Sie sind auf Seite 1von 1

N

M
L
K
J 25
I 23
H 21

1.58m
G 19
1 2 17
F
E 13 15
D 11 24
C 9 18 20 22
B 7 14 16
5 8 10 12
A 3 4 6
A' Z Y X W V U T S R Q P O

1m 1m 1m 1m 1m 1m 1m 1m 1m 1m 1m 1m 1m

TRIBUTARY WIDTH @ * DUE TO DEAD AND LIVE LOADS PA= PN = (100.855)(1.5) + (58.86)(3) REACTIONS ON DEAD LOAD AND
HORIZONTAL SURFACE LIVE LOAD
+ (1660)(1.5)
JOINT A & O = 12 (1) =0.5m P = wt. of truss (tributary area)
JOINT P TO A' = 12 (1)(2)=1.52m
PA= PN = 2.82 KN FROM NSCP 2015, TABLE 204-2
+ wt. of purlins (bay length) OF SECTION 204
PB = PC = PD = PE = PF = PG = PH = PI = PJ
+ (DL+LL)(tributary area)
TRIBUTARY AREAS @ =PK = PL = PM = (100.855)(3) + (58.86)(3)(2) CEILING LOAD = 0.48 KPa
HORIZONTAL SURFACE + (1660)(3)
Wt.truss = 19.15 + 6.285 (L) LOAD @ A AND O:
AREA = (tributary width) x (bay length) PB = PC = PD = PE = PF = PH = PI = PJ
= 19.15 + 6.285 (13) = 100.855 N/m² P = 0.48 (1.5) = 0.72 KN
JOINT A & O = 0.5 (3) = 1.5 m2
= 5.636 kN
JOINT P TO A' = 1(3) = 3 m 2 LOAD @ P TO A':
Wt.purlins = 58.86 N/m P = 0.48 (3) = 1.44 KN
∑ MA = 0
Wt (DL + LL) = (910 + 750) = 1660 N/m² 13RO - 12(1.44)(6.5) - (2.82)(13) -
12(5.636)(6.5) = 0
RO = 45.576 KN
∑ FV = 0
45.576 + RA - 12(1.44) - 2(2.82)
- 12(5.636) = 0
RA = 44.976 KN

PROPONENTS: CONSULTANT: PROJECT TITLE: PAGE CONTENT:

A FEASIBILITY STUDY OF A PROPOSED


CARIÑO, JAN AUDIE A. HOME FOR THE AGED FACILITY AT DESIGN OF TRUSS
MADRONIO, MARLON B. ENGR. RESURRECCION V. GARROTE BRGY. UNZAD, VILLASIS, PANGASINAN
FOR MAIN BUILDING
BSCE - VA PROJECT LOCATION:
BRGY. UNZAD, VILLASIS, PANGASINAN

Das könnte Ihnen auch gefallen