We reference above subjects, I would like to bring your attention to the report regarding newly
proposed project to be award from client- North gate mall.
As we get opportunity to get involved with other NEW PROJECT From the Shaik (Client of Northgate
Mall) apart from our regular Design office works at North gate site, we would like share following report
to Business Management/Development Team in Head office for better understanding of volume and
scope of work.
Project Description:
This building luxurious palace/Villa to accommodate VIP range of occupant mainly for sheik family and
his working staff which consist of living area ,Majlis, sport and fitness, staff accommodation and kitchen
area for cocking purpose.
Building Details: There are mainly 4 different blocks are part one villa/Palace
Project History:
It’s been already design and freeze by previous consultant as per below system description
Consist of Duct able FCUs units with chilled water system to serve whole building including all 4 blocks
as listed above, with common ventilation system serve by FHAUs (Detail equipment schedule can be
seen in attached documents
Client wishes to redesign and verified the existed system as following reasons
The above listed task are only tentative, it may increase subjected to real time project design and
verification work.
As mentioned above volume of work required to be finished by minimum -FULL TIME team of Design
engineer and draftsman in order to complete the job in reasonable and acceptable period of time,
which is can’t be possible to achieve at here in NG site office as side job or extra work.
As Management well knows NG site strict working conditions working team is already fully loaded with
many regular day to day tasks, including HVAC design works: