SUMMARY OF FORCES AND MOMENTS FOR PIER P1- TUIVAL BRIDGE (TENDER)
Formation Level= 99.450 m c/c dist betn bearings 2.500 m
Pier Cap Top Level= 95.775 m Horizontal seis. Coeff.= 0.270
Well Cap Top Level= 90.260 m Sign Convention : Anticlockwise Moment +ve

At Top Of Pier Cap At Top Of Well Cap


Sl.No. Description P HL Acting at HT Acting at ML MT P HL Acting at HT Acting at ML MT
T T m T m T-m T-m T T m T m T-m T-m
1 DL + SIDL & FPLL of superstructure
1i) RCC Box girder 200.1 0.0 0.0 385.2 31.1 200.1 0.0 0.0 385.2 31.1
1ii) PSC Box girder 625.2 0.0 0.0 -359.5 85.6 625.2 0.0 0.0 -359.5 85.6
1iii) Footpath Live Load 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2 Carriageway Live Load
2i) Max long mt case (70R Wheel) 82.3 0.0 -158.4 95.1 82.3 0.0 0.0 -158.4 95.1
2ii) Max Reac. case (70R Wheel) 93.8 0.0 -59.1 108.3 93.8 0.0 0.0 -59.1 108.3
3 Longitudinal force (Normal case)
3i) Max Reac. case (70R Wheel) 0.0 36.6 -7.8 96.175 97.375 0.0 0.0 28.8 0.0 161.2 0.0
3ii) One span dislodged 0.0 10.0 96.175 0.0 0.0 0.0 10.0 0.0 59.2 0.0

3 Longitudinal force (Transverse Seismic case)


3iii) Max Reac. case (70R Wheel) 0.0 34.0 -8.9 96.175 97.375 0.0 0.0 0.0 25.1 0.0 137.9 0.0

4 Due to Braking + Long Seismic (incl. DL+SIDL)


4i) Max long mt case (70R Wheel) 111.8 31.6 102.6 96.175 97.375 3.2 111.8 134.2 0.0 920.4 0.0
4iii) One span dislodged 27.0 102.1 97.375 52.0 27.0 102.1 0.0 778.1 0.0
5 Transverse Seismic Force
a) PSC Box girder span
ai) Box girder +Deck Slab 61.5 123.0 98.271 61.5 0.0 123.0 0.0 985.4
aii) Crash Barrier 8.4 16.9 99.781 8.4 0.0 16.9 0.0 160.4
aiii) Wearing Coat 5.1 10.1 99.358 5.1 0.0 10.1 0.0 92.3
aiv) Services 2.8 5.6 99.600 2.8 0.0 5.6 0.0 52.3
b) RCC Box Girder span
5i) Deck Slab +Box Girders 18.7 37.4 97.672 18.7 0.0 37.4 0.0 277.2
5ii) Crash Barrier 3.1 6.1 99.781 3.1 0.0 6.1 0.0 58.4
5iii) Wearing Coat 1.7 3.5 99.358 1.7 0.0 3.5 0.0 31.4
5iv) Services 1.0 1.9 99.600 1.0 0.0 1.9 0.0 17.7
On 50% CWLL:
5v) Max Reac. case (70R Wheel) 6.4 12.7 100.650 6.4 0.0 12.7 0.0 132.0
5vi) Footpath Live Load 0.0 0.0 100.840 0.0 0.0 0.0 0.0 0.0
10 Substructure
10i) DL 191.4 0.0 0.0 -98.1 0.0
10ii) Seismic Force: Pier Cap 14.2 28.4 95.750 28.4 95.750 155.9 155.9
10iii) Seismic Force: Pier 9.9 19.8 92.418 19.8 92.418 42.7 42.7
10iv) Seismic Force: Pedestal (a) 0.3 0.6 97.186 0.6 97.186 4.2 4.2
10v) Seismic Force: Pedestal (b) 0.3 0.6 95.975 0.6 95.975 3.3 3.3
10vi) Seismic Force: Seismic reac. Block (b) 0.6 1.2 96.131 1.2 96.131 6.9 6.9
10vii) Seismic Force: Seismic reac. Block (b) 0.6 1.2 97.531 1.2 97.531 8.5 8.5

Load Combination 04/24/2020


Pier Design

Check for Stresses in pier considering only concrete section


Pier dia= 2.5 m
Area = 4.91 m2
Z= 1.53 m3

Resultant
Load Case P Moment P/A M/Z pmax pmin
T T-m T/m2 T/m2 T/m2 T/m2
I 0.00 0.00 0.00 0.00 0.00 0.00
II 0.00 0.00 0.00 0.00 0.00 0.00
III 0.00 0.00 0.00 0.00 0.00 0.00
IV 0.00 0.00 0.00 0.00 0.00 0.00
V #REF! #VALUE! #REF! #VALUE! #REF! #REF!