Risk
Project Risk # Risk Vulnerability Instances (on time /cost/ quality/ Impact Analysis
Description
compliance)
Statutory Compliance
Events and problems requiring HO (Partners & Event requiring HO or senior management
including Environment, -
Directors) attention intervention
Health & Safety (EHS)
Please refer to Table -1 Risk Assesment (Impact) below: A) If Please refer to Table -2 Risk Assesment (Probability)below: A) If
the Impact caused by the risk is "Catastophic (5)", then it the probability of occurence of risk is "Almost Certain (5)", then it
Personnel responsible The Part/Area of the should be rated as 3 = High B) If the should be rated as 3 = High B) If the
The Strategy/ Steps being followed/ to be
for handling & mitigation power plant impacted Impact is either "Critical (4)" or "Serious (3)", it should be probability of occurence of risk is either "Likely (4)" or "Moderate
followed to reduce the impact of the risk
of Risk by the risk rated as 2 = Medium C) If the Impact (3)", then it should be rated as 2 = Medium C) If the probability
is either "Moderate (2)" or "Minor (1)", it should be rated as 1 of occurence of risk is either "Unlikely (2)" or "Rare (1)", then it
= Low should be rated as 1 = Low
Mitigation Strategy Overall Risk Owner Risk Area Risk Assessment (Impact) Risk Assessment (Probability)
1. To expedite construction of additional ground
hopper within the timeline of …….., by
incorporating suitable measures at sub-
Coal Handling Plant &
contractor level. Mr. xxxxx xxxxxxx 3 = High (Major Impact) 2=Medium ( Likely,21-50%)
Station
2. Parallely, to instill measures so that the
additional Wagon Tippler, is commissioned by
…….
5-10% <5%
Potential Impact No Potential Impact
-- No entry -- No entry
required required
(Automatically (Automatically
calculated)-- calculated)--
6 Med