Sie sind auf Seite 1von 115

SPECIFICATIONS AND BILL OF QUANTITY

PROJECT: G+2 OFFICE BUILDING

OWNER: SRS MINES, PETROLEUM, ENERGY, FOREST AND


ENVIRONMETAL PROTECTION BEREAU

LOCATION: JIGJIGA, ETHIOPIA

Date:February 2019
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU

G+4 Commercial center


PRICED BILL OF QUANTITY
SUMMARY

A. SUB-STRUCTURE

1 Excavation & Earth work Eth. Birr :- 390,511.00

2 Concrete Work Eth. Birr :- 906,865.00

3 Masonry Work Eth. Birr :- 107,415.00

Total (A) Eth. Birr :- 1,404,791.00

B. SUPER-STRUCTURE

1 Concrete Work Eth. Birr :- 3,480,556.95

2 Block Works Eth. Birr :- 590,301.60

3 Roofing & Water Proofing Eth. Birr :- 241,073.00

4 Carpentry & Joinery Eth. Birr :- 5,670.00

6 Aluminum Works Eth. Birr :- 1,719,432.50

7 Finishing Works Eth. Birr :- 6,593,028.40

8 Glazing Eth. Birr :- 117,855.00

9 Painting Eth. Birr :- 2,021,170.60

10 Sanitary Work Eth. Birr :- 371,465.00


11 Electrical Installation Eth. Birr :- 1,496,524.00

Total (B) Eth. Birr :- 16,637,077.05

Total (A + B) Eth. Birr :- 18,041,868.05

15% VAT Eth. Birr :- 2,706,280.21

GRAND TOTAL Eth. Birr :- 20,748,148.26

1
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount

A-SUB STRUCTURE

1. EXCAVATION & EARTH WORK

1.1 200mm thick top soil removing and site clearing M2 368.00 50.00 18,400.00

1.2 Bulk excavation in ordinary soil for to a depth not exceeding


300 mm from reduced level. M3 110.40 150.00 16,560.00

1.3 Dito as item 1.2 but not exceeding 320mm M3 - 150.00 -

1.4 Excavation for isolating footing to a depth not exceeding 150mm from
bulk excavation level. M3 205.51 180.00 36,991.80

1.5 Dito as item 1.4 but not exceeding 300mm M3 137.00 180.00 24,660.00

1.6 Excavation in stone masonary foundation of depth not exceeding 150cm M3 54.45 150.00 8,167.50

1.7 Fill around footing and foundation columns with imported selected materials
from out side well rolled and compacted in layers not exceeding
200 mm thick. M3 157.47 320.00 50,390.40

1.8 Fill under hard core with imported selected materials from out side well rolled and
compacted in layers not exceeding 200 mm thick. M3 264.14 320.00 84,524.80

1.9 Cart away surplus excavated material to a distance not exceeding 5kms. M3 726.20 180.00 130,716.00

1.10 250mm thick basaltic or equivalent stone hard core well rolled,
consolidated and blinded with crushed stone. M2 57.43 350.00 20,100.50

Total carried to summary 390,511.00

2. CONCRETE WORK

2.1 50 mm thick plain blinding lean concrete quality C-5


with minimum cement content of 150 kg /m3, of concrete:
a) Under footing footing M2 120.52 200.00 24,104.00
b) Under grade Beam M2 21.13 200.00 4,226.00
c) Under masonry wall M2 36.30 200.00 7,260.00

2.2 Reinforced concrete quality C-25 with minimum cement


content of 360 kg /m3 filled into form work and vibrated
around rod reinforcement (Formwork and reinforcement
measured separately)
a) In footing pad M3 43.18 3,200.00 138,176.00
b) In foundation columns M3 3.95 3,200.00 12,640.00
c) In grade beam M3 12.92 3,200.00 41,344.00
d) In 10cm thick ground floor slab M2 264.14 800.00 211,312.00

2.3 Provide, cut and fix in position sawn ZIGBA form work, or steel
formwork, whichever is appropriate, strictly you should use molded
oil paint, form work should not removed before 24 hours.
a) In footing pad M2 88.32 275.00 24,288.00
b) In foundation columns M2 31.15 275.00 8,566.25
c) In grade beam M2 129.20 275.00 35,530.00

2
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
2.4 Chip wood or equivalent expansion joint filler as per the structural
drawing and engineer recommendation.
a) Between slab & beam on ground floor level Ml 511.75 50.00 25,587.50

2.5 Mild steel re-bar according to structural drawings. Price shall include
cutting, bending, placing in position and tying with ø1.5mm wire,
a) ø8 mm deformed bar Kg 1,386.88 65.00 90,147.20
b) ø12 mm deformed bar Kg 614.64 65.00 39,951.60
c) ø14 mm deformed bar Kg 2,913.59 65.00 189,383.35
d) ø16 mm deformed bar Kg 836.14 65.00 54,349.10

Total carried to summary 906,865.00

3. MASONRY

3.1 Hard basaltic or equivalent 500mm thick stone masonry wall foundation
belowNGL level bedded in cement sand mortar ratio of (1:3). M3 49.50 1,800.00 89,100.00
3.2 Ditto but above NGL level M3 9.90 1,850.00 18,315.00

Total carried to summary 107,415.00

B. SUPER STRUCTURE
1. CONCRETE WORKS
1.1 Reinforced concrete, filled in to formwork and vibrated
around rod reinforcement ( formwork and reinforcement are measured
separately) Use OPC cement type for all structural elements.
1.11 C-25 concrete class to:
a) In elevation columns. M3 18.85 3,200.00 60,320.00
b) In floor beam. M3 65.93 3,200.00 210,976.00
c) In 15cm thick suspended floor slab M3 8.49 3,200.00 27,168.00
d) In staircase and landing M3 18.20 3,200.00 58,240.00
e) In 15cm shear wall M3 8.49 3,200.00 27,168.00

1.2 Provide, cut and fix in position sawn ZIGBA form work, or steel .
formwork, whichever is appropriate, you may use molded
oil paint over form work, and shall not removed before 24 hours.
a) In elevation columns. M2 114.96 275.00 31,614.00
b) In floor beam. M2 684.84 275.00 188,331.00
c) In 20cm thick suspended floor slab M2 1,280.31 275.00 352,085.25
d) In staircase and landing M2 150.84 275.00 41,481.00
e) In 15cm shear wall M2 56.56 275.00 15,554.00

1.3 Mild steel re-bar according to structural drawings. Price shall include
cutting, bending, placing in position and tying with ø1.5mm wire,
a) ø8mm deformed bar Kg 14,500.96 65.00 942,562.40
b) ø10mm deformed bar Kg 5,041.95 65.00 327,726.75
c) ø12mm deformed bar Kg 960.50 65.00 62,432.50
d) ø14mm deformed bar Kg 10,715.47 65.00 696,505.55
e) ø16mm deformed bar Kg 6,744.50 65.00 438,392.50

Total carried to summary 3,480,556.95

2. BLOCK WORK

Walls shall be constructed from class 'B' hollow concrete blocks. The blocks shall be
selected for their consistency in dimensions, shapes, angles and strength. Blocks should
be free from cracks or any other defects and the surface characteristic of the blocks
shall be in such a way that good key for plaster is obtained.

2.1 20cm thick HCB wall, embedded in cement-sand mortar


of 1:3 mix ratio. Both sides shall be left for plastering. M2 1,405.48 420.00 590,301.60

3
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount

Total carried to summary 590,301.60

3- ROOFING & WATER PROOFING.

3.1 Brush and blow out dirt, dust, scrapings & all other loose material
until the reinforced concrete slab is fully cleared. Cast a light weight
concrete with 240 Kg /m3 cement content on all the roof and concrete
gutter by providing the given slope with a minimum depth of 50mm.
The light weight concrete should be allowed to cure completely to
avoid cracks that could appear due to shrinkage or settlement. M2 285.23 150.00 42,784.50

3.2 Supply and lay cement-sand screed over the cured light-weight
concrete area of item 4.1 above with cement sand mix 1:3 and 1:1
with an average thickness of 30mm. M2 285.23 100.00 28,523.00

3.3 Supply and lay a single ply Hertalan or equivalent water-proofing


system, manufactured from a special EPDM rubber compound,
shall be used on the terrace roof & concrete gutter surface.
The water-proofing EPDM-system shall include contact and
bonding adhesives, sealant roof drains connection and all other
necessary accessories needed to complete the work. The entire
work shall be executed based on details provided by the
manufacturer and approval of engineer. M2 285.23 450.00 128,353.50

3.4 Supply & fix dia.100mm PVC down pipe, fixing shall be done by
means of metal rings. Work & cost includes metal strainer and two coats
of oil paint. Ml 68.20 85.00 5,797.00

