Sie sind auf Seite 1von 14

No Description Quantity Unit Rate Amount

Supply and install borepile D:0.5m, 35MPa


cylinder test @BP01
1.01
Supply labor and equipment to remove head of
bore pile max. depth 1.2m
1.02
Pilecap Works
Soil excavation for pile cap lot

1 1000 1000
Soil backfill for pile cap lot
1 1000 1000
Compaction stone backfill h:0.2m

49 36 1764
Lean concrete h:0.1m

24 85 2040
Concrete C35MPa (cylinder test)

218 85 18530
Steel bar SD390MPa for main bar

33.3 800 26640


Formwork by brick
252 0
Service pumping truck of concrete

1 300 300

51274
Stump column work

Concrete C35MPa (cylinder test)

10 80 800
1.422

800 1137.6
Formwork by plywood
76 0
1937.6
Ground Beam Works
Soil excavation for ground beam
1 1000 1000
Soil backfill for ground beam

1 1000 1000
Compaction stone backfill h:0.2m

15 36 540
Lean concrete h:0.1m

8 80 640
Concrete C30MPa (cylinder test)

77 80 6160
Steel bar SD390MPa for main bar

13 800 10400
Formwork by brick 10cm thk.

320 0
Service pumping truck of concrete

1 300 300
20040

Supply and laying sand type 3 to backfill


basement of full building area, h:0.4m

248 15 3720
Supply and laying with compaction of stone 4x6
to backfill basement of full building area, h:0.2m

62 36 2232
Supply and apply temite protection 5year
guranty 310 15 4650
Supply and laying clear plastic sheet to cover
compacted stone
310 15
Concrete for basement slab C30MPa (cylinder
test) h:12cm thk.
62 85 5270
Steel bar SD390MPa for main bar

7.44 800
Service pumping truck of concrete

1 400 400
16272
GF Column
Works

Concrete C35MPa (cylinder test)

26 85 2210
Steel bar SD390MPa for main bar

4 800 3200
Formwork by plywood
6 0
Service pumping truck of concrete

1 300 300
5710
GF
Staircase
Works
(inside
building)
Concrete C30MPa (cylinder test)

4 80 320
Steel bar SD390MPa for main bar

0.462 800 369.6


Formwork by plywood
17 0
689.6

Concrete
C30MPa
(cylinder
test) 86 80 6880
Steel bar
SD390MPa
for main
bar 21.5 800 17200
Formwork
by plywood 344 0
24080

Concrete
C30MPa
(cylinder
test) 62 80 4960
Steel bar
SD390MPa
for main
bar 12.4 800 9920
Formwork
by plywood 124 0
Service
pumping
truck of
concrete 1 300 300
15180

Concrete
C30MPa
(cylinder
test) 27 80 2160
Steel bar
SD390MPa
for main
bar 5.3 800 4240
Formwork
by plywood 216 0
6400

Concrete C30MPa (cylinder test) 4 80 320


Steel bar SD390MPa for main bar 0.462 800 369.6
Formwork by plywood 17 0
689.6

Concrete
C30MPa
(cylinder
test) 86 80 6880
Steel bar
SD390MPa
for main
bar 21.5 800 17200
Formwork
by plywood 344 0
24080
Concrete
C30MPa
(cylinder
test) 62 80 4960
Steel bar
SD390MPa
for main
bar 12.4 800 9920
Formwork
by plywood 124 0
Service
pumping
truck of
concrete 1 300 300
15180

Concrete
C30MPa
(cylinder
test) 27 80 2160
Steel bar
SD390MPa
for main
bar 5.3 800 4240
Formwork
by plywood 216 0
6400

Concrete C30MPa (cylinder test) 4 80 320


Steel bar SD390MPa for main bar 0.462 800 369.6
Formwork by plywood 17 0
689.6

Concrete
C30MPa
(cylinder
test) 86 80 6880
Steel bar
SD390MPa
for main
bar 21.5 800 17200
Formwork
by plywood 344 0
24080

Concrete
C30MPa
(cylinder
test) 62 80 4960
Steel bar
SD390MPa
for main
bar 12.4 800 9920
Formwork
by plywood 124 0
Service
pumping
truck of
concrete 1 300 300
15180

Concrete
C30MPa
(cylinder
test) 27 80 2160
Steel bar
SD390MPa
for main
bar 5.3 800 4240
Formwork
by plywood 216 0
6400

