIGHT SIMILAR FACE
STRUCTURES
walls

Exterior/Interior Plastering #REF! #REF! #REF! 2.00

Total
Computation:
Cement #REF! say 500.00 bags
Sand #REF! say 35.00 m³

TILE WORKS
(length) no. of
MARK LENGTH WIDTH say
pcs.
Ground Floor
concrete pavers
27.50 2.40
24"x24"Granite tiles
gen. merch. 10.00 4.00 16.67 17.00
asessment area 5.00 5.20 8.33 9.00
souvinir area 7.00 4.20 11.67 12.00
photocopy/printing 12.00 8.00 20.00 20.00
300x300mm tile
1.60 1.50 5.33 6.00
Toilet 5.90 1.60
400x400mm tile 1.60 1.50 5.33 6.00
Stairs
Peeble washed out 11.00 2.00

mezz. Floor
concrete pavers
27.50 2.40
24"x24"Granite tiles
open room storage 4.00 3.00
1,2,3,4 16.00 6.00
Corridor
plain cement fin. 29.00 2.25
Stairs
Peeble washed out 11.00 2.00

2nd floor
plain cement fin.
corridor-1 27.50 2.25
corridor-2 27.50 2.40

24"x24"Granite tiles
dig./audio visual 8.00 8.00
photo studio 4.00 8.00
wellness room 4.00 8.00
office 4.00 8.00
300x300mm tile
toilet 1.50 1.45 5.00 5.00
Toilet 5.90 1.60

CEILING WORKS
(length) no. of
MARK LENGTH WIDTH say
pcs.
4th floor
.19mx3mts long
Hall way-1 37.40 2.00
Hall way-2 20.70 2.00
Hall way-3 32.00 2.00
Hall way-4 13.00 2.00
Hall way-5 10.00 4.00

1/4"thk. Hardiflex
hall way 2.00 2.00 6.00
total

total length comm'l.


MARK LENGTH WIDTH
(l.m) length(m)
double furring channel
hallway 280.00 2.00 2,800.00 5.00
total

comm'l. total length


MARK LENGTH say
length(m) (l.m)
wall angle
hallway 560.00 3.00 186.67 187.00
total 560.00 187.00
total area(m²) length/sq.m comm'l. length
carrying channel 24.00 1.50 5.00 7.20
double furring clip 5.00 15.00
total area(m²) no. of pcs./sq.m
blind rivets 24.00 20.00 480.00
total lenght(l.m²) kgs./l.m
1" conc. Nail 560.00 0.03 14.00

Painting ceiling area 24.00


mark 1st coating 2nd coating 3rd coating
Flat latex paint 0.80
Semi-gloss Latex 0.80 0.60 0.40
Easytite with hardener 0.24
latex color 0.12
sand paper 2.40
roller brush
paint brush
stupa rug
Painting door area #REF!
mark 1st coating 2nd coating 3rd coating
QDE paint #REF! #REF!
Easytite with hardener #REF!
Paint thinner 0.75
tinting color #REF!
sand paper #REF!
roller brush
paint brush
stupa rug

Painting Metal 139.20


mark 1st coating 2nd coating 3rd coating
QDE paint 4.64 2.78
Easytite with hardener 1.39
Paint thinner 0.46
tinting color
sand paper
roller brush
paint brush
stupa rug

Painting Interior wall #REF!


mark 1st coating 2nd coating 3rd coating
Flat latex paint #REF!
Semi-gloss Latex #REF! #REF! #REF!
latex color #REF!
sand paper #REF!
roller brush
paint brush
stupa rug

TOILET PARTITIONS
total no. of total
MARK LENGTH WIDTH
unit Area (m²)
Phenolic board
female 1.50 1.60 4.00 20.16
0.20 1.60 2.00 1.34
0.40 1.60 3.00 4.03
male 1.50 1.60 2.00 10.08
0.20 1.60 2.00 1.34
0.40 1.60 1.00 1.34
urinal partitions 0.45 0.90 6.00 5.10
total 43.41