3.5 Galvanized Metal sheet flashing (Dev.L=35cm) Ml 209.50 170.00 35,615.00

Total carried to summary 241,073.00

4. CARPENTRY AND JOINERY

4.1 JOINERY

FLUSH DOORS

Supply & fix 3ELLE brand, ALOE Porto SSF or equivalent model 44mm thick interior
single leaf flush doors with leaf resins-bonded honey comb core in hard board raised
plans on upper and lower part of the door in MDF. The frame shall be solid wood strips
4.2.1 trims in plywood with L-shape to allow adjustment of frames to wall thickness by at
least 5mm fitted with noise reduction gasket. The door finished with veneer and coated
in Italian walnut finish. ASSA or ICSA or equivalent type lock, key and strike plate in
brass-coated steel, three brass coated pin hinges with at least 14mm diameter handle in
solid brass accessories should be incorporated. The model of the accessories shall all
be approved by the engineer.

a) D6 (size: 90x210)cm No 1.00 5,670.00 5,670.00

Total carried to summary 5,670.00

6. ALUMINUM WORKS

4
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
Every Door and window frame is manufactured from Aluminum tubular frame,
EURO profile or equivalent, 2mm thick, with an average weight that shall be approved
by the engineer. All works shall be done according to the window, door schedule.
Complete work includes all the necessary Iron monger and approved type of
6.1
cylindrical lock handles. Joints shall be water tight. Fixed and opening panels exposed
to weather shall be provided with weather strips, insuring that the strips are fixed
continuous enough to be water tight. All aluminum windows & doors type shall be
approved by the engineer.

6.1.1 Doors
6.1.1.1) D3 Size 150x210cm No 25.00 11,025.00 275,625.00
6.1.1.2) D4 Size 100x210cm No 6.00 7,350.00 44,100.00
6.1.1.3) D5 Size 80x240cm No 2.00 6,720.00 13,440.00
6.1.1.4 D7 Size 80x240cm No 6.00 6,720.00 40,320.00
6.1.1.5) D8 Size 100x250cm No 1.00 8,750.00 8,750.00
Windows
6.1.1.6) W1 Size 215x150cm No 33.00 11,287.50 372,487.50
6.1.1.7) W2 Size 60x60cm No 4.00 1,260.00 5,040.00
6.1.2 Supply & fix structural curtain wall, framed with anodized aluminum
profile frames, with tinted 6 mm thick single glass & sealant all as per
the engineers approval & detail drawings. Unit price shall include glass,
anchorage, sealant, 12mm thick melamine coated chip wood panel
cladded internally below the level of window cill & all other necessary
works needed to complete the work.
a) CW1(size:360x305) cm No 1.00 322,525.00 322,525.00
b) CW2(size:455x305) cm No 1.00 75,670.00 75,670.00
c) CW3(size:360x305) cm No 1.00 100,625.00 100,625.00
d) CW4(size:265x197) cm No 3.00 46,550.00 139,650.00
d) CW5(size:260x197) cm No 3.00 46,550.00 139,650.00
d) CW6(size:105x1,000) cm No 1.00 46,550.00 46,550.00

6.2 Supply and fix 90cm high rail to the stair case made from Ø40mm
stainless steel pipe baluster, Ø40mm aluminum handrail & 4 rows of
Ø20mm stainless steel guard rails. Price shall include metal
plates and all other necessary works and materials needed for
anchorage. Price shall also include one coat of anti rust & synthetic
enamel spray paint to metal parts & all other necessary accessories
needed to complete the work. Ml 45.00 3,000.00 135,000.00

Total carried to summary 1,719,432.50

7. PLASTERING, FLOOR, WALL


AND OTHER FINISHING WORKS

PLASTERING

7.1
Supply and apply two coats of plaster in cement-sand mortar to every internal wall
surface, columns and beams. Mix ratio shall be 1:3.Price shall include preparing the
background for plastering by hacking, nicking out joints chiseling smooth surfaces to
roughen them, etc. M2 3,610.76 170.00 613,829.20

a) Ditto item 7.1 but to the external HCB wall surface . M2 1,405.48 170.00 238,931.60

b) Ditto item 7.1 but to the Concrete slab Ceiling. M2 1,280.31 170.00 217,652.70

c) Ditto item 7.1 but to the stair soffit. M2 150.84 170.00 25,642.80

d) Ditto item 7.1 but to the shear wall M2 56.56 170.00 9,615.20

Supply & apply approved gypsum plaster with a minimum thickness of 3mm over
7.2 the 2 nd coat plastered surface of internal wall . Work & cost includes:-preparing the
surfaces, preparing every working materials etc. Application shall be done after well
cured the plastered surface and as per the instruction of the engineer M2 3,610.76 100.00 361,076.00

5
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
a) Ditto item 7.2 but to the Concrete slab Ceiling M2 1,280.31 100.00 128,031.00

b) Ditto item 7.2 but to the stair soffit. M2 150.84 100.00 15,084.00

d) Ditto item 7.2 but to the shear wall M2 56.56 100.00 5,656.00

FLOOR & WALL FINISHES

7.21 Supply and lay polished, chamfered & calibrated Sylvia epoxy treated
or equivalent type Marble/Granite tile.The price shall include Mapei, Cercol,
Keracol or equivalent type fillers and adhesive.
a) For thread (champhered & grooved at the bottom of front
edge & three rows of groove at the top of front edge for non
slippery) . size ( 35 x 3)cm. Ml 126.00 900.00 113,400.00
b) For riser.
size ( 14 x 2)cm. Ml 126.00 700.00 88,200.00
c) For floor tile.
size ( 40x40x3)cm. M2 13.65 1,600.00 21,840.00
d) For skirting .
size (10×2)cm Ml 772.54 350.00 270,389.00

7.22 Throated, weathered, champhered & grooved Marble/Granite window and door sill
embedded on Max Fix or equivalent cement mortar.
Size 3 x 28 cm window sill. Ml 70.95 750.00 53,212.50

7.23 Supply and fix 300x400mm R.A.K. or equivalent ceramic wall tiles.
Color, Pattern, thickness adhesive & grouting shall be approved by
the engineer. M2 143.36 540.00 77,414.40

7.24 Supply and fix 300x300x0.8mm non slippery R.A.K. or equivalent


ceramic floor tile lay over the pre finished screed surface. Color,
Pattern, thickness & cement adhesive shall be approved by the engineer. M2 2,560.62 500.00 1,280,310.00

7.25 Supply and fix 600x600x0.8mm non slippery RAK Dubai or equivalent
porcelain floor tile lay over the pre finished screed surface. Color,
Pattern, thickness & cement adhesive shall be approved by the engineer. M2 3,840.93 800.00 3,072,744.00

Total carried to summary 6,593,028.40

8. GLAZING

8.1 Supply and fix 5mm thick Belgian Glaver Bel or equivalent tinted glass
with rubber beads to doors, windows and window doors as shown on the
drawings. Price shall include all the necessary works needed to
complete the work. M2 235.71 500.00 117,855.00

Total carried to summary 117,855.00

9. PAINTING

9.1 Apply three coats emulsion paint to internal plastered wall surface including
beam & column surfaces. Paint type and color shall approved by the architect. M2 3,610.76 220.00 794,367.20

9.2 Ditto item 9.1 but on concrete ceiling surface. M2 1,431.15 220.00 314,853.00
Ditto item 9.1 but on shear wall M2 56.56 220.00 12,443.20

9.3 Apply granite paint to external wall surface M2 1,405.48 640.00 899,507.20

Total carried to summary 2,021,170.60

6
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
10-SANITERY INSTALLATION

10.1 SANITARY INSTALLATION


1.1 SANITARY EQUIPMENT (FIXTURES)

All Fixtures Shall Be First Class European Standard/Manufactured & Should Subject
To The Engineer's, Consultant's or Client's Approval Based on Samples, Catalogues
&/or Brochures Presented By The Contractor. Unit Price Shall Include All The
Necessary Fixing Hooks or Brackets, Fittings, Accessories, & All Other Relevant
Activities As Civil Works (Chieseling of Walls, Beams &/or Floors) & etc... For The
Proper Installation & Operation of The Fixtures, Pipes & All Other Sanitary Materials
Based On Relevant Clauses of Local & International Standards.

tap, pedestal stand, complete with plug, chrome plated chain, P- Smell trap with
connection pipe and all other necessary connecting and fixing fittings and accessories
for the proper installation and operation of the basin. The basin shall also conform with
1.1.2 the relevant clauses of Local & International Standards.

Size: 560*420*840mm (l*w*d) (Approximate Size).


Color: White
Tap: Remer or Equivalent Long Lever Cold & Hot Water Mixer Tap.
Accessories: Remer or Equivalent. Nº 8 3,500.00 28,000.00

Supply, fix, test and commission wash down Water Closets made of white vitreous
China with plastic seat and cover including 6 to 9 liters capacity low flush cistern with
push button, silent filling system & chromium plated water connection underneath the
1.1.3 cistern complete with all necessary connecting and fixing fittings and accessories for
the proper installation and operation of the closet. The closet shall conform with Local
and International Standards.

