Chapter (1)

Introduction
1.1 General
This project is consolidated and analysis of our year (2) project with six months duration which
is produced by all students of Year (2), Architectural Technology Department.

We carried out basic research and necessary professional steps for surveying, project
management, architectural design sketching and other related units from Architectural
Technology (HND class) knowledge Areas of three different projects

 NANDAMMANNYA PHATO (Bagan)


 Garden project of YANGON SWEL DAW MYAT PAGODA
 Miniature building making for public school building (YANGON UNIVERSITY OF
EDUCATION PRACTICING SCHOOL).

According to combining of three different aspects of project fields, we named “Three in one
project” for our title and we divided two groups with seven candidates each.

We have carried out facts and work in process of collecting data and practical details for our
report (log book). Apart from the efforts of us, the success of this three in one project depends
the largely on the guidelines of many others. First and the foremost, we thank to “SQA( Scottish
Qualification Authority)” for given as the chance to conduct this project study, despite all
difficulties. We wish to extend our utmost gratitude to our parents who made us believe that we
have so much strength and courage to preserve by the best man. We would like to show our
greatest appreciation to our MAC CREATIO University College’s teachers whose guidance
co-operation and support in all necessary field of the project. We also very thankful to
Department of Archaeology and Museum (Bagan), Department of Yangon SwelDaw Myat
Pagoda trustee and Headmistress and teachers of Yangon University of Education Practicing
School for supporting and permitting to success of this project. Last but not the least, we also
thank to our faculty members and co-mate, who assist us. They were very tolerant and gritty to
see us through.

1.2 Objective
 To gain experience in working with team
 To get an understanding how to use survey tool and procedure in a field
 To get knowledge how to work upon different aspect of fields
 To develop our sketching skills with hand and using computer aided software
 To get an understanding types of building material and construction technology from
different types of timeline (era)

1|Page
 To get a skill for making miniature building with using suitable tools, materials and
computer aided software
 To gain experience how to control workers and budgets until project completion date on
time schedule
 To get a knowledge about garden plants

2|Page
Chapter (2)
Planning Stage
2.1 Project Brief
First of all, we decided three different kinds of fields in one project to cover the scope of
deliverable of relevant units from Architectural Technology.

Then, we identify the members with core-skill and identify what problems can be faced and
decided ways to solve them. Very first thing of our planning stage is to get permission from
relevant department of related project. After getting permission, we established design brief;
project schedule with timeline, requirements for each project, difficulties and solving ways for
each projects.

All of the matters, we, all candidates worked under control and guideline of supervisor teachers
from MAC CREATIO University College.

3|Page
2.2 Planning Project Schedule
Project Project operation Identify duty for Required Remark
Identification each candidate Duration

Permission Nandamannya Group(A) with 1 week Start from


Pahto ( Bagan) Supervisor Teacher ( plus or November 29th
-enquired which Thel Ei Lwin for minus days (Thursday) 2018
department is document will be if
related preparation duty necessary)
-prepared
necessary
document for
permission
-counter check
Garden Project Group(B) with 1 week Site will Start from
( Yangon Swel Supervisor Teacher ( plus or January
Daw Myat Thel Ei Lwin for minus days 24th(Thursday)
Pagoda) document will be if 2019
-enquired which preparation duty necessary) However,
department is permission
related preparation start
-prepared date is the same as
necessary November 1st 2018
document for
permission
-counter check
Miniature Got a project 2 days Start from March
Building making ( permit from MD ( plus or 21st (Thursday)
Yangon and Group(A) minus days 2019
University of prepared for scale will be if
Practicing School) adjusting and necessary)
-enquired which Group(B) listed
department is material and
related estimating budget
-adjusting scale to submit
and budget headmistress
required with according to Group
headmistress (A) proposed scale
-counter check

Budget Nandamannya Group (A) had the 3 days Start from


Prediction Pahto ( Bagan) duties for above (4) (plus or December 3rd
-Listed site trip list and Group (B) minus days (Monday) 2018
expenses had the duties for will be if (while waiting
( travel expenses) equipment and necessary) permission)

4|Page
-camping expenses workers expenses
-unexpected Both groups made
expenses counter checks
-miscellaneous with supervision of
expenses Teacher Thet
-equipment Naing Win and
expenses approved by
-workers ( site Finance team of
clearing or other our School
necessary fields)
-counter check

