Sie sind auf Seite 1von 1

VRF - Installation inspection checklist

First Fix - Copper Piping & control cabling


Site Name :- Beverly Golf Avenue
Site Address :- Sector-65, Mohali.
Flat No:- Date
Contractor Name :- Cooling Solution Pvt. Ltd.
S.No. PARAMETER CHECK POINTS STATUS REMARKS
1 Refrigerant Pipe Standard Make Check the copper pipes and fitting of approved make.
2 Pipe cleanliness Check pipe should be properly cleaned internally & plugged with cap/tape
Check for frame work to be completed before stating the copper piping.
3 Laying of refrigerant piping
Check the laying of copper pipes as per approved layout
Check support must be provided after every 1.0 Meter distance, before & after T- joint/header/bend.
Support of refrigerant pipe (clamp/
4 Check for copper piping should not touch the frame work at any place.
hanger)
Check PVC sleeve to be provided over the pipe insulation at supports and wall crossings.
Check for chase to be cut with cutter of proper size & clamping of pipe in chase.
5 Chase cutting
Check for rough plaster to be done surrounding the pipes in chase cutting/wall cutouts.
Check for T-branch install in horizontal direction ( ±15° ).
6 Installation Y-branch Check for bend should be given after a minimum distance of 500mm before and after a T- Joint. Pipes
should not bent immediately.
Check for nitrogen gas shall be blown at 3-5 PSI through piping while brazing to avoid oxidation inside the
pipe.
7 Brazing
Check for Mitsubishi approved filler rod used for brazing.
Check the brazed joint for any defect as pin hole, uneven fusion or crack.
Check for proper cutting tools being used to cut copper tubes.
8 Tools
Check for correct tools being used for bending. (manual bender/ electric bender)
Check for insulation thickness as specified. 19mm thick insulation for pipe having dia 28.58mm & 22.2mm
9 Laying of Insulation and 13mm thick insulation for pipe dia. 6.35mm, 9.52mm,12.7mm,15.88 and 19.05mm.
Check using taping & adhesive to cover insulation joints.
Check for approved make control cable being used.
10 Interconnecting Control cable
Check for all cable to be run in conduits along with copper pipes with proper clamping.
Maintain nitrogen pressure at 580PSI and hold for 24 hrs to check for any leakage.
11 Nitrogen pressure testing
Check for not release the full pressure after testing, leave 350-400PSI inside the pipes
12 House Keeping Check for removal of debris and waste material from flat after completion of first fix.

FOR COOLING SOLUTION FOR BEVERLY FOR MITSUBISHI


(FIRST) (SECOND) (THIRD)