Trap: "S" Smell Trap.


Size: 706*360*795mm (l*w*d) (Approximate Size)
Color: White
Accessories: Remer or Equivalent. Nº 8.00 4,000.00 32,000.00

ceramic head work & "Lux" brass shower head, and all the necessary connecting and
fixing fittings and accessories for the proper installation and functioning of the valve.
The fixture shall conform with Local and International Standards.
1.1.4

No 8.00 560.00 4,480.00

chrome plated fastening screws complete with all the necessary fixing and connecting
accessories for the proper installation and operation of the rail. The rail shall conform
with Local & International Standards. /For actual location or place of fixing, refer
1.1.5 Architectural schedule or consult the Architect./

Model: Orient Accessories Built-in Rail.


Length: 600mm. Nº 8.00 850.00 6,800.00

location or place of fixing, refer Architectural schedule or consult the Architect./

1.1.6

Model: Orient Accessories Built-in Rail.


Size: 185*95mm.
Color: White. Nº 8.00 550.00 4,400.00

7
Supply and fix Toilet Paper Holder made of white vitreous China mounted to wall OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
complete with all the necessary fixing and connecting accessories for the proper
Item installation and operation of the fixture.
Description
The fixture shall conform with Local & Unit Qty Rate Amount
International Standards. /For actual location or place of fixing, refer Architectural
schedule or consult the Architect./
1.1.9

Model: Orient Accessories Built-in Rail.


Size: 170*185mm.
Color: White. Nº 8.00 550.00 4,400.00
necessary connecting and fixing fittings & accessories for the proper installation and
operation of the mirror.
1.1.7

Size: 600*500mm. Nº 8.00 850.00 8,500.00

Supply, fix, test & commision approved quality Floor Drain made of polished
1.1.8 stainless steel complete with P-Smell trap (minimum depth of 75mm) and all other
necessary connecting fittings and accessories.
80mm diameter. Nº 8.00 950.00 7,600.00

1.1.10 Supply and install instant water heater made for European standard. The unit price
shall include all the necessary labour and material cost.
i - Capcity : 80liters Nº 8.00 4,000.00 68,000.00

Supply 12kg Dry Powder Fire Extinguisher for ABCE class of fire as where shown on
1.1.11 the drawing in basement parking. The material shall comply with TUV, BSI, NFPA or
equivalent institution certification and approval. Complete with approved standard
hanging and fixing material Nº 15.00 200.00 68,000.00

10.2 PLUMBING WATER SUPPLY SYSTEM

Supply, install, disinfect, test and commission Potable Cold & Hot Water Supply
VESBO-PIPE SDR 6 or its equivalent PPR- Pipes (PN20), including pipe fittings,
supporting clamps, anchors, insulation (if necessary) and painting as where required,
cutting and making of chiesels on walls, floors &/or beams (if necessary) and
1.2.1 necessary accessories all as specified in the technical specification of the material and
shown on the drawings as per the manufacturer's instructions & recommendation.
Testing of lines shall be executed at a minimum pressure of 10Kg/cm 2 or twice the
working pressure, which ever is greater at the expense of the Contractor. NOTE: the
diameters which are listed are NOMINAL (internal) diameter of the pipe and the length
of each pipe must be at least 4m.
a) diameter 20mm Nominal diameter & wall thickness of 3.4mm ml 38.00 70.00 2,660.00
b) diameter 25mm Nomial diameter & wall thickness of 4.2mm ml 55.00 80.00 4,400.00
c) diameter 32mm Nominal diameter & wall thickness of 5.4mm ml 18.00 100.00 1,800.00

Supply, fix, test, and commission European Standard (Manfactured) Chromium


1.2.2 Service/Angle Valve on the water supply pipe before sanitary appliances including all
accessories, as specified in the technical specification and shown on the drawings.
a) diameter 20mm Nº 18.00 270.00 4,860.00

Supply & install high quality (Manufactured) Bronze Gate Valve on the water supply
1.2.3 pipe riser branch lines and room controlling . NOTE: the bronze gate valves must be
same brand with the ppr pipes.
a) diameter 25mm Nº 4.00 295.00 1,180.00
b) diameter 32mm Nº 3.00 330.00 990.00

10.3 WATER TANKERS PUMPS AND ACCESSORIES


1.3.1 WATER TANKS & ACCESSORIES @ ROOF LEVEL.

8
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount

Supply and install 5000 liters capacity water tank made of fiber glass wall thickness
5mm or equivalent complete with required gate valves, float valve, inlet and outlet
pipe, over flow & drain, vent pipe and all the necessary accessories thereto. The tank
shall be placed on the concrete flat roof. Nº 1.00 25,000.00 25,000.00

Supply HDPE pipes for roof level and exposed water supply pipe sutem (PN 16) with
1.3.2 all the necessary connecting pieces such as bends, unions tees etc.the pipes and fittings
has to meet BS standard or equivalent institution and the pipe diameter listed are
external diameter.

a) diameter32mm ml 25.00 330.00 8,250.00

10.4 WASTE, VENT AND STORM WATER PIPES AND ACCESSORIES

All domestic waste, vent and storm water pipe lines shall be uPVC pipes and shall be
provided with a minimum slope of 1.5% towards the outlet unless specified. All uPVC
pipes and necessary fittings shall be standard quality and be free from damage during
storage, transportation, instullation etc. Unit price shall include all the necessary
assistance civil works, such as excavation cartaway, fixing or hanging to walls, beams
or slabs etc., necessary fittings such as bends, Ys, Ts, sockets, gaskets etc.

Supply, install, test & commission uPVC (Unplasticized Poly Venyl Chloride) Series
3 (PN6) waste water drainage and vent pipes that comply with DIN 8062 according to
10.4.1 where shown on the drawings, complete with all the necessary connecting & fixing
pieces, cleaning access, anchors, sockets &/or adaptors, accessories & civil works
thereto for the proper installation & operation of the system.
a) Diameter 50 mm with wall thickness 3.2mm ml 32.00 85.00 2,720.00
c) Diameter 110 mm wall thickness 3.5mm ml 80.00 135.00 10,800.00

Supply and install approved quality storm water drainage uPVC (Unplasticized Poly
Venyl Chloride) Series 3 (PN6) Down Pipe for storm water drainage system that
1.4.2 comply with DIN 8062 according to where shown on the drawings. Price shall include
painting of UV-Radiation protection & all the necessary connecting pieces, fixing &
corrosion free clamping elements and all other neecessary assistance civil works ther to
for the proper installation & operation of the system.
c) diameter 110 mm ml 65.00 155.00 10,075.00

Supply and install Vent Caps made of rigid uPVC to be connected to the roof terminal
1.4.3 of vent pipe as shown on the riser diagram, complete with all the necessary sealings,
gaskets to roof water proofing membrane including stainless steel screws/as required
and all other accessories.
a) diameter 50 mm Nº 5.00 450.00 2,250.00

10.5 SITE WASTE & STORM WATER DRAINAGE SYSTEM


1.5.1 Waste Water Drainage

Supply and lay uPVC (Unplasticized Poly Venyl Chloride) (PN6) Orange for
external waste & storm water drainage pipes that comply with BS 4660 & BS 5481
according to the drawing shown with a minimum slope of 1.5% or natural ground slope
which ever is greater on a firm bed of selected material. The joints shall be made tight
and installation shall make the best condition for cleaning and maintenance. Unit price
shall include excavation of the trench. cartaway, back-fill & all other necessary civil
works there to.
a) diameter 150 mm ml 20.00 450.00 9,000.00

Supply and install circular sewer Man Hole made of precast concrete pipe with internal
dimension of 600*600*900mm(avg. depth), rested on mass concrete benching size
1000*1000*100mm concrete bottom slab reinforced with diameter 8mm reinforcement
1.5.2 bar c/c 200mm both ways. The bottom slab shall rest on 150mm thick well compacted
selected material. Man hole cover shall be RC concrete 80mm thick with 8mm
reinforcement bar @200mm c/c both ways as shown on the drawing. Unit price shall
include excavation, cart-away, compaction and back-fill as required and all assistance
civil works there to. Nº 2.00 2,650.00 5,300.00

9
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount

suply and construct 30 mq. Capacity septic tank in masonry wall with both top and
1.5.3
bottomconcreteslab thicknes 200mmthick with manhole openings and with inlet and
outlet pipe conections LS 1.00 50,000.00 50,000.00

TOTAL CARRIED TO SUMMARY ................................................... 371,465.00

11.ELECTRICAL INSTALLATION
Supply and install :-
1 Power & Tele Intakes (Provisional Quantity)
Cost of EEPCo power Intake LS 1 100,000.00 100,000.00

