BARRANCO m2 5,915.03
FASE MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13 MES 14
PROVISIONALES
EXCAVACION
CISTERNA
ESTRUCTURA SOTANO
ESTRUCTURA EDIFICIO
ACABADOS HUMEDOS
ACABADOS SECOS
EQUIPAMIENTO
IMPUESTOS IMPUESTOS
IGV 1,686,264.00 IGV 1,657,439.02
IGV MANO DE OBRA (2,053,050.70) -369,549.13