Concrete C30MPa (cylinder test) 4 80 320


Steel bar SD390MPa for main bar 0.462 800 369.6
Formwork by plywood 17 0
689.6
310 0.1 31
141583.2
No Description Quantity Unit Rate Amount
1 Wall and Partition
Brick wall 20cm thk.
Supply and install brick 20cm thk. from
floor to bottom slab.
First floor
(1F) 78147.52 pcs 0.03 2344.4256
K cement 34 ton 100 3400
Sand 3 32 10 320
Sand 1 30 8 240
Second
floor (2F) 58660.8 0.03 1759.824
K cement 25.2 ton 100 2520
Sand 3 24
Sand 1 23
Third floor
(3F) 55672.1 0.03 1670.163
K cement 23.95 100 2395
Sand 3 23 10 230
Sand 1 22 8 176
Roof floor
(RF) 12155 0.03 364.65
K cement 5.25 100 525
Sand 3 5 10 50
Sand 1 5 8 40
16035.063

First floor
(1F) 1420.864 5 7104.32
Second
floor (2F) 1066.56 5 5332.8
Third floor
(3F) 1012.22 5 5061.1
Roof floor
(RF) 221 5 1105
18603.22

First floor
(1F) 310 15 4650
Second
floor (2F) 310 15 4650
Third floor
(3F) 310 15 4650
Roof floor
(RF) 42 15 630
14580
Tile
First floor
(1F) 310 20 6200
K cement 5.45 ton 100 545
Sand 3 11 20 220
Second
floor (2F) 310 20 6200
K cement 5.45 ton 100 545
Sand 3 11 20 220
Third floor
(3F) 310 20 6200
K cement 5.45 100 545
Sand 3 11 20 220
Roof floor
(RF) 310 20 6200
K cement 5.45 100 545
Sand 3 11 20 220
70 20 1400
K cement 1.25 100 125
Sand 3 4 20 80
422 20 8440
K cement 7.4 100 740
Sand 3 15 20 300
38945

88163.283
No Description Quantity Unit Rate Amount

A Preliminary Works
1.01 Engineer 1 3000 1000
1.02 Architect 1 3000 1000
1.03 Project Management 1 5000 1000
1.04 1 10000 10000
1.05 1 3000 1500
14500
B Foundation Works
1.06 Supply and install borepile D:0.3m
1.07 Supply labor and equipment to remove
head of bore pile max. depth 1.2m

C Pilecap Works
Soil excavation for pile cap 1 1000 1000
Soil backfill for pile cap 1 1000 1000
Compaction stone backfill h:0.2m 49 36 1764
Lean concrete h:0.1m 24 85 2040
Concrete C35MPa (cylinder test) 240 85 20400
Steel bar SD390MPa for main bar 33 800 26400
Formwork by brick 252 0
Service pumping truck of concrete 1 300 300
52904
D Stump column work
Concrete C35MPa (cylinder test) 10 85 850
1.4 ton 800 1120
70 0
1970
E Ground Beam Works
Soil excavation for ground beam 1 1000 1000
Soil backfill for ground beam 1 1000 1000
Compaction stone backfill h:0.2m 15 36 540
Lean concrete h:0.1m 7 85 595
Concrete C30MPa (cylinder test) 86 85 7310
Steel bar SD390MPa for main bar 13 800 10400
Formwork by brick 10cm thk. 346 0
Service pumping truck of concrete 1 300 300
21145
F
248 15 3720
64 36 2304
310 15 4650
62 85 5270
1 300 300
16244
G Column Works
Concrete C30MPa (cylinder test) 31 85 2635
Steel bar SD390MPa for main bar 5 800 4000
Formwork by brick 252 0
6635
Structure Works 1F
Beam
Concrete C30MPa (cylinder test) 85 85 7225
Steel bar SD390MPa for main bar 21.2 800 16960
Formwork by brick 0
24185
Slab
47 85 3995
5.115 800 4092
310 0
8087
Column
32 85 2720
6.54 800 5232
0
7952
Structure Works 2F
Beam
Concrete C30MPa (cylinder test) 85 85 7225
Steel bar SD390MPa for main bar 21.2 800 16960
Formwork by brick 0
24185
Slab
47 85 3995
5.115 800 4092
310 0
8087
Column
32 85 2720
6.54 800 5232
0
7952
Structure Works 3F
Beam
Concrete C30MPa (cylinder test) 85 85 7225
Steel bar SD390MPa for main bar 21.2 800 16960
Formwork by brick 0
24185
Slab
47 85 3995
5.115 800 4092
310 0
8087
Column
32 85 2720
6.54 800 5232
0
7952
234070 80000 30000 344070

Das könnte Ihnen auch gefallen