1 Standby Diesel Generator Set


Fix Diesel generator set of 43kW (at site), 380/220V, 4-wire, 50Hz, 1500rpm, skid
mounted, complete with Automatic Load Transferee Switch, all necessary control and
1.1 alarm equipment; and as indicated on the drawing. No 1 400,000.00 400,000.00

2 Manhole
Manhole in bricks and with concrete base internally of 1500x1500x700mm including
2.1 concrete cover with lifting hole. No 2.00 2,500.00 5,000.00
-
Manhole in bricks and with concrete base internally of 500x500x500mm including
2.2 concrete cover with lifting hole. No 9.00 2,500.00 22,500.00

3 PVC pipes.
3.1 70 mm diameter for Power and Tele ml 122 70.00 8,540.00
3.2 60 mm diameter for Power and Tele ml 100 70.00 7,000.00
3.3 29 mm diameter for power lines from MDB to SDBs ml 588 30.00 17,640.00
3.4 16mm diameter for power lines from SDB to EACH SOURCE
4 Low Voltage System Earth
Low voltage system earthing (1x50)sq. mm bare copper conductor from CMDB earth
terminal ,to copper clad steel earthing rod of 16x2400mm in manhole measured
elsewhere(15m). [needs to have a mesh of 3 earthing rods to achieve the expected
4.1 earthing resistance] No 1.00 5,500.00 5,500.00

1x16 sq mm bare copper earth conductor from kWhmt board earth terminal to earth
4.2 rods in PVC pipe 50mm diameter. ml 7 450.00 3,150.00

5 Distribution Boards
Flush mounted distribution Board, MDB with lockable door and including bus bars of
100 Amp 3Phase, all necessary fixing and connecting accessories, complete and
5.1 consisting:-
5 pcs 10A, MCB, 1Phase
2 pcs 32A, MCB, 1Phase
2 pcs 20A, MCB, 1Phase
1 pcs 32A, MCB, 3Phase
1 pcs 40A, MCB, 3Phase
1 pcs 100A, MCB, 3Phase No 1 12,500.00 12,500.00
25% reserve pitches all complete
2 pcs digital KWHM 50-600A /3P, with Relay
3 pcs ammeter of (0-600A) with current transformer
1 pc volt meter (0-500 V), with selector switch
1 Surge arrestor of appropriate size
3 pcs pilot lamps.
5.1 Ditto as above but for SDB-GF, and consisting:40A-
3 pcs 10A, MCB, 1Phase
4 pcs 16A, MCB, 1Phase No 1 9,400.00 9,400.00
6 pcs 20A, MCB, 1Phase

10
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
1 pc main 40A, MCB, 3Phase
25% reserve pitches all complete

5.2 Ditto as above but for SDB-1F, and consisting:40A-


4 pcs 10A, MCB, 1Phase
3 pcs 16A, MCB, 1Phase No 1 9,000.00 9,000.00
6 pcs 20A, MCB, 1Phase
1 pc main 40A, MCB, 3Phase
25% reserve pitches all complete

5.3 Ditto as above but for SDB-2F, and consisting:40A-


3 pcs 10A, MCB, 1Phase
3 pcs 16A, MCB, 1Phase No 1 8,700.00 8,700.00
6 pcs 20A, MCB, 1Phase
1 pc main 40A, MCB, 3Phase
25% reserve pitches all complete

5.4 Ditto as above but for SDB-3F, and consisting:40A-


3 pcs 10A, MCB, 1Phase
3 pcs 16A, MCB, 1Phase No 1 8,700.00 8,700.00
6 pcs 20A, MCB, 1Phase
1 pc main 40A, MCB, 3Phase
25% reserve pitches all complete

5.5 Ditto as above but for SDB-4F, and consisting:40A-


3 pcs 10A, MCB, 1Phase
3 pcs 16A, MCB, 1Phase No 1 8,700.00 8,700.00
6 pcs 20A, MCB, 1Phase
1 pc main 40A, MCB, 3Phase
25% reserve pitches all complete

6 Cables
6.1 (3x2.5) Sq mm ml 310 65 20,150.00
6.2 3x4 mm sq. m 58 60 3,480.00
6.3 5x6 mm sq. m 80 150 12,000.00
6.4 (5x10) Sq mm ml 28 388 10,864.00
6.5 3x35/16 mm sq. m 100 3000 300,000.00

7 Extra Over Light Points for Flush Mounted Switches


7.1 Flush mounting single switch No 10.00 200.00 2,000.00
7.2 Flush mounting two way switch No 23.00 200.00 4,600.00
7.3 Flush mounting double switch No 80.00 250.00 20,000.00
7.4 Flush mounting intermediate switch No 3.00 250.00 750.00

6 Light Points

Flush mounted light points fed through PVC insulated conductors of 2x2.5mm 2 inside
PVC conduits of 16mm diameter, including junction boxes with covers and insulating
screw cap connectors, complete
No 174 380.00 66,120.00

8 Flush Mounted Socket Outlet Points


10-16A/1P socket outlet points fed through PVC insulated conductors of 3x2.5mm 2
inside PVC conduit of 16mm diameter including junction boxes with covers and
insulating screw cap connectors.
8.1 No 181.00 550.00 99,550.00
10 Flush mounted Socket Outlets with earth contact
10.1 Flush mounting single socket outlet of 10A/16A 1ph No 181.00 200 36,200.00

Telephon System
-The system shall be installed as per ETC standard

RJ 45 4 pair Tele socket out let points to for


flush mounting in thermoplastic conduit of 21mm

11
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
with appropriate type junction box fed by standard
(CAT 6A UTP data cable) No 48 280.00 13,440.00

RJ 45 4 pair Tele socket outlets Nº 48 200.00 9,600.00

Note :- Use PVC conduit for risers and drops


I. Supply of Lighting fitting by the Client,

II. An average Unit price is considered for


cost estimation,
III. The price of fittings under this item to be
EXCLUDED in the contract agreement.
N.B.
Recommended types of fittings indicated
on the attached lighting fitting Schedule.

(a) Lighting fittings and lamps complete No 174 1,560.00 271,440.00

TOTAL CARRIED TO SUMMARY ................................................... 1,496,524.00

12
TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

MAIN BLOCK & LABORATORY


B.SUPER STRUCTURE
1.0 CONCRETE WORK
ELEVATION COLUMN
a) In elevation columns.
35x35
3/ 2.8 l= 2.8
0.35 w= 0.35
0.35 d= 0.35
1.03 m3
30x30
28 / 2.8 l= 2.8
0.3 w= 0.3
0.3 d= 0.3
7.06 m3
20x30
2/ 2.8 l= 2.8
0.2 w= 0.2
0.3 d= 0.3
0.34 m3 30x30
36 / 3 l= 3
0.3 w= 0.3
0.3 d= 0.3
9.72 m3
dia.40
2/ 2.8 l= 2.8
3.14 π= 3.14
0.04 r2= 0.04
0.70 m3
dia.50
2/ 2.8 l= 2.8
3.14 π= 3.14
0.0625 r2= 0.0625
1.10 m3
18.85 m3 GRAND TOTAL
b) In floor beam.
First Floor
On axis 1,2,3,4,&6
5/ 13 l= 13

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

0.2 w= 0.2
0.4 d= 0.4
5.20 m3
on axis 5
1/ 4 l= 4
0.2 w= 0.2
0.4 d= 0.4
0.32 m3
On axis A,B,&D
3/ 20 l= 20
0.2 w= 0.2
0.4 d= 0.4
4.80 m3
On axis C
1/ 12 l= 12
0.2 w= 0.2
0.4 d= 0.4
0.96 m3
Second Floor to lower roof
On axis 1,2,5,& 6
16 / 13 l= 13
0.2 w= 0.2
0.4 d= 0.4
16.64 m3
On axis 3&4
8/ 14.6 l= 14.6
0.2 w= 0.2
0.4 d= 0.4
9.34 m3
On axis A&D
8/ 21.2 l= 21.2
0.2 w= 0.2
0.4 d= 0.4
13.57 m3
On axis B&C
8/ 21.6 l= 21.6
0.2 w= 0.2
0.4 d= 0.4
13.82 m3
Upper roof (water tank)

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

On axis A&B
2/ 4 l= 4
0.2 w= 0.2
0.4 d= 0.4
0.64 m3
On axis 1&2
2/ 4 l= 4
0.2 w= 0.2
0.4 d= 0.4
0.64 m3
65.93 m3 GRAND TOTAL
d) In staircase and landing
1/ 0.081 STAIR-1 from ground to first A= 0.081
1.4 w= 1.4
18 number of risers = 18
2.04 m3
landing
1/ 1.2 l= 1.2
2.8 w= 2.8
0.2 d= 0.2
0.67 m3
5/ 0.081 STAIR-2 first to roof A= 0.081
1.4 w= 1.4
18 number of risers = 18
10.21 m3
landing
5/ 1.2 l= 1.2
2.8 w= 2.8
0.2 d= 0.2
3.36 m3
landing beam
6/ 4 l= 4
0.2 w= 0.2
0.4 d= 0.4
1.92 m3
18.20 m3 GRAND TOTAL
c) In 15cm thick suspended floor slab
1st floor
1/ 260 A= 260

