Beruflich Dokumente
Kultur Dokumente
1
Calc. by Date Chk'd by Date App'd by Date
P 2/24/2020
WIND LOADING
In accordance with ASCE7-10
Using the directional design method
Tedds calculation version 2.1.05
Building data
Type of roof; Monoslope
Length of building; b = 100.00 ft
Width of building; d = 50.00 ft
Height to eaves; H = 50.00 ft
Pitch of roof; 0 = 20.0 deg
Mean height; h = 59.10 ft
General wind load requirements
Basic wind speed; V = 115.0 mph
Risk category; II
Velocity pressure exponent coef (Table 26.6-1); Kd = 0.85
Exposure category (cl 26.7.3); B
Enclosure classification (cl.26.10); Enclosed buildings
Internal pressure coef +ve (Table 26.11-1); GCpi_p = 0.18
Internal pressure coef –ve (Table 26.11-1); GCpi_n = -0.18
Gust effect factor; Gf = 0.85
2
Minimum design wind loading (cl.27.4.7); pmin_r = 8 lb/ft
Topography
Topography factor not significant; Kzt = 1.0
q = 0.00256 Kz Kzt Kd V 1psf/mph ;
2 2
Velocity pressure equation;
Velocity pressures table
z (ft) Kz (Table 27.3-1) qz (psf)
15.00 0.57 16.40
35.00 0.73 21.01
Project Job Ref.
2
Calc. by Date Chk'd by Date App'd by Date
P 2/24/2020
3
Calc. by Date Chk'd by Date App'd by Date
P 2/24/2020
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
2
(ft) (psf) (psf) (ft ) (kips)
A1 15.00 0.80 16.40 15.54 1500.00 23.31
A2 35.00 0.80 21.01 18.67 2000.00 37.34
A3 50.00 0.80 23.31 20.24 1500.00 30.35
B 59.10 -0.50 24.36 -5.97 6819.85 -40.70
C 59.10 -0.70 24.36 -10.11 2954.96 -29.87
D 59.10 -0.70 24.36 -10.11 2954.96 -29.87
Overall loading
Avert_w_0 = b H = 5000.00 ft
2
Projected vertical plan area of wall;
Avert_r_0 = b d tan(0) = 1819.85 ft
2
Projected vertical area of roof;
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_0 + pmin_r Avert_r_0 = 94.56 kips
Leeward net force; Fl = Fw,wB = -40.7 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 + Fw,wA_3 = 91.0 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 132.9 kips
Roof load case 3 - Wind 90, GCpi 0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
2
(ft) (psf) (psf) (ft ) (kips)
A (-ve) 59.10 -0.93 24.36 -23.55 1572.30 -37.02
B (-ve) 59.10 -0.86 24.36 -22.26 1572.30 -35.01
C (-ve) 59.10 -0.54 24.36 -15.49 2176.28 -33.71
Total vertical net force; Fw,v = -99.36 kips
Total horizontal net force; Fw,h = 0.00 kips
Walls load case 3 - Wind 90, GCpi 0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
2
(ft) (psf) (psf) (ft ) (kips)
A1 15.00 0.80 16.40 6.77 750.00 5.08
A2 35.00 0.80 21.01 9.90 1000.00 9.90
A3 50.00 0.80 23.31 11.47 750.00 8.60
A4 68.20 0.80 25.40 12.89 455.00 5.87
B 59.10 -0.30 24.36 -10.60 2954.96 -31.31
C 59.10 -0.70 24.36 -18.88 5000.00 -94.38
D 59.10 -0.70 24.36 -18.88 6819.85 -128.74
Overall loading
Avert_w_90 = d (H + d tan(0) / 2) = 2954.96 ft
2
Projected vertical plan area of wall;
2
Projected vertical area of roof; Avert_r_90 = 0.00 ft
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_90 + pmin_r Avert_r_90 = 47.28 kips
Project Job Ref.
4
Calc. by Date Chk'd by Date App'd by Date
P 2/24/2020
5
Calc. by Date Chk'd by Date App'd by Date
P 2/24/2020
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
2
(ft) (psf) (psf) (ft ) (kips)
A1 15.00 0.80 16.40 6.77 1500.00 10.15
A2 35.00 0.80 21.01 9.90 2000.00 19.80
A3 50.00 0.80 23.31 11.47 1500.00 17.20
A4 68.20 0.80 25.40 12.89 1819.93 23.46
B 59.10 -0.50 24.36 -14.74 5000.00 -73.68
C 59.10 -0.70 24.36 -18.88 2954.96 -55.78
D 59.10 -0.70 24.36 -18.88 2954.96 -55.78
Overall loading
Avert_w_180 = b (H + d tan(0)) = 6819.85 ft
2
Projected vertical plan area of wall;
Avert_r_180 = b d tan(0) = 1819.85 ft
2
Projected vertical area of roof;
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_180 + pmin_r Avert_r_180 = 123.68 kips
Leeward net force; Fl = Fw,wB = -73.7 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 + Fw,wA_3 + Fw,wA_4 = 70.6 kips
Overall horizontal loading; Fw,total = max(Fw - Fl - Fw,h, Fw,total_min) = 174.9 kips
Roof load case 6 - Wind 180, GCpi -0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
2
(ft) (psf) (psf) (ft ) (kips)
A (+ve) 59.10 -0.60 24.36 -8.04 5320.89 -42.77
Total vertical net force; Fw,v = -40.19 kips
Total horizontal net force; Fw,h = -14.63 kips
Walls load case 6 - Wind 180, GCpi -0.18, -cpe
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
2
(ft) (psf) (psf) (ft ) (kips)
A1 15.00 0.80 16.40 15.54 1500.00 23.31
A2 35.00 0.80 21.01 18.67 2000.00 37.34
A3 50.00 0.80 23.31 20.24 1500.00 30.35
A4 68.20 0.80 25.40 21.66 1819.93 39.42
B 59.10 -0.50 24.36 -5.97 5000.00 -29.84
C 59.10 -0.70 24.36 -10.11 2954.96 -29.87
D 59.10 -0.70 24.36 -10.11 2954.96 -29.87
Overall loading
Avert_w_180 = b (H + d tan(0)) = 6819.85 ft
2
Projected vertical plan area of wall;
Avert_r_180 = b d tan(0) = 1819.85 ft
2
Projected vertical area of roof;
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_180 + pmin_r Avert_r_180 = 123.68 kips
Leeward net force; Fl = Fw,wB = -29.8 kips
Project Job Ref.
6
Calc. by Date Chk'd by Date App'd by Date
P 2/24/2020
7
Calc. by Date Chk'd by Date App'd by Date
P 2/24/2020
Project Job Ref.
8
Calc. by Date Chk'd by Date App'd by Date
P 2/24/2020