GROUNDWORKS

Housebuilder’s

Bible13

HOUSEBUILDER’S BIBLE l 13th EDITION 1


HOUSEBUILDER’S BIBLE

Housebuilder’s

Bible13
®

Ovolo Books

Thirteenth edition published August 2019

All rights reserved. No part of this publication may be reproduced, stored in


a retrieval system, or transmitted in any form or by any means, electronic,
electrostatic, recording, magnetic tape, mechanical, photocopying or otherwise,
without prior permission in writing from the publisher.

The publishers make no representation, express or implied, with regard to the


accuracy of the information contained in this publication and cannot accept any
responsibility in law for any errors or omissions. The information in this publication
contains general guidelines only and does not represent to be advice on any
particular matter or project. No reader, purchaser or other third party should act on
the basis of material or information contained in this publication without first taking
professional advice appropriate to their particular circumstances.

The right of Mark Brinkley to be identified as author of this Work has been asserted
by him in accordance with sections 77 and 78 of the Copyright, Designs and
Patents Act 1988.

Content © Mark Brinkley


This edition © Ovolo Books 2019
Contact: markbrinkley@mac.com

Photography: Author and also Mathew Smith 07540 769814 who undertook te
Case Study work

ISBN 978-1-9160168-0-4

2 TENTH EDITION l HOUSEBUILDER’S BIBLE


CONTENTS

PROJECT MANAGEMENT 62
CONTENTS BUILDING’S 4 PRS   66
WORKING WITH BUILDERS  68
INTRODUCTION 6 HIRING SUBBIES  73
HOUSEBUILDING IN THE UK  8 CONTRACTS 76
SELFBUILD 11 EXTRAS 78
THE MODEL  16 MANAGING PRELIMS  80
HEALTH & SAFETY  83
INSURANCE & WARRANTIES  85
CASE STUDY 20 BOOK-KEEPING 88
VAT 89
OTHER TAXES  93
PITFALLS 26
FINDING LAND  27
BUYING LAND  29 GROUNDWORKS 94
ASSESSING BUILDING SITES   31 EXCAVATIONS 96
ACCESS & SERVICES  32 FOUNDATIONS 97
PLANNING ISSUES  35 GROUND FLOORS  99
BUILDING COSTS   37 FLOOR SCREEDS  103
DESIGN ISSUES  38 SLOPES, BAD GROUND & TREES  104
UNDER ESTIMATING  39 SERVICES 108
CLOSING THOUGHTS  41 DRAINAGE 110

DESIGN 42 SUPERSTRUCTURE 116


PLANNING PERMISSION  46 INNER SKIN  116
BUILDING REGULATIONS  50 OUTER SKINS  126
PARTY WALL ACT  51 INSULATION   133
CHOOSING A DESIGNER  52 JOINERY 136
TIMBER FRAME  57 UPPER FLOORS  145
SHAPE AND SIZE  61 INTERNAL WALLS   149
ROOF CARCASSING  151
ROOF COVERS  158
RAINWATER 163

HOUSEBUILDER’S BIBLE l 13th EDITION 3


HOUSEBUILDER’S BIBLE

HEATING & PLUMBING 166 ROOM BY ROOM 240


ON HEAT  166 KITCHENS   240
STANDARD HEATING  167 BATHROOMS 251
WHICH FUEL?  170 BEDROOMS 254
BOILERS 173 THE HOME OFFICE  256
EMITTERS 177 GARAGES 257
DOMESTIC HOT WATER  180
HEATING CONTROLS  183
HEAT PUMPS  186 ADDING SPACE 260
BIOMASS BOILERS  190 EXTENSIONS 264
SUPPLEMENTARY HEATING  191 LOFT CONVERSIONS  267
VENTILATION 195 CONSERVATORIES 272
FIRES & CHIMNEYS  198 GARDEN WORKSPACES  274
PLUMBING 199 BASEMENTS 275

WIRING 202 SHOPPING 278


HOUSE WIRING  203 TAKING OFF QUANTITIES  278
LIGHTING 206 ENTERING THE BAZAAR  281
BUILT-IN CONCRETE 287
VACUUMS   209 STEEL 289
TELECOMS 210 MORTARS 290
TIMBER 292

FINISHES 214
WALLS & CEILINGS  215
PAINTING & DECORATING  217
FLOOR FINISHES  221
SECOND FIX CARPENTRY  226
STAIRS 231
DRIVEWAYS & PAVINGS  234
SOFT LANDSCAPING  238

4 13TH EDITION l HOUSEBUILDER’S BIBLE


CONTENTS

GREEN ISSUES 294


CONSTRUCTION AUDIT  295
THE ENERGY EFFICIENCY REGS  299
UNDERSTANDING U VALUES  301
HEAT CALCS AND ENERGY RATINGS  303
RENEWABLE TECHNOLOGIES  309
APPLIANCES 312
SAVING WATER  313
WATER TREATMENT  316
CODE FOR SUSTAINABLE HOMES  318
PASSIVHAUS 319

APOCRYPHA 320
BEWARE BUILDING COSTS  320
ACCESSIBILITY 322
SECURITY 324
FIRE SAFETY  327
SOUND ADVICE  330
BARN CONVERSIONS  334
SNAGGING   337
WHAT’S IN A TON?  339
INDEX 340

HOUSEBUILDER’S BIBLE l 13th EDITION 5


Chapter 1

THE BUILDERS’
DILEMMA
INTRODUCTION
1 QUICK

The triangle on the right represents


the age-old conundrum for all
builders. It is said that you can
have any two of these points in a
building job but only at the expense
of the third. Thus you can have
a good, cheap job but it won’t be CHEAP GOOD
quick, or a cheap, quick job that
won’t be any good. confidently, “Ah, but how much exclaim “I bet it took you years” –
So when you hear claims – as did it cost you?” And, similarly, if and you’ll be right. So before you
you may – of people having built you meet someone who claims to set out to build a new house, first
(or more likely ‘put up’) a house have built a house for £45 per sq ft, examine your motives and see where
in just eight weeks you can reply, you can look them in the eye and you fit into the triangle.

6 13th EDITION l HOUSEBUILDER’S BIBLE


INTRODUCTION

THE CHEAP HOUSE


The average new house is constructed
entirely by builders, takes about 6-8
months to complete and costs around
£120/ft2 (that’s £1200ish/m2). It is
built to standards that meet – and
do not exceed – the current building
regulations. If you want to maximise
the financial return on your new
house – in all but the most up-
market areas – it pays to keep it dead
simple. For a cost-effective house the
following advice should be carried
out to the letter.
Dispense with any notions of
individual design. Aim for a four-
square box drawn up by a technician
or a surveyor or, better still, from a
book of house plans. Avoid architects This 2012 selfbuild in Cambridgeshire
at all costs. n anything but boring plastic was designed and built by architect
Avoid all of the following: windows Michael Goodhart. It cost £350,000 to
build, around £1650/m2. That’s in the
n layouts with more than four n home cinema rooms
upper reaches of the selfbuild galaxy,
external corners n handmade anything at all (bricks, but actually represents very good value
n anything round or curved tiles, etc) for the quality achieved.
n anything poking out through the n Agas
roof (dormers, chimneys) n garages – especially with remote-
n anything other than large format controlled doors
concrete tiles on the roof n porches and entrance canopies
n anything other than face brickwork n conservatories follows is concerned with the options
on external walls n built-in cupboards that might turn a cheap house into
n anything other than straight stairs n hardwood floors a good house and therefore much of
n complicated sites (unless at a n data cabling the book will be of little relevance to
bargain price) n any lighting that doesn’t hang from you. I have, however, always tried to
n fancy Continental plumbing a pendant in the middle of each room indicate what the cheapest option is
systems n almost everything second-hand in each element of the house.
n trying to build an ‘Eco’ house – it’s only been salvaged because it’s
n big glazed features worth more than new. THE QUICK HOUSE
n underfloor heating What you will end up with will The quick house will almost certainly
n central vacuum cleaning systems have all the charm of a 1950s council be a kit house, which is largely
n kitchens that don’t come from Ikea house. But if space for bucks is prefabricated in a workshop or
or B&Q your main motive in taking on a factory. It will also, very likely, be
n bathrooms that don’t come from construction project, then you’ll be a timber-framed house, or maybe
B&Q or Bathstore very happy. Much of the book that a SIPs house, which is a variation

HOUSEBUILDER’S BIBLE l 13th EDITION 7


Chapter 1

on timber frame that is gaining in IS THIS BOOK FOR YOU? boomers (like me) entering the
popularity. What follows is housebuilding’s housing market and partly by people
But are they really quicker? What original bodice ripper, a warts-n-all choosing to live in smaller groups.
really takes up a builder’s time is the rough guide. It is not a DIY manual This increased demand also led to a
finishing tasks and these are pretty (there are enough of those) and it is huge increase in house prices which,
much the same whatever your chosen not a disguised advertisement (I’m in turn, encouraged more people
building method. not selling anything apart from this to jump onto the home ownership
book). Although primarily concerned bandwagon, encouraged by the
THE GOOD HOUSE with new housebuilding, there is also Thatcher government which made
Most would-be individual much information specifically tailored property-owning a key plank of its
housebuilders are not hard up nor in for people converting or restoring programme.
a hurry – at least they’re not when existing properties.
they’re just planning it all; they Many of the tricks and tips THE 1988 SLUMP
might beg to differ when they’re described I have learnt the hard way This particular bandwagon came
halfway through building. They can since I started building in 1980. As juddering to a halt on August 1, 1988
afford to browse and contemplate the old saw goes: experience is the when Nigel Lawson, then Chancellor
and research. They will look at many best education, but it is also the most of the Exchequer (but now better
different options before embarking expensive. My hope is that some of known for being Nigella’s dad)
and will probably be keen that the my ‘experience’ and research will help stopped a tax perk known as double
finished product should somehow you avoid expensive pitfalls, many of mortgage tax relief.
be an expression of their personality which I’ve had the doubtful pleasure I remember the day well. I was
as well as a way of meeting their of falling victim to myself. property developing at the time, owed
individual needs in a way that an In short, the aim of this book is the bank about a quarter of a million
off-the-peg house couldn’t hope to. to enable you to build a good house and had just learned that I was to
Even if you are building for resale cheaply and quickly. Now hang become a father for the first time. It
rather than personal occupation, you on a minute, I thought that wasn’t was also the day my business partner
are more than likely to want to build possible. and I completed on the purchase of
an attractive house that passers-by a rather large barn for conversion
will come to admire and occupants in Comberton, a village near
will love to call their home. Cambridge. The timing was about as
After all, the house is likely to be HOUSEBUILDING bad as it could be.
standing long after any transient IN THE UK Double mortgage tax relief sounds
profit is banked and spent, and Housebuilding in this country has like rather an obscure tax perk, as
may well still be there when they always been a boom or bust activity, indeed it was; these days we have
are burying your grandchildren. and this has never been more clearly no tax relief of any description on
To build well, you have to know illustrated than in recent times. My mortgages but, back in 1988, both
what’s going on and not just rely on experience of the property business halves of an unmarried couple could
experts: the more you are involved began in the 1980s (in my late claim tax relief on a mortgage,
in the design, the more you will twenties) and it is worth recalling which was worth a few bob. It was
appreciate the outcome, and the what went on then, for the benefit an anomaly and Chancellor Lawson
more you are involved in the of younger readers. That period saw strove to eliminate anomalies.
building, the better that outcome a surge in private housebuilding, The problem was that he
will be. caused partly by post-war baby- announced his intention to do so in

8 13th EDITION l HOUSEBUILDER’S BIBLE


INTRODUCTION

How Brickie’s Rates Track Average House Prices

£200,000 £500/k

£150,000 £400/k

£100,000 £300/k

£50,000 £200/k

10
95

15
00
86

90

05

20
19

20
20
19

19

20

Nationwide UK Average house prices Average brickie’s rate per thousand (k) bricks laid

his budget speech in March, telling prices in 1988 would be worth the number of sales continued to decline,
us all that the elimination of this same again. the rout set in. Things weren’t helped
particular anomaly would take place For us property developers, it was at all by another of Nigel Lawson’s
at midnight on the 31st of July. more painful still. But then, as a foibles, the decision to peg the pound
People who, in more normal times, group, we have never elicited much to the Deutschmark (remember
would never have considered house sympathy. What happened on August that currency?) which led to interest
purchase together were suddenly 1st was distinctly eerie. The housing rates going up and up – the base
bounced into it by a fear that it was market just came to a standstill. rate was 15% from October 1989 to
now or never for the housing ladder. Viewing stopped. Offers to buy were October 1990. As you can imagine,
The housing market, already toppy, withdrawn. People just lost interest in housebuilders took a bath.
duly went ballistic for four months in buying homes altogether. The events It wasn’t until 1993 that house
the rush to get sales completed before of 2008, when the property market prices stopped falling. Even then, the
the Chancellor’s cut off point. also stopped dead in its tracks, were recovery was painfully slow. Rather
In Cambridge, average house eerily reminiscent, although there was than being a return to the good old
prices jumped by 25% overnight. no pivotal moment then, as happened days before Lawson’s bubble when
Many of the ‘Lawson couples’ lived in 1988. house prices gently rose year-on-
to regret the unwarranted emotional Back then, prices didn’t fall year (or so it seemed), everything
entanglement caused by this feverish immediately. But, with hardly any remained resolutely frozen.
speculation. All of them lived to house sales happening, it was hard to Newspapers were full of stories of
regret the financial chaos brought know what house prices were really families stuck in ‘negative equity’
on by the price bubble bursting on doing. However, over the next year or and of unhappy young homeowners
August 1st that year. For almost all two it became apparent that all the just handing their keys back to the
of them, it would be ten years before estate agents’ talk of the market “just mortgage lenders and going back to
the houses they bought at ridiculous taking a breather” was bull and, as the live with Mum and Dad.

HOUSEBUILDER’S BIBLE l 13th EDITION 9


Chapter 1

NEW LABOUR the market with ultra-low interest housebuilders get hold of giant
The climate all changed once rates and various schemes like Help- parcels of land to develop (or re-
again with the election of New to-Buy which subsidise new home develop in the case of city centre
Labour in 1997. Strange to think of ownership. regeneration), and they build identikit
a supposedly left-wing government But the buoyant market was not estates and sell their houses into the
riding to the rescue of the property- evenly spread across the country private market. The councils insist
owning classes, but then life was ever and in quieter areas prices remained that they also build some social
full of such ironies. little changed in a decade. This was housing in return for granting them
The fact is that average house perhaps reflected in the 2016 Brexit the right to build. Social housing
prices were back to roughly the same referendum which saw a groundswell has more or less taken over from the
level in May 1997 as they had been of dissatisfaction overturning David council housing schemes, which were
on that fateful day nine years earlier Cameron’s hopes of killing off UKIP such a feature of the middle years
when Nigel Lawson delivered his once and for all. Now we face a of the 20th century. It’s an area alive
now infamous budget speech. very uncertain future with (at time with innovation and some fascinating
From 1997, house prices started of writing) negotiations getting schemes have been built in the past
rising once again, just as they did underway to pave the way for a UK few years. Indeed standards for social
from the 1950s through till 1988. withdrawal from the EU. Whilst the housing have been consistently
This situation continued for another UK seems to be split in two by the higher than those used in the private
ten years until it finally started prospect of an independent future, sector, because the government and
unravelling in late 2007, brought on it remains none too clear what effect councils have insisted on it.
by the global credit crunch that made this will have on the housing market. And then there are ‘the others.’
it much harder to borrow money. This book is primarily intended for
We had had a ten-year Blair boom: HOW WE BUILD HOUSES the builders down here at the bottom
now we were into a Brown bust. There are many unusual aspects to of the housebuilding heap. The small
The slump that followed was rather the British housebuilding scene builders and the others. Particularly
different to the 1988 one. Price falls besides the topsy-turvy nature of the others.
weren’t so deep and transactions the housing market. Particularly In many ways, this ‘others’ grouping
didn’t stop as they had done in pertinent to this book is the way we is by far the most interesting.
1987. The housing market has been go about building homes – more Although it may account for less
propped up by 0.5% interest rates, the particularly who builds them. than 15% or so of new homes, that
lowest they have ever been. If you were to imagine a pie chart still amounts to between 12,000 and
representing the total number of 20,000 each year. And the great bulk
BREXIT houses built each year in the UK of these are built by individuals for
The Coalition years saw the market there would be three slices in it their own occupation – what the
come back to life, certainly in marked: media and everyone else has learned
London and the South-East, and n speculative housebuilders (the vast to call ‘selfbuild’.
this trend continued after the proportion); Before getting stuck into the
Tories were returned on their own n social housing (a small but world of selfbuild, I think it’s
in 2015. Mortgage lending is once reasonable slice); and important to point out that there is
again in full spate although the n others (another still reasonable a huge grey blanket of an area spread
number of new mortgages agreed is slice – maybe 15%) out between the sort of selfbuild
still well down on 2007 levels. The This type of arrangement featured in Channel 4’s ‘Grand
government has been propping up has existed for decades. The big Designs’ and the output of a small

10 13th EDITION l HOUSEBUILDER’S BIBLE


INTRODUCTION

spec builder who builds a house or


two for sale every year and every so
often builds a new one for himself –
that way netting a nice little tax free
earner. I have often heard builders
referring to odd plots of land they
own as ‘their pension’ and all good
pensions should be tax free, shouldn’t
they?
Many good people, academics
amongst them, have tried to
assess the size of the UK selfbuild
market and they get into all sorts of
difficulties, because selfbuild is not a
clearly defined entity. The first 10,000
selfbuilds are easy to spot – they show
up on the VAT returns – but the next
10,000 get murkier and murkier the
higher the total gets. Hence I quite
like the term ‘others’. It covers a lot of
This Norfolk selfbuild
nefarious undertakings.
How Big Is That House? has an internal floor
m2 ft 2 Range of building costs area of 197m2, pretty
One-bedroom flat 40 430 £40,000-£80,000 typical for a rural 4 or 5
bedroomed house
SELFBUILD Terraced two-bedroom house 60 650 £60,000-£125,000
Semi-detached, 3 bedrooms 90 970 £90,000-£200,000
Many years ago, back in the 1970s Detached 3/4 bedrooms 130 1,400 £130,000-£350,000
and 1980s, selfbuild had a decidedly Large detached 4/5 bedrooms 200 2,150 £200,000 upwards
alternative flavour to it. Selfbuild was
usually group selfbuild. This typically were done for rent rather than they then have to rent. Co-housing
involved a number of individuals or ownership – it’s now known as is another form of this, but here the
families pooling their labour to build Community Selfbuild – and this emphasis is on shared ownership.
homes for themselves in a little estate. small sector continues to flourish Whilst this specialised niche is
Group selfbuild enjoyed a boom in although it rarely accounts for more alive and thriving, it is dwarfed by the
the 1980s but came horribly unstuck than a dozen schemes each year. mainstream selfbuild market, which
when the Lawson bubble burst in In order to form a Community consists of people acting as what the
1988. Groups were left with homes Selfbuild group, you need to have Americans call paper contractors – do-
worth less than they had paid for identified a number of people living it-yourself property developers.
them and some of these schemes in the same area who are in genuine This group tends to be fairly
were abandoned half-built. Private housing need. Whereas the country well-off and tends to build relatively
group selfbuild all but disappeared off is stuffed full of people in genuine high spec houses; some estimates
the radar screens after this. housing need, not many of them have reckon that over a third of all
But group selfbuild also existed the time or inclination to go about detached housing in the UK is now
in another guise where the schemes meeting it by building a house which selfbuilt. For many of this new breed

HOUSEBUILDER’S BIBLE l 13th EDITION 11


Chapter 1

The recent governments have been


In Berlin, there hugely supportive of selfbuild and
are large numbers have instituted a number of measures
of selfbuilt to make life easier for selfbuilders.
apartments known One is to make selfbuilders exempt
as baugruppen.
This one houses
from development taxes (Section
three families on six 106 agreements and Community
floors and includes Infrastructure Levy). Another is to
a communal area prompt councils to undertake studies
in the basement. to work out what the local demand
These cohousing for selfbuild is, and then to start
models are
beginning to appear putting forward land specifically for
in the UK, but they selfbuild.
can be slow and The government has been
difficult to get off the particularly keen to promote custom
ground build, which is a little different to
individual selfbuild in that it requires
a developer to subdivide larger
parcels of land and sell serviced
plots to selfbuilders, something that
happens a lot in other countries but
has been absent from the UK scene
for decades.

LAND COSTS ARE THE KEY


The way in which prices for building
plots are set is based on subtracting
of selfbuilder there will be little – ‘Build It’, ‘Selfbuild & Design’ and the building costs from the estimated
or no physical involvement in the ‘Homebuilding & Renovating’ – and value of the completed house. For
construction of their homes. They are various exhibitions up and down the example, if the estate agent or
instead providing the nous and the land. Not to mention, of course, its surveyor marketing a plot reckons
money to purchase a plot of land and very own TV programme, ‘Grand that a nicely finished house might
build a new home on it. Designs’, which more than anything fetch £300,000 and that it might
Throughout the postwar years, has promoted the idea that selfbuild cost around £120,000 to build, then
this group was typically doing up is a noble activity, or at least an they will probably recommend that
old wrecks of houses, but as the aspirational one. the plot be sold for around £130,000,
wrecks with the most potential So why do people selfbuild? There maybe more, leaving a small element
have mostly been snapped up now, are two distinct camps here. One is of profit for the builder. There is
their attention has moved on to to work your way up the property obviously a return here but the
building from scratch. In response, ladder (aka making a bit of money): problem is that there are many more
there is now a recognisable selfbuild the other is to individuate – to get costs involved than just the plot price
industry that supports many specialist exactly what you want (aka spending and the building costs.
businesses, three national magazines a bit of money). If house prices increase by 15%

12 13th EDITION l HOUSEBUILDER’S BIBLE


INTRODUCTION

during the time it takes you to build, When interest rates start to have little effect on house values.
all appears well and good and you rise, professional developers get They are carried out because the
do appear to get a fantastic return squeezed not just by the extra occupants appreciate their amenity
on your efforts; but if house prices cost of this finance but also by the value. However, larger building
don’t go up you’ll have to throw an fact that the level of sales tend to projects – extensions, conversions,
almighty number of hours at your decline, sometimes accompanied rehabilitations and especially new
building project if you are to keep by the dreaded fall in house prices. housebuilding – call for much closer
costs down to a level at which you Housebuilders are very vulnerable in assessment of your labour input.
appear to make a profit of more than these circumstances and what looks By taking on even part of the work
a few per cent. like a healthy profit on a house can yourself, you are in effect becoming
The bulk of the profit in a greenfield evaporate within a matter of weeks. a speculative builder whose work
housing site tends to go to the A selfbuilder is in a subtly different will be rewarded by an increase in
landowner who succeeded in gaining situation to a speculative developer the value of your property. The more
planning permission to turn whatever and this may mean that they are work you carry out yourself, the less
was there into building land. able to hang on to more of this gross you pay to others and the greater your
In most parts of the UK, profit margin. The selfbuilder doesn’t eventual profit (in theory).
agricultural land is worth around need to find a buyer and therefore has The problem with this sort of work
£10,000 per acre. In contrast, in SE no selling costs; also the selfbuilder is that your labours are far more likely
England at least, half-acre building can keep construction costs down by to be rewarded in line with property
plots are still fetching over a hundred carrying out supervision and some price movements rather than with
times as much. construction work. Against this, how hard or well you yourself work.
One effect of this relationship however, it is unlikely that they can In boom times your rate per hour
between land costs and finished build as cheaply as a professional may appear to be enormous (and
housing costs is that building plots developer, whatever construction you’d probably think yourself very
tend to go up in value faster than methods they use. clever for embarking on this nice
house prices when house prices are little tax-free earner). However,
rising; conversely, plot prices fall ARE THERE REAL SAVINGS? building through a slump puts all
further than house prices when house The costs of the average residential that into a new perspective, and
prices slump. building job are made up of around many DIY builders will have found
If you just add plot costs and 50% on-site labour and 50% that they have actually lost money –
building costs together you’d see a materials. In theory, you could and the more masochistic will have
20-30% profit, but a more thorough therefore achieve savings of around converted that into a loss per hour
analysis reveals that the figure 50% on construction costs if you which begins to make slavery look
is nowhere near this amount. In carried out all the labour yourself like an attractive option.
particular, finance costs eat into the – but here we have to look at some Most people would not consider
gross profit at an alarming rate and rather complex actuarial calculations carrying out all the work themselves.
the effect of a) interest rates going up about the value of your time and In fact, the vast majority of people
and b) failure to obtain a quick sale the cost of borrowed money. Only if would have no more wish to take on
are disastrous. you are both rich and unemployed such a task than they would choose
Anyone who borrows to finance can you afford to ignore these to educate their children at home; life
a project as large as a new house is calculations. simply isn’t that long.
extremely vulnerable to changes in Most DIY projects are of low There are, however, many people
interest rates. value (say, less than £1,000) and who find their work is seasonal,

HOUSEBUILDER’S BIBLE l 13th EDITION 13


Chapter 1

Where the Money Goes professional property developers?


Design 3% 2. If builders’ profits are so
Preliminaries 3% exorbitantly high, how come so many
of them keep going bust?
Finance I started as a selfbuilder (albeit with
7%
a renovation not a new build) and
went on to become a ‘professional’
Profit (in that other people paid me for my
7%
labours), often working alongside
selfbuilders. It’ll come as no surprise
when I report that the hours are long,
the work is backbreaking and the pay
is often crap. The pay rates usually
follow the economic cycle, so that in
boom times the rates can go sky high,
PLOT Construction whereas in busts they fall back pretty
30% 50%
(at least) quickly.

MANAGEMENT WITH A
BROOM
For every seven or eight hours spent
on construction, one hour has to
be put into servicing the site. This
can involve any and everything
This pie chart shows the breakdown of costs on a
typical small developer model. The 30% plot cost from sweeping up, filling skips
is variable in the extreme: it can be as much as and even if their work only nets them and unloading lorries to meeting
50% in the more expensive areas – but the final £2.50 per hour, that’s still more than building inspectors and buying
profit figure is still fairly realistic. The final profit
level is very dependent on economic conditions,
they’d get doing nothing. materials. Many selfbuilders take on
not in the control of the developer. However, for many people this ‘management with a broom’ role
selfbuilding may just prove to be a thinking that they may not be able
lousy option. They will be committing to plaster a wall or fit a staircase, but
intermittent or out of normal themselves to 2,000-3,000 hours they had no trouble organising the
working hours, to whom a high level work – often very hard and dirty school run, therefore...
of involvement in a building project work – putting up an overpriced Be warned. You’d be right to
makes good sense. They will tend structure to a design that isn’t very think that the organisational skills
to be practical and experienced in good in the vague hope of making a are not in themselves exceptional,
problem solving and those that are ‘dream home’ and a ‘fantastic windfall but their efficient execution is very
already running their own business profit’ to boot. Ask yourself two dependent on a reasonable working
will have much of the organisational questions: knowledge of the building trades
backup in place already. The extra 1. If it is that easy to make money, and the local building practices and
costs involved will not be enormous why don’t more selfbuilders turn into prices.

14 13th EDITION l HOUSEBUILDER’S BIBLE


INTRODUCTION

After three or four projects, STILL WANT TO SELFBUILD? are now sold with warnings attached,
you’ll start to get halfway good; Having got all that off my chest, building plots and the houses
if it’s your first time, most people I will also readily point out that I that go on them are sold on the
find it an almighty struggle and have met many selfbuilders who understanding that the buyer knows
you’ll be unlikely to do it well. Your have made a tidy packet out of their the risks involved. You are assumed to
subcontractors will very quickly dealings. Nevertheless, I would argue be a sophisticated investor; make sure
realise they are working for a novice that the rewards of selfbuilding are that you actually are.
and the less scrupulous ones may not chiefly financial. What it really
be tempted to take advantage of allows is the freedom to design MONEY MONEY MONEY
this and to cut corners or to bodge, and build a new house to your Be a little bit wary of the published
particularly if you’ve negotiated ‘keen’ specifications, something that you costs you see. A selfbuilder has an
labour prices. will not be able to do by any other emotional investment in their project
Whilst your building inspector route. and really wants to believe that all
should ensure that the structure is For many people selfbuilding their work actually makes sense
adequate, very little professional represents one of the great challenges financially. Unlike the professional
checking takes place above in life. The more they are involved builder, who has good reason not to
foundation level and, in any event, in the project, the more they get exaggerate the profitability of any
building regulations do not cover out of it and the whole attraction of scheme they undertake. To do so
most of the finishing trades. selfbuild is the pure adventure of it would be to hand money over to the
Furthermore, don’t kid yourself that all. If this is your motivation then taxman. Thus the professional builder
you’re doing away with the overheads more power to your elbow. will account for every cost they
of employing a main contractor by You may well end up just a little possibly can whereas the selfbuilder
managing the project yourself. Your disappointed by the outcome and will be inclined to overlook many
phone bill will be up by £100-£200 will perhaps be haunted by a whole of the legitimate overheads in order
a quarter; your mileage will increase host of ‘what ifs’ and ‘if onlys.’ Fear to make the final sum look more
two or three fold, even if you are not, this is an experience common to pleasing.
living on site; you will need site all designers and builders. You’ll just Nowhere is this discrepancy greater
insurance; you will suffer damage have to do it all again. than in the area of finance. To a
to materials which will have to be However, if your motivation is developer, finance is just another job
replaced at your own expense; you will mainly financial then I warn you cost, essentially no different than the
end up with leftovers that you cannot to look very carefully at the sums cost of the land or the building costs.
easily get rid of; and at the end of the involved. When the house is sold on, they will
job, you’ll have to chase yourself to get Yes, you can save money total up all the loan interest they have
all those little snags finished. selfbuilding but it may not be as paid and add it in as a legitimate
More than half of a main much as you might first expect. business cost.
contractor’s mark-up goes on paying Don’t ignore the well-trodden The selfbuilder is in a rather
overheads that would be common to route of hiring a designer (who in different position. They may –
professionals and amateurs alike. And turn manages the job for you) just probably will – already have a
there is still the tricky little matter of because you think it will be expensive. mortgage before they even think
finance. There are many other costs Don’t forget that property of taking on a major project like a
besides plot and building costs, and developing (for that’s what you’re new house or a major renovation.
they all conspire to eat away your doing) is a risky business. By transferring this mortgage from
paper profit. Unlike many financial products that an existing house to a building plot

HOUSEBUILDER’S BIBLE l 13th EDITION 15


Chapter 1

they are not necessarily altering their because they think it is bound to of nothing more than a series of
cashflow at all and do not have to add be cheaper to build directly with numbers, areas and volumes which
this cost into their calculations. subcontractors. This is not the way reflect what goes on in a typical
What they are doing is to become a selfbuilder; it’s the house.
exchanging a year or two’s hardship way to become a headless chicken. It makes my job easier and it also
(such as living with the in-laws or in Even hard-bitten professionals reads better because it can be used
a caravan on site) for the opportunity have problems reconciling their to make useful comparisons over
to live in a bigger or better house dreams with their budgets and it time. And given that no one sets
than they could otherwise afford. is essentially in response to this out to build a second version of one
Whilst a cost accountant would problem that I wrote this book – of my exemplar homes, it’s hardly a
probably say that the selfbuilders are to help put you, the person paying great loss to the Bible that the model
deceiving themselves, it seems to me all the bills, back in control of the house is simply a theoretical model.
to be a perfectly legitimate approach situation. “Taking back control”
to things. — isn’t that the phrase of the THE NEW MODEL HOUSE
If there is a danger for the moment? The model house has an internal floor
selfbuilder in all this, it is that Well maybe... area of 160m2, divided between two
they will tend to get greedy and floors. That’s pretty much average for
to overreach themselves. It is a UK selfbuild, and average for all
notoriously difficult to predict the benchmark houses I have used in
building costs and the world THE MODEL previous editions. They ranged in size
is full of people with a vested HOUSE from 110m2 up to 220m2.
interest in making building costs The early editions of the The model house is rectangular,
look less than they actually are. Housebuilder’s Bible were based on measuring 13m x 7.3m externally.
Getting prices out of builders and the build of an actual house, one that As the walls are 375mm wide, the
subcontractors is often much easier had been constructed in the year or internal dimensions are 12.25m x
said than done and the chances are so prior to publication. It was always 6.55m, or 80m2 per floor. Double this
that most selfbuilders will have to a four or five bedroomed detached and you get your 160m2. There is a
commit themselves to a building house, built by either a selfbuilder or pitched roof with gable end walls at
project before they have a clear sometimes a small developer. The idea either end of the house.
idea of the actual costs. Often had been to extract the information A chimney? A good question.
people realise at a comparatively from the project and to feed it into Every benchmark house I have used,
late stage that they can’t afford the the new edition. until the 9th edition, had a fire or at
scheme they have embarked on But this approach came with a least a wood stove and therefore a
and desperately look for ways of problem attached. The houses were chimney. The 9th edition broke with
reducing the costs. never the same and so comparing this because it featured two homes
Many will complain bitterly just them with one another was a fraught which were specifically low energy –
how expensive builders are when task. one being a Passivhaus – and neither
the root of the problem is that they Since the 11th edition, I have been of them had a conventional central
always had inflated expectations of doing it differently. I’ve created a heating system, nor a fire. So my
what they could achieve with the model house which will run through model house, in the spirit of a brave
money at their disposal. future editions. It’s not a house new future, has no fire and no chimney
Many people are bounced that’s ever been built: it’s a virtual either, but you can look elsewhere to
into becoming project managers house aka a spreadsheet consisting find the cost of adding these.

16 13th EDITION l HOUSEBUILDER’S BIBLE


INTRODUCTION

In fact there are a lot of things


MODEL HOUSE: Summary of Building Costs
like stoves that selfbuilders aspire
Rounded
to which can be taken out of a
Materials Labour Plant Fees Totals Total
model house and it begins to look Professionals (Design, fees, Chapters 4 and 5) £11,000 £11,000
suspiciously cheap to build. But
Groundworks (Ch 6) £35,000
therein lies an important lesson.
Groundworks £8,400 £6,900 £5,400 £21,000
Much of the rising cost of building Drains + Services £4,700 £2,900 £8,000
a house – and it has risen a lot in the Service Connections £5,600 £6,000
25 years I have been writing about SuperStructure (Ch 7) £64,000
it – is down to consumer preferences. Inner Skin £2,600 £3,300 £6,000
Not just wood stoves, but fancy Steels and Lintels £1,300 £200 £1,500
kitchens with quartz worktops, External Cladding £7,000 £7,000 £14,000
hardwood flooring, wet rooms, LED Insulation £3,900 £1,500 £5,000
lighting schemes, glass balustrades, Joinery £11,000 £2,000 £13,000
not to mention various forms of Internal Floor £3,900 £2,500 £6,000
renewable heating. Internal Walls £1,600 £1,800 £3,000
The model house can take them Roof Carpentry £2,500 £1,500 £4,000
all, but it chooses not to. It’s a very Roof Cover £6,200 £3,200 £9,000
basic, simple build. There isn’t even a Rainwater/Fascia £1,000 £1,300 £2,000
garage. That’s probably a bit unlikely Plumbing & Heating (Ch 8) £4,300 £3,100 £7,000
Electrics (Ch 9) £3,000 £6,000 £9,000
for a detached house these days but
Finishes (Ch 10) £58,000
once again it’s fairly easy to cost it as
Plastering/Screeding £3,300 £10,300 £14,000
an extra.
Wall/Floor Finishes £10,100 £5,400 £16,000
What’s interesting is that the
2nd Fix Carpentry £3,700 £5,700 £9,000
cost of building this model house is
Painting/Decorating £700 £6,200 £7,000
around £230,000, or £1400/m2. You Externals £6,000 £6,000 £12,000
can look up cost tables which suggest Room by Room (Ch 11) £22,000
that you can build for a lot less than Kitchen £11,000 £2,300 £13,000
this, maybe even half as much, but Bathrooms £4,200 £4,400 £9,000
my experience leads me to believe Wardrobes/Storage
that a lot of these figures are fanciful. Garage not costed
Persimmon, our largest housebuilder, Prelims (Site costs, Ch 5) £3,000 £10,000 £13,000
maybe able to build at these costs Project Management £12,000 £12,000
but it very difficult for individuals Rounded Totals £100,000 £99,000 £15,000 £17,000 £230,000
to get close to these prices. Each Floor Area 160 m 2 Cost per m2 £1,440
individual row is discussed in detail 1,722 ft 2 Cost per ft 2 £130
in the relevant chapter and there are
more detailed cost tables to be found
there. The following spread (overleaf )
shows the assumptions that went into
creating the model house.

HOUSEBUILDER’S BIBLE l 13th EDITION 17


Chapter 1

The costings in this edition are based around a Model These tables show the assumptions that go into building such
House, a theoretical structure which has never been built a house and they are used throughout the book to build up an
but which encompasses everything average about an overall cost. The summary cost table is on the previous page.
average house. Throughout the book there are tables with white text headings.
These all refer to this model house and how much it would cost
to build or heat.

18 13th EDITION l HOUSEBUILDER’S BIBLE


INTRODUCTION

HOUSEBUILDER’S BIBLE l 13th EDITION 19


Chapter 2

CASE STUDY
This edition’s case study has to be my
own build. As I write this, it’s June
2019 and I’ve just completed a project
2 Then in 2014, with cash in the
bank from a previous house sale
and a new partner in my life, I saw
used as a commercial warehouse,
built in the 1940s, but had lain empty
for 30 years. It had no architectural
that started nearly five years ago and a derelict warehouse for sale on merit and wasn’t worth saving but it
it’s been both an adventure and an Rightmove, situated in the Victorian sat in a Conservation Area and this
education. back streets of Cambridge. I already meant that it couldn’t be demolished
I last built a house in 1992. In the knew the site and also knew it until a full planning permission had
intervening years, I had only been would be snapped up at way over the been granted. As it stood, there was
indirectly involved in the building asking price. I asked Mandy, my new no planning permission for anything
process, mostly via writing about it partner, whether she fancied moving and, with no less than nine adjoining
in this book and in magazines. I’ve back into town with me, and without neighbours, there were bound to be
met hundreds of selfbuilders, visited the blink of an eye she said yes. We plenty of issues to resolve.
dozens of homes and interviewed actually shook hands on it on the “Never buy a Plot without
countless individuals involved in the pavement outside the warehouse, Planning Permission.” I must have
building process. But I hadn’t built a there and then. We had made a deal. given that advice hundreds of times
house for 25 years. The site we acquired had once been to potential selfbuilders over the

20 13th EDITION l HOUSEBUILDER’S BIBLE


CASE STUDY

The story in two


years. And here I was ignoring it. pictures.
However, it wasn’t that reckless a
thing to do. Knowing the area well, Above: As it looked
I was pretty confident we would get in 2014 when it
permission for a detached house, but came onto the
I didn’t think it would take a year and market. Contrasted
with how it looks in
a half to get the planning sorted. It 2019 (below).
did. And then another nine months
to demolish the warehouse, sort out All it took was about
the garden and work through the half a million quid
many planning conditions imposed and the best part of
by the planners. The house building four years of my life.
But I really enjoyed
didn’t get underway until May 2017, the challenge and
two and a half years after we bought love what we have
the site. In retrospect, the building created.
seems like the easy part.
By and large, the neighbours
welcomed the change we brought
about. The site had been something
of an eyesore for decades and
several neighbouring gardens were
being overrun by the all-too-lush
vegetation. The derelict warehouse
would not be missed, but we knew
that there were many toes that we
could inadvertently tread on, so we
were careful.
We decided to hire Mole
Architects to help bring our plans to
fruition. I’d known Meredith Bowles,
the man behind Mole, for some
time and knew he would come up
with a contemporary design which
would tick all our boxes. We wanted
to build something that would not
only be great to live in, but would lift
this shabby corner of the street, and The application we submitted was HOW WE BUILT IT
raise the spirits of the passers-by. We welcomed by the planning committee Because of the sensitive nature of
went through a series of iterations who passed it unanimously. the site, there were no less than 18
of what we might do and having Two years later, the same planning conditions placed on the
decided on a plan we liked, we had a Cambridge planning team voted development and many of these had
model built which we then showed the house their best new small to be fulfilled before construction
the neighbours at an open event. development in their annual awards. began. The neighbours proved to be

HOUSEBUILDER’S BIBLE l 13th EDITION 21


Chapter 2

incredibly helpful in this respect and done on fixed price contracts with
enabled unfettered access down both minimal supervision, but the finish
flanks of the structure, even when it trades were hired on a day rate which
meant temporarily sacrificing their is best for quality but requires a
garden space. constant presence. We chose a lot
Deliveries were also very of very fine finishes like a Douglas
challenging as the house sits on Fir ceiling in the living room and
a narrow one-way street. Skip Portuguese limestone floor tiles
changeovers involved temporarily throughout the downstairs. And there
reversing the traffic flow. I decided were numerous finish details, built on
that offsite construction was the way site, such as vanity units, wardrobes,
to go in order to reduce the amount under stair cupboards and a unique
of coming and going and we chose external bin store complete with its
to work with Kingspan Potton, using own green roof.
their TEK structurally insulated Externally, the house is clad in
panel system. The access issues held brick with louvred cedar boards used
no fear for Potton and they drew up as a rainscreen on the unsupported
the details in conjunction with the walls, and highlighted with copper
architects. detailing. The zinc roof features seven
I acted as project manager photovoltaic panels as well as two
Above: The south wall trench. Before throughout the build, stopping all Velux rooflights, providing daylight to
we could dig the foundations, we too briefly to get married to Mandy the ensuite bathroom. Unusually for a
had to build the studio and stack during a break in the groundworks new house in an urban setting, it has
the bricks in the garden. Below: the in 2017. a 20 metre garden and the back of the
architect’s model shows the tight
The first phase of the work was house is designed to flow out into the
constraints of this site.
garden via a set of sliding doors.
One of the main design issues was
how to get light into the kitchen
area at the back of the house. It
was obvious that the light source
would have to be overhead, as side
windows were ruled out because
they would have looked directly
into the neighbours’ back gardens.
But there are a number of suppliers
using a variety of methods and we
visited many of them, including a
trip to Scotland. We eventually chose
to work with Cantifix, one of the
original structural glazing companies,
who came up with a bespoke design
featuring a sliding rooflight. It is
not only triple-glazed but it features

22 13th EDITION l HOUSEBUILDER’S BIBLE


CASE STUDY

a low-g glass which reflects solar Above: The


SIPs panel
radiation away, thus reducing the
with the
”conservatory effect” of having an twin Velux
overheated kitchen. rooflights is
We moved in in May 2018, just craned into
at the start of the summer heat wave, place
and to our surprise we found that,
Below: The
such was the effectiveness of the solar
same twin
reflection, the kitchen was actually Veluxes sit
cooler at midday with the roof light central in the
closed. We waited until the evening south facing
before we opened it up and got the roof, between
breeze blowing through. solar PV
panels.
COSTS
The whole project cost us £550,000,
not including the cost of site
acquisition (£320,000). That is about
£100,000 more than I anticipated at
the outset. The overrun was partly
driven by higher building costs,
and partly by us choosing to up the
specification in certain areas.
What we have for this is a
beautifully finished project, complete
with a large open plan kitchen cum
living room, opening up onto a paved
garden with a studio at the far end.
Many of the costs were standard
for contemporary selfbuilds but
getting that modern look just right is
fiddly, time consuming and expensive.
Although the measured internal
floor area is only 137m2, there isn’t
a square inch of the 6m x 40m site selfbuild — the type I did 25 years you might look up in a table of
that isn’t planned and detailed, from ago — and a contemporary, architect- conventional build costs.
the dry garden above the bin store to designed urban plot. Throw near The final build cost turned out
the stainless steel clothes line poles Passivhaus-style energy efficiency to be £3,400/m2, about 2.5 times as
alongside the raised lawn with rusting into the equation, with its 200mm of much as the model house featured
steel edges. insulation in walls, floors and roofs, in Chapter 1. Add in my time, and
In fact, what I have learned is and triple-glazed doors and windows, a few frills that turn a house into a
that there is a world of difference and you can see how our spend home (bookshelves, mirrors, dining
between a conventional rural figure is way in excess of anything tables, chairs) and we are close to

HOUSEBUILDER’S BIBLE l 13th EDITION 23


Chapter 2

the Chapter 3 table entitled How to that the thermostatically controlled


Treble Your Build Costs. If you only underfloor heating system didn’t
look at one table in this book, that’s cut in till mid-October and the first
the one to check out. winter’s space heating bill was just
£140 (3500kWh @ 4p/kWh).
PASSIVHAUS The overall energy load for the
Initially, I was keen to build a house including electricity and gas is
Passivhaus which is reckoned to be just under 10,000kWh/annum which
the international gold standard for splits roughly a third space heating, a
energy efficient homes. But a decision third hot water and a third (electricity
was made early on in the design only) for lighting and appliances.
process to pull back from this exacting The lighting is all LED, designed by
standard. There were two principal Nicky Burridge, and the appliances
reasons. were chosen for their efficiency. We
Firstly, the site is only 6m wide and put a seven panel solar PV array
the house is built hard against the on the roof at a cost of £5,000 and
boundaries. This means that overall this produces around 1800kWh of
wall width is critical to internal room electricity a year.
sizes and it was felt that a 400mm- The PV system includes a Solar
wide wall was a sensible compromise iBoost diverter which directs
between insulation value and otherwise unused electricity into the
footprint. immersion heater on the hot water
Secondly, the house is a very tank and this reduces the gas demand
complex shape in order to avoid by a further 500kWh/annum.
overlooking and loss of light issues. I remain an enthusiastic supporter
Passivhaus works best with simple, of the Passivhaus standard and think
box-like formats, where the so-called it’s the best way of getting a low-
form factor helps reduce heat loss. energy, comfortable home. But we
Nevertheless, the Passivhaus had to make some compromises here
construction principles were adhered and I feel that in the circumstances
to and close attention was paid to we’ve got a good solution. I’m also
airtightness detailing (with a final delighted that our first winter in
score of 1.0) and triple glazing. residence has proved that the house
The house features the very best works as designed.
mechanical ventilation with heat Top: The footprint of the house is very
recovery system, the Paul Novus, simple. Two bedrooms upstairs, three
supplied by the Green Building rooms opening off the hallway below
and a connecting staircase. The back
Store. Furthermore, there is no wood
half of the house is single storey and
stove nor any other supplementary is one large kitchen cum living room,
heating. It just has underfloor heating opening out onto the patio
downstairs and radiators upstairs, Below: A cedar bin store with its own
heated by a small gas boiler. sedum roof. Lots of little details like this
The house retains its heat so well turn a house into a home.

24 13th EDITION l HOUSEBUILDER’S BIBLE


CASE STUDY

CONTACTS
Architect Mole
Structure Kingspan Potton
Energy consultant Enhabit
Lighting Nicky Burridge nbll.co.uk
Groundworks Mead Construction
Roofing White Roofing
Triple Glazed Joinery Livingwood
Sliding rooflight Cantifix
Kitchen Tomas Kitchens
Limestone Floor Mandarin Stone
Cement Tiles Mosaic del Sur
Garden Studio My Space
Carpentry Artisan Structures
Exterior Paving Latham Builders
Landscaping Cambridge Grandscapes
Plumbing & Heating Huttie
Decorating/Carpentry Matt Kear 07989 37990
Site Management Ray Stillwell 07739 570224

The back of the house is open plan,


single storey. Visitors refer to it as a
Tardis.

Top: View into the garden from the


open plan kitchen living room.

Middle: The Tomas Kitchen beneath


the opening triple glazed rooflight

Bottom: Mark and Mandy take tea on


the patio

HOUSEBUILDER’S BIBLE l 13th EDITION 25


Chapter 3

PITFALLS
Before we get into the mechanics of
design and construction, I want to
take a chapter to look at the pitfalls
and risks involved in selfbuild. It is
3
not-so-great selfbuilds or the ones
that are still on site fifteen years after
starting.
Most people do muddle through
battle royal with planners and/or
neighbours about what it is they can
build there.
• Then comes the issues with the site
not, repeat not, a walk in the park and and most people do end up feeling itself which often turns out to be far
there are numerous little traps for the glad they have done it. But there are more expensive to develop than they
unwary. risks and they tend to fall into certain had hoped.
Everyone and their aunt has well-worn categories. • Then the builders turn out to be
watched Grand Designs and week • Firstly, people cant find a building too expensive and plans have to be
after week the story tends to follow plot at a price they can afford, amended.
a pattern. It was a huge struggle, it meaning their selfbuild dream is • Mistakes happen on site leading
cost far more than they anticipated stillborn. This may cost you a lot of to large dollops of money having
but…..(as Kevin McCloud does his time, but it won’t bankrupt you or to be spent on repairs or finding
famous piece to the camera at the end cause you sleepless nights. But it gets replacement builders.
of each show)…it was all worthwhile worse. • Money then gets tight and they
in the end. Just bear in mind that the • No 2 is that they manage to can’t see how to finish it.
Grand Designs team weed out all the get hold of a site but end up in a • Finally, the people doing the

26 13th EDITION l HOUSEBUILDER’S BIBLE


PITFALLS

Development is
SETTLEMENT controlled around
every settlement
BOUNDARIES in the country. The
usual way of doing
this is to draw dotted
lines on a map,
known as framework
boundaries. Outside
the lines, the land
is deemed to be
agricultural and
changes hands at
£10,000 an acre.
Inside, the land costs
over £1m an acre in
southern England.
This map was
included in my 1st
edition in 1994. It is
the village in S Cambs
I then lived in. In the
intervening 25 years,
the location of the
boundaries hasn’t
changed an inch.

selfbuild fall out with one another with no planning permission. Just plots and that every tumbledown old
and have to sell up in order to build couldn’t resist it. It took four years to wreck had already been tarted up.
new lives separately. turn it into a beautiful home but we The ravages of the credit crunch only
Now I can breezily write all this got there. So who am I to persuade managed to dent the total a little.
stuff down and somehow it only you not to go down this route? But The overall number is down about
seems to add to the attraction of you have been warned, and here 15% from the pre-crunch numbers,
selfbuild. I get emails which say follows a little bit more flesh on what even though the total spend seems
“Thanks for pointing this out Mark, these pitfalls actually consist of. to be much the same. It seems there
but we are going ahead anyway.” In are fewer houses being built, but they
fact, I don’t think I’ve persuaded a each cost more than they used to.
single person to go and do something The opportunities are out there and
different. Selfbuild seems to be FINDING LAND the business is being done. So, the
something that draws people to it, Every year in Britain there are question is, why do people find it so
like a moth to a flame. between 10,000 and 15,000 selfbuilds hard to get started?
And to be fair, I and my new undertaken, and probably as many I fear that the answer can be
partner and wife-to-be Mandy took major renovations and conversions. summarised in one uncompromising
on a most reckless challenge in This number has held rather steady phrase – unrealistic expectations.
2014 when we spent too much on a for many years, despite some people Or, to put it another way, the
difficult plot in central Cambridge predicting that we would run out of opportunities are rather more

HOUSEBUILDER’S BIBLE l 13th EDITION 27


Chapter 3

expensive than people can afford. There are always dozens of Counties, selfbuilders tend to either
The property market is pretty opportunities on offer in every county be replacing their own dilapidated
ruthless in valuing opportunity during the course of a year: if people houses or building in their back
and the idea that you can pick up a are deadly serious, they will find garden whilst selling off their original
really nice building plot for next to something. If they are just sticking a house. In Scotland, there is a more
nothing is fallacious. The selfbuild toe in the water, they will always find conventional selfbuild market with
exhibitions are full of people who are a reason to not go for a property or plots being bought by ‘ordinary folk’.
‘seriously looking at building a house’ they will never bid enough to get it. It also means that selfbuild is far
who basically can’t afford to, or at Or they will complain that they can’t more common in the cheaper areas.
least can’t afford it in the expensive afford the prices being asked. Of the 15,000 selfbuilds taking
areas they live in. They will make place each year in the UK, over half
enquiries, log onto websites and PROFESSIONAL PLOT FINDING the total are in Wales, Scotland or
register interest, and even buy books, Plot finding is actually becoming Northern Ireland whose combined
without ever really realising that they more organised and more population is just 10 million,
haven’t got the wherewithal to make professional. There are plot finding compared to 50 million people living
it happen. It doesn’t help matters that websites out there that will allow in England.
TV still has lots of programmes about you to zoom-in, in aerial photograph Single plots in SE England
doing up property and ‘making it all mode, and give you a pretty good idea are so expensive that they attract
happen’: this just pulls even more of what the place is like before you professional developers whereas in
people into the whirlpool. Without visit. the rest of the country they tend to be
some serious financial assets and/ You can subscribe to plot databases sold to amateurs wishing to build for
or income, it’s not really going to fly. for individual counties and you can themselves.
After two or three frustrating years, also check details of recent planning So it pays to be realistic. If you
would-be builders withdraw, saying permissions granted in your district live somewhere expensive, you need
they wanted to do it but they couldn’t so you get advance warning of plots a plot or a wad of cash to make it
find a plot. But there are plots, and before they even come to market. happen; alternatively, you can move
some people do make it happen. Even so, tracking down opportunities somewhere cheaper and upset the
So what are the essential is a time consuming process and locals with all your flash, big city
ingredients for people who do it pays to be professional about it: money. The opportunities are out
manage to get on and make it always think like a developer, because there.
happen? I think they tend to fall into that is what you are.
three camps. Either they are rich and According to Buildstore, which UNCONSENTED LAND
can afford to pay the prices needed to runs the Plotsearch database, in There are several companies selling
secure prime building plots. Or they 2019 you can find plots in Northern ‘land’ for knock down prices, usually
are lucky and happen to already own Ireland and some parts of Scotland just a few thousand pounds. The
a piece of land which is developable. for under £10,000 whereas in adverts seem very enticing but, if you
Or they are not too fussy about where Hertfordshire, the cheapest plot they keep your wits about you, you will
they live and will buy anything that have on their books is over £300,000. realise that this land has no planning
comes up, within reason. This last Those are the two extremes. It follows permission and has very little chance
group are the really keen selfbuilders directly from this that selfbuild of ever getting planning permission.
who tend to do it over and over again in Hertfordshire is somewhat It’s on the wrong side of the planning
because they love the whole process different to selfbuild as practised in boundaries and planning boundaries
of building houses. rural Aberdeenshire. In the Home very rarely move, despite what the

28 13th EDITION l HOUSEBUILDER’S BIBLE


PITFALLS

sales literature would have you


believe. Usually the giveaway is that
they advise you not to bother with
a solicitor. Here’s what Gladwish
Land Sales suggests: ‘No Solicitors
necessary! Unlike buying a house,
when buying land you do not need
to ensure vacant possession (unless
you want to scare birds away) nor do
you have to ensure all the fixtures stay.
Most land that we sell is cheaper than
buying a car. Do you use a solicitor to
buy a car? The car could be stolen and
the log book a forgery! With land,
nobody can steal the land you buy
and the transfer document you get,
once signed, is irrevocable.’
There is nothing illegal about
all this. They don’t make any false
If you can find a bungalow on a big plot and buy it at the right price it may be possible to get
claims. They make it clear the plots permission for a larger replacement home. It is a well-trodden route that can be cost-effective, but it
don’t have planning permission. is not a certainty, and there will be costs involved.
They do, sort of, insinuate that they
will get planning permission but relax planning boundaries. But it’s just to stop it from disintegrating
are very careful with their choice of something to be very wary of. and sometimes this permission is
words here. ‘We negotiate with local dependent on the structure being
councils on your behalf so that you IS IT A PLOT AT ALL? maintained, even when this is a costly
don’t have to worry about getting Don’t assume that any building and relatively dangerous course to
planning permission.’ That’s good that has once been occupied by take.
wording, isn’t it? You ‘don’t have to humans will automatically qualify There have been cases of planning
worry about it’ because nothing is for residential planning permission. permission being withdrawn from
ever going to happen on that front. Councils take widely differing barn conversions after the builder has
The moral? Don’t buy land without attitudes to what constitutes undertaken demolition of a few select
planning permission from anybody abandonment and the most telling walls.
unless you are certain what you are factor in whether or not an old
letting yourself in for. If you are building can be converted into a
tempted by any plot always talk to new home is usually the quality of
local planners who will be able to the building, not its previous usage. BUYING LAND
tell you about the history of any Always check on the status of a There are basically five methods by
applications and the likelihood derelict property in the local plan which property (including building
of getting planning consent. Just to see whether redevelopment is plots) can change hands in these
occasionally, some of this land may likely to be controversial. Often the islands.
get zoned for building, especially true planners will allow the conversion n Public auction: The best thing
now that government policy is set to of a particularly fine old barn about this is that it’s open. It gives

HOUSEBUILDER’S BIBLE l 13th EDITION 29


Chapter 3

the seller (or vendor in these circles) these situations agents often decide specialist. If you are buying in an area
a legally binding agreement. On the to switch to informal tender (see new to you, you’d be well advised to
other hand the expensive pre-sale previous point), to close the deal. look for a local rather than sticking
work has to be undertaken with no n Private sales: often referred to as with someone you’ve used before
guarantee of success. Sometimes, ‘Sale by Private Treaty’. If a buyer who might be 200 miles away.
in the excitement of an auction, it and a seller can agree on a price, then Now is the time you need as much
doesn’t get done at all. A 10% deposit there is no obligation for them to go information, official and unofficial,
is usually taken at the auction so the through the more public channels as you can get. A good solicitor will
buyer has to have funds to hand. indicated above. A lot of land changes uncover more than just that which is
n Formal tender: as practised in hands this way. You’d be surprised. Or revealed by undertaking searches and
Scotland. Once a bid is accepted, maybe you wouldn’t. checking for legal complications and
the deal becomes legally binding. The actual process of buying land boundaries.
Otherwise similar to the auction in (or derelict buildings) is similar One common pitfall occurs when
terms of pros and cons. to that involved in buying houses. the planning permission only allows
n Informal tender: buyers are asked You usually employ solicitors and you to build on one part of the site
to send in sealed bids for the property surveyors to ensure that you are not – a frequent occurrence when close
by a fixed date, together with details buying a pig in a poke. Likewise with to village framework boundaries
of their own financial position. All plots, you want to ensure that you can and the like. Some solicitors spot
the bids are opened at the same time build what you want on it at a price this, others don’t. You should be able
and the sale is agreed, usually with you can afford. But, the whole process to check this yourself on the web:
the party considered to be in the best of buying plots (and, especially, I was able to download my own
position to buy. Buyers are wary and renovation opportunities) is more parish development plan within
object to the decision being made complex because there are more three minutes of typing the name
in private and with no opportunity things that can go wrong. of my district council into Google
to increase their bid. However it’s When buying an existing property (clue – look for the Local Plan
probably less stressful than an auction at least you know that it is there, even maps). But even the best solicitor
and gives more flexibility to the if it might just fall down next week! is not going to be able to advise
vendor. With a building plot you are buying you as to whether the plot is an A1
n Informal telephone auction: nothing more than a field that comes purchase because there are a number
the common method of property with a promise, a hope for the future. of other areas that are outside the
sales everywhere outside Scotland. And unlike the conventional house remit of even the most scrupulous
It gives much more flexibility to market, the chances are that you will legal beaver.
both sides. This is both its strength have to purchase your plot without
and its weakness – you get flaky knowing exactly what you can build. PURCHASE TAXES
offers from purchasers and you get You pay exactly the same taxes on
gazumping and other evils because LIMITS OF PROFESSIONAL land purchase as you do on house
the contracts are not binding until HELP purchase. It’s called stamp duty.
physically exchanged. Furthermore, You don’t have to hire any help but The government likes stamp duty:
when there are more than three it’s usual to do so because the stakes it’s a stealth tax because, although
buyers competing for one property, are high and you don’t want to people don’t like it, it’s not going to
it can get very difficult to organise make a silly mistake. If you hire the lose them the next election, and it’s
proceedings because someone is often services of a solicitor or a licensed relatively easy to police. Only the
away or can’t make up their mind. In conveyancer, look for a property buyer pays the stamp duty, which

30 13th EDITION l HOUSEBUILDER’S BIBLE


PITFALLS

STAMP DUTY 2019 ASSESSING eastern boundaries of the plot before


any building work takes place.’
Plot or Property Price Duty BUILDING SITES Sometimes the covenant will be
up to £125k 0%
Between £125k and £250k 2%
One of the things that catches very much more specific and ask
Between £250k and £925k 5% people out at this very early stage for a brick wall nine inches thick
Between £925k and £1.5m 10% is that no two building plots are or something like that. A condition
over £1.5m 12% the same. Whilst they can be very such as this is expensive to meet and
different bands in Scotland simple to develop, they can often should really be reflected in a lower
present a number of issues which plot price.
aren’t apparent at the initial stage It is also common now to find
of investigation. There may be legal covenants preventing any further
gives selfbuilders a small advantage constraints on what you can build. development. The point behind such
because they are usually buying There may be difficulties over access conditions is not to preserve the
cheap (plots) and building expensive arrangements. The site may itself unique beauty of your setting but to
(houses). need expensive remedial work, or it hold on to any uplift in value you
Stamp duty rates were last may prove to be impossibly expensive may be clever enough to negotiate
changed in 2014 to general to get services to site. In summary, with the planners. Covenants have
approval. The old system switched you need to be aware that there are beneficiaries and you can usually
the rate entirely when the value plot development costs which are remove covenants if you are prepared
crossed a given threshold so that quite distinct from run-of-the-mill to throw money at the beneficiaries.
you paid just 1% tax if the price building costs. Let’s look at some of The going-rate for buying off a no-
was £249,000 but 3% tax if it cost the issues in more detail. development covenant is around 50%
£250,000. Now it’s been tiered so of the value created – an arm and a
that if your property costs £350,000, LEGAL COVENANTS leg, in other words.
then you’d pay 2% on the bit Building plots are often sold with Sometimes there are some very old
between £125k and £250k (£2,500) legal constraints over what may and covenants lurking on the deeds and
plus 5% on the tranche between what may not be done to them. The it’s long since ceased to be clear who
£250k and £350k (£5,000), making most common form of constraint exactly the beneficiary is. Maybe they
a total of £7,500. is the covenant whereby the vendor have died and their heirs are not very
The HMRC website is the place (i.e. the person selling the plot) apparent: unfortunately, covenants
to go for the more detailed analysis. requires that the purchaser should don’t disappear with the death of the
The rates apply all across the country fulfil a number of conditions. Many beneficiary. In such cases, you can
but note that Scotland applies of these might not cost a euro – i.e. insure against anyone coming forward
significantly lower thresholds. Plus no caravans to be stored in the back and laying claim to the uplift.
there are now punitive rates for garden or no trees to be planted
people buying-to-let. where they might block someone BOUNDARY DISPUTES
Any other charges? There are else’s view – but others can involve It is unfortunately very common
fees payable to bodies like the Land substantial costs. to encounter problems with fuzzy
Registry (between £200 and £500) The commonest type of covenant boundaries. Just because someone
and for council searches, maybe deals with boundary fencing and offers a piece of land for sale, it
another £400, but they are not would read something like this: ‘The doesn’t follow that they own all of
significant in the scheme of things. purchaser covenants to erect six foot it – or even any of it sometimes. Plot
And of course your legal fees. high fencing to the southern and boundaries are usually drawn in title

HOUSEBUILDER’S BIBLE l 13th EDITION 31


Chapter 3

deeds as relatively thick lines on OS harder to get and insurance more them. However if market conditions
maps and there is frequently lots of expensive. Many of these problems are buoyant, then you may have to
room for disagreement about where can be sorted out by throwing money part with up to 5% of the plot price
exactly these lines are on the ground. at them – but the canny buyer should just to tempt the vendor into an
In 2003 an amended Land ensure it’s the vendor’s money not option. Also the buyer may want
Registration Act was passed, theirs. to make the plot price conditional
which established a framework for on what you manage to squeeze
registering boundaries using satellite USING OPTIONS out of planning so that the price is
positioning technology. This should If there are major problems to sort £120,000 if you get permission for
improve transactional disputes over out (as discussed above) in order to one house but £200,000 if you get
time, but progress remains slow. turn the bit of land you want to build permission for two.
There are still millions if unregistered on into a legitimate building plot, you If there is a pitfall in all this, it is
properties all over the UK and it will might consider taking out an option, that you can spend a lot of money and
be decades before we see an end to rather than pressing ahead with a get nowhere. But that’s a pitfall that
such disputes entirely. more straightforward purchase. all property developers have to face.
What is an option to buy? The
RANSOM STRIPS bare bones of a contract might
Another potential problem occurs look like this: you agree a price on
when someone else owns part of the a plot of land (though even this ACCESS &
land needed to successfully develop a doesn’t have to be fixed in stone). SERVICES
plot. Typically, this is land needed to This remains in place for, say, two When assessing a plot or a barn,
access the plot. This is often referred or three years; the length of the you should take note of the distance
to as a ransom strip. Ransom strips option is entirely up to you. During you think you will have to take the
can usually be bought off although that time the vendor is prohibited services and the access you will have
you may be staggered to find out from selling to anyone else. Some to build.
that you will be required to pay over contracts involve interest payments Many backland developments
as much as half of the plot value – to the vendor: this acts as a spur come onto the market these days –
they are not called ransom strips for to the purchaser to get on with typically the rear of someone’s garden
nothing. it and protects the vendor from – and the prices asked for these sites
time-wasters. The big plus from the are often little different to the prices
RIGHTS OF WAY AND purchaser’s point of view is that an asked for somewhere with a road
WAYLEAVES option protects you from gazumping frontage. Yet the budget cost of laying
There are any number of and other forms of treachery. private driveways, drains, water and
complications that should, repeat How much would you be expected electricity combined with providing
should, be uncovered by your to pay for an option? Well, that fencing is upwards of £500/m; that
solicitor’s search: rights of way depends. If the planning angle means that a plot set 30m back
crossing the plot, existing wayleaves is difficult and you are taking on from a road is going to cost at least
for services and cables to cross the the costs of obtaining planning £15,000 more to develop than one
plot, complex shared ownership permission (which could be several with a road frontage.
of access roads, to name but three. thousand), then there may well be Whereas the layout of vehicle
Even if you can live with these no payment made to the vendor at access arrangements are usually easy
arrangements, they may well affect all. They would be very happy for to work out, finding out about the
resale values and make finance much someone else to do all this work for services requires detective work.

32 13th EDITION l HOUSEBUILDER’S BIBLE


PITFALLS

DRIVEWAYS the further the services have to run, people you need.
The basic cost of laying a drive can the more expensive it will get. Bear in mind that you don’t have
be budgeted at around £80-£100 You’d think that the utility to own a plot of land to generate
per linear metre, rather more if it businesses would be delighted to a quotation. Thus, getting new
is required to be fenced off as well. have new customers and would bend connection prices is often one of
Often there is extra work involved over backwards to help accommodate the first tasks to undertake when
in connecting to the public highway: them and get them connected for assessing the viability of a plot
typically you may have to construct next to nothing. The reality is usually purchase. Sometimes, the resulting
a dropped kerb if you are crossing very different: selfbuilders struggle high connection fees can be enough
a raised pavement, at the very least with service connections. They are to render a project unviable.
you will have to provide a small costly, lead times are unpredictable
apron of asphalt or tarmac so that and there are often strange OVERHEAD CABLES
there is no unsightly gap between administrative hoops to be jumped Power cables running across your plot
your drive and the public highway. through. are bad news. They may intersect with
In some situations you may be Utilities have been largely your proposed building, in which case
required to create a visibility splay, privatised for twenty or thirty years they will have to be moved; even if
which may involve removing existing now, yet the new connection work they don’t they will detract from the
obstructions and rebuilding them tends to be carried out by the same resale value of the property. Burying
further back from the road. old institutions that ran the publicly- them is the obvious solution but it
On the other hand, you may have owned boards, and there is very little can be horribly expensive; even a low
to construct a bridge over a ditch evidence of competition having come voltage cable can cost over £40 per m
or even make an opening through into play. BT run the copper phone to bury, which can easily make a short
an existing building. There are, cables, although Virgin control a lot diversion cost £5,000 or more. Again,
in fact, so many potential access of the fibre-optic network. Water the trick is to get quotations for this
problems that it is almost pointless and sewage are the domain of your before entering into any contract to
trying to summarise them – you local water company and electricity buy.
will, in all probability, discover them rests with the same electricity outfit
when you first visit the site. Just be that’s been in place since the year EXISTING DRAINS
aware that whilst a straightforward dot, although it’s now referred to as This is one real nightmare for rookies
highway junction will cost a couple your Local Electricity Distribution and professionals alike: existing
of hundred quid, complicated access Company - there are eight in the UK drains and water mains running
arrangements may well set you back as a whole. Gas infrastructure is now across your proposed building. Do
several thousand pounds. run by Cadent. whatever you can to find out if they
A selfbuilder’s first port of call is are present, but sometimes there are
SERVICE CONNECTIONS to get in touch with these service no records and no surface evidence.
Gas, electricity, water, sewage, providers and to ask for a quotation Drains vary in their importance;
phones. Together, these constitute for a new supply. It’s one area where small runs connecting one or two
the services and you need to have Google is still pretty useless – search households to a sewer may very easily
them (or as many as you can get) to terms like selfbuild new supply turn be diverted – depending on the lie of
turn a building plot into a home. Just up all manner of strange things, but the land – but sewers and pumped
how much this will cost you will vary not the New Homes Department drains cannot readily be moved and
enormously, depending largely on of your local utilities. You have to discovering one of these in your
your site layout. Generally speaking, persist! Eventually you will find the footings is a Grade A disaster, though

HOUSEBUILDER’S BIBLE l 13th EDITION 33


Chapter 3

When digging n overhead cables


a trial hole, the
n springy ground – suggests high
convention is to go
down somewhat
water table
deeper than n slopes greater than 1:25
the proposed n trees within 30m of your proposed
(or existing) foundations – species, size and girth
foundations. should be noted
Normally, you dig
n any evidence of ground having
two or three trial
holes just outside been disturbed or used as a dump
the proposed
footprint – not BACKGROUND DETECTION
under it. Investigations with local council,
service companies, etc., should reveal
more historical and geographical data
on which to assess likely problems.
Talk to neighbours, local builders
thankfully this doesn’t happen too around £200/m2 of footprint (i.e. the or building inspectors who may
often. The situation with mains is area you are enclosing). However any well know the lie of the land. Your
very similar; you probably will not be of the above problems encountered legal searches should turn up useful
able to build within 2 or 3m. Again on site could conspire to make things information but you can’t rely on
the key is to find out as much as a lot more expensive and, if you have them.
possible about the plot before you more than one of these problems,
exchange contracts to purchase. If expect your foundation costs to treble. TRIAL PITS AND BORINGS
there is any doubt in your mind, then For more detail on these problems To dig or not to dig, that is the
try and place a retention in the sale and how they are overcome, read question. Whether it is better to
contract which is only payable should Chapter 6: Groundworks. Here I leave everything to chance and let
nothing untoward be found under simply want to give a few pointers the building inspector decide how
the ground. about what to look for in assessing deep your foundations must go when
plots. the time comes, or investigate in
PLOT PROBLEMS detail beforehand and risk having
Next on the list of potential booby VISUAL INSPECTION to do more than you really need.
traps is the problem of difficult The first step in assessing any Many cautious builders now tend
ground. There are three basic causes building plot is to take a walk over to dig or bore trial holes as a matter
of alarming cost expansion: the site and the surrounding area. Be of course, whatever the history or
n slopes on the look out for clues as to what geology of the ground. The normal
n bad ground may have gone on in the past. Some practice is for the pits to be dug to a
n trees. points to watch out for are: depth of 3m (close to, but not under,
Straightforward excavation and n foundations of former buildings the foundations) in the presence of
foundation work can be relatively on site a structural engineer who takes a
cheap. Typically, the groundworks n evidence of drains, old long gander at the ground conditions
make up 10% or less of the overall watercourses or wells before the digger fills the holes
build cost on a new house. On a n subsidence cracks in neighbouring back in. The engineer then decides
straightforward site, this is usually buildings whether the house foundations can

34 13th EDITION l HOUSEBUILDER’S BIBLE


PITFALLS

proceed as normal or whether a more to say that strip footings would be specifying sulphur-resistant cement
complicated foundation solution is OK, because if it goes wrong in the – but it will be some time before
needed. future, then they have to bear some housebuilders are able to accurately
Expect to pay an engineer between responsibility. After all, it doesn’t cost budget for contamination problems.
£200 and £500 for this service, an engineer a penny more to say he As with other land issues,
though their fees will be much would recommend piled foundations. potentially contaminated land is
higher if special foundation designs In fact he may earn more, if he gets to going to require investigation which
are needed; a JCB for an hour design the footings as well. likely means drilling boreholes. On
should cost an additional £50-£100 ‘If I was starting again, I would my recycled site in Cambridge in
(depending on travel time). Augured definitely talk to the building 2016, I was charged £750 +VAT for
boreholes are another alternative – inspectors first. There’s always the the initial desk study and a further
likely to cost around £300 each (and risk that when you dig you find £2670 + VAT for the investigation
you’ll need two) but a good option something unexpected, but that (which involved drilling four holes)
when access to JCBs is not possible could still happen even if you have and the report. Interestingly, the
or you have other problems like high boreholes drilled,’ he said. remediation work, which involved
water tables. removing the top 150mm of soil from
But there is also a natural tendency CONTAMINATED LAND the garden area, cost rather less than
for the experts, having been called Where the problems with the the investigations.
in, to suggest very expensive, fee- site are caused by the natural
swelling, solutions when they may not characteristics of the land,
be necessary. Jeremy Bulbrook built the solutions are usually fairly
three houses in the Cambridgeshire straightforward, if expensive.
Fenland town of March during 2001 However, if you are recycling PLANNING ISSUES
and he ended up feeling badly let building land — taking on Since they introduced the concept
down by his professional advice: ‘I something like an old garage or of planning permission in 1947, it’s
had a couple of boreholes drilled on workshop — you may find yourself got progressively harder to obtain.
my architect’s suggestion. The soil up against ground with a whole Every government makes noises
report that came back from these cocktail of nasties such as heavy about reforming the planning system
recommended a piled foundation, on metals, chemicals or methane. but that has invariably been code
the basis that the first two metres or Now local authorities up and down for introducing yet more controls.
so could possibly be made-up ground, the land are currently preparing The current (2018) government has
even though it was gravel/sand. registers of contaminated land and produced a 76-page England-only
‘My building inspector asked they will be empowered to issue document, the National Planning
why I hadn’t spoken to them first. Remediation Notices, which will Policy Framework, or NPPF, which
He said that they would have been require the landowner to make revises an earlier (and shorter) version
happy with strip footings, but as a the site safe, which usually means which attempted to simplify the
recommendation for piles had been either excavating and burying the whole process. The 2012 version
made, they had no choice but to force pollutants elsewhere (the Foot and didn’t really succeed in this ambition
me down the piled route. Mouth option) or encasing them and I doubt the new version will fare
‘Now whilst I don’t want the in concrete or clay (the Chernobyl any better.
houses to fall down,’ he adds, ‘I do option). What NPPF does include is help
wonder if some of the engineers that Sometimes the solution may for selfbuilders, albeit hidden away
produce these reports are too scared be relatively cheap – for instance as an afterthought in paragraph

HOUSEBUILDER’S BIBLE l 13th EDITION 35


Chapter 3

61. Coupled with Right To Build HOW PLANNING WORKS plot can be zoned for building. Some
legislation, selfbuild is at last on the There will be more detail on this in of the major areas they are likely to
planners’ radar but the signs are that the following chapter, but I wish look at will be:
the rate of increased uptake will be here to point out that planning is a n size of the house: is it ‘too big for
pretty glacial. Even if selfbuilders political matter and in order to win the plot?’
do get some support from central planning permission you have to n site of the house: don’t assume you
government, they still have to grapple convince some of your neighbours, can build anywhere on the plot
with all the other aspects of the most of the planning committee and n neighbours’ privacy and right to
planning jungle. also to get some support from the light
What people shouldn’t expect is professional planners who inhabit n style of the house: design and
to be able to put any piece of land the council offices. Planning is dealt materials ‘must be in keeping’, or at
they fancy forward for planning with at a local level although there least architecturally stimulating
permission and get a positive result, are national policies in place which n if the site is in a Conservation Area
at least not in the short term. Just provide guidance across the countries or in the curtilage of a listed building,
because you own a paddock next to that make up the UK. You need to there will be loads more hoops you
your house doesn’t mean you can first work out what you want to build: will have to jump through. It won’t
build on it. If only... you can do this yourself though it is stop you building but it will make it
Perhaps the biggest fear for usual and probably sensible to hire a more expensive and longer to achieve
would-be selfbuilders here is being professional to help you through this planning permission.
unable to get planning permission at bit. You then put an application in n there will probably be a whole raft
all. I’ve touched on this already and to the council and then it whirrs its of planning conditions placed upon
the advice must always be to only way slowly through the several steps your approval, and these will also take
purchase land which already has needed to win (or be refused). If you time to resolve and cost money. You
planning permission granted. This want to bone up on this, search on may have to look for contaminated
leads to another issue: what if you the Planning Portal which covers ground, you may have to protect
don’t much like what they have in England & Wales newts or bats, look for archaeology,
place and want to change it? Your application is posted online or go to great lengths to build in a
Hmm. Good luck. But you may and neighbours are encouraged to certain (expensive) style
have a right planning battle on your look your plans over and to comment n vehicular access and turning heads:
hands here and you may have just on them. This is often a fraught a particular problem on narrow
started a fight with your would-be process. Neighbour objections carry fronted plots, less than 12m wide. The
neighbours, because they may not weight with the council, so it often highways department insists that not
see things quite the way that you do. helps to discuss your plans with only will adequate visibility splays
Bear in mind that as a selfbuilder, your neighbours before you put the be provided, but that there must be
you will one day be living side-by- application in. adequate room on site for cars to turn
side with these neighbours and most around or, as they say in planning
people instinctively want to get on PLANNING CONCERNS speak, ‘enter and leave in a forward
well with them. So if you battle too Even if the neighbours love your gear.’
hard and upset the locals, you may plans, the professional planners n trees and hedges: often have to be
live to regret it in years to come. In themselves may not much like what retained or replanted.
any event, you may not be able to you propose.
get your revised plans through the The planners are concerned with TACTICS
planning process. far more than whether a particular It takes several months to get from

36 13th EDITION l HOUSEBUILDER’S BIBLE


PITFALLS

planning proposals to winning like they spent less than they actually a very serviceable home. So problem
permission. If you get turned down, did because they don’t want to look number one is the extra expense of
you can appeal or you can start all stupid. buying such a site.
over again. Tactics are involved here, Then you are faced with a decision:
and each case has to be judged on its RENOVATE OR REBUILD? whether to knock down and start
merits. They chances are that (if the As virgin, greenfield building sites again or whether to work with what
site is zoned for building) you will be become more and more difficult is already there. Now here things
able to build something, but it may to obtain, people are looking to start to get complicated because
not meet with your expectations or purchase dilapidated dwellings to the chances are that it is not a
budget. demolish and to build afresh. These clear-cut issue: most renovation
are basically recycled building sites, opportunities fall somewhere
sometimes referred to as brownfield between the two extremes. Added
sites. to which it is a fiendishly difficult
BUILDING COSTS Planning permission is usually exercise to compare costs between
One of the biggest pitfalls that lays in much easier to obtain on a site with the two approaches because this
wait for the unsuspecting selfbuilder established residential usage and major decision has to be made at a
is knowing just how much it will there are also usually considerable pre-plan stage and you will have to
cost to build a house. There are cost savings to be made because the work with ballpark figures. Whether
tables you can refer to but often they service connections are already in the building is worth saving at all
only give you a glimpse at what the place. A few sites will have problems is an issue that only you (and the
actual costs might be. There are often with contaminated ground, but the planners) can decide – each case
ancillary costs which fall out of the requirements of today’s foundations has to be argued on its merits and
normal run of build costs . Some to go much deeper than was there is little point making any broad
plots require a great deal of money previously thought necessary mean generalisations here.
just to turn them into building plots. that any existing foundations will As a rule, new builds tend to be
They may have access down a lane, be excavated and disposed of. In cheaper than conversions on a £ per
or through someone else’s garden, or addition to buying a serviced plot, metre square basis, but such crude
they may involve having to remove you have an existing structure from comparators don’t always make much
some existing structure. The ground which you may be able to salvage sense as often conversions involve
may need work to bring it up to some useful materials. building extensions and other quasi-
scratch. Or, having completed the So far so good. The decision to new build bits.
build there may be many thousands demolish, however, is often not as One factor working in new builds
still to be spent to turn the site into a clear-cut as this. For a start, few favour is the VAT treatment. New
habitable home. people care to sell their existing builds don’t have to pay (much) VAT,
In truth, there are always hidden properties at building plot prices. To whereas on renovations, conversions
costs involved, even when you are do so is to admit that your home is and extensions VAT is payable on the
just moving house. It can sometimes worthless which can be a bitter pill bulk of the work. More on the ins
take years to organise and pay for to swallow, even if it’s true. In any and outs of VAT in Chapter 5.
all this stuff, but it does tend to get event it’s usually the case that the
finished eventually. Just bear in mind house is not worthless, it’s just old EXPERIMENTAL METHODS
that when you read case studies in and dilapidated and with a little bit One of the things I learned in
magazines of selfbuilders costs, they of tender loving care and a whole lot talking to hundreds of selfbuilders,
often have a desire to make it look of money it could continue to make is best expressed in a saying. “Never

HOUSEBUILDER’S BIBLE l 13th EDITION 37


Chapter 3

underestimate how little they to make. Do you want to build know what you are trying to do and
know but never overestimate their something fairly conventional, that to understand their concerns. If your
intelligence.” This manifests itself fits in with the neighbourhood, or do plans manage to piss everybody
in a number of ways but chiefly the you want to make a statement and off big time, then you are more
symptoms exhibit in men (almost do something radically different? likely to face extra hurdles when
exclusively) who latch onto some How big do you want it? How high? it comes to building, especially if
new method which they believe will What will the neighbours think of you require access through their
revolutionize the staid-old building your plans? How hard do you want to property, or are even building close
industry and will be the best thing make it for yourself ? to it. Neighbours have the power to
since sliced bread. Some people have a pretty good be quite obstructive and to this end
Take containers. There are lots of idea of what they want to build, there exists (in England & Wales
people that think using containers whilst others start with a clean only) a Party Wall Act which gives
to make houses is a really neat idea. slate and are open to all sorts of guidance on how neighbour building
There are millions of them out there, ideas. One or two salient points issues should be resolved. It’s not
they are dirt cheap and they are are worth making here. If you have straightforward, it can be expensive
sort of shed sized. Why not put a no background in architecture and to implement and it can also be very
simple roof on, stick some windows design, the chances are that your time consuming. More on this in
in and a door and, voila, you’ve knowledge will be limited and that Chapter 4.
just got a house for a few hundred you will be drawn to what you know Sometimes neighbours will be
quid. “I want to build using disused and have seen in magazines and TV, irrationally opposed to your plans
containers”. Sure it can be done, but or seen in friend’s homes or in hotels and no amount of polite approaches
it turns out that once you’ve done and the like. You could end up with will make a blind bit of difference.
drainage connections, got the services a home with lots of features but poor You may have to build (and live)
in, insulated it properly, added an overall style, or no style at all. against a background of hostility that
external skin, worked out how to One frequent mistake that people is unlikely to go away until one of
waterproof the windows, and then make is to opt for masses and masses you moves (or dies). But that’s not
joined two together because one on of glazing, thinking this is a great really a selfbuild problem – it can
its own is a bit pokey, you are well on way to bring the outside in and to get happen almost anywhere over almost
the way to doubling your build costs. daylight everywhere. Get this wrong, anything. It’s just that building work
The moral is that experimental and you can feel like you are living in makes it somehow more visceral, as
build methods are always interesting an airport departure lounge. You can though you are gaining something at
but never cheap. And if you want actually have too much daylight and their expense. If it’s a nice view you
builders to work with you on such end up getting baked on any sunny are blocking, or invading their privacy
ventures, expect to have to pay a big day worth it’s salt. Getting the joinery by overlooking them, they may just
risk premium as well. and glazing right is one of the keys have a point.
of good design and that’s not a skill
easily learned. SKIMPING ON DESIGN
How much money to spend on the
DESIGN ISSUES NEIGHBOURS design stage? A very good question
What is it exactly you would like Your new home or extension indeed. I have met selfbuilders who’ve
to build? Having hopefully got to ideally wants to sit easily with the been happy buying the services of
grips with the money side of things, neighbours. It is worth cultivating designers for less than a thousand
you have to decide what you want the neighbours a little to let them pounds, getting the plans “knocked

38 13th EDITION l HOUSEBUILDER’S BIBLE


PITFALLS

off ” in a weekend. Whereas a top HOW TO TREBLE YOUR COSTS


notch architect may well cost as much Basic Tricky Site Luxury
as £50,000 to bring forward cutting- Professionals £11,000 £25,000 £70,000
edge designs and incredibly detailed Prelims £13,000 £26,000 £20,000
working drawings. Clearly, the service Project Management £12,000 £30,000 £40,000
offered is not the same thing, and it Groundworks, Drains, Services £35,000 £50,000 £50,000
behoves you to understand exactly Internal Structure £21,000 £25,000 £50,000
what the difference is. The next External Cladding £14,000 £18,000 £40,000
chapter covers this in more detail. Insulation £5,000 £5,000 £20,000
But just be aware that if you skimp Joinery £13,000 £13,000 £50,000
too much on design fees, there are Roof Cover, Rainwater £11,000 £11,000 £30,000
invariably other costs which appear Plumbing & Heating £7,000 £7,000 £15,000
elsewhere, as builder have to scratch Electrics £9,000 £9,000 £30,000
Finishes £58,000 £58,000 £80,000
their heads to work out how to
Kitchen £13,000 £13,000 £40,000
solve unforeseen problems. And the
Bathrooms £9,000 £9,000 £20,000
overall value of the build is likely to
Garage £0 £0 £20,000
be less because the design isn’t very
Garden/Landscaping £0 £5,000 £40,000
imaginative. Renewable Heat & PV £0 £0 £20,000
Rounded Totals £230,000 £304,000 £635,000
Internal Floor Area 160 m2

UNDER Cost per m 2 £1,400 £1,900 £4,000

ESTIMATING The above table looks at three variations on the same house, our model house of four-
bedrooms, 160m2 floor area. The Basic column repeats the costs incurred in the Model
Wouldn’t it be great if you estimated House Costs table in Ch 1. You can, if your are lucky, build for less than this, but you can
a price for your project (on the back also build for much more. The middle column, Tricky Site, looks at what can go wrong
of an envelope, naturally) and then with a development budget just through difficulties encountered on site. And the last
you put the job out to tender and column, Luxury, indicates the amount you could easily spend if you wanted to upscale.
it came in on budget. Oh, and the This would probably be a contemporary style, architect-designed home with lots of
builders then went ahead and did interesting materials and lots of glazing.
everything really well, finished on
time and didn’t charge a penny in find examples of perfectly nice houses bedroom is the size of a tea towel and
extras. that appear to cost rather less than that your cat would quickly die as she
Yes, of course it would. this, some even below £1,000/m2, hit all four walls if you tried to swing
But do you really expect that to and you’ll start wondering just what a her in it. And that anyway, you don’t
happen? variety of outcomes there are, as you want a house that is the same as 60
No, of course you don’t. will also note that some people build others on the same estate.
Instead you mug up on build costs, at over £5,000/m2. Turns out most selfbuilders want
looking at tables which suggest you You can see where this is heading. 160m2 (our model house) or very
can build a house for £2,000/m2. You Whilst the likes of Barratt and often 200m2 (comfortable five
think that’s a lot, even though you are Persimmon manage to build their bedroom jobbie). And if they want
not sure what “/m2” actually means, 120m2 four bedroomed homes for a half decent kitchen, underfloor
or how you measure it, let alone what £200,000, you visit one of their show heating, timber floors, glass
it includes and doesn’t include. You’ll homes and figure out that the fourth balustrades and a big glass sliding

HOUSEBUILDER’S BIBLE l 13th EDITION 39


Chapter 3

door at the end of the living room, But life in a caravan is no holiday, CRAP BUILDERS
then lo and behold suddenly £2,500/ especially during the British winter Another all too common problem is
m2 begins to look light. where mud will be your constant getting into bed with builders who
And then the tenders start coming companion. You might as well get are useless, or who try to rip you
in and, bugger me, if the builders a job as an extra in a remake of off. Or go bust. They are all mini-
don’t want to make a profit as well. Blackadder Goes To War. nightmares and such things are
Whilst you want to hold them to Any mitigation strategies? By all unfortunately all too common.
a timetable and a guarantee that if means read build cost tables, but treat How do you guard against this?
anything goes wrong, they will stump them with a pinch of salt. Note what Whilst there are no 100% fool-proof
up, the builders want to charge for I’ve already said about the difference ways, there are some well-worn
the risk this involves. between build costs and development routines for sorting the wheat from
All of a sudden, you are looking at costs – there are lots of costs which the chaff.
quotes of £750,000 for this fancy new are real enough but which aren’t One is to employ an architect
house. normally thought of as build costs. to oversee the whole process and
And you’d thought that maybe Whilst not skimping on the basics, to let the job to a builder with a
£400,000 would have done it? don’t be obsessed with fitting all the watertight contract. Usually works,
But you already have the plot. latest gear. Don’t be greedy about but it’s expensive, although it is still
There is no escape. You have to size – most selfbuilders build too significantly cheaper than hiring a
rethink. Cut down the size of the much house for what they actually complete bozo.
house? Maybe, but you’ve already got need, and often it gets wasted in If you want to do it on a DIY
planning. Cut back on the materials needless circulation space. Which is project management basis, you must
used? Possibly, but now you’ve set a fancy way of saying don’t skimp on undertake the due diligence stage
your heart on it, it could turn out good design. It may seem that design yourself and check out who can
to be a huge disappointment if you costs a lot, but if it gets you a better deliver and who can’t.
make just like a Persimmon. How house for less footprint it’s actually a But things happen to builders
about throw the builders by the bargain. over time. The world doesn’t neatly
wayside and take on the project And don’t go into this without a divide into good guys and cowboys.
management yourself ? It should sizeable contingency. There are always Sometimes builders get stressed
in theory save you money, but you unforeseen expenses. by life events, they get ill or they
are committing your self to maybe get divorced. And sometimes good
1,000 hours work (which you may builders get brought to their knees by
not have time to do) and you don’t cowboy clients who won’t pay on the
know shit from a tree when it comes LACK OF HELP slightest excuse. Or can’t pay because
to building, so you risk making some If you do decide to take on work, they have underestimated just how
horrendous cock-ups or at least either management or hands on expensive the whole job is.
paying over the odds for tradesmen skills, get some guidance. Don’t Often there are two sides to these
and materials. wallow about learning it all from You sorry stories and one thing you can
Finally, get a caravan, live on site Tube. There are good architects and do to minimise risk is to be a good
and undertake as much of the work surveyors out there and some highly client. More on this in Ch. 5.
as possible. Fine if you know your talented builders who you can lean on
way around a building site and are (OK pay) to keep you sane. It really COCK UPS
very practical sort, plus you have a helps to have a friend who knows the Every now and then, a builder makes
few years to complete this edifice. ins and outs of the trade. an almighty cock-up and lots of

40 13th EDITION l HOUSEBUILDER’S BIBLE


PITFALLS

work has to be redone. It’s not always The answer is of course that
obvious that it’s a cock-up until much CLOSING people love a challenge and making
later in the build programme, and THOUGHTS something hopefully beautiful AND
that makes it even more expensive to Finally, let’s touch on what you get valuable is probably one of the
rectify. out of all this. No one doubts that most exciting things we can do. In
Examples? You might miss out a undertaking major building work is a comparison, getting a promotion or
steel and the building starts to sag. huge hassle. Just how huge depends going somewhere exotic for three
Or maybe the drains didn’t get tested on how you do it and what you weeks looks a little trifling. The fact
on installation and you find they leak decide to do, but it’s invariably going that it’s a bit risky just adds to the
after completion. You might set the to take over a big part of your life. mystique of it all. We love beautiful
building out at the wrong level and The question is, is it worth it? houses and beautiful gardens
the finished roof ends up being much There is no guarantee that the – National Trust properties are
higher than the planning permission finished product will be worth seemingly always packed out, at least
demanded. A neighbour complains more than what you have paid in when I venture anywhere near them.
and you have a mighty battle on your cash. Let alone effort. There is no Wouldn’t it be great if we could add
hands. guarantee that you will actually like a little to the built environment in a
What the hell do you do then? It it as much as you had hoped. There positive way, and to build something
rather depends on the nature of the is no guarantee that you will even that truly reflects our aspirations?
building contract you have in place. feel a sense of achievement. You are Instead of moving into a second-
If the builder is responsible, then the just as likely to feel knackered and hand home or a developer’s idea of
builder has to pay for the rectification. broke. what we might want, here is our
Only for many small builders, they If your relationship was dodgy chance to make something that we
simply don’t have the wherewithal beforehand, it is likely to be well do actually want, to make our mark
to rebuild half a house at nil cost, so dodgy long before you finish, and on the sod, and to leave something
they declare bankruptcy. Hmm. indeed it may not even survive. behind more substantial than a
If you are project managing your Making tons of quick-fire decisions gravestone. Perhaps our little bit of
own build, there is no one to pin the without either of your really knowing immortality.
blame on other than yourself. This what it is you are deciding on is a
sort of situation is perhaps the very sure-fire way to stir up trouble and to
worst thing that can happen on a expose relationship cracks. Especially
selfbuild, short of maiming yourself when there is loads of money riding
in an accident. on it. Remember you are not just
These things do happen, and they making a house, you are hoping to
are not an insurable risk, but they turn it into a home and you also
are fortunately rare. The best way of really want it to be a happy home.
avoiding such events is to make sure Throwing money at a building project
you use professional help whenever won’t save a troubled relationship, it
you are working beyond your skill will blow it apart.
set. Anyone can set out a house, or So why do so many people
an extension, but anyone can get in undertake all these spectacular
wrong as well. Make sure key stages projects? Why don’t we all just stay in
like this are thoroughly checked bed and look at holiday deals on the
before a tool is lifted in anger. internet?

