TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.

TEC-211200-MET-DoR-002
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Rev. Date NA
Method statement for testing and commissioning of fire hose reel.
Pages 1 of 7

METHOD STATEMENT FOR TESTING COMMISSIONING OF


FIRE HOSE REEL

PROJECT : (Replace with the project’s name, at location , city name)

CLIENT : (Replace with the client’s name)

MASTER DEVELOPER : (Replace with the master developer’s name)

PMC : (Replace with the PMC’s name)

LEAD CONSULTANT : (Replace with the lead consultant’s name)

SUB-CONSULTANT : (Replace with the sub-consultant’s name)

MAIN CONTRACTOR : (Replace with the main contractor’s name)

SUB-CONTRACTOR : (Replace with the sub-contractor’s name)

TABLE OF CONTENTS
1. REVISION RECORD.............................................................................................................................3
2. PURPOSE...........................................................................................................................................4
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-211200-MET-DoR-002
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Rev. Date NA
Method statement for testing and commissioning of fire hose reel.
Pages 2 of 7

3. SCOPE................................................................................................................................................4
4. REFERENCES......................................................................................................................................4
4.1. Contract documents......................................................................................................................4
4.2. Contractors Submittal...................................................................................................................4
5. DEFINITIONS / ABBREVIATIONS........................................................................................................4
5.1. Definition.......................................................................................................................................4
5.2. Abbreviations................................................................................................................................4
6. RESPONSIBILITY.................................................................................................................................5
7. EQUIPMENTS/ TOOLS / MANPOWER/MATERIALS...........................................................................5
8. PRE COMMISSIONING PROCEDURE..................................................................................................5
8.1. Definition.......................................................................................................................................5
8.2. Visual Inspection...........................................................................................................................5
8.3. Hydrostatic Test............................................................................................................................5
8.4. Flushing.........................................................................................................................................6
9. COMMISSIONING PROCEDURE.........................................................................................................6
9.1. Equipment/Instruments to be used..............................................................................................6
10. HEALTH, SAFETY AND ENVIRONMENT..........................................................................................6
11. ATTACHMENTS..............................................................................................................................6
11.1. Inspection Checklists.................................................................................................................6
11.2. Inspection Test Plan..................................................................................................................6
11.3. Risk Assessment........................................................................................................................6

1. REVISION RECORD
This page is a record of all revisions of the document identified below by number and title. All
previous revisions are hereby superseded and are to be destroyed.
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-211200-MET-DoR-002
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Rev. Date NA
Method statement for testing and commissioning of fire hose reel.
Pages 3 of 7

Rev Date By Chkd. Approved Description of Revisions


0 First issue

Signature field
Revision
Revision
Number
Date
Prepared by Checked by

Reviewed
By Construction Technical QA/QC MEP Co- Sub-
Manager Manager Engineer HSE Officer ordinator contractor

Approved
By Project
Manager

2. PURPOSE
3. SCOPE
4. REFERENCES
4.1. Contract documents
1. Project Specification :- Division 21, Section 211200
2. Contract Drawings :-
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-211200-MET-DoR-002
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Rev. Date NA
Method statement for testing and commissioning of fire hose reel.
Pages 4 of 7

4.2. Contractors Submittal


3. Project Quality Plan :-
4. Project Safety Plan :-
5. Material approvals
Sr.
Description Material Sub. No. Rev No. Date Remarks
No.
1
2
3

6. Shop Drawings
Sr.
Description Shop Drawings Rev No. Date Remarks
No.
1
2
3

7. Related method Statements


Sr.
Description MET no. Rev No. Date Remarks
No.
1
2
3

5. DEFINITIONS / ABBREVIATIONS
5.1. Definition
1. Project -(Replace with project name)
2. Client -(Replace with clients name)
3. Developer -(Replace with developers name)
4. Consultant -(Replace with consultants name)
5. PMC -(Replace with PMC name)
6. Contractor -(Replace with contractors name)
7. Sub-contractor -(Replace with sub-contractors name)
8. Supplier -(Replace with suppliers name)
5.2. Abbreviations
1. Engineer - Representative of “Name of engineering consultancy”
2. ICL - Inspection Check List
3. IR - Inspection Request
4. ITL -Independent Testing Laboratory
5. ITP - Inspection and Test Plan
6. ITR -Inspection & Test Requests
7. MAT - Material Submittal
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-211200-MET-DoR-002
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Rev. Date NA
Method statement for testing and commissioning of fire hose reel.
Pages 5 of 7