Budget Garden Project Group (B) had the 3 days Start from January
Prediction (Yangon Swel duties for above (3) (plus or 25th 2019( Friday)
Daw Myat from the list and minus days
Pagoda) rest of the lists had will be if
-travel expenses to be done by necessary)
-unexpected Group(A),however,
expenses both groups need
-miscellaneous to check
expenses alternatively with
-equipment supervisor, Teacher
expenses Thet Naing Win
-workers ( site
clearing or other
necessary fields)
-expenses for
painting bamboo
-expenses for plant
donating
-counter check
Miniature Counter check by One day Start from March
Building making ( both group only need 21st (Thursday)
Yangon alternatively under (plus or 2019
University of supervision of minus days
Practicing School) Teacher Thet will be if
-equipment Naing Win necessary)
expenses
-counter check
only need for data
from permission
stage
Site Trip Nandamannya Both Group (A) 3 days Start from
Preparation Pahto ( Bagan) and Group (B) did fixed December 8th
(if necessary) -enquired for car all of the lists ( Saturday) 2018
hiring (highway, together

5|Page
site to camp for 12
days)
- enquired the
treatment during
trip for all crew
- list the required
equipment and
tools for trip
-Schedule the duty
for all candidates
- Identify
discipline for all
members while
going site trip
- draw checklist for
every necessary
things before going
trip
Site Trip Garden Project
Preparation (Yangon Swel
(if necessary) Daw Myat
Pagoda)
Within Yangon
(did not need to
prepare)
Miniature
Building making (
Yangon
University of
Practicing School)
Within Yangon
(did not need to
prepare)
Site Clearing Nandamannya
(if necessary) Pahto ( Bagan)
-did not need this
stage at Bagan
Pahto
Garden Project Male from both of 3 days Start from January
(Yangon Swel the Groups lead 31st (Thursday)
Daw Myat workers 2019
Pagoda)
-conducting with
instruction to
workers
Miniature

6|Page
Building making (
Yangon
University of
Practicing School)
-did not need this
stage
Surveying Nandamannya Both groups had to 3 days Start from 11st
Pahto ( Bagan) apply survey tool (plus or December
-with measure tape and note the minus days ( Tuesday) 2018
-with theodolite necessary data for will be if
-with drone for top project necessary)
plan
-counter check
Garden Project Both groups had to 1 day Start from 2nd
(Yangon Swel apply survey tool (plus or February(Saturday)
Daw Myat and note the minus days 2019
Pagoda) necessary data for will be if
-with measure tape project necessary)
-with theodolite
-counter check
Miniature Both groups had to 1 day Start from 23rd
Building making ( apply survey tool (plus or March(Saturday)
Yangon and note the minus days 2019
University of necessary data for will be if
Practicing School) project necessary)
-with measure tape
-with theodolite
-counter check
Developing Nandamannya Both groups had to 1 month Start from 11st
Pahto ( Bagan) participate co- (plus or December
-check list with operatively each minus days ( Tuesday) 2018
required tool and other will be if
equipment for each necessary)
step
-identify duty on
each candidate
again depending
upon the skill
-design sketching
with hand to get
raw data
-deliver raw data to
final sketch with
hand and using
computer aided
software

7|Page
-counter check
again
-making correction
if necessary
-counter check
-collect data and
combining all
sketch to develop
portfolio
- final correction
and check before
delivering final
sketch to
Department of
Archeology and
Museum ( Bagan)

Developing Garden Project Both groups had to 1 month Start from 4th
(Yangon Swel participate co- (plus or February
Daw Myat operatively each minus days (Monday) 2019
Pagoda) other will be if
-check list with necessary)
required tool and
equipment for each
step
-identify duty on
each candidate
again depending
upon the skill
- deciding which
plants should be fit
for decorating to
become beautiful
garden
-deliver plant with
systematically as
their nature
-design sketching
with hand to get
raw data of garden
-decorate plant and
pavement as much
as to like design
sketch
- bamboo cutting
- bamboo painting

8|Page
-making fence for
plant
-prepare
distributing water
way for plant
- counter check
Developing Miniature Both groups had to 2 weeks Start from 25th
Building making ( participate co- (plus or March(Monday)
Yangon operatively each minus days 2019
University of other will be if
Practicing School) necessary)
-check list with
required tool and
equipment for each
step
-identify duty on
each candidate
again depending
upon the skill
-design sketching
with hand to get
raw data
-deliver raw data to
final sketch with
hand and using
computer aided
software
-counter check
again
-making correction
if necessary
- cutting foam
board as the scale
from regarding
data
-use carefully glue
for constructing
miniature building
-make any
necessary
miniature things
for scale model
-design check and
construct building
according to the
real design

