Sie sind auf Seite 1von 1

R.C. ANCHOR BEAM (0.25 x 0.25m) AT EVERY 10.00m.

OF REVETMENT
(SEE DETAIL) CREST
1.00 4.10 1.20 1.84

(SEE DETAIL)
R.C. ANCHOR BLOCK (1.00 x 1.00 x 1.00m.)
AT EVERY 989m. OF REVETMENT TOP OF REVETMENT, ELEV = 17.368m.

0.50
FREEBOARD = 17.068m.

1.25 CONCRETE FACING

1.00
GROUTED RIPRAP HANDLAID ROCK EMBANKMENT

3.55
4 PCS. HOR. ON CORNERS
9 PCS. INTERMEDIATE

2.00 m. MAXIMUM
HIGHEST FLOOD LEVEL, ELEV = 15.056m.

0.40

TOP OF PILE CAP, ELEV = 13.818m.


ORDINARY FLOOD LEVEL, ELEV = 13.758m.

0.40
0.40m X 0.40m R.C. PILE CAP STEEL COVERING = 0.05m. TOP OF STEEL SHEET PILE ELEV = 13.568

1.00
A A
(SEE DETAIL)

SEE PILE CAP DETAIL


RIVER BED

B
SEE PILE CAP DETAIL 1.00 1.00 1.00
MLLW, LEVEL = 12.46m.
PROPOSED STEEL SHEET PILE
(GSP-2) @ 6.00m. LENGTH
ANCHOR BLOCK PLAN
SCALE 1 : 10 MTS.

TYPICAL SECTION DETAIL OF ANCHOR BEAM / BLOCK


PLACE AT EVERY 10.00m. OF REVETMENT
SCALE 1 : 30 MTS.

0.25
COVERING
0.05 0.15 0.05
0.05

COVERING C = 1.15
BENDED AT 0.50m.

D = 0.15
B = 4.10
0.15
0.25

A = 0.60
0.05

COVERING

B = 0.85 A = 0.64 F
=0
ANCHOR BEAM SECTIONAL DETAIL 5 .07
= 0.0

A = 0.48
F
E = 0.15
.05

C = 0.85

B = 0.85

A = 0.85
=0

F = 0.10
A

B = 0.15
D = 0.15
0.25 0.25 0.25 0.25 0.25

.07
C = 0.15 =0
0.05

D = 0.85 C = 0.64 A
0.15
0.25

0.25

BAR 18 @ 0.25m O.C. HOOPSBAR BAR 19 5-SETS C-BAR 20 - 12 PCS. INTERMEDIATE BAR 21 - 13 PCS.
0.05

ANCHOR BEAM BAR BENDING DIAGRAM

ANCHOR BLOCK BAR BENDING DIAGRAM


SCALE NTS.

ANCHOR BEAM BAR BENDING DIAGRAM


ANCHOR BEAM SECTIONAL DETAIL SCALE NTS.
SCALE 1 : 10 MTS.

PROJECT TITLE: SHEET CONTENTS: DESIGNED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO:
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGH WAYS PLANS FOR THE TYPICAL SECTION DETAIL OF ANCHOR BLOCK
REGION XIII CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM BAR BENDING DIAGRAM
OFFICE OF THE DISTRICT ENGINEER ALONG SURIGAO RIVER
TYPICAL SECTION DETAIL OF ANCHOR BEAM B 2
LOCATION : BRGY. QUEZON, SURIGAO CITY, SURIGAO DEL NORTE NESAH B. DAPAR GINA P. SORIANO EMMANUEL J. CABANOS HENRY CRUZ J. MARAPAO
SURIGAO DEL NORTE 1ST ENGINEERING DISTRICT RP2 5
SURIGAO CITY SOURCE OF FUND: REGULAR INFRA CY 2018
ENGINEER II CHIEF PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
APPROPRIATION: 70,000,000.00
1ST DISTRICT PLANNING AND DESIGN SECTION