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

0.15 d= 0.15
39.00 m3
Second Floor to lower roof
4/ 285.228 A= 285.228
0.15 d= 0.15
171.14 m3
1/ 16 Upper roof (water tank) A= 16
0.15 d= 0.15
2.40 m3
ddt void
-1 / 8 Void @ first floor l= 8
9 w= 9
0.15 d= 0.15
- 10.80 m3
ddt stair-1 ground to first
-2 / 3 l= 3
4 w= 4
0.15 d= 0.15
- 3.60 m3
ddt stair-1 first to roof
-4 / 3 l= 3
4 w= 4
0.15 d= 0.15
- 7.20 m3
190.94 m3 GRAND TOTAL
e) In 15cm thick shear wall

1/ 21.4 l= 21.4
0.15 w= 0.15
2.8 d= 2.8
8.99 m3
ddt opening
-1 / 1.6 D1 l= 8
2.1 w= 9
0.15 d= 0.15
- 0.50 m3
8.49 m3 GRAND TOTAL
FORMWORK
a) In elevation columns.

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

total column
35x35
3/ 2.8 l= 2.8
1.4 w= 1.4
11.76 m2
30x30
28 / 2.8 l= 2.8
1.2 w= 1.2
94.08 m2
20x30
2/ 2.8 l= 2.8
1 w= 1
5.60 m2
dia.40
2/ 2.8 l= 2.8
3.14 π= 3.14
0.2 r = 0.2
3.52 m2
dia.50
2/ 2.8 l= 2.8
3.14 π= 3.14
0.25 r = 0.25
4.40 m2
114.96 m2 GRAND TOTAL
b) In floor beam.
First Floor
On axis 1,2,3,4,&6
5/ 26 l= 26
0.4 w1= 0.4
0.2 w2= 0.2
54.60 m2
on axis 5
1/ 8 l= 8
0.4 w1= 0.4
0.2 w2= 0.2
4.00 m2
On axis A,B,&D
3/ 40 l= 40
0.4 w1= 0.4
0.2 w2= 0.2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

52.00 m2
On axis C
1/ 24 l= 24
0.4 w1= 0.4
0.2 w2= 0.2
12.00 m2
Second Floor to lower roof
On axis 1,2,5,& 6
16 / 26 l= 26
0.4 w1= 0.4
0.2 w2= 0.2
169.00 m2
On axis 3&4
8/ 29.2 l= 29.2
0.4 w1= 0.4
0.2 w2= 0.2
96.36 m2
On axis A&D
8/ 42.4 l= 42.4
0.4 w1= 0.4
0.2 w2= 0.2
139.92 m2
On axis B&C
8/ 43.2 l= 43.2
0.4 w1= 0.4
0.2 w2= 0.2
142.56 m2
Upper roof (water tank)
On axis A&B
2/ 8 l= 8
0.4 w1= 0.4
0.2 w2= 0.2
7.20 m2
On axis 1&2
2/ 8 l= 8
0.4 w1= 0.4
0.2 w2= 0.2
7.20 m2
684.84 m2 GRAND TOTAL
c) In 15cm thick suspended floor slab
1st floor

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

1/ 260 A= 260
260.00 m2
Second Floor to lower roof
4/ 285.228 A= 285.228
1,140.91 m2
1/ 16 Upper roof (water tank) A= 16
0.15 d= 0.15
2.40 m2
ddt void
-1 / 8 Void @ first floor l= 8
9 w= 9
- 72.00 m2
void sides
1/ 25 l= 25
0.15 w= 0.15
3.75 m2
ddt stair-1 ground to first
-2 / 3 l= 3
4 w= 4
- 24.00 m2
ddt stair-1 first to roof
-4 / 3 l= 3
4 w= 4
- 48.00 m2
stair-2 sides
5/ 7 l= 7
0.15 w= 0.15
5.25 m2
upper roof
1/ 4 main block bottom l= 4
3 w= 3
12.00 m2

1,280.31 m2 GRAND TOTAL


d) In staircase and landing
6/ 16.34 STAIR-1 A= 16.34
98.04 m2
landing
6/ 4 l= 4

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

1.2 w= 1.2
28.80 m2
landing beam
6/ 4 l= 4
1 w= 1
24.00 m2
150.84 m2 GRAND TOTAL
e) In 15cm thick shear wall

1/ 21.4 l= 21.4
2.8 d= 2.8
59.92 m2
ddt opening
-1 / 1.6 D1 l= 2.1
2.1 h= 1.6
- 3.36 m2
56.56 m2 GRAND TOTAL

2.00 BLOCK WORK


20 cm thick
Ground floor
1/ 189.5 A= 189.5
1 w= 1
189.50 m2
First floor
1/ 290.01 A= 290.01
1 w= 1
290.01 m2
Second to fourth
1/ 1182.72 A= 1182.72
1 w= 1
1,182.72 m2 Upper roof
1/ 40.88 A= 40.88
1 w= 1
40.88 m2
ddt oppenings
Curtain walls
CW1
-1 / 3.6 w= 3.6

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

2.8 h= 2.8
- 10.08 m2
CW2
-1 / 4.55 w= 4.55
2.8 h= 2.8
- 12.74 m2
CW3
-1 / 3.6 w= 3.6
2.8 h= 2.8
- 10.08 m2
CW4
-6 / 1.97 w= 1.97
2.8 h= 2.8
- 33.10 m2
CW6
-1 / 1.05 w= 1.05
10 h= 10
- 10.50 m2
Doors
D1
0/ 1.6 w= 1.6
2.1 h= 2.1
- m2
D2
-1 / 0.9 w= 0.9
2.4 h= 2.4
- 2.16 m2
D3
-25 / 1.5 w= 1.5
2.1 h= 2.1
- 78.75 m2
D4
-6 / 1 w= 1
2.1 h= 2.1
- 12.60 m2
D5
-2 / 0.8 w= 0.8
2.4 h= 2.4
- 3.84 m2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

D6
-1 / 0.9 w= 0.9
2.1 h= 2.1
- 1.89 m2
D7
-6 / 0.8 w= 0.8
2.4 h= 2.4
- 11.52 m2
D8
-1 / 1 w= 1
2.5 h= 2.5
- 2.50 m2
Windows
W1
-33 / 2.15 w= 2.15
1.5 h= 1.5
- 106.43 m2
W2
-4 / 0.6 w= 0.6
0.6 h= 0.6
- 1.44 m2

1,405.48 m2 GRAND TOTAL

wall tiles for toilets


8/ 6.8 l= 6.8
1.8 w= 1.8
97.92 m2

Floor tiles
5/ 188 All floors A= 188
1 w= 1
940.00 m2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


steel reinforcement
project
client

drg dia length of no. Of


location shape
no. (mm) bar dimension c/c bar mem
MAIN BUILDING
ELEVATION COLUMN COLUMN
ground floor
C-1=2 pcs REC 16 4.4 10
STIRRUP 8 1.3 3 0.15 21
C-2=5pcs REC 16 4.4 8
STIRRUP 8 1.3 3 0.15 21
C-3=2pcs CIR 16 4.4 10
STIRRUP 8 0.83 3 0.15 21
C-4=1pcs CIR 16 4.4 8
STIRRUP 8 0.99 3 0.15 21
` C-5=2pcs REC 14 4.4 8
STIRRUP 8 1.3 3 0.15 21
` C-6=2pcs REC 14 4.4 8
STIRRUP 8 1.3 3 0.15 21
` C-7=10pcs REC 14 4.4 8
STIRRUP 8 1.1 3 0.15 21

first floor
C-1=2 pcs REC 16 4 10
STIRRUP 8 1.1 3 0.15 21
C-2=5pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
C-3=2pcs CIR 16 4 10
STIRRUP 8 0.83 3 0.15 21
C-4=1pcs CIR 16 4 8
STIRRUP 8 0.99 3 0.15 21
` C-5=2pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21
` C-6=2pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21
` C-7=10pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21

second floor
C-1=2 pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
C-2=5pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
C-3=2pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
C-4=1pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
` C-5=2pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21
` C-6=2pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21
` C-7=10pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21

Third floor
C-1=2 pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
C-2=5pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
C-3=2pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
C-4=1pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
` C-5=2pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21
` C-6=2pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21
` C-7=10pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21

Fourth floor
C-1=2 pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
C-2=5pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
C-3=2pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
C-4=1pcs REC 16 4 8
STIRRUP 8 1.1 3 0.15 21
` C-5=2pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21
` C-6=2pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21
` C-7=10pcs REC 14 4 8
STIRRUP 8 1.1 3 0.15 21