HOUSEBUILDER’S BIBLE l 13th EDITION 41


Chapter 4

HOUSE DESIGN is the trickiest


issue faced by every potential builder.
The central point that shouldn’t be
4
DESIGN
PLANNING CONSULTANTS
One aspect to look at is deciding what
you can actually get on the plot of
They can come later.
Planning consultants make their
living from maximising the gain
forgotten is that you want to build land you are assessing. What exactly from land and they tend to be better
the best possible house for a price you can the planning process deliver? It’s at it than those who make a living
can afford. Easily written, but how not always easy to get to grips with designing homes. The downside of
the hell do you do it? What is the this and knowing the ins and outs of using a planning consultant is that
‘best possible’ house? And how do the local planning scene can make a you can very easily get drawn into
you go about designing it? big difference. You might, for instance, a prolonged planning battle which
Questions abound. Is an architect be able to squeeze a second house may stretch on for years. If you
necessarily an expensive option? What on the plot? Or maybe get a bigger get too greedy, you are also almost
about using a designer who is not a one than seems obvious. If there is inevitably going to piss off most of
qualified architect? Isn’t it cheaper to a question mark over what you can your neighbours and that may not
use a package build design? Won’t the or maybe want to build, then first be a price you want to pay, especially
planners force me to redesign the whole consider hiring a planning consultant if you dream of living side by side
thing in any event? Where do you start? rather than an architect or designer. with them in years to come. You will

42 13th EDITION l HOUSEBUILDER’S BIBLE


DESIGN

be viewed as a property developer and plot all the existing buildings, very early in the whole mysterious
(hiss, hiss) rather than a cuddly, boundaries, levels, access arrangements, design process but you have already
heroic selfbuilder. Nevertheless, a trees, drains, neighbouring buildings reached crunch point: this is the
professional planning consultant can and any other information thought key moment when you start to
sometimes be worth their weight in to be relevant. On simple sites this commission the building and at this
gold if they manage to unlock value will cost around £500 + VAT, but point your decisions will have costly
in a parcel of land that wasn’t obvious expect to pay double this on large or implications down the line. I have
at the outset. complex sites. Bear in mind that there distinguished between a stage called
are sites where you have to undertake feasibility study and another called
DESIGN PROCESS a fair amount of clearance work and/ sketches of options. This is helpful
It is conventional to subdivide or demolition before you can even in understanding how one grows
the design process into a number undertake a site survey. A site survey out of the other but in reality there
of parts; some fixed points with forms the basis for a set of accurate is no hard and fast dividing line
known costs and others elastic in the plans: without it, you risk building in between them and how you and your
extreme. Below is a list of the stages the wrong place or at the wrong height. designer get from an empty page to
that you need to go through. You a full planning application is a very
don’t have to do it in this order (you FEASIBILITY STUDY/SKETCHES individual thing.
could for instance apply for building Assuming you have a plot and a Nevertheless, there tends to be
regulations approval before you have budget, the most important questions a clear path, which leads from the
planning permission) but it would be are: what can you build on it and site survey stage into a feasibility
frankly very strange not to do it this how much will it cost? It may seem stage (which, if you like, is about
way.
n site survey and feasibility study
n design process, leading to sketches
of options
n commission drawings for planning
permission
n submit plans for planning
permission (fee)
n try and negotiate positive planning
outcome
n do this over and over again till
outcome is positive
n detailed designs and specifications
n submit detailed designs for
building regulations approval (fee)

SITE SURVEY
Unless you are very confident of
your surveying and drafting abilities,
you should have a specialist (search
Topographic Surveys) carry out Architects often build models to help clients and planners visualise the house. This
an accurate site survey to measure one is the Denby Dale Passivhaus, written up in the 9th edition of the Bible

HOUSEBUILDER’S BIBLE l 13th EDITION 43


Chapter 4

eliminating impractical options) into are £100 for written opinions or £200 to present to the local planning
outlining practical solutions and, if you want to have a face-to-face department. Budget anything from
from there, plumping for your best meeting. £500 for pre-drawn plans through to
choice, The cost of this stage is naturally £20,000 for architect one-offs. This
Can you do it yourself ? I’ve met very open-ended. For many may look like an extraordinary chasm
some plucky souls, without any independent designers and architects, cost-wise, but bear in mind it almost
training or experience, who’ve done the early part of the process is the invariably reflects the amount of
just this, but it’s hard to do it well most challenging and the most time taken. If your site is challenging,
first time and their resultant buildings interesting and they would anticipate maybe with close neighbours to look
are almost always very unimaginative. spending around a third of their time out for, maybe in a Conservation
You can use books of house plans on this stage. The biggest variable is Area, that sort of thing, and you
for inspiration (despite the fact that you, the client. The more sussed out want to look at a range of options,
they’re mostly anything but), but do you are, the better your brief, and the then the amount of time spent in the
not expect to fit an existing plan on to shorter and cheaper this process will early stages will quickly escalate. If
your plot; the chances of it working be. you want or need to hire someone
without amendment are small and Even if you are planning to build for three months to look at many
amending existing plans can be as a kit house or use an off-the-shelf options, then expect it to cost tens of
expensive as starting from scratch. design, it is still worthwhile getting thousands.
My advice is to work with someone a professional designer to undertake For a detailed look at the
who knows what they are doing and some sort of study if only to sort out mechanics of applying for planning
has a track record of getting planning practicalities like drain runs, though permission, and the likely fees, search
permissions for homes similar to note that many package suppliers on Planning Permission adding
what you would like to build. have their own in house designers the name of your local council,
A professional at £75 per hour who will undertake this work, often who oversee the process. There are
upwards may seem a luxury, but they included within the overall price. a number of plans and drawings
will (or at least should) understand that the planners require and your
the issues and concentrate your PLANNING DRAWINGS chosen designer/agent should know
thinking on the relevant areas. There A good designer with a thorough this rigmarole backwards – indeed if
may or may not be any consultation working knowledge of local practices they don’t I would tend to be rather
with local planners at this stage, and trends will be able to help suspicious.
depending on how confident you you marry your ideas with the
or your agent feels. You may be able views of the planners, hopefully WORKING DETAILS
to get informal advice from the pre-empting any potential areas of If designing from scratch, it is
duty planning officer at your local conflict. Planning departments are conventional not to decide on all the
council, but this is likely to be very surprisingly diverse in their ideas, construction details until planning
basic. If you want a more considered often reflecting the individual tastes constraints are established. This
response to your proposals without of the chief planning officer, and is simply to avoid having to do
going through the trauma of a full knowing the whys and wherefores of things twice. However, construction
planning application, then consider local planning decisions is one way in details on conventional houses are
getting ‘pre-application advice’ where which local knowledge scores heavily remarkably similar and often the
planning officers will spend some over nationwide services. Whoever details can be lifted from previous
time considering your plans and you choose, they will have to produce jobs. On simple projects, the plans,
charge for the process. Current fees a set of planning permission drawings construction details and specification

44 13th EDITION l HOUSEBUILDER’S BIBLE


DESIGN

(known as the spec with a hard or builders who basically dispense conventional solutions, then make it
soft ‘c’ – the choice is yours) can all be with the working drawings stage. clear that you do not want unusual
contained on two sheets of A1 (840 x They work from little more than detailing and, as a result, a) your
592 mm) plans which would detail: the planning drawings which can working details should not cost too
n floor plans be littered with notes like ‘To be much, b) your house isn’t likely to
n foundation plan confirmed on site’ or ‘To Building be expensive to build and c) it is less
n drainage plan Inspector’s Satisfaction’; they are on likely to run over budget but d) it
n first floor joist layout site every day and they prefer to work won’t win any awards.
n roof truss/rafter layout out these details as they go along. The danger in trying to put a price
n N,E,S and W elevations (or eye- Once you’ve done it a few times, it to all this is that you may lose sight of
level views) works fine provided you stick to fairly the fact that, as with so many things
n section or sections through the standard solutions (they do). But if in life, you get what you pay for; if
middle of the house, showing you are new to this game and/or you someone knocks up a set of plans for
room heights, floor levels, wall can’t be there on site a good deal, you over a couple of weekends for a
constructions, joist depths, staircase then you would do well not to skimp few hundred quid, the chances are
dimensions on working drawings as these form, that your finished house will reflect
n window and door schedule (list of in effect, your detailed instructions to the fact. On the other hand, if you
joinery manufacturers’ codes) your builder. are interested in creating a wonderful
n text explaining construction Much of this detailed work and, one-off home, you’d be daft to skimp
standards (lots of B.S. numbers here). in particular, the writing of the on the design stages.
On more complicated jobs, there specification, forms the very heart of If you want to save money, you’d
may be extra plans perhaps running any forthcoming building contract. probably do better to build a smaller
to many pages, showing various If you want an element of protection house. There is a real conundrum in
complicated details like eaves or from the perils of badly executed here. People don’t want to be ripped
dormer windows. Up-market jobs building work, then a professionally off by some fancy-dan architect
tend to have the specification written written specification is worth far charging the earth. But bear in mind
separately from the drawings and more than any off-the-peg contract that the average architect earns less
a serious architectural practice may you might be tempted to sign. than the average plumber and that
write a specification running to The cost of producing working what you are hiring from them is
fifty pages or more. How much drawings for a one-off design may their time. A good architect can often
of this is necessary depends on a) be as little as a couple of thousand justify the fees because they actually
the complexity of the work and b) pounds if it all sticks to tried and add value to the finished product.
the attitude of the client. Rookie tested solutions, However, this part If an architect or designer can do
builders would be well advised not of the design work can also cost ten the business, then the thousands of
to attempt anything too unusual times as much for unusual houses, as pounds they charge is money well
first time around, in which case unusual features take time to design, spent.
the standard two-sheet plans are not to mention build. Here you might
probably adequate. Many experienced expect workshop joinery, arched STRUCTURAL ENGINEER
subcontractors never look at plans in openings, fancy staircases, patterned Having been called in during the
any event – quite a few can’t read – brickwork. Generally expensive ground investigation stage, if the
and complex plans could be wasted features are also expensive to design. designs take on any non-standard
on many. If you are building to a tight features, the structural engineer may
I know of a number of small budget and are happy with have to make another appearance. All

HOUSEBUILDER’S BIBLE l 13th EDITION 45


Chapter 4

beams, lintels, roofs and foundations


(the so-called structural elements)
areas separately. One-off housing is
really too small to justify the expense
PLANNING
of a building require proof that they of all these extra professionals and PERMISSION
are sufficient to do the job asked much of the work, designed and Planning permission and building
of them. Standard solutions to installed by the various tradesmen, regulations are two big hurdles that
standard problems are regarded as is consequently very unimaginative. every would-be housebuilder will
tried and tested, but anything out The degree of competence varies have to jump. They are complex
of the ordinary will require ‘proving’ enormously: many act as much as and not easily mastered, and many
to the satisfaction of the building salesmen as designers and most building professionals have bald
inspector. A structural engineer will make no charge provided you buy patches on their heads where
calculate the forces applied to beams their product, which is all very well they have torn their hair out from
or foundations and come up with but it makes you very vulnerable to negotiating paths through or
adequate solutions. If the ground you uncompetitive practices. around the maze of regulations
plan to build on is at all dodgy, then It’s really a very difficult area and precedents that govern our
an engineer will be required to prove to negotiate, even for hard-bitten construction activities. For a rookie
your foundation design; also many professionals. Many architects are builder this can all seem rather
very ordinary situations like using not qualified to give advice on, say, daunting, especially when you’re
steel beams or opening up a loft space lighting design or interior decorating. not even clear what the difference
require structural proving. If you are happy with tried and tested is between planning permission and
Detailed drawings and structural solutions to problems then you will building regulations – or regs as they
calculations (if needed) are presented be well advised to keep it simple are known in the trade, as in ‘God,
to the local council’s building control and deal directly with your chosen there’s been another bloody change
department for examination. contractor; if, however, you want to in the regs.’ The regs are dealt with
explore the many and varied options later in this chapter – first planning
SUB-DESIGNS open to you, then you could do worse permission.
Design and specification of finishes than read the rest of this book...
is often left to the client or builder WHAT EXACTLY IS IT?
to sort out and this is more often IN CONCLUSION Various Acts of Parliament (notably
than not passed down the line to Design and professional expenses are the Town and Country Planning
the tradesmen involved on the job. the hardest areas to budget, because Acts) require that local authorities
Therefore, the plumber designs the they are so variable. To a large extent should control what can be built
central heating system, the electrician they are dependent on the brief that where, and how buildings (and
designs the lighting, a kitchen you, as a client, present to the designers. land) should or should not be used.
specialist will take over design of the An off-the-peg house plan can be Planning permission is not concerned
kitchen. This sort of arrangement purchased for a few hundred pounds with how you build – that’s the
obviously works, as it is what happens but will very probably require a great building regs – nor with who owns
in 90% of homes built, but arguably it deal of alteration to fit both the site and the land on which you wish to build.
could be much better co-ordinated by your ideas. In contrast, an architect will There are many small construction
a single designer. probably charge between 3% and 5% projects that do not require planning
On large commercial contracts of the overall build costs just for the permission but something of the size
specialist professionals who draw planning drawings for a house. It does of a new house invariably does.
up a specification and then arrange not follow that the off-the-peg plans The power-that-bees in this
quotes from it deal with all these are necessarily better value. respect is your local council. Not

46 13th EDITION l HOUSEBUILDER’S BIBLE


DESIGN

your County or Metropolitan then you are inviting the planners to conservation department who are a
Council, but your District or City design the house for you. This they law unto themselves as to what they
council. In Scotland and N Ireland won’t do, but what will happen is like and dislike. You can usually guess
the system works slightly differently, that they will get in their minds all at where they will be heading: they
as it does in National Parks, but kinds of constraints that will severely don’t like plastic windows or satellite
then they wouldn’t want to make limit your options: ‘You must do...’ dishes or anything in fact which
it too straightforward, would they? and ‘You can’t have...’ Like our legal smacks of being common. They do
It gets worse. Officially, the licence system and our parliament, our like lots of natural materials and well
to build is granted by the elected planning system is adversarial; you designed finishes. Even if you have
councillors, but every council has a may not get exactly what you want employed a very fancy architect, and
full-time planning department staffed out of it – most planning decisions are prepared to pay good money
by planning officers, and these are are the result of compromise – but to sail through the conservation
the people who actually deal with you stand a far better chance of hoops, you can still expect to take
planning applications. Indeed, the getting more of what you want if you about twice as long to get a planning
chief planning officer has powers choose the battleground on which to permission because the conservation
to make certain decisions off his fight; i.e. submit plans with minimal department is always overworked and
or her own bat. Even when they reference to the planners. Getting the way behind schedule. Be patient.
choose not to exercise these powers planners too closely involved before
they make ‘recommendations’ to submitting your application can be SUBMITTING AN APPLICATION
the committee of councillors as to seen as ceding this battleground. The mechanics of submitting an
whether an application should be In the past few years, planning application are straightforward but
accepted or refused. The planning departments have been under cost time consuming. The application
committee rarely goes against the constraints and are under pressure to consists of a number of forms that
recommendations of its planning maximise income. One clever ruse you have to fill out, together with
officers. they have come up with is charging your plans and your payment. It is
for pre-application advice, a service now routinely done online. You will
FOREPLAY they were once happy to dispense for require (for something as complex as
You don’t have to have any free. There is no compulsion to take a new house):
contact with the planners before such advice and it may be that your n location plan (taken off OS map at
submitting your application, but it planning application is not terribly a scale of 1:1250)
is commonplace to do so. Tactics are controversial and that the planners n existing site plan (boundaries
involved here and there is no such will be delighted with your ideas. outlined in red) at 1:500
thing as a correct way of going about But there is every chance they n proposed site plan – showing
it – every case stands on its own. On won’t be, and that pre-application position of house, garage, driveway,
the one hand, you don’t want to be advice is often worth paying for. access
faced with the expense of drawing n layout plans and elevations of any
up plans only for the planners to fall CONSERVATION OFFICERS existing structures on site
about laughing at the very thought There is a whole extra raft of n layout plans and elevations of
that anyone could build on that piece planning you may have to submit to proposed dwelling at 1:100 or 1:50
of land; on the other hand, if you if you are building in a conservation n details of materials to be used
wander into the planning department area, or close to a listed building. n details of trees to be felled.
with questions like ‘What sort of Here you will come under the n Design & Access statement
house could I build on this spot?’ auspices of the local council’s In addition to these, it often helps

HOUSEBUILDER’S BIBLE l 13th EDITION 47


Chapter 4

Some Planning Terms Explained


1 OUTLINE 2 FULL APPLICATION 3 APPROVAL OF 4 RENEWAL
Often used by landowners who As its name suggests, a full RESERVED MATTERS Planning permission can be
are trying to find out whether planning application seeks to This is used to convert outline renewed, but only if consent has
development would be acceptable approve both the principle and the permission to detailed. There are not expired so this route is used
in principle without going through details of development. It lasts for often matters which are flagged up to get an extension to an existing
the hassle of having detailed plans three years. However, it usually with an outline permission which permission. If the permission has
drawn up. Outline permission to comes with numerous conditions have to be dealt with when the full lapsed, then a new application has
build is what turns a garden or a attached which each have to permission is granted. to be made.
field into a building plot; getting be agreed on before you can
it makes you seriously rich but complete the building.
it doesn’t, on its own, allow you
to build. Outline permission lasts
for five years, but a detailed
application must be agreed within
three years or else the permission
lapses.

5 RELAXATION 6 AMENDMENTS 7 EXTENSIONS /


If you have one too many If you purchase a plot with detailed CONVERSIONS
troublesome conditions, you can permission for a house that you If your building project involves work to
apply to have them removed at don’t actually want to build, you an existing structure, you may not need
a later date. Don’t hold out too may be able to amend the plans planning permission. Phone your local
much hope. without submitting a whole new council’s planning department and ask
application. There is a small their advice. Or check the government
website www.planningportal.gov.uk for
charge for amendments but if
planning in England & Wales. Scotland
your changes are substantial the and N. Ireland have their own sites.
planners may not accept them and
you’ll be back to square one.

to have three-dimensional bird’s-eye two so they can see just how the to own land in order to apply for
view drawings (isometric projections), development sits in relation to what planning permission over it but you
which show how the house fits with is already there. are required to notify the owner of
its neighbours. Planning officers In England and Wales, the your intentions.
and committee members like a nice Planning Portal website is the place
drawing, just like the rest of us, and to go for the lowdown (search on FEES
apocryphal evidence suggests that Planning Portal). I don’t know Outline fees in England in 2019 are
they are likely to be better disposed what happens in Scotland and N £462 for each 0.1 hectare (or 1,000m2
towards a well presented application. Ireland, but planning applications which is a small plot) of site area
Some people even go to the trouble are seemingly headed into the online applied for. Detailed permission for
of building scale models. This is world. one dwelling is also £462 and if you
probably over the top for routine apply for outline and then move on
applications but if there are close OWNERSHIP CERTIFICATE to a detailed application it will cost
neighbours who will be affected You also have to fill out a form you twice £462; interestingly, when I
by the new buildings, it does help stating ownership of the land in first published this book in 1995, the
to have a contextual drawing or question. You don’t actually have fee was £160, so it has nearly trebled

48 13th EDITION l HOUSEBUILDER’S BIBLE


DESIGN

in 24 years. The only way to avoid do), then you must be prepared to REASONS FOR REFUSAL
this double fee is to go straight for compromise hard. Eventually, the There can be any number of reasons
detailed permission, which involves planning officials will either grant why planners take a negative view of
more costly drawings: in some planning permission (unlikely your proposals. In rural districts the
situations this is a risk worth taking on a new house) or refer it to the land is zoned (via the ‘local plans’,
but if the application is likely to be planning committee of the local which you can inspect at your library
controversial, just go for the outline. council who, typically, meet once a or online), and if you are applying to
The current fees are set nationally and month. This referral will come with build in a non-building zone then
can be viewed online at the Planning a recommendation either way, which you’ve got your work cut out trying
Portal. the committee habitually accepts. to get anywhere. Assuming they
accept that the site is suitable for
CHANCES OF SUCCESS development, here are several reasons
After submitting your application, the CONDITIONS why they may still not play ball:
planners then go to work on assessing Planning permission is now usually n lack of adequate parking
it. These days they all seem to work in granted with conditions attached; if n can’t turn a car around on the hard
teams, and this makes it even harder you are Sainsburys wanting to build standing
to get any sense out of them as to a supermarket, these conditions may n overlooking neighbours
how they think the application is be something big, but for a one-off n roof too high
progressing. They are meant to take housebuilder they are not likely to n house too big for plot
eight weeks to reach a determination, be terribly onerous though in some n not enough garden
but in practice it depends on how parts of England additional money is n development out of keeping with
busy they are – it can all take much being asked for ‘planning gain’ – this neighbourhood
longer. This in turn has led to pressure can run to several thousand pounds. n wrong position on the plot
from central government and targets At time of writing in 2019, central n don’t like your choice of materials
have been set to turn round planning government has instructed local or overall design.
applications more quickly; all that councils not to charge selfbuilders I could go on. Suffice it to say that
has happened is that applications are any planning gain fees but this has many of these reasons are perfectly
more likely to be rejected. As recently become a hotly disputed political justifiable and if you weren’t so greedy
as 2002, only one in five applications topic and it could change during the and pig-headed you would be able to
were rejected; today it appears to be next parliament. see the sense in them. But applicants
around one in three. Which only However, the conditions they attach are apt to feel aggrieved whenever the
makes your task ever more daunting. to a successful planning application outcome goes against them.
Don’t despair. seem to be growing ever more taxing
Keep ringing them to find and they now charge £34 to discharge LOBBYING
out what’s happening to your each condition and they can take eight You don’t have to take the views of
application; sooner or later they weeks or more to decide on whether the planning officials lying down.
will reach some sort of provisional your conditions pass muster. My Many people have taken to lobbying
verdict and this is the point at latest build included conditions about their councillors to overrule the
which negotiations start. If they are garden fencing design and methods recommendation for refusal. This is
completely hostile, then you may do of securing bikes, not to mention the real grass roots politics and in many
better to withdraw the application more usual bricks, joinery and roofing. parts of the world sums of money
and start anew; if they express Fortunately, I wasn’t hit with any would change hands in order to get
some reservations (they usually payments for planning gain. planning permissions through on the

HOUSEBUILDER’S BIBLE l 13th EDITION 49


Chapter 4

nod, but in Britain, of course, we don’t then there is no reason why you can’t undertaken by any lay person capable
do that. I don’t wish to sound too go to appeal on your first application of using pen and paper, although a
sarcastic because, by and large, this is whilst simultaneously submitting thorough understanding of planning
true – people tend not to go into local a new one. Surprisingly, there is no issues will obviously stand you in
politics for money, but they do have charge for making an appeal but it good stead.
a tendency towards self-importance does take time, around six months, For many people, it will be cheaper
and many are not averse to a little and many people can’t wait that long, and much quicker to submit a new
bit of flattery. This is the network at especially if there’s borrowed money planning application. When an
work: it all depends on personalities riding on it. Appeals are presided application is refused, the planners
and who you do or do not know. over by an independent inspector, have to state grounds for refusal. In
Even if you don’t get very far often a QC, sometimes an architect, an ideal world these issues could have
with councillors, you should at least and on small projects like individual been sorted out before the application
consider lobbying your neighbours. housebuilding the usual way of ever came before the committee,
A couple of letters from neighbours going about it is to produce written but sometimes it takes a refusal to
saying positive things about your evidence. Basically, you must write actually bring the problems out into
plans is worth a lot at a planning your side of the story and explain the open. Armed with refusal reasons,
committee meeting. However, there to the inspector why you think you you can make suitable amendments
is every chance that your neighbours should have been granted planning in your next application and,
may not feel as enthusiastic about permission in the first place. On the provided you can genuinely sort out
your plans as you do and this tactic due date the inspector will visit the the issues, you should have a much
can backfire. In order to increase your site and shortly afterwards they will better chance of gaining planning
chances with neighbour support, it make their ruling known. That’s it. permission, although the outcome
does of course help to have made There are alternative methods of is likely to be some way from your
contact with the said neighbours appeal, notably using the informal original ideas.
and shown them your plans. I went hearing method, which gathers all Changes to the planning system are
so far as to hold an open day in the the interested parties together to always being mooted but all that
old warehouse I wanted to demolish discuss the issue at hand, but the ever seems to happen on the ground
to make way for our home, and written representation is the simplest is that the whole process becomes
had a model on display to show and least time-consuming (as well ever more troublesome and time
the neighbours what we intended as cheapest, if you are paying a consuming.
to do, and why. It may have helped, professional to act for you).
although we still garnered objections. Only one in three appeals succeed
and from my limited experience it
APPEAL V NEW APPLICATION is difficult to predict the outcome BUILDING
If you shoot your bolt and, despite in advance, so you are taking a big REGULATIONS
all your lobbying, your application gamble in going to appeal. You can As mentioned at the beginning of
is refused you are faced with three hire a professional to make the appeal the previous section, the building
choices: for you, but this will be expensive regs are a different matter altogether
n give up and may not add to your chances. As from planning permission. As with
n submit a new application there is no further drawing work to planning permission, there are a
n appeal. be undertaken – you can’t amend your number of small works that are
The first is the cheapest but it doesn’t plans between first refusal and appeal exempted from having building
get you very far. If you want to persist, – the appeal process can easily be regulations applied to them, but

50 13th EDITION l HOUSEBUILDER’S BIBLE


DESIGN

again a project as large as a house will your appointed building inspector BUILDING CONTROL FEES
invariably fall inside building control. – which, by and large, means doing Local authority fees are no longer
Once again, the online Planning as he (occasionally she) says. If you set nationally. However the fees
Portal is the place to go for up-to- stick to conventional methods of for new houses tend to cluster
date information about building construction this is generally not too around the £700 mark. My local
control. difficult. However, expect problems authority charges £180 + VAT for
Each local council has a building if you are inclined to unusual plan approval and an additional
control department that employs techniques. £387 + VAT for site inspections
building inspectors, who both assess The building regulations actually on new houses up to 300m2
plans submitted to them and visit consist of a number of separate internal floor area. With smaller
sites to ensure that the plans are booklets known as Approved works like extensions, the fees
actually put into practice. The plans Documents, generally referred to are correspondingly less. VAT is
submitted to building control are as Parts. Each part is given a letter charged on building control fees
more detailed than those used for and currently the English & Welsh for new dwellings (unlike planning
gaining planning permission and so versions of these run from Part A application fees) and is generally not
this work is usually commissioned as (which deals with Structure) to reclaimable.
an additional service after a successful Part R (Broadband). You can also Note that warranties for newbuild
planning application. download all the parts for free from homes are also administered by
Alternatively, you are now able to the Planning Portal website. Building building inspectors, but serve a
use a private building inspector to regulations are a devolved matter, rather different function. More on
oversee your job and to negotiate a so Scotland, Wales and Northern warranties in Ch. 5.
fee directly with them Ireland have their own building
It is worth noting, however, regulations, which are very similar but
that much of the detail needed to employ different labelling systems.
satisfy building regulations is to do The building regs are technical
with written specifications rather publications and most builders have PARTY WALL ACT
than drawings and that much of never clapped eyes on them; instead There is more to the red tape than
this is standard to all housing. they rely on their designer to have just planning permission and building
Phrases peppered with BS numbers satisfied the regs in the drawings regulations. If you are lucky these two
and sentences finishing with ‘to and their building inspector to put will be the only bits you encounter
the satisfaction of the building them straight if the situation on site but there are other things to consider
inspector’ are commonly placed in requires it. as well. Close to a neighbour? Within
specifications precisely to meet the The building regs are always six metres? You may have to treat
regs. Furthermore, what is often the getting tightened and their scope with The Party Wall Act, which has
most important part of an inspector’s is forever being increased. What been in effect in 1996 throughout
job, checking that the foundations started life as a motley collection England and Wales – prior to that it
are adequate, can really only be done of bye-laws, which attempted to was restricted to London. The idea
on site. eliminate jerry-building practices behind this piece of legislation is to
Getting approval for building in Victorian times has grown into protect the neighbouring properties
regulations is not a political matter a sophisticated instrument of social from damage when your construction
and there are no committees to go engineering, most obviously in the work is carried out. The Act is very
before or councillors to lobby. You introduction of disabled access specific about just where and when it
just have to reach agreement with regulations in 1999. comes into effect.

HOUSEBUILDER’S BIBLE l 13th EDITION 51


Chapter 4

If your foundations are to be long and involved process, as the two (pronounced Whizz-Ee-Wig)
deeper than your neighbour’s, you surveyors have to reach agreement stands for What You See Is What
must observe the Party Wall Act about just how the work should be You Get, and it describes perfectly
provisions if you are within three undertaken. Your neighbour cannot the attraction of the package-build
metres of those buildings – note not prevent you undertaking this work philosophy in that you know in
boundary, but buildings. In addition but they can delay you. If the next advance what your home will look
to this, there is a provision which door building is split into flats, like. Furthermore, you know you’ll
states that if you are building much then you have to entreat with each have a conventional, re-saleable
deeper than the neighbouring house’s occupier individually. Doesn’t that property because it wouldn’t be
foundations, then you may still be prospect fill you with joy? The Party on offer if it wasn’t. This is a very
affected by the provisions of the Act Wall Act doesn’t apply in Scotland or comforting and reassuring selling
at a distance of six metres. You draw N Ireland. If you want to know more, factor for selfbuilders.
a line at 45° down from the bottom then search on Party Wall Act and go Package builds will almost certainly
of your neighbour’s foundations and to the Gov.uk site. not be the cheapest route to a
if it strikes your projected foundation finished house: in fact, as reference
works within six metres, then Ka to the next section of this chapter
Boom – you are in the net. It’s likely will show, they are often considerably
to be pointed out to you when you CHOOSING A more expensive than the route taken
put a full planning application in. DESIGNER by volume developers. However, they
If the Party Wall Act does come There are two distinct approaches do offer the novice housebuilder
into effect – and in many urban areas to house design. One is to hire a something that few architects ever
it is likely to – you are obliged to designer (be they architect or not) do and that is a price in advance –
notify your neighbour and to assuage and to let them get on with the though I should add that in reality
their concerns that your building task of melding your ideas with they only offer a price for the parts
work may damage their property. their expertise; the other is to of the house they actually supply and
Often this can be done with an approach a package build company erect, which is often no more than a
informal exchange of letters but, who specialise in selling standard quarter or a third of the total building
if the neighbour is worried about houses, which can be adapted to costs.
what you are up to, then he or she particular needs. In some ways the Take a hill-trekking holiday in the
is entitled to hire, at your expense, differences are not that great – after Himalayas as a comparison. Many
a qualified structural engineer or all both involve building houses – people would want to go on such a
surveyor to verify your plans. A Party but conceptually it’s the difference holiday first time with a package deal,
Wall Surveyor starts at around £500 between painting from scratch and but having done it once, would realise
and this figure will rise if the work painting by numbers. that it was not so difficult to organise
gets very complicated. and that, if they ever went again,
You must state whether you PACKAGE BUILD they would go on their own, have
propose to strengthen or safeguard Whilst the creative types would more independence and save money.
the foundations of the building or probably be appalled at the idea that Housebuilding is not so dissimilar;
structure belonging to the adjoining you could buy an off-the-peg kit the comfort of having a professional
owner. Such aspects need to be house, package-build does have one organisation behind you in your first
considered at the design stage of the big advantage going for it and that venture and a feeling that you know
project to avoid unexpected costs is WYSIWYG. For those not up what the final bill will be is worth a
arising. This can, naturally, become a in computing circles, WYSIWYG lot more than the vague hope that

52 13th EDITION l HOUSEBUILDER’S BIBLE


DESIGN

you just might be saving money. If you happen to know somebody why you shouldn’t organise a parade
What buyers of package building in the trade, then there is every of talents so that you can make an
services should realise is that they are chance that you’ll appoint them informed judgement.
not getting free design. Rather, the (however inappropriate) just because Red light districts, blind dates, and
design work is being paid for within it takes away the difficult task of beauty contests – it’s all getting a bit
the package price. The package build finding a compatible stranger. Many far away from building houses. So
companies all employ architects people without any contacts will, who are all these people?
or designers and these people get however, be lured into the package
paid just like their freelance cousins, build option just because it’s there. ARCHITECT
and who do you think pays their Eyeing up package build companies Use of the very word architect is a
salaries? Now the logic of using is like visiting Amsterdam’s red light touchy subject. The general public
pre-drawn house plans is that the district: you can trawl up and down thinks an architect is someone who
whole design process is reduced to all night looking at the wares on offer designs houses but the title architect
a matter of a bit of photocopying but you don’t have to consummate is, in Britain at least, protected in law,
which should be much cheaper for all any deals if you don’t like what’s on just like the titles doctor and lawyer.
concerned. However, British planning offer. However, involving freelance To be qualified to call yourself an
restrictions being what they are today, architects and designers is more like architect you must have completed
there are virtually no uncomplicated Tinder: if you don’t know them then seven years’ training and passed all
building plots on which you can it is akin to going on a blind date. the relevant exams; an architect will
plonk an off-the-peg house: the You may or may not end up in bed regard him or herself as the natural
houses all require ‘adaptation’, which together but you have to go through choice for a commission such as
is tantamount to admitting that the a courting stage just to find out designing an individual house and
brochure designs are just sales hooks where you want it to end up. It’s a most architects love to take on such
to entice you, and that the actual time-consuming and involved process projects; trouble is, they may be rather
house you have built will have had and the outcome is just as likely to high falutin’ for your simple project
a fair amount of additional design hinge on personal – not to say sexual and – worse fears – expensive. Just
work done to it in order to get it to fit – chemistry as it is on the designer’s how expensive an architect is depends
both your ideas and the limitations of suitability and competence to carry on how desperate they are for work
the plot. This extra work is invariably out your brief. but what can’t be denied is that
charged and you may well end up Of course it doesn’t have to be thus. architects design only a small fraction
having a package build company If you’re the professional, organised of new homes in this country.
designing your home from scratch. type, there is absolutely nothing to Traditionally, architects worked
Which begs the question ‘Why prevent you having a sort of beauty on a percentage fee basis; 3% of the
start with an off-the-peg design at contest between three or four contract value to prepare plans for
all?’ In theory, a freelance architect designers, in which you interview planning permission, another 3%
or architectural designer should be them and ask to see photographs of for working details and doing the
able to provide a similar service to their previous work, ask for references tendering work and yet another 3%
a package build designer and really and even ask them to prepare a for administering the contract and
shouldn’t cost any more. But, for quotation for design work, and (if you are lucky) certifying that the
many people, the prospect of hiring possibly building work as well. The work has been done correctly – that’s
a freelance is off-putting and not fact that architects hate this sort of 9% in total for the full works. Some
just because they think it will be thing is by-the-by: you’ll be paying architects charge more than this. If
expensive. their bills and there is no reason at all they have a good reputation they can

HOUSEBUILDER’S BIBLE l 13th EDITION 53


Chapter 4

Meredith Bowles,
whose practice, Mole
equivalents, they are able to call
Architects worked themselves Chartered Architects.
our scheme through The RIBA runs a nationwide Client’s
planning and detailed Advisory Service, which will supply
design. Pictured here a list of suitable local practices who
inspecting our brick are actively looking for your sort of
panel, which the
planning conditions
business.
insisted on. There is a collection of architects
(known as the Association of
SelfBuild Architects or ASBA) who
got together to cater specifically
for selfbuilders and although as
a collection of individuals it can’t
guarantee excellence, it has done
some innovative marketing –
including quoting for architectural
services on a unit area cost basis.

ARCHITECTURAL
TECHNOLOGISTS
There is a second body, the
Chartered Institute of Architectural
Technologists, which issues a quite
separate qualification (architects
would say it is a lesser one), which is
easily charge a total of 15% or more. loads of small architectural practices relevant in the field of house design.
But they don’t have to work on a that work for rather less. Bear in Traditionally this group was thought
percentage basis. mind that architects fees are nowhere of as draughtsmen, beavering away
A newly qualified rookie might near as high as equivalent professions in offices, turning architect’s sketches
cost less than a technician – say like medicine, law or accountancy, into working drawings, but many of
£300 per day – whereas a top-notch, and the typical architect earns no them work in practice independently.
in-demand architect could go out more than a good on site tradesman. And some of them are very good.
at that much per hour. One of our Qualified architects are required CIAT oversees and publishes a
internationally renowned architects to register with the Architects Directory of Practices and a regional
quotes £70,000 for designing and Registration Board. There is a body list of self-employed members
administering a one-off house – more called the Architects Registration interested in taking on new work.
than many humble abodes cost to Council, who you can call to check Search on CIAT.
build. That’s exceptional – although whether someone who is calling
the house probably would be as well. themselves an architect is fully BUILDING SURVEYORS
But fees of £30,000 plus for up- qualified. Chartered building surveyors
market projects costing a quarter of If they then choose to join carry out lots of good design work.
a million or more to build are now the Royal Institute of British The problem is finding them.
commonplace. But there are still Architecture (RIBA) or its Celtic As a professional body, they are

54 13th EDITION l HOUSEBUILDER’S BIBLE


DESIGN

administered by the Royal Institute DESIGN AND BUILD CAD PACKAGES


of Chartered Surveyors (known as This is a method of building that Computer-aided design (CAD)
the RICS) but this amorphous group straddles the traditional distinction has been around for decades but
includes every flavour of surveyor between designers and builders. In architects tend to look down their
including estate agents and building some ways it is similar to package noses at it all: they continue to sketch
inspectors. The key is to find the right build in that you are faced with stuff on paper in the time honoured
grouping – the Chartered Building an all-in-one solution but, unlike fashion and then hire a ‘CAD
Surveyors. If you ask for a list by package build, there are usually no operator’ to turn their works of art
post, you’ll wait a long time but again pre-drawn plans on the table, so into engineered drawings.
you can search by region and area of in other respects, design and build Operating a full blown CAD
expertise on the RICS website. is more akin to hiring a freelance package (the market leader is
designer. AutoCAD) is no mean feat but what
MANY OTHERS In fact many design and build has changed recently is that there
There is in fact no requirement for businesses are based around the skills are a number of really very cheap
anyone to have any qualifications to of a designer who also happens to 3D software products around, which
design houses. The country is stuffed run a construction business. It is anyone can pick up and play around
full of unqualified but nevertheless hard to generalise because individual with on their home PC. An awful
competent designers. Some may businesses will go about things in lot of architetcs now use SketchUp
have undertaken some architectural markedly different ways. which is free in its simple version but
studies but never qualified, some I worked in a design and build costs when you want the bells and
may have qualifications in other business for ten years from 1986 to whistles.
related fields, notably structural 1996 and if anything characterised
engineers, quantity surveyors and this particular business it was the DIY DESIGN
building inspectors. And there are wide variety of projects taken on; You can, of course, go the whole hog
whole rafts of individuals who are some clients used us just as designers, and design your own home. It’s not
‘qualified by experience’ – often some just as builders, most as both. as unusual as all that and it’s not
designer builders – who do perfectly Some clients subjected us to beauty desperately difficult to undertake
good work, some of it every bit contests, some to competitive planning drawings. I once wrote
as good as professional architects tendering, some to both of these and an article for ‘Homebuilding &
turn out. Obviously these designers some to neither, preferring to work Renovating’ magazine about a 77-
are not regulated in the way that in an atmosphere of trust all the way year old grandmother who did just
architects and surveyors are and from initial contact to completion of that, having sacked her architect
you should be aware that if you building work. because he kept trying to ‘improve’
hire an unqualified designer they Unqualified designers will tend her plans. She knew what she wanted
are unlikely to carry professional to be a little cheaper and will also and successfully undertook all the
indemnity insurance; on the other tend to be a little less imaginative, negotiations with the planners.
hand, unqualified designers are likely which can be a good thing if you However, there is a large chasm
to steer you down a route where want to build cheaply. Engineers of knowledge between doing
insurance is handled by third parties, and surveyors in particular have outline sketches and filling in all the
such as the NHBC, so this is not a reputation for designing to a construction details, a chasm which
actually as big a risk as you might cost, something which has been can only realistically be filled by
imagine. You pays your money, you known to elude more up-market training and/or experience (preferably
takes your choice. architects. both). Most DIY designers get an

HOUSEBUILDER’S BIBLE l 13th EDITION 55


Chapter 4

experienced professional on board at n specifying inappropriate materials talked to an architect that I knew,
some stage if only to satisfy all the and systems, then being incapable after explaining to him that,
building regulations – as indeed did of devising professional solutions unfortunately, I couldn’t afford to
my intrepid lady. to overcome the technical problems make use of his services. He was
The problem with DIY design is created most understanding and offered to
that it’s difficult to get pleasing results n lack of knowledge of basic check over my ideas and costings,
if it’s your first time. Design sense construction techniques with no charge to me.
and spatial awareness are not skills n no understanding of buildability ‘The end result? Richard (the
that can be quickly or easily mastered n unwillingness to accept budget architect) has designed a far better
and you have to be supremely constraints extension, organised and put in my
confident in your own abilities to be n inability to manage the design planning application, organised a
entirely happy with your own work. process so that information is often good discount with suppliers and
Fine if what you were producing was late or inaccurate. has reduced my costings by some
just a set of drawings but, of course, ‘What is so disappointing is £8,000. He is going to supervise
it’s not, it’s a recipe for a real, live that, in my opinion, the standard of the work, thereby ensuring that I
house. professionalism among architects is comply with all regulations and
People are naturally afraid that they still falling,’ he wrote. that any labour I hire fulfils his/her
will be building an ugly or impractical Harding’s is not a lone voice. Here’s part of the deal. Thank goodness for
structure and so the vast majority are selfbuilder Rick Hughes’s assessment architects!’
keen to get some professional opinion of the service he received on his Well this game of architectural
on board. Most architects expect to project in Swansea: ‘I would never use ping-pong could go on all night. It
feed in ideas and improvements to an architect again, this practice has seems you either love ’em or hate ’em.
your initial ideas and most people proved difficult, frustrating, incredibly What would be fair to say though is
reckon that they are very good at this slow, and, although very good on that there is a significant minority of
and welcome the added input. But conceptual items, struggle greatly architect/client relationships that are
not everyone. once things leave the drawing board bedevilled with problems and that if
There is in fact a groundswell and enter the real world.’ you choose to work with an architect,
of opinion that rates building Hmm. Doesn’t look good, does it? choose very carefully.
professionals in general, and But in defence of architects I hear of In my own experience, I think
architects in particular, as nothing less rather more successful relationships much of the problems stem from
than a cancer working to destroy an than failures. Indeed I have heard getting architects to do the first bit
otherwise simple and healthy process many selfbuilders go as far as to say and then either winging it from then
called building. Here’s building that their project would have been on (in order to save money) or hiring
pundit Colin Harding quoted in hell without an architect on board someone cheaper to finish off the job.
‘Building Magazine’ in 1999: and that using one had got them a far The result is a bodged project with
‘Very few architects have the nicer house for much less money. workers on site spending far more
construction management skills to Try this one for a counter blast time head scratching (which of course
justify their claims to be team leaders. from home extender Marc Arnall: costs in other ways) and getting into
Most of the contracts we work on ‘I decided to build an extension long convoluted arguments about the
suffer to a varying degree as a direct and, in order to save money, I final bill because the job was never
result of the designer’s failure to do wanted to use a technician to properly designed in the first place.
their job properly and professionally. draw the plans as opposed to I reckon architects are usually worth
Typical lapses are: using an architect. Meanwhile I every penny they charge.

56 13th EDITION l HOUSEBUILDER’S BIBLE


DESIGN

THE SELECTION PROCEDURE


Building is one of the ultimate
OFFSITE walls. In Scotland, they love timber
frame and it accounts for the majority
network businesses, there being very CONSTRUCTION of new houses there. In the rest of
little formal long-term work around When arranging the running order Britain, builders are of course happy
so it is not surprising that your for the ‘Housebuilder’s Bible’, I to use timber in the roof and usually
designer should arrive on your (yet to initially thought that I should put for the floors above ground level so, in
be) doorstep by word of mouth. But this section into the superstructure a sense, even these houses have some
bear in mind that all designers have chapter, up there with walls and timber framing in them but masonry
tastes and quirks that are individual roofs. Because, if you buy a timber walls have been the preferred way of
to them and even the simplest house frame kit, then it’s basically the building homes since we ran out of
commission is likely to receive superstructure you are buying. Logic forests around three hundred years ago.
radically different treatments. Make would seem to dictate that that’s Timber frame houses in Europe
sure that you can at least live with where it should go, and indeed there have developed down a very different
your chosen designer’s ideas by taking is a piece on timber frame as an inner path to North America. North
a look at their previous stuff. And skin up there in Chapter 7. If you Americans build their timber homes
you really should, if possible, talk to want to know what a timber frame on site: we tend to make them in
their previous clients. If you have very wall is, or what a Structural Insulated factories, far away from the building
particular ideas yourself, then you Panel is, look in that Chapter. And site, and consequently timber frame
would be well advised to seek out a there’s a brief discussion of the merits housebuilding is a very different
like-minded soul. of lightweight versus heavyweight process to ‘normal’ housebuilding.
One of the keys to hiring an building in the Green Chapter, as It’s harder for builders to ‘add
architect or designer and not paying well. value’ by using timber frame or SIPS.
through the nose is to be very upfront But I believe that the main reason By taking much of the labour input
about money from the first meeting. for choosing a timber frame package off-site and putting it into a factory,
Conventionally, architects like to work build (and the same goes for its close builders are in effect doing themselves
on a percentage fee basis but there cousin, Structural Insulated Panels or out of a job and there is little incentive
is no reason why you should: some SIPS) is not to do with the merits or for them to change their ways.
argue it encourages architects to make otherwise of selecting timber or SIPS Architects are similarly disadvantaged
you spend more than you want. You as your walling material, but rather to in that timber frame construction
could, for instance, ask for an estimate do with selecting a specialist custom requires an extra stage of panel drawing
to undertake the design of your home builder as your supplier. The and extra structural calculation, both of
house and specify that your project fact that these custom home builders which are technical in nature and best
should cost no more than £XXX,000 choose to build with timber is of dealt with by specialists. There is thus
and that it has to be designed to a secondary importance. And, as if to an unwritten understanding between
budget. Some designers will flee a prove my point, there are one or two design professionals and builders to
mile when faced by such demands package home suppliers who don’t leave things as they are.
but a surprising number will actually build in timber frame. So it’s the fact
appreciate such specific requests from that it’s package build, which makes ADVANTAGES
their clients – they get very tired of it end up here in the design chapter. Selfbuilders, of course, don’t have
the polite to-ing and fro-ing that In England, Wales and Ireland to run along with the crowd and
goes on around issues like this. The (though not Scotland), the building selfbuilders throughout the UK
more specific your brief is, the better trade traditionally builds houses using have taken to timber frame in a big
pleased you will be with the results. masonry blockwork for the structural way for much the same reasons as

HOUSEBUILDER’S BIBLE l 13th EDITION 57


Chapter 4

already built or a set of off-the-


peg house types, which you can
choose or adapt to your own
requirements. In effect, most timber
frame companies design your house
as well as provide and erect the
superstructure.
It follows therefore that
the frame is only one part of
the service provided by these
businesses. What they are really
about is what is known as design
and build or what the Americans
call custom home building where
you can pitch up with a few ideas,
maybe a few sketches, and they will
transform these into a workable
home, delivered and erected on
your site.
Britain’s first selfbuild village, Graven Hill in Oxfordshire, has around 1900 selfbuild The fact that your superstructure
and custom build plots. And new homebuilding businesses are here offering is made of timber is almost
bespoke one-off homes, built in factories and assembled on site. The old distinction incidental to the procurement
between architect-designed and package build is starting to melt away. process – in order to sell you a
frame kit, it is first necessary for
Scotland as a whole has. Not only is a suits their own purposes. Because them to capture your imagination
timber frame house potentially much of this, there has grown up a quite and your confidence. Often they
quicker to build than a masonry distinct timber frame industry in have a range of standard house
one, but – because the frame itself the UK which has had to specialise types from which you can choose
is largely hollow – it is easy to in meeting all or most of the or adapt but most of them admit
insulate to a high standard and yet would-be housebuilder’s needs. A to rarely, if ever, building these
still maintain a clear cavity between timber frame company can’t just standard houses.
the frame and the outside walling build a factory, set up its jigs and These days, selfbuild clients are
material. Timber frame houses are wait for the orders to come rolling choosing to have a much greater
therefore inherently energy efficient in. Rather they have to go out and say in how their houses should look
and they are warm and comfortable grow the business by attracting and function and consequently most
to live in. the end users. As there are few timber frame houses start life as a
At least as important as any independent architects prompting sketch done by the selfbuilder or a
technical differences between the clients down the timber frame more detailed drawing carried out by
building systems is the question route, the companies themselves their architect.
of procurement. I’ve touched on need to attract selfbuilders at the Even companies with an
the fact that most architects and initial design stage and, by and established reputation for standard
most builders like to use traditional large, they do this with attractive house ranges find they are doing
masonry construction because it brochures of houses they have more and more ‘one-offs’.

58 13th EDITION l HOUSEBUILDER’S BIBLE


DESIGN

THE BUSINESSES
There are a surprising number of
frame businesses throughout the
country catering for the selfbuilder.
By and large, they tend to offer a
similar range of services. Almost all
the businesses offer a design service
to turn your preliminary drawings
into a fully engineered structure. In
this respect a timber frame house is
quite different to a masonry brick and
block house: the design for a timber
frame structure needs to be proved so
that the building inspector is satisfied
that it won’t collapse in a heap or
that it won’t take off in the wind. This
work is normally carried out in-
house, though you can commission Timber frame comes in many
a structural engineer to undertake different guises.
it for you if you want. To do it on a Above: A green oak house from
TJ Crump Oakwrights mixing
one-off basis is a complex and time- traditional idioms with masses
consuming process and you also need of glass and open plan living.
to draw up technical drawings for Oakwrights are one of several
the timber frame wall panels which, UK businesses producing
by hand, can take almost as long as bespoke oak homes for the
it does to actually assemble them. selfbuild market
Right: German factory
This is all work that can be carried housebuilder Baufritz have
out easily on a computer and this is been supplying the UK for
another contributory factor helping a number of years – they
to develop the timber frame industry specialise in biologically healthy
into a unique entity, quite distinct buildings.
from the mainstream building
industry. within, say, a forty mile radius but with a local business – the level of
Beyond the design and assembly of beyond that feel that they are bound service is usually better.
the timber frame, the businesses offer to be uncompetitive. Others have Some of the businesses are known
various levels of service from frame developed contacts all over the country for specific styles or designs. Market
erection right through to a complete and feel comfortable taking on entire leader Kingspan Potton are still best
build, often known as a turnkey builds far away from home – indeed known for their Heritage range,
service. Many of the businesses tend some of the timber frame builders half-timbered Tudor cottages, though
to offer different levels of service think nothing of going overseas. If they have long since branched out
depending on distance – for instance, anything characterises the industry into more modern designs. They
they will be happy to quote for an it is the word flexibility. Having said have spawned several imitators.
entire build or a waterproof shell that, it often pays dividends to work There are a clutch of Scandinavian

HOUSEBUILDER’S BIBLE l 13th EDITION 59


Chapter 4

or Scandinavian-inspired companies, kit is between a third and a quarter and one piece of advice frequently
a couple of American ones and an of the overall build costs though the given to selfbuilders is ‘never pay for
increasing number from Germany amount of goods supplied with the anything upfront’. On the other hand,
and places further east like Poland kit varies quite considerably. the suppliers have legitimate fears
and Lithuania. There is also a When making comparisons you that the customer can’t or won’t pay
small number specialising in SIPS, have to become adept at looking at and many have learned the hard way
as opposed to timber frame. The the small print to see what’s provided that a contract as large as a timber
selfbuild magazines are the best and what isn’t. The Scandinavian frame house, usually measured in tens
place to get information and contact kit home suppliers tend to provide of thousands of pounds, should not
details and the selfbuild exhibitions, the bulk of what you need but at a be undertaken without some form of
particularly the annual jamboree at considerable price; they also have deposit and some form of guarantee
Birmingham’s NEC in March, are a nasty habit of listing their floor that the client is able to pay. Unlike
where you can most easily make face- areas gross – that is including the other expensive items such as cars,
to-face contact. external walls – which makes the timber frame kits are bespoke and
The majority of frame companies homes appear to be 15% larger than can’t just be sold on to another
offer to work with any and every the competition, which works with customer.
style. In all there are around sixty net floor areas. Watch out for this. In One way around this problem
businesses active in the field, Scotland, the timber frame market is to use a solicitor’s stakeholder
although around half are based in is more mature than elsewhere account where the majority of your
Scotland, reflecting the popularity of and there tends to be a standard payment is lodged, usually about a
timber frame there. There is a trade Scottish package (which includes week before delivery of the main
association, the Structural Timber the plasterboard), which makes cost frame. This way the supplier can see
Association, which is a good place comparisons more straightforward. that you have cleared funds in place,
to check out who does what. Oak but they are not drawn down until
framers are something of a race apart PREPAYMENT ISSUES the frame is on site. Another often
– they don’t do trade associations! Because a large amount of work acceptable solution, used widely for
There are one or two offering to do is being carried out off-site, most car purchases, is to get a bankers’ draft
very similar things with steel frames timber frame companies want some or a building society cheque – i.e. the
and Design & Materials is unique form of prepayment. The timing and sort of cheque that won’t bounce –
in working in a similar method to amounts of deposit required vary made out to the supplier a week or
timber frame companies but actually enormously from some businesses so before delivery. This is then shown
supplying masonry materials to build that want 100% of the frame costs but not handed over until goods are
houses in the traditional way. before delivery to others who expect on site.
Generally, the concept homes are payment after work has been carried However, this raises another
expensive; for instance, a Potton out. problem for selfbuilders borrowing
Heritage home of equivalent size From a client’s point of view, the to fund their build. Many lenders
to a developer’s house is going nightmare lurking over the horizon will not release funds against goods
to cost about 15-20 % more to is that the company they are dealing still being fabricated in a factory and
build. However, if you strip out the with may be about to go bust and consequently many selfbuilders get
vernacular elements of the Potton that their cheque will be cashed caught in a Catch 22 situation where
Heritage style – notably the posts and before anything has arrived on site. they are unable to proceed.
beams – the cost differential all but Timber frame companies are no more However, there are now mortgage
vanishes. Typically the price of the secure than any other type of business products on the market, like

60 13th EDITION l HOUSEBUILDER’S BIBLE


DESIGN

Buildstore’s Accelerator Mortgage, However, it is important not to even want a minstrel’s gallery set
which are designed to unlock funds exaggerate the cost implications of under a glass atrium in your entrance
before a critical stage is reached. building complex shapes: I estimate hallway, but do be aware of the
Alternatively, many timber frame that every time you create a junction constraints you put on your space by
suppliers will accept undertakings from you add 1% to your build budget. choosing more complex designs.
lenders to pay them directly on delivery. Therefore if you were to build in an Bear in mind also that the current
The important thing to bear in L-shape, for instance, you would trend for heavily insulated walls
mind is that you must plan ahead and scarcely notice the extra cost. comes at a cost of reducing internal
discuss the matter with your chosen But wherever you interrupt the floor area. A Passivhaus wall, with its
supplier and your lender. basic shell shape of a house you 300 mm wide cavities, may eat up as
are adding junction costs and if much as an extra 5% of the internal
you choose a complex form with floor area.
extensions, dormers, porches and
SHAPE AND SIZE the like then you can take it that the
Before you even approach a designer overall cost will increase by much
or a package company, you would more than the unit cost per square
do well to take on board a few home metre at which you build the main
truths about the cost implications shell.
of your design decisions. If you are
after cheap space, then you need to CIRCULATION SPACE
build your house in a simple shape, There is another hidden cost brought
preferably a simple box with a simple about by using non-standard shapes
roof. This doesn’t have to look cheap in house design and this is to do
– indeed it doesn’t have to be cheap with having adequate circulation
– but the point is that it is almost space – i.e. hallways, stairwells and
always going to be the simplest landings. This is virtually impossible
(and therefore cheapest) form of to quantify because no two situations
construction available to you. Many are the same, but the basic tenet holds
traditional houses take this form and that the more complex your form, the
they are not all peasants’ cottages. more difficult it becomes to provide
So why should a rectangular adequate circulation space or, put
box shape be cheaper than say another way, the more space you end
two rectangular box shapes stuck up using just to get around from A
together? In a word: junctions. to B. For instance, in our lean, box-
You are introducing junctions at design developer house, circulation
every stage of the building process space occupies just over 18m2, which
and junctions always involve head is 16% of the internal floor area.
scratching and usually expensive That’s a pretty tight ratio.
detailing. Your brickwork will take Reconfigure the house in a ‘T’
just that little bit longer to build, your shape and you’ll probably be looking
carpentry will become just that little at circulation space taking up 25% or
bit more complicated, your roofing more of your internal floor area. Now
will become much more complicated. you may not mind that, you might

HOUSEBUILDER’S BIBLE l 13th EDITION 61


Chapter 5

PROJECT MANAGEMENT
WHAT EXACTLY is project
management? It’s become a buzzword
5
what contractors have always done,
which is to organise building work.
every building site, even out-of-the-way
ones where they’ve never even heard of
among builders who assume that There is power here and if you’ve it. It’s really rather a holdall term that
it’s the be-all and end-all of running never employed anyone other than a covers just about every non-manual
a building site. There are now baby-sitter that can be an attraction aspect of running a building site. And
professional project managers who to many of us frustrated prefects. But, there are no rules as to who can and who
apparently keep building sites going as the old saw goes, with that power can’t be a project manager; it could be
armed only with a mobile phone and comes a responsibility and, in the case the self building client, or their architect
a fast car, the yuppies of the building of the contractor, that responsibility is or quantity surveyor, or it could be the
trade. It’s all about networking and considerable. Whilst you are hopefully main contractor or their foreman. And
contacts, being at the very centre of a making a bit on everybody’s labour, of course it doesn’t all have to be carried
huge web of information. you also have to pick up the tabs for out by one individual – the various
Well, yes, there is this aspect, but everybody’s cock-ups. You are where functions may be split between people,
don’t get carried away. Really, project the buck stops. though when this happens you can
management is nothing new; it’s So, project management goes on at expect even more cock-ups than usual.

62 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

RAISING FINANCE actual limits depend a lot on market tending towards centralised decision
The first step in the management of conditions; when banks are keen to making, which can make things
a project such as building a house is lend then the multiplier tends to more transparent but also rather less
to have the finance organised to pay stretch upwards. If you are self- flexible.
for it. For the majority of selfbuilders employed or you actively want to sell When the time comes to act,
and small developers that translates on the finished property for a profit, you will in all probability have
as how much you are able to borrow. then the regular avenues may well to act quickly and you will need
Well, how do you go about borrowing be closed to you but there are still a whatever ammunition you can get
on a property that doesn’t even exist? number of specialist brokers who it is hold of — agent’s details of the
You will find it a lot easier to borrow worth approaching, many of whom proposed purchase, copy of planning
money if you have a) substantial advertise in the selfbuild magazines. permission, your salary details, a
assets and b) substantial income, Another very useful contact is the building budget. If you’ve no plans,
preferably both. If you don’t fall into Ecology Building Society who then show them a copy of this book
either of these categories then you are are particularly helpful in lending and say you’ve read it from cover to
by no means ruled out of the game; to those undertaking unusual cover – that’ll impress them. You
you’ll just have to work harder at constructions and renovations shouldn’t have to show any plans at
impressing the mortgage lender. which mainstream lenders shy away this stage because it is ludicrous to
There are currently around 20 from. Professional developers have expect there to be any yet but this
institutions actively seeking selfbuild traditionally borrowed from the is one area where the timber frame
borrowers; some of these are prepared major clearing banks but there are a package companies tend to win out
to lend up to 75% of the finished number of finance boutiques catering because you can actually present
value of the property and several will for them as well. A good place to a budget AND a plan, even if the
potentially lend rather more than check who is currently active in this house you end up building is nothing
this – though most will expect you to field is the small ads in Housebuilder like this.
come up with a hefty deposit for land magazine, which can be accessed
purchase. online. SCHEDULING
Since the credit crunch, several Unlike conventional mortgage
big names have dropped out of YOUR PRESENTATION lending, development loans and
this specialised niche and almost Many lenders recommend that you selfbuild mortgages are released in
all the running is now made by contact them early, when you are still stages as the work progresses. For
the old fashioned mutual building at the dreaming stage. If you have an someone new to this, it can be a
societies. The nearest thing to a existing mortgage, start by talking to daunting process, especially if they
broker is Buildstore who pioneered this source and trying to gauge their have to borrow to complete the plot
the Accelerator Mortgage, which attitude to your ideas. Talk in broad purchase for a house that’s not even
enables you to borrow ahead of the sweeps about what you are trying to designed, let alone built.
prearranged stage payments. achieve and try and winkle out of The key to doing this is to
As with conventional mortgages, them how far they will be prepared to prepare a schedule of works, the
the amount you can borrow is come along with you. Together you sort of thing that is outlined in the
dependent on your income. The may be able to shape up a budget to diagram overleaf. This shows how a
conservative approach is to restrict work to. typical British house is built, taking
the borrowing levels to three times If you feel they are being unduly around eight months to complete.
the main income or two and a half negative, then start looking at other The costings are for a total build
times the combined incomes. But the lenders. The lenders themselves are of just under £180,000, enough to

HOUSEBUILDER’S BIBLE l 13th EDITION 63


Chapter 5

Project Timeline

r
be
y
y

ar

em
t
ar

ch

s
ru

gu
nu

ne

pt
ay
ril
ar

ly
b

Au
Ja

Se
Fe

Ap
M

Ju

Ju
Groundworks An idealised
Ground Floor Walls timeline for a
First Floor project such as
Upper Floor Walls a large detached
Roof Carpentry four-bedroomed
Roof Cover house. Eight
Scaffolding months is a
typical time for
Rainwater/Fascias
a professional
Internal Studwork housebuilder
Wiring (1st fix) to take, without
Plumbing (1st fix) exactly busting
Plastering/Screeding a gut. It’s
Carpentry (2nd fix) comfortable. It
Kitchen represents around
Wiring (2nd fix) 3,500 hours work,
Plumbing (2nd fix) or three guys for
Decorating 30 weeks. The
rate of spending is
Externals
pretty constant at
Snagging around £7,500 a
week.

construct a four-bedroomed house. be any problems trying to schedule a which will probably never get sorted
It’s interesting to note that the rate workforce. But in reality each house out.
of spending is surprisingly constant is built by upwards of 30 people, It’s quite feasible to build a
throughout the job. each with different skills and each house from scratch in just three
Eight months is generally a good with their own schedules to work months but in order to do so you
time to set to build a simple house, to; you can’t expect everyone to turn have to concertina all the events.
unless you plan to take on a lot of up at the drop of a hat so you have Realistically, this means planning the
the work yourself, in which case it to programme some slack into the whole process months in advance
is likely to take a whole lot longer. schedule to allow for this. so that everybody involved in the
As you can see from the timeline, construction knows exactly what
there are nearly twenty major tasks to SPEEDY BUILDS they are required to do and when
accomplish, all needing co-ordinating Some houses do get built in much they are required to do it, just the
and timetabling so that they occur less time than eight months. If you sort of intricate project planning for
in the right order at the right time. want to build quickly, then either be which British builders are famous!
At this speed, you are actually paying prepared to spend good money on It also requires that the correct
the wages of three men to be on site professional supervision of the whole materials be delivered to site on
continually and if that were how construction process or to have a the appropriate day (ditto British
houses got built there really wouldn’t half-finished house with lots of snags, builder’s merchants). Speedy builds?

64 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

It can be done, but... be prepared all the worse because builders (and and you can use this fact to try and
to spend the time you saved in the surveyors) habitually underestimate persuade your mortgage lender not
building process planning the whole the cost of finishing building works to have to make you sell up in the
thing instead. off and the time that the finishing first place. The caravan is seen as the
soaks up. cheap and cheerful option but it’s not
STAGE PAYMENTS One of the major advantages of without its hidden costs as well.
What are the key stages or landmarks building reasonably quickly is that Usually people buy static caravans.
which trigger release of development the strain on cashflow is minimised Purchase costs vary from around
funds? Each lender seems to use because the subcontractors may £2,000 to £6,000 depending on size
slightly different criteria to define well be happy for you to withhold and quality. Add to this the costs
when each stage is completed but a payment for a couple of weeks until of getting it to site and installing it
typical regime would involve four or the next stage payment is authorised; once there, usually between £500-
five stage payments coinciding with: if that couple of weeks becomes £1,000. Many firms supplying static
n groundworks complete (say 15%) a few months, then this option is caravans will buy them back from you
n first floor joists (say 30%) effectively removed. However, there although only expect to get between a
n structure roofed in and watertight are now mortgage products on the half and two-thirds what you paid.
(say 50%) market, like Buildstore’s Accelerator You need to have drainage, water
n plastered out (say 75%) Mortgage, designed to unlock funds and electricity supplies sorted
n finished. before a critical stage is reached. before the installation which can
Normally the lender will insist on a There is another little pitfall here make it hard to move into directly
surveyor making a site visit to check awaiting the slower-than-average from selling an existing house.
that the work has progressed as far as selfbuilder: the VAT reclaim Also consider the cost of storing
you claim, although some of the more procedure. The what? Check out the your possessions. Quotes to do this
intrepid bank managers will do this VAT section of this chapter. professionally usually come in at
checking themselves. around £50 per month plus the added
WHERE DO WE LIVE? cost (say £500) of moving everything
MANAGING CASHFLOW Selfbuilders are faced with the twice. Amateur storage is feasible but
One critical point to take note of problem of finding somewhere to often results in damaged furniture
is that the lenders only ever release live during the construction of their – fabrics, bedding, books, pictures
payments after a stage is completed, new home. The lucky ones can stay should not be stored in unheated
so that you have to be able to float on in their existing homes and, if sheds through a winter if you value
the works between the payments. the market is rising, enjoy a two-for- them at all.
This fact has undone many a small one tax-free punt on the property
builder in the past and will doubtless market whilst their build takes place.
continue to do so in future. Typically, However, the majority are faced with
the builder runs out of cash towards having to sell up their existing home
the end of the job and gets stuck in in order to raise enough money to
a Catch-22 where they can’t get the buy the plot. In this situation you
final (largest) instalment of the loan have to find somewhere short-term.
because they haven’t finished building The two main options are a short-
and they can’t finish building because term rental or a caravan on site. The
they haven’t got the final stage of first is expensive, often costing rather
the loan. A tricky little pitfall made more than servicing a mortgage,

HOUSEBUILDER’S BIBLE l 13th EDITION 65


Chapter 5

BUILDING’S 4 PRS to produce something unusual


and cutting edge (£50,000 and on
on site as and when needed, as well
as checking that the work is carried
There are four cost centres in upwards). Other professional costs out properly and that the site is left
construction which are similar tend to be more predictable: typically clean and safe everyday. They have to
sounding — they all begin with all in at around c £3,000 - £5,000. keep things on the critical path. And
Pr….. — but they differ in content When looking at ballpark building they have to ensure everyone and
and hence rather confusing for lay costs per m2, items marked as everything gets paid correctly.
people. It’s time to get to grips with Professionals are usually excluded. This sort of thing doesn’t happen
them, however you plan to build. by magic: a neat ratio to bear in mind
What they have in common is NO 2 PRELIMS is that for every seven hours spent
that they are concerned with the Prelims (short for preliminaries) is “on the tools”, one hour needs to be
supporting aspects of a building a blue-collar version of professionals set aside for managing the whole
project that don’t involve the actual and covers such items as setting up process in order to do it efficiently.
materials to be used nor the fixing of a site office and a site loo, providing A typical British selfbuild, using on-
them. Add them all together and they scaffolding and site fencing, together site construction methods, requires
can account for up to a third of your with security and safety equipment around 3,500 hours site work (costing
overall expenditure….. and maybe a skip or seven. Another around £75,000 at £20/hour) and
way of looking at prelim costs is to this work will require an additional
NO 1 PROFESSIONALS see them as temporary structures 500 project management hours
Professional costs covers costs required to run the site which will (costing around £15,000 at £30/
concerned with both design and be removed on or before completion. hr.) or between 10% and 12% of the
getting the relevant permissions in Sometimes, prelims include money overall project cost. Often this work is
place to undertake a building project. set aside for a site manager’s time, carried out by selfbuilders themselves
The major fee here is usually paid but this is more usually included as a and therefore gets lost in the overall
to the architect but there may also Project management fee (see No 3). cost analysis. It’s rarely costed
be fees paid to structural engineers, Typical prelim totals for a separately unless you specifically hire
quantity surveyors and party wall new house: £10,000 to £25,000, a project manager to run the site on
advisors together with statutory depending on site complexity. your behalf, where additional fees
fees for planning permissions Scaffolding in particular can balloon would be charged for travel and office
and building regs approvals, plus in price if complex features such as overheads.
insurance and warranties. There may temporary roofing-over are involved
also be fees for such items as energy — scaffolding costs in such instances NO 4 PROFIT
assessments, airtightness testing and can be as much as £20,000. The final PR is Profit. Everybody
health and safety compliance. has an idea what profit is and what
Typical professional fees: £20,000 NO 3 PROJECT MANAGEMENT it means but it’s difficult to define
upwards. The most important The site management time is precisely, partly because it’s not easy
component here is almost always conventionally costed as No 3 — to separate profit from regular costs.
the architects’ costs. There is a Project Management. In order to Everybody who supplies goods
huge gulf between what you would get a building site to run smoothly, or services to a building project
pay a competent but unambitious someone has to manage the processes. is hoping to realise some sort of
designer for a set of house plans They have to ensure that the right profit on the transactions — simply
(£3,000 is perhaps a minimum) people are hired in the right order covering costs is never enough to
and an architecture practice looking and that the correct materials are keep the wheels of commerce oiled.

66 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

But in this context, profit has a Selfbuilder Stuart Meier’s Guide to Project Management
more specific meaning. A builder or
main contractor quoting for a project Add up the appropriate factor from each box to give an overall multiplier for your
such as a new house will allow for all eight months....
the costs of building the house, the
Experience
prelims and the project management I’ve done numerous previous projects successfully: factor 0
fees (but not usually the professionals, I’ve done quite a bit before, I’m tediously well organised: factor +50%
which are charged separately). These I’ve never tried and my wife thinks I’ll lose control: factor +300%
are the costs which they need to
recover in order not to make a loss. Complexity
Everyone says it’s a very boring design: factor 0
But over and above this they will add It has a few unusual features: factor +50%
a profit margin in order to make the Architect is really chuffed with it: factor +200%
job worth doing.
You only normally come across Site
the term Profit when you work with Flat open site with loads of room: factor 0
a Quantity Surveyor who adds a It’s a bit tight around the edges, and slopes too: factor +50%
On a clifftop with 4wd access only: factor +200%
percentage over and above the job
costs so that you can gauge what Publicity
a builder’s quote might be. Trying “Good lord, no”: factor 0
to figure out likely profit margins Grand Designs want to film it: factor +50%
is something of a black art and it Grand Designs are GOING to film it: factor +200%
is notoriously difficult to predict
builder’s quotes in advance. Looked
at from a builder’s point of view, there organise a large job and their costs and above this. It could be as low as
are essentially two things to consider tend to expand by more than they 5% or as high as 50%. So expect a
here. would like. Many builders work with fixed price quotation to be anything
Firstly, there is risk involved in the same team of people over many from 25% to 75% more than the raw
taking on any job for a fixed price. years and know their strengths and build costs. That’s a lot of money and
There may well be a punitive contract weaknesses and how best to manage one principal reason why so many
in place which will cost the builder them. Taking on extra staff to cope selfbuilders choose to become their
a great deal of money if things don’t with a greater workload can lead own project managers.
go as smoothly as hoped for. So the to unforeseen problems and costs If you want to have the comfort
builder has to assess the risk and overruns. Once again, to counter this of a fixed price contract and, with it,
make an informed guess of how likely problem, the builder is likely to add a professional management, and you
your job is to go well. The greater the significant margin. don’t want to pay through the nose
risk, the more you will be charged a So how much profit will a builder for this service then
risk premium — i.e. a higher profit add? It’s often hard to say because n build in a recession when times are
margin. the quotes aren’t broken down. hard for builders and they don’t have
The second point to consider is just But as a rule, the builder is likely too much work
how much the builder wants your to add 15% to the raw build costs n design something simple and easy
work. The busier they are, the more (Inc. prelims) in order to cover the for them to build - something in
they are likely to add to their margin project management element, plus their comfort zone
as it can be an almighty hassle to whatever the market will bear over n be as nice as pie when you come

HOUSEBUILDER’S BIBLE l 13th EDITION 67


Chapter 5

to interview the builders and let DO I NEED A BUILDER AT managed a business of whatever size
them know that you are not forever ALL? will know that it’s time consuming.
teetering on the edge of bankruptcy. The building trade is a free market Anyone who has ever managed a
Some evidence of ability to pay is but, all in all, it’s not a very good building business will know that it’s
always welcome — many perfectly advert for the free market. It is almost impossible to get it just right.
good builders go bust because their widely perceived as being expensive, Rookie builders with experience in
clients run out of money. inadequate and inefficient, certainly management can and frequently do
• Note on VAT: New build is zero- when it comes to domestic work. take on the role (and risk) of a general
rated for VAT purposes within the Indeed one of the main drivers builder, undertaking the hiring and
UK. This means that you either behind selfbuilders’ willingness to firing of tradesmen together with all
don’t get charged or you can reclaim take on the project management role the other activities. However what
any VAT that you may be charged. themselves is a widespread lack of should not be underestimated is the
However, the zero-rating doesn’t trust with general builders. amount of time and energy this all
extend to Professionals or Prelims, When times are tough in the takes up. Realistically, you need some
where you will be charged VAT at building trade, builders are falling sort of professional management
20%. The only way of avoiding these over themselves to try and get help if you can’t be on site every day
VAT charges is to employ a single work but an alarming number are (although not necessarily all day). For
contractor to both design and build simultaneously going bust. On the many people, hiring a general builder
the whole project, so that you only other hand, when times are good it makes a lot of sense.
pay one company throughout. can be extremely hard to even get
builders to quote for work – some of WHY AREN’T BUILDERS ANY
the more reliable builders I know get GOOD?
booked up with work for over a year. However much sense it makes in
The problem becomes one of finding theory, in practice many people end
a builder at any price rather than one up feeling let down by their main
WORKING WITH at the right price. There is an added contractor. More often than not,
BUILDERS danger that less scrupulous builders this is because contractors tend to
The question everybody wants will take your job on knowing full be incredibly busy people and they
answered is: ‘How do I find a good well they are inadequately resourced, are forever juggling timetables and
builder?’ I suspect that people have hoping their contact book will see deadlines.
been asking the same question all them through. Mistakes multiply Whilst the typical general
over the world for several thousand when main contractors get stretched contractor would make a good project
years now and I’ve yet to come across beyond their capabilities. manager on one particular job, the
a convincing answer. I’m not going wheels start to fall off when the
to even try. Instead I think it’s a good IS A GENERAL BUILDER, number of sites being supervised gets
idea to look at the question from a NECESSARY? above three. Yet in order to make a
number of different angles, to try and The main ingredient that a general decent living and to keep a run of
grasp just what it is that goes wrong builder brings to the party is this work going for various tradesmen,
with construction work that causes magic phrase ‘project management’. most general contractors simply
people to tear their hair out with Co-ordination of material deliveries, have to keep going at several jobs
exasperation. In an effort to close in subcontractors, building inspectors, simultaneously.
on the main question, I’ll take a look plant hire, office administration, I know from experience that it’s
at several supplementary questions. you name it. Anyone who has ever incredibly demanding and stressful

68 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

trying to co-ordinate building work Try buying a new car by offering when the builder is the creditor he
going on across a wide area. As a to pay in 30 days only if you are can basically do very little about it.
builder you may start out with the completely satisfied and then As you can see, the builder is
best intentions in the world but you withholding 5% of the price for actually in a very vulnerable position.
rapidly end up employing the same six months. Little wonder that so But clients play still worse tricks;
knee-jerk excuses used by everyone many builders experience cashflow some will withhold payment of many
else in the trade (and despised by problems. Sure, they are buying their thousands of pounds on the flimsiest
its clientele). Appointments start materials on credit but this only lasts of excuses, such as resolving a few
to get missed, calls start to go 30 to 60 days and subcontract labour snags that might be worth just a few
unanswered, promises start getting want cash more quickly than that. hundred pounds at most. Sometimes
broken. So one way you can smooth your these machinations are born of
relationship with your builder is to frustration with the performance of
WHY CAN’T BUILDERS agree how payments will be met the builder but sometimes the client
DELIVER? before the contract starts and then uses these excuses to cover up for
I’m not sure there is an easy answer to stick rigidly to those terms. If you the fact that they never had enough
this. The glib answer is ‘You try doing are having to borrow large dollops of money in the first place. Yes, these are
it and see if you are any better’. But money to finance your building work the real cowboy clients.
that’s not terribly helpful. In truth, and this money is only released in My business was ‘locked out’ on a
most general contractors do deliver stages, then be open with your builder couple of occasions on the excuse that
eventually but often at a standard well about this and make it clear just the standard of workmanship was not
below their customers’ expectations. what he has to do to trigger the stage good enough when subsequently it
So perhaps the advice should be by payments – at least he’ll know that emerged the real reason was that the
all means use a main contractor but you are being realistic about money. client was in financial difficulties and
don’t set your standards too high. Or One of the bugbears of today’s simply had no way to settle the bill.
perhaps we are not prepared to pay builder is to be told at the end of Rather than admit to the humiliation
enough for the level of service we the job that although the client is of being unable to settle a debt, it is
want. perfectly happy with the finished altogether easier and more convenient
result, the final £20,000 is going to to tell everyone that the builder is an
WHAT SCARES BUILDERS? have to wait a bit because they’ve incompetent rogue from whom you
Money for a start. It is an axiom overspent and run out of money: have had to withhold money or, even
often repeated that you should yet it happens all the time, builders more likely, submitted an extortionate
avoid paying a builder upfront getting used as sources of interest- bill for the extras.
for anything, wherever possible. free finance. Whilst the client is telling
However, there is another side of Another frequent scam foisted on everyone who will listen just how
this coin – it is the builder who is builders is the excuse that the money awful the builders are and receiving a
consequently extending you credit, is locked into a 30 or 60 day savings sympathetic ear, able to point to work
which immediately puts him at a account and that payment is being which is half finished in evidence,
disadvantage. And despite the so- withheld until the full withdrawal the builder is often forced to bear
called power of the consumer these period is up. The builder is quite likely such indignities in silence. Often
days, the levels of unsecured credit to be struggling with an overdraft as the amounts at dispute are too large
you are likely to get from a builder big as a mortgage. Yet such behaviour for the small claims court but not
are way beyond anything else you are by clients is all too common and is large enough to warrant risking a
going to be offered on the high street. verging on being really abusive but full-blown legal challenge and many

HOUSEBUILDER’S BIBLE l 13th EDITION 69


Chapter 5

than risking losing the possibility of


quoting for future work, they would
like to put in some price, any price.
So the next step is to chat with
the competition – it’s not hard, it
happens naturally anyway – and soon
an informal cartel is in place.
Reg: ‘Have you been asked to quote
for the Old Rectory job at Chipping
Butty?’
Charlie: ‘Yes. I like the look of it.’
Reg: ‘I really can’t see any way we
could do that one – could you do us a
favour and cover us.’
Charlie: ‘Sure – I’ve no doubt you’ll
be able to return the favour soon.’
So Charlie puts in his price and
tells Reg to put in a price maybe
One way of spotting a good builder is to builder chooses you as much as you £20,000 higher. Reg knows he won’t
see how tidy they are. This ICF house, choose your builder. It’s back to that get the job but he hasn’t spent any
under construction in Perthshire in 2014,
marriage thing again. More often time or money quoting for it, and
looks to have a well organised, efficient
site. Just as well when you look at the than not, a builder who suspects he hasn’t upset the architect so he’ll
scale of the retaining wall behind it. that a job is a potential lemon will stand a chance next time around
not even bother to quote for it or, when he does want the work.
if they do, they will add a very high Occasionally the builders know all
thousands of pounds get written off percentage to the overall profit figure the other tenderers on any given job
this way. Clients withholding money to cover their back should they win – in matters like this the grapevine
for whatever reason is easily the the contract. works extremely efficiently – so that
commonest reason for builders going there are cases where every builder on
bust and it can happen to even the WHAT’S WRONG WITH the tendering list has been in on the
best builders. COMPETITIVE TENDERING? scam. They all know who is providing
One practice that is prevalent is for the lowest quote and, consequently,
DOES THE BUILDER CHOOSE busy builders to get together and the lowest quote is in reality quite a
THE CLIENT? divide up the work in a way (and for high one. Such a complete stitch-up
Small wonder then that builders are a price) that suits them – it’s called is perhaps rare but frequently two or
just as wary of potential customers covering. It works like this. A job three of the quotes will be for show
as the customers are of them. The is put out to tender – typically by purposes only.
vetting process that goes on between an architect – to four or five local Partly this problem stems from
contractors and clients is very much builders. Some of them are so busy the way building work is procured in
a two-way thing and part of the that they simply don’t want to take the first place. And in particular the
skill of being a good builder is one on any more work. Architects tend to practice of builders quoting for free
who knows which clients to work regard refusals to quote rather badly causes a lot of problems. It sounds
with and which to avoid. Your and the builders feel that, rather too good to be true and of course

70 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

it is. It takes a good deal of time to price unless you hold him to a fixed huge risk margins on your job. If the
generate an accurate quotation and price for the whole job – in which builder is prepared to open his books
most builders simply send tender case – hey presto! – he’s just become a for you to see his costs, then maybe
documents off to a quantity surveyor general builder. a cost plus arrangement has a chance
who carries out the work for them A third approach is to select a of working. You need to keep on top
(for a scaled fee, depending on the builder first, preferably even before of the costs as they arise and monitor,
size of the job). Now builders often the design stage, and to work in a monitor, monitor. But if the job runs
end up quoting for five or six jobs in sort of loose partnership with them to an agreed programme, then the
order to win one, so the overheads throughout the project. Design cost overruns should be minimal. Tip
of quoting for jobs they don’t get and build – it’s a buzzword in big here: a job that finishes on time never
becomes a significant business commercial construction at the goes over budget (well hardly ever).
expense in itself. Anything that moment (where, incidentally, the
helps to ease the load of having to problems are remarkably similar if WHAT MAKES A GOOD
quote for jobs is manna from heaven only on a different scale). BUILDER?
for builders so you can see the Rather than trying to tie builders Hugely successful contractors (or
attraction of any informal price fixing down to the lowest possible price for project managers if you prefer) are
arrangements they might concoct. a set of plans they have had no part a rare breed. Though they almost
in formulating, start by asking them invariably have their roots in one of
OTHER OPTIONS? what they think are the most cost the building trades, the skills that
What’s advantageous to the builder is effective ways of getting what you are required for managing building
obviously less welcome news for the want and who is the best person to work are quite different. Good, clear
consumer. What ways are there for design such a house. This way you can communication is perhaps the most
clients to avoid being on the wrong work to the strengths of your builder important and, if you are weighing up
end of one of these cartels? The and hopefully use these to drive down potential contractors, it is probably
obvious one is to avoid using general costs. the aspect to which you should give
contractors at all, as previously Some builders will respond very the most careful consideration. After
discussed. positively to such an approach all, if you can understand what they
You can elect to be your own main – others will run a mile, much are on about then chances are that
contractor and hire all the labour preferring to work in the traditional they will understand what you are
yourself but for many busy people ways. And whilst a more open, on about too, and anyone working
this is an unrealistic option and trusting approach to building can for them will also understand
in many parts of the country it is reap dividends, it’s also not without their instructions. Of the things
becoming harder and harder to track its share of problems. that go wrong on building sites,
down good labour. Alternatively, you Just because you start out talking 90% of the time it’s because of
can hire a project manager who will partnering and understanding doesn’t misunderstandings or plain bad
do all this work for you for a fee. mean that you’ll end up there – and instructions.
However, such people are thin on untangling a messy design and build In some ways this is good news,
the ground and there are potential contract can be more work than because if you meet someone face
contractual problems when the job sorting out the more traditional to face then you do at least get an
overruns or goes wrong in some way. adversarial way of working. However, immediate impression. It doesn’t
There is also little guarantee that I do feel there is a lot to be said for follow they will do a good job but
the project manager will succeed it, particularly if you don’t want to there is a much higher chance that
in hiring the best labour at the best get keel-hauled by builders putting they’ll do the job you want them

HOUSEBUILDER’S BIBLE l 13th EDITION 71


Chapter 5

to do rather than one they want 4 The more detailed your plans, 8 If all still equal, then go for the
to do. This calls into question your the more meaningful will be the best communicator. The one who
judgement of character: can you quotations. Ideally, you should send you understand best, or just get on
tell the difference between the drawings already approved by the with best, will also be the one who
hard-working, trustworthy, reliable building inspector. If you have a will understand you best. It’s that old
characters and the shifty, slapdash separate written specification, the chemistry at work again. If you’ve got
and chaotic ones? It’s terribly difficult, process of quotation becomes much to this stage and still haven’t made up
particularly as long exposure to the more straightforward (and therefore your mind, then trust your instinct.
building game has a habit of turning tends to increase accuracy). Some of the very best of our small
the most upright people ever so 5 Ask what the day-work rates builders are extremely unambitious
slightly cynical and bitter. I suspect are and what mark-ups will be and don’t go out chasing work. They
that the truth is it’s always a bit of a applied to materials supplied, which keep a gang of three, four or five guys
gamble; there is no cast-iron way of were specifically excluded from the going and will turn work away rather
making sure you are entering into a quotation – usually done to allow than take on twice their normal
marriage made in heaven. This doesn’t you to make up your mind nearer the workload. They don’t advertise and
mean that it’s not worth taking some time. you won’t find them in the ‘Yellow
elementary precautions. 6 Be suspicious of very low Pages’. Often they don’t even do
quotations. Often you may find that quotations. Clients willingly wait
SELECTING A BUILDER most of the replies cluster around a months, even years, to get hold of
1 Try and start with a sensible figure (say £70,000) but one comes these builders and work is almost
shortlist. Get one or two of the in way below (say £45,000). Without always carried out in a spirit of trust
bigger local builders on board whom revealing your hand, try and elicit and co-operation, usually with very
you suspect will do a good job even how this quotation was arrived at: few subcontractors involved at all.
though you expect they might be what does this guy do that the others If you value quality above price and
expensive. Try and choose the smaller don’t know about? Why is he so informality above deadlines then this
ones from recommendations rather desperate for the work? It may just be may be the route for you. If there are
than pins in the ‘Yellow Pages’. the cheap one is the only one not in any of these mediaeval craft gangs in
2 Don’t waste everybody’s time by on the price fixing scam but, even so, your neck of the woods, chances are
selecting fifteen or twenty contractors. be wary. your architect or building inspector
It’s much better to have three of 7 If there is no clear winner on will know of them.
four who you contact (even visit) price, then have a second informal
personally beforehand to see if they round of interviews (probably by WHAT MAKES A GOOD
have the time or the inclination to do phone) to elicit more information. CLIENT?
your job. If the response is lukewarm, Are they busy? Are they very busy? If Be straight about money. If money is
don’t bother to send documents for you haven’t got a contract specifying a tight then sit down at the beginning
quotation, look elsewhere. completion date, find out when could of the job and discuss how and when
3 If you want to check on financial they start and how long would they payments will be made. Don’t leave it
standing and/or membership of trade take? Who would actually be running until the end.
organisations now is the time to do it. the job? Could you meet this person Communicate well. Choose a
Don’t get someone to quote for your on their current site (good chance builder you can talk to easily and one
work if you are going to reject them for a snoop)? Do they have a mobile who you in turn understand. If you
later because they don’t meet your number? Are they contactable out of choose to use a main contractor, then
standards. hours? work with him all the time.

72 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

Don’t issue instructions to the order for you to release the payment. n impose a time schedule with
subcontractors over the head of the This still doesn’t guarantee success. penalties for late completion. All
main contractor. There is a chain of But if you as a client play your part to sounds good, sensible stuff.
command and you should stick to the full and don’t mess your builder
it. It’s sometimes very tempting to around, then you won’t be doing WHAT ACTUALLY HAPPENS:
short-circuit it, but it very quickly your chances of success any harm. n never hire anyone who hasn’t been
gets messy. This dictum gets terribly In my experience, a good client is personally recommended to you: You
hard to stick to when the main the single most important element might have to wait a long time.
contractor has gone AWOL. of a successful building project – n always check on their previous
If you enter into a written contract, indeed, good clients tend to get good work: Has anyone seriously got time
then understand what the basic building work done for them. And if to do this? Chasing up old working
terms are. This applies even if the there is a key to being a good client, it contacts for subcontractors who
arrangement is less formal. is to understand just what your role is may only be on site for a day or two
Don’t be afraid to ask questions. If and playing it to the full. doesn’t feature highly on most ‘To
the job starts taking off on a course Do’ lists.
you hadn’t envisaged, then find out n always get three quotations in
why at once. writing: You must be joking. You
Realise that part of the key to HIRING SUBBIES may have to approach about ten to
getting good building work done is If you’ve chosen to dispense with the get three to respond in writing and
to be a good client, which translates main contractor then you’ll almost even then you may have to wait (and
as being a good manager. Don’t be a certainly be in the business of hiring chase) for two months.
passive consumer. And avoid letting subcontractors. Project management n never hire anybody on an hourly
things decline into a ‘them and us’ – piece of piss, mate. Subcontractors rate; get all work priced before hand:
situation. – no problem – there are simple Fine for most trades, but sometimes
Don’t keep changing your mind. ground rules, aren’t there! Well there this is totally impractical. You have
And don’t abuse the ‘free quotation’ are. They go something like this. to have a detailed specification ready
ethos that general contractors and chances are, if you are trying to
operate on. It’s one thing to get a free WHAT SHOULD HAPPEN IS: save money, you won’t have.
quotation at the outset of the job, n never hire anybody who hasn’t n check to see if they are members of
it’s quite another to demand costed been personally recommended to you a reputable trade organisation: They’ll
alternative quotes for every finish n always check on their previous probably be more expensive if they
item in your house. Main contractors work are.
spend an inordinate amount of time n always get three quotations in n check to see what guarantee they
generating quotations and the more writing offer: Worth checking on for kitchens
they are asked to provide them, n never hire anybody on an hourly and plumbing but a bit meaningless
the less time they have to spend on rate; get all work priced beforehand for most subbies. They’ve either done
managing their business. n check to see if they are members of it right or they haven’t and you’ll have
If you want to withhold money a reputable trade organisation to check.
because you feel something has not n check to see what guarantee they n never pay up front: Good advice
been done satisfactorily then be offer for anybody anytime. Sometimes it’s
specific about exactly how much you n never pay up front very hard to keep.
are withholding and why. Explain n always get ‘extras’ priced and put in n always get ‘extras’ put in writing
what you want the builder to do in writing before they are carried out before they are carried out: Alright in

HOUSEBUILDER’S BIBLE l 13th EDITION 73


Chapter 5

principle but, again, sometimes totally ESSENTIAL SUBBIES if the guy is only going to be on site
impractical if you are in a hurry (you Generally, you will be able to build for a few days it seems like a big case
will be). Get a site diary instead. If a house by hiring the following of overkill. Generally, contractors
you want it to go down in writing be characters: and subbies know the going rates for
prepared to do the writing yourself. n groundworkers. Someone with a various trades and they can usually
n impose a time schedule with JCB and access to a lorry work out an amicable agreement over
penalties for late completion: Risk n brickwork (brickies). Often a cup of tea and a ten minute chat,
losing your subbies. overlaps with groundworkers – one of and this is how 99% of subbies get
the two (or you) will have to lay the hired. It’s easy come, easy go and if
drains. Often work in gangs of three someone is useless they usually get
(two brickies/one labourer). Don’t asked to move on. However, if you
usually supply materials want to ensure high standards from
SUBCONTRACTORS n carpenters (chippies, or joiners up the start then you have to do a great
Legally a subcontractor (or subbie) is north and in Scotland). Often work deal more work, taking up references
a worker who gets hired and paid by in twos (no labourer). Don’t usually and talking to other contacts.
a main contractor. If a subcontractor supply materials NB: Don’t forget the builders’
works directly for you then they are, n roofers. Most often hired in small dilemma explained in Chapter One.
strictly speaking, not subcontractors gangs who supply and fix, sometimes High standards don’t tend to go with
at all but ordinary (or main) doing the scaffolding as well cheap prices. You gets one or you gets
contractors. n plasterers/dry liners. Mixture of the other.
The difference is crucial because one-man bands and small firms
if you become a main contractor n plumbers. Same mixture of one- LABOUR-ONLY V SUPPLY & FIX
you also become responsible for man bands and small firms Subbies tend to come in two distinct
policing your subcontractors’ tax n electricians. Same mixture flavours. The labour-only subbies
affairs – lots of unpaid admin! n decorators. Most selfbuilders do are usually hired singly or in small
However, if you are the client, this this themselves but there are plenty informal gangs. They tend to be
all flows over your head – i.e. you of ‘professionals’ around. concentrated in the heavy building
don’t have to know anything about There are a number of other side (brickworkers, carpenters,
it. Even though your subbies won’t specialist subbies who you may want plasterers). Many of the later trades
be subbies at all when they are to use: glaziers, garage door fitters, – i.e. those concerned with finishes
working for you, everybody still kitchen specialists, pavers and drive – are more often organised by small
refers to them as subbies. layers, landscapers, scaffolders. Refer businesses, which prefer to sell a
Generally speaking, when we say to Chapter 12 on ‘Shopping’ for more package whereby they supply the
‘subbies’ we are referring to tradesmen details. materials and the labour to fix the
providing a specific skill, like a materials: typically, roofers, plumbers,
plumber or a brickie. Sometimes CHOOSING A GOOD SUBBIE electricians, glaziers and kitchen
subbies will be one-man bands. I’d like to come up with an easy rule fitters. These supply and fix subbies
Sometimes they will be small firms for picking good subbies but I don’t will tend to be more organised –
employing several people. The one- know what it is. If you’ve found one you’ll be able to get quotes out of
man bands will tend to work for a perhaps you would let me know. them – and possibly a little more
cheaper hourly rate but may well be Obviously, you can go to great lengths expensive, particularly as they are in
just as expensive when it comes to to see that you appoint a master, but the business of marking-up materials
quoted works. this can be very time-consuming and they buy on your behalf. In effect,

74 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

Not all these vans are


you are introducing an extra layer of white, but you get
management, which has to be paid the picture. Subbies
for. virtually live in vans
From a small builder’s point of and it’s hard to see
view, the big advantage of hiring how you could build
small firms, rather than singletons, a house without
some parking issues.
is that cost control becomes much
clearer. If someone is quoting to On urban sites, the
supply and fit a kitchen into your problem is more
new house for £15,000 then you acute and it calls for
know in advance what the damage tact and diplomacy
is. However, if you rely on your own with neighbours. By
and large, if you keep
buying power plus Jim’s joinery skills everyone informed as
(paid for on an hourly rate) then you to what is happening,
will just have to hope that it’ll be less people are incredibly
than £15,000; logic says it should be, helpful.
but such finishing jobs have a habit of
running over budget. You could ask
Jim to quote to install your kitchen
but Jim might well be reluctant to
do so, especially if you are supplying
the kitchen fittings. And what about
co-ordinating with the plumber, the
electrician and the tiler? Who will
do this? If it’s to be you and they end
up keeping Jim waiting (they will)
then it’s you who is taking advantage been completed. For example, a both easier and more flexible.
of Jim’s fixed price and he’d have brickie on daywork might hope to If you are building to a tight
every right to cry foul. This sort of get paid, say, £150 per day: if he budget, price work is almost certainly
finishing work involves so much was on a price, he would hope to the route to take. For a rookie builder
intricate planning that it is unrealistic get paid something like £300 for this is perhaps doubly important
to expect every part of it to be quoted every 1000 bricks laid. All things because you don’t know what’s in a
for separately, so it tends to be either being equal, you would hope that he day’s work. Ask yourself how many
subbed out in its entirety or done on would lay about 500 bricks per day doors a chippie should be able to
a time and materials basis. whichever system was being used to hang in a day; if you haven’t got a clue
pay him, but human nature being then you qualify as a rookie builder.
what it is, it is widely assumed that The main problem with always
DAYWORK V PRICED WORK the person paying the brickie will insisting on price work stems from
Daywork is the term commonly get better value from priced work. the fact that it is, contractually, a
used to describe payments by the Many advisors say you should only much tighter type of agreement and
hour (or day) and it contrasts with ever hire builders on a price work that, for it to work, you need to be
priced work, where payments are basis but there are many situations able to describe the work accurately
related to specific works having where a daywork arrangement is before you can readily ask for it

HOUSEBUILDER’S BIBLE l 13th EDITION 75


Chapter 5

to be quoted. So really you need


to have a professionally written
the overall surface areas to account
for windows and doors, which can
CONTRACTS
specification for it all to make sense account for as much as 25% of the
to subcontractors. It’s not enough to area being built up. In return, they ‘DO I NEED ONE?’
say, ‘Here is a set of plans. How much normally fit the joinery in as they go You’ve already got one. It’s a
will you charge to put the brickwork without any extra charge. principle of contract law that
and blockwork up?’, because there every time you buy something or
are any number of little incidentals hire someone (or something) you
that increase the size of this work and CASH PAYMENTS enter into a contract. Any item
make a mockery of your attempts to One of the big advantages of you purchase should perform
limit the damage. organising your own building work adequately, any person you
is the ability to negotiate discounts hire should carry out the work
with tradesmen in return for paying described competently and you, in
MEASURED RATES them in cash. This is, of course, turn, should pay them the agreed
Another problem is that many illegal and any serious publication amount. In essence, it’s that simple
subbies find plans about as easy such as this cannot, naturally, and this basic principle holds
to read as you do. This is less of a condone such behaviour. But cash whether you are hiring a baby-
problem with the finishing trades payments for casual work are not sitter or constructing the Channel
where they can come and give the going to stop because I start being Tunnel.
house a once over and don’t have to self-righteous. All building work is covered by
resort to plans, but often the hardest The normal builder’s scam is these principles – it’s why builders are
parts of a job to quote are the first to take off VAT in exchange for referred to as contractors – and don’t
parts when no house shell yet exists. payments in cash, but this does think that just because you haven’t
Here a common ruse is to agree a rate not make much sense in new got a written contract then you have
for each section of work (say £400 per housebuilding because almost all the no redress should things go wrong.
1000 bricks laid) and then to total up work is zero-rated so you are not However, it is also true to say that if
when the work is completed. paying it in the first place. Unlike the things do go wrong, the more written
This is a perfectly sensible way of professional contractor, a selfbuilder is evidence you can produce to show
going about it and protects the subbie not required to police subcontractors’ how and why, the stronger your case
from any dispute about differences tax arrangements and if you choose to will be.
between what’s on the plan and what pay them in cash then that is a matter If you can produce a written
actually got built: however, there is a between you and them – it is not contract, signed by the builder, to say
great scope here for disagreements illegal simply to pay cash. Should the that he should have been finished
over the quantities actually built. subcontractor then fail to declare this by the end of August, and it’s now
Even qualified quantity surveyors will income it is they who are committing November and you still haven’t got
disagree by a few per cent and they an offence, though subsequent any glazing in, then you’ve got a
work to an agreed set of measuring inquiries might get back to you to pretty good case for withholding
rules: a contractor and a subcontractor uncover these payments. payment. Without something written
may end up 10% apart. Cash payments actually do very down, it’s your word against his and –
Note also that brickies like to little to benefit the new housebuilder well there might just be two sides to
‘measure through openings’ for both unless they are used to negotiate lower the story: you’re not in a completely
brickwork and blockwork. Thus prices from subcontractors, something hopeless position, but your case is
they don’t deduct anything from most subbies are reluctant to do. much weaker.

76 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

‘SO A WRITTEN CONTRACT IS quoting for them he is committing on the cheap is that you are more
ESSENTIAL?’ himself to carry out the work exposed to bad practice, but hopefully
Not at all. It’s actually one of the competently. If there are further you can compensate to some extent
most overrated of safety features conditions you wish to set (such as by your frequent site presence. In the
devised by professionals largely time limits), then you should add absence of any written undertakings,
to justify their fat fees. Take the these to your specifications. Should it keep a site diary to record the
aforementioned Channel Tunnel, later prove that your specifications are comings and goings and at least you’ll
the largest construction project inadequate then so be it; the situation have some written evidence in case of
undertaken in these parts in my would be no better had you signed a trouble. Even to be able to say, ‘Gary
lifetime. Teams of lawyers were written contract. and Pete were there just two days in
drafted in by both sides to negotiate that week and no-one else turned
contracts designed to be as watertight ‘IS THE SPEC WITH MY OFF- up till the 27th,’ puts you in a much
as they hope the tunnel will be. THE-PEG PLANS?’ stronger position than saying ‘they
Did it get the tunnel built on time You’ve missed the point. No contract were hardly ever there’.
and to budget? Of course not. Re- is ever completely watertight. The
enter those same teams of lawyers more detail you put into a contract, ‘I SAY. I SAY, I SAY’
to argue about compensation, etc. the tighter it gets. There isn’t a point The above section appeared
Who benefits out of all this? The at which it suddenly becomes OK; verbatim in the original edition
contractors, Eurotunnel and its rather you get what you pay for. It’s of the ‘Housebuilder’s Bible’ and
shareholders – or the lawyers? like asking how much life insurance its assertion that you don’t need
is enough when you know that a contract has caused one or two
‘IT’S ALL DOWN TO A there’s a 99% chance that you won’t people to hop up and down with
HANDSHAKE?’ need any and a one per cent chance indignation. Perhaps they have a
Not at all. That’s throwing the baby that twenty million would be very point. The fact that I’ve never built
out with the bath water. The basis of useful. Very detailed specifications with contracts doesn’t necessarily
a building contract is that the client are time-consuming to produce and prove that they are a waste of time.
contracts to pay a specified sum in are, therefore, expensive; only you can Julian Owen, a well known
return for completion of a list of decide whether you need one. selfbuild architect, pointed out that
specified tasks. The more detailed he was required professionally to
this list, the stronger the contract ‘BUT I’M PLANNING TO work with a contract and that they
becomes. If you have a professionally ORGANISE THE WORK didn’t have to be expensive or difficult
drawn up specification of works, MYSELF?’ to understand. He particularly favours
then you already have about as good It’s unusual to sign contracts with the simple 16-page JCT Minor
a contract as you can get. Signing a labour-only subcontractors or indeed Works Contract that is written in
formal written contract for work that to put anything down in writing. clear English and helps all sides to
is only specified in the loosest terms Normally, the work is described understand their responsibilities. I
is, in comparison, a complete waste of verbally or with reference to any plans won’t argue against this proposal but
time and money. and specifications to hand. However, I stand by my original line that a
the contractual principles involved in contract is no substitute for a detailed
‘YOU THINK ACCEPTANCE OF hiring subcontractors are no different written specification of work.
A QUOTE IS ENOUGH?’ and neither are your chances of There’s also the little point that a
Yes. If a builder has seen whatever redress, should things go wrong. builder faced with a formal looking
plans and specifications you have, by One of the penalties of building contract to sign will react by upping his

HOUSEBUILDER’S BIBLE l 13th EDITION 77


Chapter 5

quote. And if he sees penalty clauses, RETENTION from the overall contract value if
he will up his quote even more. It is quite common to withhold a the work is not completed to an
little money (between 2 and 5%) agreed schedule. For some reason
ANYTHING ELSE TO SORT until snags are adequately sorted out. I’ve not been able to fathom, these
OUT? However, don’t try and spring this are conventionally referred to as
There are some things that you on a builder halfway through a job as liquidated damages. Again, it’s one to
need to be clear about that are not if it was a matter of course. It’s not. sort out right at the outset and it’s a
to do with the technical specifics of Furthermore, it’s always a delicate very adversarial condition to place on
building. The formal way of dealing issue – it reeks of a lack of trust – and a builder.
with them would be to enclose the some perfectly good builders find Time penalties make sense when
terms along with the plans and specs it all rather insulting and choose to you will suffer financial hardship
you send for quotation; by putting in steer clear of such contracts. After all, (such as paying extra rent). However,
a quotation, the contractor implicitly how would you feel if 5% of your pay when a job overruns it is more often
accepts your terms. However, you was withheld until such time as your than not very hard to decide who is
could choose to sort these terms out employers saw fit. An awful lot of to blame. You have to be prepared to
more informally after acceptance of builders, when faced with a retention keep your side of the bargain, which
quotation; if you are confident that clause, just add the sum onto their means no delays in agreed payments
the terms are not too onerous on the initial quotation. along the route and no changes
builder, he should be happy to accept There is an additional problem to the specification of works. This
and, if he isn’t, then you’ve just been with retentions. How do you define still leaves the messy grey area of
given the clearest indication you’ll the end of the job? What is practical unavoidable delays (weather, strikes,
ever get that this marriage was not completion? People often take illness, disputes with architects)
made in heaven. Reconsider. Sorting possession of their new home or which could keep an impartial referee
out these matters is in the interest of extension long before the builder is busy for weeks. You need a very tight
both parties and very often the first really ready to hand over and what specification to be able to argue your
move will come from the builder. tends to happen is that a rolling snags side effectively.
list develops. Some items are clearly These added conditions are really
INSURANCE down to the builder to complete nothing more than specialised
For terms and rates, see ‘Insurance’ satisfactorily, some are extras, and forms of insurance and if you load a
section later in this chapter. Whoever many snags are rather indeterminate contract with retention clauses and
is organising the building work contractually. You could argue that time penalties you can expect to pay
should have cover. Make sure it’s in the job is not completed until the more overall for the works described.
place. snags list is finalled off, but if so,
what is the retention money being
held back for? Snagging the snags? If
PAYMENTS that’s what you want, then really you EXTRAS
Agree payment terms. If a lender is are looking for a guarantee, which is a The biggest single contractual
advancing your money in stages, be slightly different matter. nightmare any builder faces is how to
open with the builder about when adequately negotiate what the trade
and what these stages are. Generally calls variations but what everyone
it’s the builder who is advancing you TIME PENALTIES else refers to as extras. People call
credit and this makes him even more Usually, these take the form of them extras because, like Topsy,
vulnerable than you are. damages, which are to be deducted they seem to grow and grow. Some

78 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

do shrink (hence variations being a potentially stitch you up pricewise, There are two specialised forms
more accurate term) but for every but also they have a cast-iron excuse of extras, or variables, which deserve
one that shrinks or even disappears for blowing your time penalty clauses closer attention.
there must be a dozen that expand. out of the water. Even if things
It’s a particularly critical problem haven’t descended to this sabre PRIME COST SUMS
with renovations and smaller works rattling, adversarial level there is still PC sums are not a new form of
(where often 40% of the final bill ample scope to misunderstand and to anti-sexist arithmetic but a good old
is made up of items not originally misconstrue – ‘Oh I didn’t realise that builder’s routine for dealing with
quoted for) but the new housebuilder meant the glass had to be toughened loose specifications. PC sums are put
is not immune from catching these as well.’ ‘Well that’s an extra £200.’ If into contracts to allow you, the client,
particular bugs. you are the kind of client who expects the freedom to select a particular
If you’ve got plenty of time your builder to give you fully costed product at a later date. For instance,
and money and like a nice loose options for free throughout the job, you might put a PC sum of £500 for
specification where you can make up as in ‘How much extra would it be if a bathroom suite into a specification.
your mind as you go along then you’ll we had a bidet in the kitchen?’ you The contractor will have included
be wondering what all the fuss is probably deserve to pay over the odds this amount in the quotation but the
about, but if you belong to the 95% of in any event. actual figure you pay will be down to
builders who break out into a sweat Each little decision forms a mini- which bathroom suite you choose.
every time a bank statement arrives contract in itself and accounting There is a nasty little problem here
you will want to know how to avoid for them can take up over half the because things like bathroom suites
these nightmares. total admin time spent on a job. The have list prices and they have trade
The good news is that you can golden rules are: prices – indeed the trade price is a
inoculate yourself against most n make it clear that extras need to be matter for negotiation. Don’t bulldoze
of them. The bad news is that authorised by you before work starts in and buy the kit yourself, because
immunisation is itself expensive on them the builder (or perhaps plumber in
and time-consuming. Many n always negotiate extras direct this case) is expecting to make a
extras can be avoided by having a with the main contractor – that is profit on this deal and they would
professionally written specification, the person with whom you placed have every right to expect you to
but people wanting to save money the initial contract, not with anyone reimburse them for their lost profit.
will probably have avoided paying working for them The normal arrangement is that the
for one in the first place and are n write down what you’ve agreed – builder buys what you specify, and that
usually the same people who can even if it’s just in a site diary you get to pay list price and the builder
least afford extras. n the reasons for extras are many pockets the difference between list
As if the fact that extras occur at all and various. Sometimes it is down to price and his trade price; but this can
isn’t bad enough, when they do occur, unquantifiable works discovered after work out very expensive, particularly
you, the client, are negotiating with the building work has begun – in if you up the spec. There is no reason
a gun to your head; you can hardly new buildings, this type of problem why you shouldn’t negotiate a radically
hire another builder just to do the usually occurs underground. Most different deal whereby you pay trade
extras. If you’ve gone in a bit hard often it is down to the client adding prices, but make damn sure that you
at the beginning, including onerous to the original specification of works negotiate it beforehand – preferably
time penalties and retentions, you as the job progresses or, as it’s known right at the beginning. Again, the sure
can be sure that the builders will have in the trade, ‘changing their bloody way to avoid these sorts of problems
their revenge here. Not only can they minds again’. is to have a tight specification and

HOUSEBUILDER’S BIBLE l 13th EDITION 79


Chapter 5

that means one without PC sums. little planning beforehand will reap lost the paperwork which was in the
This requires decisions on things like dividends along the way. What front of the car but now you can’t
kitchen and bathroom finishes before equipment you need to hire (or buy) find it...you’ll wish you had opened
the job starts. depends very much on how you plan a trading account at the hire shop
to manage your build. For instance, if too. If you do, you will be able to take
PROVISIONAL SUMS you are entrusting the whole shooting tools for as long as you want without
Like their cousins, the PC sums, match to a main contractor, then having to pay any deposit. Deliveries
the provisional sums are placed in you really shouldn’t need anything at and collections are also much easier
contracts where there is an element of all. But if you are acting as the main to organise – most hire shops will
doubt about the amount of work to contractor and hiring subcontractors deliver and pick-up for a small charge
be carried out. They are much more to complete the various trades, (around £5-£10).
common in renovations than in new you will need to discuss each Generally, the hire charges are
building but there are nevertheless subcontractor’s requirements structured so that you pay the highest
areas – notably underground works beforehand. rate over the first 24 hours, then the
– which most builders will only It can be a confusing area. For daily rate falls significantly if you hire
estimate rather than enter into a fixed instance, some subcontractors – for longer periods. After about ten
price quotation. Understandably so. notably plumbers, electricians and weeks you will have paid as much in
It’s a buck-passing device, a way of most carpenters – tend to come hire charges as it would cost you to
saying that if there’s more work to do fully fitted out with toolkits and buy, so hiring really only makes sense
than can reasonably be anticipated, access equipment: others, typically over shorter periods. The number of
then you, dear client, will be the bricklayers, expect you to provide things you can hire never ceases to
one who has to pay. Well, you knew everything other than their trowels amaze me and rather than bore you
it was a risky game. Provisional and their levels. With groundworks, with a long list, if you are interested
sums are just one of the things that you tend to hire the kit and the get hold of a catalogue yourself –
makes building work such a gamble. labour together as a single unit – thus Hewdens is particularly good.
You can try to force contractors when a JCB is quoted at £400 a day
to take on the risk themselves but you are getting both a JCB and a HIRING V BUYING
their understandable response is driver for that price. Which begs the questions: what
to hoick prices through the roof; should you hire and what should
more realistically you can establish TOOL HIRE SHOPS you buy? There are a few basic bits of
guidelines for how provisional works If you want to stay ahead of the game, kit that it would seem near essential
will be charged: a labour rate, a mark- then make sure you have opened to have with you permanently and
up applied to materials, that sort of trading accounts with a couple of therefore you should buy if you
thing. tool hire shops because you will save haven’t already got them. I would
yourself an awful lot of faffing about. include in this basic hand tools like
For many novice project managers, a 5m tape measure, hammer, saw,
tool and plant hire is one of those screwdriver, 1.2m spirit level, the
MANAGING things that you just stumble into sort of thing you need to put up
PRELIMS once the project is up and running. shelves or assemble flat-pack kitchen
Tool and equipment hire is a rather But after you’ve been and hired three units. I would also place a cordless
specialised area that deserves a things and left £50 deposits which (£100+) power drill, a 30m cable
mention. As with most things in did or didn’t get credited to your reel extension lead (£30) and a 6m
the field of project management, a final bill and anyway you’ve gone and ladder (£120) on my list of essentials;

80 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

this equipment will be useful for


on going maintenance, not just for
housebuilding.
How much else it is worth buying
is really only a question you can
answer. It depends on how quickly
you plan to build, how much direct
involvement you will have in the
building process and whether or not
your selected subbies will have their
own equipment. A brickie gang will,
for instance, very often expect you not
only to supply tea but also a cement
mixer, and it may well make good
sense to buy one that you can sell on
at the job’s end (though don’t expect
very much for a used mixer). If you
work in the trade or have serious DIY
pretensions, then you will probably
have all of the above plus a lot more
Scaffolding is good indicator of the quality of the builder. Has
and you may view your project as a
it been erected properly? Is it clean? Is it all in place or have
wonderful opportunity to expand boards been borrowed for other tasks? Are the ladders secure?
your range of tools. But if you don’t All tell-tale signs to look for.
intend to carry on building after
you’ve finished your house, then it is
pointless to lay out thousands to buy occasionally roofing gangs. A two lifts, each being adjusted in
tools which will only ever fill up your standard scaffolding contract would level at some point. Guide prices for
precious storage space and provide specify an agreed price for a hire scaffolding are £50 per m run per
rich pickings for would-be thieves. period of eight or, perhaps, ten weeks; storey and to calculate the relevant
Whether you hire or buy, the if the hire continues beyond the metre runs add 15% to the perimeter
proportion of your total bill going on agreed period, a surcharge is levied measurements of the buildings you
either hiring or buying equipment is – typically 5% of the original price wish to scaffold to get the scaffolder’s
large (often around 2% of total build per week. The original price would lengths.
costs) and can be one major hidden include for three or sometimes four If you want to take control of the
cost to creep up on the unwary. Also visits from the scaffolders to erect scaffolding process itself, there is a
note that selfbuilders are not able to the different levels (known as lifts) system called Kwikstage by Kwikform
reclaim VAT on tool purchases or needed for the other trades to put up UK which just slots together, rather
tool and plant hire, including such the house. similar to erecting an aluminium
items as scaffolding and fencing. Single-storey houses (and detached tower scaffold, making it particularly
garages) will typically need only suitable for those who are taking a
SCAFFOLDING one lift but its level will have to be more hands-on approach and want
Scaffolding is normally undertaken adjusted between brickwork and to have scaffolding erected for much
by dedicated scaffolders or roofing; a two-storey house needs longer than the normal time span.

HOUSEBUILDER’S BIBLE l 13th EDITION 81


Chapter 5

which is a maximum 7-8 tons and


will cost £150-£200
n MEDIUM hold 3m3(4 yards),
equals around 5 tons and will cost
£100-£120
n MINI-SKIPS hold 1.5m3 (2
yards), equals up to 2.5 tons at a cost
of around £80-£100.
If you want a skip on the road,
there is red tape and a permit
involved, often around £70 for a
fortnight. You can save a little money
if you can guarantee that you will
be filling a skip with inert waste,
and even more money if you can fill
it with usable hardcore. And you
can also use skips to get sand and
aggregates delivered to site, which
saves on added transportation costs.
One of the skills of project management is working out what needs to Given that all building sites
be where and when. Our urban site had no rear or side access and produce copious quantities of
heavyside materials like bricks and sand had to be placed in the garden rubbish, I think that having a skip
area before the foundations were dug.
on site (certainly during the latter
stages of the build) is essential: if
Kwikform provide some training hold a tonne or three, it has had a you disagree, then at least have some
for people who have never used significant impact on prices. It’s not coherent alternative strategy worked
scaffolding before or, alternatively, can all bad news: skip companies are able out for waste disposal.
provide an erection service. Rental to recycle some of the typical skip
prices for a four-bedroom house waste, such as timber and metal, and SITE FENCING
sized project work out at around £80 this reduces the effects of the Landfill There are an increasing number of
a week. Tax. sites where some sort of perimeter
Skips are usually charged at a fencing is advisable, if only to stop
SKIPS flat rate which includes delivery, unwanted visitors clambering all over
Part of your build plan should swapping over, final removal and your building site and walking off
involve a close look at how you waste disposal. You don’t get charged with your toolkit.
plan to dispose of waste; for many for keeping a skip on site, unless you The standard steel fences (often
small builders a skip is a practical are paying the council for a road referred to as Heras fencing) hire
and economical solution. The basic permit, which is added to the bill come in 3.5m lengths and cost about
cost of a builder’s standard sized separately. If you plan to use skips, it £5/length/week. If you need security
skip has more than doubled since is well worth setting up an account fencing for more than five months,
the introduction of Landfill tax in with your chosen supplier. it will probably pay you to buy it and
1996. By 2019, this tax had risen Skips come in three sizes: resell when you have finished.
to £91 per tonne, and as most skips n LARGE hold 6.2m3(8 yards),

82 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

SECURITY TIPS One way of keeping


thieves off a site is
n Have valuable materials (joinery,
to install CCTV. We
sanitaryware, kitchen goods) on site for did this on our site in
as short a time as possible before fixing Cambridge and, lo and
n If you have nowhere to lock up kit like behold, we caught a
cement mixers, barrows and hand tools thief on film very early
then at least hide them so that the casual one May morning. Not
that it made a lot of
visitor does not see them from the road
difference. The full story
n Take small tools (especially power is to be found in Ch.15.
tools) home with you
n Get the windows glazed and the
external doors hung as soon as is
practicably possible
n If your site is particularly vulnerable,
consider building the detached garage
first (if you have one) to use as a strong
room. Alternatively, do what many of
the professionals do and hire a container
for the duration. An onsite CCTV
camera will also help as a deterrent.

height), but thereafter the dangers by doing your homework and trying to
HEALTH & SAFETY of trench collapse become very establish just where cables are likely to
Building sites are by their very nature much greater. There are well proven be buried.
dangerous places. We demand finished techniques for shoring up trenches
buildings that are themselves structurally and if you are not sure what you are PLANT
sound, weatherproof and safe to live-in doing then for God’s sake get hold of Control machinery. Heavy plant can kill
but in order to create them we have to someone who is. or maim if not properly controlled. If you
go through a series of steps, which are Deep foundations are potentially get behind the wheel of a dumper truck
inherently unsafe. Anyone managing very dangerous and you need to guard don’t play silly buggers, be very wary.
small building sites is legally required against not just trench collapse but They are not difficult to drive but they
to be aware of these risks and to take also materials and people falling down can be difficult to control, particularly
measures to minimise their impact. New into them. If you are working close to if it’s wet and muddy. They can easily
housebuilding is actually one of the safer or underpinning an existing structure end up crushing someone. Dumpers
sectors of the construction industry – a fact there is the additional problem that are often used to pour concrete into
borne out by lower insurance premiums you could undermine it and cause a foundations and this frequently leads to
– but there are still a large number of potentially catastrophic collapse. accidents. Also, ensure cement mixers are
potential hazards to be negotiated. Another problem to always be aware properly seated before you start loading.
of is encountering buried cables and
EXCAVATIONS pipes, something that is common when LADDERS
Trench work is usually fairly safe you are opening roads to make service Don’t be tempted to be macho – anchor
at levels down to about 1m (waist connections. You can reduce this risk the top end on to something secure. Don’t

HOUSEBUILDER’S BIBLE l 13th EDITION 83


Chapter 5

make do with funky old ladders with gashed and generally bashed about extra work. If you don’t then chances
broken rungs. And wonky step ladders are and it’s not unusual for bare wires to are the only way you’ll even know
a nightmare you can live without. get exposed. that nails are lying in wait is when
Keep your eyes open for this sort you tread on them. Ouch.
SCAFFOLDING of thing and if you come across badly
Don’t be afraid to spend money on frayed cable then replace it, don’t LIFTING
extra scaffolding. If you are uneasy bodge it with insulating tape. Back injuries are by far the
about doing some task off a ladder commonest cause of lost time for
(or a scaffold tower) then get proper STEEL TOE-CAPS builders. They can usually be easily
scaffolding erected. It’s surprisingly Bruised and broken toes are still one avoided by asking for some help
cheap and you’ll get the job done of the commonest of accidents. Yet when lifting heavy objects like bags
in half the time. Also be very wary you still see subbies wearing trainers of cement. Again, don’t feel you have
about ‘rearranging’ scaffolding. on site. If you are buying purpose to be macho just because you’re on a
Usually, this means nicking boards made shoes, get some with steel toe building site. Ask for help.
off the scaffolding to use elsewhere. caps (from most builder’s merchants
Think who might be going to use from around £30). If you manage to MINOR ACCIDENTS
the scaffolding in the near future and acquire a pair with Doctor Martens Have a small first aid kit on site.
make sure they know what’s been written on them you’ll have a valuable Most injuries are minor and can
going on. fashion accessory to boot. Most readily be treated with TCP and a
builder’s merchants also do a line of bandage.
POWER TOOLS steel toe-capped wellies.
If you don’t already have a kit of
power tools but are planning to buy HEAD INJURIES
some, then buy 110v ones rather Most ‘serious’ sites insist on hard hats CDM REGS
than 240v. You’ll need a transformer being worn at all times, yet you won’t In April 2015, the CDM
to get them to work but they are far even find a hard hat on most small (Construction Design and
safer. When you hire power tools you sites – which is a shame because small Management) Regulations were
should be offered a choice of 110 or sites are no less dangerous and, when expanded to include selfbuild for the
240v. If you are committed to using people are working above you, a hard first time. The CDM regs began life
240v power tools then ensure that hat makes good sense. Yet, because in 1995 and received a major upgrade
your temporary electricity supply they have an image of being ‘for the in 2007. The earlier versions of CDM
is protected with RCDs (Residual big boys only,’ the small builders and specifically excluded domestic clients
Current Devices). their subbies tend to shun them at all but made substantial administrative
times. At least make an effort. Have a demands on small builders running
ELECTRIC CABLES couple of hard hats on site and wear commercial sites. There was a key
Long extension leads are a menace them when people are working on appointment of a CDM co-ordinator
(though sometimes unavoidable). Try scaffolding above you. who had to take on responsibility
and avoid trailing them across site for developing a Health and Safety
where vehicles may drive over them. SHARPS file and ensuring that everybody
Get a cordless screwdriver – they Remove nails from loose timber lying involved on the job had some level
are brilliant and you won’t need all around site. Common sense really but of competence. The 2015 regs not
those extension leads. it usually gets overlooked. If you keep only do away with this Co-ordinator
Cables on building sites tend to get a clean and tidy site, this will be no role but make no mention at all of

84 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

competence. Maybe competence was For instance, if you are involved jobs, CDM may come to have a
just too much to police. Maybe it was in demolition, you are required significant role to play. But at the
dropped because it was needlessly to plan and carry it out in such a domestic client scale, it’s now not far
bureaucratic. But it’s gone, and with it manner as to prevent danger or, short of being a simple check-box
much of the purpose of CDM. where it is not practicable to prevent exercise.
What’s left? The Health and it, to reduce danger to as low a
Safety file is still required but the level as is reasonably practicable.
guidance offered by the Health It’s hardly going to say anything
and Safety Executive (HSE) is to else, is it? You are also required to INSURANCE &
download an App called CDM have a written record of your plans WARRANTIES
Wizard (available only on Android before commencing, but if you have There is a great deal of risk involved
and IoS, which shows just where filled out the CDM Wizard, you will in building. One of the keys to
this is being pitched). Fill it out — be there already.  successful building is to be able to
mostly a series of checkboxes, about So what exactly is required of manage this risk so that it doesn’t
15 minutes work — and “This is the today’s selfbuilder, now that almost overwhelm you, and one of the
Construction Phase Plan of your all building work comes under most useful tools, in this respect, is
job as required under CDM 2015.” CDM?  The guidance includes a insurance.
Sorted. flowchart (p86) which is about as Risk comes in two flavours,
You also have to notify large clear as mud, as it bandies around physical and financial. The physical
jobs to the HSE before you start terms like DIY and contractor risk on building sites is largely
but many selfbuilds will not be without defining them. But if you a health and safety matter and
classified as large. The threshold work your way through this, you managing that risk is looked at in
is that the job lasts longer than 30 will find that you are more than the previous section ‘Site Safety’.
working days and has more than 20 likely deemed to be a domestic client But there is an overlap between the
workers working simultaneously at and that you really don’t have to do two types of risk because an injured
any point in the project, or that the anything because the people working subbie or passer-by may well choose
job as a whole exceeds 500 person for you, be they designers, main to sue you for negligence and so the
days. Typical selfbuilds will come in contractors or individual tradesmen, first (and arguably most important)
somewhere around here, but few of become responsible for CDM by layer of insurance rears up at you. In
them actually get as far as estimating default, unless you want someone in fact, you need two separate policies
this figure beforehand. If you have particular to act as the CDM guy. in place to cover this risk because the
to comply, then look for form F10 I don’t happen to believe that risk to the general public is dealt with
which you can fill in online. CDM 2015 is particularly taxing quite differently to the risk to people
It is also noticeable that the 2007 on designers and contractors either. working for you.
CDM regs guidance was a much Designers are required to design in
longer document and was frankly ways to minimise risk to workers and EMPLOYER’S LIABILITY
over-complicated. It didn’t include to follow-on maintenance, which If you employ any subcontractors
any information about health isn’t a bad idea and hardly needs a – and if you undertake your own
and safety risks, merely their set of regulations to tell us as much. project management you are deemed
management. In contrast, nearly half And contractors have to produce to be an employer, at least from an
of the 90-page CDM 2015 guidance a health and safety file, which it insurance angle – and any one of
concerns itself with managing specific appears can be done for free via the these subcontractors then has an
risks you are likely to meet on site.  CDM Wizard. For large complex accident, which might be construed

HOUSEBUILDER’S BIBLE l 13th EDITION 85


Chapter 5

to be your fault, then they can sue (usually with a hefty excess) together planning permission. Make sure that
you. If this is a serious accident the with fire or structural damage to any your insurance company understands
sums of money at stake will be large. structures that you may be working the difference.
Most policies now cover you for on. Your lender will probably insist Contracts Works or All Risks
£10 million. A general builder is that you have all risks cover just as policies are not mandatory and they
required by law to have an Employer’s a conventional mortgage lender will usually come with dozens of options
Liability policy in place and if you, as insist that buildings insurance is in for you to pick and choose just which
a client, are using a general contractor place on any property they mortgage. risks you want to cover. These go
then you don’t need your own policy If you are employing a builder to from the catastrophic (such as the
in place as well. But you should check erect your house, again you shouldn’t building being destroyed) down to
to see if your chosen contractor’s need to take out your own policy as the inconvenient (such as some kid
policy is in place. well but again you must check to nicking your power tools). Just where
see that they have current all risks you draw the line and just what
PUBLIC LIABILITY insurance in place and that it’s large excess you choose to bear yourself has
This covers people (or objects) who enough to cover the value of your an enormous impact on the cost of
you are not employing but might, completed house – very often the the policy.
nevertheless, still have cause to regret policies stipulate a maximum contract There are only a handful of
your building site ever existed. Maybe value above which they won’t pay out. insurance companies active in
the mud from your site led to an One important point to note is that the construction market and
accident, maybe your scaffolding fell contract works insurance does not most of them are open to the
down on someone’s car, or maybe cover any existing structure you may needs of selfbuilders as well as
some kids were playing in your be altering, converting or extending. the professionals. The names with
foundation trenches when... This is You would be expected to have the track records currently are
‘what if ’ insurance with a vengeance, this covered by a regular buildings Selfbuildzone, Self-builder.com and
but although the chances of a claim insurance policy. Buildstore via their Buildcare package.
are small, any such claim could be There is another particular Expect to pay around 0.5% of the
extraordinarily large. Most standard problem, which occurs with total project value to get most of the
policies cover you for £2 million unconverted barns with valuable cover you really need to build with a
worth of damage. planning permission riding on the safety net. That translates at around
back of them. The nominal value £800 for a typical, four-bedroom
CONTRACT WORKS of the structure may be very low detached house. Small builders pay
INSURANCE indeed – in fact it may well be a much the same rate on their overall
Financial risk can never be entirely liability rather than an asset – but the turnover. This would cover you for
covered – for instance no one is planning permission depends on the all the main areas that professional
going to insure you against your building continuing to exist. Were it builders are supposed to cover,
finished house being worth less to burn down before conversion work being employer’s liability, public
than it cost to build. But there are is started, you could theoretically liability and all risks insurance, all
various catastrophes that you can, to have the planning permission summarised above.
a certain extent, guard yourself from. revoked, which would be far more If you are selfbuilding, then these
The basic level of insurance here is expensive than replacing the original policies cease to have any validity
covered by the Contract Works or fabric. So the risk you are insuring once you have completed and so
All Risks policy, used to cover theft in these cases is not the value of then you need to transfer to regular
of plant and materials from site the building but the value of the building and contents policies.

86 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

WARRANTIES Over the years, the remit of the company) in the event of defects
A specialised area of insurance, NHBC changed so that it started arising in the future.
the structural warranty only to cover defects which might appear But, of course, you have to pay for
applies to new build homes. It’s a in the structure after completion. this policy and, for selfbuilders, it’s
one-off payment, usually costing Things like damp walls, roof failures, an expensive exercise. There is no
around £2,000, which covers subsidence. Gradually, it became requirement to take out a warranty,
structural failures in homes for standard for the mortgage lenders to but if you want to borrow money, you
the first ten years. It apes what require sight of an NHBC warranty will be well advised to have one in
happens in the developer market to ensure that the property they were place.
where the NHBC (the National lending against was covered if there In contrast, your standard building
Housebuilding Council) rules the were latent defects. And then this control doesn’t come with any
roost. requirement for a mortgage started guarantee.
The NHBC were active in the to spread to selfbuild, where the risks Regular building inspectors have
selfbuild arena till recently but have were very different. the power to act as construction
now left the field open to a number Thus selfbuilders found themselves policemen, making you redo bits
of smaller, more nimble operators, needing a warranty (or something of your work so as to satisfy the
principally Selfbuildzone, Premier similar) in order to qualify for a building regs. And they are able to
Guarantee and LABC (Local mortgage. It is this requirement issue (or withhold) a completion
Authority Building Control). which drives the warranty market. certificate for your works, which is
Why have a 10-year warranty at How do warranties work? Initially, a mighty handy thing to have when
all? A little back story. you submit your plans, which are you come to sell your house. But
If you buy a car or a computer, it is scrutinized and sometimes returned you have no redress against them if
usual for it to come with a one-year for one or two amendments. The their inspections should prove to be
or two-year guarantee, provided free warranty providers then carry out negligent. That is where warranties
of charge by the manufacturer. The onsite inspections to see if you are come into their own.
new homes market once operated building what your plans suggest you By and large, warranty inspections
in exactly the same way – i.e. the should be building. and building inspections are carried
builder supplied their own guarantee Unlike traditional building out by different people, despite the
– but back in the 1930s depression, inspections, which take place work being almost identical. Whether
there was such a huge number at pre-arranged landmarks, the this arrangement is sensible is open
of housebuilders going bust that warranty inspectors habitually turn to question, but this is how it works
the house-buying public lost all up randomly, although you usually in practice. Most selfbuilders work
confidence in the guarantees being get warned of their visit beforehand. with one insurance company from
offered by individual builders. Those Having satisfied themselves that you the outset and get them to cover site
housebuilders who remained in have carried out the building work insurance and warranties.
business decided to pool together the correctly, you then get a completion If you work with your local
risk and that’s how the NHBC was certificate. authority building inspection
born. The crucial difference between team (the traditional route), they
The original NHBC warranty was ordinary building control and a may steer you towards an LABC
therefore created to assure people warranty scheme is that the latter warranty. As LABC stands for Local
buying off-plan that their new home is turned into an insurance policy, Authority Building Control you
would be finished, even if the builder which allows you to make a claim might surmise that this warranty
they were dealing with went under. against the builder (or its insurance is organised by your local building

HOUSEBUILDER’S BIBLE l 13th EDITION 87


Chapter 5

inspectors. But they are in fact Professional Indemnity (PI)


administered from the same office insurance in place for just such BOOK-KEEPING
in Birkenhead that an apparent rival eventualities so they can’t just roll
in this market, Premier Guarantee, over and play dead the moment SITE DIARY
hails form. Interesting market, you get heavy, but what isn’t often Even if you loathe the thought of
warranties. understood is that their insurance record keeping, do try and keep a site
policy will cover their costs but not diary and write down a summary of
yours. And unless you have all costs every day’s action:
ARCHITECT’S awarded to you (which is extremely n weather
CERTIFICATES rare) then you are likely to end up n what work was done
There is an alternative to buying with huge legal bills. n who was on site and how many
warranties. If an architect (or in So, another financial risk looms hours they worked
some cases a surveyor or a chartered and, lo and behold, there is yet n quotations, orders, deliveries,
builder) is supervising your job, another policy available to cover shopping trips
you can elect to have them issue this particular risk, although I n payments made
progress (and completion) certificates only know of one such policy, the n contacts made, phone numbers
throughout the job which say that Selfbuild Legal Protection scheme. n site visits by building inspectors,
the work has been done to their It will pay reasonable legal expenses architects, surveyors, etc.
satisfaction. for actions you might wish to take n comments, feedback from casual
Most lenders are more than against a whole raft of characters visitors, neighbours
happy to take the word of a suitably over and beyond your architect: n accidents (however small),
qualified (and insured) professional your main contractor, your subbies, breakages, theft.
instead of a latent defects warranty. your materials suppliers, even your This not only provides a fascinating
However, your professional is unlikely solicitor. It costs about £125 and is historical record, but a site diary has a
to provide such a service for free valid for up to two years after you more immediate benefit if a dispute
and the overall cost may well end move in. arises; you have a written record of
up being very similar to third party What if you are using a designer transactions as they occur. Whether you
insurance. who doesn’t carry PI insurance? choose to work with or without a formal
There is a pitfall here too for the Many very good house designers are contract, a site diary will provide you
unwary. Your architect is not an not formally qualified and would find with loads of unexpected ammunition
insurance company and making it very difficult to get PI cover. should things ever turn nasty.
a claim against an architect is no In these instances, your protection
easy matter. If your double glazing would have to lie with a the third- BASIC ACCOUNTS
(say) was to fail after five years you party warranty provider. Once your What level of accounts you keep on
would have difficulty establishing plans are accepted by your chosen a project like a selfbuilt house is
whether this failure was down to poor warranty provider, then they are very much up to you. Because you
design or to manufacturing defect. taking on responsibility for their are able to reclaim VAT on most
If you think the blame lies with your outcome, though you need to read purchases going into a newly built
architect’s design or supervision, the small print to get a handle on house, it is a must to keep every
you would then have to pursue the what is covered and what isn’t. VAT receipt that comes your way
architect for compensation. Straightforward it is not. (I recommend a lever-arch file and
Now it is part of a properly a hole puncher for filing). When
qualified architect’s job to have the time comes to make your claim,

88 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

you will have to total all the figures, budget breaker is the unavoidable puncher (c. £25) to pierce the thicker
but whether it’s worth keeping a extras (often to do with extra tomes. In addition, get a pack of
running total of costs going whilst foundations or drains). There is cardboard magazine files, which you
the job is in progress is doubtful. only one safe way around this and can use to hold really thick literature
Running trading accounts with that is to make a largish – say 5% – like you get from kit home suppliers
builder’s merchants and plant hire contingency sum available for such and certain kitchen manufacturers.
shops can be a big help; not only is eventualities. If your budget doesn’t
buying more convenient (and often stretch to this, then how about
cheaper) but just the fact that tax building a smaller house? The more
invoices get sent by post to your home loosely organised your management
address makes it much easier to keep of the job is, the higher the chance VAT
tabs on paperwork. Trading accounts is there is of encountering unavoidable VAT rates can change. Indeed they
a subject dealt with in greater length in extras. No amount of clever may well do during the lifespan of
Chapter 13 ‘Shopping’. management accounting will make this edition. It only takes a single
up for an incomplete specification. announcement in the House of
MANAGEMENT ACCOUNTS Commons. This edition is based on
If money is tight then you should CORRESPONDENCE the situation that applied in early
consider putting a lot more effort Keep handy copies of all 2019, whist the whole country is
into job accounting. You need an correspondence to do with your watching out for the outcome of
early warning system in place to warn house from plot purchase to suppliers’ Brexit. It assumes that nothing much
you when costs start to overshoot. terms. Some of this now happens major happens in the following
The key to doing this is to split your using email, but an awful lot still gets months or years, but in reality it could
whole project down into a number done on paper. Even if it’s email, it’s all change very quickly. All prices
of little joblets such as groundworks, still not a bad idea to print it out mentioned in this book are VAT-
external masonry, roofing, etc. Prepare and keep a hard copy. A lever-arch free (unless otherwise stated). The
a detailed budget for your house file with about ten sub-dividers peculiar situation that selfbuild finds
showing how much you expect to should be sufficient. Don’t forget that itself in is about to be described in
spend on each joblet and prepare a correspondence means keeping copies some detail but it’s worth noting here
job schedule sheet showing how long of your letters as well as ones received, that you can download the selfbuild
each stage of the job should take. so work out some system of making VAT reclaim form from the Revenue
Analyse costs as they occur and use and keeping copies of your side. & Customs website on www.hmrc.
your site diary to estimate how much When you express any kind of an gov.uk. Hint — look for Notice
of each stage is completed each week. interest in building, you soon find 431NB (for newbuild) or 431C (for
You don’t go into a project like yourself getting snowed under with conversions) in the VAT section.
building a new home without mailshots for this, that or the other. New housebuilding (and
some sort of a budget. Sticking to Some of this is junk, some of it is conversions of non-domestic property
the budget is obviously crucial to incredibly useful, but you will need into homes) enjoy a privileged
the success of the project, but in to be on the ball about organising position in the UK VAT world. They
my experience you are more likely it or you’ll never be able to retrieve are mostly zero-rated. This means,
to come adrift through making the useful bits when you need them. in layman’s terms, that you can
an unrealistic budget in the first Again, a subdivided lever-arch file is reclaim almost all the VAT charged
place rather than overspending on a real winner here, though you may to you in the course of creating your
budgeted items. The other great need to invest in a heavy-duty hole new house. This is something of

HOUSEBUILDER’S BIBLE l 13th EDITION 89


Chapter 5

RECLAIMING VAT
So much for politics. Here follows
an explanation of the VAT position
in Great Britain as of 2019. The
position varies depending on how
you organise your construction.
If you are a professional builder
undertaking a spec build for the
first time, it could hardly be simpler;
you just reclaim the VAT inputs
each quarter when you do your
VAT returns. The only complexities
come with certain costs where
VAT is not reclaimable. More on
This is VAT form 431NB these in a minute. For selfbuilders,
(stands for new build). The HMRC runs a special scheme called
form for conversions is 431C. VAT refunds for DIY builders and
converters. Really, this claim pack is
a must-have item unless, of course,
an anomaly. Since the introduction of a non-domestic property was you think the government deserves
of VAT in 1983, almost all other widened in 2001 to include anything the money more than you do. You
building work has been standard- that hadn’t been lived in for ten can use the DIY reclaim scheme
rated, which means that you cannot years so conversions of all kinds of even if you have very little input into
reclaim the VAT. buildings into homes was brought a new house: if a builder undertakes
The reason new housebuilding into the zero-VAT net – prior to that a turnkey project for you, you can
survives VAT-free is that VAT they had to have been unoccupied still reclaim VAT on items like
cannot be levied on second-hand since 1973. fencing and paint that you might put
house sales since such sales are Gordon Brown, as Chancellor, also in yourself.
private, and so it would be regarded introduced a 5% VAT band, which How you run a job has a bearing
as inequitable for new housebuilders applies to work on properties empty on the VAT situation. Design
to have to charge VAT on their for more than two years, and also fees and professional services and
product when 90% of all house to changing the number of living preliminary costs are not normally
sales escape it. Nevertheless, units in a building. This latter was eligible for VAT refunds but if you
the imposition of VAT on new presumably brought in to encourage start by appointing a builder who
housebuilding is a possibility that all builders to convert large houses into provides design as part of the overall
new housebuilders must face and it flats but it seems to equally well apply package (as you might with many
has occasionally come to the fore in to people who want to turn a block of timber frame companies), then
the political debate about the future flats into a large house. it’s all considered one design and
of housing. What Brexit may or may not build contract and you can reclaim
Having warned you of that, bring is a matter of utter speculation all fees (provided the invoicing
the changes in VAT rules for and this is as true of VAT on doesn’t separate out the fees from
homebuilders recently have actually housebuilding as it is on everything the construction). It’s called creative
been pretty helpful. The definition else. invoicing.

90 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

If you are taking on the project WHAT IS ZERO-RATED? As your house nears completion,
management yourself, there are quite As discussed already, recent changes you will find a number of items that
a few ground rules you need to be in VAT rules have somewhat HMRC, in their wisdom, regard as
aware of. simplified the rules and made fittings that lie outside the zero-
You can’t reclaim VAT from definitions of what can and cannot rating net. If there is any ground rule
subcontractors for their labour, or be zero-rated much easier to grasp. at all it is that if the items are fixed
on supply and fix contracts. If it’s There are two areas to consider. into the building then they are zero-
a regular new build, then make Firstly, how does the job as a whole rated but if they are removable then
sure they don’t charge VAT in the stack up in the VAT reclaim stakes? you must pay the VAT.
first place. Just to make things And secondly, which costs incurred However, there are many
complicated, if the project you can you reclaim? exceptions to this rule and the rules
are undertaking is classed as a The first area has always been are often subject to review. I present
conversion, not a new build, then looked on as a minefield. If you the following list for general guidance
you are able to reclaim VAT on are in doubt, you can get hold of only; the VAT office may view things
labour, even though VAT on the the rules on the web at www.hmrc. differently. Please don’t jump down
labour should be being charged at gov.uk where you want to get hold my throat if you find you are unable
the reduced rate of 5% – you have to of two documents, VAT notice to reclaim VAT on something I’ve
ensure that it is. 708 (Buildings and Construction) said you can. It’s the VAT office you
You can only make one claim and and VAT information sheet 0501 should be arguing with and, if you’re
this must be within three months of There are of course still grey areas canny, you will do this before you
completion. Completion is not the – for instance what happens when start construction. VAT Notice 431
same thing as occupation: they expect you convert a pub that has a self- includes a similar list, which you
you may well occupy before technical contained flat – but it’s still simpler should refer to for the latest views
completion but if the delay between than it was. A bit. And no, building from the VAT office.
the two is longer than six months new holiday lets doesn’t qualify for Having tried to get myself off
then they become suspicious and will zero-rating. What’s in and what isn’t this particular hook, let’s look at the
demand explanation. Tread cautiously is all determined with reference to current state of play. Personally, I find
here. these lengthy documents. this catalogue of what’s in and what’s
Valid VAT receipts, made out Provided you can establish that out ridiculous, and I’d be tempted
to you, must support all purchases your project is a new build, almost to laugh at it if there wasn’t so much
you wish to reclaim the VAT all the construction costs are eligible damn money riding on it. Don’t keep
on. A VAT receipt is one that for zero-rating of VAT. That is to say, telling your VAT official that ‘This
includes the supplier’s VAT No those suppliers who are knowingly is crazy!’; they know it and they’ve
(but doesn’t necessarily separate supplying a zero-rated project should heard it a thousand times before.
out the VAT). Credit card slips, not add VAT to their invoices and n Kitchens: Fitted kitchens are
cheque stubs, delivery notes are if VAT is applied (currently at 20%) zero-rated but white goods (cookers,
not VAT receipts. Note also that if you should be able to reclaim it. The washing machines, dishwashers, etc.)
some of your material supplies are situation with conversions is subtly are not. There is no distinction made
purchased through a subcontractor different. Here you are expected to between integrated and freestanding
who is not VAT registered, you will pay VAT on all supplies, including equipment – you must pay VAT
not be able to reclaim VAT – the labour, albeit at the reduced rate of on them – so things like waste
original invoice must be made out 5%. You can still reclaim using the disposal units and water softeners
to you. DIY builders VAT refund system. are standard-rated. However there

HOUSEBUILDER’S BIBLE l 13th EDITION 91


Chapter 5

are some zero-rated appliances, most to reclaim the VAT. further VAT reclaims in order to get
notably cooker hoods and built-in n Garages and driveways: their hands on this money before the
vacuum cleaners. Zero-rated, but note that other house is complete. If you employ a
n Agas: Standard-rated except when outbuildings are standard rated. VAT registered builder to construct
they have an integral boiler; then they n Landscaping: They will generally your house this reclaim problem does
are regarded as part of the heating accept a limited amount of turning not occur as the builder’s invoices
system and VAT can be reclaimed. and paving as zero-rated. The rule are zero-rated for all but the exempt
n Fitted cupboards: At present the seems to be that if the landscaping items though note that you can still
ruling seems to be this – if you build is included as part of the planning use the DIY reclaim scheme if you
the cupboards (i.e. fitting doors across permission, then it’s zero-rated. buy just the odd can of paint and a
alcoves formed in the walls) then it Otherwise it’s standard rated. few curtain rails on your own account.
seems that you can reclaim the VAT n Swimming pools: Standard-rated
on all the materials, but if you buy unless it’s inside a building, which is LISTED BUILDINGS
in fitted cupboards then you can’t. If at least attached to the main house. Listed buildings used to enjoy a
that’s not clear then ask your VAT n Outbuildings/conservatories: semi-privileged VAT position in that
office. Detached outbuildings (except whilst repairs were standard rated,
n Flooring: All forms of carpeting garages) are standard-rated. improvements were zero-rated. Lots
are standard-rated. Everything else is However, attached extensions like of fun was had by designers and
zero-rated. conservatories are zero-rated. The builders, trying to show that a repair
n Heating/plumbing/sanitaryware: rule seems to be if it’s attached, it’s was actually an improvement, but
All zero-rated except water treatment zero-rated: if it’s detached, you have this game was stopped in its tracks
units. Fireplaces are also zero-rated. to pay the VAT. The only exception is by then-Chancellor George Osborne
Solar panels, heat recovery systems the detached garage (see above). who made all listed building work
and air conditioning also qualify for n Plant hire, scaffolding: These are standard rated (i.e. 20% VAT) in
zero-rating. standard-rated items, which you 2012.
n Electrics: All zero-rated. Light cannot reclaim, although note that
fittings should be OK provided they scaffolding erection and dismantling VAT IN THE EU
are fitted, but a zealous inspector may is technically zero-rated whilst the The VAT regimes for new
disagree. hire is not. Therefore, you can save housebuilding vary substantially
n Alarms: Both smoke alarms and money by getting your scaffolder to around the EU. There is no such
burglar alarms are zero-rated. Also invoice separately for the two services. thing as zero-rating anywhere else (as
fire safety equipment is now zero- n Professional fees: Standard-rated. far as I can establish). In the Republic
rated. of Ireland, VAT is collected at over
n Furnishings: Movable furniture is END OF THE PARTY 20% on all building materials though
invariably standard-rated. The status A selfbuilder can only make one there is a tax break if you employ a
of fitted shelves is unclear. Curtains reclaim from the VAT office and so registered builder on a new house –
and blinds are standard-rated but you when it’s done, it’s done. This presents you pay VAT at 12.5% instead.
can reclaim VAT on curtain rails. a major cashflow problem to many But one piece of good news is
n Decorating: Paint is zero-rated as there is usually several thousand that if you are undertaking zero-
and you shouldn’t have any problem pounds waiting to be reclaimed, rated building in the UK you can
with wallpaper. Also, if you want to several thousand pounds which most reclaim VAT on materials purchased
have decorative finishes (like pine selfbuilders could well use to finish off anywhere in the EU. Of course Brexit
match boarding) you should be able their project; many end up forgoing may well change all that, but at time

92 13th EDITION l HOUSEBUILDER’S BIBLE


PROJECT MANAGEMENT

of writing (2019) the EU directives sell it shortly afterwards? What if of people pursued for tax on their
still apply. you step from one selfbuild house ‘speculative’ profits on selfbuild is tiny, it
to another to another? Welcome to would be as well not to make too much
the world of the serial selfbuilder. It’s of a song and dance about how much
actually a long established practice in money you may have made.
OTHER TAXES the UK. I remember a builder doing In reality, not that many people will
Whereas professionals and exactly this in the Cambridgeshire keep on moving house and building
selfbuilders are on a level playing village I grew up in. My parents and moving and building indefinitely.
field when it comes to VAT, selfbuild bought a house from him in 1950. By Whilst it’s a great way to build up
really comes into its own when you the time we left the village when I equity and reduce mortgages, it
start to look at other taxes. If you are was 13, he’d moved house about five doesn’t actually bring in any extra
building your one and only house, times and was at work on another, all cash unless you start trading down.
then you really don’t have to pay any in the same village. It’s also pretty exhausting and doesn’t
taxes at all on the profits you make. Many small builders live a semi- fit easily into the requirements of
The two taxes that you might expect nomadic, selfbuild lifestyle like this, family life. But it probably beats
to get clobbered by are income tax interspersing regular work with the odd babysitting as a way of eking out a
and capital gains tax (CGT). If you homebuilding or renovating project. As little bit extra. Until such time as
are a professional, you will get caught long as you establish each house as your the property market decides to take
by one of these two. Typically, income ‘principal private residence’, you should another tumble…
tax is levied on you if your livelihood be in the clear tax-wise, although there
involves building homes for sale, are signs that the Revenue is beginning
and CGT cuts in if you buy and sell to take an interest in this area. There
second homes or houses to let out. is no published guidance on how long
Here you would be expected to pay you have to stay in a house before it
income tax on any rental income, and is accepted as your ‘principal private
CGT on any gains you make when residence’ that would distinguish you
you come to sell the house. However, from a commercial developer but 12
neither income tax nor CGT have months is often quoted as a broadly
ever been levied on ‘your principal acceptable period. The key point to
private residence’ so any profits you establish isn’t how long you live in
make on your private homebuilding a house but that the project wasn’t
are consequently tax-free. Even if undertaken with profit in mind.
you sell off part of your garden for ‘Private residence relief is not intended
someone else to build a house, you to relieve speculative gains,’ reads the
don’t pay any tax on the proceeds, Inland Revenue Help Sheet 283.
although you can trip into the tax ‘Relief is not therefore available where
net if the garden area exceeds 0.5 you acquire or spend money on your
hectares. dwelling-house wholly or partly to
Now the selfbuilders’ tax exempt realise a gain on its disposal.’ Ominous
status raises a few interesting wording, especially as it could be
possibilities. What if you move into applied to just about anyone who ever
a house you have built, make it your bought a house in Britain. It’s worth
‘principal private residence’, and then bearing in mind. Although the number

HOUSEBUILDER’S BIBLE l 13th EDITION 93


Chapter 6

GROUNDWORKS
Groundworks is the term used to
describe all the things that builders
do beneath ground level. It’s actually
a hotch potch of different activities
6
shrug your shoulders and utter
asinine comments like ‘You can’t
make an omelette without breaking
eggs’.
part to do with ease, speed and
cost of installation. This chapter
concentrates on these issues as
well as taking a closer look at how
– excavation, drainage, service Groundworks is really a question some of the problems, outlined in
connections, concreting and some of getting from A to B as cheaply Chapter 3 ‘Pitfalls’, are solved.
brickwork. and easily as possible. There are Given a straightforward site and
The advent of JCBs, readymix many reasons for using something a straightforward house design, the
concrete and plastic drainware other than the standard solutions groundworks can progress with
has taken a lot of the graft out of for your underground work, but remarkable speed at a comparatively
this part of building, but it still all of them involve sorting out or low cost. However, a problem site
remains an exacting and potentially avoiding problems, not increasing can easily double the base costs, so
hazardous task. It is also incredibly amenity value. This is not to say I cannot emphasise enough how
messy, especially when there’s rain that the housebuilder does not important it is to analyse thoroughly
about. Whilst neighbours will look face choices of how best to get the costs involved in just getting your
on in horror as you recreate the the groundworks completed, but house out of the ground.
battlefield of the Somme, you must these choices are for the most Groundworks is also one of the

94 13th EDITION l HOUSEBUILDER’S BIBLE


GROUNDWORKS

MODEL HOUSE: Groundworks Cost Summary


Quantity Rate Materials Labour Plant Totals
£6,000 is at the low end of EXCAVATION £ 6,000
excavation costs. If there is Clearing Oversite/Site Strip 35 m3 £ 46 per m 3 £ 1,610
any slope on the site that Setting Out & Preparation 120 m2 £ 10 per m 2 £ 1,200
needs excavating, or if deeper
Excavating and Muck Away 50 m3 £ 46 per m 3 £ 2,300
trenches are required, the costs
Dumper Hire 5 days £ 160 per day £ 800
will multiply. See section on
Slopes, Bad Ground and Trees. FOUNDATIONS £ 8,000
Foundation labour 50 m3 £ 50 per m 3 £ 2,500
Readymix in Trenches 25 m3 £ 80 per m 3 £ 2,000 £ 350
Similarly, foundation costs Blockwork Footings 40 m2 £ 50 per m 2 £ 1,240 £ 760
can also escalate. On many Face Brick Footings 12 m2 £ 83 per m 2 £ 580 £ 420
sites now, engineered GROUND FLOOR 95 m2 £ 7,000
foundations are required, so
Beam and Block floor 95 m2 £ 38 per m 2 £ 2,380 £ 1,220 £ 350
that overall costs can stretch
to as much as £50,000 in 125mm Celotex Insulation 80 m2 £ 29 per m 2 £ 1,800 £ 300
some situations. DPM 80 m2 £2 per m 2 £ 50 £ 140
50mm Leanmix concrete 80 m2 £8 per m 2 £ 320 £ 320
Totals £ 8,400 £ 6,900 £ 5,400 £ 21,000
2 2
Overall Footprint 95 m Internal Floor Area 160 m
Cost per m Footprint Cost per m Floor Area
2 2 2 2
£221 m 131 m
areas of housebuilding most prone JCB driver do you begin to realise drains and the services have been
to mistakes being made. The setting just how difficult it is and how installed correctly. Your building
out of foundations and levels and the easy it is for it to go badly wrong. inspector will provide some guidance
correct siting of drain terminals is not Of all the areas of housebuilding, and should be able to pinpoint errors
a job to be undertaken lightly; add a groundworks is the one that needs and bad practice but is not paid to
slope into the equation and you have the most management and the best be a surveyor and will have no idea if
a job to tax the most skilled surveyor. management. If you are a DIY project your trenches are off-square or in the
Yet the supervision of groundworking manager, this is the big one. Crack wrong position. It is much harder to
is often left to harassed digger drivers this and you will have no problems ferret out mistakes on groundworking
who ‘want to get on with it’ and down the line. than on later parts of the build and
often barely refer to any plans that Most builders choose to usually much more expensive to
may have been drawn up. The horror subcontract all the groundworks rectify at a later date.
stories that you occasionally hear of but, whilst this makes it very much On traditional masonry work,
completed houses having to be taken easier to navigate this stage, it is still accuracy is not so important because
down because they were put up in the vital to check that you are getting the bricklayers can correct errors in
wrong place are a testament to the exactly what you asked for. You must setting out and levels – to a certain
consequences of rushed excavations. check that the foundations are in extent – as they go about their work.
the right place, are square, and are But most of the so-called modern
THE NEED FOR ACCURACY at the right height (this last can be methods of construction – timber
If you’ve never been involved in difficult to measure). You must check or steel frame, SIPs, ICFs or thin-
setting out foundations, you can sit that the access arrangements have joint masonry – have little room for
back and laugh at the incompetence; been properly constructed, with falls error and the tolerance standards
not until it’s just you and a stroppy going the right way and that the are much more exacting, so getting

HOUSEBUILDER’S BIBLE l 13th EDITION 95


Chapter 6

groundworks accurate at this stage in millimetres above or below FFL. There are also health
is vital. TRADA, the timber people, Lasers make this all much easier considerations, whichever method
suggest the following standards for than in the past, but mistakes still get you employ: watch out for
foundations under a timber frame made. asbestos, which was very common
house: Unless you are working in a in much of the 20th century
n Wall lengths should be within ± confined area where mechanical plant housing now being demolished.
10mm of plans cannot reach, then you will want to In fact you are unlikely to
n Diagonals: ±5mm up to 10m, or ± get hold of a JCB or some similar demolish anything substantial
10mm over 10m digger. Some builders have diggers without encountering asbestos.
n Floor slabs level to ±5mm and digger drivers in their armoury, You will need to ensure that your
Sounds easy. Good luck. but most just have contacts with guys demolition contractor is licensed
who are self-employed and own their to undertake this sort of work
own machine. They tend to charge for and has in place a risk assessment
travelling time so it’s worth getting and management plan to dispose
EXCAVATIONS someone local and – depending on of hazardous waste. All this is
A flat site is a cheap site; clearing how busy they are – they often charge likely to be covered by planning
debris off the oversite will not take for a minimum of half a day even conditions, in any event.
long and digging normal depth when they’re only around for a couple
foundations for a four-bedroom of hours. But at around £300 per day MUCK AWAY
house will take a JCB no more than for driver plus JCB, they can do the Charming expression for getting
a day. Note, however, that the crucial work of around ten to twenty men rid of the spoil. The topsoil is
task of setting out the foundations on and therefore represent a bargain not stripped off and stored on site for
the ground has to be carried out after to be sniffed at. They can also do a lot later use, but the subsoil is usually
the undergrowth is stripped away. of damage. dumped somewhere else. Many
It’s not a job to rush, especially if The one-man-band digger drivers digger drivers operate in tandem
you are new to the game, and so you tend to be the most helpful, but they with a 15 or 20 tonne lorry and
ideally want to leave a couple of days do like to get on with it. If you’re will have local dumping contacts.
between site clearance and the start not 100% on top of what’s to be Alternatively, it is worth chasing up
of excavation. The key to getting this done then the chances are that you’ll local landowners to see if they have
done accurately is to have an accurate get rushed into mistakes. Trench any holes to fill.
site survey to hand, complete with excavations happen remarkably Subsoil taken out of the ground
datum heights, and an accurate set of quickly: expect around 50m per day, ‘bulks-up’ at least 30% when piled
plans drawn up based on the survey. enough for a small house. in a heap (or on a lorry). This means
A good groundworker will set out that just under 12m3 dug out of
all the key points, and check they are DEMOLITION MAN? the ground will fill the 15m3 space
square by measuring the diagonals. If you’ve an existing structure to on a 20-tonne lorry: those sorts
Heights will be checked with demolish, then you’ll have a choice of of calculations are typical when
lasers. They will also want to know taking it down slowly and salvaging doing muck away sums – a cubic
trench widths and depths, though materials, or getting a machine to metre in the ground tends to weigh
this may vary according to ground demolish it, which is not very green between 1.5 and two tonnes. Some
conditions. The key datum point is but far more exciting. I’d suggest that ground conditions, notably clay,
conventionally Finished Floor Level it is almost entirely dependent on the bulk-up at much more than 30%: a
(FFL) and everything is expressed value of the salvaged materials. 50% or even 60% bulk-up rate can

96 13th EDITION l HOUSEBUILDER’S BIBLE


GROUNDWORKS

be expected. Make sure if you get one is the site access; it pays to get
GROUNDWORK KEY PRICES
a quote per cubic metre whether your drive levelled and hardcored as
Groundworker £ 22 per hr
you are dealing with muck in the early as possible.
JCB Hire with driver £ 60 per hr
ground or bulked-up on the lorry. To work out your likely excavation JCB digs in easy ground 5 m 3 per hr
and muck away costs, first work out JCB digs in hard ground 2 m3 per hr
LANDFILL TAX the volume you need to remove. If it’s
Landfill tax was introduced in 1996 fairly easy digging, it’s likely to cost 20 tonne lorry £ 350 per load
20 tonne lorry holds 12 m 3 spoil
and it’s one of those taxes that gets around £12 per m3 to dig out of the
Landfill tax (inert) £ 3 tonne
subjected to an escalator. This means ground and an additional £30 - £35
it keeps going up, rather like the per m3 to remove it to a licensed tip (of Readymix Concrete £ 80 per m 3
taxes on petrol, cigarettes and alcohol. which £5 will be tax). If the digging is Concrete Pump Hire £ 350 per day
Unlike these, you don’t really notice hard (rock, for instance) the excavation Dumper Hire £ 160 day
landfill tax, until you come to start to costs can double or even treble but the Setting Out Foundations £ 10 min per m2
clear building sites. muck away costs should be unaffected. Foundation Work £ 50 min per m2
There is an important distinction EXCAVATION COMPOSITE RATES
between inert waste and man-
made stuff. Inert is a term used to
cover ground you might dig out in FOUNDATIONS EASY DIG
Excavation with JCB £ 12 m3
the course of excavations. It still If you ever get involved in working
Muck away in lorry rate £ 29 m3
gets taxed but at a much lower around the foundations of some pre- Plus Landfill tax £5 m3
rate, currently £2.90 per tonne. In 20th century buildings, as you might Total £ 46 m3
contrast, the man-made waste gets if you were building an extension HARD GROUND DIG
really clobbered, and the current rate on to a Victorian house, you will be
is £91 per tonne. That adds around amazed at how shallow and how Excavation with JCB £ 30 m3
Muck away in lorry rate £ 29 m3
30% to the cost of muck away lorries basic the existing foundations appear
Plus Landfill tax £5 m3
and skips, so it’s important to make to be compared with what we build
Total £ 64 m3
sure everyone knows just what is off now. ‘How come this house is still
being excavated. standing?’ will be your first thought.
Followed by ‘If these foundations
SUMMARY have supported this house for so long, a depth of just three or four brick
On many sites you will be unable what am I doing messing around a courses, that way spreading the load
to get heavy plant like JCBs to the metre further down below ground?’ of the house across a wider area.
back of the house once you have Both good questions. Neither has a These below-ground courses were
completed the trench excavations. simple answer. known as footings and the footings
If you have plans for landscaping The history of foundations is were effectively the foundations.
or drainage or even plan to build a vaguely interesting and a little Today we still refer to footings but we
swimming pool or a summer house instructive. The current idea of put concrete foundations under them.
at a later date, this may be your only building up off slabs of concrete at 21st century footings are simply
opportunity to get the groundwork depths of a metre or more below the brick or blockwork sandwiched
done quickly and cheaply and a ground level is relatively new, very between the concrete foundations
change of plan or an oversight can much a 20th century innovation. and the damp proof course that is
have costly ramifications later. The Victorians used to step the walls usually installed at 150mm above
Another area to sort out on day out at the base, pyramid style, over ground level.

HOUSEBUILDER’S BIBLE l 13th EDITION 97


Chapter 6

is towards deeper and deeper


foundations, which means more and
more concrete. This usually works but
we still have a large number of new
houses that subsequently suffer from
foundation failure.
The best advice is to follow the
advice you are given as closely as you
can – don’t cut corners. Readymix
concrete and excavations are
moderately expensive but nothing
like as expensive as having to fix later
failures.
As foundation requirements have
grown deeper over the years, two
options have evolved about how to
construct them – at least on largely
problem-free sites. One is to pour
the minimum amount of concrete
possible into the foundation trenches
and then build upwards in brick
or blockwork – these are known as
The reality of foundations for many people. You dig ’em – they fill up with water strip foundations. The other system
before you can order the readymix reverses this logic altogether and
pours as much concrete as possible
When concrete foundations were hard and solid but when the ground into the trench before starting on the
first adopted widely, in the 1920s, starts moving then they look as bricklaying – this is usually called
they were sold to builders as being feeble and spindly as you could want. trenchfill. Both methods have pros
a cheaper and quicker method of Consequently, foundations have and cons.
building-in adequate load bearing. been getting deeper and deeper over With strip foundations, laying
In fact, the load imposed by a typical the years in an attempt to get down footings below ground level, is cheap
house (which maybe weighs around below the trouble zone. on materials but heavy on labour; it
100 tonnes in total) really isn’t that The Building Research is also slower. In contrast, trenchfill
great – it’s similar (on a weight per Establishment investigated the is much quicker but, of course,
area basis) to that imposed on the phenomenon of ground movement uses more concrete. When pouring
ground by your feet when you stand in the 1990s and found a particular concrete into clay soils, you will
up. The problems arise from the fact site that regularly heaved up and probably have to use the trenchfill
that the ground has a nasty habit down by 50mm over the course method.
of shifting about, which itself has a of a year, not to mention a 60mm An important consideration when
nasty habit of causing all manner of sideways movement as well. Mostly designing foundations is to set the
disruption on the very rigid structures it’s sites with large trees and clay soils level of the concrete so that it ‘works
placed on it. Building foundations but it’s also rather unpredictable, blocks’. Blocks are laid either flat
out of concrete may sound very so consequently the momentum in courses of 110mm or in vertical

98 13th EDITION l HOUSEBUILDER’S BIBLE


GROUNDWORKS

FOOTINGS: Key Rates and 600mm wide). Using a 450mm


7N Concrete Blocks £11.00 m 2 wide bucket is going to reduce the
Trenchblock 300mm £30 m 2 amount of readymix used by a quarter
Celcon Blocks £12 m 2 (as well as reducing excavation costs)
Regrade Bricks £10 m 2 but it is not to be recommended
Face bricks £48 m 2 to rookie builders. Cavity walls –
Blockwork mortar £1.00 m 2 generally now 350mm wide and set
Brickwork mortar £3.60 m 2 to get wider still as cavity widths
DPC £1.00 m get increased to cope with ever
Readymix Concrete £ 80 m 3 more insulation – sit uncomfortably
M 2 RATES FOR FOOTINGS Materials Labour Combined on such a narrow trench; internal
Lay Footings (100mm blocks, vertical) £ 13 £ 15 £ 28 load bearing wall foundations are
Lay face bricks £ 52 £ 35 £ 87 obviously less of a problem, but
Lay 300mm Trenchblocks £ 30 £ 19 £ 49 the key factor in all this is accurate
Alternative to Footings setting out of trenches.
Readymix Trenchfill 600w £ 48 £5 £ 53 Unless you are an experienced
450w £ 36 £6 £ 42 surveyor, you really want to play safe
and set trenches at 600mm wide.
courses of 225mm (ish). If you your foundations level! If you have
have surveyed the site accurately, a detailed foundation plan in place,
your datum measurements will your designer should have worked
show exactly where the damp proof this all out in advance and you simply GROUND FLOORS
course will be so you can ensure that have to follow the instructions. The ‘industry standard’ is to build a
you stop the concrete at 225, 450 The depth and length of the concrete or masonry ground floor and
or 675mm below that point. That trenches are not in your control, but a timber first floor. This is how 90%
ensures that you keep the fiddling the trench width is largely down to of single homes are built in the UK.
about and cutting to a minimum – which bucket the JCB uses to dig Only in Scotland does the practice
provided, of course, that you pour with (the general choices being 450 change – there they still love timber

Traditional Strip Footings Trenchfill


External External
ground ground Ground floor
Brick block
level level
cavity wall

Blockwork
footings Concrete
fills trench
Trench dug
600mm wide

Concrete min
250mm thick

HOUSEBUILDER’S BIBLE l 13th EDITION 99


Chapter 6

GROUND FLOORS: Key rates your knees in floor. Add in a little


Materials Labour Combined
re-inforcement in the concrete (not
Unit Cost m2 rates m 2 rates m2 rates uncommon), maybe some underfloor
Beam and Block Floor (inc blocks) £25 £13 £38 heating pipes laid on some sort of
Hanson Jet Floor (insulation, no concrete) £26 £13 £39 backing board in the screed, and
Hollow core floor £40 £13 £53 another plastic DPM layer above the
Telescopic Vents £ 5.00 ea £ 1.30 £ 1.80 £3 concrete (sometimes specified) and
Airbricks £ 3.50 ea £1 na £1 you have a very complex as well as a
100m2 DPM £ 50.00 roll £ 0.60 £ 1.80 £2 very thick construction.
125mm Celotex Insulation £20 £4 £24 The problem from a costing point
150mm Celotex Insulation £25 £4 £29 of view is that the floor finishes are
175mm Exp Polystyrene Insulation £14 £4 £18 usually considered separately. On top
of that, it’s also common practice to
Crane Hire £350 day
consider the intermediate layers such
65mm Readymixed Screed £8 £7 £15
as the underfloor heating and the
50mm Gypsum Screed £20 S&F only £20
100mm Concrete £80 m3 £8 £9 £17
screed in yet another compartment.
50mm Leanmix slurry concrete £80 m 3 £4 £4 £8 Yet they are also all related. Ideally,
Reinforcing Mesh £4 £4 £8 you need to start with your floor
150mm Hardcore £56 m3 £8 £8 £16 finish and work downwards to get
Sand Blinding over hardcore £56 m3 £3 £2 £5 your most cost effective floor. Again
50x200mm Joists £4 m £14 £17 £31 a thorough design will itemise all
50x200mm I beams £10 m £25 £11 £36 these different layers and make
22mm Chipboard £13 sheet £11 £6 £17 construction relatively simple
GROUND FLOOR OPTIONS: All-in Rates per m 2 SOLID SLABS
Concrete Slab (Un-reinforced) £ 76 inc 100mm Jablite and 65mm screed finish
A solid concrete slab is usually
Concrete Slab (Reinforced) £ 83 inc 100mm Jablite and 65mm screed finish
laid 100mm thick over a layer of
Beam and block floor £ 77 inc 100mm Jablite and 65mm screed finish
compacted hardcore. This is the
Hollow core floor £ 90 inc 100mm Jablite and 65mm screed finish
Hansons Jet Floor £ 77 inc 65mm Screed Finish (insulation built-in)
most labour intensive system and,
Insulated Timber joist ground floor £ 89 inc base concrete and chipboard floor cover conversely, the cheapest on materials,
Insulated I-beam ground floor £ 94 inc base concrete and chipboard floor cover which makes it suitable for DIY
builders with access to cheap or free
ground floors. First floors, known as being timber, solid slab and pre-cast labour.
intermediate floors, are in a section concrete suspended floors. You have a choice of placing the
all of their own in the next chapter. On the solid slab exhibit I counted insulation layer – you have to have
Here, I just look at ground floors. seven different layers in the sandwich: an insulation layer – either above or
Comparing floor costs is a bit of a from the bottom, hardcore, sand, below the concrete.
nightmare. The problem is to know damp proof membrane (DPM), It’s sort of conventional to finish a
where to begin and end. I was struck concrete, insulation, screed, floor concrete slab floor off with a cement
by this when visiting the National cover. In total, nearly 500mm in screed on top, laid at a later stage of
Selfbuild and Renovation Centre in depth. That’s just phenomenal. If it the build. But there is no requirement
Swindon. There they have a small were all, miraculously, to turn to jelly, to do so and some builders dispense
display showing the main floor types, you would be wading about up to with the screed layer, choosing to

100 13th EDITION l HOUSEBUILDER’S BIBLE


GROUNDWORKS

get a smooth finish on the concrete


using a power floater. There is no
reason why you couldn’t place your
insulation beneath your slab, and
sink your underfloor heating pipes
(if you want them) into the concrete:
it’s just that not many people think
this far ahead. The trend for polished
concrete finished floors also plays into
this. But more on this later.

