No.

of Days

Test
S.No. PBT No. completion Shifting of Equipment
date Manual Arrangemetn of
from Location to
Excavation test setup
Location

1.0 PBT-01 2 5 1

2.0 PBT-02

3.0 PBT-03

4.0 PBT-04

5.0 PBT-05

6.0 PBT-06

7.0 PBT-07

8.0 PBT-08

9.0 PBT-09

10.0 PBT-10

11.0 PBT-11

12.0 PBT-12

13.0 PBT-13

14.0 PBT-14

15.0 PBT-15

16.0 PBT-16

17.0 PBT-17

18.0 PBT-18

19.0 PBT-19

20.0 PBT-20

21.0 PBT-21

22.0 PBT-22

23.0 PBT-23

24.0 PBT-24

25.0 PBT-25
ays

Gravity loading Remarks


using soil bags Total No. of
and fill manually Days
and testing

5 13