DOORS
total no. of total
MARK LENGTH WIDTH
unit Area (m²)
Phenolic board
female 0.60 1.60 4.00 8.06
male 0.60 1.60 2.00 4.03
total 12.10

DECORATIVE STONE

MARK LENGTH WIDTH total Area (m²) say


wall angle
Area-1 9.00 1.00 36.00 36.00
Area-2 1.75 5.00 17.50 18.00
Area-3 9.50 2.00 38.00 18.00
Area-4 9.50 1.00 19.00 19.00
Area-5 9.00 0.60 10.80 11.00
total 102.00
25.50
ALUM. CLADDING

MARK LENGTH WIDTH total Area (m²) say


wall angle
Area-1 1.50 16.00 48.00 48.00
Area-2 1.50 14.00 42.00 42.00
Area-3 7.00 4.00 28.00 28.00
total 118.00
Quantity of cement and sand for plaster per square meter area

Mixture Cement in bags Thickness of Plaster


class 8 mm 12mm 16mm

A 0.144 0.216 0.288


B 0.096 0.144 0.192
C 0.072 0.108 0.144
D 0.06 0.09 0.12
Sand 0.008 0.012 0.016

AREA (m²)

1,855.51

(width) no. total no. total no. of total area


say
of pcs. of pcs. pcs. (m²)

-
11.67 12.00 204.00 70.00
11.67 12.00 192.00 65.10
11.67 12.00 96.00 29.75
8.33 9.00 108.00 600.00 33.75
-
16.67 17.00 391.00 391.00 33.75
16.67 17.00 391.00 391.00 33.75
782.00
7.33 8.00 376.00 30.80 58.23 59.00
7.33 8.00 272.00 22.00
7.33 8.00 128.00 10.12
7.33 8.00 136.00 912.00 11.00

11.67 12.00 204.00 70.00


16.67 17.00 119.00 40.00
11.67 12.00 192.00 65.10
11.67 12.00 192.00 65.10
83.33 84.00 420.00 150.00
11.67 12.00 108.00 36.05
10.00 10.00 40.00 12.00
7.00 7.00 119.00 42.00
10.00 10.00 110.00 37.20
10.00 10.00 100.00 36.00
8.33 9.00 36.00 10.00
7.50 8.00 96.00 31.50
7.50 8.00 56.00 1,792.00 16.65

-
11.67 12.00 168.00 56.00
168.00

13.50

-
11.67 12.00 168.00 56.00 182.00
168.00
#REF!
13.50 #REF!

56.00
13.50 69.50

(width) no. total no. total area no. of


say say
of pcs. of pcs. (m²) pcs.

42.50 14.76 15.00


2.40 0.83 1.00
44.90 16.00 pcs
(width) no. total no. no. of
say furring clip say
of pcs. of pcs. pcs.

21.25 22.00 44.00 21.25 12.50 265.63 270.00


1.20 2.00 4.00 3.00 5.00 15.00 20.00
48.00 pcs 290.00 pcs
(width) no. total no. total area no. of
say say
of pcs. of pcs. (m²) pcs.

15.00
- 15.00
(width) no. total no. total area no. of
say say
of pcs. of pcs. (m²) pcs.

42.50 8.00
42.50 8.00
3rd coating gal say unit
9.15 4.00 0.90 1.00 tin
4.00 - 4.00 gal
1.00 lits
20.00 pcs 5,716.80 114.34
2.00 pcs
5.00 pcs
5.00 kg
1 Acrylic semi-gloss latext paint finis

3rd coating gal say unit


4.00 0.05 4.00 tin
0.52 4.00 0.13 10.00 tin

4.00 lits
80.00 pcs 5,716.80 114.34
5.00 pcs
12.00 pcs
10.00 kg
1 Acrylic semi-gloss latext paint finis
2 Flat latex paint boysen white
3 Flat wall enamel paint
3rd coating gal/tin say unit 4 Q.D.E. Paint Boysen
1.44 2.00 gal 5 Masonry putty
1.00 gal 6 Easytite w/ Hardiner
1.00 gal 7 Perlite (patching compound)
0.50 lits 8 Stikwel
20.00 pcs 9 Sand paper
pcs 10 Paint Rower
4.00 pcs 11 Paint Brush
2.00 kg 12 Paint Thinner
13 Consumable like tinting colors