SUSPENDED FLOORS
Pre-cast concrete floors are a
factory-produced alternative to
ground-bearing slabs. Because of
the added transport costs, they are
rarely economic over small areas, say
below 50m2, so you don’t see them
used for house extensions but they The concept behind the beam and block floor is dead simple. The concrete beams
become an increasingly cost-effective form an upturned ‘T’ section, enabling the blocks to sit loosely between the beams.
solution as the floor area increases. This technique was introduced in the 1970s and has been widely taken up across
The increasing popularity of pre-cast the country. Builders like them because they are quick, dry and relatively easy to
floors has been driven by a number of use, but they are expensive on smaller footprints, below 100m2
factors:
n floors can be laid in a day and for ventilation in the void under the supplied. A number of businesses
worked on the next day floor: this is achieved with airbricks cater for this market and many
n no wet trades involved - no built into the external wall, usually have links with builders merchants
readymix lorries required with offset ducts placed within the who act as middlemen. The floors
n have to be used on sites where cavity. are designed to work with standard
there would otherwise be excessive concrete blocks (i.e. 100 x 225 x
backfill under the ground-bearing BEAM AND BLOCK 440mm) as used in wall construction.
slab Beam and block is the cheapest and There is often more than one way
n they can be used on intermediate commonest form of precast floor: to run the beams and you may be
floors as well as ground floors it consists of number of evenly able to take advantage of 225mm
Perhaps the main downside to spaced concrete beams, similar to beams that can span up to 8m and
using pre-cast floors is that each one timber joists, infilled with normal can sometimes enable you to do away
needs to be manufactured to order building blocks. It has been gaining with sleeper walls within the main
and you may well find that you have in popularity with developers since floor area.
to wait six to eight weeks for them it first appeared in the 1970s, largely Another thing to watch out for
to be delivered. If you plan on using because it’s fast and largely dry. is the 1:300 camber on these pre-
a pre-cast floor, then you must plan As with all pre-cast options, beam stressed beams. It’s surprisingly large:
well ahead. The other issue that and block floors are provided by as much as 13mm on a 4m long
needs attention is the requirement specialists who work from drawings beam. If you lay a screed over the

HOUSEBUILDER’S BIBLE l 13th EDITION 101


Chapter 6

floor you can of course get a level as an intermediate floor. Instead Victorians but have gone out of
finish and if you want a dry finish or of concrete beams being laid and fashion for two reasons. Firstly,
a floating floor, you need the floor to infilled with blocks, the whole floor a requirement, which has come
be level. is laid in a series of wide concrete into the building regs, to cover the
planks - hollowed out to reduce the ground beneath a timber ground
INSULATED BEAM FLOORS weight, hence the name. Hollowcore floor with a concrete capping capable
A variation on the standard beam is the most expensive of the pre-cast of withstanding the passage of
and block floor uses polystyrene options but leaves you maximum moisture, which adds at least £5/
infill blocks to fill the voids between flexibility: you don’t have to align m2 to costs; secondly by the added
the beams. They have become your internal walls above load- complexity of fixing underfloor
increasingly popular as a ground bearing walls or supporting beams insulation between the joists.
floor option since changes to the – you can build anything anywhere. Upstairs, of course, no such extra
building regs in 2002 brought in However, the internal walls where work applies and here timber joisting
a requirement for floor insulation, the planks meet end-to-end have to is easily the cheapest option.
previously a green option only. be double thickness in order to have On the ground floor, timber still
It’s a little more expensive than a adequate bearing. Hollowcore floors makes a lot of sense if you want a
block infill floor but it does away are prized for their soundproofing timber floor cover because you can
with an added layer – you can, and qualities and are thus commonly used have an entirely dry construction.
indeed must, just place a structural in apartments. Around half the cost of a timber
screed on top of it before you have ground floor goes into the sheeting
a working platform. This can make HYBRIDS (usually chipboard or plywood) that
it difficult to work with underfloor Most pre-cast floors are topped off is laid over the joists and where a
heating unless you add another with a cement screed, if only to get plank floor finish is desired this
screed layer above. a smooth surface on which to lay a sheeting can be dispensed with. The
The best-known insulated floor floor cover. But there are a number problem with doing this is that either
beam system is Forterra’s Jet Floor. of options that require a structural the planking will be exposed for the
Whilst these flooring systems screed or concrete slab in order to duration of construction, which will
undoubtedly work well and have gain sufficient strength. The insulated almost certainly lead to damage, or
been tried and tested over many beam floor is one example but there some form of temporary sheeting
years, they do suffer from cold are others, used widely in Continental will have to be installed which will
bridging at the edges where the Europe, sometimes known as lattice cancel out most of the perceived cost
heat is able to divert away from the girder plate floors. advantages. However, the technique
beams into the walls. If you want The advantage of using such a works well with reclaimed boards that
cold bridge free foundations, you system is that you can get greater need to be sanded and sealed and can
need to look at using an insulated spans per floor depth. Indeed, you serve as both temporary and finished
polystyrene raft, where the walls can get a span of over 9m on just a floor covering.
themselves are built up off the 250mm depth floor.
insulated base. INSULATION
TIMBER Underfloor insulation on the ground
HOLLOW CORE Suspended timber ground floors floor is not quite mandatory but
Hollow core planks are another form could potentially be very cheap recent changes to the building regs
of craned-in precast floor though and simple to build. They were make it expensive to avoid. There
this time more commonly used commonly installed by the are several methods of insulation

102 13th EDITION l HOUSEBUILDER’S BIBLE


GROUNDWORKS

available. The cheapest and most the hardest and most skilful aspects nozzle and are self-placing. They have
readily understood is to lay flooring of housebuilding and, as such, is been available in the UK since the
grade expanded polystyrene at ripe for a little techno-fix. Which is 1990s and have captured something
200mm thickness over the sub-floor precisely what has been happening in like 20% of the market. The cost is
and under the screed or chipboard. the world of screeding. about £180/m3 as opposed to £100/
Or you can use a thinner layer Traditional, 20th century- m3 for readymixed screed, but these
(around 125mm) of one of the more style screeding, involves a two- screeds can be laid at half the depth
efficient insulation boards such as and-one gang, mixing up a very (i.e. 35mm - except where you have
Polyfoam, Kingspan or Celotex. dry, comparatively strong, 1:3 underfloor heating; then its 50mm as
These techniques of underfloor cement:sand mix and laying it by opposed to 65mm.) It’s particularly
insulation are relatively new and there hand, 65mm or 75mm deep. The suitable for underfloor heating as it
are possibly problems building up screeding gang work on their hands doesn’t require wheelbarrows with
in the future should the insulation and knees, smoothing out the screed the potential to damage the pipes.
not prove to be as rigid as expected: mix, trowelling off the surface, and Look out for Gyvlon, Cemex Supaflo
ensure that the insulation you specify keeping a very close eye on the levels or Tarmac Truflow. Also check out
is flooring-grade. More cautious across the floor. It’s very easy to get Screedflo, an interesting independent
builders will continue to use some it horribly wrong and end up with business in this arena that is making
form of reinforcement in their screeds a sloping floor or one with hills and a name for itself and has a natty
to counteract any such failures. valleys in it, which clients tend not to specification called Screedflo dB
Aficionados of underfloor appreciate very much. In my costing which is designed to be poured
heating will wonder what all the tables, I have 65mm screeding down onto intermediate timber floors to
fuss is about. Such systems only at being around 25 mins/m2. Most aid sound proofing and provide a
work well with very high levels of experienced screeding gangs work medium for underfloor heating.
underfloor insulation – otherwise at something nearly twice this rate, It’s still the province of specialist
much of the heat would be lost – enabling them to do over 100m2 per contractors, which makes it rather
and, whatever problems there may day. But their art/skill is so highly more expensive than traditional
have been with underfloor heating regarded that they can charge two screeds, but not by very much. It also
systems, laying insulation under or three times as much as ordinary dries a little more quickly. Talking of
heavy cement screeds does not tradesmen and the only way I can drying....
appear to be one of them. make sense of their charging rates is
by making it appear to take longer DRYING TIMES
than it actually does. Screeds, whether cement or gypsum
Anyway, the screed business based, take time to dry and it’s
FLOOR SCREEDS is slowly changing. Site mixed important that they are thoroughly
Traditionally, the floor screeding screeding, as I have just described, dried out, especially if there is a
is undertaken by plasterers, and it is dying out and it now accounts for timber floor being laid on top of
happens much later in the build less than a third of the overall screed them. I have seen beautiful oak floor
process than the groundworks. But market. The bulk of screeds are now boards buckle and warp because
it’s also pretty much a first fix process delivered readymixed, which is good moisture from the screed below was
because it gets covered over by floor for quality and does away with a third still evaporating. Seventy days is
finishes (unless of course you go for a of the two-and-one gang. But the real reckoned to be time enough for most
polished concrete floor finish). growth market is in gypsum-based screeds: in the summer months it will
Although it looks simple, it’s one of screeds, which are sprayed out of a be a little less. If you have underfloor

HOUSEBUILDER’S BIBLE l 13th EDITION 103


Chapter 6

buster either. You will find more


about this flooring method in
Chapter 10, where I discuss floor
finishes.

SLOPES, BAD
GROUND & TREES
If you have worked through the
book to this point from ‘Pitfalls’ you
will have twigged that, although
groundworks can work out to be
relatively cheap, they can also turn
into a budget-crippling nightmare.
There are three basic causes of
alarming cost expansion:
n slopes
Screedflo being poured over n bad ground
underfloor heating. The process is another complication: it can be n trees.
quick and it uses far less materials laid in concrete early on in the
than conventional screed.
build process, but it’s not without SLOPES
its issues. I have come across a case Obviously, it all depends on how
where the pipes were tested in the much it slopes, but even quite gentle
heating fitted, you can speed the autumn and left full of water over slopes can create havoc with a tight
process but only gently: cement the winter whilst the rest of the budget. Brinkley’s Slope Law states
screeds must be left for 28 days house was built. Frost got to them that, no matter how you deal with
before any heating is applied at all, and caused the pipes to split and this it, each one degree of slope will
and even then it has to be turned on wasn’t discovered until the house was add £1,500 to your development
slowly, a few degrees higher each day. finished. Ouch. costs. Obviously this represents
an enormous over-simplification
WHY SCREED AT ALL? POLISHED CONCRETE of different situations but you will
You often don’t have to. If you are Polished concrete, as it is known, is be disappointed to discover that
finishing your floor in timber, you uber-cool, the kind of thing you find it rarely works out less than this
may not need to lay an intermediate in art galleries. It’s laid instead of a and sometimes it can be a whole
floor, but if you are laying tiles and/ screed, usually at the groundworks lot more, especially if you are
or carpet, you will need a smooth stage in the proceeding. It goes constructing a mansion larger than
surface to work off and it’s hard well with underfloor heating too. 200m2. The fact is, you just can’t
(though not impossible) to get Although it’s not cheap, when it get away with building a sloping
a concrete slab smooth enough is placed against the cost of the house and so adjustments have to
for this. Underfloor heating is alternatives it isn’t really a budget be made between the lie of the land

104 13th EDITION l HOUSEBUILDER’S BIBLE


GROUNDWORKS

and the lie of your house and these EXCAVATE AND CART AWAY cost terms, but this method is likely
adjustments are expensive. It’s not Here you dig a large, house-sized hole to leave you with expensive steps
just excavating out the ground so out of your slope, dispose of all the to build up to the back/front of the
you can build on the level; if the excavations and fit the house into the house. The overall structure is also
slope is greater than five degrees, hole. This is perhaps the simplest and likely to be far more imposing and,
there are complications with access the one that the planners are likely to consequently, much less likely to pass
roads and pavings, drains, and prefer, as it will keep your roofline low. muster with the planners.
landscaping. Steeper still and you There will be the cost of excavation
are likely to require retaining walls and carting away which, depending FIT HOUSE TO SLOPE
and possibly even safety railing. on the lie of the ground, could easily Arrange the house as a series of
Aficionados of Grand Designs cost £5,000-£10,000. Add to this the steps, running up the slope. Building
may remember a couple in Bath, cost of any retaining walls that might basements and/or mezzanine split-
filmed in 2007, who managed to have to be built: budget £100/lin m for levels may well be architecturally
spend £300,000 taking out a slope a one metre high retaining wall, and the most pleasing but it is also the
before they even got to dig their bear in mind that retaining walls get most expensive. Split-levels have
foundations. According to my law, wider as they get higher, so tall ones cost implications at almost every
they must have had a 200°slope, are exponentially more expensive stage of the building works: stepped
which is going it some, so be warned foundations, shuttering for floor slabs,
it’s not really a law at all. I expect BUILD OUT FROM HIGH POINT special stair joinery, complex service
you already realised that. Here you substitute the cost of routes, and complex roof details.
Faced with a sloping site, there are excavating with the cost of building Split-level building adds between
basically three options for the new supporting walls. There may not be 10 and 20% to your overall building
housebuilder. much to choose between the two in costs.

Brinkley’s Slope Law


This chart attempts to put a cost on dealing with
Slope ratio Added
sloping sites. There is a huge amount of guesswork Development
involved but the basic lesson is clear for all to see. The
1 IN 2 Cost
steeper the site, the more expensive it is to deal with 25º
when building. It’s emerged as a “Slope Law” with my
name attached for good measure and gives rise to my 1 IN 3 £30,000
twitter handle @slopingsite.
20º

15º 1 IN 5 £20,000

10º
1 IN 10 £10,000

HOUSEBUILDER’S BIBLE l 13th EDITION 105


Chapter 6

Raft v Pile measured areas of house and any


outbuildings such as garages.
Two competing foundation systems There are three likely solutions to
often specified by engineers bad ground:
when ground conditions are not
n deeper foundations (usually
straightforward. The concrete raft
extends under the entire building, reinforced with steel)
acting as both wall foundation and n raft foundations
floor slab. Concrete piles are sunk n piling.
deep into the ground and support a
horizontal beam which acts as the wall
foundation.
DEEPER FOUNDATIONS
You will have to excavate to good
bearing ground (if it’s there). If it’s
RAFT just a question of going down to
2.5m, you may get away with the
regular trenchfill foundation. But this
will be expensive; it will add around
PILE £10/m2 to the ballpark footprint
figure (remember base equals £200/
m2) for every 100mm deeper you
have to dig.
Deeper than 2m, it starts to look
like other engineered systems will
Whichever method you choose worth carrying out any amount of save you money – see following items.
to overcome the problems set by a detective work to ascertain exactly Trouble is, if you are discovering
sloping site, you will be faced with what has happened on your site how bad it all is as you dig, then
extra landscaping expenses – steps, because the ramifications can be it’s realistically too late to switch to
turfed banks, rockeries. Although expensive. one of the alternative foundations
these costs can generally be deferred A site appraisal is likely (but not systems.
over a number of years, they will definitely) going to uncover the One technique commonly used in
add significantly to the overall problems you will meet below ground clay areas is to fit a collapsible board
development. and your foundation design is almost against the side of the trench, rather
definitely going to be in the hands of like lining paper on the side of a
BAD GROUND an engineer. cake tin. The idea is that clayboard is
A variety of problems are dealt with The key to understanding the cost flexible enough to allow the clay to
under the category of bad ground. implications of these alternative heave without moving the enclosed
The commonest are clay soils and the foundation solutions is to hang on concrete foundations. There are
presence of tree roots, but also you to the ballpark figure that applies to a number of dedicated products
must be prepared for bog conditions, normal groundworks. This is currently available for this application; the two
mining subsidence, wells, water around £200/m2 of footprint covered. best known are Claymaster which is
courses, old factory workings, disused This includes the cost of providing made of polystyrene and Clayboard
refuse tips, even problems when foundations, below ground walling which uses a honeycomb filler very
ancient remains are discovered. It’s and a ground floor to the externally similar to that used in moulded doors.

106 13th EDITION l HOUSEBUILDER’S BIBLE


GROUNDWORKS

RAFTS ground beam, which would be all site with mature trees will tend to
On a problem-free site, the floor that you would eventually see of the look immediately attractive but
slab is laid a couple of stages further operation, and would look much you should pay close attention to
on than the foundations. However, like a regular trenchfill concrete just where these trees are located
with rafts, you pour the foundation foundation. Budget prices are £40 in relation to your proposed
concrete together with the floor slab per m depth for individual piles foundations.
concrete in one operation. With (depth anywhere from 3-10m) and
various cambered design profiles and £80/lin m for ground beams. TREE ROOTS
a whole mass of steel reinforcement, There are various other Tree root systems can spread a very
you create a concrete raft, which will techniques that can be used as long way from the trunks and they
move as one. If subsidence occurs, an alternative to concrete piling can suck water from even greater
the raft will absorb the changes or reinforced rafts but these are distances causing movement and
without imposing extra strains on the really the province of the specialist shrinkage in soils, which is bad news
superstructure above. engineer. One interesting option is for house foundations. The solution
A raft foundation uses vast Abbey Pynford’s Housedeck, which to this problem is not to cut down
amounts of concrete and steel and is designed to be cost effective for the offending trees – this can actually
is unlikely to cost less than £200/ single house developments; it’s make the situation worse for up to
m2 footprint. There have been a actually a floating or suspended raft, ten years afterwards – but to have
few high profile problems with which gives you a well-insulated deeper foundations, or specialist
raft foundations where the raft as slab. Housedeck will typically cost ones. The NHBC publishes tables
a whole starts shifting; leaving the upwards of £25,000 for a 150m2 showing the foundation depth
house above perched at a precarious footprint. Abbey Pynford’s Phil needed for different tree species
angle. They are not a solution for Jones commented to me: ‘Our unit at varying distances but this is too
every site. area rate gets lower as the footprint technical in scope for this humble
increases, up to about 250m2. We work: the summary table is designed
PILING are never going to be competitive to let you roughly gauge the effect
Increasingly specified as the with simple strip foundations but on construction costs. There are
engineering solution of choice for we find that Housedeck starts to four variables that determine the
difficult sites, piling is also reckoned make sense if you have to dig down foundation depth when tree roots are
to be cost effective in situations more than 1.5 metres’. present; these are:
where foundations would otherwise n shrinkability of the soil – clay soils
have to be deeper than 2m. The are the usual issue
number of piles and the depth of n water demand from tree species:
each pile can only be determined some species such as poplar, willow
by drilling trial holes. A typical TREES and elm, are very thirsty whereas
installation would place piles 2.5m There are two different ways others, such as beech and birch,
apart under every load-bearing in which trees may affect your have much less impact on your
wall (including detached garages) development costs. One is visual; foundations
and each pile would go down until planners and neighbours may n mature height of tree species
solid ground was reached. All the view the importance of your trees n distance of tree from foundations
holes are then filled with concrete quite differently from you. The The worst-case scenario would be
(either poured wet or precast) other is to do with the effect of to have a tall and thirsty tree, located
and tied together with a concrete tree roots on your foundations. A 7m (or less) from your foundations,

HOUSEBUILDER’S BIBLE l 13th EDITION 107


Chapter 6

Distance at which roots cease to


have any effect on foundations SERVICES
What exactly do we mean by
running services? It’s an easy phrase
Distance within which that drops off the tongue, like going
specialist foundations for a gentle jog around the local
will be required
park. But it’s often more like a
marathon, and it can easily end up
driving selfbuilders to distraction.
The services are what connects
your to-be-house with the rest of
the world, the very things that turn
a 16th century hovel into a 21st
century palace. Electricity (vital),
water (even more vital), gas (useful)
and telecoms/broadband (what, no
Instagram?) all need to be fitted
into place and all come with a cost
attached. Technically, it is possible
to live entirely off the grid, but it’s
not straightforward and it too comes
with a bag of attendant costs, so it’s
easier to imagine you are building a
normal house in a normal place and
you want the normal 21st century
which are in clay. God help you! building inspector. stuff.
The NHBC would want you to dig If there is good news in here It’s a difficult area to estimate
foundations over 3m deep or use piles it is that there is now effectively because every site is different and
or rafts. And, of course, it would cost. some sort of cap on the amount the costs involved are highly variable.
your foundation costs may grow. Electricity supplies are usually seen
ACTION The new techniques coming on as the most important because there
If your plot has any of these problems stream – especially piling and ground are often ways around the others.
it will pay dividends to seek advice beams – are slowly but surely getting Gas can be supplied in its bottled or
at the survey stage. The person who cheaper. If you have bad ground, your LPG format, or oil can be used as
would normally deal with such total groundworks costs (including an alternative. Water can sometimes
matters is a structural engineer, but if laying of the ground floor) may well be taken from under the ground
you are employing a designer to solve double from a base of around £200/ via a borehole and broadband and
your problems, it would be as well not m2 footprint, but they are unlikely to telecoms are frequently available
to engage another professional off treble. If you are excavating blind – by means other than a direct cable
your own bat; let the designer choose i.e. without a clue what lies beneath connection. These are the sorts of
how (and who) best to overcome the – then a contingency fund of around things you have to look at when
difficulties. A possible source of free £80/m2 of footprint would be a good assessing the viability of a plot in the
and impartial advice is your local idea. first place.

108 13th EDITION l HOUSEBUILDER’S BIBLE


GROUNDWORKS

Tip: Decide where the


But electricity? So much of services will come
modern life hinges on our use of into the house (i.e. in
electricity that not to have a supply the utility room) and
would be very difficult indeed. And lay ducting under the
the cost of that supply depends to house floor between
a large extent on how far away the the external meters
and this point. Each
street mains are, as a big part of the supply needs its
cost is in excavating the trenches to own duct - don’t be
site and the reinstatement afterwards. tempted to double
High connection charges can render up. It may also make
a site undevelopable. First things first, sense to lay further
get a quote to find out how much the ducts under the
ground floor to get
electric is going to be. services from inside
This work isn’t carried out by the the house out into the
regular utility companies like nPower garden for electrics,
and EDF. For electricity, you have water and even gas
to go to a Distribution Network for BBQs.
Operator (DNO) and there are nine
of them in the UK. A web search will
show you who carries work out in
your area. The gas grid runs on similar
lines. A good source of information
on this is the Energy Networks site.
Back in the day, when I first started
writing about selfbuild, this was
all pretty difficult to work out, but supply, you can arrange that for an sponsored roll out has been. The first
the services offered are a lot more additional cost. generation of Smart Meters, the
transparent now and the providers I The actual meter is the SMETS1, effectively tie you into the
recently used, UK Power Networks responsibility of your chosen supplier supplier who fits them so you lose
for electricity and Cadent for gas, with whom you will be expected the ability to switch suppliers easily.
have good websites which explain the to take out a contract. The small So see if you can get a SMETS2
likely range of costs you will be faced independent power suppliers don’t fitted on your new home. On the
with. get a look in here — you have to other hand your new home will be so
Both the gas and electric services work with one of the big six. And it energy efficient (won’t it?) that you
run on similar lines. The suppliers are sort of makes sense to go for a dual won’t need to worry about fuel bills
responsible for getting the service fuel option here if you are fitting gas in future.
to your meter box and you are as well. They will in all likelihood Water isn’t so very different either.
responsible for the meter box itself supply you with an internal smart There will be one supplier in your
and the works on the house side of meter which, depending on the area and you have to get through to
the meter box. Where the meter box model, makes it very hard to change their new supplies department and
is placed is open to a little negotiation suppliers. If you want to know more, take it from there. They will want
with the surveyor who comes to site. search on smart meters and find to fit a water meter somewhere in
And also if you want a temporary site out what a mess the government the ground probably close to your

HOUSEBUILDER’S BIBLE l 13th EDITION 109


Chapter 6

site boundary and leave everything the house somewhere like the utility areas that might freeze so need to be
beyond that point up to you. Worth room which may not be next to the wrapped in pipe lagging. If you can’t
noting that water pipes are required external meter boxes. Electricity be doing with all this hassle, there are
to be buried 750mm below ground will use armoured cable, gas will use businesses out there that will take all
level (to prevent freezing), whereas TracPipe and water will be run in the hassle of your hands and arrange
gas and electricity cables go down 25mm MDPE pipe which must be for quotes, and installations of
450mm. insulated if it runs under a suspended electricity, gas and water. Check out
Telecoms and broadband supply floor as it runs a freezing risk if not. Gas and Electricity Connections.
needs to be considered as well. In You can run these service cables and
fact they have a brand new building pipes at any reasonable depth in the
regulation (Part R in England) floor so they don’t have to be done
requiring all new homes to be before the floor base or the beam and DRAINAGE
broadband ready. The route into the block floor is laid, but they do have First things first: it is important to
house depends on what is available to be considered before the floors are understand the difference between
on your boundary. It may be an finished. foulwater and rainwater.
overhead connection. Unlike the Another thing to consider at this n Foulwater is the waste generated
other services, broadband/telecom stage is the supply of these same by normal household usage -
connections are usually put in free services to the external areas of the flushing loos, emptying baths
in exchange for signing up to a house. You may well plan for water, and sinks, washing machines,
contract. gas, electricity and broadband in dishwashers etc. Foulwater is
By way of example, on my recent your garden. Think garden lighting, sometimes subdivided as black water
self build I paid £1,080 for the water summerhouses or studios, gas BBQs, (toilets) and grey water (most other
supply, £447 for the gas and £1694 hot tubs and fountains. These are best outlets).
for electricity. They are fairly typical laid downstream from your consumer n Rainwater, as its name suggests, is
of the lower end of costs — one of units and gas and water stop taps, what falls out of the sky and flows
the few advantages of building in the so a second set of routes should be down the gutters and downpipes
middle of town where supplies are in planned as well. from the roof, not to mention the
the street outside. Virgin broadband One way around this conundrum hardstanding areas as well.
was installed for free. of what to lay when is to run twin Generally our sewage systems
If you find the prospect of dealing wall cable ducting through the are working at near capacity levels
with all these service providers too foundations. If you are blessed with and therefore it is a standard
daunting, there are businesses out huge amounts of foresight, you will requirement that rainwater is not
there, such as Gas and Electricity even leave drawstrings inside the added to the load. Hence it is
Connections, who will for a fee, ducting so that when the time comes normal to lay two separate drain
undertake water, electricity and gas you can simply pull the cable or gas systems to dispose of their respective
supplies to new homes up to the pipe through the duct, although in wastes in different ways. In certain
meter boxes. reality most services can be pushed locations it may be possible to run
The services works extend on your through almost as easily, provided rainwater into the main sewerage
side the meter box. You have to run there are no sharp bends to negotiate. system (refer to your water
cables and pipes to your consumer Don’t be spare with it and don’t be company) but it would be unwise
unit, your gas and your water tap, and tempted to double up by putting two to assume that this is the case. You
to your telecoms outlet. The chances services through one duct. Water will need to prove that there is no
are that you want to bring them into pipes shouldn’t be left exposed in alternative.

110 13th EDITION l HOUSEBUILDER’S BIBLE


GROUNDWORKS

FOUL WATER DRAINS: Key rates


In assessing the likely costs of any Plastic pipe & fittings £16 m run
individual scheme there is one Pea Shingle £56 m 3
overriding question that must be Excavation £46 m 3
answered at the outset. That is, Road Openings £500-£8,000
‘Where the hell am I going to Soakaway £ 1,000
Storm Drain Connection £ 1,000
dump all this crap?’ There are other
Main Drain Interceptor £ 500
questions as well, notably: ‘How do Kit Installation Drainage Fields Total
I get it there?’ but ‘Where to?’ is the Septic Tanks £ 600 £ 700 £ 3,500 £ 4,800
‘big one’. So, although it may seem Mini Treatment Works £ 3,000 £ 2,500 £ 2,000 £ 7,500
illogical to start at the end, we’ll Cesspool £ 2,500 £ 2,500 £ 5,000
look at the drainage options this way Reed Beds £ 6,500 £ 3,500 £ 10,000
around.
DRAIN COSTS per LINEAR METRE
RUNNING INTO THE MAIN Materials Time in mins Lab @ £20/hr Combined
DRAINS Foul Drain Runs £ 34 80 £ 29 £ 63
Rainwater Drain Runs £ 34 60 £ 22 £ 56
Even a relatively simple mains
Service Trenching £18 40 £ 15 £ 33
drainage connection can be an
expensive business. Locating main
drains can be a problem; the water
companies hold what records exist
and, whilst access is open to all, opening and connection need to be ground level. Normally, drains are
accuracy is not guaranteed. carried out by a) your water company, best laid at gentle falls (around 1:80)
The amount of work in b) your own building inspector and and sharp inclines are discouraged. If
excavating and connecting to the c) the council highways department your main drain level is way beneath
main drain (usually referred to as who inspect no less than five times to your optimum house drain level,
‘doing a road opening’) can vary ensure the surface reinstatement is in you will probably find it easiest to
enormously depending on the order. A busy road may require traffic construct a backdrop manhole near
depth of the drain, whether there lights and if your main drain runs your boundary line. A backdrop
are vacant junctions (known as under the other side of the road, the manhole works a bit like a waterfall:
laterals) already present to connect whole process becomes very much it’s a sudden drop from one level
on to, the presence/absence of more complicated. to another and it requires special
other utilities and the attitudes and The water company is going to construction methods and access
charges of local authorities and insist that you employ a competent arrangements.
water companies. groundworker to make the
To open a public highway you connection and therefore it is a PUMPS
must contact the council highways sensible idea to get some quotes for If your outlet drain is higher than
department in order to purchase a this work before proceeding. your house drains you have the
road-opening permit, now generally option of pumping the waste up hill.
known as a Street Works Licence BACKDROP MANHOLES This is often done by building in a
(prices very variable but probably It is much cheaper, easier and safer tank of some description, similar to
going to set you back as much as to lay house drains at depths of a small septic tank (say, 2m deep and
£300 in total). Inspections of the between 600 and 1200mm below 1m in diameter) into which the house

HOUSEBUILDER’S BIBLE l 13th EDITION 111


Chapter 6

then the septic tank should give


MODEL HOUSE: Drainage and Services Costs decades of trouble-free service.
Rate per The cost of the tanks varies
DRAINS m run Materials Labour Cost depending on the volumes they
Foul Drains 40 m £ 63 £ 1,360 £ 1,170 £ 2,530 are designed to deal with but
Rainwater Drains 60 m £ 56 £ 2,040 £ 1,320 £ 3,360 single household units are often
Service Trenching 15 m £ 33 £ 270 £ 220 £ 490 priced between £400 and £600.
Soakaway ea £ 1,000 £ 200 £ 1,200 Added to this is the cost of the
Total £ 4,700 £ 2,900 £ 7,600 groundworkers installing the
SERVICE CONNECTIONS tanks (often around £1,500)
Electrics £ 2,500 and the cost of excavating and
Mains Gas £ 500 installing a herringbone soakaway
Water £ 1,800 system - again depending on the
Road Connection for Drains £ 750 volumes to be dealt with and also
Total £ 5,600 ground porosity. It would be wise
drains run, and fitting either a solid ridiculous amounts, like £8,000, to budget £4,000 to £5,000 for a
handling pump or a macerator or for a simple T-off a main drain just new septic tank system.
grinder pump. The macerator pump 3m away. And another instance of However, simple septic tanks
is the more expensive but allows the £10,000 for a double sewer and storm won’t work in every location. The
waste to be expelled in a 32 or 50mm drain connection across a very quiet Environment Agency will be
pipe, which makes it a better bet for road. When costs start getting silly taking a look at your site and may
long distances. A control panel is like this, it might be time to look at well come to the conclusion that
placed somewhere indoors or in a the alternative, an off-mains solution. your ground conditions require
weatherproof casing. something else, typically a sewage
Expensive though a pump is, it OFF-MAINS DRAINAGE treatment plant, which is like a
can be cost effective to install one The simplest and the cheapest off- septic tank on steroids. Well, it
when the main drain connection is mains solution is usually to install a has a power source to speed up
further than 300m away, even if it is septic tank. It’s a tried and tested the digestion process.
downhill. This is because it can pump method and there are millions of The simpler plants use a little
out into a small bore pipe that can be them in operation, dotted around power to drive an air pump
laid in a flat trench, much reducing the countryside – it’s a very rural whilst the unique Klargester
excavation costs. On the other hand, thing. A septic tank is one of the Biodisc is designed around a
any system that works by gravity simpler concepts to understand series of rotating metal discs.
alone is ultimately preferable because in the field of sewage treatment: And there is one, the Bio
it isn’t going to break down. it is an underground chamber Bubble, which acts like a super-
Budget between £2,000 and (traditionally constructed of brick, super-charged septic tank and
£4,000 for making a road opening more recently from concrete or eats the solids as well as the
and maybe a further £3,000 if you GRP), into which your foul waste liquor and therefore doesn’t need
need a pumping station. Occasionally system empties. There is no power any desludging.
road openings can be done for less needed, there are no moving parts
but don’t count on it. Recently the and, as long as the solids at the DISCHARGE CONSENT
tendency is upwards, not down, and bottom of the tank are regularly In England and Wales, sewage
some selfbuilders are being quoted pumped out (or desludged), disposal comes under the aegis of the

112 13th EDITION l HOUSEBUILDER’S BIBLE


GROUNDWORKS

Environment Agency and they have The advent of


a say in what you can and can’t do. plastic pipes has
made laying drains
They used to operate a permit system easier. Pre-formed
called A Consent to Discharge but inspection pits
this has been replaced (in 2010) have a number of
by a Water Discharge Consent, outlets. These drains
known as EPP2, which makes the are benched on
concrete to get the
process much easier if you are using
falls right and will
conventional solutions, but much shortly be supported
more expensive if you plan anything with pea shingle
unusual. elsewhere. Building
If you use a EPP2 registered inspectors will
supplier, such as Klargester, then usually want to have
sight at this stage,
provided you follow the instructions
but failing that, be
and take out a service contract, your sure to photograph
site is deemed to qualify. If you this stage.
choose something or someone who
hasn’t registered, then you have to
convince the Agency that what you
are doing is adequate and you also
have to buy a permit (around £900).
The situation in Scotland and
N.Ireland is different but they
too seem to be in the business of
introducing something like EPP2 in
the near future.
beds (aka Constructed Wetland pump out the solids, which are
ALTERNATIVE OPTIONS Sewage Systems). A reed bed system collected in a primary settlement
There is a growing interest in can be used to upgrade the effluent tank. Reed beds also require some
alternative forms of sewage disposal. coming out of a tank so that it weekly maintenance so they tend to
Some of these are seen as being meets the same discharge standards attract enthusiasts rather than the
greener than the conventional as a package treatment plant and fit-and-forget brigade.
methods but it’s a tag that many can, therefore, be discharged into a Reed bed treatment is well
of the alternative practitioners watercourse. Although it sounds very accepted as a sewage treatment
themselves are reluctant to organic and natural, successful reed method and is now being specified
emphasise: most readily admit that bed drainage involves a surprising on a large scale by some of our water
there is a time and place for almost amount of construction and no way companies. There are however other
all the sewage systems on the market is this a cheap option – installation options, including the use of dry
and it is often stretching things a bit costs are similar to a package composting toilets. Increasingly,
far to make out a case that any one treatment plant and you require an selfbuilders are turning their attention
system is greener than another. area the size of half a tennis court. to the whole picture of water and
The best known of the alternative And like a septic tank or package waste management and seeking to
disposal systems is the use of reed treatment plant, you still have to combine aspects such as rainwater

HOUSEBUILDER’S BIBLE l 13th EDITION 113


Chapter 6

harvesting and grey water recycling garden works as and when, these joists to support it, not to mention
with efficient treatment of sewage days building inspectors want to some extremely expensive waterproof
waste. see calculations on the porosity of detailing to ensure it doesn’t leak.
Normally it is a principle of all the subsoil and estimates of how SUDS also addresses hard paving
foulwater drainage systems that the drains will cope in 1 in 100 year areas and look to use not only
rainwater should be disposed of events (i.e. freak thunderstorms). permeable paving but to have
separately: the problem being that Consequently, soakaway deep pockets of hardcore installed
whereas most sewage digestion construction has become far more underneath, again with the idea
systems need a steady supply of elaborate and it is not unusual to of absorbing large quantities of
blackwater to keep working smoothly, have to excavate a very large hole of stormwater.
rainfall has a habit of arriving in 3m3 and to fill it will plastic crates It is something of a hot issue
large quantities which can disrupt rather than brick rubble. Coupled because we seem to be suffering
the workings of the sewage systems. with the tendency for people to from frequent flash flooding events,
However, if rainwater is being want sliding folding doors with probably as a result of climate
collected separately, it is usually used flat levels between internal floors change. Whereas SUDS designs can
to flush toilets and this way the two and patios, which requires close make a significant impact on large
systems can be effectively combined attention to rainwater drainage, developments, on single sites, their
at one stage removed. rainwater disposal is an area which impact will only ever be limited.
has become much more expensive It is perhaps worth considering
in my lifetime in building. installing some SUDS features on
SITING OF TANKS your selfbuild, especially if you are
Any off-mains drainage system that concerned about flood risk.
uses a tank which needs desludging SUDS
(and that includes most of the The idea of SUDS (Sustainable
options) has to consider tanker access Urban Drainage Systems) is to stop STORM DRAINS
– 30m is reckoned to be the limit flash flooding caused by rainwater Common in urban areas, rare in the
that a tanker’s hose can extend to. In cascading off hard surfaces like roofs country, they are actually designed
Scotland, tanks must be a minimum and roadways, and to store rainwater to stop the roads flooding, but
of 15m from the house. No minimum somewhere where it won’t cause can sometimes be used for house
exists in England and Wales but if you flooding. It could result in a more rainwater. Budget £1,000 to make a
have a sensitive nose you would do complex soakaway design (see above) connection to a storm drain. Storm
well to stick to the Scottish standards. but it could also be a pond or a swale. drains are often over 100 years old
It could even be a blue roof: that is and in a poor state of repair, and
RAINWATER DISPOSAL one that is designed not just to be locating them can be a hit and miss
SOAKAWAYS home to vegetation (that’s a green affair. Typically, these are managed
The traditional destination of roof ) but to also store significant by the highways department of the
rainwater is a soakaway in the amounts of stormwater for slow local council (rather than the local
garden that is nothing more release into the drainage system. If you water company) and they often
than a hole dug into the ground, think green roofs are expensive (they flatly refuse to accept any additional
traditionally filled with free are), you will blanche when you find rainwater discharge, even when it
draining hardcore or brick rubble. how much a blue roof costs, as you are is obviously the best option. If you
Whereas soakways used to be basically placing a reservoir on your have well-honed negotiating skills,
afterthoughts, completed with the flat roof and you need some very beefy here’s a good place to use them.

114 13th EDITION l HOUSEBUILDER’S BIBLE


GROUNDWORKS

RAINWATER INTO MAIN doubles the basic metre rate for drain EXCAVATION OF TRENCHES
DRAINS laying to between £60 and £80/lin m – Drain trenches are normally 450mm
Attitudes to this vary from area to the cost of one manhole is equivalent wide (the width of a digger’s
area, but nowhere is it encouraged. to 10 lin m of straight drains. So the narrow bucket). 100mm drain (the
But when soakaways and storm general idea is to plan your drain runs standard) is going to be adequate
drains are impracticable, this course with as few bends as possible. for all situations where there are less
will often be accepted as a last resort. than five loos. There is no set depth,
There must be an interceptor between but if you lay at less than 600mm
the two drain systems to prevent DRAINAGE TIPS you may have to cover the pipe run
unpleasant pongs coming back up the When drawing up working details with paving slabs or some form of
rainwater gullies. for drains, note that the plans need hard standing to prevent damage
drawings and specifications which from above. If the run is deeper
RAINWATER HARVESTING should include the drain layouts, the than 1200mm, you will start to have
There are now a handful of businesses invert levels (depths), and details of problems working the trenches.
in the UK selling (mostly German) junctions, inspection chambers and The optimum fall is 1:80 which is
gear with which you can filter, access (rodding) points. equivalent to 250mm on a 20m run.
collect and pump rainwater around Although the trade is still split If you have to cope with gradients
the house for flushing loos. More between using clay and plastic much steeper than this then take
information can be found on this in (uPVC) drainage, someone new to specialist advice - don’t assume that
the chapter on Green issues. the game would do well to use plastic. drains will work just because they are
There is little to choose between going downhill.
the systems on price but the plastic Plastic pipe should be bedded on
ROUTES systems are more user-friendly. There pea shingle, which is a particularly
This is the other major decision to are six major players in this field fine grade of gravel. Allow one ton
be made when looking at drain runs. and, underground at least, there is of pea shingle for every 8 lin m of
The idea is to get from the house little to choose between them on drain. When calculating excavation
to the final dumping point with as quality or price. Osma are the market quantities, allow for 80% of excavated
few bends as possible. Drains have a leaders and their installation guide material to go back into the trenches
tendency to get blocked so access is tells you much of what you need to once the pipes are laid.
important at all bends. know about laying drains. They do
Straight 110mm plastic drain runs a free (but slow) design service but
can be machine excavated (to average you must know your main drain
depths), laid and buried for around invert (drain depth) levels for it to be
£40/lin m. The building inspector may worthwhile.
allow you to have a few gentle radius Plastic pipe is sold with heavy
bends on your drain runs, provided discounts off list price. A new
they don’t prevent rodding – that is house project should be able to
clearing future blockages with drain get discounts of 30-40%. All the
rods – but generally the accepted manufacturers produce guttering and
practice is to have access to the drains internal waste fittings as well and,
every time there is a bend. The addition if you combine your order, you will
of inspection chambers, gullies, rodding have more muscle to negotiate better
access, etc (‘fittings’) more or less discounts.

HOUSEBUILDER’S BIBLE l 13th EDITION 115


Chapter 7

SUPERSTRUCTURE
Superstructure is a long and
pretentious word and I would like
to use some funky Anglo-Saxon
7 Definition? Well you have
hopefully figured it out by now – it’s
all the above ground bits of a house
you buy a factory-built house, it’s the
superstructure that you are getting.
Or at least part of the superstructure.
alternative, altogether more down- up to but excluding the finishes and The roof covers and the external
to-earth. Trouble is, I don’t know the wiring and piping. Literally, wall finishes are conventionally left
one. Some use the term shell – as in the super (i.e. above) structure as to you to sort out, along with the
‘Putting up the Shell’ – and perhaps opposed to the sub (i.e. below or substructural works and the finishes.
this isn’t bad, especially if you think under) structure. So in Superstructure
of it in terms of sea shells, not egg we’ll look at walls (as in inner and
shells. But, to confuse matters, the outer skins), external doors and
outer walls that make up the shell windows, roofs and all the fiddly INNER SKIN
get referred to as skins or, sometimes, bits that hold them together. Floors? The external house walls are
leaves; one suggests bodies, the other The ground floor details are in the conventionally made up of an inner
trees, neither eggs nor sea creatures. previous chapter, the first floor and and outer skin. The inner skin tends
It all seems a bit of a mess; hence I’ll above – known as intermediate to be the part where the work is
stick with the term Superstructure. floors – are buried in this chapter. If done: it holds up the structure and

116 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

provides the support for the floors find a route across cavities: they are galvanised steel, now stainless steel,
and roof. The outer skin is there to very difficult to build well, easy to get placed in regular patterns, dictated by
provide some weatherproofing and wrong. For along with cavity walls the building regs. Lintels are needed
to look good. There are, in addition came brick ties (to knit the inner over window and door openings.
to this, internal walls which are there and outer walls together), returns These are now usually steel and they
to divide the house into rooms. These (for joinery to sit in) and cavity trays need to bear at least 150mm at either
are looked at later in the chapter. (to divert water trickling down the end of the openings they bridge.
Whilst there is much in common inner skin across to the outer skin). You also have to consider how
between inner skins and internal Cavities had a nasty habit of filling water will behave inside a cavity: it
walls, there are enough differences to up with bits of crud, or snots as they has a tendency to funnel across to the
make it helpful to look at them (and are lovingly referred to, which would inner skin so you have to take great
cost them) separately. cling to the ties and form tracks care to ensure that any water trickling
I’ll start with a look at how blockwork for the water to cross the cavity. As down the outer face of the inner
homes work. This remains the No 1 regards protecting the house from skin has to be directed outwards
housebuilding method in the UK as a water damage, cavity walls are only above openings. There are a number
whole. It’s only serious rival, at least in marginally better than solid walls. of companies producing cavity tray
terms of numbers built, is timber frame, In the 1980s, we started to become products designed to keep cavities
and I’ll therefore make this section a concerned about heat loss through dry, a very specialised niche within
bit of a compare and contrast between walls and builders began to put the building trade.
the two methods. The other build insulation into the cavities. Now
systems are looked at in the next section, you might think that these two BLOCKS
Alternative Skins. alternative uses for a cavity – i.e. to Typically, building blocks are made
stop water going one way and heat of cement and various aggregates like
MASONRY BUILDS the other – are completely at odds sand and stone. In many countries
You can’t really get a handle on with one another and, essentially, blocks are manufactured with feature
blockwork houses without looking you’d be dead right. Yet, bit by bit, finishes and are used extensively,
at the whole issue of wall cavities. builders are learning that insulation instead of bricks or stone, as external
Cavities enabled builders to and cavities are not an impossible wall finishes in their own right. But
incorporate large format concrete marriage and many builders are in Britain this hasn’t proved to be
blocks – which became widely now enthusiastically stuffing their a popular technique, except where
available in the 1930s – into house cavities with all manner of insulants cheaper substitutes for stone are
walls whilst retaining a brick skin without suffering horrendous damp sought. So when we look at building
on the outside. Prior to this, houses penetration problems. blocks we are analysing how well they
had been built with solid brick perform structurally, not how good
(occasionally stone) walls in what LINTELS AND WALL TIES they look.
we would now call a single-skin Cavity walls need to be knitted
arrangement but back in the day they together. And the openings in them BLOCK STRENGTH
were just plain walls. need to be bridged. And the bases of Block strength is calculated in
The cavity was advertised as them need protection against rising Newton /mm2, known in the trade as
being an ‘improvement’ in house damp. All told there are a number of ‘Newtons’ or just plain ‘N’. Roughly
construction because it introduced a things you have to think about when speaking the more cement in the
barrier across which rain supposedly you build a cavity wall. The knitting block, the higher the strength (or
couldn’t jump. But rain often does together is done with wall ties, once the more Newtons it is said to

HOUSEBUILDER’S BIBLE l 13th EDITION 117


Chapter 7

have). Most blocks qualify for the


basic 3.5N strength, though some INNER SKIN: Key Rates per m 2
applications require 7N blocks Time taken Labour
Blockwork Materials Accessories in mins at £25/hr Combined
(i.e. below ground and some floor
Celcon 100mm blocks £12 £2 35 £15 £ 29
blocks). You will find a number of
Hemelite blocks £12 £2 35 £15 £ 29
‘utility blocks’ on the market but
Thin Joint Blocks £12 £4 25 £10 £ 26
their strength is not guaranteed.
Having said that, there aren’t many Timber Frame
applications in housebuilding that 47x90mm Frame £5 £14 50 £21 £ 40
call for extra-strength blocks. 47x140mm Frame £9 £14 50 £21 £ 44
47x185mm Frame £10 £14 50 £21 £ 45
BLOCK TYPES Timber frame is here costed as if it was being built on site, which it rarely is in the
UK. Usually, it’s built offsite in a factory where many different parts (lintels, joinery)
There is an industry standard size of
are also assembled, making it very hard to compare directly with masonry build. As
block, which is 440x215mm. This is a general rule, there isn’t much to choose between the systems on cost grounds.
the equivalent of six standard bricks
and you need ten of these blocks to
build a square metre of wall: they are MODEL HOUSE: Inner Skin Costs
conventionally bought by the square Materials Labour Total
metre – a ten-pack. They are usually Inner Skin Area - minus joinery openings 185 m 2
Celcon type Blocks laid in mortar £14 m 2 £ 2,600
100mm thick, though some of the
Inner Skin Area - measured through openings 220 m2
super-lightweight varieties are thicker
Blocklaying price based on above £15 m2 £ 3,300
in order to get their insulation values
Total £ 2,600 £ 3,300 £ 5,900
up to par.
2
Switch to 140mm Timber Frame 185 m £ 8,100
THE DENSE BLOCK Switch to 185mm Timber Frame 185 m 2 £ 8,300
Uncomfortably heavy to lift, they are Additional Beams, Battening + Other Works 185 m 2 £ 3,000
usually used below ground, often at Inner Skin Area — when measuring up work, brickies tend to measure “through
openings” to allow some time for fixing joinery and lintels.
7N strength. Cheap – full loads cost
just around £8/m2.
Sixties, these blocks have become be acceptable.
LIGHTWEIGHT CLINKER a huge hit in the UK market and Brickies love aircrete blocks because
BLOCKS more than 70% of new homes use they are light and easy to cut. Plasterers
Almost half the weight of a dense them somewhere. There are three are not quite so fond of them: they
block, these are often used on the manufacturers, Celcon, Forterra’s have a reputation for movement which
inner leaf of insulated cavities and Thermalite brand and Tarmac, who causes plaster to crack. This is one of
in partition walls. They provide an bought the fourth, Durox, which the reasons for the rapid uptake of
excellent keying surface for plasters. is still obtainable as a separate plasterboard stuck onto walls (dot and
They are also widely used in beam- brand. Their big plus is (or was) dab), taking over from the old wet
and-block flooring; they are very that they packed enough insulating plastering routines.
similarly priced to dense blocks. properties into them to allow
builders to carry on with empty TRADE RATES
AIRCRETE BLOCKS cavities. Current U values are now An all-in labour rate of between £12
Introduced from Scandinavia in the too demanding for this solution to and £16/m2 for laying blocks is OK,

118 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

depending on area. All-in rate means Cavity batts designed to completely battens onto which the plasterboard
that your brickies would fix wall ties, fill the void between the walls – is fixed. The insulation value depends
cavity wall insulation, joinery, lintels, known as Full Fill – are usually made on the choice and depth of insulation.
airbricks, DPCs, etc. as they go, but out of one of the woolly insulators Although it gets around the problem
excludes the cost of laying an outer such as glass fibre or mineral wool; of having to partially fill the cavity
skin, which likely as not will be in a these are ‘wicked’ (rhymes with wall, it leaves a number of cold
different material. licked) to stay rigid and are cut to fit bridges between floors and where
Using an all-in rate saves the hassle in around cavity ties. internal walls meet external walls
of measuring non-standard runs An alternative would be to blow and this makes it hard to meet the
like chimneys. A two-and-one gang the insulation (either polystyrene U-value ratings now required for
should be able to lay between 30 and beads or glass fibre) into the cavity walls. It’s often used in renovations
40m2 of blocks in a day. Combined after construction. Cavity fill is only where you don’t want to disturb the
with the cost of blocks and mortar, acceptable in the more sheltered parts outer wall but it’s not common in
it creates an inner skin walling cost of the country: in the rain-swept newbuild. It eats floor space.
of around £30/m2, against which all west, you have to maintain a 50mm
other options have to be compared. air gap in the cavity. In other words, 4 EXTERNAL INSULATION
Note that when working on measured you look for a partially-filled cavity Adding insulation to the outside of
rates, brickies conventionally treat solution. the external wall is commonly done
joinery openings as if they were part on the Continent and is used here
of their work (which arguably they 2 PARTIAL-FILL extensively when refurbishing old
are, as they fit the joinery as they go). Most of the regular insulation buildings. But it is still somewhat
This makes a considerable difference materials are available in formats unusual on new builds. Where it is
to overall costs, as highlighted in the designed to partially fill the cavity. used, it is normally in conjunction
Inner Skin table. Despite making special retaining with some sort of rainscreen, like
clips for wall ties, the wet Tuesday in brick slips or terracotta panels, which
INSULATING CAVITIES February syndrome means that it is incorporate insulation within the
The preferred way for the majority often difficult for brickies to maintain system.
of English builders to knock-out the a partially clear cavity. They drop
inner skin/cavity detail up till 2002 mortar ‘snots’ into it. THIN-JOINT BLOCKWORK
was to use an aircrete block and an If you want a decent amount of Thin-joint or glue mortars are
empty cavity. Since then, builders insulation plus a 50mm cavity, your widely used in Germany and were
have got used to adding insulation overall wall thickness is starting to introduced into Britain by Durox in
into the cavities. Builders are now blow up to 350mm plus, and this 1991 but their uptake hasn’t been as
faced with four basic options: fill the starts to eat a significant chunk out of fast as the manufacturers hoped for
cavity with insulation, put insulation your internal floor area. and their use has been limited in the
in the cavity but leave a gap (known housebuilding arena.
as partial fill), insulate on the inside 3 INSULATED DRY LINING There are two key elements that
of the wall or on the outside of the This method involves using either make it different to conventional
outer wall. plasterboard laminated to insulation blockwork. Firstly, it uses a very sticky
and sticking the whole thing on mortar, more akin to tile adhesive
1 CAVITY-FILL INSULATION the room side (i.e. inside) of the than a traditional sand and cement
This is both cheap and easy to do – inner skin wall. Or, more frequently, mix. This thin-layer mortar starts
but you do lose your empty cavity. insulation fixed to the wall with to set within ten minutes and this

HOUSEBUILDER’S BIBLE l 13th EDITION 119


Chapter 7

makes it possible to work with much


bigger block sizes - this is the second Cavity Wall Insulation Techniques
key element and the one from which
the speed advantages derive. The limit
The Empty Cavity scores very
on block size is set by what a man can badly in U value terms at around
easily handle: in fact, in response to 0.6. No longer an option for
feedback from site, Celcon’s currently today’s housebuilders
preferred size – 610 x 270mm – is
slightly smaller than the format they Cavity Fill Insulation: usually with a
launched with. Blocklayers who have mineral wool. Good insulation but
moved over to thin-layer reckon that no gap to stop rain penetration.
OK in drier areas of the country
it’s around 30% quicker. Any increase
in material costs is more than offset
by a decrease in labour rates.
The techniques used are quite
Partial Fill Insulation: usually with a
different to mortared blockwork. In PIR board (Kingspan or Celotex).
many ways, it’s closer to carpentry than The board has to be pinned against
masonry: tooling up for thin-joint the inner skin.
blockwork also requires a bandsaw, a
mortar spreader, a block rasp, a mortar
whisk and a wall tie puncher – you Insulated dry lining or internal
can’t use traditional wall ties. Thin- insulation. Used in conversions and
renovations but rare in newbuilds
joint work also requires a very level because it eats up roomspace
base to work off; with just a 2mm bed
between the blocks you can’t make
good any initial errors as you go. As
with many of these new techniques,
Timber Frame: here the insulation
the problem for would-be adopters is sits within the inner skin itself,
that there simply aren’t any (or at least filling the voids between the studs.
many) blocklayers around who know Variations like SIPs provide even
anything about thin-joint. When faced better insulation levels.
with the thin-joint option, the knee-
jerk reaction is to hoick the labour
rates up through the roof when, going
on the evidence, they ought actually to
be lowering them. wall, which is, in many ways, the most to navigate through the options.
elegant solution. We are, of course, The strand that unites them all
TIMBER FRAME talking timber frame here. is that they offer factory-built
Tinkering around with where you Innovation flourishes here. What superstructures and this, in turn,
put the insulation in relation to the we once routinely referred to as offers rapid and precise build times.
blockwork is all very well but there is timber frame is now a collection of In North America, timber framed
a mainstream alternative that enables varied offsite construction systems, housing is almost always constructed
you to place the insulation inside the and it can be difficult for selfbuilders on site by teams of carpenters armed

120 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

This is essentially what


you get when you buy a
standard UK timber frame
kit home. This is the
superstructure. It takes
about a week to erect this
on a prepared site.

with chainsaws in a process known stuck with a more rustic, open-panel Britain – elsewhere they use softwoods
as stickbuild. But the Europeans approach which simply concerned to achieve the same effect. It’s never
— starting with the Swedes in the itself with getting the basic timber going to compete with the standard
1920s — have always preferred the structure up and then fitting out form of timber building on cost
idea of pre-fabricating their timber all the insulation, services and grounds – green oak superstructures
homes and shipping them to site on plasterboard on site. The structure are usually around 30% more than
the backs of lorries. Timber frame itself was usually built from studwork conventional timber frames – but it
in the UK could have gone down covered with OSB (Oriented Strand comes with an inbuilt sense of style
either route but, with little native Board) for bracing, and one of and substance which people seem more
timber suitable for housebuilding the main advantages it held over than happy to pay a premium for.
and without a pool of stickbuilding masonry construction was that it The original open-panel style of
carpenters, factory pre-fabrication allowed ample space for mineral wool timber frame is now under threat
was always favourite to win out, insulation and yet still retained an as tighter building regulations have
despite the fact that the initial boom empty cavity. forced a re-think. Open-panel
in timber frame was largely financed An alternative version of timber timber frame was based on using the
by American oil money looking to frame used a mixture of solid timber 38x89 CLS stud which, once braced
house workers in the Aberdeen area posts and beams and infilled with with OSB, forms a strong box-like
in the 1960s. studwork, apeing the methods used structure. However, an 89mm depth
However, whilst the Continentals by the Tudors. This style continues is no longer an adequate width for
veered towards building pre-finished, to thrive, having morphed into green the insulation required to meet
or closed-panel homes, the Brits oak building, a style almost unique to building regulations and in the past

HOUSEBUILDER’S BIBLE l 13th EDITION 121


Chapter 7

One such is Val-U-Therm, a


system developed by Bryan Woodley
and currently licensed to two UK
manufacturers who target the
selfbuild market, Scotframe and
Flight Timber. It’s a timber frame
building system which uses a largely
plant-based insulation foam which is
factory-injected into the panels. The
technology behind the injection is
German, but the plant matter used in
the insulation is locally sourced.

CLOSED-PANEL TIMBER
FRAME
A sort of halfway house between
regular timber frame, as practised
in the UK, and prefabs is the closed
panel systems, as used by the Germans
and the Swedes. Here the wall, floor
A SIPs build in Scotland. The panels are a little different to timber frame: they
consist largely of insulation encased by boards. and roof sections are finished in the
factory, right down to the services
few years alternative approaches have conventional timber frame, but not by and decorations, and then craned into
come to the fore. Some stuck with a huge margin, and when you factor place on site. It’s quicker than regular
the narrow studs and started adding in the convenience of having the or open panel methods, which require
extra layers of insulation outside insulation already in place, the price internal finishing on site, but it only
the timber frame, others began looks more appealing. SIPS have suits builders who are very organised
using 140mm wide studwork which been slowly biting into the market and know exactly what they want. It
allowed ample space for insulation, share of timber frame. has been tried once or twice in the UK
but added significantly to costs. but has never really caught on because
HYBRIDS the average British client wants the
SIPS For many years, framed construction flexibility to change their mind every
Structural Insulated Panels are a seemed to be turning into a battle two days or so. However, whenever a
sandwich construction made up of between SIPS and conventional German factory house builder appears
a layer of insulation encapsulated timber frame, but what now seems on Grand Designs, the world and their
between sheets of oriented strand to be happening is that new hybrid aunt goes weak at the knees about how
board (OSB). They offer better forms are appearing that seem to amazing it all is and just why can’t we in
insulation levels for a given wall have a foot in both camps. The Britain build that way as well. So much
thickness because they use far less hybrids seem to have bought into so that there are now about a dozen of
timber, their strength coming instead the idea that frames should be pre- these companies setting up in the UK.
from bonding the insulation with the injected with insulation, but have Amazing the methods may be, but
OSB. stuck with a framework of timber, or they are not cheap. Even when sourced
SIPS are more expensive than sometimes steel. from Poland, the resulting houses are

122 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

costing over £2,000/m2 and thus they


are aiming mostly at the top end of the
market.

GREEN OAK/POST AND BEAM


The traditional way, that is to say
Tudor way, of building large timber
houses was to erect a large post and
beam skeleton (usually using oak)
and then to hang the house off it.
Whereas modern, industrial timber
frame is a fast, lightweight, cheap way
of erecting walls, here we are working
in an altogether different idiom. Post
and beam housing has undergone
a revival in recent years and it’s
used for both retro designs (Border
Oak, Potton Heritage) and modern
(Carpenter Oak). It’s also essentially
the form you get when you take on a
Closed panel timber frame sees the whole wall finished in the factory, including
timber barn conversion. It’s very good doors and windows and inner and outer wall linings. This is a German Baufritz
for creating large open-plan spaces house being erected in Cornwall
as you don’t require structural walls.
However, you do require an external
weatherproof cladding. It’s the added wow factor. CLT manufacture is the use of non-
Post and beam frames are by their toxic polyurethane adhesive (solvent
very nature load-bearing but often CROSS LAMINATED TIMBER and formaldehyde-free) which helps
the houses designed around them Developed in Switzerland and boost the environmental credentials
would stand on their own walls Austria in the 1990s, CLT techniques of CLT. Sustainable builders also
without any help at all from all that enable us to build solid walls of love the fact that a timber building
oak. Consequently, the cost of the softwood timber, by glueing small is actually locking up CO2 in its
posts and beams is almost always an pieces of it together into one large structure, rather than just reducing
extra, from the pure construction cost panel. CLT is produced by placing the amount burned by incorporating
point of view, to the cost of building these panels in layers stacked at energy efficiency measures.
the house in a simplified, modern right angles to one another and then CLT sections can also bring the
format. It’s therefore never going to glueing them together under high- beauty of timber inside the home.
be a cheap way to build. But what’s pressure to make immensely strong Here is a walling material which is
just as interesting, to my mind, is panels which can be used for walls good to look at in its own right, and
that there are a number of small and roofs. The panels can be up to doesn’t require a sheet of plasterboard
developers out there who willingly 13.5m in length and are available in to cover it up. KLH, one of the
pay all that extra money to get an oak 3, 5, 7 or 9 layers, varying in thickness principal producers of CLT, now
framed house because they can make from 57mm to 300mm. grades its output in three distinct
it back and more on the asking price. One of the innovations used in visual categories, domestic visual

HOUSEBUILDER’S BIBLE l 13th EDITION 123


Chapter 7

quality, industrial visual quality and have worked with it and know best using them as well. However, neither
unseen, designed to be hidden behind how to use its strength and elegance. pods nor prefabs are likely to be of
wall finishes. Obviously, the inclusion Increasingly, we are seeing it used on the remotest interest to self builders
of CLT as an interior design element selfbuilds and residential schemes or small developers because, to make
requires thoughtful design, because and it offers a unique approach to economic sense, you have to replicate
there will still be issues with running homebuilding. the work many times – opinions vary
cables and pipes in front, but used as to how much many consists of but
carefully it can make a stunning PODS AND PREFABS it’s not less than 30 and it may be as
feature. The past few years have seen renewed much as 100.
In cost terms, CLT remains at interest in prefabrication as a solution Timber and steel frame homes are
the upper end of the structural to our housing needs. Bathroom normally supplied in what kitchen
element spectrum, especially so as pods in particular are migrating from suppliers would call a flat pack state,
it normally requires added layers of commercial office space into housing. wall and floor units ready to be
insulation placed outside the wall or They are assembled and finished assembled on site. In contrast, pods
roof in order to obtain satisfactory in a factory and then craned into and prefab units are supplied as ready
U values. However, CLT is not quite place on site, bolted into place and assembled units – indeed they tend
like other wall materials because it the plumbing is connected from the to have as much work done in the
can also act as a beam in its own outside. Completely prefabricated factory as possible. Transportation
right and CLT can therefore be dwellings are also back – steel-framed thus becomes the limiting factor
used over open-spans without any containers have been used to build – you can’t realistically transport
further support. Consequently, it hotels and MacDonalds for years and anything that won’t fit onto the back
has a growing fan base and there are now innovative housing groups such of a lorry.
several architectural practices which as the Peabody Trust have started
ICFS
Another technique. Another three
letter acronym. Just to prove not
all innovation is happening in the
lightweight framing, this one uses
polystyrene moulds and lots of
concrete. ICF stands for Insulated
Concrete Forms.
There is an umbrella group, known
as the ICFA (Insulating Concrete
Formwork Association), which acts
as a point of reference. In 2019, it
had nine members active in the UK
market.
The idea behind ICFs is that
you start with a delivery of hollow
polystyrene blocks (or sometimes
panels) which you then stack up
Insulated Concrete Formwork (ICF) seen here at the critical readymix pour stage. into a house shape. You stop at each
Note the concrete pump at work — the tube is being inserted into the wall cavity
seen top right
floor and get lorry loads of readymix,

124 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

which you pour into the hollows in STEEL been an explosion of interest in
the polystyrene walls. It’s a clever In some parts of the world – notably how we might do it differently in
variation on how concrete building Australia – steel-framed housing is future. All I’ve tried to do here is
work is usually carried out, where big bananas. In Britain, its heyday summarise some of the methods
you take down the formwork after came and went in the 1940s in the which are putting themselves
the concrete has set. With ICFs, the post-war prefab boomlet. Since then, across as alternatives to the
polystyrene acts initially as formwork it’s remained something of a curio. mainstream. There are several more
(or mould) for the concrete and stays There are two approaches, mirroring ethnic methods about which I
in place to become the insulation for timber frame. You can have a post know very little and can’t really do
the finished house. and beam structure (which is what much more than point you in the
The polystyrene can be covered most office buildings are) or you can right direction.
on the outside with polymer build lightweight wall panels (which n Straw bale homes: a small
(flexible) renders; inside, however, is where most of the housebuilders’ phenomenon in North America,
there are many unusual techniques interest is). Advocates reckon it’s they have started to sprout in Britain
for fixing internal walls, frames and superior to timber frame in many and Ireland as well. Our best known
floor joists, which would probably ways – it’s lightweight, it’s fast, it’s straw bale builder is Barbara Jones
completely flummox the average accurate – but it’s mostly been aimed who runs Straw Bales Futures (aka
British builder. And whilst the at the mass-housing end of the Amazon Nails).
idea is engagingly simple, it’s not spectrum. n Centre for Alternative Technology,
without its problems as I’ve seen For several years, British Steel’s Machynlleth, Powys. Mine of
on site when the wet concrete Surebuild was the only game in information, especially on timber and
sometimes bursts through the side town and they regularly produced also straw bales. Wide number of
of the polystyrene blocks. about 1,000 homes a year from an residential courses on offer and good
ICFs have an undoubted appeal antiquated plant in South Wales. bookshop with details of all these and
to people wanting to take a hands- Now if you Google Surebuild, you’ll more.
on approach to building their own only find historical references to Every other episode of ‘Grand
walls. They don’t require bricklayers it. British Steel were taken over Designs’ seems to feature a new take
and blocklayers, anybody can by Corus, who were in turn taken on building homes which promises
do it. However, there are some over by India’s Tata Steel and the to turn the construction world upside
cost implications that have to housebuilding bit was put out to down: only I’ve been around long
be addressed. Even using your grass. There are often new businesses enough to know that, by and large,
own sweat labour, ICFs are more which start out to “introduce” steel they don’t.
expensive than blockwork or timber frame to the UK market, but they
frame. never seem to get any traction PERFORMANCE
In their defence, the ICF suppliers and so this sector really remains STANDARDS
point out that overall wall costs a housing by-water, though of There is one aspect of new
are often pretty much the same course it is very much No 1 in the housebuilding trends which is worth
as blockwork or timber frame, at commercial world. mentioning here and that’s growing
around £80/m2, but that’s really interest in Performance Standards,
only true where you want to use a OTHERS which emphasize how well a house
rendered exterior finish which can Having been very traditional in is built rather than just what it’s built
sit directly on the polystyrene wall our approach to homebuilding out of.
formers. for decades, suddenly there has In particular I want to draw

HOUSEBUILDER’S BIBLE l 13th EDITION 125


Chapter 7

An increasing outer skin. Whilst there have been


number of numerous developments and changes
selfbuilders are in the techniques used to build the
pushing the boat
out to try new
structural inner skin, the outer skin
techniques and has remained largely unchanged
new materials. This over the years. Other than some very
house in Suffolk modern houses, which tend to swap
is set to be one of glass or terracotta rainscreens for
the first straw bale cavity walls, most of the materials
Passivhauses in the
world.
used to clad homes haven’t changed
that much.
But not THE first. The basic choices are fairly limited.
There is already Brick – still easily No 1 in England;
one a few miles stone – expensive, tending to be used
away in Norfolk.
where local styles dictate; renders
– top choice in the wetter parts; or
lightweight claddings such as timber
boarding or tiles – commonly used for
odd decorative panels but rarely for
whole houses.
There is surprisingly little
difference between the prices you
pay for external claddings. It’s hard
to build an outer skin for less than
£40/m2 and it’s not difficult to vastly
your attention to the Passivhaus a question of deciding which is best: increase this figure if you specify
Standard because it is making waves just seek out people who know what expensive materials and finishes.
as the gold standard of low-energy they are doing and you’ll probably be Before embarking on a look at
homebuilding. There is much more fine. what the regular options are, a word
on this elsewhere in the book. But about mixing up walling materials,
the point I am labouring to make something that’s become very popular
here is that you can use any kind of with developers. Mixing materials
construction method to make a high OUTER SKINS invariably creates an extra layer of
performance home — the standards If you’re reading the book complexity and therefore adds to costs.
are rarely prescriptive. conventionally (i.e. from front Not only are different materials and
Leading on from this point, you to back), you will have noticed trades being brought in for relatively
can see that what really matters more that a previous section, ‘Inner small amounts of work, but junction
than the materials or system you Skins’, started with a short (very details need to be built in as well. It’s
choose is the quality of the building short) history lesson about the difficult to be too precise about this
work. All these construction systems introduction of cavity walls into because every situation is different
are capable of delivering fine homes, British housebuilding. If you weren’t but bear in mind that simplicity helps
in the right hands: equally, they can paying attention, the cavity splits if your primary aim is to hold down
all turn out to be nightmares. It’s not the external walls into an inner and costs.

126 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

BRICK about, to do with frost resistance ENGINEERING BRICKS


Bricks remain the preferred material and salt content. The frost rating is These are particularly hard-wearing
for external walls throughout broken down into three categories and strong. Not only do they offer
England and Wales. They are being F (high), M (medium) and O much greater structural support
reasonably cheap, they are well (appalling), and the salt rating is split (and so they are a natural choice for
understood by the building trade, into just two categories, L (low) and supporting steel beams) but they are
they can look attractive and, above all, N (normal). What does it matter? also extremely moisture-resistant.
they are durable. Not only should a With frost, the problem is spalling, This second quality, combined with
brick wall not need any further care where the face of the brick starts some very low prices, has seen
after construction, it should actually crumbling away. Very soft bricks, engineering bricks being widely
improve with age. rated O, would not be acceptable in used as a damp-proof course (DPC).
There are dozens of brick any situation in the UK where they The semi-gloss finish on the bricks
manufacturers and thousands of would be exposed to the elements (which are either blood red or slate
bricks to choose from. There is also – i.e. outside – but only severe blue) can be used to good effect in
a substantial business in reclaiming frost areas (Scotland, the Welsh creating two-tone effect brickwork
bricks from old buildings – though mountains and the English Lakes both at DPC level and elsewhere on
it only amounts to 1% of total brick and Pennines) would require an brick elevations.
sales, that’s still 40 million bricks F-rated brick. M-rated bricks are fine
reclaimed each year. If you are limited for almost all applications outside SPECIALS
by budget you will probably find your these areas, but note that in certain This is the term given to bricks
choice is rather narrow, but if you are exposed spots (notably chimneys) that aren’t a standard rectangular
prepared to pay more than £500 per you will be asked to add copings and box shape. These get used, typically,
1,000 (that’s 50p per brick) then a overhanging courses if not using an on details like cills and brick wall
whole world of choice opens up. F-rated brick. cappings where you want to stop
Choosing a brick is quite an The matter of low or normal rainwater pooling. Some of the more
involved process and it is notoriously salt content is not as important to common specials are readily available
difficult to visualise what a brick wall housebuilders. In very wet areas but many have to be made to order,
will look like from a manufacturer’s (usually within sight of the Irish Sea) which is a) expensive and b) time-
display board. Most British bricks it is advisable to avoid bricks with consuming. If your chosen design
are baked clay and these are the ones an N rating as you may be asked to incorporates specials then don’t
to go for if you are seeking out a use sulphate-resisting cement. A assume that they will just turn up
character brick. merchant will be able to advise as to with the rest of the bricks; you may
There are other materials, notably a brick’s rating – but what if you’re have to wait another two months.
concrete and sandlime, that get used using second-hand bricks? You’ll have In response to these problems
to make bricks but the overall effect to check your source and convince with procuring specials, there are
tends to be industrial looking and, the building inspector that they are now brick-bonding services which
crucially, there are no great price suitable for outdoor use. The building will cut and glue ordinary bricks
savings to be had – unlike in the inspector will very probably have into out-of-the-ordinary shapes. At
world of roof tiles and block paving seen the brick before and will be able between £3 and £4 per brick they are
where concrete is invariably cheaper to assess its suitability. But do check a little cheaper than unusual specials
than clay. before forking out. Take samples and with a turnaround of one week,
There are two technical ratings into the building control office if rather than six, they are a whole
for clay bricks that you should know necessary. lot quicker. It’s a particularly useful

HOUSEBUILDER’S BIBLE l 13th EDITION 127


Chapter 7

service if you are using a second-hand EXTERNAL WALL FINISHES: Costs per m2
brick from which you could never
Time in Labour at
otherwise hope to obtain specials. Try Heavyweight claddings Materials Mins £25/hr Combined
Brickability. Brickwork @ £500/thousand £ 35 85 £ 35 £ 70
Brickwork @ £1,000/thousand £ 65 85 £ 35 £ 100
BRICKIES’ RATES Natural stone £ 56 180 £ 75 £ 131
One of the key rates in building Artificial stone £ 27 120 £ 50 £ 93
is known as the brickie’s rate and Lime Render £ 22 80 £ 33 £ 66
it expresses how much bricklayers Monocouche Render £ 24 120 £ 50 £ 74
charge for laying 1,000 bricks. It
sounds simple and it’s not. For a start,
it only really applies to very simple Lightweight claddings
runs of stretcher brickwork, beloved Painted Render on mesh £ 20 100 £ 42 £ 62
Monocouche Render on cement board £ 23 70 £ 29 £ 52
by the UK’s speculative developers.
Tile Hanging £ 36 70 £ 29 £ 65
On such British residential sites,
Terracotta Rainscreens £ 80 60 £ 25 £ 105
a two-and-one gang (that’s two
Metal Claddings £ 80 200 £ 83 £ 163
brickies serviced by one labourer)
Sawn + Stained Weatherboard £ 19 70 £ 29 £ 49
will lay 1,000 bricks a day – though Unpainted Cedar £ 52 50 £ 21 £ 73
normally they alternate between brick Burnt Timber £ 79 50 £ 21 £ 100
and blockwork. So the brickies’ rate
expresses how much a two-and-one MODEL HOUSE: Brickwork costs
gang gets paid for a day’s work. The Area in m 2 Rate Materials Labour Total
problem is that they very rarely lay Brickwork @ £500/k 200 £ 70 £ 7,000 £ 7,000 £ 14,000
this many bricks in a day. There are
extra features. Work like corners around £600 per 1,000 face bricks they inform the manufacturer that
and reveals and fixing joinery and laid, over treble what it was in 1995. there is a new house going to be built
insulation, not to mention fiddly In some cheaper areas it’s still down in Pig Lane, they clock a commission,
details like dogs-toothing gables around half this at £600/k, a brickie rising to near 20% if it turns into a
and soldier courses. Estimators will is taking home £250 a day and the sale. They also shut out competitors
be tempted to measure the square labourer £100. from this particular deal – only
meterage of brickwork and work out the initial contact gets offered the
how many bricks that is (clue: there BRICK FACTORS commission.
are 60 bricks to a square metre on Specialist merchants, known as It would probably be better if you
single skin stretcher work). If paying factors, have developed long antennae didn’t know that. It’s a cosy little
brickies by the square metre, be clear for detecting new housebuilding relationship between manufacturers
whether your square metres are ‘solid’ activity. If you phone up a factor and merchants that reeks of rip-off
(i.e. including the joinery openings in inquiring after bricks, the first thing Britain. But would you get your
their calculations). The conventional you get asked is: ‘Where is the site?’ bricks cheaper if it didn’t happen?
arrangement is to measure straight Why do they all want to know? Maybe.
through openings: there is however Well, brick factors get money for A brick factor will wave brick
no additional charge for building simply identifying (or ‘covering’) a panels in front of you with gusto and
frames into the openings. new site, even if they don’t get the the bricks will not be identifiable
As of 2019, our local rate was up subsequent order. So the moment as Ibstocks or Hansons but have

128 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

names like Mellow Red or Autumn to get a rendered finish – rendering are applying is as much a decorative
Gold – renaming the bricks makes directly on to blockwork or rendering finish as it is a weatherproofing
it harder for you to get alternative on to metal-lathing like Riblath or layer. As they can be applied in one
quotes. Don’t get me wrong: dealing Renderlath, nailed on to battens. coat — typically around 15mm
with brick factors can be fun and The first would normally be used on thick — they are a much less labour
some of them do terrific deals, but masonry-built houses, the second intensive process than traditional
there is more than a hint of the on timber frame, though note that renders. The downside is of course
Middle Eastern souk about the whole the Scottish preference is to build a the material cost — a 25kg bag costs
process. As far as I can ascertain, this masonry block wall around a timber anywhere between £8-£10 and only
rigmarole is more or less restricted frame superstructure and then to covers a square metre of wall area.
to bricks, although it is rumoured to render (or harl) the surface of the This compares with a materials cost
occur with up-market roof tiles and blockwork. on a traditional cement render of
pavings. Render is also widely used against around £2/m2. But of course, the
insulation backgrounds, as you monocouche render systems claw
MORTAR would expect to find with Insulated much of this added cost back through
You can’t lay bricks without mortar Concrete Formwork walls, or external reduced labour costs, not to mention
and mortar actually makes up around insulation systems. eliminating the need for subsequent
20% of the area of a brick wall. So painting.  
what the mortar looks like is arguably DECORATIVE RENDER Another advantage of monocouche
as important as what the bricks look A nearly lost art, which is undergoing renders is that they have additives
like. The current fashion is for very a revival. The finish is rather like an placed in them which make them
pale mortars, aping the lime mortars upmarket Artex applied to the face more flexible and help to eliminate
that the Victorians used. One way to to enliven the appearance. In East cracking. The additives vary,
get this is to use pure lime mortars Anglia, it is known as pargetting. depending on the make-up, but they
instead of cement, but lime mortars typically include acrylics, polymers
are expensive and not as easy to use as MONOCOUCHE RENDERS and silicates, sometimes giving rise
cement. If you want the look but not Monocouche is French for single to alternative names, such as “acrylic
the hassle, you can use white cement layer or bed. Conventionally, both renders.”
(Snowcrete) and sand mixed with lime and cement renders have been Not all plasterers are entirely happy
plasticiser. There is a much longer mixed on site with sand and applied to apply monocouche renders in just
section on mortars in Chapter 12. in a series of layers or coats, never one coat, and a site I visited recently
less than two and sometimes three in London has had two coats applied
RENDER or more. In contrast, a monocouche by hand for an overall cost of around
Rendering is the term most render is supplied in bag form ready £35/m2. This compares with around
commonly used for an external for mixing with water: it can be £20/m2 for a traditional two-coat
plastered finish. It’s widely used in applied by hand trowel or sprayed on. cement render, or £30/m2 for a three-
Scotland, where it’s known as harling, It’s a practice which has spread here coat finish. 
and in Ireland. There is a reason for from the Continent and many of the
this: it’s better at keeping rain out big names in this field — Sto, Knauf LIME
than brick, and therefore the wetter Marmorit, Weber — are German in Green builders love lime and happily
the region, the more you see render origin. apply it to all manner of unlikely
being used. These renders use white cement surfaces such as straw bale and cob.
Two alternative techniques are used and are pre-coloured so that what you But lime works just as well on more

HOUSEBUILDER’S BIBLE l 13th EDITION 129


Chapter 7

TIMBER AND BOARDS


Plain timber boarding (sometimes
known as clapboarding) has come
back into fashion ever since the rise
in popularity of barn conversions.
There are several different styles.
Roughsawn timber (featheredge)
looks more rustic; planed timber
(shiplap) can look a shade more
sophisticated. In their raw states, they
make remarkably cheap claddings,
costing between £15 and £20/m2
(materials only). But they drink wood
stains by the gallon and, of course,
they require extensive maintenance
to keep looking the business. If you
pay for the labour, then weatherboard
is actually one of the most expensive
of claddings after thirty years has
elapsed.
Step forward a number of timber
or near-timber solutions that don’t
require staining in the first place, let
The Graven Hill Plot Passport is a useful guide to what are the currently
alone frequent re-applications. Cedar
fashionable facades for selfbuild housing. To find more detail, visit Graven
Hill> Find a Plot>select one of the larger selfbuild plots and download the Plot – usually Western Red Cedar – is the
Passport. It also covers roofing options. best-known timber promising to be
fit and forget. It’s five times the price
of basic sawn featheredge but it lasts
standard materials like blockwork, bought wet, by the tub) through a for 60 years. Hopefully. It’s being
and it too has some advantages over number of distinct bagged products sold on the proposition that it lasts
cement renders. Lime is inherently — hydraulic limes — which behave 60 years and there are many acres of
more flexible than cement and you rather like a weak cement. They need cedar cladding going up all over the
are less likely to have problems with to be mixed on site with sand, and place in locations that are often hard
moisture getting trapped within are hand trowelled in the traditional to reach so it had better last 60 years!
the wall – a noted problem when way. Limes are a little more expensive It goes a mellow silvery-grey after a
cement renders are applied to old than standard cement renders, but couple of years.
walls. Lime also tends to look very shouldn’t really take any longer to There are a number of mid-priced
appealing, though to keep it looking apply. alternatives between cedar and the
good it does require frequent coats of For lovers of tradition and modern basic whitewood boards. Native
limewash. methods of construction, there are larch is sometimes specified – it’s a
Building limes are available in one or two lime-based monocouche little cheaper than cedar. There are
a variety of formats from the very renders. Look out for K-Rend also some interesting heat-treated
traditional lime putties (which are (K-Lime) and Baumit. timbers coming onto the market: one

130 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

is Thermowood which is a treated VERTICAL TILING Rainscreens and brick slip claddings
redwood with a 30-year lifespan. Using vertical tiling is another tend to be done on a supply and fix
Another is Accoya, a pine which has Victorian building feature that is basis and they also tend to be expensive,
been treated with vinegar and heat, coming back into fashion, particularly but they come into their own when
and boasts a 50-year lifespan. And in SE England. Costs are very similar renovating existing walls where extra
both Eternit (Weatherboard) and to plain tiles laid on roofs, although insulation is required but space is
James Hardie (Hardiplank) produce vertical hanging tends to be a little limited. They typically add only 50 or
convincing pre-painted fibre-cement more expensive because there is more 60mm to the wall width.
boards for slightly less than genuine work involved in cutting corners, There is a growing interest in using
timber boards. Right at the bottom angles and around openings. Generally all manner of unconventional materials
end of the spectrum is uPVC: sure, it it looks best with small format plain as rainscreens. One that catches the
doesn’t rot but it doesn’t really have tiles or slate and it is more important eye is the use of Corten rusted steel
much going for it as a cladding. to select a good looking (i.e. expensive) which has been around for decades but
There are also a number of tile for a wall than it is for a roof. has suddenly leapt across the chasm
semi-industrial boards which can Cedar, in the form of small tiles called from industrial uses into contemporary
be used to clad buildings. These live shingles, also features as wall cladding. architecture and house design. This steel
really in the commercial sectors of alloy is designed to strengthen as it rusts,
the building trade but one or two RAINSCREENS by producing a thin protective film on
adventurous architects sometimes There is a modern variation on vertical the surface.
specify them on housing. tiling, which is known as a rainscreen.
Incidentally, with all external These are now commonly used in GLASS
timber that requires painting or commercial developments and city Another ultra-cool design feature is
staining, it is good practice to put at centre blocks of flats and they are to use glass as a structural material,
least one coat of paint or stain on the beginning to make their mark on rather than just something that
boards on the ground before fixing. modern housing designs. They can sits in joinery. By combining
Timber shrinks, and if the whole be made of a variety of materials, two techniques, laminating and
board is not covered with a uniform but many seem to use a large format toughening, glass can be made thick
colour you will end up with 1-2mm terracotta tile. Look for products enough and strong enough to make
flesh-coloured strips wherever boards such as Forterra’s LockClad or self-supporting wall panels and even
overlap. Wienerberger’s ArGeTon. rooflights which you can walk on.
One curio in this field which has Rainscreens are normally fixed to Costing upwards of £1,000/m2,
become fashionable recently is the some steel or aluminium support rails, structural or frameless glass is always
use of charred timber, an ancient which replace the more traditional going to be a luxury feature but its
Japanese practice involving running timber battens. use is spreading from more mundane
a blowtorch across the surface of the There is another variation on the items like staircase balustrading to
boarding to produce a distinctive rainscreen idea, which is to fit a opening rooflights and frameless
burnt look. It is to wall claddings brick-slip cladding. A brick slip is patio doors. Two useful contacts:
what Creme Brulee is to puddings. to a brick what stone cladding is to Cantifix and IQ Glass.
It looks great but it obviously has stone — i.e. a thin brick facing which
to be handled with care. Google can be stuck on an insulated backing. STONE
Shousugiban if you want to know It’s primarily a way of covering If you live in one of the so-called
more. It’s nearly double the price of external insulation when applied to stone belts you may well have to build
cedar. an external wall. in stone to satisfy the local planners.