8. MEP - Mechanical Electrical Plumbing


9. MET - Method Statement
10.MIR - Material Inspection Request
11.MSDS - Material Safety Data Sheet
12.PPE -Personal Protective Equipment
13.PQP -Project Quality Plan
14.PTW -Permit To Work ( Working at Height or enclosed spaces)
15.RA -Hazard Identification and Risk Assessment
16.RFIA - Request for Inspection and Approval
17.SPD - Shop Drawing
18.TBM - Temporary Bench Mark
6. RESPONSIBILITY
7. EQUIPMENTS/ TOOLS / MANPOWER/MATERIALS
8. PRE COMMISSIONING PROCEDURE
8.1. Definition
1. Fire Hose Reel -1” & 1 1/2” Fire Hose System
2. Automatic Wet System:It is a system that is attached to a water supply capable of supplying the
system demand at all fires and that requires no action other than opening a hose valve to provide
water at hose connection.
3. Minimum pressure requirement:
3.1. Hydraulically designed to provide 10 GPM (37.85 lpm) at a minimum residual pressure of 2.2 bars at
the outlet of the hydraulically most remote 1” dia. Hose reel connection.
3.2. Hydraulically designed to provide 100 GPM (378.5 lpm) at a minimum residual pressure of 4.5 bars at
the outlet of the hydraulic most remote 1 1/2” dia. Fire hose connection.

8.2. Visual Inspection


1. Prior to perform the Functional Test of the Hose Reel System the following visual Inspection shall be
checked:
2. Check for approved make and recommended materials by the manufacturer / supplier are used at
site.
3. Check that the Hose Reel Cabinets, Landing Valves and its accessories are installed as per the approved
drawings for its quantity and location.
4. Check that the Fire Extinguishers are installed as per the approved drawings for its quantity, type and
location.
5. Check that all the fire extinguishers are in proper condition for its pressure, Tag and mechanical seals.
6. Check the Painting of the piping system
7. Check all the valves, pipes and bolts are tightened properly.
8. Hydraulic testing of the piping system in accordance with NFPA and the approved Method of
Statement.
9. Conduct a Flush test to remove all dirt and other debris, etc.

8.3. Hydrostatic Test


1. Plug all the openings
2. Close all the drain valves.
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-211200-MET-DoR-002
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Rev. Date NA
Method statement for testing and commissioning of fire hose reel.
Pages 6 of 7

3. Fill complete pipeline with water avoiding any air column. (For this purpose keep the drain valve at the
highest elevation slightly open, while filling water when line is completely filled with water close the
valve)
4. By a pressure pump pressurize the line to an intermediate pressure, say 100 psi. Wait for 5 minutes;
check all major joints for any visible leak.
5. If the system is OK as per point No. 4 again pressurize the system to 150 psi and wait for 10 minutes
for any drop in pressure or leakage.
6. If the system is found to be leak proof as per item No. 5 pressurizes the line to 200 psi and keep for 2
hrs.

8.4. Flushing
1. Prior to perform the final Test of the internal fire hose reel and Fire Hose system a flush test shall be
conducted as follows,
2. Pull the hose reel or fire hose outside the building or inside the toilet area
3. Direct the hose to a free direction.
4. Open the valve.
5. Keeps water going for 2-3 minutes?
6. Continue the flushing till all debris is removed and clean water is coming out.
7. Close the valve.
8. Repeat the same procedure for all others.

9. COMMISSIONING PROCEDURE
9.1. Equipment/Instruments to be used
1. Adjustable Spanner.
2. Pressure Gauges.
3. Pipe Wrench.
The following are to be checked prior to handover of the Fire Hose / Hose reel System to the Clients/ End
Users.
1. All Fire Hose System Network and attached appurtenances subjected to system working pressure shall
be hydrostatically tested at 200 psi. (13.8 bars) and shall maintain that pressure without loss for 2
hours. Loss shall be determined by a drop in gauge pressure.
2. The piping system shall be flush tested to ensure thorough cleaning of the network piping. The
minimum flow rate shall be at least that necessary to provide a velocity of 3 m/ sec.
3. Ensure all the components of the fire cabinets are installed properly (landing valves, hose reels,
extinguishers & fire hoses).
4. Check pressure in all the floors by using special adapter with calibrated pressure gauge and note the
readings.
5. Open the lock shield valve of each hose reel and adjust its pressure to 3 - 4 bars through 1" PRV. The
water throw should be 6 metre. (Hose reel should be opened inside toilets or outside the building to
avoid any damages to other services).
6. Check all the fire extinguishers for its certification (inside pressure & hose connections also to be
checked).
7. A system functional test may be conducted as given below once the entire Fire protection system is
completed.
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-211200-MET-DoR-002
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Rev. Date NA
Method statement for testing and commissioning of fire hose reel.
Pages 7 of 7

10. HEALTH, SAFETY AND ENVIRONMENT


11. ATTACHMENTS
11.1. Inspection Checklists
11.2. Inspection Test Plan
11.3. Risk Assessment