3rd coating gal/tin say unit


17.94 4.00 4.48 5.00 tin
gal
5.00 gal
2.00 lits
pcs
4.00 pcs
10.00 pcs
5.00 kg
3rd coating gal say unit
4.00 13.67 14.00 tin 15.00
128.48 4.00 32.12 35.00 tin 37.00
9.00 lits
2.00 sacks
200.00 pcs
8.00 pcs
15.00 pcs
10.00 kg

3rd coating gal say unit


4.00 0.47 1.00 gal
4.46 4.00 1.11 2.00 gal
10.00 lits
10.00 pcs
1.00 pcs
2.00 pcs
3.00 kg

say

say
unit

917.40
811.80
224.40
26.00 6.80 1,953.60
7.00

unit


AREA (m²)

#REF!
#REF!
#REF!

(width) no. total no. total no. of total area


say
of pcs. of pcs. pcs. (m²)

66.00

6.67 7.00 119.00 40.00


8.67 9.00 81.00 26.00
7.00 7.00 84.00 29.40
13.33 14.00 280.00 96.00
191.40 sq.m
5.00 5.00 30.00 2.40 sq.m
9.44 sq.m
5.00 5.00 30.00 2.40 sq.m
11.84
22.00 sq.m

66.00

12.00
96.00
108.00
65.25
65.25 sq.m
22.00 sq.m

61.88
66.00
127.88 sq.m

64.00
32.00
32.00
32.00
160.00 sq.m
4.83 5.00 25.00 2.18 sq.m
9.44 sq.m
11.62 sq.m

Quantity of cement and sand for plaster per square meter area

Mixture Cement in bags Thickness of Plaster


class 8 mm 12mm 16mm

A 0.144 0.216 0.288


B 0.096 0.144 0.192
C 0.072 0.108 0.144
D 0.06 0.09 0.12
Sand 0.008 0.012 0.016
(width) no. total no. total area no. of
say say
of pcs. of pcs. (m²) pcs.

74.80 131.23 132.00


41.40 72.63 73.00
64.00 112.28 113.00
26.00 45.61 46.00
40.00 70.18 71.00
246.20 435.00

24.00 8.33 9.00


24.00 8.33 9.00 pcs

total no. of
say unit area (m²)
pcs.

560.00 560.00 pcs 560.00 3,500.00 907.00


560.00 pcs

unit

pcs
pcs

4.00 pcs
75.00

240.00 pcs

0.50 kgs

3rd coating gal say unit


4.00 0.20 2.00 gal
1.80 4.00 0.45 4.00 gal
4.00 gal
2.00 lits
30.00 pcs 5,716.80 114.34
2.00 pcs
5.00 pcs
5.00 kg
1 Acrylic semi-gloss latext paint finis
2 Flat latex paint boysen white
3 Flat wall enamel paint
3rd coating gal/tin say unit 4 Q.D.E. Paint Boysen
#REF! 4.00 #REF! 3.00 tin 5 Masonry putty
4.00 gal 6 Easytite w/ Hardiner
4.00 gal 7 Perlite (patching compound)
1.00 lits 8 Stikwel
50.00 pcs 9 Sand paper
pcs 10 Paint Rower
8.00 pcs 11 Paint Brush
10.00 kg 12 Paint Thinner
13 Consumable like tinting colors

3rd coating gal/tin say unit


7.42 4.00 1.86 8.00 gal
3.00 gal
5.00 gal
lits
pcs
pcs
5.00 pcs
5.00 kg

3rd coating gal say unit


4.00 #REF! 10.00 tin
#REF! 4.00 #REF! 22.00 tin
6.00 lits
330.00 pcs
15.00 pcs
20.00 pcs
20.00 kg