HOUSEBUILDER’S BIBLE l 13th EDITION 131


Chapter 7

You may actually want to build in best known and the largest producer. Traditionally, rubble walling was
stone – it’s usually very attractive Although, to the practised eye, independent of any backing materials,
– but it’s likely to be very much reconstituted stone will never look as but now it is much cheaper to lay
more expensive than the developer’s good as the real thing, it will cost about if it is set against a background of
standbys: brick and render. half as much and, if done well, looks as blockwork – which makes it a bit like
There are basically three approaches: good as many of the cheaper bricks. very rough pebble dash. Each area of
you can use real stone quarried the country has its own local ‘rubble’
out of some hillside, you can use STONE CLADDING stones and seaside locations often
reconstituted stone, which is stone Stone cladding has got a reputation tend to find theirs on the nearby
dust glued together with cement, or for being naff as hell, but this is beaches.
you can use stone cladding which because it’s often associated with In East Anglia, flint is the usual
usually gets stuck on the outside of people who fix it to their brick terrace material and prices vary enormously
cheaply erected blockwork. houses to ‘make a statement’ (such depending on how it is finished. Flint
as ‘I’m naff as hell’). Out of context can be laid as wholestones – which
NATURAL STONE like that it does look more than a gives a rough ‘agricultural’ look – or
Building stone tends to be a very touch ridiculous, but on a new house it can be knapped, which involves
local affair. It was, after all, hewn in a stone village chances are most breaking the stones open to reveal a
from quarries and, in the days before casual passers-by would not even shiny black inside which is then set as
cheap transportation, could only know it was stone cladding. However, the facework. You can now buy pre-
be carried the shortest of distances. artificial stone claddings are now finished flint blocks, which take all
Many of these old stone quarries virtually unobtainable and natural the hard work out of it – you just lay
survive and supply the demands of stone cladding is very expensive so them like a conventional block.
the local construction trade. In some if you are starting from scratch you
areas there are thriving second-hand might just as well use real stone. PORCHES AND BAYS
markets in stone walling materials, One interesting option is to use Thus far I’ve been looking at exterior
yet nowhere is natural stone a cheap reconstituted stone cladding. It finishes but there is, of course, much
material. You may be given brownie sounds awful but Fernhill produce more to the external design of a house
points for using natural stone in your a very convincing product which is than just the materials used. Features
house – more likely the local planners set in moulds and is so realistic that like bay windows and porches have been
will insist on it – but you’ll probably it’s virtually impossible to tell from coming right back into fashion despite
be adding £10,000 to the overall cost. the real thing. But realism comes at a the fact that they are expensive to build.
The cost of laying stone varies a little price: it costs around £35-£45/m2 to It’s quite hard to separate out how
depending on its characteristics and buy the tiles and laying is as expensive much extra these features cost because
whether it’s coursed or not, but a good as brickwork. It can be placed on a they tend to get lost in the whole job
stone mason would hope to lay around polystyrene backing (useful for people costings.
3m2 a day. He would also be hoping to building with ICFs) but it’s usually A bay window, for instance, involves
earn around £200 a day so you can tell stuck onto an outer blockwork wall. minor additions to almost every aspect
what sort of price per square metre you of the construction – excavations,
should be looking at here. RUBBLE WALLS foundations, flooring, brickwork,
If you know the right quarries this joinery, roofing, guttering, carpentry
RECONSTITUTED STONE kind of walling material can be and decorating (to name just nine).
A cheaper alternative is to use a extremely cheap to buy, but it tends Individually these changes are not
reconstituted stone. Bradstone is the to be very time-consuming to lay. great but added together I estimate

132 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

that a two-storey bay may add as DON’T RUIN IT fluffy. And some come in sheets or
much as 3% to the costs of erecting Having gone to all that trouble to rolls. All have pros and cons and not
the house superstructure. For an get good-looking materials correctly all are suitable in every application;
area less than 3m2 that’s expensive proportioned, it is worth taking on mostly they are available in a number
– getting on for double the amount board a cautionary word about the of different formats – often in
spent on ordinary living space. effect of those little elements, which combination with other materials like
Porches are easier to quantify, can ruin the overall effect - like a wart chipboard and plasterboard – which
although bear in mind that the on the face of a much loved friend makes describing them all extremely
standard of construction varies (shouldn’t that have been a carbuncle? complicated.
enormously from something little Ed). Whether you go for period charm
more than a rain shelter to what or ultra-modernism really makes no GLASS FIBRE
amounts to a mini-extension. Being difference, just think about the details Cheap, reasonably good insulator.
(usually) rectangular in shape, porches — remember the devil is in the detail. Excellent when laid flat in lofts but
are not appreciably more expensive to Here are a few style tips: when placed in walls it will sag. But
construct than the main structure, but n rainwater downpipes – the fewer the help is at hand: it can be ‘wicked’,
bear in mind that any complications better which stiffens it up and allows it to be
that might ensue will end up taking n plastic meter boxes – hide them placed into wall cavities without risk
a disproportionate amount of round the side of sagging or, as they say in insulation
supervision time. n security floodlighting – don’t point it speak, to ‘perform well in the vertical’.
straight at people walking towards it Here they tend to get referred to
CILLS AND ARCHES n alarm bells – potential burglars will as batts as in cavity batts or timber
One of the classiest effects you can still see them on a side wall frame batts. Although nearly double
get on external facades is to use n satellite dishes – they can sometimes the price of unwicked quilts, they are
feature lintels above and cills below go out in the garden. still good value compared to other
your openings. There are a number of materials.
options for doing this. The cills and
lintels can be formed from special MINERAL WOOL
bricks or made on site with a granite INSULATION In most ways it performs very
and cement mixture, which is fine if All materials insulate to a greater similarly to glass fibre and can also
they get painted afterwards. Another or lesser extent but only since the be wicked to perform well in the
variation is to have reconstituted 1970s have we seen the widespread vertical. However, mineral wool is
stone ones made up in a workshop: adoption of materials that do noticeably superior to glass (and
this is the most expensive option but very little else except insulate. By almost all other insulation materials)
also probably the most attractive. and large, these materials are not in terms of fire resistance. It is usually
Insetting joinery into the facade prohibitively expensive and most priced to compete with glass though
is not merely a decorative process. will pay for themselves within a few sometimes it is 5 to 10% more.
By its very nature it helps to protect years. So whilst you could design The Danish company, Rockwool,
windows and doors from the worst your home to avoid using insulation dominates production and it’s often
of the weather, and the building wherever possible, there would be referred to by this trade name.
regulations acknowledge this by very little point in doing so.
making recessed joinery compulsory There are several materials available SHEEPS WOOL
in Scotland and in many exposed to insulate housing. Many are rigid, The natural product on which both
parts of the rest of the country. board-like. Some are woolly or even glass wool and mineral wool are

HOUSEBUILDER’S BIBLE l 13th EDITION 133


Chapter 7

based. In many ways it performs and below ground but it’s a bit pricey insulation use was but one. On it’s
very similarly to its synthetic cousins to use elsewhere. Businesses to check own, in low rise housing, it’s not
but it’s obviously much nicer to out are Dow Chemicals, who make dangerous but it’s good to be aware
work with – the synthetic ones are Styrofoam, and Polyfoam. that it can burn. There aren’t many
notoriously itchy and unpleasant, building materials that can’t.
especially glass wool. It’s only really POLYURETHANES (PIRS)
appeared as an option in the past The most efficient of the mass market CELLULOSE FIBRE
few years and it appeals mostly to insulators, it is usually sold in rigid This is sometimes promoted as
people wanting to build using natural sheet format, usually foil backed. a green alternative to the other
products wherever possible. They also However, it is pricey even if you materials. For a start, it’s made from
need deep wallets because it’s rather buy second hand, where a company recycled newspapers (so that’s where
more expensive. called Seconds & Co is busy. The they go) and it can also be used in
domestic market is dominated by two timber frame walls without a vapour
EXPANDED POLYSTYRENE manufacturers, Celotex and Kingspan, barrier, which is reckoned, by some,
Now it’s on to plastics. The most though others are beginning to appear. to be an advantage. It has one major
familiar plastic insulation is expanded A big problem with polyurethane disadvantage in that it is not available
polystyrene (EPS). It gets used in has been that its production involved in a sheet form so it has to be
buildings in two formats. The first the use of CFCs, now implicated blown in by specialists. Trade name
is as a vast amorphous mass of little in the demise of the ozone layer. Warmcel.
white beads that get blown into This has led the manufacturers on a
cavity walls from lorries. The second frantic search to find ways of making UNUSUAL INSULATIONS
is in rigid boards; here two brands their boards with a different blowing There are numerous other materials
dominate, Jablite and Kay-cel. It agent, and this has produced a range being used as insulants, and new
performs very similarly to glass and of similar insulation boards made ones coming onto the market all the
mineral wool in terms of insulation with either polyisocyanurate foam or time. At the hi-tec end of things,
capabilities (but not fire protection) phenolic foam. Phenolic foam (sold there are vacuum-insulated panels
and is similarly cheaply priced. Used as Kooltherm) is actually a somewhat (VIPs) which are horribly expensive,
widely in cavity wall construction better insulator than standard Celotex terribly thin and only last for 30 years
(in both formats) and underfloor and Kingspan, but is considerably (Nanopore or Kingspan’s Optim-R).
insulation (where the regs now more expensive. Then there are the aerogels of which
require at least 100mm of EPS). Despite their cost, the plastic Spacetherm is the best known
foam insulations are increasingly example. It’s rather brittle and dusty
EXTRUDED POLYSTYRENE being specified because their of their to use, but it has its place where you
This is a different version of superior performance as insulators want good insulation and don’t have
polystyrene that is much denser which means that they are space very much space. Foamglas is another
and much stronger - expanded efficient. Basically these boards are hi-tec insulant: it is made of crushed
polystyrene sheets are notoriously twice as good but three times the cost glass and carbon and is totally
brittle. In terms of insulation of the basic insulators — i.e. expanded impervious to water, rot, vermin or
capabilities it lies midway between polystyrene and the wools. any sort of damage.
expanded polystyrene and the Whilst the dreadful Grenfell tower Then there are various natural
polyurethanes, but its big selling fire has brought into question their insulation materials. Apart from
point is that it is resistant to water use externally, the blaze resulted from Warmcel and Sheep’s Wool, look
penetration. It’s great under floors a combination of factors and plastic out for Hemp Insulation (Isonat),

134 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

INSULATION: Key Rates per m 2


Underfloor Ext Wall Flat ceiling Sloping roof
Approx U value needed (2013) 0.13 0.18 0.13 0.13
Rockwool INADVISABLE 175mm Batts 340mm Roll INADVISABLE
Cost/m2 £10 £6
Exp Polystyrene 200mm INADVISABLE INADVISABLE INADVISABLE
Cost/m2 £14
Extruded Polystyrene (Styrofoam) 150mm INADVISABLE INADVISABLE INADVISABLE
Cost/m2 £21
PIR foam boards 150mm 100mm 150mm 150mm
Cost/m2 £20 £16 £20 £20
Blown fibre INADVISABLE 200mm 300mm 300mm
Cost/m2 £15 £30 £30
Sheeps Wool INADVISABLE 150mm 300mm 300mm
Cost/m2 £17 £24 £24

Acoustic Insulation Internal Walls & Floors


75mm
Cost/m2 £3
Labour rate for fixing insulation £22 hr
Time taken to fix 1m2 (normal insulation) 10 min/m2
Cost to fix 1m 2 £3.70
Time taken to fit superinsulation 15 min/m2
Cost to fix 1m 2 £5.50

The total amount spent on MODEL HOUSE: Insulation Costs


insulation is nearly £5,400, Area Item Materials Labour Totals Costs/m2
around 2% of overall
Under Ground Floor 80 m 2 125mm PIR £ 1,800 £ 300 £ 2,100 £26
construction costs. The
Ground Floor insulation is NB Under Ground Floor Insulation is2costed in Groundworks Table for Model House Calcs
subtracted from this table Ext Walls 200 m 175mm Dri-Therm £ 3,000 £ 700 £ 3,700 £19
because it’s included in the Ceiling Roof Insulation 80 m 2 340mm Rockwool £ 500 £ 300 £ 800 £10
Groundworks cost table in Acoustic Walls 60 m2 75mm Rockwool Prorox £ 200 £ 200 £ 400 £7
Chapter 6. Acoustic Floors 75 m2 75mm Rockwool Prorox £ 200 £ 300 £ 500 £7
Total exc Ground Floor £ 3,900 £ 1,500 £ 5,400

Hemcrete (a lime-hemp mixture), MULITIFOILS body to them and therefore tend to act
and Pavatex (wood fibre board). These The multifoils are a controversial like conventional insulation, though
materials are usually used with timber group of insulation materials, which none is thicker than 25mm.
framed houses where the emphasis work on the Bacofoil-behind-the- The use of multifoils is based on
is on breathing walls - i.e. ones built radiator principle. That is to say they their manufacturers’ claims that they
without a conventional vapour barrier. have shiny reflective barriers which are equivalent in insulation value
These are usually bought via specialist bounce the heat back into the room. to around 250mm of mineral wool,
suppliers: Mike Wye Associates is a There are three, Actis (from France), which makes them suitable for use
useful contact as they maintain an Alreflex 2L2 (from Holland) and in sloping roof spaces. This claim is,
online price list. Airtec (British), which have some to put it mildly, controversial. When

HOUSEBUILDER’S BIBLE l 13th EDITION 135


Chapter 7

placed into a guarded hot box, the absorbent insulation is a category in a window, has become an area
traditional method of measuring U all on its own. Usually supplied in where you have to consider a range of
values, multifoils only perform to rolls, all the major suppliers such options.
the equivalent of 80mm of mineral as Rockwool and Knauf produce Some sites still operate using the
wool. Nevertheless, multifoils have a denser version of their standard old methods but the trend now is to
established a foothold in the insulation thermal products, and there are get the windows and doors glazed
market, thanks to their endorsement Sheeps Wool versions as well. The and decorated in a distant factory,
by BM Trada, a prominent third plastic insulants don’t really get a look to be fitted much later in the build
party certifier, and whether you in here because it’s all about density, process. Now the brickies fit sub-
choose to believe the claims of their quite the opposite to what is wanted frames or cavity closers around the
manufacturers, or not, it would be with thermal insulation. Placing openings, where once they put the
churlish of me not to mention their acoustic insulation into ceiling voids whole window or door frame in.
existence. They can be a very useful way and internal walls is routinely done
of getting some insulation into areas after the plumbing and wiring has
like loft roofs where space is limited. been put in place, before the boarding BUILDING REGULATIONS
Multifoils are getting used in stage, and it’s a classic DIY project The building regulations are also
conjunction with other materials, such manager’s job. It’s not skilled, it’s driving change here. No less than six
as plastic insulation boards, and the messy and it doesn’t require any sets of regulations cover our joinery
authorities are far happier to accept specialised tools. Just a good face activities and you really need to be
these combination applications. mask, a hop up and a tape measure. aware of the basics because if any
of your choices fail to comply, you
BUYING TIPS may have to replace what you’ve
Generally the best place to buy expensively installed. Let’s look
insulation materials is from the JOINERY at them individually, based on the
insulation specialists. Sheffield current regulations in England.
Insulation (SIG) and Encon are the Joinery is the preferred architectural Wales, Scotland and N Ireland have
best-known national distributors but word for what most of us call similar requirements.
there are numerous local ones and windows and doors. The choices
a couple of online specialists. Some you make here are perhaps the most FIRE (PART B)
of the insulation installers are worth critical factor of all in determining All habitable rooms must have a
checking out for supply only. The what sort of house you build, or at means of escape other than the room
supply and fix services offered are least what it looks like. door. This usually means an opening
often a good deal; it is hard to beat Back in the day, this used to be a window somewhere on the ground or
them on price (or speed) except where pretty straightforward affair. Even first floor. Higher storeys may require
you are not paying for site labour. within the lifespan of this title, alternative arrangements. But it’s not
A great online resource if you want joinery options were fairly limited enough to have a window that opens.
to know more is Greenspec.co.uk. for all but the most upmarket homes. The rules state that a) the opening
It has bags of information on the Things have changed. There are now must be at least 0.33m2, b) that the
different types of insulation available. far more options and styles and there opening must be 450mm high and
is a move away from using standard 450mm wide and c) the opening
ACOUSTIC INSULATION fittings towards more bespoke stuff. must be within 1100mm of the floor.
Generally required in timber walls And glazing, which used to be a Technically, these are known as egress
and floors in new dwellings, sound matter of just sticking a pane of glass windows.

136 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

VENTILATION (PART F) a plastic film: when hit it breaks but ACCESS (PART M)
Unless you have opted for a whole doesn’t collapse. Part M covers the disabled access
house ventilation system, you have Laminated glass is conventionally arrangements for new housing and
to provide ventilation in each room. 6.4mm thick and it costs around you are required to have at least
This is conventionally done by double standard float glass, one accessible doorway where the
fitting trickle vents in the heads of considerably more than toughened threshold is level (defined as no
the windows. Some foreign window glass. Consequently for these obstruction greater than 15mm) and
suppliers don’t do trickle vents – they applications, toughened glass is the clear-door opening of at least
are a uniquely British solution to this now almost universally specified, 775mm, which you get when you fit
problem. So you have to decide on but laminated glass is preferable if a door that is at least 826mm wide.
your ventilation strategy at the outset you are worried about security; it’s There is a lot more to Part M; this bit
— don’t get caught out. harder to break through. affects your door choices only.
Some people want to opt for night
latch windows which offer a slightly ENERGY EFFICIENCY (PART L) SECURITY (PART Q)
open but locked setting instead of Like all other elements making up What was once a performance
trickle vents, but bear in mind that the thermal envelope of the house, standard for doors and windows
a picky building inspector may not doors and windows have to meet known as PAS 24, used mainly in
accept this and point out that such defined U values, though there is Secured by Design schemes, became
windows are a security risk — see a little leeway allowed here. The a standard building regulation in
Part Q notes coming soon. generally accepted standard U value 2015 and it applies to all “easily
for doors and windows in new homes accessible” doors and windows.
SAFETY GLASS (PART K) is now 1.4, but you can have the odd Although not difficult to beat, it can
Some doors and windows require solid door at a relaxed U value as high catch suppliers out, especially if they
safety glass as 2.0. are foreign and are not aware of Part
n any window less than 800mm off This translates as double glazing Q. Look to fit “Part Q compliant”
floor level on windows and composite external windows.
n any window less than 300mm from doors, either solid or with some
a door double glazing. A composite door COMPLIANCE
n all doors and sidelights where pane is one that is made up of insulated A good designer should be aware
width is greater than 250mm panels encased by another material of all these issues and should ensure
n internal glazed doors with pane such as steel, GRP or timber. that your joinery choices comply
sizes more than 250x250mm. Your glazing performance will be with all these regulations, but some
What do they mean by ‘safety assessed when the SAP calculations are people are not all that competent
glazing?’ There are two common carried out and the joinery you choose and some clients skimp on the
forms of clear, strengthened glass: will have to comply and be seen to design stages and never get around
n toughened: baked hard to about comply. Generally if it meets the 1.4 U to specifying what sort of joinery
five times the strength of float glass value standard, it will comply. they will fit until too late. Mistakes
and, when broken, shatters into There is a good case to fit joinery get made, and sometimes perfectly
harmless lumps. Toughened glass that beats the performance of good joinery gets replaced because
costs about 50% more than the standard double glazing — for it falls foul of one of the Regs. Your
standard float glass. instance triple glazing and/or solar building inspector may give you some
n laminated: consists of two sheets reflective glazing — but we will look leeway, or they may not. They will
of ordinary glass sandwiched around at that shortly. certainly be seeking some evidence

HOUSEBUILDER’S BIBLE l 13th EDITION 137


Chapter 7

that your joinery does actually GLAZING


comply. Sometimes this is evident Glazing is one of the few areas of
from a site visit. Toughened glass construction which has undergone
is usually stamped. Door openings, significant change since I started
window cill heights and openings in the building game back in 1980.
are measurable on site. But security? Back then, double glazing was well
U values? You need to ensure that established but it was mostly people
your suppliers invoices or quotations ripping out old timber and metal
reflect accurately describe what it is windows and putting in plastic
you have used. Expect the U values of double glazed ones. As for clever
each item to be itemised, along with glass, it came down to a choice of
evidence of Part Q compliance. plain see-through or frosted (for
bathrooms).
Double-glazing promised comfort
REPLACING OLD WINDOWS and warmth. The early forms of
There is a scheme that covers double glazing were a significant
replacement windows only, governed improvement on single glazing in
by a body known as FENSA terms of U-Values, the common
(England & Wales only). A glazer measurement of heat loss. Single
who is accredited by FENSA can glazing scores around 5 (hopeless); in
sign off their work as being compliant contrast, a basic double glazed sealed
with current building regs without unit scores around 3 (the lower the The trend towards factory-glazing of
having to trouble the local building better). But the technology of double windows has been accompanied by
inspector. This information may later glazing has kept on developing and the uptake of cavity closers, pictured
here, which you build into the wall as it
be required when you come to sell the most advanced triple-glazed goes up. The windows and doors are
the house so there is a semblance systems available today have U values clipped in later when the damage can
of a stick here to get you to comply. under 1 (better than walls were in the be minimised
So look out to see if your installer is 1970s). That’s five times less heat loss
FENSA approved installer. If not, you than single glazing. the years and only recently has the
can still go down the other route of industry worked out how to combat
paying for a building inspection. FAILURES IN SEALED UNITS the problem. By and large, factory
One area that remains exempt from In fact the building trade took a long glazing has cured these issues and
the requirements is listed buildings. while to come to grips with basic now the vast majority of double
English Heritage see the FENSA double glazing. There was a horribly glazed units are supplied in this way
scheme as a uPVC window salesman’s high failure rate, usually manifesting — i.e. ready glazed rather than site
licence to rip out all that is wooden and itself in the form of misting between glazed.
lovely from our national treasures. The the panes. The gap around the so-
exemption may also apply to properties called sealed units kept breaking INCREMENTAL
situated in Conservation Areas though down and moist external air got in, IMPROVEMENTS
this isn’t abundantly clear. In the resulting in condensation between Various measures improve the
Conservation area I live in, people are the panes. efficiency of double-glazing and it’s
still putting in plastic windows and no Hundreds of thousands of double helpful to look at what they are. The
one seems to care a jot. glazed units failed this way over simplest is to increase the distance

138 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

Low-e coating is a developing


JOINERY COSTINGS Rules of Thumb technology and there are now hard
• The Model House has 35m 2 of joinery (inc external door openings) coatings and soft coatings with varying
• As a rule, joinery openings equate to 20% of the overall external wall area
emissivity levels. Soft coatings are better
• You can derive a m 2 rate by dividing the overall cost by the area of joinery openings
and, needless to say, more expensive. A
• This is helpful when comparing window prices
hard coat will reduce the overall U-value
• Doors are more expensive than windows
by 25%; a soft coat by as much as 35%.
• The cost/m 2 incresaes as with small windows
• Unusual styles, made to measure and non-standard sizes all add to costs
Another energy-saving technique is
• The Joinery Schedule is based on a pretty basic window! to use warm edge spacers around the
sealed units. Traditionally, the spacers
were made of aluminium which is a
MODEL HOUSE: Joinery Schedule very good heat conductor. A classic
Softwood, factory glazed Base cost £ 270 /m 2 £ 55 /m 2 case of cold bridging. By replacing
Width in Height Area Fitting Combined the aluminium with something less
m in m in m2 Item Cost costs Cost conductive (typically plastic) you get
Kitchen French Doors 1.8 2.1 3.8 £ 1,000 £ 310 £ 1,310 a much more even U-value across
Kitchen Window 2.1 1.2 2.5 £ 700 £ 140 £ 840 the entire sealed unit. The smaller
Utility Door 0.9 2.1 1.9 £ 500 £ 200 £ 700 the units, the bigger difference warm
Utility Window 1.2 1.2 1.4 £ 400 £ 80 £ 480
edgings make.
Dining Room Window 2.1 1.2 2.5 £ 700 £ 140 £ 840
Beyond this, there are adjustments
Front Door 2.0 2.1 4.2 £ 900 £ 230 £ 1,130
you can make to the frames, which
WC 0.5 0.7 0.3 £ 100 £ 20 £ 120
£ 460 £ 3,760
can have a major impact on heat
Lounge Patio Door 3.2 2.1 6.7 £ 3,300
£ 200 £ 1,200 loss. And ultimately, you can add an
Bed 1 1.8 2.1 3.7 £ 1,000
En suite (wet room) 1.2 1.2 1.4 £ 400 £ 80 £ 480 extra sheet of glass and move to triple
Bathroom 1.2 1.2 1.4 £ 400 £ 80 £ 480 glazing, which also improves efficiency
Bed 2 1.5 1.2 1.8 £ 500 £ 100 £ 600 by around 25%. Triple glazing is also
Bed 3 1.5 1.2 1.8 £ 500 £ 100 £ 600 much better for sound proofing.
Bed 4 1.5 1.2 1.8 £ 500 £ 100 £ 600 Add all these 25%s here and 35%s
Grand Total 35 £ 11,000 £ 2,000 £ 13,000 there plus the odd 10% and you can
Costs/m2 £ 310 £ 370 see how a state of the art double
or triple glazed unit can get a very
between the panes. A 6mm gap common choice (though some use low U-value, far in excess of what is
was the old standard in the 1970s. krypton). Argon filling adds to the required by the current UK regs.
By upping this to 16 or 20mm you cost of the units and it results in only a The problem is that all these
reduce heat loss by nearly 25%. It’s marginal improvement in efficiency. techniques add to costs. For instance,
easy for the glazing manufacturers Next comes low emissivity (or triple glazing is about 25% more than
to alter the gap and there is no cost low-e) glass. Low-e glass works by double glazing. In terms of value for
penalty here. The difficulty comes in absorbing short wave solar heat, just money, none of these measures pay
adjusting the frames, which start to like other glass, but then acting as a for themselves as the incremental
look heavy. reflective shield to the long wave heat heat savings are not that great. But in
The next trick is to fill the air gap emanating from inside the house. In terms of comfort, they all make a big
between panes with something other effect it introduces a layer of one-way difference and few people who pay extra
than air. The inert gas argon is the insulation into the sealed unit. for state of the art glazing regret it.

HOUSEBUILDER’S BIBLE l 13th EDITION 139


Chapter 7

Typical Window and External Door Costs


2 2 2 2 2
£200 m £400 m £600 m £800 m £1,000 m

Softwood frame only Glazing Finishing

Softwood factory glazed

Hardwood factory glazed

PVCu or plastic
2
Model House cost for 35 m

Timber composite

Aluminium, Steel, GRP

Triple glazed windows

Folding, sliding doors

£7,000 £14,000 £21,000 £28,000 £35,000

CLEVER GLASS
There is more to glazing than factor and it’s expressed as a fraction useful solar heat in the nine months
energy saving and the two big of 1 which is what you get with no of the year when you aren’t too
glass companies, Pilkington and glass at all. Standard double glazing bothered about overheating. There
St Gobain, seem to be endlessly lets through about 60% of solar heat, is a balance to be struck here and
introducing new features. Check out expressed as 0.6, triple glazing about there is no right answer, but a good
their websites to learn more, but here 50% or 0.5 and then solar controlled designer and/or supplier will be able
are some of the interesting options films can reduce this to as little as you to guide you as to the best option.
available want, though people are advised not
to go below 30% or 0.3 as although ELECTROCHROMIC GLASS
SOLAR CONTROL it’s designed to keep out infra-red, it The ultimate in glazing intelligence
Introducing films into the glazing also loses light in the visible spectrum is the ability to switch the properties
process enables the manufactures as well and so things start to get a of glass with electricity. I first saw this
to do all kinds of things. Whilst little grey below 0.3. in the year 2000 where it was used on
low-e glass stops internal heat I’m a fan of solar control glass. the BRE’s Millennium House to turn
leaking outside, solar control glass We installed it in our kitchen roof a clear window into an obscure one
does pretty much the opposite — it light and we sailed through the at the touch of a button — no more
stops unwanted heat getting in. It’s heat wave of 2018 with comfortable curtains or blinds!
particularly useful in conservatories, internal temperatures. The kitchen But since then, the technology
rooflights and large expanses of south was actually cooler with the rooflights has moved on to allow you to switch
and west-facing glass (aka Big Glass), closed than it was when open to the between letting in lots of solar
as these are the features which tend elements. If you are wanting Big radiation in winter to keeping it out
to cause overheating in summer. Glass in your new home, then temper in summer. Maybe one day, all glass
The amount of solar heat coming it with a low G value. will be like this, but it remains an
through window is referred to as a G The downside is that you lose expensive luxury at present.

140 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

OBSCURE GLASS
Gone are the days of boring frosted
glass. There are many decorative
effects available delivering different
levels of obscurity. In fact, planning
conditions sometimes refer to the
specific level of obscurity required in
an overlooking window. Often this is
“Pilkington Level 3 or similar”.
Many people do not want to
install obscure glazing as it seems to
go against the very idea of glazing
— i.e. you can look through it. But
sometimes needs must. Question is,
is it acceptable to use a stick-on film
instead? Here is a technology that has
also advanced in leaps and bounds,
including the ability to electrically
switch obscurity on and off. The
chances are that only the most eagle-
eyed building inspector would notice
the difference, and in terms of the
effect, the stick-on films look just as It’s down to the combination of than conventionally framed glass);
good, at least for a few years. There two safety techniques, toughening frameless versions are even more
are lots of small suppliers out there and lamination, which combined, expensive.
looking for your orders. sometimes in several layers, makes a
material that is immensely strong and AIR TIGHTNESS
SELF-CLEANING GLASS can bear significant loads. Almost as critical to the energy
Both St Gobain and Pilkington Thus we have features like glazed performance of windows and doors
produce self-cleaning glass, which is safety screens for staircases and as their overall energy ratings, is
coated with yet another film which balconies, glazed walls and even the the method used to fit them into
stops droplets appearing which glazed floor. The prices are eye- the external walls and the draught-
should stop streaking. That doesn’t watering, compared to conventional proofing of the opening parts when
mean you never have to clean glass solutions, but the effect is often in contact with the fixed parts.
again, but it should greatly reduce the startling. Draught-proofing is now pretty
number of visits by window cleaners. The strength of these new glazing well built into doors and windows
elements has meant that there is but gaps around the frames, where
STRUCTURAL GLAZING also a trend towards using less and they are built into walls, is still left
One of the great boom areas of less frame in windows and doors, very much up to the guys on site. It’s
building in the past decades has and sometimes none at all — i.e. not unusual to see large gaps under
been the use of glass as a building frameless glass. Again, minimal lintels, for instance, which would later
element in itself, with no frame or frame styles are now commonplace be covered over with plasterboard:
indeed any visible means of support. (and significantly more expensive this makes a mockery of fitting high

HOUSEBUILDER’S BIBLE l 13th EDITION 141


Chapter 7

cost double glazed units. with the chosen design. For instance, machine. It appears that the widths
Many suppliers are developing if you are building in the Georgian were changed in the early 1980s after
sub frame assembly systems, which rectory style, you will almost certainly a directive from Brussels indicated
address some of these issues. The be wanting to use a Georgian sash-style that the 300mm brick was about
sub frames, or cavity closers, fit into window. to take over Europe and that they’d
the cavity and are built-in as the Windows and, to a lesser extent, better have joinery to suit. The joinery
wall goes up. They address the old doors, are absolutely critical to your manufacturers all obliged, but bricks
problem of cold bridging where the overall house design and generally there remain 215mm long! This is most
internal skin was taken around a is a window that works for every house noticeable on the 1200 wide windows,
corner (known as a return) to form design so you would be most unlikely which disrupt the vertical joints on face
an opening for a window or a door, – indeed extremely badly advised – to brickwork.
but they also act as a clip-in frame for fit the wrong style of window into The old British joinery businesses
the window to be placed directly into the wrong façade. Not that the typical have all been taken over now but the
later without having to mess around homeowner on the typical suburban same factories still churn out these
with any screws. street would know this: bear witness to windows by the truckload. Names
In timber framed construction, the the dreadful mish-mash of styles and to look out for are Jeld-Wen, who
normal routine is to build a plywood materials used in the great replacement took over two of the big names in
boxing around the window opening window craze of the 1980s 1990s. But this business, Boulton & Paul and
with a 10mm gap all the way round, an awful lot of contemporary housing John Carr, Premdor (doors only)
and then tape the window frame to isn’t tied to any style in particular and and Magnet. Of these manufacturers,
the plywood on the inside. On the this leaves a wide range of choices Magnet are alone in maintaining a
outside, the seal is usually made with available. substantial branch network of depots
expandable foam tape, known as through which they sell exclusively. All
Compriband. WINDOW OPENINGS the others sell through the established
One of the key tricks in designing builder’s merchants. There are
CHOOSING WINDOWS to a budget is to stick to standard numerous others in this business like
Timber or plastic? Or something industry window and door sizes. All Howarth Timber who sell directly to
else entirely? Pre-glazed or finished the main manufacturers selling into housebuilders and the trade.
on site? Modern or traditional? this market are geared up to make When plastic windows appeared
Made-to-measure or off-the-peg? thousands of standard windows on the scene, back in the 1970s, they
What sort of opening mechanism? and doors to fit these openings. were being sold almost exclusively
There are, in truth, a lot of questions There are cost and time penalties for into the replacement market and the
facing you when it comes to window varying away from these openings, businesses were all geared up to make
selection. You have, in fact, a so everyone sticks to these openings. one-offs. It took a long time for the
microcosm of the UK housebuilding What exactly are they? uPVC manufacturers to realise that
scene right here in one product The window opening heights are easy the new housebuilders only really
group. to fathom: they are in 150mm steps, wanted about five different window
There is quite a good chance that which represents two bricks courses – sizes and that there were economies
you won’t have to go through all these the height options are 450, 600, 750, of scale to be had here by aping the
decision processes, at least in any great 900, 1050, 1200, 1350, 1500mm. The likes of Boulton & Paul. The plastic
detail, if you work with a designer or a width options – 488, 630, 915, 1200, window merchants started making
package company who steer towards 1770mm – would at first glance seem basic windows in the same old
a window that just happens to work to be selected by a random number modular sizes and then improved on

142 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

the process by introducing clip-in there is a large price gap between the ROOFLIGHTS
cavity closers which let you push a basic stuff and the top of the range, A word about rooflights and, in
finished window into place, long after whatever material you choose to use. particular, Velux windows. They are
the brickies had left site. This fitting If you want a shortcut price guide, another form of composite window,
system is now available on most types look out for the cost of a unit like a being basically timber windows encased
of window. 1200x1200mm window and use this in an aluminium cladding, but they
to extrapolate upwards. have revolutionised loft living by being
COMPOSITES A basic unit in a simple simple to install, and near problem-
There are a number of suppliers who configuration, say a double casement free in operation. They cost around
offer timber windows capped with a window with one opening panel, £500/m2 including the essential roof
durable exterior. Velux made a name will cost around £260 fully glazed flashings, very little more than the
for themselves producing rooflights and finished. You can easily spend standard price for good quality timber
like this and gradually the practice double or triple this amount by or uPVC windows. Velux is not the
has spread to conventional windows changing styles or materials. If you only company making rooflights but
as well. Andersen Windows, the are using a joinery catalogue for they are the trailblazers and still enjoy
American joinery giant, produce pricing purposes, bear in mind that by far the largest market share in this
a huge range of timber doors and most items are normally sold at big specialist market: but watch out for
windows with an external uPVC discounts to the published prices. Fakro, a Polish company also reckoned
coating, but the bulk of UK interest 30% or 35% off are often taken to be very good.
is now in Scandinavian and German as read and big volumes or good
origin manufacturers. haggling skills can easily increase this GLASS CEILINGS
Prominent amongst these is the discount. Developing on from sloping
Velux Group (VKR Holdings) One of the things that throws rooflights, we see a huge interest
who also manufacture Velfac and people out is that the headline in glazed rooflights for flat roofs
Rationel, two of the most popular. rates for timber windows from — in effect glass ceilings. Glazing
Other suppliers of note include the large joinery manufacturers developments over the past few
Nor Dan, Ideal Combi, Protec and appears to be low, much lower than years have brought this once
Internorm. British suppliers are also any of the finished windows. A exclusive technique into the ambit
now establishing themselves — look raw timber window needs glazing, of selfbuilders and triple glazing has
out for Allan Brothers and Kloeber. needs detailing around the openings made it possible to build light into
There are many smaller businesses and needs decorating as well: the a roof without the attendant loss of
who design and build to order. We combined costs of these items is heat. It’s all part and parcel of the
used one, Living Wood, from Bury more than double the cost of the raw frameless glass trend and the same
St Edmunds, who supplied triple timber window. businesses that dominate glass walls
glazed, Passivhaus standard timber If you account for these extra also tend to produce glazed roofing,
windows and doors with a spray- items as the window table does, often combing the two to good effect.
painted aluminium exterior in 2018 then you find that uPVC is now the It’s still eye-wateringly expensive,
for around £1,000/m2. cheapest way to build a window, by and if you include opening rooflights
some margin. But uPVC itself varies as well, the metre rates can exceed
COMPARING COSTS enormously in quality. Top of the £5,000/m2. But given that you get
Joinery is an expensive feature range products like Masterframe three to four times more daylight
in the overall budget. It frequently cost just as much as the better timber through an overhead window, it can
makes up 10% of the final figure, and windows. usually be counted on to turn a dull

HOUSEBUILDER’S BIBLE l 13th EDITION 143


Chapter 7

room into an exciting one. Look out they are supplied pre-painted, already have them opening inwards but to do
for Velux Skylights, and products fitted into a doorset. this you ideally want to create a large
by IQ Glass, Cantifix and Glazing return space for them to sit against,
Vision. but this isn’t always practicable or
GLAZED DOORS feasible. You also have to decide
EXTERNAL DOORS The idea of opening up a largish whether to split the arrangement in
Many of the things that I’ve written hole in the house facing the garden two so that you have doors closing
about windows apply equally to is attractive to most of us; it’s a sort each side. For easy access, many
external doors. Furthermore, there is of poor man’s conservatory. Actually, people choose to have a solitary
a polite convention that your choice leave the poor man out of it, because ‘traffic door’ on one side, which acts
of door should not clash with your big glazed doors are expensive. You like one side of a pair of French
choice of window – a convention have a basic choice here between doors, allowing all the other door
that’s well worth following whatever sliding doors and hinged ones. Back leaves to stack up on the other side
your chosen style. As with windows, in the day, these were routinely only when the weather is suitable. An
the door manufacturers tend to referred to as patio doors (1960s) or alternative is to opt for sliding doors
stick to pretty conventional ideas French doors (1920s). Step forward which have no limit on them width,
and all produce variations on some to this century and they have become but do have to keep at least one leaf
remarkably similar themes. One of sliding doors and bi-fold doors, the fixed. The ultimate in coolness here
the more daring ideas is to put a latter also known confusingly as is to have a fixed sliding door which
little bit of stained glass in the pocket folding sliding doors. completely disappears into a wall
window on some of the designs. By These were first introduced into the pocket so that when fully open you
and large, the best that can be said UK in the late 1980s and they mark see nothing at all. I hardly need to
about the design of these doors is a logical progression for large glazed tell you that such a feature will tend
that ‘it blends in quite well’ or ‘isn’t openings. to cost about the same as a small
that unobtrusive?’ If you want a door The doors run in trackways family car.
that makes a statement about you located both above and below the Folding sliding doors are almost
– and, after all, the front door is the opening, just like a sliding patio invariably made to measure, so there
first thing visitors come into contact door. However, the individual doors can never be such a thing as a price
with – then you’ll have to look to a are hinged together so that they list. However, generally costs start
bespoke joiner’s shop or a salvage concertina into a very small space. at around £800 per leaf (door) and
yard. Either way expect to pay. This means that virtually the entire rise to around £1400, depending on
door frame can be opened up, unlike the materials used, so a seven-leaf
FRONT ENTRANCE patio doors where one section door would cost between £6,000
Most front entrance doors are now must remain fixed in place. This and £10,000. Generally, the more
what we call composite doors, which open aspect appeals to anyone who leaves used, the more expensive, so
is to say they are made up of several likes the idea of the house and the sometimes you can save a little money
materials, including an insulated core garden merging into one on a bright by specifying a smaller number of
which is required in order to meet the summer’s day. wider doors (hint: aluminium door
requirements for Part L, the energy One thing to consider is how leaves can be as wide as 1200mm).
efficiency regs. What you actually see the doors sit when fully open, as One step beyond regular framed
fitted around the core can be timber, they must extend either inwards or sliding doors is the frameless glass
steel or GRP and sometimes it can be outwards by the width of a door leaf. door, either in a folding configuration
hard to tell the difference, especially if The neatest arrangement is usually to or sliding. This is a more specialised

144 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

area and the suppliers tend to be One of the big


the structural glazers mentioned issues with
in the previous section. Check out large expanses
of external
Frameless Glass Curtains. glazing is
the risk of
DOORS OR DOORSETS? overheating.
Most external doors are now sold as One way
doorsets, that is to say the doors are around this
already fitted into a frame, and with is to add a
sunshade, or
the door furniture already in place. brise soleil,
Essentially this is much simpler as you which is
just have to get the frame in place. angled so
You can still buy individual doors and that the peak
fix them into a frame, and if you do so summer
you have to consider that the frame must heat is kept
off the glass
match the door and that the handles, whilst low
hinges and locks also match. level winter
The problem with this approach is sunshine is
that since 2015 external doors have welcomed.
had to meet a new security standard,
Part Q in England & Wales, which
requires the entire door assembly (i.e.
door, frame and hardware) to meet PAS
24 which is a testing regime, and it’s
extremely difficult to do this without
buying a doorset — preferably a Part Q
compliant doorset. Part Q only applies from there. For the rest of us, stick with on the other hand, you have to
to new builds and major conversions a doorset. consider sound insulation, which you
where there is a change of use, so on don’t on ground floors.
extensions and renovations you won’t be The structural elements of
checked, but in new builds it forms part UPPER FLOORS intermediate floors are pretty similar
of the compliance routine you have to be The ground floor has been to ground floors. Obviously, the
aware of. looked at in the previous chapter, ground-bearing slab is not an option
Part Q is quite prescriptive. For Groundworks. Any floors above but otherwise you have the same
instance a letter box must be no more ground level (inc floors over choice to make between timber or
than 260x40mm and must be designed basements) are referred to as concrete suspended floors. Timber
to hinder anyone attempting to remove intermediate floors; they act as floors are traditional and remain the
keys from the inside with sticks or both floors for the rooms above and cheapest option. The main reason for
their hands. And a viewer must be ceilings for the rooms below. This switching to something else is to get
incorporated, although a pane of glass makes the issues we need to look at better soundproofing. In fact, timber
will suffice. If you really want to fit doors rather different. Intermediate floors floors don’t have to perform poorly in
in the old way, I suggest you familiarise only have to be thermally insulated if this department but it’s a widely held
yourself with Part Q and work back they are above features like garages; perception that they do.

HOUSEBUILDER’S BIBLE l 13th EDITION 145


Chapter 7

TRADITIONAL JOISTS informed that there is an estate solution, made up specifically for your
The standard way to build of houses in Redditch built out of site.
intermediate floors in both masonry nothing but I-beams in the 1970s. As an alternative to the solid
homes and timber framed ones has Having never been to Redditch, I-beam floor joists, look out for
been to lay sawn timber joists across I’ll have to take it on trust. But it metal web joists, the best known one
the floor. Span tables exist to show wasn’t until the 1990s that anyone being the hollow Posi-Joist. In recent
you just how deep your joists need really started to push I-beams in years, I have come to notice far more
to be to avoid flexing unacceptably. a big way. That’s when Trus Joist Posi-Joists than I-Beams, though
Once you get to a span of around MacMillan started advertising them essentially they do the same thing.
five metres, you struggle to find a as SilentFloor.
joist deep enough to cope, so most What’s the proposition? Well you JOIST HANGERS
conventional house designs stick to pay more for an I-beam than you How do you sit a timber joist on a
spans under five metres and place do for a sawn timber joist. Almost wall? You build it in on top of your
load-bearing walls in the appropriate twice as much in fact on a linear blockwork and then fill in the gaps
places to pick up the joists. metre basis. But in return you get between the joist ends with odd bits
There are routines for dealing with a product that takes half the time of block: what could be simpler?
openings around staircases – lots of to install, and is far easier to install Well that’s how it was done for
doubling up of joists - and supporting services through. Instead of having years on building sites up and down
partition walls above – more doubling to drill holes or make notches, you the land. But the energy wonks have
up. And nowadays chippies join joists just tap on a preformed knock- cause to believe that this is very sloppy
using steel hangers. There are also some out and you are through. And the and contributes hugely to unwarranted
elaborate rules about just where you squeaks? Well, one of the main air leaks. Not only do the brickies take
should and shouldn’t notch and drill holes problems with timber when used very little care in filling in this void,
through joists, rules which are routinely in floors is that it shrinks as it dries but then the joists shrink by 5% or
ignored by plumbers and electricians. out. A 200mm deep timber joist more, as discussed, making air leakage
To provide stability, the joists need to may well measure just 195mm after paths almost inevitable.
be braced together: this is achieved with a warm, centrally heated winter The building regs require you
either diagonal struts or solid bridgings. and this causes not only squeaking to pay a little more attention
As you can see, whilst the basic idea floors but can also lead to problems to this detail. They would really
of laying floor joists is simplicity itself, with showers and baths where the like joists (and I-beams) to be
there are a number of additional factors mastic seals fail. An engineered hung off external walls using joist
to consider that make it a whole lot I-beam cannot shrink because the hangers, but this is a fiddly detail
more complex and a whole lot slower web (the upright bit) is made of and builders have been allowed to
than it might be. So much so that the OSB, or some similar plywood-like lay joists onto the walls, provided
traditional sawn joist floor is rapidly board. close attention is paid to mastic-
being replaced by…. I-beams are also capable of ing around the joist ends to ensure
spanning up to six metres, which there will be no air leakage. It’s a
I-BEAM FLOORS gives them an additional edge. If detail that will become far more
This is an American innovation, you are interested in I-beams (and critical in the future when air
which uses thin, lightweight there are now several manufacturers), tightness testing will be taken
timber RSJs. Like many building you have to order in advance, just as seriously. Incidentally, this is
innovations, the I-beam has actually you would with roof trusses. They unlikely to be a problem in timber
been around for decades. I am reliably are invariably sold as an engineered frame designs.

146 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

SOUND INSULATION But it’s a very basic improvement or a heavier building board such as
In 2003, I spent the night in a very that is called for. You may want to Fermacell on the ceiling. Added cost,
beautiful detached new house which do better. Here follows some costed maybe £5/m2. Sound transmission
had cost well over £300,000 to build. suggestions; if you want to know reduction: 3dB.
Whilst the thermal U-values had more about what a decibel is, have a n Improve this by a further 2dB by
been engineered down to amazingly look at the section in the last chapter introducing resilient bars, fixed to the
low levels by the use of SIPS panel entitled Sound Advice. underside of the joists. You fix the
construction, as far as I could see – n The naked floor option. plasterboard to the resilient bars. These
and hear – no attention at all had Construction - timber joists or I metal strips, costing just 65p/lin m, act
been paid to internal sound-proofing beams, chipboard cover, single sheet to separate the ceiling boards from the
and I could hear all too clearly what of plasterboard underneath. Cost: floor joists. Isolation is one of the keys
was going on in the rest of the house effectively minus zero as you aren’t to improving sound insulation. The
during the night. God knows what allowed to build like this anymore. very best way of building isolation into
they thought of my snoring! The Likely decibel reduction? Around 35 a floor is to separate the ceiling joists
floors were the simplest construction dB on the lab test scale. from the floor joists, but this makes for
imaginable: hardwood planks over n The English building reg a lot of extra work and a very deep floor
timber joists above a single skin of requirement within the home (E2): void.
plasterboard. The walls were just as adds insulation in joist space and a n Add a floating floor above. There
basic. ceiling board that is slightly heavier are numerous proprietary acoustic
Such construction details have than we have been getting used to. floor systems on the market: the
caused a lot of problems for a lot of British Gypsum has a product called insulation manufacturers all seem to
people over the years. It’s the simplest Wallboard Ten (because it weighs make them, as do the plasterboard
and the cheapest floor detail you 10 kg/m2) which is the building reg makers. They are rated either
can build and, over the past fifty requirement. Cost: zero. Hoped for lightweight - aimed at impact
years or so, it’s got both simpler and decibel reduction: 40dB. You can noise mainly – or heavyweight. The
cheaper to build. Manufactured improve this rating a little by putting heavyweight ones are usually made up
boards have taken the place of denser in more insulation into the joist space. of layers of heavy board products with
materials and they have tended to Don’t pack it tight – 80% depth names like SoundPlank. Overall, with
grow less dense over time as suppliers is reckoned to be ideal for sound attention to flanking sounds as well,
strove to drive down costs. It all absorption. heavy floating floors will add about
contributed to a sustained decline in n Add a carpet and underlay 5dB to decibel reduction, cost maybe
soundproofing standards which many above. Dramatic improvement in £5/m2 and add 50mm to your floor
new homeowners have had cause to impact sound going down. Slight depth.
complain about. improvement in airborne sound
Up until 2004, the building regs coming up! If you really don’t want PRECAST CONCRETE FLOORS
didn’t have anything to say about this carpet upstairs, add a resilient layer As a complete alternative, you can
trend. They concerned themselves (an acoustic underlay) between switch to a masonry floor system. You
solely with stopping noise passing the chipboard and the floor cover. see an immediate substantial jump
through party walls and floors Acoustilay and Ecoustic are two brand in airborne sound reduction between
between flats and terraced housing. names costing between £10 and £20/ floors, of the order of 15dB, though
That state of affairs changed when m2, depending on your spec. Reduces impact sound reduction requires a
Part E, the bit of the regs that deals sound transmission by around 5dB. bit more thought. However, there
with soundproofing, was re-worked. n Use two layers of plasterboard is also a substantial cost penalty

HOUSEBUILDER’S BIBLE l 13th EDITION 147


Chapter 7

FIRST FLOOR COSTS per m 2 combines the simplicity of timber


Time in Labour @ M2 I-beams with an anhydrite screed
Mats mins £20/hr rates covering, making it ideal for sound
Joists £18 45 £17 £35 reduction and also underfloor heating.
I beams £20 30 £11 £31 A floor which behaves like a solid
T&G Chipboard £11 15 £6 £17 concrete floor, designed to be built
Weatherdeck 22mm £17 15 £6 £22 into a lightweight timber frame
Acoustic Quilt £3 10 £4 £7 construction. Check out Screedflo dB
Acosustic Upgrades for Party Floors £22 40 £15 £37 and Lewis Decking.
Beam and block (above ground floor) £25 35 £13 £38
Hollow core £40 30 £11 £51 PARTY FLOORS
Readymixed cement screed 65mm £8 20 £7 £15 Having gone into some detail on
Gypsum screeds 50mm £20 supply and fix only £20
how to improve sound insulation
First Floor Options per m 2
levels on intermediate floors, it’s
Timber or I beam floors to 40dB (Part E2) £60
worth adding that if you are involved
Timber or I beam floors to Party Floor standard £100
Beam and Block floor with screed to 40db (Part E2) £50
in constructing party floors – that
Beam and Block floor with screed to Party Floor Standard £55 is floors between flats - you have to
Hollow core floor with screed (all versions meet Party Floor standard) £66 meet some very tight sound reduction
standards. And you will very possibly
be asked to have your floor (and
MODEL HOUSE: Floor Costs
party walls) tested to see if they work
Construction specified Materials Labour Total
as designed. See the section called
Timber Joists with Acoustic Insulation m2
‘Sound Advice’ in the last chapter to
under 22mm Weatherdeck Rates £ 49 £ 31 £ 79
Floor Area in m2 80 £ 3,900 £ 2,500 £ 6,400
find out more.
Also note a couple of little points.
for switching away from timber or how best to finish a masonry floor. First, carpet still works pretty well
I-beam joists. Underneath, you have a problem in that as a sound-proofer. I know it’s out
As with ground floors, the choice you need a service void in which to run of fashion but a good carpet laid
is either a beam and block floor or a lighting cables. You can either fix battens over a thick underlay does wonders
hollow core plank floor. The planks into the floor or hang the plasterboard off for keeping the noise down, at least
are better acoustically but are more special clips. Above, you have a problem as good as many of the other more
expensive and are more taxing to install; with the camber on the floor beams expensive solutions I have been
they require double thickness supporting and the manufacturers want you to lay writing about. And downlighters.
walls unless the planks span between a screed. Fine, if you want underfloor Very fashionable, I know. But making
external walls. Both masonry systems heating, but expensive if you don’t. holes in the ceiling is bad news noise-
can perform well but beam and block Interestingly, the cost of installing wise.
in particular is prone to catastrophic a precast intermediate floor is not
acoustic failures. Why? Because the dissimilar to improving a timber floor to FLOOR FINISHES
blocks get left out. Or taken out to the standard of a precast one. The lowest grade of timber floor
make a path for plumbing or soil stacks. covering in widespread use,
Whatever you make a floor out of, if you ACOUSTIC FLOORING chipboard, is made out of tiny wood
start punching holes in it, it won’t work. An innovation I first came across particles suspended in a sea of glue.
You also have to pay attention to in 2008 is a flooring system that It’s around half the price of the much

148 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

stronger plywood but is not nearly


as durable. The NHBC requires that
all chipboard used in new housing
should be moisture resistant, but
this is far from being weatherproof
and it is not recommended that
chipboard be built into a house before
the structure is watertight – but
nevertheless it regularly is.
Chipboard is now frequently laid as
part of a floating floor: that is to say that
it is laid – or rather wedged-in without
any fixings at all – on top of polystyrene
floor insulation sheets on the ground
floor, or acoustic insulation sheets on
intermediate floors.
Problems have been encountered
with chipboard sheeting curling at the Engineered joists like these Posi-Joists don’t twist or splay or squeak and they are
edges and with sheets getting wet and very easy to run services through.
consequently expanding and cracking
walls above. In theory, there is much to ones: the external walls are slightly of the first floor joists: if the span is more
recommend floating chipboard floors, more expensive to build than their than 5 or 6 m, then you can’t run joists (or
especially where a carpeted finish is blockwork equivalents. concrete floors) across the gap without
required, and costs are no higher than If you opt for studwork, then you have a break, and that break has to be either a
the traditional cement screed topping another choice to make; timber or steel? load-bearing wall or a structural beam.
given to ground floors. In practice it pays The use of lightweight steel channel Now you can have internal load-
to use the technique with caution; lay is gaining momentum with the major bearing walls built in timber - most
timber battens underneath where extra housebuilders. When you have people timber frame houses do just that - but
support is needed such as underneath who know what they are doing and a conventionally you need to add extra
stud walls, at external doorways and at decent sized run of a few houses, then support down at foundation level, usually
the foot of staircases. steel framed walling systems are cheaper in the form of a trench foundation. So
than timber or block. GypFrame is the you can see that load-bearing walls are
best known system. Increasingly, we are quite a bit more expensive to build than
seeing dry lining gangs offering a steel simple partition walls.
INTERNAL WALLS stud wall installations service as well as At roof level, the issue is rarely critical
The traditional routine for internal plasterboarding. because most roofs are designed to
partition walls is to build blockwork Which to choose? Well the main spread the load from side to side, across
walls downstairs and timber studwork issues to consider here are load-bearing the wallplates, so no load gets transferred
upstairs. Internal studwork is a little and sound. Do you need internal load- down to internal walls. This is why
cheaper and quicker to build than bearing walls? traditionally internal partition walls are
blockwork. By the way, don’t assume Most two storey houses with spans of blockwork downstairs and timber stud
from this that timber frame houses more than 5 m (which is most of them) upstairs. We are beginning to go around
are cheaper to build than block built will require some way of taking the load in circles!

HOUSEBUILDER’S BIBLE l 13th EDITION 149


Chapter 7

SOUND ISSUES or some such nonsense. But they Note that if you plan to fit a
Builders instinctively go for may not explain that once a room mechanical ventilation system in
blockwork if load-bearing capacity gets wider than the normal span your new home, you need to ensure
is important. The other reason why for a floor joist you will run into that there is a route through any
they like blockwork is of course extra costs because you have to fit a steel beams that might effectively
soundproofing. Generally a block beam across the middle to split the divide the floor void into two. A
wall is pretty good at soundproofing loading. This width varies with the good plan will know where your
between rooms. The current building size and frequency of the floor joists, duct runs will be placed and allow
regulations call for a minimum of but once you get over 4 m, your for a hole in a steel beam to push the
40dB sound resistance which, in costs start to rise substantially. Well, ducts through.
truth, isn’t very difficult or exacting. they do if you are working with
If you are building in timber or timber joists: some of the alternative OTHER BEAMS
steel channel, you will have to add materials mentioned in the flooring Timber framers tend to use
a little insulation into the void and section (i.e. concrete precast floors specialised beams when they want to
use a slightly heavier than normal and timber I beams) are capable of create wider than average rooms. If
plasterboard (such as British much longer spans. you are using a post and beam system
Gypsum’s Ten). To improve on Steel beams themselves are not wildly of construction such as employed by
this, fix double thickness boards to expensive but fixing them is a lot of some timber frame companies like
each face of the wall. Or switch to a work, no matter which method you use. Potton Timber or Border Oak, the
much heavier building board such as If they are set inside the floor void, the solution comes complete with the
Fermacell, popular in any event with floor joists will all have to be hung off house as they use the massive post
selfbuilders because it’s much easier the steel; if the steel is put below the and beam timbers to hang the rest of
to finish than plasterboard. ceiling then it will have to be boxed in the house off.
You can go to great lengths to with plasterboard. A more usual situation is to use a
soundproof your bedroom walls but Steel also needs looking after; it needs flitch beam, which is a piece of steel
bear in mind that a bedroom is only a coat of paint and it needs protecting sandwiched between timbers. Flitch
as soundproof as its weakest link from the threat of fire – usually this is beams can be made up on site and are
and that’s usually the door. Unless achieved by fixing two thicknesses of subject to the same sort of cost provisos
you go to the considerable expense plasterboard around it, although there as regular steel beams. There are various
of fitting an acoustic doorset, then are fire-proofing paints that can be other types and styles of timber beam
you’d probably do well not to get applied as an alternative. Despite its available; one worthy of mention is the
too fussed about the whole process. inherent strength, steel is actually one of glulam (pronounced glue-lam) beam
Other design tips are to place built- the first things to give in a serious fire, that is made up of hundreds of small
in cupboards between rooms you so steel beams normally get extra fire timber sections glued and laminated
want to isolate, and to avoid placing protection. together. Glulam beams are rather more
electrical switches and socket plates Inserting a steel beam of around 5 expensive than steel on a strength for
in noise-sensitive walls. m length is likely to add around £300 price basis, but they look good, good
to construction costs. You will also be enough to leave exposed even though
required to supply calculations to prove they look a little too modern for some
STEEL BEAMS that the beam is adequate for the span: a traditional tastes. Most specialist timber
Every designer will tell you that you structural engineer will need to be hired merchants will stock several sizes from
can build rooms to any size that you and this may well cost more than the around £20-£50/lin m. depending on
want – ‘your imagination is the limit’ beam itself. girth.

150 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

INTERNAL WALLS Key Rates per m 2


Basic Acoustic Combined Time in mins Labour Combined
Mats Insulation Accessories Materials (inc insulation) @ £20/hr Rates
100mm Blockwork £12 £2 £14 35 £ 15 £ 29
90mm Timber Studwork £6 £3 £1 £10 28 £ 12 £ 22
Steel Channel (with 15mm Soundblock) £3 £3 £6 £12 20 £8 £ 20
add Acoustic Upgrades for Timber or Steel Party Walls £8 30 £ 13 £ 21

MODEL HOUSE: Internal Wall Costs


Area in m 2 Rate Materials Labour Cost
Masonry Walls 70 £ 29 £ 1,000 £ 1,100 £ 2,100
Timber Stud walls 60 £ 22 £ 600 £ 700 £ 1,300
Total £ 1,600 £ 1,800 £ 3,400

ROOF CARCASSING than traditional roofs and, because


of the inherent strength of each
n they should never be altered on site.
They can’t be cut around chimneys
There are two major competing individual truss, they use considerably and openings, so you must get the
techniques for building roofs. less timber – usually about 30% less plan accurately built
Traditionally, roof timbers were by volume. Another tip is to set the truss
measured, cut and assembled Whereas traditional cut roofs spacings as accurately as possible
on site – a skilled job involving are built from sawn carcassing, using a 600mm spacing. This will pay
complex setting-out procedures and readily purchased from any builder’s dividends when it comes to tacking
cutting lots of obscure angles and merchant, trussed roofing tends to get the metric length plasterboard sheets
notches. Traditional roof carpentry fabricated by specialists. Not that this to the ceilings formed by the trusses.
is an art form in itself and it has should present a problem to builders: So why doesn’t everybody use roof
its own rich jargon involving the provided you can present a set of trusses? Well, mostly they do but
likes of rafters, purlins, collars and dimensioned plans, you will get a there are some situations where the
birdsmouths. However, the rise quote back usually within a few days. traditional cut roof holds sway:
of the prefabricated roof truss is You can contact specialists or you n roof truss manufacturers sometimes
slowly but surely putting an end can take your plans to any builder’s get very busy and cannot deliver for
to all this. With trussed roofs, the merchant who will do the donkey several weeks
brainwork is done by computer, the work for you. n complicated roof shapes take
cutting by machine and the jargon If you choose to build using trusses, longer to build whichever system
is reduced to fink and fan, the two bear in mind that prefabricated roof you use and the difference in
commonest truss designs. Erecting trusses are sensitive things and they erection speeds – which is the
a series of roof trusses is generally perform well only if they are treated trusses’ big selling point – is much
a straightforward matter – hoist well: less marked.
them into place, straighten them n care should be taken not to put any Consequently, many builders specify
up, nail them on and add diagonal twist or undue load on to them, both trusses for their main roofs, but prefer
bracing. whilst being handled and when being to stick with the traditional methods
On a simple rectangular box- stored before erection when it comes to odd jobs like
shaped structure, roof trusses are n they should be stored upright on building dormer windows, porches or
about three times quicker to erect bearers (not standing on their feet) garages.

HOUSEBUILDER’S BIBLE l 13th EDITION 151


Chapter 7

STEEL LINTELS: key rates be aware of. The internal sloping


• Convention is that they need 150mm bearing at each end
ceilings on these houses greatly limit
• Thus 1200mm wide window requires 1500mm lintel, or 1.5m what goes on underneath them;
• These costs are averages per metre run beds are usually OK, cupboards are
Regular Type £ 38 m difficult and planning a bathroom
Heavy Duty £ 49 m in such a space is something you
Box Type (internal) £ 17 m should consider very carefully. You
Timber Frame Type £ 14 m can end up with a lot of expensive
Single Skin for Garage £ 56 m dead space; you may like the idea
Masonry Cast Cills £ 30 m of under-eaves cupboards or a
basin in a sloping alcove, but you’ll
INTERNAL STEEL BEAMS
probably live to regret it and end up
• Av metre run prices for shotblasted and painted channels
wishing for convenience rather than
Heavy duty RSJ (ie UB 203x133x30kg) £ 47 per metre run
character.
Lighter RSJ for short spans <4m (203x102x23kg) £ 40 per metre run
Labour to set £ 100 each
When comparing floor space costs,
consider space under raked ceilings to
MODEL HOUSE: Steel and Lintel Costs be worth considerably less than space
Total Length Materials Labour Total with full-height ceilings.
2 Universal Beams (RSJs) 8m £ 320 £ 200 £ 520 The prefabricated roof truss
15 No External Lintels 25m £ 900 n/a £ 900 works most effectively when you
5No Internal box lintels (downstairs only) 7.2m £ 100 n/a £ 100 are designing roofs that sit entirely
Total £ 1,320 £ 200 £ 1,520
above the upstairs room space. Then
ATTIC TRUSSES that they effectively lose their cost the horizontal section of the trusses
There is another reason why many advantage over traditionally cut roofs. can sit directly onto the wallplates
builders dislike the trussed roof; at the top of the surrounding walls
it effectively eliminates use of the ROOM-IN-THE-ROOF DESIGNS and form the ceiling joists for the
loft space for anything other than Where overall roof heights are upstairs rooms. When you introduce
storage. The cross-members, which restricted, it is common to build the a raked ceiling you change the truss
make up each truss cannot easily be upper storey of a house projecting loadings and start having to use much
removed or altered and this makes partly into the roofspace. When wider rafter sections, and if you have
it much harder and more expensive added to an existing dwelling this is long sloping ceilings you will have to
to open up the roof space at a later usually referred to as a loft conversion introduce a midway support beam
date. but in a new build the convention is known as a purlin. In effect you are
There is, however, the possibility of to give the upper floor at least a metre back to constructing a traditional roof,
using specialised attic trusses, which of vertical wall before the sloping (or so again the supposed economies of
are designed to leave the main loft raked) ceiling cuts in. This type of prefabricated trusses largely disappear.
space open so that any future loft design is sometimes known as a one- However, there are roofing systems
conversion can be arranged with and-a-half storey house. appearing now which address these
a minimum of fuss and expense. If you are going for a room in the problems, replacing rafters altogether
However, whilst the speed of roof design – and many timber frame with a series of insulated panels
installation is maintained, attic trusses companies specialise in this style stretching from the ridge down to the
are between two and three times the of home – there are a number of eaves, with no timber cross supports.
price of regular ones and this means knock-on effects which you should It’s a variation on the theme of using

152 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

ROOF CARPENTRY COSTS per m 2


attic trusses to create an open space • Roof areas measured 'in plan': that is to say, the roof pitch is ignored
in the roof but its selling point is that Time in Labour @
it is lightweight and quick to install. Materials minutes £20/hr Combined
We are essentially talking about Traditional or cut roof £ 30 110 £ 40 £ 70
SIPS construction here (see section Fink Truss Roof £ 25 40 £ 15 £ 40
under Inner Skins, where it’s used as Attic Truss Roof £ 45 40 £ 15 £ 60
load-bearing walling). There used to Panelised roof (simple design) £ 50 12 £4 £ 54
be specialist SIPS roofing businesses
about but these days you would do MODEL HOUSE: Roof Carpentry Costs
best to locate a more generalist SIPS • Note these are 'in plan' measurements
supplier/installer. Plan Area in m2 Rate Materials Labour Total
House Roof Area (Trusses) 100 £ 40 £ 2,500 £ 1,500 £ 4,000
VAULTED CEILINGS Total £ 2,500 £ 1,500 £ 4,000
Some designs call for the room in the house with walls, roof and a window opening roof lights. Velux is the big
roof idea to be extended all the way and then joining it seamlessly on to name in this field (though there are
up to the ridge beam at the apex of the main roof structure. Whilst this several others) and Velux rooflights
the roof. Here you have no flat ceiling may appeal to the model makers are very quick and easy to install; on
area at all. This is a visually dramatic amongst you, harassed builders in a new building an opening rooflight
effect, often employed in barn a hurry will not appreciate all this will cost between £250 and £500
conversions and new oak buildings intricate detailing. depending on size and will add
where you have attractive timber People buying kit homes with virtually nothing to labour cost – it
rafters which are worth displaying in dormers placed on the roof might taking no longer to install than it does
their own right. This is a world away think that they are avoiding all to fit the roof covering over the same
from prefabricated roofing trusses, this hassle, but they will find that space. In comparison, a simple dormer
employing techniques of roof design finishing dormer details is still a is likely to cost over £2,000. It may
similar to those used in mediaeval time-consuming business. The roofers well be that your overall desired effect
times. have to form valleys and often stepped demands dormer windows in your
lead flashings, plasterers or bricklayers roof and, if so, so be it. Just be aware
ROOF WINDOWS have to come back to fill in tiny wall that these types of windows (like
Once you have opted for a room spaces on the outside, and even tacking bay windows) are not only expensive
in the roof design, you have to sort plasterboard on the inside calls for an in themselves but are also heavy on
out how you will treat the windows ability to think three dimensionally. management time. Unless very well
for these rooms. When your natural Another pitfall associated with some planned out, they are more than likely
window height coincides with a dormer designs occurs when they to cause snags further on down the
sloping ceiling you have two choices. break the eaves gutter line of the main line.
You can ‘go with the roofline’ and fit a house, which results in extra rainwater If you are converting a barn you are
sloping rooflight window or you can downpipes; I have seen various ways likely to find that the planners will not
‘break through the roofline’ and build people have tried to disguise this detail allow dormer windows and will force
a dormer. but none of them look particularly you to use a rooflight. In response
A dormer window is a fiddly convincing. to this, Velux have produced a range
construction. However it is formed, it Planners permitting, you can of of conservation rooflights that are
involves building a sort of miniature course forget about dormers and fit designed to blend in with centuries-

HOUSEBUILDER’S BIBLE l 13th EDITION 153


Chapter 7

Roof Carpentry Jargon Buster A medium sized 350mm light pipe will
produce much more light than a 100W
valley bulb even on a dull winter’s day and
rafters ridge rooflight will be adequate to light a room up to
verge
hip 15m2. At around £400, they are similar
in cost to rooflights but they can have
advantages in certain situations - you
can bend the pipes round corners if
necessary.

EDGE DETAILS
One important detail to consider
when thinking about roof designs
is how to treat the roof edges. The
gable end dormer eaves ridges, hips and valleys will be sorted
pitch out by the roofing contractors, but
the eaves and verge details are largely
a matter of roof carpentry. Here, it
makes no difference whether you’ve
Attic truss built a traditional cut roof or a trussed
(£75 each)
rafter one; you still have to sort
out some sort of effective junction
between the roof cover and the
underlying structure.

EAVES
There are numerous variations on
Fink truss
(£25 each)
this theme, none of which is likely to
cost less than about £20/lin m to fix
(excluding decorating costs). If there is
an industry standard detail it is closed
or boxed eaves. The vertical section
is the fascia board: the horizontal bit
old buildings whilst still providing reflective tube that allows you to under it, returning to the wall, is the
ease of opening and double-glazing pipe daylight from a roof down into soffit. One of the emerging trends here
expected of modern roof windows. the house. What you actually see is is for builders to use uPVC sections.
These conservation rooflights are a transparent dome sitting on your uPVC has all but taken over the
however priced at a 30% premium to roof and a translucent light diffuser – guttering and downpipe market and
standard rooflights. looking for all the world like an electric it’s a small step to switch from timber
lampshade – fitted onto the ceiling to uPVC for the supporting fascia
SUNPIPES of the room below. What you get is a boards as well.
For those of you still in the dark, credible amount of natural daylight An alternative is to have open
a sunpipe or light pipe is a highly into the darkest recesses of your home. eaves. These are reckoned to look less

154 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

modern and often more attractive. I was a little


dubious about
Some designs dispense with fascia
sunpipes but
boards altogether and allow guttering my architect
to be strapped on to the rafter feet - persuaded us to
this is a particularly useful technique to fit them over a
employ with timber barn conversions couple of dark
where a fascia would look out of place corners and I have
been impressed
- but the more usual method dispenses
by the amount and
with just the soffit boards and leaves quality of light they
the rafter feet exposed. An open eaves produce. Such a
detail is a little more expensive than simple idea — just
boxed or soffitted eaves as you still a mirrored tube,
have to provide a plywood plate (albeit capped top and
bottom. To work
above the rafter feet to catch the felt)
well, you need to
and you are left with fiddly finishing pay close attention
details on the exposed underside. to insulation around
More expensive still is to use the them.
Georgian-style parapet. Here you
build your external walls up above the
eaves line and collect the rainwater
draining off the roof in a hidden
lead gutter behind the parapet. This
technique was once common in
inner-city housing terraces and large
country houses, but nowadays tends
to look a little bit pretentious – unless enhanced by using some fancy dog’s- by the provision of a 10mm continuous
you happen to be building a large tooth brickwork: the bargeboard air gap all the way around the eaves.
Georgian-style house. method is rather easier to install You might think that this is a very
(it too can be enlivened by adding straightforward matter, but there is also
VERGES decorative effects). concern that a ventilation gap shouldn’t
Verges are only found over gable become an open doorway to birds and
ends, so many houses without gables ROOF VENTILATION insects, and therefore there has grown
will have only eaves details. There are, It is surprising to many people up a whole industry making plastic
again, two classic treatments of verge that roof timbers do not need to be roof vents that let air in and keep bugs
junction details. One is to lay the treated with preservatives (unless you out. There are several different types;
tiles or slates straight on to a bead of live in a long-horn beetle area, mostly some are cut into the soffit boards,
cement at the top of the supporting south of London) but you do need to some are nailed on top of the fascia
gable wall, the other is to oversail the consider moisture penetration very and some get fixed between the rafters.
wall and to finish the roof cover over carefully.
a (usually timber) bargeboard. Each For a conventional trussed roof, RIDGE VENTILATION
technique has its merits. The direct where the upstairs living space does When you have a room in the roof
method can look horribly cheap not project into the roofspace, the design, roof ventilation becomes a
but, equally well, is capable of being ventilation requirements are satisfied more complex problem and care has

HOUSEBUILDER’S BIBLE l 13th EDITION 155


Chapter 7

Framed If you are working with a


constructions handmade tile, Tudor Roof Tiles
designs, which produce an almost-invisible venting
includes most system that uses the natural camber
roofs, used to pay
much attention to
present on most handmade tiles to
vapour barriers, provide adequate ventilation space to
but these days take the foul air away from extractor
the emphasis has fans and soil pipes.
moved on to air
barriers which are UNVENTED ROOFS
installed to a more
exacting standard. If all this ventilation seems to be
The joist ends more trouble than it’s worth, then
cannot pierce you’ll want to know about other
the barrier and options. In fact, if you were building
the barrier joints a room-in-the-roof design then you
have to be taped.
would also be well advised to use an
The air pressure
test which follows alternative because they are likely to
measures the be cheaper and easier.
success of each If you are building a new house
installation, one with a pitched roof, you will find
of the very few in that there simply isn’t the depth
situ tests which
of rafter to stuff insulation in
show how well
constructed a and still have room for a 50mm
house actually is. vent gap under the roof. But just
when all seems lost, Tyvek and
the breathable membranes ride
in to the rescue. These materials
are at once waterproof and vapour
to be taken to leave an airflow gap there are several formats of ridge permeable and their manufacturers
between the roofing felt and the ventilation tiles now available: they have convinced the authorities that
insulation surrounding the living are invariably expensive – expect if you specify one of these so-called
space. There is also a requirement for to pay between £30 and £50 each breathable membranes instead of
ventilation at the top of the roof, the – and unlike the dry ridge systems traditional roofing felt, then you
ridge, and this can be expensive to they are all too obvious from the don’t need to have the 50mm vent
achieve. ground. gap within the rafter space and you
One way of achieving this is Roof or ridge vented tiles are also don’t need to worry about eaves and
to fit a ventilated ridge, a plastic useful with an internal soil pipe or ridge ventilation. Although they are
extrusion which fits under the an extractor fan both of which can expensive compared to roofing felt,
ridge tiles: this has the advantage be ducted up through the roof space. you claw this money back by saving
of being visually unobtrusive but it Glidevale produce the most complete on other materials.
comes at a cost of around £20/lin catalogue of roof ventilation and also It’s not quite true to say you don’t
m, much more than the cost of the some of the best solutions for these need a vent gap at all because most
ridge tiles themselves. Alternatively types of problems. designs call for counter battening under

156 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

Contrast these two roofs. Both are


‘room in the roof’ designs but the one
the tiles or slates – this effectively gives heated envelope of the building. on the right uses attic trusses, while
you a vent gap on the outside of the Roofs such as these require venting the one on the left is built on site. They
roof, above the rafter line. at eaves level – already covered – both might have used attic trusses
There are many variations on the but this isn’t always enough to stop but on the site above the builder was
unvented roof design, sometimes condensation. told there would be a delay of several
weeks to get trusses on site – so he
known as a warm roof design. The roof cover itself can get very, hand built it instead
It’s complicated in Scotland by very cold, especially on clear cold
the requirement for roof sarking, nights, and the moisture in the air in
which is a layer of solid timber the loft finds a dew point under the
boarding traditionally nailed over felt where it proceeds to drip down ROOF COVERS
the rafters. However, the insulation onto the ceiling. It seems to make no
manufacturers and the breathable difference whether you fit felt or a There are many different materials
membrane suppliers all have details breathable membrane. used to cover roofs but before we
showing ways of satisfying both the The most effective solution is to go on to examine them, consider
U-value requirements and moisture build in some form of ridge venting. first that most housing estates in the
management – every roof design has Combined with the eaves venting, this country have a concrete tiled roof.
to pass what is called a Condensation creates a stack effect that keeps the Why? Simply a question of cost –
Risk Analysis. air flowing through the loft. Without concrete tiles are an amazingly cheap
ridge vents, the air inside the loft way to provide a roof cover and,
frequently hangs around for a long designed well, they can look effective.
CONDENSATION PROBLEMS time. Sometimes but not, unfortunately,
A little discussed but widespread Guidance on condensation in new always.
problem concerns condensation roofs has changed in 2011 so that The cheapest way to cover a roof
in lofts. It’s a feature of cold roofs it’s no longer adequate just to fit a is to first have a shallow pitch and
where there is unused loftspace. breathable membrane under the roof secondly to cover it with a big tile.
The insulation gets placed at ceiling with eaves vents. High-level or ridge Shallow pitches give you less roof to
level, leaving a large mass of air venting is required as well. cover and big tiles are cheap to make
inside the roof but outside the and cheap to lay. End of.

HOUSEBUILDER’S BIBLE l 13th EDITION 157


Chapter 7

Roof Cover Costs (supply and fix) per m2


2 2 2 2 2
£20/m £60/m £100/m £140/m £180/m

Concrete interlockers

Clay pantiles

Plain tiles

Artificial slate Zinc, copper, metal claddings

Natural slate

Thatch

Felts or single ply membranes Turf or green roof


House
Model

cost

£2,500 £7,500 £12,000 £17,000 £22,000

MODEL HOUSE: Roofing Costs


Spanish Slates Area Rate/m 2 Materials Labour Combined
House Roof Area 122 m 2 £ 80 £ 6,200 £ 3,200 £ 9,400

Only its not, because visually they alone makes them much quicker to lay. which others aspire and if you want
also look pretty naff. Ok-ish on the Large format tiles start losing their cost to get a better understanding of the
roof of a Tesco, not so great on the advantage on complex roof shapes with possibilities with tile coverings, you
roof of a house. There is a polite lots of cuts, so you tend to see them on should get hold of their Pocket Guide
convention that you don’t put massive very simple roof designs. to Roofing; it’s free, downloadable as
tiles on top of homes. Small format tiles, known as plain a PDF, and it’s an incredibly useful
Traditionally, the tile used on tiles, are available from a wide range booklet which will tell you more than
homes in most of Southern England of suppliers in both concrete and you will ever want to know about
was made of clay. Clay looks good clay. At the top end of the plain tile roof tiling. Redland tends to be more
and it weathers well in a way that market come the handmade clay expensive than the competition (at
concrete doesn’t so a clay tile will tiles: these are something else and, least on single site developments)
hold its value far better, for the same like handmade bricks, they tend and you may find better prices if you
reason that clay bricks will — you to lend a strong vernacular flavour chase Marley roofing or one of the
rarely see a concrete brick. But clay to any building they are put on. smaller manufacturers such as Sand
tiles are more expensive to make than However, handmade clay tiles are also toft or Russell.
concrete so clay is always seen here as amazingly expensive, costing around Most roofing contractors have
an upmarket option. five times as much to supply and fix cosy relationships with one particular
The large format or interlocking as the basic concrete interlocking tile. manufacturer and you may well
tiles (so beloved of Tesco’s and the The roof tile market in the UK is find that it pays you not to be too
other supermarkets) often measure dominated by two giants, Redland picky as to whose tile goes on your
330x270mm, the size of six plain tiles; (now part of Monier) and Marley roof. Handmade tiles tend to be the
you don’t need very many and this fact Eternit. Redland sets the standards to province of smaller producers: if you

158 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

have a deep wallet, look at Keymer a supplier of second hand slate. cheaper, artificial alternatives around
and Tudor, who produce visually Prices are similar to imported slate that will not look in the least bit
stunning roof tiles that are brand new and quality is similarly variable but, convincing but using them may save
yet manage to look at least 200 years if you know what to look for, it’s you several thousand pounds. Again
old. relatively easy to assess the quality of you face a tricky task reconciling your
If you crave the look of a traditionally a recycled slate and it can make a very budget with the demands of your
tiled roof but your budget doesn’t stretch good buy. There are also a number local planners.
that far, Ibstock produce a large format of slate substitutes on the market.
concrete tile called the Gemini, which The cheapest are the fibre cement SHINGLES
simulates the plain tile look by planting slates but these are liable to warp and Another old vernacular stand-by is
a groove down the middle of a large discolour over time. the cedar shingle. A shingle is a tile
format tile. Slightly more expensive but There are also a number of fashioned out of cedar wood and is
arguably better looking comes Sandtoft’s manufactured slate products, usually usually supplied in random widths
20/20 and HF’s Beauvoise, imported made out of reconstituted slate to give a broken up effect. It is a
from France: both are middle format dust. Redland produce the best- reasonably hard wearing material
clay tiles. known reconstituted slate tile called – though not as good as clay, slate
the Cambrian. It is a mid-priced or concrete – and it is used just as
SLATE alternative to the natural slates and often to do vertical wall panels as it is
Not all tiles are manufactured. Slate unimpressive artificials. However, pitched roofing. Cedar is a naturally
became the preferred roofing choice many planning officers will insist on durable timber that doesn’t require
of the Victorians when the railways you using natural slates, even though any treatment or staining, and if you
provided access to the cheap Welsh they couldn’t tell the difference when covet a genuine timber house then
slate quarries. The Welsh slate is laid on a roof. shingles will be your chosen roofing
still there in Snowdonia but it is no Then again, you could stop messing material.
longer cheap; indeed it is up there around and just fit Welsh slate. The
with handmade tiles, zinc and thatch reason it’s more expensive is that it’s THATCH
as one of the most expensive options simply better than the alternatives This is really one for enthusiasts but
for the pitched roof. In rural areas, and that’s entirely down to geology. If new thatched homes are getting built
slate is unlikely to be most people’s you are looking for a reasonably local, in small but increasing numbers. Not
first choice. However, planners often thoroughly natural and incredibly only is it very expensive, but there are
insist on slate roofs for the flimsiest durable roof covering, Welsh slate is numerous regulations about where
of reasons and it is as well to be aware the one. thatch can go on new buildings.
of that possibility. The one that used to trip people
If you want slate but are reluctant STONE BELT ROOFING up was a requirement for thatched
to pay the going rate for new Welsh Don’t think that you can get away roofs to be at least 12 metres
slate, there are a number of other with just a stone facade if you from another house but if you pay
options. You can look to source your live in an area where stone is the close attention to the internal fire
slate from Spain or even further predominant building material. proofing arrangements, using a set
afield: prices are much cheaper than For sure, you will be required to of guidelines known as the Dorset
Welsh slate but quality has been lay a stone tile roof to match your model, you should find that this
patchy and it’s worth looking out for neighbours. Local material prices requirement can be relaxed. Thatch
slate carrying a 30-year guarantee. vary from quarry to quarry but are is not something that can be added
Alternatively you can track down invariably high. There are numerous as an afterthought; if you are really

HOUSEBUILDER’S BIBLE l 13th EDITION 159


Chapter 7

the actual roof tiles may make up no


more than 50% of the overall roofing
material costs. The most visible
additional elements are the ridge and/
or hip tiles (usually around 20% of
cost); the underlay and supporting
battens are the other significant costs.
Ventilation gear, which is often fitted
by roofers, is another expensive item.

FELT AND BATTENS


Roofing felt is now rarely used as its
been replaced by all manner of clever
membranes that promise to be both
waterproof and vapour permeable,
and sometimes even more. But the
practice of covering the roof is still
Coursed stone tiling: the courses get narrower as you move up the roof. An
attractive vernacular feature but time consuming and therefore expensive to achieve
routinely referred to as felting and
battening and it is useful for getting
serious about it you must design to it than just fixing zinc to a roof. a structure wind and watertight,
the roof around the thatch. You are You have to decide whether to have a sometimes long before the actual roof
more likely to come across thatch warm roof or a cold roof. The purists cover is applied.
if you are involved in renovating or like cold roofs and if you go this way On all but the largest houses,
converting. you have to construct a ventilated the whole process of felting and
cavity over the timber roof, itself battening usually takes roofers no
METAL ROOFING an expensive and lengthy process more than a day.
If you really want to be on trend, then as the zinc has to be laid on 18mm Don’t make the mistake of felting and
metal, preferably zinc, is the material or 22mm ply. Plus all these metals battening before choosing a roof covering:
of choice. A standing seam zinc roof (and much of the other roofing the spacing of the battens is set by the
is a thing of beauty, especially if the products you can get hold of ) are gauge of slate or tile and the gauges are
detailing is crisp and sparse. Getting sourced outside the UK which makes very variable. Note that the Scottish
it right is not straightforward and them even more expensive when our practice is to build a solid timber sarking
metal roofers are still hard to find and currency nosedives. layer on top of the rafters before laying
can demand a very high fee for their felts: this adds significantly to the roofing
services. ROOF DETAILS costs but makes a much stronger structure.
To get a handle on the way metal As most roofing is carried out by
roofs work, you need to look at one specialist contractors, usually on a HIP TREATMENTS
of the websites that distributes the supply and fix basis, there is perhaps The hip is the name given to an
metals. The one I used was Metra not the need to know so much about external angle in a roof – an internal
Metals who stock copper and the intricacies of roofing. However, angle is called a valley – and the
stainless steel as well as zinc from there is a lot more to a roof than standard way of finishing a hip is
the two main suppliers, Rheinzink slates or tiles and even thatch or to use something very similar to a
and VM Zinc. There’s rather more zinc. On a typical detached house conventional ridge tile, although

160 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

the hipped version is sometimes labour costs are still significant.


slightly differently shaped. This is a On plain tile roofs there is the
cheap and quick specification and alternative of using purpose-made
it is really the only practical way of valley tiles. These are very similar to
finishing a concrete interlocking inverted bonnet hip tiles. Again, this
tiled roof. is an expensive option but it is worth
However, if you are planning considering around features like dormer
on a plain tiled roof there is an windows where the valleys are visible
alternative, which is to fix bonnets, from the ground. Hip tiles, £15/m run
which look very rural and vernacular.
However, bonneted hips are way VERGES
more expensive both in labour and The verge is the name given to the
materials (you’ll need something junction between a pitched roof
like ten bonnets per linear metre as and a gable wall. Making this detail
opposed to two hip tiles). weatherproof can be challenging.
An even more expensive option, The simplest method is to lay
which is most often seen on slate a mini-soffit board (known as an
roofs, is to cut the tiles or slates to undercloak) on top of the brickwork
meet exactly over the hip. This is (or timber bargeboard if one is
Bonnets, £60/m run
known as a close-mitred hip and it specified), run the roof cover up to the
tends to be preferred by those going edge of the undercloak and then fill
for neat, unfussy solutions. the void between with cement mortar.
Bonnets and close-mitred hips may There are alternatives. Redland
sound like unnecessary extravagances, make a concrete wrap-over tile
but although they are way more that can be used with certain tile
expensive than hip tiles, the total length covers and there is even a plastic
of hips to cover is often not that much verge system. However, these other
and specifying something different here methods all cost around double the
has a marked effect on kerb appeal. cement undercloak technique and
they add nothing to the look of your Close mitred hips, £80/m run
VALLEYS roof edge.
Another cost-sensitive area of roofing
is the valley, which is formed when DRY TECH SYSTEMS general reluctance to take up their
two rooflines meet on an internal The parts of the roof most vulnerable offers partly because of the higher
corner. The valley is not as visually to weather damage are the perimeter prices charged for these fittings
prominent as the hip and this makes areas like ridges, hips and verges. and partly because the look is even
it a candidate for treating as cheaply The traditional way of fixing ridge, more modern and nondescript
as possible. The commonest way of hip and verge tiles is to bed them than the conventional roof. In
doing this is by fitting a purpose- in cement. For some time now the Scotland, dry verges are the norm
made valley gutter and cutting the tile manufacturers have been trying and housebuilders seeking a low
tiles or slates around it. Here, GRP is to persuade us to use dry systems, maintenance finish are also specifying
tending to replace lead; it’s quite a bit which clip together with a series of them – cement fillets on roof edges
cheaper and much quicker to lay but mechanical fixings, but there is a are notoriously brittle.

