Beruflich Dokumente
Kultur Dokumente
1. Imbalan Pegawai
Rp
ADMINSTRATION DEPARTMENT
TANJUNG ENIM PSC & MURALIM PSC. - Site & Jakarta support 20.0
POSITION TITLE
Public Holidays
Normal
(15 Days in 2012-
Working Days
2013)
Wellsite Geologist -
Field Assistant 5.5 23
Field Assistant Coordinator 5.5 23
Tenaga Administrasi Lapangan/Field Administration Officer 5.5 23
Tenaga Pembantu Logistik/Asst. Logistic 5.5 23
General Assistant 5.5 23
Subtotal Imbalan waktu kerja lebih per 12 bulan & Hari Libur Nasional
Sub-Total Va
Overhead & Profit E
TOTAL VAL
Annual leave
Medical Medical THRK monthly
Duration (Mon) Allowance Jamsostek
Insurance Coverage accrual
monthly accrual
In-Patient Out-patient
leave accrual
limit 1 mon per month (1
salary/12 month salary
months: per 12 months -
monthly accrual per 12 days per
premium month year) 8.33% 5.74%
8.33%
Estimated
Annual Taxable
Income Less Estimated Monthly Total Rp (calculated
Minimum Max. Income of Benefits and on percentage
8.33% Rp Deduction Tax - Monthly Taxes O&P)
ment (Rp.)
Total
172,248,555
4,110,477
3,523,266
7,751,185
1,761,633
189,395,116
ment (Rp.)
Total
17,248,555
17,248,555
206,643,671
Total Contract
Gross Rate
Rp
-
796,445,039
386,311,280
62,397,420
52,801,360
117,117,992
26,334,860
35,096,480
Amendment 1 EXHIBIT B1
SCHEDULE OF PRICE - SECURITY SERVICES
CONTRACT NO. 0067/DE-TE-MLM/XI/2012 (Bridging) REVISION
DART ENERGY (TANJUNG ENIM) PTE. LTD.
DART ENERGY (MURALIM) PTE. LTD.
1. Imbalan Pegawai
Annual leave Severance Payment
Estimate Net Monthly Medical THRK monthly Sub Total Total Gross
Position Duration (Mon) Medical Insurance Allowance Jamsostek (UUK 13) monthly Income Tax Sub. Total
Candidate Rate Coverage accrual -taxable Rate Per Total Contract
monthly accrual accrual
Month Gross Rate
Salary +
Rp In-Patient Out-patient Estimated. Benefits + O&P
leave accrual
limit 1 mon per month (1 Estimated
salary/12 month salary Annual Taxable
ADMINSTRATION DEPARTMENT months: per 12 months - Income Less Estimated Monthly Total Rp (calculated
accrual per 12 days per Minimum Max. Income of Benefits and on percentage
monthly premium month year) 8.33% 5.74% 8.33% Deduction Tax - Monthly Taxes O&P) Rp
8.33%
TANJUNG ENIM PSC & MURALIM PSC. - Site support -
Security Guard 6.0 2,000,000 6 166,667 166,667 166,667 166,667 114,800 166,667 45,894,200 199,559 1,147,693 3,147,693 113,316,930.00
6.0 113,316,930.00
Est Overtime hours/pax/day Est. Overtime hours/pax Total Estimate Overtime Payment (Rp.)
Rate
Overtime /
POSITION TITLE Public
Public Holidays hours/pax Normal Working
Normal Normal Working Public Holidays (15 Normal Working Holidays (15
(15 Days in 2012- (Rp.) Days per 6 Total
Working Days Days/month Days in 2012-2013) Days per month Days in 2012-
2013) months
2013)
Security Personnel 7.5 157.5 11,561 10,924,855 65,549,133 65,549,132.95
TOTAL IMBALAN WAKTU KERJA LEBIH JANUARI 2014-JUNI 2014