say
say

unit

917.40
811.80
224.40
26.00 6.80 1,953.60
7.00

unit


are meter area

ags Thickness of Plaster


20mm 25mm

0.36 0.45
0.24 0.3
0.18 0.225
0.15 0.188
0.02 0.025

3.67 4.00 472.00


mi-gloss latext paint finish, boysen white

mi-gloss latext paint finish, boysen white gals 10.00 5.00 50.00
paint boysen white gals 6.00 5.00 30.00
namel paint gals 2.00 5.00 10.00
gals 1.00 5.00 5.00
gals 1.00 5.00 5.00
ltrs 2.00 5.00 10.00
tching compound) ltrs 10.00 5.00 50.00
lits 1.00 5.00 5.00
pcs 150.00 5.00 750.00
pcs 2.00 5.00 10.00
pcs 5.00 5.00 25.00
gals 2.00 5.00 10.00
le like tinting colors lits 2.00 5.00 10.00
are meter area

ags Thickness of Plaster


20mm 25mm

0.36 0.45
0.24 0.3
0.18 0.225
0.15 0.188
0.02 0.025
mi-gloss latext paint finish, boysen white gals 10.00 5.00 50.00
paint boysen white gals 6.00 5.00 30.00
namel paint gals 2.00 5.00 10.00
gals 1.00 5.00 5.00
gals 1.00 5.00 5.00
ltrs 2.00 5.00 10.00
tching compound) ltrs 10.00 5.00 50.00
lits 1.00 5.00 5.00
pcs 150.00 5.00 750.00
pcs 2.00 5.00 10.00
pcs 5.00 5.00 25.00
gals 2.00 5.00 10.00
le like tinting colors lits 2.00 5.00 10.00
CONCRETE WORKS
FOR ONE (1) STRUCTURE NO. OF
TOTAL
SIMILAR
MARK LENGTH WIDTH HEIGHT VOLUME
STRUCTUR
(m.) (m.) (m.) (m³)
E
F-1 0.00 0.00
37.00
FTB
0.00 0.00
21.00
GB
0.00 0.00
14.00
C-1
C-2
C-1 0.00 0.00
42.00
B-1

B-2
B-3
B-4 0.00 0.00
31.00
LB-1 0.00 0.00
2.00
CB-1 0.00 0.00
2.00
RB-1

RB-2
RB-3
RB-4 0.00 0.00
18.00
LB-2 0.00 0.00
1.00
CB-2 0.00 0.00
1.00
SLAB ON FILL
0.00 0.00
39.00
SUSPENDED SLAB 3.50 1.20 0.10 1.00 0.42

0.42 3.78
STAIRS
0.00 0.00
39.00
Total 0.42 0.45 4.54
say 5.00
0.00 0.00
2.50 5.00