HOUSEBUILDER’S BIBLE l 13th EDITION 161


Chapter 7

FLAT ROOFING rubber roofing products looks very good sedum) which requires little if any
With modern design in fashion, the on paper and the price is very attractive, maintenance. You don’t really want
popularity of flat roofs is waxing. New but they are often sold into the DIY to be up there in the summer with a
materials and techniques are arriving market and many are laid with a brief lawn mower.
all the time, making this a complex reference to a YouTube video and no The build-up of a green roof
area to understand, and interest in more. Consequently, they are often laid involves the use of single-ply
green roofs makes it more complex in a sub-optimal way which can lead membranes for waterproofing and
still. to issues like ponding and bubbling. careful attention to drainage and
Mastic asphalt was the first of the Whether Firestone like it or not, edging details. There is also the issue
manufactured flat roofing materials, first EDPM has grown a reputation as a shed of the extra loading, which requires
used over 100 years ago. It is a two-layer roofing material. stronger supporting joists within in
system, which is hot poured over the The option that has gained the then roof structure. It’s not something
roof area. It has many advantages over upper hand in the flat roof market are to fit as an afterthought.
other systems because it can easily form single-ply membranes, often but not Green roofs aren’t for everyone.
complex shapes, although these days always based on PVC and laid cold on a Ideally you need to be able to see
the roofers tend to steer you towards supporting fleece. Sika are big here (with them to enjoy the benefits and many
products like Kemperol, which is a liquid two products Sarnafil and Trocal) as flat roofs are barely visible. They
resin-based solution that is applied cold. are Bauder and ICOpal. It is not a DIY also don’t work well with rainwater
Whilst this is an undoubted advantage, product as the edgings are penetrations harvesting, as the run-off water tends
it is still not that easy to lay. It was are complex and use heat guns, but the to go brown and dirty. On the other
described to me as a “combination of result is usually very good and often hand, green roofs are good at holding
fleece and goop which smells quite toxic come with 25 year guarantees. onto rainfall and some are even
and gives you 20 minutes to get it right Note that if you ask a roofing designed to attenuate rainfall to stop
before it goes off.” contractor to quote for a flat roof, you flooding. These are technically known
In the 1950s, the preferred flat may not get much choice as to what as blue roofs.
roofing method became felt, or built-up material you get, because they have Green roofs, when done well, are
multilayer bitumen impregnated felt to tie-ins with manufacturers and staff an attractive feature and certainly
give it its correct title . It has been used tend to be trained in one system or more interesting than a dull grey felt
extensively on flat-roofed extensions another. Unlike roof tiles, it’s not easy for or membrane roof cover. Whereas
during the past 60 years where it grew the contractors to switch to alternative most flat roofing methods can be
the reputation for being cheap and suppliers. budgeted to cost between £50 and
cheerful, and good for no more than 15 £90/m2, green roofs start at over
years. In truth, felt roofing is available £100/m2 and head north. Whatever
in several different configurations, and GREEN ROOFS system you plump for, the price
at each price point, the performance A popular (and expensive) variation reflects not just the area but the
improves so that at the top end it’s as on flat roofing is to place vegetation complexities of the roof. Penetrations,
good as any of the alternatives. But on the surface. As you might imagine, upstands, edgings and corners all add
increasingly builders have been switching there is an enormous variety of mightily to the base price.
to new materials. possibilities here from intensive
At the bottom end, the preference roof gardens, designed to be walked PV ROOFS
is now for rubber roofs (EPDM). over and enjoyed as balcony areas, PV (photovoltaics) are usually
Firestone, the tyre people, are big in this to extensive green roofs which just thought of as a something you add
market. The performance of the various aim to provide some plant-life (often to the top of a pitched roof and

162 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

are considered as an item in the A complex edge


overall energy budget. But PV can detail using the
be fitted as part of a roof cover in PVC single-ply
membrane
itself and the price has been falling Trocal. These
dramatically over the past ten years. membranes,
In 2018, the cost of a standard PV combined with
panel (1650x992mm), had fallen to metallic strips,
under £300 and supply and fit prices allow you to
were still falling. As zinc and metal form corners
and channels
roofs have been heading up in price which would be
towards £200/m2, PV installed prices very much more
have been heading down towards difficult with
this figure and it’s entirely likely other materials.
that within the next five years PV
will become a competitive roofing
materials in its own right. No longer
will people be worried about the
lack of Feed-in-Tariffs or get fraught
working out payback periods. The
French do a lot of integral PV roof
installations and there are rubber
trays (from France) available from
the likes of Midsummer Wholesale
which you can use to place over the
roofing membranes.

PLASTIC more ornate sections such as ogee.


The low maintenance, low budget When designing rainwater
option is plastic (uPVC). There are systems, you have to bear in mind
RAINWATER around half a dozen manufacturers in the likely flow rates that naturally
Getting rainwater off roofs and the UK and they all sell through the tend to vary with the area of roof
down into the drainage systems is builder’s merchants. Note that there being drained: if your roof areas are
one of the small but very important is a compatibility problem here: even large you may find yourself having
details that can make or break the though the designs are very similar, to fit more downpipes than you wish
appearance of a house. Done well, the rival manufacturers’ products and one way around this is to use a
with appropriate materials, it can add rarely fit each other, so don’t mix larger guttering and downpipe. The
a little to the overall visual appeal of and match your guttering. Generally manufacturers all hold data to help
a house. However, done badly, it can uPVC guttering is available in four you specify appropriate sizes. For
ruin a fancy facade. The key to getting colours: black, brown, grey and white. instance, Osma produce a StormLine
the look right is the placing of the There is also a range of sizes and gutter section, which will drain over
downpipes and, as a general rule, the styles: both half-round and square- 100m2 of roof area, as opposed to the
fewer the better. box are common plus there are a few 57m2 maximum specified for their

HOUSEBUILDER’S BIBLE l 13th EDITION 163


Chapter 7

You don’t have to There are two perceived drawbacks


use conventional to using plastic guttering. One is
downpipe in a
that, as discussed, it all looks a little
rainwater system. This
is a chain gutter which naff; the other is that it isn’t actually
works just by catching any good. uPVC guttering generally,
the falling water and and the rubber jointing gaskets in
directing it down to a particular, seem to break down under
drain below. You do the effects of bright sunlight and the
need a good overhang
to make this work.
effective lifespan of a uPVC rainwater
system is probably only about 15-20
years. Expect to start replacing bits
after this time.

OTHER OPTIONS
All the other options are more
expensive but all promise greater
durability. The traditional British
material used for guttering before the
advent of plastic was cast-iron and
this is still widely available in a range
of period details. It is now mostly
used on conservation work and listed
buildings. With proper maintenance
standard RoundLine section. Now, There is quite a choice available, (which means repainting every five
this guttering is over twice the price designed to cope with the whole years or so), cast-iron guttering does
of the RoundLine, but specifying it range of materials that you may last a long time – there are many
can sometimes actually save money have to fix into or around. There examples of Victorian rainwater
by cutting down on both the number are adjustable brackets available, systems still in good working order.
of downpipes and the length of which can accommodate situations Copper is another material,
underground drainage work. where you are unable to fix into your widely used on the Continent.
Fixing uPVC guttering off preferred location — very useful It’s very resistant to the elements
scaffolding is at best a semi-skilled when working with uneven surfaces and doesn’t need any painting.
job easily mastered by a competent that you might expect to find on barn Copper of course changes colour
DIYer – the manufacturers all have conversions or stone buildings. over time to eventually achieve a
concise installation guides. But note There is a current trend to install lime-green patina, which will suit
that whilst it is a relatively easy task guttering and downpipes together some properties better than others.
to do from scaffolding, it can be a with plastic fascias and soffits: it Copper is also used with chain
very dangerous and difficult thing to makes sense, as the work takes place pipes, an interesting technique that
undertake using just a ladder. Also in the same locations. There are does away with the conventional
you need to pay attention to the businesses such as Floplast which enclosed downpipe and allows the
brackets used to hold the gutters and produce all the necessary fittings – i.e. rainwater to run down a chain to the
downpipes in place. rainwater gear and fascias. ground - only to be recommended

164 13th EDITION l HOUSEBUILDER’S BIBLE


SUPERSTRUCTURE

when you have a good overhang on RAINWATER AND ROOF EDGE: Key Rates
your eaves. Labour £22 hr
Aluminium and plastic-coated Fix Fascia Boards 15 min/m
steel are also used. Aluminium now Fix Soffit Board 30 min/m
tends to be the province of specialist Fix Bargeboards 30 min/m
suppliers who provide seamless Fix Cappings 15 min/m
welding. Both these systems are Fix Rainwater Goods 30 min/m
available in a wide range of colours Materials
and promise many years’ maintenance upvc Rainwater £15 m
free service. Aluminium Rainwater Gear £30 m
upvc Fascias and Soffits £8 m
Timber Box Fascias/Soffits/Bargeboards £6 m
Stainless steel cappings for timber £8 m
RAINWATER HARVESTING
There is no reason to stop you putting Key Rates per Lin. M
some of this mildly acidic rainwater Time in
to good use before pouring it all away. Mats Mins Labour Total
Many people will be interested in Timber Fascias & Soffits £6 45 £ 17 £ 23
building-in rainwater butts and these Timber Bargeboards £6 30 £ 11 £ 17
can be made much more useful and uPVC Fascias & Soffits £8 45 £ 22 £ 30
more productive if they are designed uPVC Rainwater Gear £ 15 30 £ 11 £ 26
in from the beginning. For around Metal Rainwater Gear £ 30 30 £ 11 £ 41
£10, you can add a rain diverter to Stainless steel cappings £8 15 £6 £ 14
your downpipes, which will not only MODEL HOUSE: Costs for
redirect your rain into a tank but is Fascias, Soffits and Rainwater Gear
also intelligent enough to know when m Rate Materials Labour Combined
the tank is full and then redirect the Fascias + Soffits 26 £ 23 £ 160 £ 440 £ 600
rain back down the downpipe. Bargeboards 18 £ 17 £ 100 £ 310 £ 410
If you want to use the rainwater for Guttering & Downpipes 48 £ 26 £ 720 £ 530 £ 1,250
domestic purposes, you are talking Rounded Total £ 1,000 £ 1,300 £ 2,300
more serious underground storage
tanks and pumps. A full rainwater
harvesting system is expensive to
install and needs to be maintained.
There is more detail on this and on
grey water recycling in Chapter 14,
Green Issues.

HOUSEBUILDER’S BIBLE l 13th EDITION 165


Chapter 8

HEATING & PLUMBING


ON HEAT
Deciding on a heating system is
8
make it any easier to know what that
system might be. There’s nothing for
it but to start at the beginning. A
our houses) leak heat and this leaked
heat must be replaced, which we do
by eating. Calories are just another
one of the biggest bugbears facing little background on the physics of measurement of energy. The colder it
a would-be housebuilder. And heat will improve your understanding is outside our bodies and our houses,
it’s getting ever more complex, as of all the areas discussed. Here the more heat we leak and the more
the new homes we are building answered for you are six questions energy we have to take on board.
require less and less in the way of that you’d never even think to ask.
conventional heating. It’s such a
complex field and there are so many Q1 WHAT IS HEAT? Q2 WHAT IS FEELING WARM?’
options available that it is terribly Heat is a by-product of ‘work’ going The rate at which we lose heat
easy to get swamped by the sheer on or, if you like, energy being determines how hot or cold we feel.
volume of information. It’s all very spent. Heat is most commonly ‘Feeling cold’ is a signal that we are
well saying something smarmy like found where one substance is in the losing high and potentially dangerous
‘You should choose the system that process of breaking down into its amounts of heat; ‘feeling warm’
suits you best’ but that doesn’t actually constituent parts. Our bodies (like signals that all is OK.

166 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

Q3 WHAT DETERMINES HOW – i.e. you feel warm very quickly – of the steam engine. We seem to
WARM WE FEEL? but it can also be rather unpleasant, routinely refer to watts or kilowatts
n The insulating capability (U value) of drying the throat and watering the with a lower case w, but when it’s
our clothes (or duvets, or houses) eyes – think of the fan heaters in cars. written shorthand it becomes kWh.
n The temperature of the surrounding In contrast, radiant heat you hardly To make it even more complex,
air notice. We experience it from things there are other units used for energy
n Wind speed (wind chill factor) like underfloor heating systems, measurements and one you frequently
n Level of water vapour around night storage radiators and Agas. come across is the British Thermal
n Whether our skin is wet or dry Despite their name, radiators deliver Unit or BTU which, as you might
n How much heat is being ‘given a mix of all three forms of heat. The guess is imperial. The Americans still
off ’ (radiated) by surrounding objects air convects through them, they are use it. What many people don’t realise
(including the sun). hot to touch (conduction) and you is that the BTU is a measurement of
When assessing heating systems, are aware of their warmth if you sit energy rather than power so it’s the
we use air temperature as the main nearby (radiation). equivalent of a kilowatt hour, not the
indicator of background comfort kilowatt. If you want to know the
but it is important to be aware that Q5 SO WHAT’S THE PERFECT power output of a boiler, you need to
air temperature is just one of several HEATING SYSTEM? divide by hours. Thus:
factors at play. Anyone who has ever I haven’t really been much help here, 1W = 3.41 BTU/h
had a thermostatic control dial in have I? You just need to understand 1kW = 3,410 BTU/h
their home will be well aware that that you must make a series of
what’s warm on a dry day can be 2° or compromises and your aim is to make
3°C too cold on a wet or a windy day. the least bad compromise.
STANDARD HEATING
Q4 HOW DOES HEAT MOVE? Q6 SO WATTS IT ALL ABOUT? All this theory is fine but how well
Heat transfers via three different Finally a word about how we measure does a central heating system stack
methods: conduction, convection and power output, because I know up? The ‘wet’ central heating system
radiation. Conduction is the passage people find it confusing, not least described below was pretty much
of heat through a solid – the classic because there are different systems standard in British housing between
example is the poker placed in the of measurement in operation. By far 1970 and fairly recently, both for
open fire that soon gets too hot to the easiest one to plump for in the newbuilds and refurbishments. It may
hold. Convection is what happens UK today is the watt (W) and its big now be under threat from several
to heat when it transfers into a gas brother the kilowatt (kW) which is new fangled systems, but most people
(typically air) – it rises. Radiant heat 1,000 watts. These are measurements would still think of it as the norm. It
is the glow you feel on your face of power, rather than energy used. If remains a good place to begin.
when you are standing near a bonfire; you want a measurement of actual
the air temperature may be minus energy used, you need to express it HEAT LOSS CALCULATION
10° C but you feel as warm as toast. as so much power per hour, which You start with a little maths. First
We don’t often feel conducted heat we routinely call the kilowatt hour or you need to know the heating
but most heating systems deliver a kWh. requirement for the house as a whole.
mixture of the other two, convection Why the capital W in the middle The plumber or heating engineer
and radiation. of kWh? It’s a strange convention usually carries this task out on a
Convected heat (or warm air) is to do with the watt being a unit room-by-room basis, working on
characterised by being very responsive attributed to James Watt, inventor the size of the room, the number of

HOUSEBUILDER’S BIBLE l 13th EDITION 167


Chapter 8

HEATING: Key Materials Prices


demand from radiators. But the heat
loss calcs are still useful in assessing
Gas Combi Boiler + Flue £ 850
radiator sizes (or for that matter
Gas System Boiler + Flue £ 900
any other type of heat delivery like
Oil Condensing Boiler + Flue £ 1,500
170lt Mains Pressure Cylinder £ 750
underfloor heating).
Primaries/Valves/Pumps £ 500
Radiator and Pipework £ 120 BOILER
Heating Controls/wiring £ 200 The boiler is fitted preferably against
TRVs £ 15 an outside wall and the exhaust gases
Room Thermostats £ 60 are ducted horizontally outside, by
Kilma UFH Electric Heat Mats £ 20 /m2 way of a balanced flue. The boiler
UFH Pipe inc Manifolds & thermostats £ 35 /m2 heats water passing through it and
Bunded Oil Tank £ 1,000 this water is then pumped through
Plumbers rates £ 40 /hr Cost the primaries (large copper pipes) and
thence to the cylinder and radiators.
Fit Boiler + Balanced Flue 12 hr £ 480
Or, if it’s a combi boiler, directly
Fit Cylinder 8 hr £ 320
around the pipes without going
Fit Tanks in Loft 8 hr £ 320
Run Cold to Loft 4 hr £ 160
through a cylinder of any sort.
Connect Primary Pipework 8 hr £ 320
Fix one radiator 1 hr £ 40 CYLINDER
Pipe radiator 1 hr £ 40 Placed in the airing cupboard, this
Fit Whole House Heating Controls 6 hr £ 240 acts like a giant (bath-sized) kettle
Fit Individual Room Stats 2 hr £ 80 for heating domestic hot water
Commission System 8 hr £ 320 (DHW). It starts to empty every
Place and Plumb-in Oil Tank 6 hr £ 240 time a hot tap is turned on; it is (or
Lay underfloor heating/m 2 24 mins/m 2 £ 16 was) simultaneously filled from a tank
of cold water in the loft space which,
MODEL HOUSE Heating Costs in turn, is filled from the water main.
Labour
The cylinder is indirect which means
Materials Hours @ £40/hr Combined
that the water inside it never passes
Gas Boiler and Flues £ 850 12 £ 480 £ 1,300
14 Rads £ 1,890 28 £ 1,120 £ 3,000
directly through the boiler but rather
Mains Pressure Cylinder £ 750 8 £ 320 £ 1,100 gets heated at one stage removed
Controls £ 260 6 £ 240 £ 500 by the boiler water passing through
Primaries (pipework) £ 500 16 £ 640 £ 1,100 copper loops inside the cylinder.
Commission System 8 £ 320 £ 300 In recent years, almost everyone
Rounded Totals £ 4,300 78 £ 3,100 £ 7,400 has moved over to pressurised
cylinders which don’t require any loft
outside walls and the insulation levels As insulation levels have risen over plumbing.
of the house. The results are used to the years, space heating demand
assess the size of the radiators. The has fallen, so the critical factor in RADIATORS
boiler is then sized-up by adding deciding boiler size in new homes is These are fitted and connected by
together all the radiator outputs now delivery of adequate quantities two copper pipe circuits: one – the
and adding ‘a bit.’ At least in theory. of hot water to the taps rather than flow – takes the hot water from the

168 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

boiler around the circuit, the other THE FABRIC EFFECT RENEWABLE HEAT INCENTIVE
– the return – takes the cooler water One of the most important things This is a subsidy scheme designed
coming out of the radiators back to determining your choice of heating to encourage low carbon heating
the boiler. A small plastic tank (feed system is the energy efficiency of systems, in particular heat pumps,
and expansion tank) is placed in the the structure you are trying to heat. biomass and solar thermal water
loft which gives the hot water in The more clothes you wrap around heating. It operates in England,
the circuit space to expand – which the building, the less heat is required Scotland and Wales and is
it does as it gets hotter. Again, the to keep it warm, so the smaller and administered by OFGEM. It also
need for loft plumbing has largely cheaper your heating system needs operates (slightly differently) in
been removed by the switchover to to be. N.Ireland but there it is better known
mains pressure systems, but let’s not At the extreme end of things – and as the subject of scandal.
get ahead of ourselves. More on these here we are talking about the most The fine details are to be found on
later. exacting energy efficiency standards OFGEM’s website but the first place
around, such as PassivHaus – you to look for information is the excellent
CONTROLS can get by without a conventional YouGen website (www.yougen.co.uk)
The system is electrically pumped heating system because 90% of which puts the latest background
to supply even heat around the what you require comes from information out there to the public
house. There is a programmer and a incidental sources; that is people, pets, together with an overview of who is
thermostat which turn the system appliances and lights. eligible and who isn’t, and what the
on/off and also switch motorised But don’t be sucked into thinking current tariffs are. The OFGEM site is
valves so that the hot water pumped you can build a house without any where you make the application.
from the boiler can be switched heating. If you go away for a few The subsidies as of 2019 are set to
between heating the water in the days in winter, there will be no last for seven years and stand at the
cylinder or circulating around the incidental heat to keep the structure following amounts per kWh:
radiators. The radiators may also warm in your absence and it really n• air source heat pumps 10.5p
have their own thermostatic valves, will feel cold on your return. You n• ground source heat pumps 20.4p
or TRVs. need to have some method in place to n• biomass boilers 6.7p
provide space heating, however little n• solar thermal heating 20.6p
LABOUR CONTENT you use it. Why the difference? Why not just
In a new four-bedroom house, the offer the same subsidies and let the
pipework and control cabling will WHY DO ANYTHING ELSE? market decide which technology
be ‘first fixed’ in three to four days; This home heating system still works is best? Here it gets quite complex
first fixing needs to take place after pretty well for houses that are on the because each technology is different.
the structure is up but before the mains gas grid. But if you do not live The installation costs are hugely
plastering starts. The ‘second fix’ or plan to build where mains gas is different — think maybe £5,000
(including hanging radiators) will available, the whole issue of home for solar panels and maybe £15,000
take five to six days. Conventionally, heating becomes a lot more complex. plus for a ground source heat pump
the heating engineer also fits the Traditionally, people switched to — and the capabilities also vary
sanitaryware, does the kitchen oil but oil-fired central heating has considerably. For instance, you
plumbing and the above ground become more expensive to run over couldn’t hope to heat a house using
waste runs, and all this work tends to the years and there are now green- only solar panels.
get lumped into one quotation and tinged incentives to try and persuade What the subsidies are attempting
carried out together. everyone to switch to something else. to do is to cover the added costs of

HOUSEBUILDER’S BIBLE l 13th EDITION 169


Chapter 8

installing these systems instead of, LPG frequently buying co-operatives in


typically, oil-fired boilers which tend Liquid Petroleum Gas is used by place, which can slightly soften the
to be what is being replaced here. But gasoholics who live away from the impact of the bills. Note that there
the government has chosen to make main gas grid. Its big drawbacks are is usually a significant seasonal price
the payments spread out over seven that it has to be delivered by road on fluctuation, and having a tank large
years, rather than just making a one- a tanker and it has to be stored on enough to allow buying once a year
off payment. site in a bloody great gas tank, though should lower your fuel bills.
More on the logic or otherwise these can be buried underground Oil-fired systems still account for
of these renewable technologies for a considerable extra expense. The around 10% of the home heating
later. But bear in mind that you are storage tank needs to be 3m from any market, and were — until the advent
not forbidden from using the old buildings or boundaries so there are of the Renewable Heat Incentive
technologies and it’s worth having an comparatively few sites that it is suited — much the most popular choice in
understanding of what they are. to. rural areas where mains gas is not an
Calor Gas is the biggest supplier option.
and they take on full responsibility Oil boiler prices are 20-50% more
for installation and maintenance of than gas equivalents, though this
WHICH FUEL? tanks. They usually charge around is partly because they use the more
MAINS GAS £300 to install a tank: this includes efficient pressure jet burner. Oil
Piped gas is currently available to pipe laying to the boiler. Note that cannot be used to cook with (unless
around 85% of UK households, alternative suppliers such as Shell using an oil-fired range).
which includes almost all urban areas. sometimes supply tanks for free but Storage tanks are now all plastic
A quick look at the comparative fuel you are then bound to use them as and you have a choice of double
costs table will show it’s still very suppliers. or single skin. Go for double; they
much the cheapest option. However, Despite having a tiny fraction of are much simpler, although more
large tracts of rural Britain and the market, LPG versions of many expensive. You can make a single skin
Ireland are deemed too remote to gas boilers are available, though tank into a double one if you build a
justify laying gas mains and most of usually at a 10 - 15% premium. masonry bund around it, but it’s best
these areas will never have the option Note that LPG can also be used for avoided. At the moment you may
of a piped gas supply. Have a look at cooking be required to have a double skin or
the website nongasmap.org.uk ; very bunded tank if there is a danger that
helpful in this respect. Sometimes an OIL your heating oil would spill out into
initial enquiry will trigger the offer to The most common domestic heating a watercourse. Single skin tanks start
extend a gas main along a side road. oil is known correctly as 28-second at around £400, double skinned ones
Gas has other advantages. You can burning oil, almost identical to are roughly twice the price so that
cook with it for starters. Gas boilers kerosene used by commercial a 2500lt bunded tank costs around
are so commonplace that the market airliners. Like LPG, it has to be £900. Other costs you may have to
for them is very competitive so prices delivered to and stored on site but take into consideration are supporting
for new or replacement boilers is unlike LPG there are numerous piers, initial placement, measuring
very keen. And environmentally, it’s players in this market which keeps gauge, filter, fire check valve and
relatively clean. Not only is the CO2 the prices competitive — you don’t microbore connection to boiler, in all
content much lower than it is for oil have to be tied into one supplier. maybe an additional £300.
or coal, it’s also got less in the way of Indeed, every rural district has a Recent upgrading of the
toxic particles released when burning. choice of suppliers and there are regulations means that ideally an

170 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

oil tank should be placed 1.8m


from the house and 760mm from FUEL COSTS 2019
a boundary, although if you build COST ANNUAL
STREET COST CONVERSION /kWh TARIFFS
a reasonably fireproof structure
Electricity (St Rate) 16p/unit none 16.0 p £ 85
these distances can be relaxed.
Electricity (off peak) 6p/unit none 6.0 p £0
Oil tanks are also ugly and their
Mains Gas 5p/unit none 4.6 p £ 85
careless siting can spoil an otherwise
LPG (Calor Gas) 45p/lt Divide by 7.6 6.6 p £ 120
attractive elevation. They can be OIL (28-second) 55p/lt Divide by 9.8 6.0 p £0
buried underground (like a petrol Wood pellets £300/tonne Divide by 5300 5.6 p £0
station) but the cost here soars. Smokeless Coal £460/tonne Divide by 6700 6.8 p £0
Camouflaging with trellis and ALL FIGURES INCLUDE VAT at 5%
climbers is a cheaper option and Figures from Nottingham Energy Partnership
allows access for tank replacement.
FUEL: Effective Costs Compared
Appliance
SOLID FUEL/BIOMASS Fuel or Boiler
Cost/kWh efficiency Effective Cost
This all-embracing term includes just ELECTRICITY
about everything you can burn which Daytime Peak Rate 16.0 p 100% 16.0 p
isn’t a liquid (oil) or a gas. In the 20th Heat Pump CoP of 4 16.0 p 400% 4.0 p
century, this list would have included Heat Pump CoP of 3 16.0 p 300% 5.3 p
a range of coals and coal derivatives Heat Pump CoP of 2 16.0 p 200% 8.0 p
like anthracite but hardly anyone is MAINS GAS
burning such polluting fuels anymore, Elderly Cast Iron Boiler 4.6 p 60% 7.7 p
at least certainly no one is installing Condensing Boiler 4.6 p 90% 5.1 p
new coal burning stoves. Today we LPG
are looking at biofuels, which refers Elderly Cast Iron Boiler 6.6 p 60% 11.0 p
to fuels that are derived from wood Condensing Boiler 6.6 p 90% 7.3 p
or fast growing plants. In particular, OIL
there is a growing interest in pellet Elderly Cast Iron Boiler 6.0 p 70% 8.6 p
Condensing Boiler 6.0 p 90% 6.7 p
fuels, which are made of wood
SOLID FUEL
compressed to have similar energy
Wood Pellet 5.6 p 85% 6.6 p
value to heating oil. If you plan to use
Coal Fired Boiler 6.8 p 75% 9.1 p
wood or one of the biofuels, then it is
ALL FIGURES INCLUDE VAT at 5%
important to build somewhere dry to
store it; this takes space but can be an pellet boilers
all linked to 8b are quite capable of and pellet prices. Generally they have
attractive feature in its own right. meeting all the heat and hot water tended to track oil prices, but as the
Biomass heating systems are requirements of a large house. renewable heat subsidies progress
available as kitchen ranges, living Transport costs are a big issue here and huge power stations convert to
room stoves or utility room boilers. because it doesn’t make sense to ship biomass, as is happening at Drax,
Wood-burning stoves struggle to wood long distances just for burning. then there are fears that biomass
generate enough heat for domestic So either buy wood locally or look at prices will rise.
hot water and wet heating systems pellets, which are compressed wood.
combined, but appliances like Note, there are worries about wood

HOUSEBUILDER’S BIBLE l 13th EDITION 171


Chapter 8

Comparative Heating Costs

£30,000 ALL ELECTRIC HEATING

LPG CONDENSING BOILER

OIL FIRED CONDENSING BOILER


£25,000
GROUND SOURCE HEAT PUMP

GAS CONDENSING BOILER

£20,000 PELLET BOILER

£15,000

This graph attempts to show


£10,000 how the various heating
options work out financially by
comparing capital costs with
£5,000 running costs. The Renewable
Heat Incentive skews the
calculations: the capital costs
are the same but the running
costs are paid back to you by
the government over 7 years.
s

s
n

ar

ar

ar

ar
io

ye

ye

ye

ye
at
all

r5

0
r1

r1

r2
st

te
In

te

te

te
af

af

af

af

ELECTRICITY
It’s not everybody’s first thought for Installation to a new site is rarely Heat pump suppliers have routines
space heating and domestic hot water, very expensive, unless the site is for getting around this issue (which
but it may well be the future. This extremely isolated. As it’s going to be are also likely to cost a little extra) so
is because we are developing ways on site in any event, the only added it’s good to be talking to specialists
of creating electricity (windpower consideration is whether you need at an early stage to work out what is
and PV) and ways of using it wisely a three-phase supply. This is only best at your site.
(heat pumps and ventilation systems). likely if you have a big house which
Plus we are now developing homes requires a big heat pump. How much SOLAR POWER SOURCES
(Passivhaus) which need so much extra does a three-phase supply cost? Solar power comes in two distinct
less energy to keep warm that It’s hard to be even indicative here flavours, as you are doubtless aware.
many of our long held concerns as I hear reports that vary from £300 The main interest in the past
about “wasting electricity” are being to £15,000. It all depends on the few years has been in installing
challenged. But let’s not jump ahead. distance travelled and access issues. photovoltaic (PV) panels, because the
What are the logistics of installing Best thing is to ask for a quote from electricity generated by them used
electricity for heating? your electricity distribution company. to get large subsidies. No more. They

172 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

were axed in 2019. greater than mains gas. nuts, but everyone is entitled to
There is however an older Oil is a slightly dirtier fuel than their viewpoint. What they have
technology, the solar thermal panel, gas (acid rain wise) and produces achieved is to bring the whole topic
which heats domestic hot water around 35% more CO2 than gas. of energy production centre stage
and this is still subsidised via the Electricity is a form of converted so that now just about everyone
Renewable Heat Incentive. energy so it is much processed knows about wind turbines, solar
Whilst they can be very effective, before it enters the home. It power and fracking for gas. And
they will never do more than heat is generated in a number of everyone seems to have an opinion
your water in the summer months, so ways – by burning coal and gas about what we should or shouldn’t
solar hot water is only ever a partial and increasingly biofuels, by be doing.
solution. Using solar power is unlikely hydroelectric dams, by wind and What remains more controversial,
to save more than 10% of your overall solar power and by nuclear fission. as far as I am concerned, is the
fuel bills, whichever system you use Whatever the merits or demerits of green subsidies for biofuels. Biofuels
for your main heat source. electricity generation, much of its release just as much CO2 (and other
energy is lost in transmission along pollutants) on burning as fossil
COMPARATIVE FUEL COSTS the national grid, which adds to fuels do but because the carbon has
The accompanying table gives a its expense and reinforces its poor never been fossilized it doesn’t in
reasonable indication of where we environmental rating. Despite the theory add to the CO2 already in
stand regarding fuel costs in 2019 existence of so-called green tariffs, the atmosphere. Biofuels therefore
You not only have to look at the electricity in all forms is reckoned remain part of the open carbon
actual cost per kilowatt hour of each to produce between two and three cycle as long as trees are planted to
fuel which in itself involves a little times as much carbon dioxide per replace those that are burned. The
extra maths because liquid and solid kilowatt-hour as mains gas. The reason it’s contentious is that it
fuels are not sold by the kilowatt exact amount depends on how much takes around 60 years for the carbon
hour, but also at the efficiency of wind is blowing and how much sun to be recaptured by the newly
the heating appliance you plan to is shining and how cold it is, so it planted trees and this isn’t really a
use. Things get further complicated varies from day to day. The plan problem that can be left for 60 years.
by the Renewable Heat Incentive is to reduce the so-called carbon I think it would be far better to
which greatly favours low carbon heat intensity of electricity over the offer subsidies to people who build
sources for a limited time period. coming decades by switching away using timber, thereby using the new
from fossil-fuelled sources. buildings as a carbon sink, rather
ENVIRONMENTAL IMPACTS As an interesting aside, in earlier than burning the biofuels.
Gas is the cleanest of the fossil editions of the Bible, I used this That’s a very simplified version of
fuels in that it produces very little section to explain the basics of a very complex debate, And it won’t
sulphur dioxide or nitrous oxide (the energy production and to show sort your heating system out, will it?
acid rain gases). It’s also efficient how the future was planned to be
in that little is lost in transmission greener. In the past few years, this
from source to end-user and so its has all become rather controversial BOILERS
combustion produces comparatively with lots of commentators arguing Boilers are rated according to
little carbon dioxide, at least that we shouldn’t be doing this, the power they can produce.
compared to oil. Liquid Petroleum it’s too expensive and that fossil Manufacturers used to work in BTU
Gas is a more processed form and fuels are just fine. I happen to be (British Thermal Units) but now
results in carbon emissions 20% of the school that thinks they’re everyone seems to have adopted

HOUSEBUILDER’S BIBLE l 13th EDITION 173


Chapter 8

kilowatts (kW) which are, in truth, require a 40kW boiler to replace differently. Since a change in the
much simpler. Just remember: hot water as fast as you consume building regulations in 2005,
n 1kW = 3410 BTU/h. it. Now arguably the best way of they have all been condensing
A small application - like a one- counteracting this problem is to store boilers. Why condensing? There’s
bedroom flat – might use a 6kW hot water in a cylinder so that you an interesting bit of physics to
boiler; a large Victorian vicarage effectively buffer the demand. This understand here. Condensing boilers
would require something in excess of means you can afford to reduce the have extra large heat exchangers (or,
30kW. A new four-bedroom house boiler size. Smaller boilers are not in some designs, a second one) which
built to the latest thermal regulations only cheaper but run more efficiently. extract a much greater proportion
will need – well read on, it’s a bit Most boilers now modulate the of the usable energy from the fuel.
controversial. burner so that they can burn lean 20th century boilers burned hot and
Conventionally, boilers are sized by and green at around 6kW when quick, taking about 75% of the usable
totalling the radiator output (worked they are just being called on to do energy in the gas or oil being burned
out from the heat calculation) and the space heating, but can also ramp and dumped the rest out as exhaust
adding a bit for heating domestic hot up the power output to 24kW or gas via the flue at a high temperature
water (DHW), and then going to the even 30kW when the hot water tank (250°C).
nearest size above. This is a bit hit-or- needs filling. In theory, the higher the There was usable heat being
miss, to say the least. modulation ratio, the better, but not thrown away here but, in order to use
all agree with the theory and it is not it, the boiler had to be redesigned so
HEAT DEMAND always obvious what the modulation that the exhaust gases spent far longer
The industry standard is to design ratio is on any given boiler. Worcester inside the chamber. In fact, the flue
heating systems capable of keeping Bosch, the market leaders, certainly gets so cool that, in ideal conditions,
the house around 21°C warmer don’t make a big thing of it. If you it condenses, which in itself gives an
than the outside temperature. Now fit a decent sized cylinder (say 140 energy boost to the process. Check
in a new house, the amount of heat litres), you should be able to use out the “latent heat of condensation”
needed to keep the structure 21°C a 12kW boiler and still enjoy hot on Wikipedia if you want to know
warmer than outside is surprisingly baths — see later section on Recovery more.
small. As a rule of thumb, you need Rates. But condensation isn’t all good
no more than 14 watts/m3 of living news. Because it’s a wet process,
space. Take our four-bedroomed condensing boilers produce
model house as an example. It has a BOILER HEAT EXCHANGERS a significant plume of soggy
floor area of 160m2 which means it The old style gas and oil-fired boilers exhaust gas at around 50°C to
has a heated volume of 430m3. The used cast iron heat exchangers 60°C which can be a nuisance if
overall heating requirement is going and worked by heating up this the flue isn’t well sited, and can
to be around 6,000 Watts (14 x 430) cast-iron, which transfers the heat cause some horrible staining on
or 6kW. However, any gas or oil-fired through to the hot water. They were exterior surfaces. Condensers also
boiler fitted into this house is going characterised by being easy to install, produce a mildly acidic watery
to be much bigger than this because reliable but inefficient. The cast-iron waste which has to be collected
it has to heat the domestic hot water takes a comparatively long time to and piped away to a soil stack or
in a reasonable timespan. heat up and a correspondingly long a gulley, creating another siting
A power shower will drain heat time to cool down — hence the issue which sometimes makes it
away at a rate of 1kWh every 90 inefficiency of heat transfer. impossible to replace an existing
seconds or so, so you would actually Today’s boilers all work rather boiler with a condenser. The boilers

174 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

themselves also have to be built BOILER TYPES advantage of this is that you don’t
with non-corrosive materials (no Most suppliers now split their boilers require any loft plumbing. System
more cast-iron). You would think into one of three categories being boilers are usually specified with
all this would combine to make n Heat only (or conventional) unvented hot water cylinders.
condensers very expensive, but the n System The combi does away with the
competing boiler manufacturers n Combination (or Combi). cylinder because it heats water
have engineered their designs so What’s the difference? The instantly via an extra large or
well that a condensing boiler today conventional boiler is the most basic secondary heat exchanger. It is
is basically no more expensive than and therefore the cheapest to buy. therefore cheaper to install than a
a conventional one was in the 1990s. It just heats water passing through, conventional system.
Condensing technology isn’t whether it is used for space heating Combi boilers are now well
specific to one class of boiler: they or domestic hot water via a cylinder. established in the UK — they
can be stand-alones, combis or Controls, pumps, thermostats, account for well over 50% of all
system boilers, wall mounted or everything else is fitted separately. new boiler sales. Low flow rates
floor mounted, gas or oil-fired and The system boiler incorporates mean they are not that wonderful
even biomass. There are hundreds a few bells and whistles which for applications such as showers
of models of condensers available: mean that there is less work to but they are good choices for
you can check out models and their do elsewhere: typically a system households with erratic lifestyles,
efficiency ratings on www.boilers. boiler has a circulating pump and coming and going at all hours. The
org.uk. an expansion vessel within it. One relatively low water content heat

Plumbing Systems Compared

COMBIS SYSTEM BOILER & CYLINDER


No water storage involved at all. The cold feeds The hot water is stored in an unvented hot
all come off the mains. The hot water is heated water cylinder. The radiator circuit is heated
instantly as it passes through the combi boiler directly via the boiler.

HOUSEBUILDER’S BIBLE l 13th EDITION 175


Chapter 8

but most manufacturers add a 15-


20% premium. In a new dwelling
however, this is almost always going
to be much cheaper than building in
a conventional flue.

FAN FLUE
Popular in flats where boiler
positioning is sometimes difficult.
Specifying a fanned flue adds 20-30%
to the cost of a conventionally flued
boiler, but allows a far greater number
of positioning possibilities because
the fumes can be expelled at a much
greater distance.

FLUE POSITIONING
There are masses of regulations
This Grant oil-fired boiler is no thing of CONVENTIONAL FLUES about where you can and can’t place
beauty but it can be housed outside, This is the old-fashioned, low-tech boiler flue terminals in outside walls:
which is a boon for the smaller rural
selfbuilds that don’t have space for solution and involves releasing these are set out in building regs
such a piece of kit indoors. the exhaust fumes into some sort Part J in England. For instance, they
of vertical chimney. However, shouldn’t be less than 300mm below
conventional flues require an an opening window or under the roof
exchangers also mean they need intake of air from the outside, eaves and they shouldn’t be less than
rather more careful commissioning which must be built-in somewhere 600mm from an internal or external
by the plumber and, even so, the (i.e. you can’t just rely on drafts). In corner. Your designer should be aware
heat exchangers scale up in hard a draft-proofed new house it really of these hurdles, but every now and
water areas. Hard water scaling isn’t doesn’t make a lot of sense, unless then someone gets caught out and
a terminal problem — you can get you have a room-sealed boiler or has to reposition the boiler away
the boilers de-scaled — but it won’t fire — see the section on Wood from its preferred spot. Generally,
do any harm to fit some sort of Stoves and Chimneys late in this the regulations are not as stringent
scale-inhibiting device as well. chapter. for fan flue terminals, and fitting a
fanned flue boiler can sometimes be
FLUE CHOICES BALANCED FLUE a useful (if expensive) way around an
Where you have a boiler, you must This draws fresh, combustible air otherwise intractable siting problem.
also have some form of exhaust in through a pipe which shares
pipe to get rid of the fumes. The the same opening through which CAST IRON KITCHEN
flue, as it is known, is actually the exhaust fumes are expelled. RANGES
quite an expensive part of the kit Nowadays, this is the preferable This is an option that appeals to
and selecting the right flue is an option with gas and oil-fired boilers; many because of the intrinsic style
important step. There are currently some balanced flue versions are the and feel. The Aga is the best known,
three options. same price as conventional flues but it is basically just a huge cast

176 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

iron cooker not a whole house- examples of people fitting all singing radiators come in standard shapes
heating boiler. There are now lots of and dancing cast-iron ranges into and sizes, typically from 300mm to
range cookers out there but what we new houses only to be overwhelmed 700mm high and from 500mm to
are looking at here is a little more by the amount of heat they pump out. 3000mm long. Most manufacturers
specialised; something that cooks It’s a problem in summer especially produce three or four height options,
and provides enough hot water for when it had been hoped to use the each available in lengths which
heating and the hot taps. Rayburn is range as a cooker only and yet the increase in 100mm steps. There are
undoubtedly the best known name cooker won’t work without heating also double-panelled and finned
though there are several others, up copious amounts of hot water versions that give off more heat.
The Rayburn Heatranger series is which has nowhere to go except Roughly speaking, they produce
available as gas, oil, electric and solid around parts of the radiator system. heat in proportion to their size: the
fuel versions and can typically provide The better insulated the house, the smallest (300H x 400L) will give out
enough hot water to keep a large bigger the problem. 0.25kW, the largest, double-panelled
house warm, but is also capable of type (700H x 2000L) will give out
running on a summer setting that around 4kW. Having carried out a
reduces output to around 1kW. heat calculation for each room, you
There are limitations in using EMITTERS will be faced with a choice of shapes
ranges for all your heating ‘Emitters’ is a convenient tag to and sizes as to how that heat load can
requirements – no mains pressure use for the bits of space heating be met and here thought can be given
tanks, relatively unresponsive – but systems that deliver the heat. Go to radiator placing.
the top models now have electronic into Plumb Center and ask for an List prices are, as ever, indicative of
time and thermostatic control and emitter and they’d most likely direct where the haggling starts. Discounts
Esse even make a condensing model. you to the local psychiatrist, but if off radiators can be huge (60-
No way is this a cheap option but if I just call them radiators (rads in 70% is not uncommon with some
you have your heart set on a cast- plumber-speak) then I am ignoring manufacturers); look to pay around
iron cooker it is worth considering all the other weird and wonderful £50 for each kW of output, although
upgrading to one that does space heat emitters that exist. More on note that you will find that in practice
heating and domestic hot water those later. Conventional wet central most retailers still use BTU as the
(DHW) as well. Having said that, heating systems use rads, so we’ll start output unit. Remember 1kW = 3410
the space/DHW heating capabilities here. BTU/h. Merchants tend to have
come at a price (£600-£800) for special offers going and so it pays
which you could purchase many more RADIATORS not to be too fussy as to the make.
efficient gas- or oil-fired boilers as These are what go into most central A four-bedroomed house would use
well as more sophisticated controls. heating systems today and most perhaps 15 rads with a total output
It is also little understood that ranges readers will be all too familiar of 15kW. Piping up the rads with
are very expensive to run, whatever with them. Functional rather than 100m x 15mm copper tube, fittings,
the fuel. The gas-fired Rayburn uses elegant,there are several well-known valves would cost an additional £300
around 30,000kWh/annum (cost makes that tend to compete on price: in materials. Add in thermostatic
£1500); this is rather more than the e.g.Stelrad, Quinn (formerly Barlo), radiator valves at around £10 each
anticipated space heating costs for a Myson. Plus there are specialist and a bit extra for heated towel rails
large house and nearly twenty times companies that have sprung up, and the cost sails over £1,000.
the cost of conventional gas cooking. such as the Radiator Company and Radiators come in many different
I have also come across one or two Radiating Style. Rather like windows, shapes and sizes. If you want

HOUSEBUILDER’S BIBLE l 13th EDITION 177


Chapter 8

something different to the bog homes having well in excess of installing bog standard radiators.
standard pressed steel, then you 100 linear metres of skirting, this With an underfloor heating system,
can have it. But you will also pay makes skirting heating an expensive the floor itself becomes the emitter
for it. Instead of paying a meagre option as a whole house solution. It’s and, so as you don’t burn your
£50 per kW output, you will be probably better suited to renovations. tootsies, the wet systems need to
paying out more than £100 and Look out for Discrete Heat. work at lower temperatures than
possibly twice as much. Zehnder ordinary wall rads. They are very
is a good place to start: this Swiss HEATED TOWEL RAILS suitable for use with condensing
radiator company doesn’t do There are hundreds of designs to boilers and heat pumps, both of
pressed steel but they do most choose from dozens of manufacturers. which work most efficiently at low
other designs: multi-column style Zehnder are still very much a top temperatures. UFH is mostly laid
(similar to the old cast iron rads), end option, but even Wickes sells under a cement screed, which is
low surface temperature rads (think 11 different designs, varying in price used as a heat reservoir (like an
nursing homes) and sleek die- from £70 to over £500. electric storage heater); this means
cast aluminium designer rads in a In fact, several radiator companies that the heat is released slowly
variety of colours, plus a range of make no distinction between heated throughout the day. It is pleasantly
very cute towel rails. All of them towel rails and ordinary radiators. draught-free and the heat stays close
well north of £100 per kW output. They are, after all, just radiators that to the floor. There are now many
Another interesting company is happen to be a slightly unusual shape. businesses offering varying levels of
Radiating Style who have been Note that you often want heated service and most can be found at the
shaping and welding all manner towel rails on when the rest of your selfbuild exhibitions.
of interesting objects into heat heating system is shut down. If this Underfloor heating is not
emitters since the 90s, turning bothers, you can opt for a dual fuel a homogeneous product:
radiators into fashion accessories. towel rail which is plumbed as a every system is different and
Traditional cast-iron radiators normal wet radiator on the heating the quotations need to be
are still around and available from system, but also has an electric deconstructed carefully to see
an increasing range of suppliers. In heating element which cuts in when whether you are comparing like
period bathrooms and the like they the central heating is off. with like. Watch out to see if
are just the ticket but they do not significant extras are included, such
come cheap. as insulation, heating controls and
mesh to attach the pipe to. Note
SKIRTING RADIATORS UNDERFLOOR HEATING that whilst UFH does away with
One increasingly popular alternative Available as either water-based radiators, you still need to find
is to fit skirting radiators. They (wet) or electric, underfloor heating somewhere to fit the manifold
vary from the functional, rather (or UFH) is now widely specified where the pipes emerge from the
institutional-looking variety to ones in the UK selfbuild market. The floor and connect up with the
that look every bit as convincing as electric systems are most frequently supply pipes. Manifolds are large
conventional skirting board. installed as mats in single rooms and ugly and are best concealed
Skirting heating delivers a more like bathrooms. Whole houses tend in a cupboard or a utility area. In
even heat than conventional radiators, to use warm water piped systems. cost terms, UFH tends to work
and yet is just as responsive. However, Overall, its market share in the UK out about £1,500-£2,500 more
costs tend to work at over £30 per is still small because it tends to be than a standard radiator system in
linear metre and with most detached rather more expensive than just a largish house, pretty similar to

178 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

There are many


using skirting heating or unusual methods of
radiators. fixing underfloor
heating pipe.
UFH UNDER TIMBER FLOORS Left: plastic
Whilst there is some debate about backing board
the suitability of UFH under timber used to keep
everything
floors – wood is regarded as an regular. Bottom:
insulating material – virtually every pipe clipped to
supplier offers it as an option. There underside of
are several methods of installing timber flooring
UFH under timber floors. Some
use aluminium plates to spread the
heat across the floor: some require
a mortar ‘pug’ to be built as an extra
layer in the floor, some use nothing
at all, the pipes being clipped to
the underside of the floor after it is
laid. Generally the aluminium plate
system is rather more expensive
than the other systems in terms of
materials supplied but the mortar
pug system requires a fair amount
of extra building work. Some
suppliers quote for installation
using alternative designs: the mortar
pug system usually appears to be
significantly cheaper but bear in
mind that it will involve other
significant construction costs.

PIPE ISSUES
People naturally fear pipe failure
with UFH. Suppliers go to great
lengths to ensure that the pipe
is up to the job, but as it is still best to specify one with an oxygen ENERGY SAVING
a relatively new technique, there barrier as this reduces the risk of Many suppliers claim that UFH is
is some justification for at least rust getting into the system. inherently energy efficient and will
being worried about it. Most warm When testing, it is now usual to save you money in the long term.
water UFH is run in PEX pipe, put the system under air pressure I have my doubts. Just because
now widely used all over Europe rather than a water test. Accidents it works at low temperatures,
and reckoned to be the safe choice. have happened when residual water compared to radiator-based systems,
An alternative is to use one of the left in the pipes after a test has later doesn’t necessarily mean it will cost
polybutylene pipes like Hep2O. It’s frozen. less to run. You are after all heating

HOUSEBUILDER’S BIBLE l 13th EDITION 179


Chapter 8

up a much larger area, using much are all heavily insulated to keep the MAINS PRESSURE HOT
more water. Furthermore, when hot water hot for longer. They are WATER
placed in a cement screed, UFH is a said to be vented because they are not These systems use unvented (i.e. no
very slow response system: it takes pressurised in any way and they have loft pipework for expansion) hot
a long time to heat up and a long to have an expansion tank to cope water cylinders which are strong
time to cool down. This in itself with expanding hot water. enough to withstand storing hot
can waste a lot of heating because In conventional systems, there are water under mains pressure. They
the house may be empty for long two tanks in the loft: one (usually answer the problem of low flow rates
periods. Arguably, UFH is therefore 227lts) feeds the cylinder, the other to showers but a cost of around £600
best suited to lifestyles where people (usually 18lts) supplies the central makes them rather more expensive
are around all day. Under timber heating system. Having to put a tank than combis. To operate to full effect
floors the response times are quicker in the loft – avoiding this is sold as a they need at least 2.5 bar of mains
but the efficiency is reduced because big plus for other systems – actually pressure and a mains flow rate of
of the insulating qualities of timber. costs around £250 for the water 35lts per minute.
Ditto when placed under thick storage tank and around £100 for Unfortunately, UK water
carpets. the feed and expansion tank (aka companies are only obliged to provide
One common route taken the Jockey Tank). I really don’t think
by selfbuilders is to run UFH anyone plumbs a new house like this
downstairs and radiators upstairs. It anymore.
makes a lot of sense because a) it’s a
bit cheaper and b) radiators are not
quite such a problem in bedrooms. INSTANTANEOUS HOT WATER
Small instantaneous hot water heaters
are still sold but in a new house
the normal way of achieving this
is by fitting a Combination Boiler
DOMESTIC HOT (or combi). So many combis are
WATER sold in the UK that they are no
The traditional system, used in more expensive than system boilers,
Britain for most of the 20th century, despite their capability of heating
and outlined at the beginning of hot water for the tap as well as
this chapter, used a copper cylinder, space heating. Because of this,
fed by a tank overhead or in the loft, combis have become the cheap and
and heated by copper tubes inside. cheerful option for new central
These tubes transfer heat from the heating installations in flats and
boiler primary circuit to the water starter homes.
in the cylinder: the domestic hot The main problem with combis
water (DHW) never passes through is that the hot water flow rates
the boiler at all and thus this way achieved tend to be a bit feeble and
of doing things is known as an you really begin to notice this when
indirect system. In the very early taking a shower. If a house has Chelmer’s thermal stores have been at
days, copper cylinders sat naked in two or more bathrooms, a combi is the cutting edge of this technology for
airing cupboards but these days they probably best avoided. many years

180 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

mains water at 1 bar pressure so the difference. If you want to stick usually hold around twice this
many situations will not benefit at with a gravity system but value a amount.
all. Phone your water company to good shower, then you will need to n A typical household of four uses
determine your local pressure. Mains fit a shower pump. There are single between 200 and 250lts of hot water
pressure hot water cylinders come impeller pumps that boost the water a day, conventionally heated to 60°C.
with a whole raft of safety features after the mixing valve, and double Officially. My experience of a household
attached and a requirement that a impellers that boost both hot and of five, including three teenagers, is that
qualified person installs them, both cold before they enter the valve. these official estimates are way out of
requirements of the building regs. There is also an increasing number line. The real amounts could easily be
of all-in-one pump and valve double these figures.
THERMAL STORES shower units. n It takes 12kWh to heat 200lts of
A variation of the unvented hot water Which you choose is partly water through 50°C (the difference
cylinder is the thermal store. Rather dependent on the layout you have. between the temperature of the cold
than using a combi boiler to heat the Prices are largely dependent on the water and the hot water) and the
water for the hot tap, the incoming power of the pump. They can be average cost of water heating (by
cold water passes through a tank of hot purchased for just over £100, but a gas or oil-fired boiler) is £250 per
water (aka the thermal store) and draws pump delivering 15lts per minute annum. Those are the official figures,
heat from this source instead. Thermal (equivalent to a reasonable mains assuming your notional family uses
stores usually work without the need pressure system) will cost £180 plus. 5,000kWh per annum on heating
for tanks in the loft; instead they come Add the costs for extra wiring and DHW. I think a more realistic figure
with integral feed and expansion tanks. fitting and you can see that a shower is 2,000kWh per person, which
For a four-bedroom house, expect pump is not a very clever option in would make it around £100-120 per
installation costs midway between a new building, where you would person in terms of cost.
using the standard route and using be quids in by starting off with n Just under half of all water
mains pressure unvented systems. a better DHW system. Leading consumed in the home is heated.
Thermal stores were first developed manufacturers: Mira, Aqualisa.
by British Gas in the 1980s and A more recent innovation for a SHOWERS AND FLOW RATES
are produced by a number of small house with a feeble water supply A good power shower needs a flow
British manufacturers, notably is the whole house shower pump rate of 15lts per minute. This will
Gledhill. They are particularly good which is a sensible option if you not be achieved by the conventional
when you want to combine different have more than one shower, as gravity-type system. A pump will
inputs; e.g. if you have a solar panel or the cost is around double that of a be required (or else feeble showers
a heat pump supplying hot water as single shower pump - look around endured).
well as a boiler. You can get thermal the £350 mark. The best place to Now our legislators take a very
stores made to order to fit your install a whole house shower pump different view. They now regard 20lt
particular application from Chelmer is close by the cylinder which makes per minute showers as an indulgence
Heating. the plumbing much simpler. and have introduced building regs
(Part G in England) to restrict
SHOWER PUMPS BACKGROUND FACTS shower flow rates. When you build a
When all is said and done, the main n A bath takes about 70-80lts of hot new house now, you have to account
reason for having mains pressure water and so water storage needs to for all the water using appliances and
hot water is to enjoy decent showers be above this level (or instantaneous) demonstrate that you won’t use more
- that’s the place you really notice to be adequate. Hot water cylinders than 125lts of water a day for each

HOUSEBUILDER’S BIBLE l 13th EDITION 181


Chapter 8

RECOVERY RATES
The time taken for cold water from
the mains to get to 60°C inside the
cylinder is referred to as the recovery
rate. This rate is dependent on the
size of the boiler or the cylinder heat
exchanger – whichever is smaller.
For instance, a typical cylinder for a
four-bedroom house needs 8kWh
of energy to heat its 140lts of water
from 10°C to 60°C; an 8kW heater
will accomplish this feat in one hour,
whereas a 16kW heater will take just
half as long.
Evacuated
In theory a 32kW heater would
tube solar
panels achieve the same feat in 15 minutes,
are more but in practice this would not happen
expensive unless the boiler was also rated at
than flat plate 32kW, which is unlikely. Here the
collectors, but boiler size becomes the limiting
give better
factor in the recovery rate. Unlike
performance
under cloudy boilers, cylinders are not advertised
skies by the size of their heat exchangers;
however, some manufacturers sell a
‘standard’ version which takes about
one hour to heat up and a ‘quick
person in the household. Whereas Aqualisa produce some showers that recovery’ version which takes 20
kitchen sinks, loos and washing have an eco setting. minutes. The latter simply have larger
machines have a marginal effect on The problem is that unvented hot heat exchangers.
overall volume usage, shower volumes water systems are set to deliver power
are critical, and so the hunt is now on showers at 15lts or 20lts per minute.
for low-flow power showers. Which In fact, this is their chief attraction. EFFICIENCY/HEAT LOSS
is a contradiction in terms, but there What is the point of fitting one, if All new cylinders are insulated
you have it. you can’t have a high volume shower? to reduce heat loss to less than
The word is that we should be You might just as well fit a combi 3kWh of heat during a 24-hour
fitting showers of no more than 6lts boiler where the flow rate is feeble in period. Effectively, this heat loss
per minute. Whether this will really comparison. It is unlikely to be much can be ignored for six months of
satisfy today’s teenagers, I have my better than 10lts per minute. the year as it is simply transferring
doubts, but I can give you some Bear in mind that if you are heat from water to space heat;
pointers. renovating, none of this water during the summer you might
The Nordic Eco shower is a calculator malarkey applies. It only leak something like 500kWh of
possibility, and Hansgrohe have a 6lt applies to new dwellings, so you can heat. Many new cylinders (like
shower that is said to be OK. And fit what you want. the Megaflo) are encapsulated

182 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

by 50mm of polyurethane which registered with the Microgeneration


reduces heat lost over a 24hr period Certification scheme. HEATING
to under 1kWh – nothing to all CONTROLS
intents and purposes. DEAD LEGS
The hot water piping running Before the days of central heating
between the cylinder and the hot (around 1950), heating controls
water taps is effectively an extension consisted of putting (or not putting)
HOT WATER SOLAR PANELS to the cylinder; water sitting there coal on the fire or, at best, an on/off
A 2-3m2 roof mounted collector is loses its heat very quickly. switch on an electric heater. Here
capable of producing 3,000kWh of An efficiently designed installation is an industry that has grown at a
hot water for your cylinder during would have around 5lts of water prodigious rate and there is now a
the course of a year, that’s maybe sitting in the hot pipes. This may bewildering range of options open to
equivalent to 500 five minute hot sound insignificant, but bear in mind the householder. Yet the purpose of
showers for free, albeit between the that every time a hot tap is opened controls is quite simple:
months of April and October. The some of this water is replaced and so n to increase comfort
more hot water you use, the better if every hot tap is turned on just three n to decrease fuel consumption
the payback on solar panels. times a day, then 15lts of extra hot n safety.
The annual savings are unlikely to water has to be heated. This section concentrates on
be enormous but subsidies available An inefficient design with much wet heating systems; other heating
via the Renewable Heat Incentive longer dead legs – i.e. bathrooms and systems (warm air, electric, solid fuel)
can make solar thermal a mildly kitchen all at opposite ends of the tend to have slightly different control
attractive investment. house - might use four or five times systems, although the logic behind
Note that to get effective use out the length of hot water pipe. Not them all remains the same.
of solar hot water panels, you need only does the cost of supplying hot
to have a large cylinder or thermal water to the dead legs then become PROGRAMMERS
store, preferably around 50lts per significant but also you start getting Timers to the layman. These are
person. The panels tend to produce 20-30 second lags between opening basically the on/off switch for the
about 3kW heat at full whack so the hot tap and getting hot water. whole heating system and, as such,
they require four or five hours to Avoid long dead legs if possible. override all the other controls (except
replenish a 200lt cylinder from There is a way around this safety features like frost thermostats).
cold: not quick, but fine if you have problem which is to create a Digital display has brought big
adequate capacity. pumped hot water loop around the improvements to programmers and
The standard routine is to let the house so that there is always hot now for little more than £30 you can
solar panels do their work during water at each hot tap. get separate controls for hot water
daylight hours and then top up the However you have the added heating and space heating which
heat in the cylinder from your boiler cost of installing and running you can switch on and off 21 times a
during the night. a circulation pump and, to be week.
You can get more information effective, you have to insulate the Heating programmers have a
and possible supplier details from hot water pipes to a high standard reputation for being really fiddly to
the Solar Trade Association website. otherwise you will gain very little. set and many people just leave them
Note that if you do want to get any For some, a hot water loop is just on the factory presets which rather
subsidy, you will have to ensure that something else to go wrong at some defeats the purpose of having them
both the kit and the installers are point in the future. in the first place. Many intrepid

HOUSEBUILDER’S BIBLE l 13th EDITION 183


Chapter 8

souls have started out to match their – e.g. boilers in garages or other in a predictable way. Zoning more
heating system to their lifestyle, unheated spaces. It can of course complex than upstairs/downstairs is
only to give up in frustration. take precedence over a timer which possible, but would probably involve
Plumbers just love being called back says the system should be off. Alone longer and less efficient pipe runs
to find out why the heating isn’t amongst the family of stats, the frost which would tend to cancel out any
coming on, only to find that you’ve stat turns the system on rather than advantage.
been messing around with the off and consequently malfunctioning
programmer. frost stats can be expensive to run and MOTORISED ZONE VALVES
Despite this, a basic electronic difficult to pinpoint. These are what the programmer
programmer is now considered an operates; they are used to switch the
absolutely essential component of PROGRAMMABLE flow of hot water around different
a central heating system. Digital THERMOSTATS parts (or zones) of the system. The
displays are now almost universal, These combine the functions of cheapest systems use a 3-port valve
although it hasn’t made them easier the ordinary programmer (time but it is better to use two 2-port
to use than the older ones with plastic switching) with that of the room valves. The simplest valves switch
knobs. stat (temperature switching). They all water either this way or that and
also allow you to pre-select different therefore give rise to something called
THERMOSTATS temperature maxima for different hot water priority, which means that
Known by plumbers as just stats, times of day: very clever but even the hot water stops being pumped
these provide a secondary level less user-friendly than the ordinary around the radiators when the
of on/off switching, controlled by electronic programmers. A potential domestic hot water is being heated
temperature. This means that if the energy saver and a potential comfort in the cylinder. There are more costly
air or water temperature is higher increaser and no more expensive valves that are capable of opening in
than the thermostat setting, these than a programmer and room stat a middle position which allows a flow
controls will switch the heating separately. Whereas ordinary time- of hot water both ways.
system off, even though the timer only programmers can be placed A standard set of heating controls
says ‘run’. anywhere that’s convenient, once you (excluding TRVs) for a four-bedroom
Thermostats come in several introduce a thermostat you have to house would cost around £200. These
different flavours. Room stats will cut think very carefully about its location controls are often sold in packages
off hot water to radiators when the and which temperatures it will be which usually include a pump,
set temperature is reached. Placing measuring. motorised valve, a programmer, a
them requires care. Cylinder stats do room stat and a cylinder stat. Note
much the same for the hot water TWO-ZONE HEATING that wiring must be provided between
cylinder. Some are integral with the SYSTEMS all these components.
cylinder, some are strapped onto An energy saving idea which splits
the outside. the space heating into two heating TRVS
Boiler stats are usually integral with zones – typically upstairs/downstairs Thermostatic radiator valves (TRVs)
the boiler; these set the temperature of – in addition to heating the hot are apparently simple little gizmos
water passing through the boiler, which water. It involves using a three-zone fitted on to the bottom of radiators
is the hottest part of the system. programmer such as the Horstmann that can sense the air temperature
Frost stats are a safety device which Channel Plus. Again, the benefits and switch off supply to the radiator
turns the heating on if there is a very much depend on lifestyle – i.e. when satisfied. They are cheap, they
danger of any components freezing whether you really use your house increase comfort levels by stopping

184 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

overheating and they reduce fuel bills. in conjunction with a whole house that. And it turns out that Nest is not
They are now fitted as standard on thermostat (see above) which can alone.
new radiators. override the individual TRVs. This is All the new systems are based
What’s not to like? Well, there known as having a boiler interlock. It around replacing your existing
have been problems with the takes a bit of getting used to, as you heating controls with a new box of
operation of TRVs. Many people don’t want the whole heating system tricks which can be controlled by an
do not understand the principle to shut down when some rooms are app “from anywhere in the world”
of thermostatic control and, when warm and others are cold, but if it’s and which is either wired up to your
feeling cold and seeing a dial, turn set up right (the positioning of the boiler and heating system, or uses a
the TRVs to ‘Max’, thinking this whole house stat is critical), then it wireless system to do the same thing.
will make the radiators hotter. It really does save a lot of energy by As your existing controls are already
won’t. It simply turns the radiator preventing the boiler from working wired together, it’s easy to replace
‘On’ at a lower room temperature. its socks off when no heating is them with something new without
Radiators are either ‘on’ or ‘off ’. required. having to run extra cabling. Pricewise,
Furthermore, because they require the various offerings all seem to come
manual operation, there is no way WEATHER COMPENSATION in between £200 and £250 though
of knowing (other than learning Perhaps the most sophisticated of note that some include installation
from experience) how high to set all the domestic heating controls, and some don’t.
them to achieve comfortable space weather compensation introduces an British Gas Hive Active Heating
heating in any given room – though external thermometer which controls is one of the simpler systems. It
note that the latest versions allow the output temperature of the boiler. essentially replaces your existing
you to limit the highest/lowest If the external temperatures drop, heating controls with its own versions
settings. the boiler output increases, and vice which you can then either control
Another problem with TRVs is that versa. The kit is not cheap - costing remotely or conventionally. In this
they are prone to sticking (usually in maybe an extra £150 or £200 - and respect, it’s one of the least smart of
the off position) and many people have the claimed-for savings are disputed the applications.
reported radiators not working at all at by some. In theory it should make Nest offer a facility to switch your
the beginning of the heating season. I it cheaper to run boilers, especially heating on and off automatically
know of someone who took all their condensing boilers which get by linking it to your mobile, which
TRVs off because they appeared an efficiency boost if the return knows where you are, a feature
to stop the radiators working at all. temperature falls below 55°C and the referred to as Occupancy Detection.
Sticking TRVs are often a symptom boiler actually starts condensing. Tado is a German business that
of having dirty water in the system: if does everything that Nest does
it happens to you, you should get the HEATING CONTROLS 2.0 without the Apple-like style, but is
system flushed and add some corrosion In 2014, a number of digital whole compatible with other manufacturers’
inhibitor. house heating controls became products.
Fitting TRVs does reduce the widely available. Whilst people
demand on the boiler because, have been beavering away at this UNDERFLOOR SYSTEMS
although they won’t turn the boiler area for years, no one had paid Underfloor heating is usually controlled
off, every radiator that turns itself much attention to it until Google by wall mounted thermostat, one for
off reduces the demand on the forked out $3billion for a company each zone which roughly translates as
boiler. But a better way of doing called Nest which makes a learning each room (depends on your layout). If
this is to have your TRVs working thermostat, a neat looking one at you build a really well insulated house

HOUSEBUILDER’S BIBLE l 13th EDITION 185


Chapter 8

(why wouldn’t you?), you can pretty smaller volume of water at higher CoPs throughout the year.
much do away with other controls temperatures inside the house. There are three important elements
as you don’t really need to switch the The efficiency of a heat pump to a GSHP heating system:
system on and off according to the time system, which is what it’s all about, 1) A ground loop. This is comprised
of day, because it works by trickling is measured by the coefficient of of lengths of pipe buried in the
heat into the floor 24/7. My experience performance (CoP). This is the ratio ground, either in a borehole or
on our 2018 selfbuild confirms this of units of heat output for each a horizontal trench. The pipe is
hypothesis: although there are five unit of electricity used to drive the filled with a mixture of water and
zones, all with their own wall mounted system. Typical CoPs range from antifreeze, which is pumped round
thermostats, the only one we ever fiddle 2.5 to 4. Obviously, the higher the the pipe absorbing heat from the
with is the one in the main living room/ better. A score of 1.0 would be a ground (or a water source like a
kitchen area which is usually set to disaster, as that is what you get from stream).
19.5°C. Occasionally, when it’s wet or a straightforward electric heater or 2) A heat pump. This has three main
particularly cold, we move it up to 20°C, immersion heater. parts:
but mostly it’s set at 19.5°C all winter The critical factors determining n the evaporator – takes the heat from
long. the efficiency of the system are the water in the ground loop;
The only time we ever reset is when the performance of the heat pump n the compressor – moves the
we go away for a few days, and then itself and the input and output refrigerant round the heat pump and
we put all five zones down to 15°C. temperatures: the narrower the compresses the gaseous refrigerant to
Having the ability to turn this back to range of temperature between the temperature needed for the heat
standard setting a day before return the source and the house, the distribution circuit;
would be handy, but thus far we have more efficiently the system runs. n the condenser – gives up heat
resisted spending hundreds of pounds However, heat pumps continue to to a hot water tank that feeds the
on a Wirsbo controller and just ask a work effectively even at sub-zero distribution system.
neighbour to pop in instead. temperatures. 3) A hot water heat distribution
system, no different to a conventional
heating system. The house can use
GROUND SOURCE HEAT radiators but efficiencies are gained
PUMPS (GSHP) by switching to a low temperature
One of the key advantages of using underfloor heating system.
HEAT PUMPS the ground as a heat collector is
Heat pumps are a hybrid heat that the temperatures stay relatively
source. They are run entirely even over the course of a year. At COSTS AND PAYBACK
on electricity but they capture a one metre depth, the ground A typical 8kW system costs £10,000-
additional energy from the temperature in Britain fluctuates £12,000, plus to the price of the
external environment, most between around 5°C (in mid-winter) distribution system around the house,
commonly heat from under the and 12°C (in mid-summer); as you maybe another £3,000-£5,000. That’s
garden space (that’s ground source) go deeper still, the temperature way more expensive than a gas or
or from the air (air source) and, fluctuations disappear altogether. oil-fired boiler system, but the blow
just occasionally, from ponds Ground source heat pumps are is greatly reduced by the Renewable
or streams (water source). They therefore able to tap into this natural Heat Incentive subsidy.
grab some of this low-grade heat heat store even in the depths of Does it make sense? There are, a
and compress the energy into a winter and thereby maintain high number of variables that need to be

186 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

considered, all of which impact on


the payback equation.
n Fuel costs: essentially you are
comparing electricity costs with oil
costs and maybe biomass as well.
Mains gas is by some way the cheapest
option now and you would struggle to
justify a heat pump against mains gas
on fuel cost savings alone. But with
oil at around 50p per litre (translating
at perhaps 6p per kWh after boiler
inefficiencies are taken into account,
then you only need a CoP on your heat
pump of 2.0 to make the heat pump
win this particular race.
n Level of subsidy. In 2019 the level of
subsidy offered by the Renewable Heat
Incentive is reasonably attractive. If
all goes to plan, the added installation
Ground-source heat pumps take
costs should be covered. Paradoxically, lift required is itself dependent on the
up a considerable amount of space,
the better the house is built, the less external ground temperature, which something like the size of a tennis
you will receive in subsidy because the may vary by 10°C or more, depending court for a four-bedroomed house
less you will use the heat pump. New on ground conditions and the depth
installations have to be metered, so the the ground loop is installed.
payments will depend on your actual Which begs an important much power as others. The best of the
usage. additional question. What is the Yorkshire sample achieved a CoP of
n Demand: The work you require from achieved performance of heat 4, the worst less than 2 – only half as
your heating system is a function of the pumps? In September 2010, the efficient. Two key factors which affect
size of your house, its insulation levels, Energy Savings Trust released the this seem to be the preferred space
its airtightness and your lifestyle. By result of a survey of 83 heat pump heating temperature and the demand
reducing demand, you also reduce the installations (54 ground source and for hot water: where both these
scope for savings in running costs and 29 air source) and found very mixed are high, the CoP is significantly
hence you actually lengthen payback results. Many were achieving the reduced.
periods for all green technologies. hoped-for efficiencies (CoP higher
n Actual efficiencies: A good heat than 3.0) but an awful lot weren’t and UNDERFLOOR HEATING
pump will easily achieve its stated often the CoP went as low as 1.3 – Heat pumps are at their most
objective, which is usually to raise water remember an electric fire has a CoP efficient when delivering relatively
temperatures in the house by 35°C at a of 1.0! Another data collecting survey low temperatures, typically around
CoP of 4. Many systems will do even I am aware of took place on eight 45°C. This immediately lends itself to
better than this in CoP terms. But for separate installations in Yorkshire underfloor heating as the preferred
every 1°C extra temperature lift you and again there was a wide range delivery method, as this works well
require, the efficiency of the heat pump of outcomes with some ostensibly at these relatively low temperatures,
drops by around 3%. The temperature similar households using twice as compared with radiators.

HOUSEBUILDER’S BIBLE l 13th EDITION 187


Chapter 8

DOMESTIC HOT WATER


RENEWABLE HEAT INCENTIVE 2019 It’s important to assess your domestic
Payments per kWh from April 2019 for 7 years Monitoring Total return over 7 yrs hot water needs carefully because this
Ground source heat pumps 20.87 p/kWh To be metered £5,000-£10,000 is an area where heat pumps are not at
Air source heat pumps 10.7 p/kWh To be metered £2,500-£5000 their best. Most heat pumps are set to
Solar thermal 21.08 p/kWh Deemed £1,000-£2,000 deliver around 10kW maximum: this is
Biomass 6.87 p/kWh some checking £2,000-£5,000 easily enough to keep even a very large
house warm throughout the coldest
Source: Ofgem Note the rules keep changing!
winter snaps. It is also quite adequate
GARDEN SPACE cooling in summer. Generally to provide stored hot water for a family.
REQUIREMENTS this comes at a cost, not only in However, the recovery time taken to
If you have a large garden, it is cheap additional installation fees but replace hot water is fairly lengthy in
to lay pipework in shallow trenches, in operating efficiency as well. A comparison with typical boilers.
excavated by digger. But if garden better option is to pump some of The only situation where this
space is tight, there are alternatives the waste cold air (the fridge in is likely to be a problem is if you
available. You can drill a borehole, at reverse) into cooling units, known have heavy use of power showers,
an additional cost of around £5,000, as passive cooling. Whilst it’s not which drain the heat out of tanks at
which can accommodate all the quite as effective as reversing the between 12 and 20 litres per minute,
ground source pipework, in an area whole system, it is much less energy depending on how hot the water is
as little as 2m x 2m. hungry. stored. A heat pump could take an
hour or so to replace the hot water,
GROUND CONDITIONS ADDITIONAL HEAT SOURCES whereas a boiler, rated at 20kWh,
Trench collectors work best with You may want to harness other power would take half the time. If your hot
relatively wet soils, such as clay, sources to boost your hot water water needs were more modest, then
where there is a mechanism for supply. For instance, you may have you probably would not even notice
the heat taken from the ground a stove that can produce hot water, any difference.
to be readily replaced. In dry or you may have solar panels fitted. Again, it is an issue that can be
ground, such as sand or gravel, the Most heat pumps can accommodate addressed at the design stage. You
ground itself can eventually freeze additional heat sources but it is may be able to install booster heating
because the heat being taken out important that the whole hot water elements or a secondary hot water
isn’t replenished. This, of course, supply side is designed correctly at storage tank. But the cost, as ever, is a
doesn’t stop the heat pump working the outset. reduced overall CoP.
but low ground temperatures do
reduce the efficiency. It can be that SWIMMING POOLS NOISE AND SITING ISSUES
the heat transfer from dry ground One of the favorite applications for Heat pumps behave to all intents
falls off considerably through the heat pumps is to provide heating and purposes like refrigerators.
winter, so the best advice is always for swimming pools. It’s something Although clean – there are no
to get some sort of ground survey ideally suited to heat pumps as they emissions – they are probably best
undertaken. work at their best when delivering located in a utility room or garage
a constant trickle of heat, rather rather than in living space. Most
COOLING CAPABILITIES than a few short sharp bursts which designs work with large water tanks,
Some systems are capable of being typifies how oil and gas fired boilers often around 200 or 300lts, about
run in reverse so as to provide work. double the size of a larder fridge.

188 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

Adrian Thurley’s Cambridgeshire house, built in 2003, is constant 10°C all year around. But in fact the temperature
heated entirely by an Ice Energy heat pump. The heat pump in the garden loop has changed dramatically through the
is located in the basement; it’s connected to two 200m year, peaking at 21°C in summer and going as low as -1°C
long pipes that run under the front garden and it is capable in winter. Yet even at -1°C, the heat pump still manages to
of providing 18.5kW of heat, using less then a third of this extract 3° or 4°of heat from the pipes. For every one kilowatt
amount of electricity to do so. It heats the water up to of power used in running the system, we get between three
55°C, to be stored in a large pressurised cylinder. ‘It’s been and four kilowatts of heat out of it. That’s the magic of heat
fascinating to see it working,’ said Adrian. ‘I was led to believe pumps.’ It cost around £10,000 to install.
that it drew its heat from the ground, which remained at a

There are very few house designs variable. If it is present nearby, it can AIR SOURCE HEAT PUMPS
that couldn’t incorporate a heat often be supplied at no extra cost, Seen by some as a poor man’s heat
pump but equally its not something and the running costs are identical pump, the air source heat pump
to fit in as an afterthought. to normal single-phase supplies. But (ASHP) uses the same techniques
on some sites the cost of three-phase to pull usable heat from the air,
THREE-PHASE ELECTRICITY supply may be many thousands of rather than beneath the ground. The
Some larger units are best operated off pounds – effectively prohibitive. In immediate disadvantage is that the
a three-phase supply. The additional such cases, it is usually possible to air temperature is far more variable
cost of three-phase is extremely work around the supply restrictions. than the ground temperature and that

HOUSEBUILDER’S BIBLE l 13th EDITION 189


Chapter 8

An air source heat of hydro electricity, which is 100%


pump installed at renewable. The typical Swedish winter
the Milton Keynes throws up temperatures of –25°C.
benchmark house Even at this sort of temperature,
from Edition 9. This
heat pump is being
heat pumps keep Swedish homes
used, primarily, to comfortably above 20°C indoors and
heat the domestic also supply all domestic hot water
hot water. Note that needs. Paul Wurk, a Swedish architect
the extract from the with close connections to the British
ventilation system is selfbuild industry via his work with
located right behind
the heat pump (it’s that the Swedish House Company, is a
square grill in the wall) keen advocate of heat pumps and
so that any residual finds it hard to understand why we
heat being expelled don’t use them more often in Britain.
from the house can be ‘My 230m2 house is heated entirely by
recycled through the
electric heat pump. Although I have a
heat pump
wood-burning stove, I haven’t used it
for many years. The key to the comfort
is the insulation levels we have: my
20 year-old house has 200mm of
insulation in the walls and 300mm
in the roof and, were I to re-build
it today, I would be required to use
even more. Even so, my heat pump
consumes just 12,000kWh per annum
and I reckon my CoP is around 3.’
the ASHP unit is likely to have to do pack up altogether. However, there are
more work, which of course makes it also significant developments in the
less efficient. However, not having to technology, especially as regards water
mess around with pipework under the heating, and products like the Genvex
ground makes ASHP much cheaper Combi (£6,000 worth of whole house
to install. Furthermore, advocates of water heater fired by air source heat BIOMASS BOILERS
ASHP are moving towards solutions pump) keep appearing on my radar. Modern biomass boilers are not
that involve heating tanks of hot water designed to be focal point room
to act as energy batteries for home fires, but instead aim to replace a
heating, thus the ASHP doesn’t have domestic gas or oil-fired boiler in a
to work continuously. A SWEDISH PERSPECTIVE utility space. Many of them are also
There have been many problems Heat pumps are regarded as the designed to automate the delivery
associated with ASHP. Not least that standard way of heating homes in of fuel, none more so than the wood
in very cold weather, air source heat Sweden, and have been used widely pellet boilers which can be set up
pumps either work so inefficiently for 30 years. Partly this is because to take fuel from a hopper without
that you would do better with an Sweden has very little fossil fuel and human intervention.
electric immersion heater, or they partly because it has good supplies Biomass boilers can run on

190 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

logs, but are more often set up to introducing extra heating into a space
burn wood chips or wood pellets, SUPPLEMENTARY that is already adequately heated.
which are compressed wood HEATING What are the options?
shavings, enabling long distance The very essence of central
transportation as a fuel to rival oil. heating is that you don’t require OPEN FIRES
In contrast, log burning only really anything else to keep you warm. Open fires are particularly
makes economic sense if the fuel is Once your boiler or heat pump has challenging in modern homes
sourced very locally. Wood pellets fired up, every room in the house because in recent years there has been
are a common form of domestic fuel is designed to reach a comfortable much greater emphasis on energy
in some countries (notably Austria temperature within an hour or two. efficiency and airtightness, which
and Sweden) and are now becoming If you have underfloor heating, the makes the installation and operation
widely available across the UK. house stays warm throughout the of a traditional open fire problematic.
Unlike stoves, boilers are winter whilst you are barely aware There are three conflicting
designed primarily to heat water, you have a heating system at all. requirements at work here:
either for space heating or domestic And yet selfbuilders still yearn for n energy efficiency demands
hot water. They are functional something more, something a little that warm air inside the house
rather than elegant, although many different, something a little bit less isn’t allowed to seep out through
models exist which blur these sterile and more social. unwarranted holes in the fabric (like
boundaries and would happily sit in In short, a fire. The problem is that open chimneys!)
a living room. it’s technically challenging to start n ventilation requirements demand

COSTS
Whereas you can buy wood burning
stoves for between £600 and £3,000,
biomass boilers tend to be very
much more expensive: expect to
pay anything between £4,000 and
£12,000 for a top of the range,
automatic feed boiler.
The Renewable Heat Incentive
used to pay handsomely for installing
a biomass boiler but it seems to be
going out of fashion — not helped
by a scandal with the N.Irish version
Biomass boilers are
which paid people for burning very different to the
unlimited amounts of biomass in familiar wood stoves.
empty sheds. As of 2019, the RHI Rather than loading logs
stands at 6.87p/kWh, paid out for on manually, you burn
seven years. This should amount to wood pellets which can
be loaded automatically.
an overall subsidy anywhere between
Here is an example
£2,000 and £5,000, depending on the using a hopper which
amount burned . you would fill daily.

HOUSEBUILDER’S BIBLE l 13th EDITION 191


Chapter 8

that there is a constant supply level of is opened for refuelling. stoves, boasting a 95% efficiency
fresh air in a house, enough to keep In the past, this wouldn’t have been level are gaining traction, despite the
the air fresh but not enough to supply an attractive option because the glass £3,500 (exc VAT) price tag.
air to an open fire would soon have sooted-up and the As with the room-sealed fires, there
n an open fire requires a significant pleasure of an open-fire would have is an issue with air supply to wood
supply of air to create a draft in order been lost behind a wall of blackened stoves. The trend is towards room-
to keep the fire going and draw the glass. But today’s clean wood-burners, sealed supply as well, as no one wants
smoke up the chimney. with their emphasis on energy a permanently open vent hole in their
This last point is the killer. An efficiency, don’t release any significant living room. The cheaper, traditional
open fire will require a permanently particulate smoke and the glass stays wood stoves are designed to work in
open vent hole of anywhere between clear, so much so that you are barely environments with free air flow and
250x250mm up to 500x500mm, aware that the combustion is taking will not suit a new house built to
depending on the size and design place in a sealed box. current airtightness standards, so the
of the fire. That’s similar to leaving a Room sealed fires, such as the air supply is a critical factor to assess,
window open throughout the winter, M-Design range (costing around if you are considering a wood stove.
not a very appetising prospect when £3,300 exc VAT), burn at around
you have just paid a small fortune to 85% efficiency and come with a SOURCING WOOD
insulate and double glaze your new secondary air ducting system which Wood burning is the height of
house. This open vent can be sealed allows the warm air produced by the selfbuild fashion at the moment, but
up during the airtightness test, so in fire to be piped around the house. it’s not without its issues. For one
theory Part L (the energy efficiency thing, wood prices are increasing
regulations) can’t stop you having a WOOD STOVES as rapidly as other fuels, especially
permanently open vent of this size, The wood burning stove is a simpler now that it’s being subsidised for use
but you will be penalised elsewhere way of achieving the same thing — in power stations. In addition, the
by the SAP calculations and have to having a focal point fire in a centrally current generation of super-efficient
install expensive additional energy heated, near airtight house. Wood fires and stoves depend on burning
saving features to compensate. It’s burners are available in wide a range properly dried timber if they are to
hard not to conclude that the days of of styles and a huge price range — achieve their desired effect.
the traditional, Victorian-style open anything from around £300 up to Many local timber suppliers are
fire are over. nearly £10,000. Whilst the principle selling green timber which has
But technology provides a solution remains the same — i.e. to burn wood been felled recently and has a high
— at a cost — by way of the Closed in a controlled way in a metal container moisture content. Ideally this needs
or Room-Sealed Fire. This is a hybrid — you do tend to get what you pay for to be stored for 18 months or two
design, halfway between a traditional and at the top end of the range, you years before it’s dry enough to burn.
open fire and a wood burning stove. It are buying sleek modern designs with If you haven’t got time or the capacity
sits within a wall opening and looks incredible burning efficiencies. to do this, then you should really
like a traditional open fire, but the The market has also subtly be buying kiln-dried wood, but this
combustion takes place behind glass changed. Burning coal has gone is much more expensive — often
in a controlled environment where the out of fashion in the 21st century. double or three times the cost of a
air is ducted in and out without ever Everyone wants to burn wood. People regular load.
mixing with the air in the house. The are also much more interested in the Of course, if you have the time
only time the house air mixes with the efficiency of the stove which means and space, the best thing is to create
combustion air is when the glass door that products like the German Xeos a covered wood store where you can

192 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

buy two years ahead and dry your


own fuel, topped off perhaps with
an internal storage feature close to
the fire where you can finish off the
logs before you put them on the
fire. A word of warning: you may be
tempted to create a wood store at the
front of your house — it can be a very
attractive feature — but with rising
wood prices this may become a target
for organised theft, so it advisable to
situate your wood store away from
prying eyes.