Roof floor
` C-5=2pcs REC 14 3 8
STIRRUP 8 0.9 2.8 0.15 20
` C-6=2pcs REC 14 3 8
STIRRUP 8 0.9 2.8 0.15 20

FLOOR BEAMS
first floor
On axis 1,2,3,4,&6 top 14 14.87 3
14 6 1
bot 14 14.17 3
st 8 1.1 13 0.15 88
on axis 5 top 16 5.05 5
bot 16 4.35 5
st 8 1.1 4 0.15 28

on axis A,B&D top 14 21.87 3


14 10.66 1
bot 14 21.95 3
st 8 1.1 20 0.15 134

on axis C top 14 13.875 3


bot 14 13.17 3
14 21.82 7
st 8 1.1 12 0.15 81

Second floor to lower


On axis 1,2,5,&6 top 16 14.87 3
14 6 1
bot 14 9.575 4
14 4.595 3
st 8 1.1 13 0.15 88

on axis 3&4 top 16 16.245 3


16 5.135 2
14 3 2
bot 14 15.55 4
st 8 1.1 14.6 0.15 98

on axis A&D top 16 22.85 3


14 12.735 1
bot 14 22.95 3
st 8 1.1 21.2 0.15 142

on axis B& C top 16 23.2 3


14 12.735 1
bot 14 13.375 3
14 9.975 4
st 8 1.1 21.6 0.15 145

upper roof (water tank)


On axis 1,&2 top 14 4.7 3
bot 14 4.7 3
14 4.595 3
st 8 1.1 4 0.15 28

On axis A&B top 16 4.7 3


bot 14 4.7 3
14 4.595 3
st 8 1.1 4 0.15 28
FLOOR SLAB
1st floor slab
1 8 7.125 4 0.14 30
2 8 5.845 4 0.12 34
3 10 2.74 4 0.12 34
4 8 5.845 5 0.12 43
5 10 2.74 4 0.12 34
6 10 2.665 5 0.14 37
7 8 10.815 4 0.12 34
8 10 2.665 4 0.13 32
9 8 6.15 4 0.12 34
10 10 3 4 0.14 30
11 8 6.15 4 0.12 34
12 10 3 4 0.15 28
13 8 5.6 4 0.14 30
14 8 5.6 4 0.13 32
15 8 9.71 5 0.12 43
16 10 2.665 5 0.12 43
17 10 3 4 0.15 28
18 8 6.15 4 0.14 30
19 8 8.375 4 0.14 30
20 10 2.665 4 0.15 28
21 8 6.15 4 0.14 30
22 10 2.665 4 0.15 28
23 8 4.6 4 0.11 37
24 8 7.025 4 0.11 37
25 10 2.665 4 0.15 28
26 8 5.845 4 0.11 37
27 10 7.025 4 0.11 37

2nd to 4th floor slab


1 8 4.445 4 0.12 34
2 8 6.15 4 0.14 30
3 10 2.665 4 0.15 28
4 10 3 4 0.15 28
5 8 4.445 5 0.12 43
6 10 2.665 5 0.15 34
7 10 2.74 4 0.12 34
8 8 6.375 4 0.14 30
9 8 8.6 4 0.13 32
10 8 6.15 4 0.14 30
11 10 3 4 0.15 28
12 10 2.665 4 0.15 28
13 8 8.6 5 0.13 39
14 8 5.6 4 0.15 28
15 10 2.665 5 0.15 34
16 10 3 4 0.15 28
17 8 6.15 4 0.14 30
18 8 8.375 4 0.13 32
19 10 2.665 4 0.15 28
20 8 4.15 1.6 0.15 12
21 12 2.91 4 0.15 28
22 8 5.875 4 0.13 32
23 10 2.665 4 0.15 28
24 10 3 4 0.15 28
25 8 5.6 4 0.15 28
26 10 2.665 5 0.15 34
27 10 3 4 0.15 28
28 8 6.15 4 0.14 30
29 10 2.665 4 0.15 28
30 10 2.665 4 0.15 28
31 8 6.15 4 0.14 30
32 8 9.875 4 0.12 34
33 10 3 4 0.15 28
34 8 9.875 5 0.12 43
35 8 5.6 4 0.15 28
36 10 2.665 5 0.15 34
37 10 3 4 0.15 28
38 8 6.15 4 0.14 30
39 8 9.875 4 0.12 34
40 10 2.665 4 0.15 28
41 8 6.15 4 0.14 30
42 12 2.91 4 0.15 28
43 10 3 4 0.15 28
44 8 5.6 4 0.15 28
45 12 2.91 5 0.15 34
46 10 3 4 0.15 28
47 8 6.15 4 0.14 30
48 12 2.91 4 0.15 28

Lower roof slab


1 8 4.445 4 0.12 34
2 8 6.15 4 0.14 30
3 8 2.665 4 0.15 28
4 8 3 4 0.15 28
5 8 4.445 5 0.12 43
6 8 2.665 5 0.15 34
7 10 2.74 4 0.12 34
8 8 6.375 4 0.14 30
9 8 8.6 4 0.13 32
10 8 6.15 4 0.14 30
11 8 3 4 0.15 28
12 8 2.665 4 0.15 28
13 8 8.6 5 0.13 39
14 8 5.6 4 0.15 28
15 8 2.665 5 0.15 34
16 8 3 4 0.15 28
17 8 6.15 4 0.14 30
18 8 8.375 4 0.13 32
19 8 2.665 4 0.15 28
20 8 4.15 1.6 0.15 12
21 10 2.91 4 0.15 28
22 8 5.875 4 0.13 32
23 8 2.665 4 0.15 28
24 8 3 4 0.15 28
25 8 5.6 4 0.15 28
26 8 2.665 5 0.15 34
27 8 3 4 0.15 28
28 8 6.15 4 0.14 30
29 8 2.665 4 0.15 28
30 8 2.665 4 0.15 28
31 8 6.15 4 0.14 30
32 8 9.875 4 0.12 34
33 8 3 4 0.15 28
34 8 9.875 5 0.12 43
35 8 5.6 4 0.15 28
36 8 2.665 5 0.15 34
37 8 3 4 0.15 28
38 8 6.15 4 0.14 30
39 8 9.875 4 0.12 34
40 8 2.665 4 0.15 28
41 8 6.15 4 0.14 30
42 10 2.91 4 0.15 28
43 8 3 4 0.15 28
44 8 5.6 4 0.15 28
45 10 2.91 5 0.15 34
46 8 3 4 0.15 28
47 8 6.15 4 0.14 30
48 10 2.91 4 0.15 28
Upper roof slab (water tank)
1 10 6.815 4 0.15 28
2 10 6.815 4 0.15 28

stair case
stair case-1 (grd to frst) 14 5.055 1.4 0.15 10
14 2.23 1.4 0.15 10
14 1.39 1.4 0.15 10
14 5.32 1.4 0.15 10
14 2.27 1.4 0.15 10
14 1.465 1.4 0.15 10
8 1.4 2.97 0.14 22
8 1.4 1.5 0.15 11
LB1 top 14 3.6 3
bot 14 3.35 3
8 1.1 3 0.15 21
stair case-1 (first to roof) 14 5.055 1.4 0.15 10
14 2.23 1.4 0.15 10
14 1.39 1.4 0.15 10
14 5.32 1.4 0.15 10
14 2.27 1.4 0.15 10
14 1.465 1.4 0.15 10
8 1.4 2.97 0.14 22
8 1.4 1.5 0.15 11
LB1 top 14 3.6 3
bot 14 3.35 3
8 1.1 3 0.15 21
stair case-2 (first to roof) 14 5.055 1.4 0.15 10
14 2.23 1.4 0.15 10
14 1.39 1.4 0.15 10
14 5.32 1.4 0.15 10
14 2.27 1.4 0.15 10
14 1.465 1.4 0.15 10
8 1.4 2.97 0.14 22
8 1.4 1.5 0.15 11
LB1 top 14 3.6 3
bot 14 3.35 3
8 1.1 3 0.15 21
Shear wall
10 8 2.8 0.15 20
8 8 2.8 0.2 15
10 2.7 2.8 0.15 20
14 3.2 4
TOTAL LENGTH
UNIT WEIGHT
TOTAL WEIGHT
TOTAL WEIGHT WITH 5%
no.memb total no. total length in meters for each dia.
er Bars 6 8 10 12 14 16

2 20 88
2 42 54.6
5 40 176
5 105 136.5
2 20 88
2 42 34.86
1 8 35.2
1 21 20.79
2 16 70.4
2 42 54.6
2 16 70.4
2 42 54.6
10 80 352
10 210 231