9|Page
-paint or any
making to appeal
as real building
-add any
miscellaneous
things need to be
same as real
building and
environment
- counter check

2.3 Planning Time Schedule


According to the Project Schedule, we fixed the time schedule as follow;

(1)Nandamannya Pahto ( Bagan) ( 24.Nov.2018 to 11.Jan.2018)

Developing
Permission Budget Site Trip 11.Jan.2019
Surveying
24.Nov.2018 Prediction Preparation

Figure2.3.1 : Process of Nandamannya Pahto (Bagan)


Depending upon the time schedule, teachers gave the dead line for first project until
15.January.2019 ( nearly two months ).

(2)Garden Project (Yangon Swel Daw Myat Pagoda)

Developing
Permission Budget
Site Clearing Surveying 4.March.2019
24.Jan.2019 Prediction

Figure 2.3.2 : Process of Garden Project


Depending upon the time schedule, teachers gave the dead line for second project until
10.March..2019 ( nearly two months ).

10 | P a g e
(3)Miniature Building making ( Yangon University of Practicing School)

Developing
Permission Budget
Surveying 25.March.2019
21.March2019 Prediction

Figure 2.3.3 : Process of making miniature building


Depending upon the time schedule, teachers gave the dead line for third project until
10.April.2019 (about three weeks ).

11 | P a g e
Chapter (3)
Developing Stage
3.1 Project Brief
As the objective of each project, for Nandamannya Phato Project, we measured and noted detail
of the original temple for making correction as the original according to the natural disaster and
then our delivered data will be very important to keep original shape and detail. So, we had to
make everything in measuring and sketching of this project with very precisely and we avoided
any ideas deviated from the original. Then, for this project, as there were no data on the temple
the project was used on, it was chase to be the subject on which the project was to be conducted.
Garden project is taken behavior of its aesthetic properties and scale modeling project is built to
present the project.

We did all of the projects depending on the checklist and Schedule from Planning Stage. The
project was delivered with little to no obstacle for possible difficulties were taken in account
before commencing. The deadline was met with at having to shift the dates. Small difficulties
were able to be negotiated to assignment of team members according to their individuals skills,
the over watch of the supervisors and systematically reports.

The main difficulty during the project was the negotiation to get permission to work on a
infrastructure during public viewing (or) operating hours. Also the weather conditions had to be
taken accounted. For the last project, it is the shape of public school,then we decided the summer
school close time.

3.2 Essential Requirement Equipment and tool list for a project


 Survey tool
 Drawing tool
 Garden Planting tool
 Architectural Model making tool
 Computer Aided software

Survey tools for a project

 Total Station
 Total Station Accessory kit
 Tripod

12 | P a g e
 Theodolites
 Digital Auto Level
 Laser Level
 Surveying Rods
 Drone (for top plan)
 Measuring Tape
 Pocket Tape
 Two-way Radios
 Compasses and Inclinometers
 Field Books
 Ladder

Drawing Tools

 Sketch Books
 Pencils
 Eraser
 Sharpener
 White chalk
 Point pen ( with Black ink)

Garden Planting Tool

 Large Garden Spade


 Narrow Blade Trowel
 Dandelion Digger
 Root Saw
 Gardening Fork
 Hand Spade
 Axe
 Rake
 Saw
 Shovel
 Hedge Shear
 Gardening gloves
 Taps
 Lawn mower
 Boots

13 | P a g e
 Wheelbarrow
 Watering can
 Seeds
 Plants (flowered plant and shaded plant)
 Fertilizer
 Taps and Garden hose
 Bamboo for Fence and decoration
 Rock for decoration
 Paint and brush
 Hammer
 Clay pots

Architectural Model making tool

 Foam Board
 Cutting Mat (A3)
 Knife
 UHU glue
 Paper glue
 Mini hobby tool box
 Nail polish
 Ruler
 Printer
 Roofing paper
 Small wood for modeling (easy cut)