HANDLING THE OUTPUT


A modern, highly-insulated home
requires very little heat to keep
warm and you may well find that
your “little fire in the corner” ends
up overwhelming you and has you
rushing to open all the available
windows to cool down. This is
especially true if you have installed
an underfloor heating system whose
output cannot easily be turned down.
One possible solution is to choose
a stove with a back boiler, a water- BUYING TIPS ventilation system with heat recovery
heating element, that can use excess n Don’t oversize the stove. Stove to waft around the heat from a 3 or
heat to meet some of your domestic outputs are rated in kW and, in an 4kW wood stove. I would caution
hot water demands. As a rule, back existing older house, 1kW will heat against this. It’s a bit hit or miss, to
boiler stoves use far more fuel something like 20m3 of room space. say the least. Ventilation systems are
(around 75% of the output goes into But in a well-insulated new house, not heating systems and they are
heating the water) and you may not that same kW will be enough to heat usually set up with the living room
fancy having to reload so frequently. up between 70 and 100m3. Bearing as an inlet, not an outlet, so the idea
Another option is to arrange for in mind a four bedroomed house is that heat from a stove will magically
the heat output to be ducted around typically no more than 450m3: you be distributed around the bedrooms is
the rest of the house, either in a can see that you really don’t need fanciful.
dedicated system or via a mechanical much heat to keep it warm, especially n Chimney or flue? In an existing
ventilation system. If it’s the latter, as the chances are the house already house, you may well be able to use the
make sure that the designers know has a central heating system in place. chimney but ensure that it’s swept and
what your aims are because the n Many selfbuilders have successfully free of obstructions. In a new house, you
register next to the fire needs to be an based their entire home heating will probably want to fit a stainless steel
outlet rather than an inlet. strategy on using a mechanical flue, which is cheaper than a chimney.

HOUSEBUILDER’S BIBLE l 13th EDITION 193


Chapter 8

n Smoke Control Areas: many local being cheap night-time tariffs. These idea is that, for a small premium, you
authorities now have smoke control exist because they can’t turn off the match your usage with renewable
areas. Google “Smoke Control Areas” nuclear power plants at night and supplies. Thus, instead of having
to find out if you are in one. You can so they have all this power pumping to go to the hassle of mounting
still fit a wood stove in a smoke control around the system with nowhere to photovoltaic cells on your roof or
area but it has to be a clean-burn one go, so they sell it off cheap as electric putting a wind turbine in the garden,
if you want to burn logs, or a multifuel heating. Enter the world of off-peak you can get a supply of renewable
stove on which you burn smokeless night-storage heating: it is the most energy over the grid. On this basis,
fuel. Indeed, wood burning in general uncontrollable, unresponsive heating many people have opted for electric
has started to come in for some stick system ever designed, delivering heating systems, feeling that they are
due to our increasing concerns about the bulk of its heat when it’s hardly not only cheap to install but cause no
air pollution. The really green option needed. Not to mention the fact that environmental damage whatsoever.
now is to have no wood stove at all. night-storage heaters are usually dog If only. My view is that these green
n Check out the Log Pile website ugly. electricity tariffs are an illusion and
(www.nef.org.uk/logpile), an online To counteract these failings, the they actually promote the use of all
database of stove, boiler and fuel supply companies have additional forms of electricity, whereas a more
suppliers. tariffs with off-peak rates for three considered approach would be to
hours in the afternoon, known as reduce electricity demand wherever
Economy 10 tariffs because they possible.
ELECTRIC HEATING give you a ten-hour split charging
Information about electric heat period. Also, they now tend to WARM AIR
pumps can be gleaned in the previous recommend electric underfloor Warm air or forced air heating
section. Here I take a look at the heating topped up with ceiling systems work by blowing heated air
common but non-garden variety of heaters, which are designed to run around the house in a series of ducts.
electric heating, the night storage on the new Economy 10 tariffs. All you see of it are inlet and outlet
heater, the convector heater, electric These developments represent a big grills, usually a pair per room. It’s the
boilers and various forms of electric improvement in the outlook for most common form of heating in
underfloor heating. electric heating: the pluses that apply American homes but in Britain it’s
Electric heating has one or two to wet underfloor systems apply just fallen right out of favour after many
things going for it and one very as strongly to electric heating. Yet as systems fitted in the 1960s and 1970s
big thing going against it. That big long as oil and gas remain half the proved to be noisy and ineffective.
contra-thing is the cost of electricity, price, straightforward electric heating I don’t think any private developers
by far and away our most expensive is unlikely to be many people’s first have fitted warm air heating systems
fuel source. Not surprising really, choice. into new homes since about 1985.
as it is still predominately made by Johnson & Starley are the only firm
burning fossil fuels, mostly coal and GREEN ELECTRICITY TARIFFS left producing warm air units in
gas, and there are large inefficiencies Environmentally, electricity is often this country, mostly satisfying the
in converting fossil fuels into thought of as a dirty fuel because its retrofit market. They work with a
electricity, not to mention piping it production is still mostly from fossil conventional flued, floor-standing
for thousands of miles around the fuels. Can you avoid this conundrum gas-fired boiler. The system must be
country. by buying green electricity? installed by a registered installer and
Against this high price, electricity Whilst the supply you actually get would cost around £4,000 for a four-
suppliers have held up a trump card, is identical to normal electricity, the bedroom house. This would include a

194 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

gas-fired boiler and all the ducting to TRICKLE VENTS Higher up the range, the fans have
push the hot air around the house, but The modern British window has humidistats which can automatically
domestic hot water (DHW) would a slot drilled out of it at the top into switch fans between off, low and high
have to be supplied by other means. which you are required to fit a trickle settings dependent on humidity in
Perhaps a more serious candidate vent. These slimline plastic inserts the bathroom.
for selfbuilders is the US firm Unico have now become nearly universal The typical cost of all these
who are offering a forced air unit on standard joinery — indeed it is measures on a four-bedroomed house
which combines heating with air a problem to find windows without is around £500, though the trickle
conditioning. They are usually present them. Some manufacturers still vents may not be readily costable,
at the major selfbuild shows and can charge extra for fitting them, some because they are hidden in the charge
be linked up to many different kinds supply windows with just the slots cut for windows
of heat source, including heat pumps. out and supply the vents separately.
An awful lot of people have no WHOLE HOUSE SYSTEMS
idea what a trickle vent is, even less The building regs allow for radically
what it does, but for those in the different approaches to ventilation.
know it is not universally loved. One is to do away with trickle vents
VENTILATION and to provide both extract and
Buildings need to be ventilated. COOKER HOODS inlet ventilation via a series of ducts
Trapped water vapour in particular Normally fitted as standard in controlled by electric fans. A number
can be very damaging, causing kitchens, although they don’t have of manufacturers produce units that
condensation and encouraging mould to be ducted outside – they are said will recapture some of the heat being
growth and wet rot. It’s a potential to ‘recirculate’ if they don’t. Cooker sucked out of the house, mixing
problem in both the external hoods are usually sold as part of it with fresh air being brought in
structure of a house, especially under a package with hobs and ovens. through the loft.
ground floors and in roofs, - and They start at around £50: automatic Welcome to the world of the
within the enclosed living space. versions with humidity controlled mechanical ventilation system with
The building regulations deal switching are available at around heat recovery (or MVHR). The
with the need for ventilation in both £100, but the current fashion if for system fan usually sits in the loft or
areas. Underfloor ventilation (only rather grand stainless steel ones in a utility room and it draws fresh
applicable with suspended ground which typically cost £300 upwards. air in through a duct in the outside
floors) is by way of air bricks; roof Actually, the fashion doesn’t stope wall and passes it across the outgoing
ventilation is by eaves or soffit vents there. There are all manner of warm air so that the outgoing heat
and occasionally air bricks too. expensive extractors available with is transferred into the incoming cold
costs extending well into four figures. air. It then pipes the incoming air
INTERNAL VENTILATION into the ‘dry’ rooms (living rooms,
The building regs dealing with BATHROOM FANS bedrooms) and sucks internal air out
internal ventilation (Part F in A basic, 15lts/s, fan can be controlled of ‘wet’ rooms (kitchen, bathrooms).
England) specify that habitable by a pull switch, or linked to a room An MVHR system will cost
rooms must have adequate light switch. Bathrooms without between £4,000 and £6,000 to install
ventilation, and the default routine windows have to have models fitted so it’s not a cheap and cheerful
for this is based around opening with automatic overrun timers option, and it requires a lot of design
windows, trickle vents and extractor and, where ducting is required, a input to enable it to work effectively.
fans. centrifugal fan is recommended. It costs money to run (in truth, not

HOUSEBUILDER’S BIBLE l 13th EDITION 195


Chapter 8

Mechanical Ventilation with Heat Recovery (MVHR) the system needs to ne balanced as
well, so that the air flow through
MVHR involves a lot of the system is even. There also needs
ducting. The inlet and to be a significant airflow between
extract ducts are kept
rooms, so ensure that there is at least
separate and meet at
the heat exchanger a 12mm gap under each and every
conventionally located bathroom or bedroom door. In order
in the roofspace. The to comply with Part F of the building
extracts are placed in regulations, the finished system must
the wet rooms (kitchens, be tested to show that the anticipated
bathrooms) whilst the inlets
air flow rates at each register are close
supply the living rooms and
bedrooms. to the designed for figures, usually
within ± 5%.
And having lived with a newly
installed Paul Novus system, supplied
by the excellent Green Building
Store, I can vouch that they work. In
winter, the windows stay shut and the
air stays fresh. In summer, the heat
exchanger gets by passed so that cool
very much), it doesn’t of itself save and bends. The better systems use night air is drawn into the system,
any energy and it leaves you with aluminium rigid tubes and they minimising the effects of hot nights.
strange space age looking vents in all have to have silencers fitted to MVHR systems are not to be
your ceilings and walls. Who on earth reduce sound transfer between confused with warm air heating
would ft one of these? rooms. Cheaper systems use plastic systems. They don’t actually heat
It turns out just about everyone ducting. Routinely, MVHR suppliers anything. If an MVHR system is
who is interested in energy efficient also design the installation as well, 90% efficient, which some of them
building because an MVHR system for which they often make a charge are, this means that they retain 90%
makes it possible to live in a near- of several hundred pounds. Don’t of the outgoing heat. Therefore, if it’s
sealed environment and yet still skimp on this: it is worth it. If you 20°C indoors and zero (0°C) outside,
have good air quality. They are a are buying a kit home or designing the incoming air will be piped in a
key enabling device for Passivhaus one from scratch, you need to make 18°C (i.e. 90% of the difference). Your
and other low energy homes. the designers aware of this at the heating system simply has to top up
Without such a system, all that thick outset because threading the ducting the air inside by 2°C to get it back to
insulation, air tightness tape and through floor voids and maybe 20°C where it all started.
triple glazing would make no sense. through steel beams is much, much You can add heating elements
Selfbuilders are big into MVHR, and easier with a little pre-planning. to MVHR systems to get them
with good reason. Although the actual assembly is to behave more like warm air
There is a lot to be mastered here. not incredibly skilled and could be heating systems, but it’s not ideal
Firstly, you have to design the layout carried out by a competent DIY-er, as they pump the warm air into
when the house layout is being for most people it makes sense to the bedrooms (where it’s arguably
detailed. The key is to minimise the get a system fitted on a supply and not wanted) and draw it out of the
duct runs both in terms of length fix basis because to work effectively, bathrooms. Usually it’s better to

196 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

Great care has to


let the regular heat emitters (i.e. be taken installing
radiators, underfloor heating) get MVHR systems. In
on with their job and just leave order to avoid noise
ventilation to the MVHR system. transmission, the
ducting is routinely
fitted with silencers,
visible here in an open
PASSIVE STACK VENTILATION bathroom ceiling as
This is another option that can be the two rectangular
used if you are interested in whole boxed sections set
house ventilation. Passive stack into an otherwise
ventilation also uses ducts to extract circular metal array.
stale air from the house but there the
similarity ends. Trickle vents are fitted
in all the dry rooms (i.e. living rooms,
bedrooms) whilst ducts run from the
wet areas (bathrooms, kitchens) up
to a vented ridge tile and air pressure
does the rest, drawing air in through
the house and away through the roof.
A whole house system (with four
passive stacks) would cost around
£2,000. Add a cooker hood (which is
recommended) and the overall cost
will be around 60% more than the
standard route. of a single length of pipe made of systems when running in heating
There are currently two passive conductive antimicrobial material mode, but they come into their own
stack suppliers, Passivent and Aereco approximately 200mm diameter laid as a method of passive summer
and one interesting newcomer, 1.5 or 2m below ground in a loop cooling, where the incoming air
Ventive, who appear to have invented around the house or in the garden. drawn into the system can be up
a fully passive system that also One end terminates in a stainless to 5°C cooler than the external air
recovers some of the waste heat. In steel tower (about 1m high) where temperature.
general, Passivhaus enthusiasts tend the air is drawn in and the other links
to steer people away from this style up with the supply ducting for the COOLING
of ventilation because it’s not so heat recovery unit (or vent supply There are home air conditioning
reliable. Some times it works a treat, fan). The costs vary depending on the systems available in the UK but
but change the wind direction and it size of the house: the smaller kits are whilst new housebuilders show
stops working altogether. priced at £2,000 and the largest at increasing interest in more and
£4,000 – this is in addition to costs more sophisticated ways of staying
GROUND TO AIR VENTILATION incurred for installing a mechanical warm during the 25-odd week
Perhaps better known as earth pipes, ventilation system. annual heating season, there is
these have been used in a number of Why fit earth pipes? They have limited interest in staying cool
countries over the years, but only very a marginal positive effect on the during the 10-week high summer
rarely in the UK. The system consists efficiency of mechanical ventilation period.

HOUSEBUILDER’S BIBLE l 13th EDITION 197


Chapter 8

Why? Well for a starter, it is wonderful idea on paper but it is like a Passive House, then you
expensive. An air conditioning likely to be quite unpleasant to live really don’t require very much in
system for a detached house with during July and August. the way of a conventional heating
would set you back in the region system, and these ventilation bolt-
of £5,000. A one-room system HYBRID HEATING- on heaters seem like a good way
would cost around £1,500. VENTILATION SYSTEMS forward. The only proviso is that
The existing models are all Thus far I have tried to nail these solutions are certainly not yet
electrically powered and a whole everything down into neat boxes. mainstream and you may end up
house model would consume Thus we have heat pumps, cooling being something of a guinea-pig if
around 3-5kW of power when products, ventilation products and you fit one.
going at full blast — typically water heating products. But you
it would run for only 50% of don’t have to dig very deep to see
the time, even on the hottest of that there are degrees of overlap
days, providing you remember here and that, not surprisingly, there FIRES & CHIMNEYS
to keep the doors and windows are new products which don’t fit Look around any 21st century
shut. The units also tend to be into these neat boxes. Let’s look at housing scheme and you will
noisy, though this problem can ventilation systems that incorporate see lots of clean-cut roofs, with
be reduced if the design of the heat pumps and thus turn them into rarely a chimney in sight. That is
installation is good. Like boilers, warm air heating systems. because chimneys are expensive
air conditioning needs to have Take, for instance, the Genvex to build, and stoves or fires are
exhaust ducting and this means Combi, an interesting piece of kit quite unnecessary in a modern,
that the system has to be built-in that sells for around £6,000. It’s a centrally-heated home. Penny
permanently and is connected to big box which uses an air source pinching developers, quite logically,
an outdoor unit. heat pump to draw heat from omit them. If there is a chimney,
Some of the heat recovery units the exhaust air coming from your the chances are it will be a
and some heat pumps offer an mechanical ventilation system, and dummy made of GRC (Glassfibre
air-cooling facility; the Villavent uses this to provide hot water and Reinforced Concrete), or some
4 unit provides something called some warm air heating for your other lightweight material, put
comfort cooling – it will not turn house. there at the insistence of the local
the house into a fridge like the ones I’ve seen it installed in a low planning department.
in American homes, but will be able energy housing development in But selfbuilders sing to a
to drop incoming air temperature Somerset and have to say I was different hymn sheet and most of
by several degrees. And some heat quite impressed. them long to have a focal point
pumps can run in cooling mode as There are others. The PassivHaus fire. Top of the selfbuild pops is the
well. standard – which demands wood-burning stove, combining as
Generally, it is felt that cooling whole house ventilation systems it does elegance and efficiency.
isn’t really necessary in the UK – seems to be encouraging the But all wood stoves require a
climate if the house design is well- development of a number of flue and/or a chimney. They are not
executed. One problem to avoid is compact air handling units which quite the same thing. A chimney
solar over-heating in the summer also provide a small element is a masonry structure designed to
months, the sort of effect that you of heating using heat pump act as a flue, but you can have a flue
see in conservatories. Large south- technology to achieve this. If you without having to build a chimney.
facing glazing may sound like a build a very low energy house, What are the choices?

198 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

MASONRY CHIMNEYS 50% more expensive than stainless flexible flue liners plus the labour to fit.
Whereas a chimney was once steel. Ceramic flues tend to come Of course, there may be much
simply constructed in brickwork with a 30 year guarantee (rather than more work you need to undertake
as an open duct, terminating with 10 years for stainless steel flues). to bring an existing chimney back
a terracotta pot, they are now built They are recommended for heavy into use. The brick or stone work
around a core of clay or concrete flue use, especially with biomass boilers. may be weathered and need repair or
liner. For a chimney to work well, it Another option is to go for a repointing: the flashings may have
requires a good flow of air and the pumice stone prefabricated flue: to be replaced: the pots may need
flue also needs to maintain as high a they provide a very simple way of replacing as well.
temperature as possible, so there are building a long lasting, insulated
exacting regulations about chimney masonry chimney system, at a
design. For instance, it’s important similar cost to a twin-walled
for chimneys to be insulated as stainless steel flue. Instead of having
this keeps the smoke warm and to source components from several PLUMBING
lessens the chances of it condensing different suppliers, these chimney Conventionally, plumbers are hired
as tar deposits. This is particularly systems are supplied as kits for easy to fit heating and sanitaryware; this
important with wood burning assembly. Names to look out for here includes all above ground waste
appliances, as they burn cooler are Schiedel and Anki. fittings, but rarely underground
than coal. Material costs for a new Bear in mind also that masonry drainage or rainwater goods.
chimney start at around £1,000 and chimneys require foundations Traditionally, plumbers also undertook
can spiral upwards depending on the whereas steel and ceramic flues don’t. sheet-metal work on roofing, but now
design. However, there is generally On the other hand, if you want a this tends to be carried out by roofers.
a considerable labour element going traditional pot, then you need to place There are a couple of grey areas
into building a masonry chimney, it on a chimney. Flues have metal to be aware of. The first concerns
and there is added complexity when terminals instead. the wiring of heating controls
wanting to place a masonry chimney (which is sometimes carried out
within a timber-framed house. by the electrician) and the second
RENOVATING EXISTING concerns the installation of kitchen
FLUES CHIMNEYS sinks and dishwashers, which is
The budget option with a wood Many people will want to keep an sometimes undertaken by specialist
burning stove is to go for a pre- existing chimney and adapt it for kitchen installers. Be clear, when you
fabricated stainless steel flue. use with a wood burning appliance. are hiring, who is to do what. The
Whereas a gas-burning appliance can You need to check that the chimney situation has been muddied by making
use a single-skin flue, with solid fuel is functional and adequate – a good most electrical work notifiable to
you have to use an insulated twin- chimney sweep should be able to help building control, which means that
wall flue section in order to stop the here. And it is now commonplace many plumbers are no longer qualified
smoke condensing inside the flue. to install flexible flue liners, usually to undertake things like the wiring of
Typical material costs for a 7m twin- pushing them down the existing your central heating controls.
wall stainless steel flue are around chimney from the top. Whilst often
£1,500. Main manufacturers are Rite- not essential, a flexible flue liner will CHECK THE SPEC
Vent, Poujoulat, SFL and Selkirk. help with the free flow of smoke and Many contractors have only the
Ceramic twin-wall flues are a make for a more efficient chimney. vaguest understanding of the ins
more up-market option, and are 30- Expect to pay upwards of £500 for and outs of heating and plumbing

HOUSEBUILDER’S BIBLE l 13th EDITION 199


Chapter 8

for hot water storage? What will hot


water flow rates be like?
n Where will the overflows run to?
n What sort of guarantee is offered?

PLASTIC WASTE PIPES


Slowly but steadily, plumbing is going
plastic. There are still many plumbers
who wouldn’t be seen dead using
anything other than copper for their
water feeds but you will search high and
low to find one who uses anything other
than plastic for waste fittings.
The whole subject of plumbing in
the waste for bathrooms, loos and
kitchens is surprisingly complicated
and is covered at good length in the
A progress shot taken on our recent selfbuild shows the inevitable march of plastic
building regs (part H, if you must).
pipe for both supply and waste. Also note how crowded it is up here in Posi-Joist The problem is that you need to stop
land. smells getting up into the house from
systems and are more than happy to n What fuel is being specified to the drains: this is (usually) achieved
let their plumber design, price and run the system? Have the costs of by designing in water traps separating
install whatever system they like, and connection and storage been fully the appliances from the drains below.
plumbers have become quite used taken into account? There are several different trap
to acting almost autonomously, as n What controls are being provided? designs around, usually named after
long as the kit works and the price is n How easy will it be to service the letters of the alphabet – P and S
about right. Comparing quotations system? figure prominently. Were that it was
between plumbers is consequently n Will pumps and cables be all there was to it and it would be the
a very difficult business because the concealed? end of the story but unfortunately
specifications of the competing systems n What insulation is being provided these water traps have a habit of
are almost bound to be different unless to the hot water pipes? failing, often through induced
a professional has been employed n What sort of emitters are being siphonage sucking the water down
to design the system beforehand, specified? the pipe. What has evolved is a series
something which hardly anyone n If standard panel radiators, where of rules dictating how we should
bothers with on smaller residential will they be sited? lay out our waste runs and where
construction jobs. n Will they have TRVs fitted as and when the runs should be joined
Points to watch out for when standard? If so, will these be in together. The ones which tend to
comparing quotations are: addition to or instead of a whole-house catch people out are the maximum
n Are the design considerations thermostat? length of basin runs – 1.7m – laid
identical? What temperature is each n What provision has been made at a fall of between 18 and 22mm
room to be heated to? How many air for towel radiators? Heating airing per metre run. It seems ridiculously
changes an hour have been assumed in cupboards? precise; it’s borne out of many years
the calculations? n What arrangements will be made analysing just why basins gurgle and

200 13th EDITION l HOUSEBUILDER’S BIBLE


HEATING & PLUMBING

lose their water seals. and a choice of working methods. has to be done in copper. One area
You can cheat: there are now The DIY route is to use a push-fit where plastic plumbing really wins
non-return valves that don’t require system based on either uPVC or out is when you are specifying I-beam
a water seal — the best known is polypropylene. Serious plumbers floors: you can’t notch I-beam floors
Hepworth’s ingenious HepVO valve. often prefer to use a glued system, (you can actually, but the results are
The main waste runs also cause known as solvent weld. These are disastrous) so the ability to uncoil the
problems. The general rule is to typically made of ABS (acrylonitrile pipe through holes in the webbing is
run the appliances, such as basins, butadene styrene), a rather more almost indispensable.
baths and showers, in small pipe rigid plastic. The average spend in a
sections (typically 32, 40 or 50mm) house on above ground waste fittings
into a 110mm pipe, called a stack, is around £300 so it’s not a budget
which drops vertically down to the buster, whichever system you opt for.
underground drain system. Stacks
need to be ventilated and at least one WATER
stack on every drain run needs to be Indoor plastic plumbing has been
ventilated to the outside, usually done kicking around since the 1970s and in
through the roof. If you have more its time it’s come in for a fair amount
than one stack, you can use a short of stick from the professionals. It’s
version, known as a stub stack, on also resulted in numerous floodings
the subsequent stacks: these can be caused by duff joints or, more often,
topped off with air admittance valves, lazy installers. However, it’s very
also known as Durgos. These act in a easy and quick to install; it’s mostly
similar fashion to the smaller HepVO push-fit and it comes on a roll so you
valves used in small bore drain runs don’t have to bother with soldering
– letting air into the system but not joints as you do with copper. So
letting any out. quick and easy that, at long last,
At ground floor level, it’s usual to it’s really taking off in professional
run the waste pipes together into plumbing circles as well. Partly it’s
an external gulley and thence to the because it’s used exclusively for
drains. The principle remains the underfloor heating (where it seems
same: to prevent smells from the to perform fine) and partly due to
drains escaping into the house. It’s new building techniques. Hepworth,
one part of the house fit-out which the originators, have redesigned their
is routinely tested on completion of joints to make them hopefully idiot
the job – the air test usually involves proof and there is now competition
putting a bung into the drains at the from other big names in the field
highest manhole and another bung like Marley Plumbing, John Guest’s
somewhere short of the air outlet and Speedfit, and Polyplumb.
then seeing if the system between It’s hard not to come to the
holds a given air pressure. conclusion that copper plumbing is on
Indoor waste pipes have migrated the way out, although it will continue
across to plastic almost exclusively to be used extensively for many years
now but there is a choice of plastics to come. Gas plumbing, for instance,

HOUSEBUILDER’S BIBLE l 13th EDITION 201


Chapter 9

The wiring of new and existing


homes is covered by building regs,
and is a notifiable event in the life of
a house, but the regulations simply
9
WIRING
is pretty much the same as the 18th
edition of the IEE Wiring Regs.
But what has changed is that house
wiring now has to be passed by
project, like a new house, then you
will already be involved in a building
regs application and you won’t be
required to do an additional one just
insist that the wiring is done either by building inspectors or by qualified because electrics are involved. Here
a competent person or to a standard electricians so you need to find out if you can simply ask your building
that is passed as competent by a your electrician is ‘Part P compliant’. inspector to check the wiring, along
competent person. If that sounds like If they are, they can issue you with a with everything else.
gobbledygook, welcome to the world certificate on completion to say that
of the building regs. In Scotland, the work has been carried out to the COSTS
electrics have always been a notifiable relevant standard. Very small works The tables in this chapter show just
event, but England & Wales only are exempt, but anything involving how each element of an electrician’s
fell into line in 2005 when Part P kitchens, bathrooms or externals is quotation would be made up and
came into effect. Part P is all about notifiable so, for instance, fitting a how this translates into a whole
notification. new kitchen is now likely to come house quotation. Compared to most
The actual requirements are under building regs. aspects of construction, electrical
embedded in BS 7671, which itself If you are undertaking a major fittings vary enormously in quality.

202 13th EDITION l HOUSEBUILDER’S BIBLE


WIRING

For many years, the market was DNO may offer to halve or even be run over by diggers, dumpers or
dominated by two British businesses, waive the entire connection fee as lorries. Discuss your requirements
MK and Crabtree: indeed many a sweetener, but more likely they with the DNO’s new supplies
specifiers indicate that fittings should will try to persuade you to have a estimator; there will be an extra
be by either of these two firms. But three-phase supply which will cost charge for temporary supply but it’s
there is a huge gulf between MK/ 20% more. Long cable runs (say in usually not large, provided there are
Crabtree prices and some very cheap excess of 50m) can be prohibitively no major cable detours.
imported gear. The current TLC expensive, costing many thousands,
catalogue (www.tlc-direct.co.uk) has and should be carefully costed when METER BOXES
MK 13amp double sockets at £3.25 assessing the plot. Each DNO has a The industry standard is to install
each; however, they also have their New Supplies Department, which is white plastic boxes built into the
own brand version (Telco) at £1.50 where you should look for quotations; external wall. The DNOs like them
each. There are lots of options if you you don’t need to own the plot before because they can access the meter
want something between these two getting a quotation. without entering the house; builders
prices. And, of course, there are many, like them because they usually supply
many suppliers producing all manner them free (as they do lengths of
of fancy switches and sockets. If you TEMPORARY SUPPLIES underground ducting) and they can
are the sort that gets exercised by the Some builders manage without be built into the outer skin brick wall
differences between brushed chrome, temporary electricity supplies, relying without a lintel. The only problem
satin chrome and polished chrome, on generators and diesel-powered is that they are ugly; ugly enough
then you can easily pay over £30 an mixers; indeed most of the house to ruin a fancy period facade. If
outlet. superstructure can be easily erected this bothers you then either look to
without power tools. However, locate the plastic meter box where it
plumbers, electricians and second- won’t detract from your kerb appeal
fix carpenters are big users of power or insist that the company supply
HOUSE WIRING tools (albeit mostly portable ones comes into the house where it can be
CONNECTION FEES nowadays) and you can’t have your concealed in a cupboard.
Electricity connection to new homes permanent supply turned on until Gas supplies have the same
is organised by the businesses which they’re finished so, for most builders, problem but they offer an alternative
used to be the local electricity board a temporary supply makes good meter box concealed in the ground;
but are now known as Distribution sense. however, this is felt to be unsafe for
Network Operators (DNOs). You Current regs insist that the an electrical supply. Water meters are
can look up who operates in your area temporary supply board is adequately always concealed in the ground.
at energynetworks.org. The DNOs housed; on most sites this means
are free to set their own connection building a blockwork box with at
fees and, being monopoly suppliers least a paving slab roof and a lockable SMART METERS
of an indispensable power source, door. Budget a day’s work and £100 You are not legally required to fit a
they tend to charge a lot. Even a materials to build an adequate shed smart meter when you build a new
straightforward connection is likely with consumer unit and sockets on home but I think you’d be nuts not
to cost in the region of £800. a backing board inside. Care should to because how else would you know
If you are considering electric be given to locating the temporary that all that expensive insulation and
heating or an electric heat pump in supply so that long cables are not left glazing is actually working to save
your house, you may find that the trailing over the site where they could you energy. If you’ve not lived with

HOUSEBUILDER’S BIBLE l 13th EDITION 203


Chapter 9

ELECTRICS: Key Rates Electrician's charges particular layout. A 16-gang unit


ITEM COST LABOUR charged at £ 40 /hr
will suffice for all but the largest
Double Socket £ 12 Sockets 50 mins £ 33 houses and it is recommended not
Single Socket £ 10 External Sockets 100 mins £ 67 to economise too much on this
Fused Spur £ 10 Door Bells 120 mins £ 80 item. Miniature circuit breakers
5-amp Socket £ 10 Light Outlet 30 mins £ 20 (MCBs) have now replaced the
Cooker Switch £ 15 Each switch 30 mins £ 20 traditional fuses; instead of fusewire
Cooker Outlet £5 Extenal Lights 90 mins £ 60 blowing, a little button pops out
Shaver Point £ 25 extra for light fittings 45 mins £ 30 and reconnection is never more
Immersion Point £ 10 Fans (inc kitchen extracts) 150 mins £ 100 complicated than pressing the button
External Sockets £ 30 Smoke Detectors 60 mins £ 40 in again.
Consumer Unit £ 80 Basic CU 60 mins £ 40 Another development is the advent
Residual Circuit Devices £ 40 Each circuit 10 mins £7 of residual circuit-breaking devices
Each Fuse £5 Electric Ovens and Hobs 180 mins £ 120
(RCDs) – now mandatory – which
TV/TELECOM WIRING
provide increased protection against
Coaxial Point £ 10
you can access it. electrocution in the event of contact
Telephone Point £ 10
There have been issues with the with live wires. One drawback of
Loft Aerial £ 50
Door Bell £ 30
first generation of smart meters RCDs is that they are very sensitive
SAFETY (SMETS 1) which meant that and can be triggered by thunderstorms
Smoke Detectors £ 30 once fitted it is very difficult to or faulty equipment. This in turn may
LIGHTING change suppliers. But in 2019 the cause problems with things that must
1-gang Switch £6 next generation is being rolled out not have their power supply cut off –
2-gang Switch £7 (SMETS 2) and these afford you the chiefly freezers and smoke detectors.
3-gang Switch £8 luxury of being able to switch and to An RCD-inspired power cut-out
Pull Switch £6 keep the records from your previous could have very messy consequences
2-way Switching £5 supplier. if it occurred during your two weeks
3-way Switching £ 10 In time all meters will be smart and in the Algarve, and for this reason it is
Ceiling Light £ 20 they will start offering varying tariffs recommended that freezers are run off
Fire rated LED downlights £ 20 which will enable significant energy separate circuits not protected by an
FANS
savings both nationally and for RCD. The net result of all this is that
Bathroom Fans £ 50
yourself. So don’t be a luddite — fit a you’ll be spending around £100 on
Kitchen Fan £ 75
smart meter. your consumer unit whereas in the bad
old days it might have cost only £20.
a smart meter before, they give you
real time readings on how much CONSUMER UNITS AND RCDS SOCKETS
electricity and gas you are using, The consumer unit – what used to If you’ve got deep pockets, fit lots
plus daily read outs on what you’ve be known as the fuse box – is the of sockets – but at £20-£25 per
consumed. Log onto you account and place where the supply is split into outlet this can rapidly become a
you can see a detailed breakdown of a number of separate circuits for prohibitively expensive option. If
what you’ve used every day. distribution around the house. There you know how you are going to
This may of course be an awful are conventions on how these circuits arrange beds and furniture in each
bore to many (most?) of you, but it’s should be arranged, although the room you can minimise the number
still good to know that it’s there and exact design will depend on each of sockets needed; if you want to

204 13th EDITION l HOUSEBUILDER’S BIBLE


WIRING

MODEL HOUSE Electrical Costs


Smoke Shaver Cabling
Sockets Lights Switches Data Detectors Fans points RCDs Totals
Kitchen/Dining Area 8 12 4 2 1 1
Utility 2 1 1 1 1
WC 1 1 1
Hallway 1 2 2 1
Lounge 8 6 2 2
Bed 1 8 4 2 2
Ensuite 2 1 1 1
Bathroom 2 1 1 1 This table attempts
Bed 2 8 2 1 to summarise the
Bed 3 8 2 1 complexities of
Bed 4/Home Office 8 2 2 2 costing a very simple
Landing 2 2 1 1 electrical installation
External 1 4 2 on a new house.
Totals 54 42 21 8 3 5 2 Selfbuilders regularly
Labour in hrs 45 53 11 7 3 13 3 20 155 hrs spend three or four
Rounded Cost of labour £ 1,800 £ 2,120 £ 440 £ 280 £ 120 £ 520 £ 25 £ 800 £ 6,000
times this when
they start specifying
Typical material costs £ 12 £ 20 £7 £ 10 £ 30 £ 75 £ 25 £ 600
scene lighting, whole
Rounded Cost of materials £ 650 £ 840 £ 150 £ 80 £ 90 £ 380 £ 50 £ 600 £ 3,000 house audio and
Wiring total labour and materials £ 9,000 smart home devices.

retain flexibility for each room then (Part P compliant is the thing to have some idea where not to drill
you’ll probably need a minimum of look out for) or passed by your holes. However, this requirement is
three sockets per bedroom and four building inspector. It’s not made DIY frequently ignored in the rush to get
sockets in living rooms. It will cost a installations illegal, as some claim, but jobs done and sometimes even to try
lot more to add sockets in the future it has brought in a measure of quality and save money by using less cable.
and not having them where you control that wasn’t there before. Even if you know where the cable is
want them when you’ve moved in There are a number of areas where buried and, therefore, think it doesn’t
is very frustrating. Also, don’t think DIY housewirers – and professional matter, don’t forget that the cable will
that you are saving money by fitting electricians come to that – are prone still be there long after you’ve moved
single sockets instead of doubles. The to make untraceable errors and you on and some poor sucker thirty
work involved in installing them is would be well advised to steer clear years hence could be in for a nasty
identical and the materials price is of house wiring unless you have a surprise. Technically, you are allowed
only pennies different. You can step- thorough knowledge of the tasks in to run cables within 150mm of
up to metallic-finished sockets for an hand. internal corners and wall and ceiling
extra £5 or £10 per outlet. junctions, but this habit cannot be
CABLES IN WALLS recommended.
SAFETY ISSUES Cables buried in walls must be set
Since 2005, electrical work in the either vertically or horizontally EARTH BONDING
home has to be either carried out from the outlets they supply. The It is a requirement that exposed
or passed by a qualified electrician idea is that the follow-on trades metalwork should be earthed to

HOUSEBUILDER’S BIBLE l 13th EDITION 205


Chapter 9

prevent it becoming ‘live.’ This is n Kitchen unit lighting – usually


normally done with 10mm earthing fixed below wall units LIGHTING
cable (it’s green and yellow). What n Check the rating of your electric The best light is natural sunlight. Lux
exactly needs to be bonded? cooking gear – 30 amps may not be is a measurement of light density
n Water and gas mains as they enter enough and whereas 500 lux is the generally
the house n Wiring for electric showers and accepted level of electric light needed
n Any exposed structural steel and power shower pumps for reading, bright sunshine delivers
oil tanks n Wiring and installation of fans 100,000 lux and even a cloudy
n All services must be bonded in bathrooms and kitchen, or a overcast day will produce 5,000 lux
together mechanical fan system, if required of light.
n All metal in bathrooms must be n Separate circuit for immersion The older you get the more light
bonded together. heater you need. A 60-year-old requires ten
Note that if you are plumbing n Outlets left for smoke detectors times more light than a 10-year-old.
with plastic pipe (such as Hep2O or (now mandatory) So how do you go about providing
Speedfit), the requirement to earth n Doorbell wiring lighting?
bathroom radiators and steel baths is n Heating controls wiring: boiler,
dropped. programmer, thermostats, pump LEDS
and valves all need to be connected. There have been a lot of changes in
ELECTRIC HEATING This work is often undertaken by building and services technology in
If you are interested in electric the plumber but the electrician must the housebuilding scene since I first
heating and heat pumps in particular, leave at least a fused spur to power started writing about them in 1994.
have a look at the relevant sections in the controls. If the plumber does this But in that time, I’ve never witnessed
the Heating chapter. You may have to wiring, then a separate test certificate a technology that has leapt off the
opt for a three-phase supply. will be needed from him page and caused me to rewrite a
n Fused spurs for waste disposal whole section of the Bible from one
FREQUENTLY OVERLOOKED units and/or water softeners edition to the next. But LEDs were
When designing electricity supplies to n Wiring to sewage treatment plants that game changer. Their time has
a house there are a number of points or for any external water pumps definitely come.
to watch out for – and easily forgotten (water features, swimming pools) LED (light emitting diodes) lamps
at the first-fix, cable-burying stage. n Wiring for electric garage door have been evolving, improving and
Many electricians are used to doing operators: needs an accurately placed decreasing in price fairly steadily (at
what they are told and no more and single socket, not really a problem if around 10% per annum for over a
will be of little help in designing a power is in the garage decade) and now TLC are selling a
better system. Here is a bulletted list n Burglar alarm first-fix white LED downlighter lamp for
of commonly forgotten wiring details: n Wiring for renewable energy just £2.15. Admittedly mostly LED
n Loft lights, cupboard lights – do systems, such as photovoltaics or lights are still rather more expensive
you want them? wind turbines, both of which produce than this — they tended to be priced
n Separate freezer circuit – preferably power in DC and need inverters to between £5 and £12 per lamp in late
not protected by RCD turn this into AC. Also meters have 2014 — but they have a performance
n Separate garage supply if garage is to be adapted if exporting the power edge on just about all other kinds of
external you produce. lighting ever invented. They are now
n Outside power points, security n Wiring for a car charging point, if brighter, they stay brighter longer,
lights, welcome lights required they are available in warm, cool or

206 13th EDITION l HOUSEBUILDER’S BIBLE


WIRING

daylight whites, they last longer (or LEDs are already the
they should do — there are questions most efficient light
about just how reliable the really source available and are
cheap ones are). And critically, they constantly improving.
Currently prices are
use a lot less energy than all the other falling by nearly 10% per
forms of energy efficient lighting that annum.
we have come across.
They knock spots off the unpopular,
mercury-laden compact flouresecents
(CF). CFs had little going for them LEDs. However, this is a technical 5-AMP PLUGS
except energy efficiency and, by and issue which will probably be resolved A handy idea for living rooms
large, LEDs are now far more energy soon. where you want to have a number
efficient than CF lamps. And LEDs of sidelights is to fit a series of
do downlighters just as well, if not 5-amp lighting sockets (usually
better, than halogen. There are lots with small round-pin holes to
of outlets that supply them — in DOWNLIGHTERS distinguish them from 13-amp
fact very few that don’t — and if Light sources concealed in the mains sockets).
you look around you can find LED ceiling (or wall or floor) have the These can be linked together
replacements for just about any bulb big advantage of being stylistically and all switched from one point.
you might care to think of. GU10 neutral – i.e. they can blend in with It’s convenient not only because it
downlighters cost around £6 each, any type of decor. They have the gives you a master switch to control
their bayonet replacement bulbs disadvantage of only being able to all the sidelights plugged into the
(B22) anywhere from £7 to £14. light a rather limited area and a large 5-amp sockets, but it also gives you
If you want to dim LEDs you room lit entirely with downlighters the ability to dim. By arranging the
have to buy dimmable LEDs and can be impractical. Despite their switching next to the door, it gives
get a suitable dimmer switch to name, downlighters do not have to you the option of doing away with the
match the very low loads. If you point straight down: there are ‘eyeball’ central pendant lighting altogether.
swap an LED for a conventional versions which beam the light off at If you know nothing about the
bulb where a dimmer is present, an angle – in effect sidelighters. art of good lighting and you are in
you may end up damaging both the There are some very simple cheap a hurry and don’t want to waste a
dimmer switch and the lamp. And downlighters which consist of little small fortune, you won’t go wrong
if you have a low voltage halogen more than a metal ring around hole by specifying a handful of 5-amp
downlighting scheme, you need some in the ceiling into which you fit the sockets.
specialist advice about replacing the lamp. And there are some more You can create quite sophisticated
existing lamps with LEDs, as the elaborate ones which come in their lighting effects by using side lighting
transformers may need replacing. But own casing: these are often fire-rated. and, without spending a fortune on
if you are starting from scratch, you There is a good argument for always fittings, you can get pools of light
really should not be bothering with using fire-rated downlighters because wherever you want them whilst
low voltage halogen. Dimming LEDs they do something to cover up the retaining a flexibility to change it all
is still a work in progress. In theory, hole you have made. A hole in the if you get bored and want something
it should all function smoothly. In ceiling does little to help sound- different. Downside is, of course, that
practise, you sometimes get weird proofing, airtightness or insulation, you have to re-wire all the plugs on
effects from supposedly dimmable not to mention fire-proofing. your sidelights.

HOUSEBUILDER’S BIBLE l 13th EDITION 207


Chapter 9

SCENE LIGHTING switch over to any old bulb after the cupboard shelf. If your kitchen design
This is where lighting meets home building is finalled doesn’t want or need pelmets under
automation. Here you programme n the new efficiency threshold is your wall cupboards and you don’t
banks of lights to come on together increased to 45 lumens per circuit- want exposed lights, then this is the
to create moods or scenes. It’s watt (see Lamp Efficiency table). answer for you.
something that is commonly Ordinary incandescent bulbs
seen in places like conference and halogen will fall foul of the DINING TABLES
suites and lecture theatres but is regs. Fluorescent and compact A pendant light hanging over a
beginning to migrate towards the fluorescent should be fine but LEDs dining table works very well, but
home. Products such as Lutron’s — the coming light source — are make sure that the lamp is well
Homeworks works with most now appearing with much higher concealed by the shade or fitting.
types of lamp and allows you to efficiencies than we have been used Lighting from the side is much more
programme lighting arrangements, to — scores of over 100 lumens per difficult because of the shadows cast
including dimming, so that rather circuit watt are now commonplace, by the diners. As an alternative to
than fiddling endlessly with several and Cree have a lamp in development a hanging light, go for a cluster of
different switches to get the desired that produces 250 lumens per circuit downlighters. .
outcome, you can just have two watt. Note however that not all LEDs
or three scenes to play out as and are super energy efficient and it can LIVING ROOMS
when you want them. Not only can be quite hard to tell what the lumens There are no set rules for lighting
you switch banks of lights on and per watt rating is on individual lamps. living areas. Chandeliers, spotlights,
off with one button but you can also But nevertheless, building inspectors uplighters, wall lights, downlighters,
do vacation settings for security. But are unlikely to get heavy handed with table lamps, sidelights; all have a role
it comes at a frightful cost, typically you if you fit LEDs. to play and it’s very much a question
around £1,500 per room and as of taste. Most developers and
much as £10,000 for a whole house ROOM BY ROOM selfbuilders will be planning fairly
solution. KITCHENS conservative interiors, particularly in
Central pendant lighting is their living rooms, and an awful lot
LIGHTING AND THE BUILDING particularly inept at providing light of the high-tech lighting schemes
REGS for kitchen worksurfaces, and this is would be completely inappropriate
The building regs address energy one area where task lighting is now here. However, the use of concealed
efficiency in lighting and further considered essential. The conventional fittings, such as downlighters, is
enhancements are likely in future. place for this is under the wall compatible with virtually all settings.
They want you to fit some energy cupboard units, hidden from view by Lighting a room with
efficient lightbulbs. But where? the decorative downstand known as downlighters is generally pleasing to
And how many? The requirement the pelmet. the eye but it is expensive because of
for England & Wales is set out in An alternative is to fit downlighters the numbers needed. Pendant fittings
the Domestic Buildings Services in the ceiling over the kitchen and wall lights may be preferred but
Compliance Guide 2013: surfaces, but placement has to be considerable time and expense may
n it asks for 3 in every 4 outlets to be extremely accurate and you risk go into selecting the right fittings
low energy getting unlit areas under the wall for the room; downlighters actually
n it relaxes the previous requirement units. You can get downlighters require less thought. Another option
for the fittings to be dedicated, that are only 20mm deep and are is to go for three or four uplighters
meaning that people will be free to specifically designed to fit into a or wall lights, which will generally

208 13th EDITION l HOUSEBUILDER’S BIBLE


WIRING

be enough to provide all the lighting Ratings if you want to know what bit of thought to external lighting
needs (including reading) for a these are in detail, but the quick – unless you are building next
largish room; this presents a stylish and cheerful run down is that the to a well-lit road, you will find
mid-priced alternative between the bathroom is split into three zones that some form of external light
expense of downlighters and the poor and each has to have light fittings is essential just to negotiate the
light quality offered by a central light. suitable for the risk (but only if you front path. By all means arrange to
Feature mirrors need to be set where choose to place light fittings in these switch it on a timed Passive Infra
they do not directly reflect lights. zones). Red (PIR) detector, but that doesn’t
A traditional effect like a mirror n Zone 0 is either in the bath itself mean you have to blast people in
above an Adam style fireplace will or in the shower tray (why would the face with over bright bulbs.
be ruined by a chandelier directly in you want a light fitting in a shower PIR switches can be adjusted to
front of it. Picture lighting is another tray?) and requires top-rated fittings trip on at different light levels and
problem area that you can ruin if you (scoring IP 67 or higher). for different lengths of time – from
don’t get it right. n Zone 1 is immediately above the a few seconds to several minutes.
bath or in the shower cubicle up to As alternatives to in-your-face
BEDROOMS a height of 2.25m above floor level. floodlights, consider wall-mounted
For most people, bedroom lighting Here you require a fitting rated at lanterns, outdoor spotlights spiked
will be a mixture of an ambient IP44 or higher. into the ground, free standing
central pendant and table lamps for n Zone 2 is the area around Zone bollards or even brick lights, which
reading. Although a central pendant 1, up to 0.6m surrounding it. This replace a standard brick in your
light source will be cheaper to install, also requires an IP44 light fitting or external wall.
when the cost of task lighting is better. The energy efficiency regs also
included, the alternative options of address external lighting. They
uplighters or downlighters look more HALLWAYS/STAIRWELLS demand that external lights should
pocket-friendly, although you must n Don’t be tempted to hang lights either be fitted with daylight
pay attention to switching from the where you can’t change the bulb detectors and timed switches or not
bed as well as by the door. without a ladder. use more than a 40W bulb. Because
n Don’t fit uplighters at the foot of the LED take-over, the regs here
BATHROOM LIGHTING of stairwells where you can see the are looking a little dated, as a 40W
The regulations require that bathroom bulbs from above. LED would be the equivalent of
light fittings should be concealed to 250W in old money.
prevent direct contact with water. EXTERNAL LIGHTING
Conventionally, this is done by The bane of external lighting is the
placing a central light inside some 500 watt halogen floodlight. In the
sort of glazed casing. There are some last few years these have become BUILT-IN
extremely naff bathroom light fittings very cheap and very common, yet VACUUMS
around and finding a good one can be their effect is blindingly unpleasant, Why bother to fit a built-in vacuum
difficult. An alternative approach is to unless well concealed. The advent cleaning system? The big plus with
use sealed downlighters. of LEDs hasn’t ended this practice central vacuums is that what gets
There is in fact a raft of regulations — it’s just made it more energy sucked up stays sucked up. With a
about lighting in wet areas, covered efficient. portable vacuum, efficiency depends
by the IP ratings (IP here stands Security lighting need not be on how well the filter works. Small
for Ingress Protection). Google IP unattractive. It is worth giving a particles of dust go through the filter

HOUSEBUILDER’S BIBLE l 13th EDITION 209


Chapter 9

and get re-circulated, which is why a


house often smells a little bit different
after vacuuming. By removing the
motor to somewhere like a utility
room or, better still, a garage, you are
shifting all this dust out there, though
it may not do much for the look of
your shiny new car. And, by locating
the motor out of the way, you also
get another plus which is near-silent
vacuuming.
The biggest minus seems to be
finding somewhere to stash the pipe.
The fewer inlets you have the cheaper
and easier to install but the longer
the pipe needs to be. Many people fit
one inlet downstairs and one upstairs
which means you need up to 10 m system on a four-bedroom detached Built-in vacuums are a niche product
of pipe to be able to get to the far house are around £1,000 (excluding in the selfbuild market. They make for
interesting displays at exhibitions.
corners of the house. Coiled up this labour). Some businesses actually give
makes a considerable heap – much away the wall ducting with timber
bigger than a portable vacuum. The frame kit homes, hoping this will
solution is to build in a rack, like a create a sale later.
hosepipe rack, somewhere handy to future buyers as well. Time to
get to but easy to conceal. A pipe knuckle down and take a hard look
cupboard no less. at what’s in and what’s out in home
There are a number of small TELECOMS communications.
manufacturers working in the UK As recently as 1995, this was a fairly
market. Most advertise heavily in the short section: you stuck a phone line KEY CHANGES
selfbuild press and can be regularly in, you put a couple of TV points The twentieth century saw the near-
found making pitches at the selfbuild in, an aerial in the loft, maybe a universal adoption of three different
exhibitions. If you are interested, satellite dish and you were away. For wiring systems into the home:
most will quote from floor plans you many people this will still be a fine electricity, telephones and television,
send them. They aim particularly at solution, but the intervening years with a few homes opting for a fourth
the new build market because the have seen the arrival of home office system, wiring for burglar alarms.
system is most conveniently fitted at working, the internet, and digital TV, Of these, only the first, electricity,
the first-fix stage so that the ducting and suddenly the basic house wiring has conventionally been cabled all
is easily concealed. Put another way, doesn’t look quite up to the mark over the house. Telephones initially
it’s more trouble than it’s worth to anymore. came into the house at just one
fit the pipes into an old house but Now you have to make an educated socket, more recently two or three
building into a new home is relatively guess as to what to put in and what and likewise TV outlets have been
straightforward. to leave out, not only for your own restricted to one, two or three outlets.
Prices for a built-in vacuum cleaner requirements but for any possible Whilst the electric cabling routes

210 13th EDITION l HOUSEBUILDER’S BIBLE


WIRING

around the house remain largely use just one decoder for all the TVs to the fibre-optic network, run by
unchanged, the demand for more in the house, but if you want to watch VirginMedia, which promises much
complex phone wiring and TV different channels, then each TV will faster speeds. Open Reach is also now
cabling is causing these other systems need its own decoder (or be a digital rolling out a fibre optic network.
to grow and converge. Phone wiring TV).
is changing because we want more WIRED OR WIRELESS?
outlets and because we are using Selfbuilders have over the past decade
phone lines for more than just PHONES AND BROADBAND or so spent a great deal of money laying
conversations. TV wiring is changing Phone cabling around the house has data cabling systems around their
because the methods of delivering traditionally been a simple affair. Your homes, only to find that the world
TV signals are changing. Over and service provider (traditionally BT) seems to have migrated to wireless
beyond this, the actual cables used installed a master socket and you could systems, which require nothing more
for phones and TVs are changing run a small number of extensions out than a single broadband router —
and people are starting to cable from there. If you started running a usually provided free by the internet
for additional reasons: things like business from home, you would install service provider – plugged into the
security, audio and lighting control. a second line with a fax/phone on it. It phone line. Whereas once, we all used
rarely got more complicated than that. desktop computers (which came with
DIGITAL TV Surprisingly, the broadband roll-out all manner of wires and cables), we
TV signals are delivered to the home hasn’t changed it that much. If you now seem to be using laptops, tablets
by three different methods, rooftop want to connect three computers, and smart phones where mobility is
aerial, satellite dish and fibre optic an X-box and a TV to the internet, key. Has the technology moved on to
cable. If you live in or near to a big city, you can do it all via one phone line. the extent that wired systems are now
you will have a choice of all three but Broadband is now established as a redundant?
fibre-optics are unlikely to be laid out medium for watching TV and video
in rural districts, so you need to find out on demand, even though there are WIRELESS PROS
what is available and what works well distinct signs that the infrastructure n It’s simple to install
in your area. is groaning with the demand being n It’s inherently flexible - you don’t
Standard TV signals (the ones we placed on it. One of the neatest features have to plug into a socket
have all grown up with since the 1950s) of broadband is that you can still make n It’s almost as quick as hard wired
have conventionally been fed around and receive phone calls on the same connection – strictly speaking not
the house in brown coaxial cable from line whilst uploading and downloading true, as wired connections are capable
the rooftop or loft aerial. The standard whatever from the internet, something of much greater data transmission
signal is usually adequate to service the old dial-up connections couldn’t do. speeds, but the limiting factor is
three or four TV sets – if you want So in many ways, broadband makes usually the bandwidth coming into
more you need to add a small amplifier life simpler for people working from the house, not the distribution around
to the system. home who previously would have had the house, so in reality you won’t
Digital TV isn’t so different. The to install multiple phone lines. notice any difference
signal needs to be decoded in the Cable modems, an alternative way n It’s more convenient with mobile
house, something which used to be of getting broadband, are available to devices like iPads and iPhones. In fact
achieved in a box of tricks called a customers of the cable network which most of the recent phones and tablets
digibox, although these days it’s usually covers 50% of the UK population. don’t have any way of connecting to
done inside a digital TV (that is a TV The deals are broadly similar to other cable as they are wireless by default. 
that has a built-in decoder). You can broadband offerings but link you n Far fewer cables

HOUSEBUILDER’S BIBLE l 13th EDITION 211


Chapter 9

The wiring closet,


n It works up to 25m from the base
sometimes known
station as Node Zero. If
n It’s easily and cheaply upgradeable  you data cable a
house, the aim
WIRELESS CONS is to bring all the
n You may get wi-fi blind spots – it cables individually
back to this point
often doesn’t work in every corner so that each
of the house: aluminium sheeting, outlet is directly
in particular (sometimes used with connected to the
plasterboard or underfloor heating), hub. Frankly, you
blocks wireless reception, though you don’t really need
can buy signal boosters to counteract any of this unless
you are running an
this phenomenon). office.
n Sometimes other devices can cause
interference
n This makes it problematic when
planning ahead – how do you know
whether it will work or not?
n You still get a better, more reliable
connection speed with cable.

EXTENDING WIRELESS
NETWORKS It may be that in future selfbuilders sockets and then connect Ethernet
There are work-arounds for some of will stop flood wiring their homes cabling. It saves you having to run the
these problems. There are products with data cabling and instead run two cabling all over the house.
that enable you to set up booster or three ethernet cables from the hub Again, it’s an inherently flexible
outlets which take the signal from to strategic points around the house system because almost every room
the main router and relay it to parts and then rely on wireless connection has electrical sockets and so you can
of the home (or the garden office) from booster stations. That is have a cabled internet connection
where reception is difficult. Apple’s precisely what I did on my 2018 anywhere you want. It’s a particularly
Airport Express is designed to do selfbuild and have no complaints. good solution for outbuildings and
just this, and it also enables music to garden offices where a wireless
be distributed wirelessly as well. The POWERLINE NETWORKS connection might struggle. But
advantage of these products is that But there is another technology that it’s still not as good as dedicated
they are portable, so that you can threatens to make even this amount Ethernet cabling: Powerline is not
move them around until you get the of data cabling redundant, because nearly as quick and is prone to
signal strength you require. now you can transmit data through occasional, inexplicable cut outs.
Of course, it’s not either wired or your home’s electrical wiring system.
wireless. There is nothing stopping Type ‘Powerline’ into Amazon and WIRED ETHERNET
you playing mix and match, so that it’ll return a dozen or so pairs of This is the ‘conventional’ way of doing
some parts of your home network are plugs at around £40, enabling you to it, even though just a few years ago it
wired whilst other parts are wireless. fit these adaptors into your electrical was regarded as cutting edge.

212 13th EDITION l HOUSEBUILDER’S BIBLE


WIRING

Data cabling migrated from offices Similarly the patch panel and the will still be other features of the smart
where it is now as common as electric RJ45 outlets needed to plug in your home (principally entertainment, audio
wiring. Instead of haphazardly running devices are commodity items. and security systems) which are more
cables from the various input points The materials to fit out a four- reliable when used with cable. But then
to the various output points around bedroomed house would typically cost these never did use the standard data
the house, you designate a place in the around £800-£1,200, depending on the cabling systems in any event.
house as a central hub (known as the number of outlets that you require. This Whilst cable systems will continue
wiring closet or sometimes, annoyingly, compares very similarly with the cost of to supply faster and more reliable data,
as Node Zero) and you bring all the electrical wiring. we have grown used to the convenience
incoming cables to this point and then For many selfbuilders, the cabling of wi-fi only tablets and phones and it
distribute them around the house to is seen as just another DIY task to be seems likely that wi-fi is set to sweep all
wall-mounted data sockets which look completed along with the underfloor before it.
very much like electric sockets. heating and the central vacuum system.
A wiring closet doesn’t have to reside There are now many companies
in its own purpose built room – unlike offering to supply and fit structured
the other kind of WC. cabling systems and prices start from
The essential element in a wiring about £2,000 for a basic fit out, though
closet is a patch panel, a wall-hung box many of the more esoteric uses of
the size of a small suitcase. The patch structured cabling such as lighting
panel plays a similar role to an electrical control and multi-room sound systems
fusebox in household electrical wiring are expensive extras costing many
where the power coming into the house additional thousands.
is split up and sorted into different The one major weak point with Cat
circuits. It is in here that the phone 5 cabling was that it didn’t deliver a very
lines and TV cables are all connected. compelling TV signal. Because of this it
Rather than being connected up in has been conventional to run CT-100
series (or daisy chained) as many TV coaxial cable as well as Cat 5 around
and phone outlets are in conventional the house and back to the patch panel.
set-ups, each outlet throughout the
house is connected directly back to the IN SUMMARY
patch panel. That means a double data The question remains: if you are
socket will have two cables running building a new home in the 2020s,
next to each other back to the patch does it make sense to fit a data cabling
panel where each will terminate with its system to every room in the house? The
own unique number which corresponds short answer is no.
to a number etched on the data socket. Mobile computing and wireless
The wiring is done with data cabling communication is taking over and few
of which there are various formats homes will have more than one desktop
like Cat 5 or Cat 6; generally the computer in future.
more expensive the cable, the more However, it may still be worth
data it will carry. The cable itself is running a limited cable network to
not expensive, typically no more than get reliable access to far-flung corners
electric cable. of the home. And of course, there

HOUSEBUILDER’S BIBLE l 13th EDITION 213


Chapter 10

10
Traditionally, the second-fix
stage of house building begins
FINISHES
see when the house is completed.
Hence this chapter, entitled
like me, you may find yourself frozen
in a state of indecision. How ever
with the internal plastering, even ‘Finishes,’ covers what some would much you know or find out, there
though these days the majority of call the second-fix. will still be more that you don’t know
new houses never get to see any It is also worth bearing in mind and eventually you have to plump for
traditional plastering. Up until this that we are entering the world of something otherwise the job never
time, everything going on inside interior design. If you are selfbuilding gets finished.
the superstructure of the house has or renovating, this is pretty much By all means start hanging out
been first-fixing — constructing where the shopping starts and it can in Pinterest and find out what
walls, roofs and floors, burying be both exhilarating and frustrating. everyone else is doing — that’s
pipes and cables. The key difference Just what are you going to lay on your being on trend, I believe. Or even
between the two stages is that the floor? Just how are you going to finish hire an interior designer if you really
first-fix works will be hidden within the walls? can’t face endless trawls around
the structure, whilst the second- You may be the sort to have very websites, exhibitions, catalogues and
fix items will be there for all to definite ideas about what you want or, showrooms.

214 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

WALLS & CEILINGS PLASTERING Key Material Costs


Unit Price Divider Metre Rate
Back in the 1990s, when I first
12.5mm Plasterboard 1200x2400 £ 4.80 2.5 £ 2.00 m2
started writing about selfbuild,
12.5mm Soundcheck Board 1200x2400 £ 8.00 2.5 £ 3.20 m2
plastering looked like it was a dying
12.5mm Fermacell Board 1200x2400 £20 2.5 £ 8.00 m2
art. Everyone had started fitting 12mm Render m2 £1 1 £ 1.00 m 2
plasterboard to their walls and Thistle Skim Multi Finish 25kg bag £ 7.00 9 £ 0.80 m2
ceilings and copying the Americans Monocouche Renders 25kg bag £10 1 £10 m2
and Europeans in basically just 65mm Screed (mixed on site) m3 £140 15 £9 m 2
painting over it. Besides, plasterers
themselves all seemed to be wizened PLASTERERS KEY RATES per m2
old men who by rights should have Charged Rate £22 /hr Labour Mats Total
retired years before. They didn’t have Render and Skim 30 mins £ 11 £3 £ 14
any apprentices and it was hard to Render only (Scratch Coat) 15 mins £6 £2 £8
see just who would apply the plaster Render (Top Coat) 20 mins £8 £2 £ 10
when they finally hung up their Tacking (Nailing) Plasterboard 35 mins £ 13 £3 £ 16
boots. Tacking Soundblock Board 40 mins £ 15 £5 £ 20
However on my recent selfbuild, I Dot and Dab (Sticking) Plasterboard 20 mins £8 £3 £ 11
Skim Finish on Plasterboard 16 mins £6 £1 £7
chose to go with a wet plaster finish
Dry Lined Finish to Plasterboard 12 mins £5 £1 £6
and had to book ahead months in
Fixing External Mesh for Render 12 mins £5 £8 £ 13
advance to get some very young
Two-coat External Render 50 mins £ 19 £3 £ 22
and capable plasterers. What has Single-coat Monocouche Render 30 mins £ 11 £ 10 £ 21
happened? Why has the worm turned. Floor Screed, 65mm Thick 25 mins £ 10 £ 11 £ 21
Two reasons stand out. One is Ready-mixed Screed 20 mins £8 £8 £ 16
to do with the sheer beauty of a Gypsum Screeds 50mm Supply and fix only £ 20 £ 20
perfectly smooth finish applied
to plasterboard, something which MODEL HOUSE Boarding & Plastering Costs
painted dry lining can never really Area Rate Materials Labour Total
match. The other is the new emphasis Celings (Skimmed board) 140 m 2 £ 27 £ 800 £ 2,900 £ 3,700
on airtight construction as a way of Walls (Skimmed board) 350 m 2 £ 27 £ 2,100 £ 7,400 £ 9,500
delivering energy efficient homes. Gypsum Screed 80 m 2 £ 20 £ 400 £ 1,600
I’m not sure my plasterers knew Total £ 3,300 £ 10,300 £ 14,000
much about the benefits of airtight
construction but in truth they didn’t plaster, we routinely refer the pink changed over the years from being a
really need to. They simply focussed gypsum powder which comes in three-coat cement-based coating to
on getting that smooth, shiny surface bags and is spread thinly or skimmed all manner of fancy, through-coloured
that well-applied gypsum plaster across internal walls and ceilings. bagged products, usually hailing
delivers and that was precisely what I But plasterers do more than just from Germany, which promise a
was looking for. skimming. They also lay the backing lifetime of crack-free beauty. There
coats, which are usually cement- is also a renewed interest in lime
PLASTERING based, and many also do traditional renders which had, by the 1990s,
The very term plastering is often floor screeding. And then there is the all but been abandoned in favour of
misused. When we talk about world of external renders, which have gypsum-based products. I noted that

HOUSEBUILDER’S BIBLE l 13th EDITION 215


Chapter 10

Plasterboarding have preferred using dot and dab


these days is a multi- techniques to stick plasterboard onto
task job, especially the wall. Dot and dabbing is a skill
in internal stud walls.
itself, much loved by speculative
In this bathroom,
sound-proofing is housebuilders as you don’t get any
required and this cracking or crazing, which sometimes
takes the form of afflicts cement-rendered walls. But
both acoustic wool it is lousy as an air tightness detail
insulation stuffed and, as we are now emphasising air-
into the gaps
tightness, the attractions of dot and
between the studs,
and Soundcheck dab are waning.
board being fitted
into the adapted PLASTERBOARD
studwork. If you do go for a plasterboard base,
you need to look at which boards
to use. The cheapest way to buy
is to specify the full size boards
(1.2m x 2.4m) at standard thickness
(12.5mm). Use square-edged board if
you are going to skim, and tapered-
edge is you are painting directly
(known as taping and jointing).
However there are many instances
where an improved board is either
required or desirable. Plasterboards
are available offering sound, fire and
whilst my old school plasterers were That should be enough to let you moisture resistance and it is likely
scornful of anything to do with lime, know that if you are trying to do as that on a quality self-build you will
the current crop see lime plasters much work as possible on a DIY be using at least one of these in large
as a challenge and look forward to basis, plastering is one trade you don’t quantities.
working with it. want to take on. You would be better What about fixing boards? Some
Plasterers like to get their hands advised to stick to one of the paint- plasterers offer this service, but
dirty. It is a wet trade. The ones I only methods. There are techniques to most are so busy now that they stick
used to work with all seemed to come be learned here too, but you can hope to what they are best at. Unlike
from Glasgow and spoke with such to master them relatively quickly. plastering itself, fixing plasterboard
thick accents that it was often hard is not particularly skilled though it
to make out what they were saying. BLOCKWORK WALLS is often slow and intricate, especially
Joe Quigley was the best of them and If you are plastering onto blockwork where you have odd-shaped rooms
he once told me that you could write walls, then you have a choice of how and lots of little details to fuss
everything you needed to know about to do the backing. The traditional over. First fix carpentry, if well
plastering on a single sheet of paper, route is to get your plasterers to apply planned, should provide studs and
but you could spend five years learning a wet cement render, but for the joists at spacings compatible with
the trade and still not be any good. past thirty years or so housebuilders plasterboards, but inevitably there

216 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

will be corners in every room where to what I thought would happen 25 which are completely waterproof and
the spacings don’t work and extra years ago, the trade is booming and can therefore be specified in shower
timber supports have to be inserted good plasterers are hard to pin down. enclosures.
in order to provide a backing for the
plasterboard. Internal timber walls NATURAL PLASTERS
and ceilings also require sound-proof There is a small but growing
insulation and often all this work, interest in traditional lime and clay PAINTING &
including the plasterboard tacking is plasters which has spread from the DECORATING
done by the site carpentry crew rather conservation market into new build. Of all the building trades to master,
than specialists. In fact, there is a Clay, in particular, has a reputation painting is by far the easiest. It thus
great deal of work in turning a first- for being good in wet rooms because represents a sensible way for the
fix shell into a plaster-ready structure. it absorbs moisture and helps control DIYers to add value to their project
On my recently completed humidity levels. Plus it looks good without spending an arm and a leg
selfbuild, the battening out, insulating unpainted. on professional help. As the old saw
and tacking took twice as long as goes, if you can piss, you can paint.
the actual plastering. Whilst my FERMACELL By all means take it on, but there
500m2 of plastering to ceilings and Widely used in Germany, are a couple of provisos here. Firstly,
walls took just 18 days, costing Fermacell is, in some ways, very although it’s easy to do, it’s much
£2800 including materials, the pre- similar to plasterboard and, in others, harder to master and you can usually
plastering preparation work took rather superior. It has a much higher readily tell whether the painting
40 days and totalled £15,000. We racking strength than plasterboard has been carried out by an expert or
may have put an excessive amount of and is therefore particularly useful someone merely competent.
timber into the supporting structures, when you want to hang radiators The second is the amount of time
packing out walls and ceilings where and bathroom furniture off timber taken to paint the interior of a house
the first fix carpentry was not quite stud walls and you don’t know where is something to grasp before you set
perfect, but the result is a superb the studs are. Fermacell also makes sail. A typical detached house — our
finish with clean lines with very little for better soundproofing. However, model house for instance — has
skirting or architrave. We don’t have a it is pricey in comparison with around 500m2 of plastered walls
single plastering crack in the house. plasterboard, two to three times the and ceilings and maybe 300lin.m
We skim plastered in a very cold price. Consequently, it is being used of skirtings, architraves, window
February and had hoped to start in the UK mostly as a backing board boards, window reveals, door linings,
painting a couple of weeks later, but for kitchens and bathrooms and you name it. A good painter doing
the drying out process took longer where soundproofing between rooms three-coat work will spend between
than I would have liked and I ended is an issue. It is usual to glue the 200 hours working their way through
up hiring a dehumidifier for three boards together and simply paint over this lot. That’s about five weeks solid
weeks. At £75 a week, it is a hidden them for a finished surface. work for one person. If you take that
cost of plastering in winter, but a far Fermacell is appreciated by a on yourself, do you have five weeks
better than holding up progress on a breed of DIYers who don’t want to spare, with nothing else to do in the
building site. be troubled with plasterers. It’s fairly interim? If you leave it to do in bits,
Watch out also for just how busy simple to paint it. maybe a room at a time, you risk
plasterers currently are. Be sure to Other boards worth seeking out mucking up the finishing schedule.
book them well ahead if you want are Knauf ’s Aquapanel and Hardie Trying to paint a kitchen that’s
to stick to your timetable. Contrary Backerboard, cement particle boards already in use is a mind-numbing

HOUSEBUILDER’S BIBLE l 13th EDITION 217


Chapter 10

Decorating Rates (inc Labour and Materials) Another tip, this one for the
Each coat Cost for three coats stylistically challenged housebuilder,
Emulsion to Internal Plasterwork £ 2.40 m 2 £7 m 2 is to slap magnolia on everything.
Lt Greene/Farrow & Ball White is a bit too clinical for most
Masonary Paint to External Render £ 7.50 m2 £23 m2 people’s taste; in contrast magnolia
Stain to External Cladding £ 6.50 m2 £20 m2 has enough cream in it to soften the
Varnish to Hardwood Flooring £ 6.20 m2 £19 m2 overall effect without making any
Paint One Face of a Window £ 11.30 m2 £34 m2 loud statements that will clash with
Stain One Face of a Window £ 11.50 m2 £35 m2 furnishing choices made later on. If
Paint One Face of a Door £ 7.60 m2 £23 m2 you are in a hurry and don’t want to
Stain One Face of a Door £ 7.80 m2 £23 m2 be bothered planning colour schemes,
Paint Balusters and Stair Supports £ 11.30 m2 £34 m2
then magnolia is the answer.
Stain Balusters and Stairs £ 11.50 m2 £35 m2
It’s also a boon in homes shared
Paint Strips £ 2.70 m run £8 m run
with small children where walls have
Stain Strips £ 2.80 m run £8 m run
Wallpaper £ 12.00 m2
an endearing habit of getting drawn
on. Instead of trying desperately to
MODEL HOUSE 3 Coat Decorating Costs clean off the mess, you can just slap
Area/Length Rate Materials Labour Total some more paint on it and it’ll be just
Plasterwork White 490 m2 £7 £ 290 £ 3,230 £ 3,520 like new. Dull but true.
Timber lengths If you are so minded, you can
Door Linings 66 m £8 £ 40 £ 510 £ 550 spend an awful lot of money on posh
Architraves 130 m £8 £ 70 £ 1,010 £ 1,080
paints like Farrow & Ball and Little
Skirtings 120 m £8 £ 70 £ 940 £ 1,010
Greene. Their emulsions cost around
Windowboards 20 m £8 £ 54 £ 160 £ 214
five times as much as the regular
Cupboards/Shelves 50 m £8 £ 135 £ 390 £ 525
Total £ 700 £ 6,200 £ 6,900 Dulux and Crown but the colours
are lovely and in the great scheme of
experience and takes about twice as need to make is between a matt finish things, paint is still a pretty small beer
long as it does to paint a near empty and a silk finish. Matt finishes are when it comes to the overall budget.
room, as you are constantly moving characterised as being thicker (more In fact, painting is one of the very few
plates and pots and pans from one opaque) and softer; silk finishes trades where the costs are more than
place to another in order to get at produce a harder, glossier look that 85% labour (mostly they are around
ceilings. has the added advantage of being the 50-50 mark).
If you have the money, I’d strongly more readily washable. There is no
recommend getting it done by a difference in price. Satin finishes are WOODWORK
professional, but you can undoubtedly a halfway house between matt and Interior woodwork is traditionally a
make the cash go further if you silk. One tip for new housebuilders is three-coat gloss paint system. Back
choose to DIY it. to apply your emulsions immediately in the 1990s, woodstains seemed to
after plastering or dry-lining is be taking over from paint but now
INTERIOR WORK finished. You can get in and have paint is back with a vengeance. There
Most interior walls are finished with a relatively free run at bare walls is lots of debate about whether to use
emulsion paints, which are very without having to fiddle around with a water-based paint or an oil-based
cheap and very easy to apply, being skirtings, architraves, socket boxes, one. If you’ve never done much
water-based. The standard choice you switch plates and radiators. painting before, the water-based

218 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

ones are far easier to use, but most there is some truth that good building venetian blind. We treated the
professional decorators still prefer standards are usually reflected in Cedar with a fire-proofing liquid
the oil-based ones, as you can get a tight joints, mastics, particularly Organowood which also has the
slightly better finish with them. the silicone based ones, are now so effect of pre-ageing the timber so
Though dark woodstains are out widely used that it is inconceivable that it looks almost instantly like it’s
of fashion, liming wood to make it you will not have any need of them ten years weathered.
lighter is very much on trend. Look at some point. It is, however, very If regular softwood timber is your
out for Osmo’s lovely Polyx Oil tints difficult to estimate just how much thing, then you have to provide
which isn’t strictly speaking anything mastic you will need – that, at least, some form of protection for it if
to do with lime but gives a very good often depends on how wide your gaps it’s to be used externally. The main
washed effect. are. And it is also true that mastic is choice is between traditional paint
The modern preference for shadow a whole lot easier to apply against and woodstains. Even though
gaps and tile upstand skirtings is tightly fitting backgrounds. If you are woodstains are more expensive to
partly based on looks, but is also well subcontracting decorating, you should buy, the cost difference between the
grounded in minimising redecorating make it absolutely clear where you two systems is negligible because
costs. want mastic to be applied and which there is such a high labour content
type of mastic you want to be used. in decorating and, if anything,
MASTICS stains are slightly quicker to apply.
Mastics are something of a new EXTERIOR WORK What really causes decorating costs
feature in building, or at least the You can avoid exterior decorating to tumble is reducing the number
ways we use them today are new. altogether by specifying pre-finished of coats needed to get a decent
They now tend to get applied to just materials like uPVC, composites or finish. Many builders do this with
about every conceivable join between aluminium coverings. Windows and stains by dispensing with the third
materials; so wherever joinery meets doors are available with composite coat, which would be difficult with
brickwork or a tiled surface meets finishes and there are masonry conventional paint, but there are
a worktop or a bathtub, there’s a alternatives for fascias and soffits. now a number of one-coat paints
bead of mastic. There are mastics for Renders are now available in bags (eg Crown Solo) that enable you
sealing between plasterboard sheets which are pre-coloured. Even timber to dispense with the undercoat at
and decorator’s mastics for filling boarding is available in cementitous a price.
cracks (Painter’s Mate). Just about replica or in species like cedar that
the only thing that is common to require little if any treatment. There MASONRY PAINTS
them is that they are packaged in are also an increasing number of Masonry paints, which are used to
tubes. Where water penetration is timber options like Thermowood cover external render and masonry,
a problem – and that includes most and Vastern’s Brimstone which don’t are water-based and many will claim
external applications – it is worth require any further treatment. Or to last for 15 years before needing
paying more for the silicone based plump for something ultra-cool like re-coating. They are easy to apply
ones which, whilst remaining flexible, burnt timber. but their application should not
are less likely to break down. Note that on my recent selfbuild, be rushed; the underlying cement
It is said by some that mastics we included 45m2 of Western render must be allowed to dry out
are the bodger’s friend and that if Red Cedar, place in an unusual thoroughly. This is a drag because
you build to very high standards configuration which involved fixing many builders are itching to strike the
your joints will all be tight and you the cedar planks in louvred so that scaffolding by the time the external
shouldn’t need mastics at all. While it looks to all intents like a huge rendering is done and waiting for

HOUSEBUILDER’S BIBLE l 13th EDITION 219


Chapter 10

render to dry can take forever. Take such a splashbacks and shower to live with the cracks. Not that you
the scaffolding down and it’ll take enclosures, but even here the actual should have any if you’ve done your
you three times as long to paint the amount needed for wall protection is board preparation well.
house. The moral? Only build houses often far less than we choose to fit.
with external painted panels when WALLPAPER
the sun shines. Or, better still, opt for ARTEX The fashion for all things white or
a pre-coloured monocouche render. Anyone for Artex? I didn’t think so. off-white in new homes has not been
It was the go-to ceiling cover in the kind to our wall paperers. It’s not so
ALTERNATIVE FINISHES post war years (when it contained very expensive but wallpaper is almost
You are of course not restricted to asbestos) but thankfully it’s gone unheard of now as a whole house wall
painted walls and ceilings. But with right out of fashion. Although it’s covering. It tends to be confined to
plastered walls and ceiling working much easier to apply than skimmed children’s bedrooms and even there,
out at around £17/m2 and painting plaster, it is also much harder to paint it’s often just on one wall.
a further £7/m2, almost all these which actually made it a bit of a Wallpaper doesn’t have to be
alternatives are considerably more pain in general. Housebuilders used expensive, but it’s never going to
expensive, so they tend to be used to specify Artex on their ceilings, be as cheap as paint so you would
decoratively. Not in every case. Some to help stop call-backs for cracking only sensibly use it if you are very
areas require specialised wall covers happening but by and large it’s better confident that you have a statement
you want to make. It works fine in
One of the hidden many period properties, but in new
joys of selfbuild is homes…….. I don’t think so.
growing a familiarity
with all manner of
outlets you would
never normally set EXPOSED BRICKWORK
foot in. The tile shop On the other hand, internally
is a prime example. exposed brickwork can look fabulous
If you are happy with in any sort of setting, providing the
white metro tiles brickwork is of good quality. It’s
everywhere, then
long been used around fireplaces and
you’ll save yourself a
lot of time. But once chimneys but the vast majority of
you start exploring new homes don’t have such things
what’s out there, it anymore — a wood stove really isn’t
begins to eat you up. the same.
By all means use some panels
A plug here for a
of brickwork, or even fair-faced
fantastic tile shop
in London (pictured blockwork, but bear in mind that the
here), Mosaic del larger the area you use, the more you
Sur, where we ended will have to accommodate services and
up spending a lot of beams over openings. The neat way to
money. do this is to also make these features in
their own right, so that you run pipes
in copper and cables in metal trunking
and surface mount metallic switches.