2 20 80
2 42 46.2
5 40 160
5 105 115.5
2 20 80
2 42 34.86
1 8 32
1 21 20.79
2 16 64
2 42 46.2
2 16 64
2 42 46.2
10 80 320
10 210 231

2 16 64
2 42 46.2
5 40 160
5 105 115.5
2 16 64
2 42 46.2
1 8 32
1 21 23.1
2 16 64
2 42 46.2
2 16 64
2 42 46.2
10 80 320
10 210 231

2 16 64
2 42 46.2
5 40 160
5 105 115.5
2 16 64
2 42 46.2
1 8 32
1 21 23.1
2 16 64
2 42 46.2
2 16 64
2 42 46.2
10 80 320
10 210 231

2 16 64
2 42 46.2
5 40 160
5 105 115.5
2 16 64
2 42 46.2
1 8 32
1 21 23.1
2 16 64
2 42 46.2
2 16 64
2 42 46.2
10 80 320
10 210 231

2 16 48
2 40 36
2 16 48
2 40 36
0
0

5 15 223.05
5 5 30
5 15 212.55
5 440 484
1 5 25.25
1 5 21.75
2 56 61.6

3 9 196.83
3 3 31.98
3 9 197.55
2 268 294.8

1 3 41.625
1 3 39.51
2 14 305.48
2 162 178.2

16 48 713.76
16 16 96
16 64 612.8
16 48 220.56
16 1408 1548.8

8 24 389.88
8 16 82.16
8 16 48
8 32 497.6
8 784 862.4

8 24 548.4
8 8 101.88
8 24 550.8
8 1136 1249.6

8 24 556.8
8 8 101.88
8 24 321
8 32 319.2
8 1160 1276

2 6 28.2
12 36 169.2
12 36 165.42
12 336 369.6

2 6 28.2
12 36 169.2
12 36 165.42
12 336 369.6
1 30 213.75
1 34 198.73
1 34 93.16
1 43 251.335
1 34 93.16
1 37 98.605
1 34 367.71
1 32 85.28
1 34 209.1
1 30 90
1 34 209.1
1 28 84
1 30 168
1 32 179.2
1 43 417.53
1 43 114.595
1 28 84
1 30 184.5
1 30 251.25
1 28 74.62
1 30 184.5
1 28 74.62
1 37 170.2
1 37 259.925
1 28 74.62
1 37 216.265
1 37 259.925

3 102 453.39
3 90 553.5
3 84 223.86
3 84 252
3 129 573.405
3 102 271.83
3 102 279.48
3 90 573.75
3 96 825.6
3 90 553.5
3 84 252
3 84 223.86
3 117 1006.2
3 84 470.4
3 102 271.83
3 84 252
3 90 553.5
3 96 804
3 84 223.86
3 36 149.4
3 84 244.44
3 96 564
3 84 223.86
3 84 252
3 84 470.4
3 102 271.83
3 84 252
3 90 553.5
3 84 223.86
3 84 223.86
3 90 553.5
3 102 1007.25
3 84 252
3 129 1273.875
3 84 470.4
3 102 271.83
3 84 252
3 90 553.5
3 102 1007.25
3 84 223.86
3 90 553.5
3 84 244.44
3 84 252
3 84 470.4
3 102 296.82
3 84 252
3 90 553.5
3 84 244.44

1 34 151.13
1 30 184.5
1 28 74.62
1 28 84
1 43 191.135
1 34 90.61
1 34 93.16
1 30 191.25
1 32 275.2
1 30 184.5
1 28 84
1 28 74.62
1 39 335.4
1 28 156.8
1 34 90.61
1 28 84
1 30 184.5
1 32 268
1 28 74.62
1 12 49.8
1 28 81.48
1 32 188
1 28 74.62
1 28 84
1 28 156.8
1 34 90.61
1 28 84
1 30 184.5
1 28 74.62
1 28 74.62
1 30 184.5
1 34 335.75
1 28 84
1 43 424.625
1 28 156.8
1 34 90.61
1 28 84
1 30 184.5
1 34 335.75
1 28 74.62
1 30 184.5
1 28 81.48
1 28 84
1 28 156.8
1 34 98.94
1 28 84
1 30 184.5
1 28 81.48

1 28 190.82
1 28 190.82

1 10 50.55
1 10 22.3
1 10 13.9
1 10 53.2
1 10 22.7
1 10 14.65
1 22 30.8
2 22 30.8
1 3 10.8
1 3 10.05
2 42 46.2
4 40 202.2
4 40 89.2
4 40 55.6
4 40 212.8
4 40 90.8
4 40 58.6
4 88 123.2
8 88 123.2
4 12 43.2
4 12 40.2
8 168 184.8
1 10 50.55
1 10 22.3
1 10 13.9
1 10 53.2
1 10 22.7
1 10 14.65
1 22 30.8
2 22 30.8
1 3 10.8
1 3 10.05
2 42 46.2

2 40 320
2 30 240
4 80 216
2 8 25.6
TOTAL LENGTH 0 34963.135 7782.585 1030.14 8441.035 4065.4
UNIT WEIGHT 0.222 0.395 0.617 0.888 1.209 1.58
TOTAL WEIGHT 0 13810.43833 4801.854945 914.76432 10205.21132 6423.332
TOTAL WEIGHT WITH 5% - 14,500.96 5,041.95 960.50 10,715.47 6,744.50
ch dia. #REF!
20 24
0 0
2.467 3.55392
0 0
- -
TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

A.SUB STRUCTURE
1.0 EARTH WORK

1.1 site clearing


1/ 23 MAIN BLOCK 1 23
16 w= 16
368.00 m2
368.00 m2 GRAND TOTAL
1.2 bulk excavation to depth 150 cm
1/ 23 l= 23
16 w= 16
0.3 d= 0.3
110.40 m3
110.40 m3 GRAND TOTAL
1.3 bulk excavation to depth 320 cm
1/ 23 l= 23
1 w= 1
0 d= 0
- m3
- m3 GRAND TOTAL
1.4 pit excavation not exceeding 150 cm
F1=220x220x60=7 pcs
7/ 2.7 l= 2.7
2.7 w= 2.7
1.5 d= 1.5
76.55 m3
F2=200x200x50=5 pcs
5/ 2.5 l= 2.5
2.5 w= 2.5
1.5 d= 1.5
46.88 m3
F3=170x170x40=8 pcs
8/ 2.2 l= 2.2
2.2 w= 2.2
1.5 d= 1.5
58.08 m3
F4=150x150x40=4 pcs
4/ 2 l= 2
2 w= 2
1.5 d= 1.5
24.00 m3
205.51 m3 GRAND TOTAL
1.5 dito but not exceeding 300 cm
F1=220x220x60=7 pcs
7/ 2.7 l= 2.7
2.7 w= 2.7
1 d= 1
51.03 m3
F2=200x200x50=5 pcs

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

5/ 2.5 l= 2.5
2.5 w= 2.5
1 d= 1
31.25 m3
F3=170x170x40=8 pcs
8/ 2.2 l= 2.2
2.2 w= 2.2
1 d= 1
38.72 m3
F4=150x150x40=4 pcs
4/ 2 l= 2
2 w= 2
1 d= 1
16.00 m3
137.00 m3 GRAND TOTAL
1.6 Trench excavation

1/ 66 l= 66
0.55 w= 0.55
1.5 d= 1.5
54.45 m3
54.45 m3 GRAND TOTAL
1.7 Back fill under foundation
volume of pit and trench
205.51 m3
54.45 m3
259.96 m3
ddt volume of footing
F1=220x220x60=7 pcs
-7 / 2.2 l= 2.2
2.2 w= 2.2
0.6 d= 0.6
- 20.33 m3
F2=200x200x50=5 pcs
-5 / 2 l= 2
2 w= 2
0.5 d= 0.5
- 10.00 m3
F3=170x170x40=8 pcs
-8 / 1.7 l= 1.7
2.2 w= 2.2
0.4 d= 0.4
- 11.97 m3
F4=150x150x40=4 pcs
-4 / 1.5 l= 1.5
1.5 w= 1.5
0.4 d= 0.4
- 3.60 m3
ddt foundation column
section=40x40
33 / -0.65 l= -0.65

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

0.4 w= 0.4
0.4 d= 0.4
- 3.43 m3
ddt foundation column
section=35x35
-9 / 0.35 l= 0.35
0.35 w= 0.35
1 d= 1
- 1.10 m3
section=30x30
-14 / 0.3 l= 0.3
0.3 w= 0.3
1.5 d= 1.5
- 1.89 m3
- m3
section=Ø40
-2 / 0.1256 Area 0.1256
1.5 d= 1.5
- 0.38 m3
section=Ø50
-1 / 0.19625 Area 0.19625
1.5 d= 1.5
- 0.29 m3
ddt volume of stone masonary
-1 / 66 l= 66
0.5 w= 0.5
1.5 d= 1.5
- 49.50 m3
157.47 m3 GRAND TOTAL
1.8 ditto but for under hard core
10 / 3.75 volume of bulk 1= 3.75
3.75 w= 3.75
1.15 d= 1.15
161.72 m3
5/ 4.75 l= 4.75
3.75 w= 3.75
1.15 d= 1.15
102.42 m3
264.14 m3 GRAND TOTAL
1.10 25 cm thick hard core
10 / 3.75 3.75
3.75 w= 3.75
0.25 d= 0.25
35.16 m3
5/ 4.75 l= 4.75
3.75 w= 3.75
0.25 d= 0.25
22.27 m3
57.43 m2 GRAND TOTAL
2.0 COCNCRETE WORK
a) lean concrete under footing

