Plastering Thickness 12 mm
Plastering Area 100 m2
Plastering Ratio
Cement 1
Sand 6
Sand Bulkage 35 %
Wastage 20 %
Calculation
Assume that for 1 Cu of dry volume required 1.33 Cu of cement and 1.33 Cu of sand
of wet volume. Which means to create a 1 Cu of a dry mortar volume is required
1.66 Cu of a wet mortar volume.
Required Cement 50 kg
Required Sand 110.344828 kg
Required Aggregate 200 kg
Water 27.5 kg