Beruflich Dokumente
Kultur Dokumente
No Dokumen PM.ADC-FRM-OPS-008
Tanggal 27/08/2017
LINE UP PENYANDARAN Revisi 1
Halaman 1 dari 1 halaman
15-23
04-May
07-15 MV. PERMATA CAROLINE (PT. ADARO) MV. MONICA (PT. PLNBB/KPC/UNIT 8)
23-07
03-May 15-23
07-15
23-07
02-May 15-23
07-15 BG. SYUKUR 47 (PT. ARUTMIN/UNIT 8)
23-07 MV. UNITAMA LILY (PT. BUKIT ASAM) MV. ALIYAH PERMATA (PT. PLNBB/KPC)
01-May 15-23
07-15 BG. ELICIA (PT. OBP)
23-07 MV. SARTIKA BARUNA (PT. BUKIT ASAM)
30-Apr 15-23
BG. POLARIS (PT. PLNBB/UNIT 8)
07-15
Tanggal Jam JETTY 1 JETTY 2 JETTY 2 EXT JETTY SPOJ JETTY SPJ 1
No. Nama Kapal / Tongkang (Voyage) Shipper Port of Loading Vol. B/L (Ton) ETA ETB Estimate Commence Estimate Completed ETD HBS (Ton)
JETTY 1
1 MV. SARTIKA BARUNA PT. BUKIT ASAM TARAHAN 12.000,000 30/04/2020 19:00 30/04/2020 20:00 30/04/2020 21:00 01/05/2020 13:00 01/05/2020 14:00 0
JETTY 2
1 MV. UNITAMA LILY PT. BUKIT ASAM TARAHAN 51.501,471 24/04/2020 13:21 28/04/2020 14:58 28/04/2020 17:52 03/05/2020 17:52 03/05/2020 18:52 14.200
2 MV. PERMATA CAROLINE PT. ADARO TABONEO 65.500,000 27/04/2020 21:30 03/05/2020 19:52 03/05/2020 20:52 09/05/2020 20:52 09/05/2020 21:52 0
JETTY 2 EXT
1 MV. ALIYAH PERMATA PT. PLNBB/KPC TG. BARA 53.503,000 08/04/2020 19:24 28/04/2020 17:30 28/04/2020 19:00 03/05/2020 21:24 03/05/2020 22:24 13.300
2 MV. MONICA PT. PLNBB/KPC/UNIT 8 TG. BARA 40.000,000 26/04/2020 01:42 03/05/2020 23:24 04/05/2020 00:24 08/05/2020 12:24 08/05/2020 13:24 0
JETTY SPOJ
1 BG. POLARIS PT. PLNBB/UNIT 8 JAMBI 7.446,141 26/04/2020 10:45 29/04/2020 21:40 29/04/2020 23:40 30/04/2020 17:40 30/04/2020 18:25 1.500
2 BG. ELICIA PT. OBP JAMBI 7.669,448 12/04/2020 12:00 30/04/2020 21:00 30/04/2020 21:45 01/05/2020 21:45 01/05/2020 22:30 0
3 BG. SYUKUR 47 PT. ARUTMIN/UNIT 8 ASAM-ASAM 7.507,880 26/04/2020 22:30 01/05/2020 23:30 02/05/2020 00:15 02/05/2020 16:15 02/05/2020 17:00 0
JETTY SPJ 1
Rekapitulasi Antrian Kapal & Tongkang a. Kapal 2 b. Tongkang Unit 1-7 5 c. Tongkang Unit 8 4
Keterangan
A Lokasi: Port of Discharging PLTU UP Suralaya
1 Vol. B/L = Volume Bill of Lading
2 ETA = Estimated Time of Arrival
3 ETB = Estimated Time of Berthing
4 ETD = Estimated Time of Departure
5 HBS = Hasil Bongkar Sementara
6 FIB = Form Ijin Bongkar (Unit 1-7)
Catatan:
BG. Sentana Cargo pasokan PT. OBP shifting to anchorage (cargo blocking) rencana sandar di dermaga SPOJ menunggu jadwal selanjutnya (ROB. 6.562,787) Dibuat Oleh,
BG. Ivanka pasokan PT. OBP shifting to anchorage (cargo blocking) rencana sandar di dermaga SPOJ menunggu jadwal selanjutnya (ROB. 6.114,572) FARID'S
SHIPPING COORDINATOR