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

F1=220x220x60=7 pcs
7/ 2.25 l= 2.25
2.25 w= 2.25
35.44 m2
F2=200x200x50=5 pcs
5/ 2.05 l= 2.05
2.05 w= 2.05
21.01 m2
F3=170x170x40=8 pcs
17 / 1.75 l= 1.75
1.75 w= 1.75
52.06 m2
F4=150x150x40=4 pcs
5/ 1.55 l= 1.55
1.55 w= 1.55
12.01 m2
120.52 m2 GRAND TOTAL
b) grade beam
on axis B&C (1-6)
2/ 20.35 l= 20.35
0.25 w= 0.25
10.18 m2
on axis 2,3,4&5 (A-D)
4/ 13.35 l= 13.35
0.205 w= 0.205
10.95 m2
21.13 m2 GRAND TOTAL
c) Under masonry wall

1/ 66 l= 66
0.55 w= 0.55
36.30 m2
36.30 m2 GRAND TOTAL
2.02 C-25 concrete for
footing
F1=220x220x60=7 pcs
7/ 2.2 l= 2.2
2.2 w= 2.2
0.6 d= 0.6
20.33 m3
F2=200x200x50=5 pcs
5/ 2 l= 2
2 w= 2
0.5 d= 0.5
10.00 m3
F3=170x170x40=8 pcs
8/ 1.7 l= 1.7
1.7 w= 1.7
0.4 d= 0.4
9.25 m3

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

F4=150x150x40=4 pcs
4/ 1.5 l= 1.5
1.5 w= 1.5
0.4 d= 0.4
3.60 m3
43.18 m3 GRAND TOTAL
b) foundation column

foundation column on FC1=.35x.35x1.5=2 pcs


2/ 0.35 l= 0.35
0.35 w= 0.35
1.5 d= 1.5
0.37 m3
foundation column on FC2=.35x.35x1.5=5 pcs
5/ 0.35 l= 0.35
0.35 w= 0.35
1.5 d= 1.5
0.92 m3
foundation column on FC3=0.40x1.5=2 pcs
2/ 0.1256 Area= 0.1256
1.5 d= 1.5
0.38 m3

foundation column on FC4=0.50x1.5=1 pcs


1/ 0.19625 Area= 0.19625
1.5 d= 1.5
0.29 m3
foundation column on FC5=.35x.35x1.5=2 pcs
2/ 0.35 l= 0.35
0.35 w= 0.35
1.5 d= 1.5
0.37 m3
foundation column on FC6=.30x.30x1.5=12 pcs
12 / 0.3 l= 0.3
0.3 w= 0.3
1.5 d= 1.5
1.62 m3
3.95 m3 GRAND TOTAL
c) In grade beam
on axis A-D/1-6 4 pcs
4/ 20.35 l= 20.35
0.2 w= 0.2
0.4 d= 0.4
6.51 m3
on axis 1-6/A-B 6 pcs
6/ 13.35 l= 13.35
0.2 w= 0.2
0.4 d= 0.4

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

6.41 m3
12.92 m3 GRAND TOTAL
d) In 10cm thick ground floor slab

1/ 264.14 A= 264.14
1 d= 1
264.14 m2
264.14 m2 GRAND TOTAL

FORMWORK
a) In footing pad
F1=220x220x60=7 pcs
7/ 8.8 l= 8.8
0.6 d= 0.6
36.96 m2
F2=200x200x50=5 pcs
5/ 8 l= 8
0.5 d= 0.5
20.00 m2
F3=170x170x40=8 pcs
8/ 6.8 l= 6.8
0.4 d= 0.4
21.76 m2
F4=150x150x40=4 pcs
4/ 6 l= 6
0.4 d= 0.4
9.60 m2
88.32 m2 GRAND TOTAL
b) foundation column

foundation column on FC1=.35x.35x1.5=2 pcs


2/ 1.4 l= 1.4
1.5 d= 1.5
4.20 m2
foundation column on FC2=.35x.35x1.5=5 pcs
5/ 1.4 l= 1.4
1.5 d= 1.5
10.50 m2
foundation column on FC3=0.40x1.5=2 pcs
2/ 1.256 l= 1.256
1.5 d= 1.5
3.77 m2
foundation column on FC4=0.50x1.5=1 pcs
1/ 1.57 l= 1.57
1.5 d= 1.5
2.36 m2
foundation column on FC5=.35x.35x1.5=2 pcs
2/ 1.4 l= 1.4

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

2.4 d= 2.4
6.72 m2
foundation column on FC6=.30x.30x1.5=12 pcs
2/ 1.2 l= 1.2
1.5 d= 1.5
3.60 m2
31.15 m2 GRAND TOTAL
c) In grade beam
on axis A-D/1-6 4 pcs
4/ 40.7 l= 40.7
0.4 d= 0.4
65.12 m2
on axis 1-6/A-B 6 pcs
6/ 26.7 l= 26.7
0.4 d= 0.4
64.08 m2
129.20 m2 GRAND TOTAL

3.0 masonary wall


1/ 66 Below the NGL level 66
0.5 w= 0.5
1.5 d= 1.5
49.50 m3 Above the NGL level
1/ 66 l= 66
0.5 w= 0.5
0.3 d= 0.3
9.90 m3
59.40 m3 GRAND TOTAL

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+4COMMERCIAL CENTER
CLIENT AHMED BUDUL
LOCATION GODEY, ETHIOPIA

contractor supervisor consultant


steel reinforcement
project
client

drg dia length of no. Of bar


location shape
no. (mm) bar dimension c/c mem
MAIN BUILDING
FOOTING
F1=220x220x60=7 pcs 14 3.1 2.1 0.13 34
F2=200x200x50=5 pcs 14 2.7 1.9 0.13 32
F3=170x170x40=8 pcs 12 2.4 1.6 0.13 26
F4=150x150x40=4 pcs 12 2 1.4 0.15 20

FOUNDATION COLUMN
FC-1=2 pcs REC 16 4.2 10
STIRRUP 8 1.3 2.5 0.15 18
FC-2=5pcs REC 16 4.2 8
STIRRUP 8 1.3 2.5 0.15 18
FC-3=2pcs CIR 16 4.2 10
STIRRUP 8 0.83 2.5 0.15 18
FC-4=1pcs CIR 16 4.2 8
STIRRUP 8 0.99 2.5 0.15 18
` FC-5=2pcs REC 16 4.2 8
STIRRUP 8 1.3 2.5 0.15 18
` FC-6=2pcs REC 16 4.2 8
STIRRUP 8 1.3 2.5 0.15 18
` FC-7=10pcs REC 14 4.2 8
STIRRUP 8 1.1 2.5 0.15 18

grade beams
On Axis A-D/1-6 top 14 21.87 3
bot 14 21.95 3
8 1.1 20 0.15 134
On Axis 1-6/A-D top 14 14.87 3
bot 14 14.17 3
8 1.1 13 0.15 88
10cm thick ground floor slab
1 8 20 13 0.25 53
1 8 13 20 0.25 81

TOTAL LENGTH
UNIT WEIGHT
TOTAL WEIGHT
TOTAL WEIGHT WITH 5%
no.memb total no. total length in meters for each dia.
er Bars 6 8 10 12 14 16 20

0
7 238 737.8
2 64 172.8
8 208 499.2
4 80 160

0
2 20 84
2 36 46.8
5 40 168
5 90 117
2 20 84
2 36 29.88
1 8 33.6
1 18 17.82
2 16 67.2
5 90 117
2 16 67.2
5 90 117
10 80 336
5 90 99

4 12 262.44
4 12 263.4
4 536 589.6
6 18 267.66
6 18 255.06
1 88 96.8

1 53 1060
1 81 1053

TOTAL LENGTH 3343.9 0 659.2 2295.16 504 0


UNIT WEIGHT 0.395 0.617 0.888 1.209 1.58 2.467
TOTAL WEIGHT 1320.8405 0 585.3696 2774.84844 796.32 0
TOTAL WEIGHT WITH 5% 1,386.88 - 614.64 2,913.59 836.14 -
#REF!
24

8.20

0 0
3.55392
0
-

Das könnte Ihnen auch gefallen