Sie sind auf Seite 1von 1

1.

30

1.30
ROOF DECK ROOF DECK

2.70

2.70
19TH FLOOR LINE 19TH FLOOR LINE

2.70

2.70
18TH FLOOR LINE 18TH FLOOR LINE

2.70

2.70
17TH FLOOR LINE 17TH FLOOR LINE

2.70

2.70
16TH FLOOR LINE 16TH FLOOR LINE

2.70

2.70
15TH FLOOR LINE 15TH FLOOR LINE

2.70

2.70
14TH FLOOR LINE 14TH FLOOR LINE

2.70

2.70
13TH FLOOR LINE 13TH FLOOR LINE

2.70

2.70
12TH FLOOR LINE 12TH FLOOR LINE

2.70

2.70
11TH FLOOR LINE 11TH FLOOR LINE

53.30

53.30
2.70

2.70
10TH FLOOR LINE 10TH FLOOR LINE

2.70

2.70
9TH FLOOR LINE 9TH FLOOR LINE
2.70

2.70
8TH FLOOR LINE 8TH FLOOR LINE
2.70

2.70
7TH FLOOR LINE 7TH FLOOR LINE
2.70

2.70
2ND FLOOR
6TH FLOOR LINE
LINE 2ND FLOOR
6TH FLOOR LINE
LINE
2.70

2.70
5TH FLOOR LINE 5TH FLOOR LINE
2.70

2.70
4TH FLOOR LINE 4TH FLOOR LINE
2.70

2.70
3RD FLOOR LINE 3RD FLOOR LINE
2.70

2.70
2ND FLOOR LINE 2ND FLOOR LINE
3.00

3.00
FFL FFL
NGL NGL
.40

.40
LEFT SIDE ELEVATION RIGHT SIDE ELEVATION
SCALE: 1:200M SCALE: 1:200M

BATANGAS STATE UNIVERSITY PROJECT TITLE SUBMITTED BY SHEET CONTENT SHEET NO.
COLLEGE OF ENGINEERING,
ARCHITECTURE AND FINE ARTS COMMERCIAL BUILDING SUAREZ, KIM CHARLONE A.
CE - 5204 RIGHT SIDE ELEVATION
CIVIL AND SANITARY LEFFT SIDE ELEVATION A
PROJECT LOCATION SUBMITTED TO
ENGINEERING DEPARTMENT 3
LIPA CITY, BATANGAS ENGR. RHEA S. DE OCAMPO

Das könnte Ihnen auch gefallen