Computer Aided Software

 Auto CAD
 Sketch-up
 Revit (Architecture)
 Adobe Design Standard (Photoshop and Illustrator)
 Microsoft words and excel

3.3 Developing Steps for a project


3.3.1. Nandamannya Pahto ( Bagan)

 Planning Project Schedule


 Preparing for site trip
 Start surveying steps as soon as we reached site location

14 | P a g e
 Report survey data
 Sketch detail by identifying groups
 Measure and sketch one by one for all parts of the temple
 Checking every days and every time finished one part
 Deliver sketch to Auto CAD
 Check again with real temple
 Correction making if any necessary
 Final Check
 Deliver to supervisor

3.3.2 Garden Project (Yangon Swel Daw Myat Pagoda)


 Firstly, we visited to the site to survey .We measured the built concrete walkways and
distances of existed plants and trees
 According to the size and amount of bushes and plants to clean, we manage how many
workers are needed to hire for this purpose
 The budgets for hiring the workers and flowers and plants to plant in the garden are
estimated
 Then we divided two parts to grow the plants from the center of the site area (i) part A
and (ii) part B.
 The rough design for planting flowers is sketched.
 Then the measurement of sketch is practically measured on the site area.
 For part A, we ordered the labours as the estimated places of the flowers and plants to
grow .
 To finishing the planting fast and reduce the wastes, we have to ordered the workers
carefully.
 For part B, we have to choose carefully which plant is suitable for which place .
 To get the relaxation of the worshippers who came to Pagoda near our proposed garden ,
we planted the refreshing flowers and plants . And also we designed the plants with shape
.
 Then we decided what to do in the upcoming decoration and designation weeks. Also
prepared the things we need such as 1/2' bamboos, 1 1/2' bamboos, shovel , hammer ,
paints , clay pots , and white rock table sets.
 Then, we contemplate the textures of this garden and place the 1 1/2' bamboo chops
like the fences.

15 | P a g e
 After we managed where to place bamboos like fences , we make the walk path for the
worshippers and visitors of the Swel Taw Pagoda in the garden .
 Then we bounded the walk path with 1/2 ' bamboo and 1 1/2 'bamboos.
 We painted the bamboos with white , yellow , red , green and blue .
 As we planned the clay pots and the grovels are placed like the rocks flowing from the
pots .
 After all of that we put the set of rock table under the shaded trees.

3.3.3 Miniature Building making ( Yangon University of Practicing School)

 Planning Project Schedule


 Surveying Building
 Record measuring data and roughly sketch for building
 Deliver to Auto CAD for plan and 3D
 Cutting foam Board according to the data of plan
 Gluing to become 3D shape
 Roofing making with Foam Board and Roofing paper
 Draw, paint and glue any necessary to become the same as real building
 Adding small miscellaneous part that support to same as actual building
 Final Check

16 | P a g e
3.3.4 Memory Record of Making Project

Fig 3.3.4.1 : Memory for Nandamannya Temple

17 | P a g e
18 | P a g e
Fig 3.3.4.2 : Memory of Gardening Project

Fig 3.3.4.3 : Memories of Scale Modeling Project

19 | P a g e
Chapter (4)
Result of Activity
After making good co-operation each candidate with the control and support of our supervisors,
finally we got precious memory, skill, knowledge and good result of project.

We would like to present all of our project in this report, however, for the Bagan project,
according to the huge project and need to present many detail picture, we can only attached with
Appendix pages for these drawings.

20 | P a g e
21 | P a g e
Chapter (5)

Conclusion

These three projects give us many advantages about applying the lectures in real time work and
help us more understanding about each subjects we have learnt. As these projects are team-work
projects, we have learnt how to communicate, realize, negotiate and work in a group as a team.
We got many friends and partners and we had not only so much fun but also a lot of stress. All of
us tried our best for the projects and took our responsibilities by the schedule for each team.
Thanks to all teachers and co-workers who helped and guided for necessaries and advices to
overcome the projects.

22 | P a g e
Appendix
Nandamannya Phato (temple) (Bagan) ‘s Detail Drawing
 Location Map
 Site Plans
 Plan from 3 ft
 Plan from 18 ft
 Overall Plan
 Elevation ; Front (A), Back(C), Left(B) ,Right(D)
 Section A-A
Section B-B
 Some Detail Drawings from wall painting ( Fresco) of Bagan Nandamannya Temple
( 8 pages with 16 different painting)

23 | P a g e