FINAL TERM PROJECT OF Aviation English/RT Communications

1. Project Title RT Procedures being followed in Different countries across the world

2. Project Description  INTRODUCTION


 Airports of the assigned country (any 3)
 General overview of the selected airports
 Equipments used in airports
 Transmission channels / Frequencies
 Ground Equipments
 ATC practices
 ICAO classes of the airspace.
 Flight Information services of that airport
 Latest Air report
 Latest Aeronautical meteorological Information
 Approach Control Services
 Directions of landing and take-off.
 SID & STAR charts
 Missed approach Procedures
 Runway Configuration
 Signals used at Aerodrome
3. Learning Outcomes 1. The objective of this project is to provide students an opportunity
(LO)
to demonstrate their understanding of RT Procedures applied
worldwide.

2- Student will be able to understand the ATC practices in the world.

3- Understand Radio communications in the ATC system.

4- Understanding about all RT procedures and phraseology

5- Understanding about the basics of Air Traffic Management.

4. Time Duration (2 week)

5. Total marks 40 Marks

 Formatting = 10 Marks
 Report = 20 Marks
 Supporting documents= 10 marks

6. Size of team Individual

7. Description of Tasks Timeline Evidence

The students will be given a country by the instructor. The student will have to make project on the airports of that
particular country.
1- Introduction of Airports
 Select any three airports of the assigned
country.
 Airport Introduction 1 week Report
 Mention CAA policies of that country
2- All details mention above should be include in
report according to the airports of that particular
country.
.
3- Documentation
 Jeppesen Manual
 Weather Forecast reports 1 week Report
 METAR
 TAF
 SIGMET
 All Supporting documents