0.00 0.00
1.50 3.00

0.00 0.00
1.00 2.00

0.00 0.00
2.50 5.00

0.00 0.00
2.00 4.00
0.00 0.00
0.10 0.20
0.00 0.00
0.10 0.20

0.00 0.00
1.00 2.00
0.00 0.00
0.05 0.10
0.00 0.00
0.05 0.10

0.00 0.00
2.50 5.00

0.21 0.42

0.00 0.00
2.50 5.00
0.23 0.45
0.30 0.50 5.80
Rate/day Rate/hour
Proj. Engineer 600.00 75.00
Construction Foreman 500.00 62.50
Mason 450.00 56.25
Carpenter 450.00 56.25
H.E. Operator 500.00 62.50
L.E. Operator 500.00 62.50
Driver 300.00 37.50
Steelman 400.00 50.00
Labor 300.00 37.50
Painter 450.00 56.25
Roof Installer 450.00 56.25
Welder 500.00 62.50
Glass Installer 300.00 37.50
Plumber 400.00 50.00
Electrician 450.00 56.25
Rate/day Rate/hour
Road Grader 7,500.00
Payloader 7,000.00
Road Roller 6,500.00
Water Truck 4,500.00
Transit Mixer 1,500.00
One Bagger Mixer 400.00
Concrete Cutter 400.00
Concrete Vibrator 250.00
Welding Machine 450.00
Electric grinder 150.00
Bar cutter 200.00
Description Amount unit
Portland Cement 280.00 /bags
Screened Gravel 1,300.00 /cu.m
Washed Sand 600.00 /cu.m
Asphalt Sealant 110.00 /lit
Assorted Nails 75.00 /kg
16mmØ Def. bars 60.00 /kg
Form Lumber 2"x5"x12' Coco lumber 24.00 /bd.ft
Aggregate Sub-Basecoarse 400.00 /cu.m
#16 G.I. tie wire 85.00 /kg
1/2"x4'x8' Form Plywood 560.00 /pc
Asst. Form lumber 24.00 /bd.ft
6" CHB 12.00 /pc
Tile Adhessive 190.00 /bags
16"x16" Ceramic tile 85.00 /pc
16"x16" Outdoor tile 65.00 /pc
Tile Grout 25.00 /kg
Flat Latex paint 1,810.00 /tin
Semi-gloss Latex paint 2,370.00 /tin
Latex color 120.00 /lit
Patching compound 15.00 /kg
Stickwel 195.00 /lit
Roller brush 100.00 /pc
Paint brush 45.00 /pc
Sandpaper 25.00 /pc
Stupa Rag 20.00 /kg
Tile Roof Roofing sheet (.5mm thk.) 420.00 /sq.m
Ridge roll 450.00 /pc
Gutter 450.00 /pc
Tekscrew 1.75 /pc
Silicon Sealant 150.00 /tube
Blind Rivets 500.00 /box
Touch-up paint 150.00 /lit
1.5mm x 2"x6" CEE purlins 650.00 /pc
1.2mm x 2"x4" CEE purlins 397.00 /pc
1.0mm x 2"x3" CEE purlins 400.00 /pc
10mmØ Plain Round bar 138.00 /pc
1/4" x 10"x10" Base plate 250.00 /pc
Welding rod 1,200.00 /box
12mmØ x 10" Anchor bolts w/ 120.00 /pc
8"x8" Glazed tile 32.00 /pc
8"x8" Unglazed tile 32.00 /pc
Tile trim 78.00 /pc
Tile Grout 25.00 /kg
4"Ø Diamond cutter 450.00 /pc
3"Ø PVC pipe 460.00 /pc
3"Ø PVC Elbow 1/4 bend 53.00 /pc
2"Ø Stainless Steel pipe 3,250.00 /pc
3/16"x1" Flat bar 235.00 /pc
3/4"x3/4" Square bar 245.00 /pc
Welding rod/Accessories 2,500.00 /lot
4"Ø Grinding disk 65.00 /pc
Water closets w/ Accessories 2,800.00
Wall hang lavatory w/ Accessories 1,800.00
Soap holder 250.00
Tissue holder 250.00
Towel holder 450.00
4"x4" Floor drain 350.00
Ordinary faucet 65.00
Clean water line pipes and accessories 2,000.00
Sewer pipe line and accessories 3,500.00
2x40W FL lamp w/ housing 1,500.00
25W CFL 60.00
4"x4" Pinlight 250.00
Receptacle 4"Ø 50.00
Single pole switch 120.00
Two pole switch 165.00
3-Way switch 210.00
Main ACB 6-holes 1,850.00
4"x4" Junction box 35.00
2"x4" Utility box 35.00
1/2"Ø PVC pipe x 3.00 mts. 61.00
3.5mm² THHN wire 3,207.50
14mm² THHN wire 85.84
1'Ø PVC pipe x 3.00 mts. 102.00
1"Ø Long sweep elbow 38.00
1/2"Ø PVC Long sweep elbow 25.00
1"Ø RSC pipe x 3.00 mts. 420.00
1"Ø Entrance cap 65.00
3-Pole secondary rack 285.00
1"Ø Long sweep elbow (RSC) 85.00
Electrical tape 45.00
Hardiflex ceiling board 420.00
0.40mm 19mm x 50mm x 5m
Double furring channel 115.00
0.80mm 12mm x 38mm x 5m
Carrying Channel 140.00
0.40mm 25mm x 25mm x 3m
Wall angle 85.00
W-Clip 8.00
1-1/2" Concrete nail 90.00
Mesh tape 150.00
Blind rivets 500.00