220 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

TIMBER rediscovered them and suddenly glass FLOOR FINISHES


Internal timber panelling used to be blocks are everywhere. Though the
very popular in the 1970s and 1980s, initial wave of enthusiasm after we Nowhere else in building is there
and then fell right out of fashion. But re-discovered glass blocks has abated, such a great variety of materials
unlike many building fashions from they are still very much around and at such a huge variation in price.
that era, timber interiors have made a are on message. Ballpark materials You could carpet a four-bedroom
comeback. costs come in at around £60/m2. house for less than £3,000 (inc.
The key difference is that dark or VAT); equally you could spend over
stained timber is no longer sought CERAMIC WALL TILING £20,000 and not risk being accused
after, so you won’t be fitting any more Tiling is not strictly speaking an of extravagance. If you really want
stained pine matchboarding, the alternative to plaster and paint floor envy, take a look at Dinesen
scourge of the 1970s bathroom along because it is often applied on top, timber floors and note how hard
with the avocado bathroom suite. But so ‘addition’ might be a better word. it is to find a price. That’s because
Scandi-looking pale timbers are in and Its use is often entirely functional you won’t be able to afford it. I’d
lime-washing effects are right in. Hell, when applied as a splashback behind hazard a guess that to lay Dinesen
people are even fitting timber panels sinks, basins and baths, but in the throughout the entire 160m2
and painting them. Check the mood Mediterranean you frequently see model house would cost upwards of
boards of Pinterest for what is on trend. ceramic tiling in living rooms and £40,000.
In cost terms, timber panelling is bedrooms as well. In the UK wall Enough of this. A word about the
intermediate in cost between painted tiling is seen in more functional sub-floor.
plaster and exposed brickwork or tiling. terms, partly because wall tiles are so
much more expensive here. FINISHED FLOOR LEVEL
PLYWOOD Whether you pay under £10/m2 Throughout the works, from
One wall finish I am partial to in for some unadorned and unnamed foundations onwards, the key datum
utility rooms is plywood. OK, it white tiles or £80/m2 for top of the point is the ground floor finished
tends to be dark but it’s incredibly range, hand painted tiles out of the floor level (FFL). Everything is built
practical and it can make what might Fired Earth catalogue, the fixing in reference to this point. However,
be a cold, unfriendly room somehow costs remain remarkably similar. The when you come to lay a ground floor,
seem warm. The same issue you have adhesives which you use to stick the the FFL suddenly becomes extremely
with exposed brickwork haunts a tiles down with and the grouts which critical. Not only do you want a
wall surface such as plywood, but in you spread between the tiles tend perfectly flat floor, but you want your
a utility room/plant room, does it to work out together at around £6/ door thresholds to work seamlessly
matter? m2 depending on the thickness and and you want the bottom tread of
specification. The laying costs depend your staircase to fit snugly onto the
GLASS BLOCKS on the intricacies of the task in hand, finished floor and to be exactly the
One of the most intriguing trends but on fairly straightforward work, same height as all the other steps.
in home interiors has been the re- it takes a tiler around one hour to fix How do you go about working this
emergence of glass block walls. They a square metre of tiles and about 30 out?
were widely used in the 1930s, mostly minutes to grout them up later. Big Firstly mark where the theoretical
on public buildings, but then all straight runs will be faster than this FFL actually is on your sub-floor,
but vanished from view. You simply but most tiling work in kitchens and and work out whether your sub-floor
didn’t see them until about 20 years bathrooms involves a fair amount of is indeed flat. Use a laser level to
ago when the TV interior shows cutting. mark on the walls in several places

HOUSEBUILDER’S BIBLE l 13th EDITION 221


Chapter 10

Floor Finish Costs (supply and fix per m2)


2 2 2
£30/m2 £60/m £90/m £120/m

Carpet

Vinyl Upmarket Vinyl (Amtico, other LVTs)


Cork

Quarry Tiles

Porcelain and Stone


Laminate (timber effect) Engineered timber

Hardwoods

£6,000 £24,000

Model House Cost £16,000

MODEL HOUSE: Floor Finishes & Wall Tiling


Area in m 2 Rate/m2 Materials Labour Totals
Carpet 70 £60 £3,600 £500 £4,100
Oak Flooring 60 £ 80 £3,100 £1,800 £4,900
Stone Tiling 30 £ 130 £2,200 £1,800 £4,000
Wall Tiling 40 £60 £1,200 £1,300 £2,500
Totals £10,100 £5,400 £16,000

a nominal point, conventionally accommodate the uncoupling mat heating and here you need to be
1000mm above FFL, starting from and the adhesive. You therefore won’t aware that stone and ceramic floors
the original datum point. Then you go far wrong if you plan for a 25mm work beautifully (nothing feels
can measure down and hopefully your flooring zone above your first fix floor quite so good as walking barefoot
subfloor level will be a little bit more in order to fit a floor finish. Unless on a heated stone floor in the
than 1000mm. How much more? of course you are going for a much middle of winter). Thin vinyls work
It helps to select a floor finish thinner vinyl sheet or tile, or a carpet. OK, timber floors less so as they
early, or at least a floor finish depth. Really, it pays to have at least some insulate the heat within the sub-
Floor tiles are usually either 12mm idea of how exactly you are going to floor zone. Carpet is worst of the
or 15mm thick (external ones are cover your floors, even if you haven’t lot because that is like laying a coat
thicker), whereas timber is usually chosen a specific finish. over the floor.
20mm. Having said that, timber It’s not that underfloor heating
flooring is usually laid on a 3 or 5mm UNDERFLOOR HEATING doesn’t work with sub-optimal
underlay, whereas stone/ceramic Note that floor finishes frequently floor finishes, it’s just has to work
flooring needs a 10mm build up to have to work with underfloor harder to get the room above up

222 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

to temperature. In other words, schemes. Synthetics like nylon and VINYL


it is less energy-efficient and you acrylics are now commonplace and The very word vinyl sounds cheap
lose one of the main attractions of much carpet sold these days is a but don’t be misled, it’s not. At the
underfloor heating, namely warm cocktail of wool and synthetics – lower end of the market, brands like
floors. and people walking on them would Polyflor advertise sheet vinyls at £15/
not know the difference. The very m2, but at the top end Amtico are
CARPET cheapest material is polypropylene now selling at over £100/m2. The top
Even when glued down, carpet is which looks synthetic but may be of the range likes to be referred to as
regarded by HMRC as a movable fine for your needs, especially in luxury vinyl tiling and has it’s very
item and therefore subject to VAT bedrooms. own three-letter acronym — LVT
as a furnishing – all other types of n Comparing prices is difficult flooring. A mid-priced, very popular
floor finish are zero-rated in the UK because a lot of carpet is not branded alternative is Karndean.
and therefore effectively exempt from and as there are so many varieties on The best results are to be had when
VAT when built into a new house. the market, very often no two outlets the immediate sub-floor is covered
Even so, carpeting still provides sell the same thing. Sticking to an either with a 5mm latex screed or
potentially the cheapest form of floor established name like John Lewis will thin plywood sheeting. Factor in
covering available – especially the ensure that you are not ripped-off, waste, accessories and laying costs of
bonded cords which also happen to but they are unlikely to be selling between £20 and £30/m2, and you
be reasonably hard wearing. Beware carpet below £10m2. can see the headline rate is often
offers of free underlay and free laying; n Bear in mind this rule of thumb about half to a third of what you will
obviously these services are not free when estimating cost: you should end up paying.
and the charge for them is included double the advertised price of a fitted If you are not drawn to vinyl, there
in the price. Usually priced by the carpet to get an idea of what it will are a host of other materials used.
metre, carpet laying can be subject all cost when laid on your floors. This Cork was once the floor cover of
to enormous wastage because of the will allow for offcuts, underlay and choice for the Habitat generation (c
limited roll sizes. The DIY builder laying costs. 1970s-1980s), and is still around but
might be happier to lay carpet tiles, n Bathroom Carpeting: avoid hard to track down. Linoleum has its
but if price is the only consideration, woollen carpets in bathrooms as they fans too. And there are
then it will still probably be cheaper will tend to go mouldy, especially if
to look out for the absolute basic they have a hessian backing. STONE V PORCELAIN
ranges supplied and fitted by one of Somewhere in the housebuilding
the carpet warehouses. Some of these process you are going to cross swords
carpets sell for a good deal less than with a tile retailer. Even if you don’t
a decent underlay (which can cost FLOOR TILES want a stone or stone-effect tiled
£3m2) so you can imagine what the There are many different materials floor anywhere, you will still be
quality is like. used to tile or sheet floors and there looking out for some wall tiling for
n Material: Wool is the traditional is not space to cover them all here. In kitchens and bathrooms. Step into a
and natural material for carpets; it particular, there are any number of tile warehouse and you will soon be
also tends to be the most expensive. synthetic rubbery plastic type floor overwhelmed by the choices facing
Other natural materials you can use coverings which are generally more at you, and you will doubtless spend an
include sisal, coir, jute and seagrass, home in an industrial or commercial inordinate amount of time thinking
all of which tend to give a faintly setting than a house. Here I look at about tiled surfaces and wondering
bohemian feel to your flooring some of the more popular options. what your choices will say about you

HOUSEBUILDER’S BIBLE l 13th EDITION 223


Chapter 10

to everyone who comes to your home. cleaners, lemon juice and vinegar, add-ons for floor laying will rise to
Perhaps the biggest thing you the sort of things which could easily around £25/m2, and that’s without a
have to decide is whether to go for a get splashed around a kitchen floor. £50/m2 laying cost.
natural stone tile or a manufactured Darker floors, slates and granites, are
one. If you go natural, your finishes not really as delicate as the limestone DRYING TIMES
are limited by what we can find family but dark floors are also less in Note that floor screeds take time to
buried in the ground, but that does vogue. dry and that you must abide by the
encompass some very beautiful stone It’s not a straight choice between guidelines which indicate how long a
which will frankly be hard to fault stone and porcelain, as it sometimes floor should be left uncovered before
on a appearance. It’s surprising how seems. There are a range of semi- you lay anything on top of it. The old
many manufactured tiles endlessly handmade tiles (often referred to as adage was roughly 1mm per day, so
mimic natural stone and, increasingly, Moroccan cement tiles) which are that a 75mm screed would therefore
timber as well. The Italian porcelain assembled using natural products take 75 days to dry out. You won’t go
specialists have been perfecting set into a cement background. far wrong with this rule of thumb but
photo-etching and some of the The beauty of the product hangs in reality it depends on the external
effects they now produce are almost pretty much on the quality of the temperatures and the internal
indistinguishable from timber, let coloured pigments used in the humidity. If time is of the essence,
alone stone. The same is true of the manufacture, but they are usually hire a dehumidifier to speed up the
vinyl tile producers, where they seem easily distinguishable form the mass- process once the building is wind and
obsessed in getting their tiles to look produced alternatives. watertight.
like natural products.
If this is telling us anything, it’s LAYING TIPS POLISHED CONCRETE
that we like natural products which Laying costs for stone/ceramic floor One of the most fashionable floor
makes me think that we should fit tiles are high because it’s a slow finishes you can plump for is to
natural products and not photographs process — it really doesn’t want to be lay a concrete floor slab and then
of natural products, especially where rushed. The larger the tiles, the more “polish” the top so that it becomes a
the price difference is minimal. expensive they are, but they are also beautifully smooth surface in its own
OK, you may make a good case for quicker to lay, but aside from this right. It’s a very skilled process and
not fitting timber in a shower room there are several additional costs. It is definitely not one to be undertaken
and plumping for a porcelain faux- normal now to lay a slip membrane to on a DIY basis, nor even by a
timber floor plank here instead. But allow for the tiled surface to uncouple groundworker who fancies having
elsewhere? from the screed beneath, which a go, because if it goes wrong (i.e.
Having got that off my chest, should prevent cracking. Schluter cracks), there is not much you can do
there are some reasons to consider Ditra Matting and Bal Rapid Mat about it.
before you go natural. Natural stone are two popular options, but at When we were doing our
cost a bit extra to lay because you £8-£12/m2 they add considerably recent selfbuild, we approached
have to take extra care to protect the to the laying costs. And then large the acknowledged masters of this
stone if you don’t want it to stain floors will require expansion joints trade, Lazenby’s, for a quotation
and discolour. And having laid it, as well, although these can be simply and ended up baulking at the cost
it takes a bit of looking after too, achieved by leaving a gap and filling of £145/m2 or over £12,000 for our
especially the limestones, travertines it with the appropriately coloured humble footprint. By the time we
and marbles as they react to acidic mastic. Add in grouts and maybe a had finished applying the last of our
substances like standard floor hired tile cutter, and the cost of all the limestone floor tiles (chosen because

224 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

they looked like concrete, would you Polished


believe), we realised that it would concrete floor
actually have been a little cheaper to by Lazenby’s.
At over £120/
have gone with Lazenby’s. m2, it seems
Just a note to say a concrete finish expensive,
doesn’t have to be dark. Polished but when you
concrete is available in a range of compare it
colours, including white, so that you with alternative
don’t have to be building a cave. The finishes such
as stone tiles,
floor finish is applied a few days after it is in fact very
the readymix pour so you are then competitive. No
left with a surface you have to keep wonder it’s in
clean for the rest of the build. Also fashion
perhaps worth mentioning here that
finished concrete can also be used for
stairs, worktops and sanitaryware. It’s a composite MDF backing, usually easy to lay. Floors need looking after
versatile. around 12mm. The thicker the timber and even occasionally sanding, which
One of the big pluses of a polished veneer, the better quality the floor. An takes about 1mm off the surface, so
concrete finish is that you save on the engineered floor is always going to eventually a 4mm layer of hardwood
cost of a screed, whether conventional be more stable because of the MDF veneer will wear through, so maybe
or otherwise, because the concrete is backing which makes it more suitable looked at in the ultra-long term, the
both floor and screed. It also works for bathrooms (though arguably not engineered approach will not stand
really well with underfloor heating. as suitable as a porcelain timber-look the test of time. But we are taking
It’s got a lot going for it, but do plan alike floor plank for about the same about a century here before it wears
well ahead. The better suppliers tend price. through, so I wouldn’t worry about it
to be booked up months in advance. In timber flooring, there are an over much.
awful lot of options and a wide range Another approach is to use a
TIMBER FLOORING of prices; oak planks can be anywhere reclaimed board or a parquet floor
The rise and rise of hardwood between £20 and £80m2 (not that has been stored undercover and
flooring is a notable trend in including stuff like Dinesen which is is, hopefully, dimensionally stable.
contemporary home design. It was way more expensive). It’s a huge price These vary in price from around
always thought of as an aspirational range for what you might imagine £20m2 up to £50m2 and will almost
feature but people used to get put off are very similar products. Of course, certainly involve you in a lot of extra
by the price. It’s not got any cheaper they’re not. You really do get what work (de-nailing, sanding, hole
but all of a sudden people seem to be you pay for here. filling, more sanding, sealing). The
quite happily paying £40 — £80m2 One of the key points to watch if huge variation in prices for reclaimed
for hardwood floor planking and are you buy a solid hardwood floor is that boards is of course an indication that
being increasingly daring as to the the moisture content is right down there is a huge variation in quality as
choice of wood, although oak remains at around 8% when you lay – this is well.
a perennial favourite. especially important if you want to Laying timber floors is generally
The alternative option is to use an fit underfloor heating. Personally, I much quicker than laying stone
engineered timber floor which has a am a fan of the engineered timber or ceramic tiling. The easiest and
4-7mm layer of hardwood stuck onto approach as it is just more stable and quickest method is to float the floor

HOUSEBUILDER’S BIBLE l 13th EDITION 225


Chapter 10

MATWELLS EDGE TRIMS


It’s always a nice touch to see people We need some way of dividing the
thinking ahead and building in a walls from the floors and the door
sunken matwell is usually a sign linings from the walls. Traditionally
that someone has been. Now that this is done with skirting boards
the disabled access regs require level (wall-floor junctions) and architraves
access, usually at the main entrance (door surrounds). These features in
door, a sunken matwell becomes even themselves formed part of the great
more important, as the door now Victorian indoors which sort of echoed
opens just a few millimetres above ancient Greek temples. There were
the floor cover. dado rails (which are at waist height)
There is an industry standard and picture rails (for hanging pictures,
matwell (which may surprise some) stupid) not to mention glorious ceiling
which is 760 x 460 x 40mm. If you covings and ornate roses around a
stick to this you can buy galvanised central light. The more fancy the house,
steel surrounds for around £40 and the bigger and more elaborate these
Matwells can be both functional these will take industry standard trim details got. There were certain
and elegant and work well with level sized coconut matting. But you don’t standard mouldings as well: Torus,
thresholds. need to stick to the industry standard Ogee and Ovolo are three of the best
because you can create your own known but really every joiner’s shop
surround, whether in timber or tile. would be knocking up their own local
Coir Mats cut to order and have variations. They look great in period
on top of the sub-floor, separated a range of thicknesses so it can just homes but frankly it all looks a bit
by an 5mm underlay. By floating, slip into any spot you set for them. At dated now in a contemporary home.
we mean that the actual boards are £75 for over a square metre behind Plain is now king, the simpler the
neither mechanically fixed (with the front door, it works out as cheap profile the better, making it one of the
screws or nails) or glued down. They as any of the major alternatives. very few areas of housebuilding where
are simply stuck together along the things are trending towards cheaper. A
tongues and grooves at each edge round or chamfered edge, preferably
of the boards, then clamped tight made from white-painted MDF is
and finally fixed in place with the quite the thing nowadays.
skirtings around the edge. If the SECOND FIX There is (or rather was) a logic
sub-base is sound, there should be no CARPENTRY behind fitting skirting boards. It is
movement. So the secret of a good We are now getting well into the standard building practice to leave a
floating floor is ensuring that the finishing stages of the house and we 50mm gap between the floor and the
subfloor is sound and level, which are looking at second-fix carpentry. bottom of the plaster on the wall so as
may involve packing it up or adding That’s because much of this work is not to breach the damp-proof course
self-levelling compound to ensure it traditionally done by the carpenter. placed in the wall; however, damp-
actually is. The routine is the same on But also bear in mind that many of proofing techniques have changed
both screeds and solid timber floors. the more interesting options don’t and now floor membranes are lapped
Only if you are laying directly onto involve carpenters at all. Any one for into wall membranes and the rising
joists do you have to have any use any shadow gaps? Tile upstands? Floating damp never (in theory) penetrates
screw fixings. staircases? Glazed screens? Read on. the room space at all. Today, skirting

226 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

Shadow gaps are


is there to fill the unsightly crack very fashionable
between wall and floor. but very difficult to
And architraves hide the gap execute well. They
between the door lining (timber) replace traditional
and the plasterwork. Whilst this can architraves and
look neat when the plastering is just skirtings altogether
to create a clean,
finished, a gap will tend to appear modern look
over time, which will tend to crack as
time goes by.
Fixing times don’t vary much but
as regards material costs, the fancy
sections are two to three times more
than the utilitarian versions which
are around £2/m for skirtings and
architraves, whether pine or MDF.
Skirtings and architraves are best
nailed or screwed into the walls but,
alternatively, can be stuck on with
an adhesive like Gripfill or CT1, a
mastic glue which can be used to
bond all kinds of materials.

TILED UPSTANDS so hard to do so little, because despite will now be visible — these are
One option when working with a the fact that there’s nothing there but designed to be covered over when
stone or ceramic floor is to select a a gap between the door lining and the architrave is fixed. You may also
tiled upstand, using the same tiling the plasterboard edge, they are very find that the widths of the standard
as you have used on the floor. You difficult to pull off well because you linings don’t match your wall and
need a good tile cutter but there is a can see the gap all the way around, so plaster widths. Remember that
good chance that you can also use up it has to be done well. planed timber is sold in nominal
lots of offcuts here. It is undoubtedly To get a shadow gap, you start by widths (that is before planing takes
more time consuming and therefore fixing the door lining and then fix a place) and the actual widths are
more expensive than using a timber plaster stop bead into the wall around usually 7 or 8mm less than this. So
or MDF skirting, on the other hand it, leaving a gap between of around be prepared to spend a little extra on
you don’t have to paint it — ever. It’s 10mm. Expamet make shadow gap your door linings: they may have to
got a lot going for it, especially if you beads, although you could elect to be made up on site, or purchased as
have chosen a nice floor tile. But it use a conventional stop bead. You are specials.
won’t really do much for your door looking to get the surfaces of the wall Done well, a shadow gap finish
architraves. and the door lining to be absolutely looks great. Done badly, it will look
flush. awful.
SHADOW GAPS However, you might want to use
The cool modern thing is to go for something other than standard door INTERNAL DOORS
shadow gaps instead of skirtings and linings, which are supplied with slot Like the edge trims discussed above,
architraves. Rarely can it have been joints in the head section, which the British door has its roots in

HOUSEBUILDER’S BIBLE l 13th EDITION 227


Chapter 10

Victorian style. Panelling was the pretty good looking oak veneer doors or 686mm wide (they are metric
thing and decorative panelling even which match most engineered timber measurements for imperial 2’6” and
more so, along with ornate knobs floors and are ready finished so you 2’3”), and there is also a good chance
and handles. There was good reason don’t need to decorate. Plus they are that your walls won’t end up being
for this because the timber available suitably heavy. either 109mm wide or 132mm wide.
was all planked and you had to make In which case you’d better have a
a large flat surface like a door in a good carpenter onsite because you
frame — hence the panels. DOOR LININGS will have to adapt your door lining
20th century industrial techniques Doors are conventionally hung in to suit your openings and/or your
changed all that and we can now a frame called a door lining. Door doors. In fact, it is often simpler to
make doors out of paper-thin linings are cheap enough but they forget that builder’s merchants even
materials like hardboard, covering are also very fiddly to understand. sell items called door linings and
over egg-box like fillings and dressed These are designed to slip into the just make them yourself. But door
with the thinnest possible veneers of door openings left in the blockwork linings are useful: don’t think you
tropical hardwood. Anyone for sapele or studwork, and they are routinely can fit internal doors without door
(pronounced sa-pee-lee)? I didn’t supplied in three pieces — two linings, whether you buy them from
think so. Hardwood veneers have long pieces or jambs for the sides a merchant in pre-set sizes, or make
thankfully gone way out of fashion and a shorter head piece, altogether them yourself.
now. coming to 5.1m. The door lining
The very cheapest doors you can sets also routinely come with a set FIRE DOORS
get are around £30. They actually of door stops which you fix to the Fire doors are sometimes insisted
look fine when you’ve painted outer linings and against which the on by building inspectors because
them but don’t ever kick them. A actual door shuts. So a door lining set you have to have a second means of
popular variation on this theme is consists of 6 pieces of timber in all. A escape from bedrooms. At first glance,
the embossed or moulded door; they fire door stop is thicker than a normal you might think this condemns you
are no stronger but they imitate the door stop. to have a strange looking fire door
fielded panels found on timber doors Door linings traditionally come with wired and frosted glass, but in
and some of them imitate wood in two different depths, designed fact the key differences are that a fire
grain texture. Some superior ones use to cope with two different wall door is 44mm thick whereas a normal
a type of fibreboard for the casing widths. Either depth can cope with door is 10mm less (i.e 34mm). That
and they are strong enough to take two different door sizes (762mm gives you a much beefier door and,
glazing, although doors with glazing or 686mm). The two door lining having discovered the difference,
panels are much more expensive – sizes are known as 32x138mm and many people plump for a fire door
around £70. All the major joinery 32x115mm. If that’s not complicated even when they don’t actually need
manufacturers have a selection of enough, these aren’t the actual sizes one.
these doors and, if you want to you get because they get planed There is a snag to all this. If you
select a door, get hold of one of their down by about 6mm. These so- are required to fit fire doors, you also
catalogues. called nominal sizes end up being have to fit intumescent strip around
Most selfbuilders will be opting 27.5x132mm and 27.5x109mm. the doors so that it can form a seal
for something a little beefier and Why am I telling you this? Do should there ever be a fire. This is
probably more contemporary in you really need to know? Just not something that you’d really want,
style. If your budget stretches to over possibly yes. There is a good chance unless of course a fire is in progress
£200 per door, you can get some that your doors won’t be either 762 downstairs.

228 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

UNDERCUTS to be impressed by something strong the latch determines exactly how far
If you are fitting mechanical and solid which responds readily the handle or the knob sits from the
ventilation with heat recovery into to their grasp. Or so many male edge of the door. This is known as the
your home, then make sure that housebuilders believe. backset.
you leave a decent gap under each Having said that, most of the The standard tubular latch is
and every internal door because regular options are pretty limp. around 63mm long and has a backset
this becomes a critical air pathway There are door furniture pre-packs of just 44mm: it’s designed for
between the incoming air (in available from builders’ merchants handles only. When fitting a knob
bedrooms and living rooms) and and DIY sheds and specialists like on an internal door, fit a longer latch
the outgoing air (in bathrooms and Ironmongery Direct. They come as with a backset wide enough to get
kitchens). Leave at least 12mm off shrink-wrapped pre-packs at fairly your fingers around the handle - say
the bottom of the door over and reasonable prices. at least 75mm.
above the finished floor level. This These pre-packs have one big An external door knob will require
won’t please the building inspector advantage going for them in that an even longer latch – say 95mm.
if it’s a fire door, but you have two they’ve got all the bits you need in the The pre-packed knobsets normally
building regs (B v F) going head to pack. The alternative is to buy the bits include 75mm latches, but if you are
head here and you can’t please both yourself but here you risk forgetting buying independently then watch out.
sides. vital bits, having to overbuy on items
like screws and even buying the POCKET DOORS
DOOR FURNITURE wrong bits – classic one here is to get These tend to get used where
Door furniture is the phrase used to the wrong-sized hinges. If your tastes space is at a premium and where a
describe just about everything to do veer away from these mainstream hinged door would be inconvenient.
with doors excluding the door itself. choices you’ll have to brave it and Typically, a pocket door is specified
That usually means all the bits made go and order your very own door where a tight bathroom arrangement
of metal. Door ironmongery would furniture. makes it difficult to open the door
be much easier to understand, but If you want more unusual fittings inwards, or where a hinged door
the building trade likes the word then the DIY sheds have a surprising would impede access.
furniture to be used here variety; if you want wood or ceramic There is nothing novel about
The point to cotton on to here is knobs this is a good place to look. pocket doors — they were used in
that some door furniture is purely And Ironmongery Direct comes into Victorian times — but many people
functional in that you don’t see it or, its own here as it has an outstanding are unaware of their existence. In
if you do, you don’t notice it; however range. order for them to work, you need to
other bits are very visual and – wait plan ahead and to build an encasing
for it – tactile. Yes folks, door handles KNOBS V HANDLES wall wide enough to take the door.
are sexy. Developers know this and There is one painful little trap to As a standard internal door is just
consequently are prepared to spend watch out for if you go for a door 34mm wide, it is not asking too much
above the bare minimum to create an knob rather than handle. You need of a 100mm-wide wall to wrap itself
impression on the would-be house to fit a longer latch otherwise you around a door. In fact, most pocket
purchaser. will scrape your knuckles every doors are housed in steel framed
Door handles may indeed be the time you open the door. For the kits which take the place of regular
only part of the house that the viewer technically challenged, the latch, in studwork.
actually touches during an inspection this instance, is the metal tube that The general increase in interest
and female purchasers are thought fits inside the door and the hole in in pocket doors has seen new styles

HOUSEBUILDER’S BIBLE l 13th EDITION 229


Chapter 10

proprietary loft hatches complete


with a built in loft ladder.
It’s worth remembering to install
a permanent light in the loft just
to make life easy when fixing a loft
ladder. You won’t regret it.

BOXING IN
Boxing in the pipes and ducts is
a new facet of housebuilding that
now forms a significant bit of a
second-fixer’s work. In the good-bad-
indifferent-olde days the pipes were
left naked for all to see. The stench
Pocket doors pipe in particular was usually run
tend to be fitted down the outside of the house.
with pre-formed Current fashions are for internal
steel housings stench pipes – concealed internal
which are
stench pipes – and this means boxing
designed to slip
into a studwork is de rigueur.
wall Now, depending on your
disposition, this type of job can seem
like an incredible almighty drag or a
marvellous opportunity to show the
world just how creative you can be
emerging. You can get glazed pocket assembly, as the sliding track can with a bit of dead space.
doors, and even pocket fire doors. be fitted at the door hanging stage, Whichever camp you fall into,
There are several specialists offering provided the alignments have been it helps to plan your pipe runs and
different styles and functions: look worked out in advance. attendant boxings well ahead so that
out for Eclisse, Scrigno and PC the boxing can be incorporated into
Henderson. LOFT HATCH the overall scheme of things rather
Another space saving option is Every house with an empty loft than sticking out into rooms like an
to have one door sliding across two has one and they are not the most ugly carbuncle.
openings, typically a bathroom and demanding of features. But take a Bathroom boxings are often tiled
a cupboard. Here, you build a track little care in fitting a loft hatch as it over, but you must allow at least some
across the two adjacent openings is frequently a weak point in your of the panelling to be removable – a
and hang a sliding door on it so that home’s battle against draughts. In trick that’s accomplished with mirror
it either closes off the bathroom or terms of heat loss through the loft screws and flexible mastic joints.
the cupboard. It sounds uninviting hatch, effective draught proofing If you are painting the finish, then
but it can work well where privacy is is ten times more important than MDF is probably the best material to
only an issue on one half of the door the insulation. You don’t have to do use, but if you plan to stick ceramic
track. It can also be much simpler to anything dramatic; just make sure tiles on, then a waterproof 18mm
install than a complete pocket door it sits tight. Most people now buy plywood would be a better choice.

230 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

Boxing is also widely used in it achieve this with a straight flight or STEP ONE is to measure the total
bathrooms to create a fitted vanity with a turn or two? There are practical rise, this is the measurement from
unit effect. There is a range of basins reasons for choosing a straight flight: finished floor below to finished floor
(known as semi-countertop) that it’s usually the cheapest option and level above.
are designed to sit over a boxed unit, it usually makes it easier to move STEP TWO is to work out the
and there are also concealed cisterns furniture up and down stairs. And if number of steps needed. Staircase
which will be proud to flush behind at any point in the future, you might builders refer to the horizontal steps
your mini-wall. The usual choice of want to install a stair lift, a straight as treads, and the vertical connecting
wall finish will be ceramic tiles but flight is much the simplest option. parts as risers. It’s usually reckoned
pine matchboarding is becoming However, sometimes a turn will fit that the best height for a riser is
fashionable once again, albeit painted the available space better. If you want 200mm, so you want to be as close
not varnished. to create a more dramatic entrance to this as possible — the building
with a full height hallway, and space regulations allow you to have risers
is somewhat lacking, then a staircase up to 220mm. Typically you get a
with a half landing is a good way to 2600mm overall rise and this divides
achieve this. And in smaller houses neatly into 13No 200mm individual
where circulation space is tight, you steps or risers.
STAIRS can reduce the overall space taken up STEP THREE is to work out
Designing and installing stairs by a staircase and its top and bottom the number of treads and how they
and landings is one of the less landing areas by engineering a turn will sit. There is always one less tread
discussed aspects of housebuilding or two. than the number of risers, as the top
yet a staircase can make or break an There are often several options on of the stairs is designed to be level
interior, and getting it right it can how you can run a staircase. A good with the finished floor and you have
be very challenging and sometimes designer will work through them to only a connecting piece, known as a
extremely expensive. So what do you see which one flows best. The polite nosing.
need to know? convention is to arrange the stairs so STEP FOUR is to work out the
There are building regulations that the base should be somewhere tread width (known as the going),
about how you should set out a close to the front door of the house which in turn gives you the pitch of
staircase so that it works safely. and that you shouldn’t have to cross the stairs. The minimum going for
Too few or too many steps and a room to get from the front door to a domestic staircase to comply with
it’ll be difficult to climb. Handrail the stairs. This is doubly important building regulations is 220mm and
positions, headroom and pitch are if there is (or maybe, at some time in the pitch of a domestic staircase must
also regulated, all with the aim of the future) a third storey to the house, not exceed 42°.
making staircases user friendly. By when the stairs have to act as a fire If you break the stairs with a
and large, it’s worth sticking to these escape route from the loft. landing, it’s conventional to keep
guidelines, although they can be the same rise and going for both
relaxed in certain circumstances, such TECHNICALITIES halves of the staircase. There is
as restricted loft access. Having established the overall no restriction with how narrow
staircase design (hopefully at a much you can go with a staircase but
DESIGNING THE LAYOUT earlier stage than second-fix), the the width of a standard flight of
The first and most critical factor is to next problem is to develop a technical stairs is 860mm, and this should be
work out how the staircase will run. brief for how the stairs are to be regarded as a minimum for a main
Where will it flow from and to? Will constructed. staircase.

HOUSEBUILDER’S BIBLE l 13th EDITION 231


Chapter 10

WINDERS AND SPIRALS the grandest houses would have photographs of unguarded open riser
Winders (pronounced wine-ders, not attempted to make a feature out staircases in magazines. The reason
win-ders) is the name given to steps of a staircase. In normal domestic for this may be that the new staircase
that turn corners whilst still climbing; architecture, the stairs fulfilled a is a replacement of an older one, and
a spiral staircase consists of nothing purely functional role, and this that the work has been carried out
but winders: a more conventional remains true in the vast majority of outside building control jurisdiction.
arrangement uses three winder steps developer built homes. Even twenty Alternatively, the guard rails have
(usually at the top or the bottom of the years ago, pretty much the only been removed after the building
flight) to navigate a 90° turn. They are choice you had to make was whether inspector’s final visit.
space efficient: these days they are most the timber spindles on your banister
commonly used with loft conversions, were to be plain or carved. But in FLOATING STAIRS
precisely because of this reason. common with the growing interest The ultimate in staircase chic is to go
in other interior design features, for a set of treads that appear to hang
HEADROOM staircases have started to get modern in space, connected only at one end to
You need a minimum of 2000mm and sexy. Instead of spending a few the wall. These are known as floating
of clear headroom above the pitch hundred pounds, maximum, on stairs and, not surprisingly, owe their
line on a domestic staircase to building a staircase, people now seem existence to a fair amount of intricate
comply with building regulations. willing to fork out several thousand steelwork hidden behind the plaster.
Having insufficient headroom can pounds for designer staircases, Each one is a work of art, and the
be a problem when the stairwell commonly using such materials as costs are to match. Expect to pay
is located under an area of sloping glass, concrete and steel. upwards of £15,000 for such a beast.
roof and it’s a technical detail that is Just how you get such a staircase
often overlooked by architects and OPEN RISERS through the building regs beats me.
designers. Replacing solid risers (the vertical And I am yet to be convinced that
sections of each step), with open they will ever be child friendly. But
LOFT STAIRS risers is something that features high maybe that’s the point...
The regulations recognise that there on many selfbuilders’ wish lists. There
are certain situations – principally is a problem here in that the building GLASS
loft access – where it just isn’t regulations don’t permit any gaps in Such is everyone’s desire for space
feasible to build a standard staircase. stairs wider than 100mm, in order to and light that we have witnessed a
Provided the stairs only lead up to stop small children falling through. rise in demand for glass balustrading
one habitable room (plus an attached The standard solution to this is on staircases and landings. The glass
bathroom), then you are permitted to to have a semi-open riser design, so has to be thick and toughened, and
use either a loft ladder or an alternate that each step appears to have a little consequently the fixings have to be
tread staircase. The normal pitch downstand underneath it, known as more robust and this adds to costs. If
requirements are also relaxed allowing a riser downstand. This allows you to you want the cool, contemporary look
you to fit a staircase into a much see through the stairs as you climb of glass around your stairs, it’s likely
tighter space. These stairs are often up, whilst satisfying the guarding to add between £3,000 and £8,000 to
marketed as space saver stairs. regulation. An alternative is to have the costs, depending on the scale and
completely open risers, but to fit complexity of your design.
TRENDS a horizontal bar at the mid point
The role of the staircase is gradually between the treads. FUSION
changing. In previous eras, only Nevertheless, you often see Richard Burbidge introduced the

232 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

This open
contemporary-looking Fusion staircase meets
stairparts range in 2000 and initially the building
thought that they were launching a regulations by
niche product, but it’s turned into a adding a bar
big hit. The stair parts for a simple underneath
staircase with a 2m landing sells for each tread. The
requirement is
around £550 using Fusion, around that a 100mm
£200 more than pine, but it’s much diameter ball
quicker to fit, ‘requiring an average should not be
of just seven saw cuts as opposed able to pass
to 125 when using conventional through the
stair balustrading’. Such has been gap between
the treads. This
the success of Fusion that other is to protect
manufacturers have now launched young children
similar products, such as Axxys from who might fall
Cheshire Mouldings. through.

MODULAR STAIRS
Generally made in Italy, modular
stair kits offer a way of getting a
contemporary design on a budget.
They tend to specialise in spiral and
spacesaver designs and they probably
wouldn’t suit a main staircase as
they generally don’t comply with
UK building regulations but may be
suitable for small loft conversions and
mezzanine sleeping platforms.

STAIR LIGHTING
It’s important to think about how
a staircase and landings should be
lit, both in terms of daylight and the room behind. These days, a more switching. More elaborate lighting
during hours of darkness. In some common solution is to set a rooflight is available; typically this will involve
house designs, the circulation space above the stairwell. If space is tight, LEDs placed into the wall adjacent
is in semi-darkness the whole time an alternative option is to use a to the stairs, either on every step or,
because all the windows are placed lightpipe. more subtly, every third step.
in the living rooms, bedrooms and The stairwell also needs to be lit
bathrooms. Good designers will electrically. The standard arrangement MATERIALS AND
find ways of introducing daylight: is to have lights both top and COMPARISON COSTS
traditionally, this was achieved with a bottom, and for these lights to be There are two essential factors that
glass fanlight placed above an internal switched from both top and bottom have a bearing on costs. One is the
doorway which borrows light from of the staircase, known as two-way design of the staircase, the other

HOUSEBUILDER’S BIBLE l 13th EDITION 233


Chapter 10

is the materials used to build it. work out prices directly. As a rule, a recommended on clay sites, is to use a
Generally, the simpler the design, the straightforward flight of stairs with Terram or Geotextile sheet underlay
cheaper the staircase. It also helps to a small, 2m landing, can be supplied beneath the hardcore layer. These
have a standard rise between floors: if for as little as £500 and fitted in a day, allow water to pass through whilst
the distance between finished floors is but if you want to use cutting edge stopping mud mixing in with the
the standard 2600mm, then you gain design and unusual materials, it’s not hardcore overlay. Laying hardcore
a small advantage in being able to difficult to spend ten or even twenty can be done by hand but this is
order an off-the-peg staircase. times as much. backbreaking and time-consuming.
Straight flights are of course The most efficient method is to
cheaper than staircases that turn, and use machines to spread and tamp
curved staircases tend to be more hardcore – digger buckets are
expensive still. particularly effective tampers.
As for materials, the cheapest It is very useful to have hardcore
stairs tend to be engineered pine DRIVEWAYS & laid as early as possible on a building
and plywoods. These are best suited PAVINGS job as it aids access and stops the
for fully carpeted stairs. One step up Driveways are included on the list site becoming a quagmire. However
from this is parana pine, which has of external works that are exempt drain-laying timetables do not always
been the preferred timber for stair from VAT on new buildings, so allow this use of machinery and
makers for many years. It is a tightly there is every reason to finish the whether it is worth getting machinery
grained softwood with lots of reddy- drive before occupation. Almost in later just to lay hardcore depends
brown colour variations and it takes invariably, planning permission on the size of the driveway.
a clear coat of varnish. It often gets for new homes requires provision If you dispense with or skimp
specified with hemlock stairparts. for off-road car parking and this on this hardcore sub-base, you will
Hardwood staircases are more means that some attention has to end up with a drive which will
expensive still, although you can be paid to both where and how this initially look good but will rapidly
get a hardwood look for less money is to be accommodated. So whilst disintegrate. The other problem to be
by specifying veneered MDFs. a garage is arguably a luxury you aware of here is rainwater drainage;
Hardwoods vary in price from two could dispense with (or postpone), on flat sites, water will tend to pool
times the price of softwoods, to four driveways and hardstandings must if it is not adequately planned for. To
or five times the price, depending on be accommodated within the initial this end, it is normal to lay the drive
the choice of timber. Oak is usually design. so that rainwater collects in certain
the most expensive. points, then drains off to a soakaway.
Other materials used include steel FOUNDATIONS Whilst the falls can usually be
(popular for spirals), reconstituted Whatever drive finish you decide on, constructed when the actual driveway
stone (also popular for spirals) and the base you lay should essentially is being laid, the drainage obviously
glass. Pre-cast concrete is uncommon be the same: ideally 100-150mm of has to be installed before the sub-
in individual houses, though it’s hardcore. A 1m3 void needs 2 tonnes base. A minor detail? You won’t think
sometimes used in basements. of hardcore to fill it, so: so if you overlook it.
Stairplan.co.uk run an amazingly n To lay hardcore 100mm thick, 1
helpful website with lots of guidance tonne will cover 5m2 BLOCK PAVING
on choosing stairs, and they also n To lay hardcore 150mm thick, 1 Block paving is something akin to
have an online shop at www. tonne will cover 3.3m2. laying bricks on the ground. The
tradestairs.com which allows you to A superior method, particularly blocks are a similar shape, although

234 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

usually a little thinner than a house


brick, and they usually have a
chamfered edge, unlike a house brick.
They can be made of clay or concrete:
concrete is invariably cheaper and
perfectly adequate for the job, but it
tends to look dull in comparison —
think garage forecourts.
They are usually laid dry (without
any cement) on a 50mm bed of
sharp sand, and finished with
jointing sand brushed over them and
whacked with a compactor plate: dry
laying is cheaper than wet and this
makes them a cheap and attractive
option for patios and paths as well
as drives.
Supply and fix prices for plain
block pavings tend to come in
The benchmark house in the 9th edition of Housebuilder’s Bible used this
around £40m2 (excluding hardcore contemporary arrangement for its driveway: decorative aggregate bordered by
foundation preparations), but these block paving. I used this as a template for costing the “Externals” on the model
are at the low end of what you might house.
expect to pay for something fancier.
Kerb work obviously has a big impact and how many geotextiles should be which get planted out, to concrete
on the overall costs and the value involved. grids with voids, to plastic cellular
of this varies from site to site but On small selfbuild sites, permeable systems which contain gravel or
averages about 20% of the overall paving systems are unlikely to make a grass, and even reinforced turf. It’s a
costs. Fancy pavers will bump the huge difference to the world of storm specialised area: the acknowledged
overall price up by 50-100%. water management (unlike a Tesco experts here are Grasscrete.
car park, for instance), but you may
well be required to build a SUDS- TARMAC
PERMEABLE PAVINGS compliant driveway as a planning Back in the world of impermeable
In recent years, there has been a condition. Usually, it’s enough pavings, there are other options
growing interest in pavings that are to direct the surface run-off to a besides block paving for driveways.
designed to absorb water rather than soakaway, which can be done with Tarmac is one, although it has pretty
to direct it elsewhere. Welcome to drain gulleys just as easily as fancy much fallen out of fashion on the
the world of sustainable drainage permeable paving systems. selfbuild scene. Preparation is much
systems (SUDS). It’s actually a On the other hand, you may be the same as for pavers; kerbs need
whole system approach to surface attracted to a permeable paving to be set in concrete around the
run-off and the pavers form only system and there is nothing quite so perimeter, although these are usually
part of it: you have to use a no-fines eco-chic here as a grass paving. There cheaper than the special kerbings
sub-base which will hold water, and are several systems available: these used with block paving.
there are debates about just where vary from block paving with spaces A pukka job should consist of

HOUSEBUILDER’S BIBLE l 13th EDITION 235


Chapter 10

External Works - Key Rates Time


– strong and relatively expensive –
Materials Taken in Labour @ £20/hr Combined and it is normally laid at 100mm
150mm Hardcore Base £ 11 m 2 20 £ 8 m2 £ 19 m 2 depth. Reinforcement should not be
100mm Concrete Slab £9 m 2
25 £ 10 m 2
£ 19 m 2 necessary. Cheap and cheerless.
2 2
2 Coat Tarmac £ 40 m 60 £ 22 m £ 62 m 2
75mm Gravel £ 7 m2 40 £ 15 m 2 £ 22 m 2 PATTERN IMPRINTED
Decorative Aggregate £ 15 m2 40 £ 15 m 2 £ 30 m 2 CONCRETE (OR PIC)
A number of specialist operators
2 2
Paving Slabs £ 15 m 40 £ 15 m £ 30 m 2
2 2
York Stone £ 75 m 60 £ 22 m £ 97 m 2 now offer patterned concrete paving
Simple Kerbs £8 m 50 £ 19 m £ 27 m where imprints of pavers are set into
Plain Block Pavings £ 20 m 2 40 £ 10 m 2 £ 30 m 2 wet concrete to give a paved effect
2 2
Fancy Block Setts £ 30 m 40 £ 10 m £ 40 m 2
drive. This technique is widely used
Block Kerbs £ 15 m 50 £ 19 m £ 34 m
elsewhere around the world but
Pattern Imprinted Concrete Supply and Fix only - often with a minimum charge £ 35 m 2
is having difficulty catching on in
Resin Bonded Driveways Supply and Fix only - often with a minimum charge £ 30 m 2
Turfing £3 m 2
20 £8 m 2
£ 11 m 2
the UK because of the low prices
Post and 3 Rail Fencing £6 m 60 £ 22 m £ 28 m of standard concrete block paving.
Palings £8 m 60 £ 22 m £ 30 m Having said that, you can’t get
Picket Fence £ 18 m 60 £ 22 m £ 40 m concrete block paving to look like
Close Boarded Fence (1.8m h) £ 35 m 90 £ 33 m £ 68 m wood. If you want to see just what
Contemporary Slatted Fence 70 m 90 £ 33 m £ 103 m you can do with pattern imprinting
225mm Brick Wall (1.8m h) £ 300 m run 360 £ 140 m £ 440 m on concrete, take the family off to
Disneyworld – it’s full of it.
MODEL HOUSE Externals There are some noted snags with
Area/Length Rate Materials Labour Total
PIC: it can crack (it shouldn’t but it
Base Preparation 160 m2 £ 19 £ 1,760 £ 1,280 £ 3,040
does), it can get slimey, it can stain,
Decorative Aggregate 140 m2 £ 30 £ 2,100 £ 2,100 £ 4,200
and you are stuck if you have to
Block Paving Setts 20 m2 £ 40 £ 600 £ 200 £ 800
Paving Slabs 15 m2 £ 30 £ 225 £ 225 £ 450
take the drive up for drain repairs
Post & Rail Fencing 30 m £ 28 £ 180 £ 660 £ 840 or something like that. It’s also the
Close-boarded Fencing 15 m £ 68 £ 525 £ 495 £ 1,020 province of high-pressure sales teams
Turfing 140 m2 £ 11 £ 350 £ 1,120 £ 1,470 and sometimes the prices quoted can
Total £ 5,700 £ 6,100 £ 11,800 look ridiculous. It shouldn’t really cost
much more than block paving.

a 80mm base course laid below a the finished drive may not last very RESIN-BONDED DRIVEWAYS
35mm top course, known as the long. Available from specialist firms,
wearing course. A 50m2 driveway these work by sticking small stones
with 20m kerbings should cost CONCRETE into a rigid sheet to give a shingle-
slightly less than a basic block paver. Base preparations are again similar look driveway which is as hard
Some tarmac prices appear to to pavers and tarmac; kerbs can be and durable as concrete or tarmac.
be far lower than this – this is the ignored in favour of shuttering (or Fantastic product if it’s done properly
Wild West of the building trade road forms) for which steel formers but can be a disaster if not, so check
remember – but the specification are available to hire. The designated the credentials of the installers. Prices
is unlikely to be the business and readymix for driveways is PAV 1 tend to be similar to the Pattern

236 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

Imprinted Concrete, and minimum


charges (often around £2,500) often
apply.
Unlike the other alternatives to block
paving, resin-bonded surfaces are very
much in vogue and are used in all
sorts of unlikely places like National
Trust properties.

SHINGLE AND GRAVEL


This is the cheapest option and,
in many rural situations, the most
attractive. However, note that the
better gravel driveways are actually
labour intensive as they involve
laying three or four layers of stones,
individually rolled. Edgings need
to be placed – treated timber strips
are adequate – and the success of
the drive overall depends on good
hardcore beneath.
Top coat materials shouldn’t cost
much but laying costs are likely
to be high, especially if there’s no
mechanised plant available.
Quotes to supply and lay a gravel
drive often specify a simpler two Granite setts make an attractive paving but they are labour intensive to lay.
layer application as this keeps the
price down to around the £10m2
mark (excluding foundation works). FANCY PAVING OPTIONS when it is designed for foot traffic
There are also a number of much There are many other materials only, it does not need to be laid as
more expensive decorative stone available to lay paths and, in deep as under driveways. As you
effect gravels you can use — look particular, patios. Labour costs might expect, natural materials like
good, but an easy way to bump up for laying vary widely (£15-£30/ sandstone and limestone tend to be
the price. m2) depending on whether they more expensive than the concrete
Many selfbuilders put gravel drives can be laid wet or dry and whether ones, although the market has been
in place because it’s cheap and at they need pointing-up afterwards. flooded in recent years by some
the end of the job they are looking Wet laying involves using cement amazingly cheap Indian sandstones.
for ways to save money. Often they (albeit usually a dryish mix) and There are numerous websites selling
live to regret the decision, because tends to be very much more labour landscaping materials and once you
gravel “walks” and the stones get intensive. Some hardcore backfill start browsing you will soon get the
everywhere. is usually advisable, although hang of what costs what.

HOUSEBUILDER’S BIBLE l 13th EDITION 237


Chapter 10

– just whack posts in every 2m or


so – but have a temporary air about
them which may not appeal to all.
The picket fence is similar in design
but altogether more permanent
in appearance and it costs around
£25/m.
If you require privacy and security
then you will have to go for a solid
or near solid fence with a height
of 1.8m (above head height). The
traditional way of doing this is to
erect something similar to a post-
and-rail fence and then to cover it
with vertically fixed, featheredge
boarding. This is known as a close-
boarded fence. Expect it to cost
around £60/m. It is a little cheaper
to use ready-made panels of the type
you see in garden centres but the
The main timber fencing options are, result is very flimsy in comparison.
from the top: Post and Rail, Chestnut There are many variations on the
Palings, Picket Fencing and the Close- theme of boarded fences; you can set
boarded Fence. The close-boarded the boards horizontally or diagonally,
fence is normally 1.8m high and thus
provides an element of privacy.
or alternate the boards between the
inside and the outside of the fence
posts (called hit and miss fencing).
privacy or security, then the cheapest You can achieve quite stunning
Finally a plug for www. permanent option is the timber effects very simply and they don’t
pavingexpert.com, a website post-and-rail fence. This arrangement have to be stained dark afterwards.
maintained by paving guru Tony shouldn’t cost more than £12/m; it If you want to investigate further, I
McCormack, where you can find out looks fine and is easily maintained. If recommend you get Jackson’s Good
more than you possibly ever wanted you have longish (30m plus) lengths Fencing Guide. They also deal with
to know about the black arts of to erect, then the cheapest suppliers wire fencing which, I am assuming,
paving and drainage. are to be found in the pages of Horse is of lesser interest to would-be
& Hound. Alternatively, a chain housebuilders.
link fence is cheap, is more secure
and should stop dogs and children BRICK WALLS
SOFT straying. Whilst timber fencing is getting
LANDSCAPING Another cheapish option is expensive at around £60/m, you are
1.2m-high cleft chestnut which, not going to get even a whiff of a
If you just want to mark a boundary being vertical, are much harder to brick boundary wall under £300/m
and are not too bothered about climb over. They are easily fixed and, if you use a nice brick and build

238 13th EDITION l HOUSEBUILDER’S BIBLE


FINISHES

up to head-height, the cost will be


around £500/m. This is a different
animal altogether and ideally should
be erected along with the main house
so as to combine economies of scale
– not to mention getting JCBs into
the back garden. A 1.8m-high brick
wall is actually a rather vulnerable
construction, prone to blowing
over in howling gales, and best
practice advice now recommends
that all unsupported walls over a
mere 650mm high should be built
two brick skins thick (225mm). In
exposed locations, a 1.8m-high brick
wall should be built 330mm thick.
Whether your wall is free-standing
or is being built as a retaining wall
against some high ground, your
building inspector will advise you as
to the exact requirements needed. Jackson’s have built a strong reputation for supplying good quality fence panels
Dry stone walls are, needless to say, in a wide variety of styles. Their current selection includes a number of interesting
even more expensive, costing around contemporary styles such as louvred and hit and miss panels, which promise
privacy whilst still allowing a little sunlight through.
£300/m for a waist-high one.

GARDENS landscaper at this point and sort out purposes, but anything like planting
Whilst we are not wishing to stray the garden area with mini-diggers trees or shrubs or hard landscaping is
too far into the world of gardening, and dumpers, a sort of groundworks not, unless the planning permission
every selfbuild has at some point to 2.0. It’s often a surprising amount specifies that it is carried out.
face up to the fact that the garden of work, and a surprising amount What about garden lighting? You
needs some attention, especially if of money, especially if you start can spend a lot of money on this. The
its been used as a dump for building specifying water features, garden HMRC advice begins to get sketchy
materials and as a place to clean out lighting and summerhouses. at this point. It just states that outside
cement mixers. It’s not a good place The go-to garden cover remains the lighting is an item you can claim
to start. lawn which sounds cheap as turf is for (i.e. get the VAT back on), and
You may well have to clean out available at around £3/m2, but if you makes no mention of garden lighting.
the detritus you’ve left behind and want professionals to lay it the costs My best advice is to check for
bring in some topsoil. On some sites, shoots up to nearer £20/m2, not much yourself either in the DIY selfbuild
the clean topsoil has to be delivered different to carpet. documentation (VAT431NB) or on
before the building work even starts Bear in mind your VAT position VAT in construction (VAT Notice
because there is little of no access here. Normally the provision of soft 708, section 13).
after the structure is up. landscaping (which includes lawns)
Really you need to hire a is treated as zero-rated for VAT

HOUSEBUILDER’S BIBLE l 13th EDITION 239


Chapter 11

KITCHENS
ROOM BY ROOM
11
What prominence to give to the
suppliers as it means a) bigger
kitchens and b) consumers are more
conscious of the way their kitchens
to little more than a laundry room,
but for some people, particularly
country dwellers, a proper mud room
kitchen? It is one of the more taxing are going to look. If you accept the would be far more useful; somewhere
internal design decisions that you will notion that you want your kitchen warm and light to take off wellies
be faced with. The two extremes to to be the most important room in and wet coats, to air clothes, for dogs
opt for are: the house, then you are probably to sleep in. It’s the natural place for
n the kitchen as utility area (hidden prepared to spend a much larger sum a back door, but to do it properly
from view and servicing a separate on making it beautiful. On the other requires a surprising amount of space.
dining room, aka the Downton hand, if you want to keep costs down, They are not called mud rooms for
Abbey option) design your kitchen more as a utility nothing; during the long dark winter
n the kitchen to be the main living area and have a separate dining room months, just going out into the
area of the home, typically called an where you eat. garden is a seriously mucky business
open-plan arrangement. and the interface between inside and
The trend is towards the open- MUD ROOMS AND LARDERS outside needs thought.
plan kitchen; this suits the kitchen Many designs relegate the utility area The separate larder is an old idea

240 13th EDITION l HOUSEBUILDER’S BIBLE


ROOM BY ROOM

coming back into fashion. This can wall. If not, you have to plan your 1960s, a kitchen cabinet was thought
be a small room and doesn’t need plumbing carefully. of as something to do with Harold
any daylight but to work well it n DO leave worktop space either Wilson’s unique style of government.
needs to be easily accessed from the side of both the sink and the hob (or But shortly thereafter, the fitted
kitchen preparation area. In days of cooker top). kitchen arrived in the home and, bit-
yore, the larder enjoyed a completely n DO keep the sink, the hob and the by-bit, we have learned to spend more
different microclimate to the kitchen fridge reasonably close to each other. and more money on our kitchens.
- it was cool, dark and even a little Some kitchen planners will go on at There are several procurement routes,
damp - but this is hard to achieve in length about the importance of the each with its own pitfalls. Whilst the
contemporary housing because of the work triangle in the kitchen. Politely bulk of the new kitchen market now
energy efficiency demands. But even ignore them. goes into replacing existing kitchens,
a centrally-heated larder is useful if n DON’T place a hob or a sink in a a significant chunk gets accounted
only to store dried food and crockery: corner unless you consider an angled for by all the new homes built each
it’s much cheaper than fitting it all corner arrangement (expensive); year. And whilst a penny pinching
into expensive kitchen units. corners tend to make poor working/ spec housebuilder may spend as little
storage space. as £3,000 on fitting a kitchen on a
GRASPING THE KETTLE n DON’T place a fridge or freezer starter home, you only have to open
When you’ve come to some next to or under a heat source (hob, a Sunday newspaper to realise that
conclusion about how you want your cooker, radiator). some people are happy to spend over
kitchen to work with the rest of the n DON’T forget to consider the £100,000 on a fitted (or perhaps an
house, you can then get down to boiler if it needs to be in the kitchen. unfitted) kitchen. Bigger of course,
the nuts and bolts design-matters Not only will it be hot but also there better undoubtedly, but thirty times
of what goes where. It is usual are rules concerning just where bigger or better? Undoubtedly not,
to start with a list of household you can and can’t place boiler flue but do bear in mind that a cheap
appliances. If you have opted for terminals. kitchen probably won’t last more than
a separate utility area, this will n DON’T put wall cupboards over ten years whereas an expensive one
be the natural home of washing the sink; conventionally, sinks go may be good for fifty.
machines and tumble dryers and, under windows and for most small- New fashions come but never really
possibly, freezers. The kitchen or medium-sized kitchens this will go, so kitchen design continually
proper must have a sink, a hob, always be the most practical location. expands to incorporate new ideas
some sort of cooker and a fridge. If you’re a neat, logical kind of whilst simultaneously recycling the
Dishwashers are now ubiquitous person, having got this far you should old ones. The basic manufacturing
and are conventionally placed close be able to draw a layout plan on some process is relatively simple and cheap
to the sink. The positioning of graph paper and begin to get an so that no new idea can ever be free
your appliances around the kitchen idea of the number of units you will from imitators for more than a couple
becomes the skeleton on which the need. Congratulate yourself because of years.
kitchen furniture is hung. There are you’re the kind of client any kitchen The kitchen business is fully
some conventional dos and don’ts to supplier would be pleased to have – metricated and works in modular
consider: you actually know what you want! units which increase in 100mm
n DO locate sinks and plumbed-in intervals. Thus any given range of
appliances where waste pipes can KITCHEN UNITS floor units or wall cupboards will
get to the drains. Usually this means The fitted kitchen is very much a be available in widths of typically
placing them against an outside 20th century invention. Back in the 300mm, 400mm, 500mm and

HOUSEBUILDER’S BIBLE l 13th EDITION 241


Chapter 11

600mm; 600mm is the key one, is that you are buying the materials, Smallbone – which started as an
this is the building block of the not the fitting out. Consequently, antiques business in Wiltshire – led
fitted kitchen – appliances are they look much cheaper than all the way in creating a new vernacular
conventionally made to fit into the other options, which come on kitchen, which managed to strike
600mm gaps. The other sizes tend to a supply and fix basis. Now B&Q some chord in the English middle-
get used to fill awkward gaps between may well have a few trade cards class psyche and led people to pay
the 600mm units. By twiddling the stuck at the back of the store with vast sums to recreate a past that
plan about a bit, you can fill any space names of recommended installers never existed. Using many revived
on any wall to the nearest 100mm – but tread with care here. Installing techniques and idioms (rag rolling,
and they sell blanking-off pieces to a kitchen is a complex multi-task of marbling, Welsh dressers), they
cover any little gaps left over. a job involving co-ordinating fitters, created a magnificent, seductive
All but the most expensive kitchen plumbers, sparkies, tilers and fitters illusion. To purchase the actual
unit carcasses are made from a wood all over again. It’s not just a question Smallbone marque is horribly
pulp board like chipboard or MDF, of getting hold of some bloke handy expensive – the average one costs
usually covered with a melamine with a screwdriver, he must be £42,000 – but the style has spawned
veneer which serves to make bloody useful with a mobile phone dozens of imitators. These high prices
them both stronger and moisture as well. have proved to be just perhaps a bit
resistant. The cheaper doors, which too high and Smallbone (and the
are hung over these carcasses, are THE CONTINENTALS related Mark Wilkinson Kitchens)
made of similar materials, although The more innovative and interesting went bust in 2009, though they
here the melamine covering is designs are the preserve of the up- continue to trade under new owners.
usually decorated with some trim. market kitchen. The Germans were This school of kitchen design has
Solid timber or plywood are more the first into this pond in the 1970s grown away from providing modular
upmarket door options and there are when names like Wellman, Allmilmo boxes towards what has become
adventurous designs using materials and Poggenpohl came to the UK. known as the unfitted kitchen – an
such as stainless steel and plastic. Like all things German, they have Aga here, a beech block table there,
built up a reputation for superbly terracotta tiles on the floor, wicker
FLAT PACK DIY KITCHENS crafted kitchens. In terms of style baskets hanging on rails, you can
There are several ways of getting however they’ve been left in the almost smell the garlic and olive oil.
fixed up with a kitchen. About slow lane. The high-tech, continental Some of these up-market companies
the cheapest is to go to one of the look is now led by the French and, must be approached directly, many
giant DIY retailers such as B&Q especially, the Italians – look out for have just one UK outlet. The nearest
or IKEA and buy yourself a flat- Boffi’s futuristic designs. thing to a directory exists in the back
pack. The cheaper kitchens tend to of ‘Kitchens, Bedrooms and Bathrooms’
be supplied flat-packed and need SMALLBONE, ETC magazine which will give you an
assembling on site, a feat which Despite exporting barely any kitchens overview of the market’s top end.
in theory is straightforward but in at all (we import about 20%), the
practice can be damned difficult, British have responded to the threat KITCHEN BOUTIQUES
especially when it takes you two of mainly up-market invasion by Another approach is to ignore the
days to realise you haven’t got all the inventing a whole new romantic plethora of manufacturers and
bits. theme – sometimes known as the concentrate on your local kitchen
Another point well worth English Revival style or, more often, specialists. Most small towns
garnering about flat-pack kitchens “doing a Smallbone.” have at least one, and a regional

242 13th EDITION l HOUSEBUILDER’S BIBLE


ROOM BY ROOM

shopping centre will have several.


Most will stock only three or four
manufacturers’ products but as
manufacturers offer sometimes
hundreds of options (especially
door colours) this can still be quite
bewildering. Typically, they will stock
a mass-produced British flat-pack
product that they will use to try and
compete with B&Q and co, but the
bulk of their showrooms are given
over to displaying a more up-market
continental range. They make more
money on the more expensive
kitchens so it is understandable that
it is these that they promote.
Many people are rather reluctant Which? magazine surveyed six flat pack kitchens and found IKEA came out
to set foot inside a kitchen specialist tops. “The best quality units we tested,” they wrote,”provided you can follow the
as they think it would be a) too instructions.”
expensive and b) involve high-
pressure selling. By and large, this is The personal service and the excellent kitchens although, stylistically, they
not the case; although they probably quality was money well spent, as far tend to be the most conservative of all.
cannot compete with B&Q on as we were concerned, but it wasn’t Their catalogues are easy to get hold
kitchen unit price alone, they are cheap. The cost, including appliances, of and clearly priced. The builder can
usually owner-managed and tend to was just under £30,000, making it a buy these units (and the accessories)
give a high level of personal service top end £5,000/m3 kitchen. at discounts of between 20 to 40%
without resorting to any pressure off list price and many will be happy
tactics. Unlike the major retail outlets, THE BUILDER to negotiate to share at least some of
prices are usually negotiable and this If you are fitting a kitchen as part of the discount with you – see section
makes it hard to compare on a like a much larger project (i.e. building on the Project Management chapter,
for like basis. a house) then it may make sense to in particular find out what a PC
Some kitchen specialists aren’t keep the work in-house and ask your Sum is. Even so, the prices from the
simply re-sellers but actually make builder to fit it. That’s if you are still volume joinery majors, even with full
their own units, often with a on speaking terms by the time you discount, will be slightly more than
distinctive style. If you like the house have reached the kitchen fitting. There the cheapest available from the likes of
style, then they can make an excellent are several outlets (principally builders’ B&Q; but there is one big advantage
choice, but don’t work with an outlet merchants and joinery centres) that if your builder fits the units and that
like this if you want something quite aim to sell mainly to builders and is that he will remain responsible for
different to what they like to do. they have kitchen catalogues available sorting out any snags. If, on the other
On our 2018 selfbuild, we worked to browse through and sometimes hand, you supply your own units to
with just such a business, Tomas showrooms to visit. your builder and, say, the hinges work
Kitchens, based in Cambridge but Some of the major joinery firms – loose or there are unsightly gaps here
who work throughout the South East. Howdens, Magnet – produce fitted and there, then you’ll have your work

HOUSEBUILDER’S BIBLE l 13th EDITION 243


Chapter 11

cut out trying to convince him it’s his is actually a very good choice of Armitage Shanks Belfast, cost
fault: indeed you’ll have fallen into one material for a sink; it’s strong, between £110 and £150 depending
of the contractual traps placed along lightweight and easily cleaned. on size. Taps and waste are extra:
the route. The very cheapest kitchen sinks these sinks are most definitely not
now tend to be stainless steel; single sold in packs.
COSTS bowl/single drainers can be picked
Strange as it may seem, you can quite up for less than £100, a set of taps for TAPS
easily compare kitchen unit costs less than £20. However, the products Depending on your bowl
by the cubic metre (m3). It’s actually from the big names in kitchen sinks arrangements, a moveable tap is a
quite helpful because it gives you a (Leisure, Carron, Franke, Blanco, very handy thing to have and one on
handle on both basic cost and the Barazza) can be much more. Expect a hose is even more useful. The longer
quantity of units. to pay £250 upwards plus for the hose, the better as far as I am
Floor units are conventionally something as good as a Franke one- concerned. Separate taps and simple
900mm high (the worktop level) and and-a-half bowl sink. mixers cost next to nothing, but a
600mm deep. Above worktop wall fabulous Hansgrohe pull out spout
units are 700mm high but no more SYNTHETICS AND CERAMICS stainless steel kitchen tap can cost
than 350mm deep. Double height In the 1990s, a whole bunch of £600 or more.
units are typically 2100mm high. composite materials were used to
By way of example, the kitchen of a make sinks but they have pretty much BOILING WATER TAPS
small one bedroom flat would consist gone out of fashion now. As with We seem to have come up with
of around 2m3 of units. It has maybe bathrooms, where everything is now an entirely new kitchen gadget in
10 units in all, including appliance white, kitchen sinks have reverted recent years, the boiling water tap
housings. A very large detached to either stainless steel or white which basically replaces a £25 kettle
house is likely to have around 8m3 ceramics, or the sink-cum-worktop with a £500 instant hot water tap.
upwards, say up to 40 units, probably effect you can get with Corian (see For a few quid more, you can add
including an island. below). an ice-cool tap as well. It’s the sort
The model house used to compare The old fashioned butler’s sink of thing which we, as well trained
costs in this edition has been tends to look a wow in the kitchen consumers, will tend to lust after,
deemed to have 5m3 of kitchen units showroom, particularly when it is and doubtless once experienced will
(around 20 units) and is mid-priced inset in a hardwood surround with never be able to live without. But
at around £1,200/m3. Fully finished drainage grooves. It’s not changed as someone whose only ever come
kitchens (including appliances and from the original Victorian design across them in showhouses, I think
worktops) are available at anywhere (i.e. a large white rectangular box) I can make do with a kettle. Lots of
between £800 and £5,000/m3. The and this adds an air of authenticity people now making them, Screwfix
cost gap is staggering: there is a to it which nothing else in a modern are selling them. Make sure your
world of difference. kitchen can touch, not even an chosen sink has the tappings to take
Aga (which hails from the 1930s). one.
Consequently, it’s become an item
SINKS in all Smallbone-inspired kitchens WASTE DISPOSAL UNITS
Having once been out of fashion and its very size and weight stand Almost universally fitted in America,
because they were cheaply made, as statements of contempt for the waste disposal units are still
stainless steel is back to No 1 in standard mass-produced fitted something or a rarity in the UK. They
the kitchen sink pop charts. Steel kitchen. Butler’s sinks, such as the sit under the kitchen sink and are

244 13th EDITION l HOUSEBUILDER’S BIBLE


ROOM BY ROOM

electrically powered to spin at very have to be made where two sheets you hire a kitchen fitter they will
high speed and macerate food waste meet. And there will be edge details probably use such a specialist to fit
so that it can pass down an ordinary and a splashback to think about too. the worktop. A fitted worktop in a
32mm kitchen sink waste pipe and So here the headline rate is only the material like Corian or Dekton will
out into the sewer system. The best beginning of the journey. cost upwards of £750 per linear metre
known name is InSinkErator, costing But, as ever, the headline rate is the (based on a 600mm wide worktop,
between £200 and £400 depending place we all start. The bottom end of the standard width). Islands and
on the model and the power. the market is dominated by laminate peninsulas will of course cost even
If you are a successful composter, boards, usually with a post-formed or more.
then you will eschew such a hi-tech, rounded edge. These used to be what
low sense way of getting rid of tea everyone fitted back in the days when
bags, coffee grounds and food waste. fitted kitchens were a new idea. You KITCHEN APPLIANCES
But they do overcome the issue can buy a 3m long laminate worktop All prices quoted in this section will
people have with smelly bins in smart for under £50, so here the main cost include VAT. Trade prices invariably
kitchens. is the hole cutting and jointing. exclude it whilst retail outlets
Other materials are available. invariably include it. Whichever way,
Laminated hardwoods were new housebuilders in the UK cannot
fashionable in the 1980s but proved reclaim VAT on kitchen cookers or
KITCHEN WORKTOPS to not keep too well. Granite and appliances with the sole exception of
The worktop is the name given to other stone tops were in vogue in the cooker hoods, which are regarded as a
the main shelf in a kitchen where 1990s but they tend to be a bit dark. ventilation item.
all the action happens – the food These days the vogue surfaces are
preparation, the cooking and the composite materials like Corian or COOKING
cleaning. Everything else is just manufactured stone products known The standard practice today is to
storage. Getting the worktop right as Quartz, which of course cost about buy a built-in oven with a separate
is a crucial part of kitchen design ten times more than the old plastic- hob and a hood, often sold together
and, although it may not be the first based laminates. as a package. Every supplier offers a
thing you think about when selecting Corian in particular is unusual in choice of gas or electricity for your
a kitchen, it will be the single most that it can be formed into sink- hob without any effect on price,
important element in your kitchen. shapes so that you can appear to have but a gas oven is more expensive
The standard width for worktops is a seamless kitchen sink which looks than an electric one. The budget
600mm, which is sufficient for most and feels exactly like the rest of the developers’ packages are priced at
kitchen configurations. Peninsulas, worktop. Corian however is not quite around £300.
islands and breakfast bars may all as durable as the quartz worktops Appliances are mostly made to
require wider surfaces; there are a few and materials like Dekton are now modular sizes so that they slip easily
extra-wide sizes available with two appearing which you can put a hot into any kitchen unit assembly
good edges, designed for these types pan on and not cause any markings. although there is no compulsion
of applications. All these options (except the basic to source your appliances from the
Buying worktops is not laminate worktops) can be machined same place as your units. Neither of
straightforward because they tend to to give you drainage grooves next course is there any compulsion to
need a little configuration in order to to the sink if you wish. There are stick to the same brand of appliances
fit a kitchen. Typically a hole will be numerous worktop specialists around throughout the kitchen, though for
cut for a kitchen sink and a joint will who take on this type of job and if convenience many people do.

HOUSEBUILDER’S BIBLE l 13th EDITION 245


Chapter 11

STAND ALONE/SLOT-IN microwaves are excellent in a number responsive and cheap to use: its
COOKERS of areas (eg boiling vegetables, drawbacks are that they are hard
Go into Currys, and you will still reheating, defrosting) where to clean and they have a dislike of
find a range of very 1950s-style gas conventional cooking is cumbersome. pans boiling over. If mains gas is
and electric stoves. I don’t think very They are quick, clean and energy unobtainable, then consider having
many go into new homes (unless you efficient. bottled gas just for the hob. Gas
are specifically going for that 50s As an alternative to fitting a cooking has another big, often
retro-look) but they are very cheap. separate microwave unit, most unspoken plus going for it in that
However, 21st century housebuilders manufacturers now make multi- it continues to work in power cuts,
all go for fitted ovens and hobs. The function or combi ovens that include something many rural areas still
question is which oven, hob and a microwave function. You can use suffer from frequently.
hood? In recent years the choice has these as either conventional only, Whilst electric hobs have been
multiplied alarmingly making this microwave only or both functions seen as the poor relation, there are a
once simple task extremely taxing. at once which allows you to halve number of developments that make
the cooking time for something like them more interesting. First the
OVENS a chicken or roast potatoes but still ceramic hob came along which was
At the basic end you get a single get an element of crispy browning. easier to clean, if nothing else, but
electric oven with a timer clock However operating them in they perform only slightly better than
and two or three functions. That is combined mode is quite complicated conventional electric plates. They do,
enough for 90% of us. It’ll cook a – it requires a whole new set of however, make a pleasing orange glow.
Christmas dinner, what more can you cooking skills. More recently we have seen
ask? Well, a lot. What’s happened Steam ovens sell themselves as induction hobs that work via a
with ovens mimics what’s happened healthy alternatives to microwaves. magnetic field rather than an
with computers. They have grown They tend to be quite small, not element. When magnetic pans
more functions and controls. Take a much bigger than a microwave, are placed on the surface, a field is
top of the range Miele single oven. It and they work by boiling water and created which produces heat. The
comes with ten functions. It also has blasting steam into the cooking field is only generated where the
ThermoClean plus pyrolytic cleaning chamber (some of them do this under pan touches so induction cooking is
with Air Clean catalyser. Don’t yer pressure). Like microwaves, they efficient and extremely quick – faster
luv this stuff? You need to go on a are surprisingly versatile and can do even than gas. Induction hobs are
course just to see how it works and, much of the cooking undertaken also horribly expensive – expect to
not surprisingly, Miele, along with a on a hob as well as useful little jobs pay around £500 for one of these
handful of other manufacturers, run like defrosting and sterilising bottles. beauties. And buy new cookware – it
cookery demonstration courses. Again, it’s a whole different approach has to be magnetic.
to cooking that has to be learned The more up-market suppliers can
SPECIALIST OVENS afresh. Steam ovens are still quite also fit you out with specialist hoblets
The relentless rise of the microwave a specialised item and they are not where you can mix and match your
has seen it elevated from being a cheap, prices starting from about cooking surfaces and include griddles
countertop accessory to being a built- £600 from de Dietrich or Miele. and fryers as well as the more usual
in second oven in its own right. Most plates. Most manufacturers also give
people find it far more useful and HOBS you the option of having extended
flexible than having a double oven. Where they have a choice, most hobs if you find the standard 600mm
Despite being limited in their uses, people go for a gas hob. Gas is fast, width a bit limiting.

246 13th EDITION l HOUSEBUILDER’S BIBLE


ROOM BY ROOM

Be aware that the standard unit, otherwise known as a downdraft One to ponder. I’m one of a
electrical supply for electric cooking hood, which is designed for cooking growing number of people who live
in the kitchen is a 30amp cable. This on an island unit. It sits in a slot in a new home without a kitchen
is only capable of supplying 7.5kW behind the hob on and emerges up extract at all and are happy to take
of power (you need 4 amps for each from the worktop at the touch of a a chance using the whole house
kW). Double ovens will use as much button. Costs typically more than ventilation system plus the occasional
as 6kW with everything on and an £2,000, and some complex sub-floor open window to do the work. Thus
induction hob or a five or six plate venting is required to get them to far, so good, but it’s early days….
ceramic hob can take as much as work
8kW with every ring in action. You Should you have your kitchen WHICH MAKE?
can elect to either uprate your supply extractor venting to the outside or There is an awful lot of snobbery
to 45amp or run separate circuits for simple re-circulating the extracted air about kitchen appliances. Classy
the oven and the hob. back into the kitchen having passed kitchens need white goods with
through a grease filter and a charcoal German (or at least German
COOKER HOODS filter? The plain extractors are simpler sounding) names like AEG, Bosch,
Cooker hoods now seem to come and cheaper but they simply throw Siemens or Miele (it’s pronounced
in about five flavours. The standard the air out of the house: it needs like Sheila). Very classy kitchens
version is a rectangular box which sits venting which may not always be need classy German makes like
between 650 and 750mm above the easy (especially on an island) and may Gaggenau. British manufacturers like
hob: you get a three speed fan and a require ducting which is awkward. Hotpoint, Tricity Bendix, Creda have
light (actually very useful) but they The re-circulators don’t work quite reputations based on price rather than
are cheap and usually noisy. so well and require occasional filter quality, as have Philips Whirlpool
Then there is an ‘integrated’ variety changes, but will work fine if you and most of the Italian manufacturers
which gets concealed in an overhead don’t live on fry-ups. with the exception of Smeg (yes,
wall cupboard and is activated by In fact, most of the time, kitchen they are Italian) who have levered
pulling the top-hung cupboard door extractors do remarkably little and themselves up to Premiership status.
open. Next, a slimline or telescopic people often cook on hobs forgetting The very cheapest appliances often
version which is typically no more to turn on the extractor and it doesn’t come with little-known brand names
than 25mm deep and these are make much difference to the air and obscure East European origins.
turned on just by a gentle tug towards quality. Getting confused? It gets worse.
you; the fan itself sits in a dummy If you are going for a low-energy White goods branding is an
cupboard above. house, you will already have plans extremely complicated area. There
The traditional up-market option for a whole house ventilation system is much cross-manufacturing of
is to go for a canopy cooker hood and here the system kitchen extract parts and ‘country of origin’ labelling
which acts more like a conventional is routinely fitted with a grease filter should more correctly read ‘country of
chimney: usually finished in stainless in any event. The manufacturers all final assembly’. As an example, most
steel, look to pay north of £350 for tend to steer you away from using European cooker hoods are made in
this type, though much cheaper whole house ventilation as a kitchen Italy and perform to much the same
ones can be found on eBay and the cooker extract because the thought of (rather noisy) standard whether they
like. But you can easily track down clogging up a ventilation system with are branded Candy, Neff or Creda.
canopies costing over a grand. grease if just too horrible, but if you Much of the upmarket German kit
About the most upmarket option never fry anything what exactly is the is actually assembled in Turkey or
is to go for a worktop ventilation problem? Portugal.

HOUSEBUILDER’S BIBLE l 13th EDITION 247


Chapter 11

No wonder purchasers often Aga. Any large radiant heat source eco house. I am sorry. Much as you
subcontract the decision making will be immensely attractive on a might hope to just slip one in as a sop
as well as the installation. Broadly bitingly cold day and it’s this aspect to the wife (that’s the usual story),
speaking, if you want to create an of the Aga – over half a tonne of hot such is the energy consumption of
impression then the brand names cast-iron – which fuels its seemingly these behemoths that it just can’t be
have to be German. The very best unending popularity. A large storage done. If you want to see a splendid
cookers tend to be German, but don’t heater would fulfil the same function example of a company trying to
assume that a German brand name at a fraction of the cost but, I’m defend the indefensible, have a look
is necessarily a sign of quality. Also, afraid, it would completely lack the at Aga’s Green Issues web page. ‘It’s
if you want anything unusual like a necessary style. built from recycled materials,’ they
built-in griddle you will need to seek If you are contemplating an Aga trill. ‘It’ll last much longer than an
out the high quality brand names. for your home, you must plan for it ordinary cooker.’ ‘It’ll store energy
However, if low price is your main from the ground upwards. Though from renewable power sources.”’
concern, then you should check out not designed as water boilers, for an ‘Some of our Agas will be biofuel
Currys’ own brands or alternatively extra £300 you can go for an Aga enabled.’ Yes, yes. All true and all
specialists selling to developers – with a boiler capable of heating not utterly irrelevant. Denial is a thing of
Arrow, Allied, or BCG. less than 400 litres of water a day wonder.
(ie enough for about eight people)
AGAS and – provided yours is a new house RANGES
The Aga remains the item for the qualifying for VAT zero-rating – you There are alternatives between
complete country kitchen. Despite can reclaim VAT on the purchase the splendour of the Aga and the
their exorbitant cost (new price which instantly saves around £500. industry standard ‘tin boxes’ which
anywhere between £6,500 and HMRC is usually happy to accept are sold as part of a fitted kitchen.
£15,000 plus the need for adequate this distinction and it cannot insist When the first edition of this book
foundations, suitable chimney that the boiler is ever connected to came out in 1995, hobby cookers
arrangements and fitting costs) your hot water cylinder. Agas come were unheard of. Now every kitchen
and their exorbitant running costs in gas-fired, oil-fired, solid fuel and showroom has them on display at
(around 50 litres of oil or 275kWh of electric (Economy 7) versions, and prices starting at around £600. They
electricity a week – you work it out), it has recently unveiled a biofuel- are now referred to as range cookers
otherwise rational people still salivate enabled range. and they are about half as wide again
at the thought of having an Aga in There are a number of cast iron as the industry standard 600mm so
the kitchen. They can’t do chips, they stove makers besides Aga and they you get six rings instead of four. You
can’t grill and boiling a kettle takes are usually quite a bit cheaper. Many can get them dual fuel so that you get
forever but, to quote the sales blurb: of them incorporate boilers so that an electric oven and a gas hob: indeed
‘An Aga transforms even the most you can use them as both cookers this is the most popular option.
functional kitchen into a warm and and house heaters but although this
welcoming gathering place for all the sounds economical, it can be a mixed WHITE GOODS
family. It becomes the heart and hub blessing when it’s your only heat
of your home.’ source – it’s not so much a case of DISHWASHERS
The fact that this description is often being warm in winter as boiling in If you want a dishwasher, the big
spot on usually says more about the summer. decision facing you is whether to
the state of the rest of the house No way can you reconcile having go free-standing or integrated. If
than any unique attributes of the an Aga with hopes of building an you are buying a fitted kitchen you

248 13th EDITION l HOUSEBUILDER’S BIBLE


ROOM BY ROOM

will come under a little pressure to


go for an integrated one which will
slip behind a kitchen-unit door so
that you wouldn’t know there was a
dishwasher there at all.
Now, despite the integrated ones
having less in the way of metal
casing, they invariably cost more.
Sometimes it can be hard to compare
because the models are not directly
equivalent. Take a good, solid
German make like Miele: their basic
free-standing dishwasher is available
for around £550 but if you want it
integrated it costs £200 more.
If you succumb to the allure of an
integrated dishwasher, you have a
further choice to make; to hide the
entire machine behind your chosen
kitchen unit door – that’s known
Much as I don’t get Agas, even I have
as fully integrated – or to let the machines and tumble dryers but
to admit that they do sit well in a
control panel peep out at you in a generally these items get placed in country kitchen.
way referred to as semi-integrated by a separate utility room and they are
some and as drawer line by others. therefore normally purchased as free-
If you find the distinction standing items. Hotpoint and Bosch
between fully and semi-integrated are the biggest name in washing are just throwing heat away from
dishwashers all a bit too precious, machines. Their basic stand-alone an expensively built energy efficient
then save yourself a couple of models start at around £250-£300 home.
hundred quid and bung in a free- but as you add features the price The condensers have to do more
standing one. And avoid stainless increases. work and therefore use more energy:
steel fronts and save yourself another they also cost between 50 and 80%
couple of hundred quid. TUMBLE DRYERS more than the simpler vented ones.
Stainless steel looks good, You’d think choosing a tumble dryer As its name suggests, condensing
photographs well but as anyone who would be simple but, of course, it tumble dryers produce a lot of water
has lived with one will tell you, they ain’t. There are a number of factors to which either has to be manually
don’t half show the fingermarks. If consider, most importantly whether emptied from an in-built bucket or
you want the stainless steel look to to go for a vented one or a condenser. plumbed into the waste pipes.
stay looking clean, then you actually Or splash out on a heat pump one? A new development is the heat
need aluminium, which is even more The difference? The vented ones pump tumble dryer: many of
expensive. are the simplest and cheapest. They the regular manufacturers have
work by throwing the warm, moist introduced them. They are very
LAUNDRY air out of the house via a 100mm expensive, upwards of £500 to buy,
You can get integrated washing flexi-duct. This isn’t very green as you but they offer much lower running

HOUSEBUILDER’S BIBLE l 13th EDITION 249


Chapter 11

costs because of the heat pump price tag. Ice dispensers anyone? else. I have lived with compost
technology. They work as condensers Don’t forget they need a water bins most of my life and, whilst
so need plumbing into the waste supply. the theory is all fine and dandy,
pipes, but they use much less power. All attempts to add value to what the practice is anything but.
In fact, they are rather slower than are essentially nothing more than Firstly, if they aren’t emptied
conventional tumble dryers and this cold cupboards. Again, if you are frequently, ideally daily, then they
can be a good thing because they are trying to save a little money, consider get smelly and fly-blown. Secondly
less likely to shrink clothes. building an old fashioned larder, the compost heap itself needs a
Whilst we are on the subject located off the kitchen, where you lot of attention if it is to work
of clothes drying, don’t forget the can store even more than you would as advertised. Otherwise it too
traditional methods — washing lines get in a 26.7ft3 Maytag Sovereign. I becomes smelly and fly-blown
in the garden and hanging rails in figure even a small larder will be five and acts as a magnet to the local
the utility room. Both useful, even times the volume – but where would rat population. And unless it gets
with a tumble dryer, but both need you put the ice dispenser? turned over every now and then, it
planning ahead to get full value from doesn’t even make useful compost.
them. One step is to keep chickens which
KITCHEN WASTE will dispose of most of your vegetable
Regular bin collections have become spoil but then chickens need even
COLD STORAGE more sporadic and we are now more work than a compost heap.
There are numerous options of expected to sort our waste in- Another is to turn in the opposite
above- and below-freezing point house. This represents a challenge direction and get a waste-disposal
storage and there are also numerous for kitchen designers because it unit, as discussed in the previous
arrangements for their housing. You effectively means we have to have section (see under Sinks).
have the same decisions you get with two or three different bins in each Whatever route you choose, don’t
cookers – whether to integrate or kitchen. Or at least have a plan for be fobbed off with a kitchen design
go free-standing. Free-standing is dealing with all the waste. based around a mini-swing bin
invariably cheaper. Or was until the Much of this isn’t terribly of 20lt or less. Even the greenest
arrival on our shores of the giant difficult to achieve. You just need households need a waste bin that will
American fridges which you haven’t a few extra bins. If you are really hold a 50lt bin liner. If storing great
a hope of integrating into any MDF bothered, you can build these into quantities of waste is a problem you
kitchen unit. Now a whole raft of your kitchen cabinets but this is can’t see an easy way around, consider
new names (to us) like Admiral, expensive. The cheaper options are a rubbish compactor that reduces the
Amana and Maytag are selling to use good looking bins in the volume four or five times. They are
enormous fridge freezers with ice kitchen – currently Brabantia are an expensive option, costing around
dispensers and are getting to over the best established name with their £700 and taking up as much space as
£2,000 for some models. Quite a stainless steel offerings – or get a a large bin!
change from a Whirlpool under- load of plastic boxes and put them
the-counter-job for £150. in the utility room or the garage. The
And Smeg has appeared with trouble with putting bins out of the
some curved edge 1950s style fridges kitchen is that the act of throwing
in a range of pastel colours, looking stuff in bins gets problematic and is
fabulous and definitely not for therefore prone to high failure levels.
concealing, especially with a £1,000 Compost bins are something

250 13th EDITION l HOUSEBUILDER’S BIBLE


ROOM BY ROOM

If you don’t buy a suite, you’ll have temperature.


BATHROOMS to remember to get all these items The ultimate in safety and
The bathroom is a multi-trade zone. separately – items like cistern levers convenience is to fit an electronic
Do not be fooled into thinking that are easily overlooked. If you want to bath filler tap which presets both
bathrooms are all about plumbing- opt for a separate shower instead of a temperature and bath depth.
in sanitaryware: that’s just the bath you may be able to find a two- Crosswater and Aqualisa make them
beginning. Ventilation, wall tiling, piece ‘cloakroom suite’ (be warned: and the overall cost is little different
mirrors, accessories, obscured glazing, cloakroom basins are often minute). to conventional taps.
enclosed light fittings, pull switches, A very basic bathroom suite will
underfloor heating mats, towel rails cost £300 upwards. Most bathroom ACCESSORIES
(heated or otherwise) and specialised outlets have a range of four or five Most suites offer a wide range of
floor coverings all combine to make suites going up in price to around matching accessories (shelves, soap
bathroom fitting a complex and £400; after that, you get into more holders, loo roll holders, toothbrush
elaborate process – and one that is up-market designs where all items holders, toilet brush holders, towel
easy to neglect in the hurry to finish come priced individually. rails) at prices well over the odds
a house. Prices tend to get softer as they for what you would pay in a DIY
Bathrooms are also expensive. get higher and trade discounts of shed. Even on a fairly basic suite,
Bear in mind that it’s not the size of ‘no more than 10%’ on budget lines you could easily spend over £100
the bathroom but the fittings in it. suddenly rise to 30% or more when on buying matching fittings, adding
Big bathrooms are becoming very your spend rises above £1,000. another 20% to your suite price. If
popular; many people want to fit you want a bidet, expect this to add
cupboards and furniture in them and TAPS around 30% to the basic three-piece
the en-suite bathroom, in particular, To date, baths and basins have suite price.
seems to be getting bigger and bigger, been available with all manner of
eating chunks out of its attached tap arrangements. The old British STYLES
bedroom. But there is no need to standard of hot tap on the left and You can have any colour you want
follow these American-led trends cold tap on the right has gradually as long as its white. Just where this
slavishly. Our Continental cousins been superseded by various mixer taps craze for white bathrooms arrived
still prefer family bathrooms and, which are often extremely unintuitive. from, I am not sure, but it upsets
although the word en-suite would In 2010, the regulations were me just a little, because I come
seem to be French, you won’t find amended so that, in future, all bath from a generation which regarded
many in France. taps will have to be thermostatically coloured suites as being mildly
controlled. This is to prevent around sophisticated and now everyone
BATHROOM SUITES 20 deaths and 600 serious scaldings just laughs at us. I can remember
Budget bathrooms are most usually that occur every year because of in earlier editions of this book
sold as three-piece suites. Normally a hot water, in bath, in particular. giving advice on how to colour
bathroom suite includes: The problem is that hot water is co-ordinate your sanitaryware with
n Bath, bath taps, plug routinely stored at 60°C and this is your tiling scheme. No more. That
n Bath panels (to conceal the fact about 18°C hotter than you want would look far too dated, far worse
that the bath is plastic) a bath or a shower. Thermostatic than not having the latest regs
n Basin and supporting pedestal taps premix the hot and cold water at my fingertips. But it seems so
n Basin taps and plug and include temperature limiters illogical. How come you can still get
n WC, cistern, seat, handle. to stop water going above a pre-set coloured wall tiles? Or are they all

HOUSEBUILDER’S BIBLE l 13th EDITION 251


Chapter 11

going to be nothing but white soon? adjusting flow rates and temperature minute (equivalent to a good mains
There are still defined groups of settings, you can fit a digital shower pressure system) will cost £180plus.
bathroom suite styles but whereas and just programme this stuff in. And Leading manufacturers: Mira,
it was once a straight toss-up you can, of course, arrange two-way Aqualisa.
between trad and modern, now it’s switching so that you don’t even If you want a power shower in a
a little harder to define. Check out have to be in the shower to turn it new house, you would be well advised
bathstore.com, Wolseley’s consumer- on. Aqualisa’s Quartz shower (which to avoid all these products and go
facing spin out, and see if you can does all this) has proved to be a big for a mains pressure or near mains
work out which is which. Actually hit, despite it’s £400-odd price tag. pressure hot water system. Having
bathstore.com isn’t a bad place to The switches, which you have to press taken us decades to accept mains
start, even though it sometimes gets quite hard, give you visual feedback pressure hot water systems in the UK
horrendous reviews from customers: to tell you when the shower is up – they weren’t admitted until 1987
I find its showrooms are well laid out, to temperature so there is no more – they have now pretty much swept
and its prices are certainly keen. dipping in and out of the shower to the field in new housing: the days of
test whether it’s just right. It also works water tanks up in the loft appear are
with baths too – you can enjoy a Digital gone.
Bath, which tickles me somehow. Against this are building
SHOWERS regulations which seek to limit the
Showers are popular both as SHOWER POWER flow of water through showers —
attachments to bath taps (known as There are many routes to getting a see the upcoming section called the
shower mixers) and in their own right good pressure through your shower Water Calculator. You don’t actually
in stand-alone shower cubicles. Apart head. The most effective is to install need a shower to deliver 30lts/
from style – and there are showers to a mains pressure hot water system minute. Half that much is still a
fit every style – there are two things or a thermal store (see section on pretty good shower and you can get
to look out for: thermostatic control Domestic Hot Water). The least a perfectly adequate shower from
and adequate flow rate. effective is to install an electric as little as 8lts/minute. Possible low
shower or a combination boiler, both flow showers which you might want
THERMOSTATIC CONTROL of which heat water instantaneously to check out include the Nordic Eco
Thermostatic control automatically and therefore suffer from low flow shower and Hansgrohe’s 6lt shower.
adjusts the balance of hot and cold rates. In between these extremes Wolseley Sustainable Building
water flowing through the shower come a whole gamut of power Center promotes Mira’s Eco handset
head as other taps in the house turn showers which aim to add whoosh which, it says, gives a good 6lt shower.
on and off. It is expensive, usually to feeble pressure from tanks in the
adding around £70 to the cost of loft. There are single impeller pumps, SHOWER ENCLOSURES
a shower. A cheaper alternative which boost the water after the Acrylic trays can be had for under
is to have a shower with a high- mixing valve, and double impellers, £50 but they are not recommended
temperature limiter that will avoid which boost both hot and cold before because of problems with leaking
scalding but may still leave you they enter the valve. Which you caused by the trays flexing. The
drenched in cold water when a hot choose is partly dependent on the most popular option is the ceramic
tap opens somewhere else. layout you have and prices are largely stone trays: Matki’s are good. For a
dependent on the power of the pump. little more, you can buy them with
ELECTRONIC SWITCHING They can be purchased for just over an under-tile upstand that will
Rather than faffing about with taps, £100, but a pump delivering 30lts per minimise any possibility of leakage.

252 13th EDITION l HOUSEBUILDER’S BIBLE


ROOM BY ROOM

The standard size is 760mm square A good wet


(which suits the standard pivot room will be
doors). There is a small cost penalty if designed so
that it can be
you want a larger tray, however note
easily accessed
that some people find the standard by a wheelchair
760x760mm size uncomfortably user, but doesn’t
mean. splash everything
As for doors, many arrangements in site. A simple
no longer require doors. It rather glazed screen
usually suffices.
depends how much space you have.
Conventional showers still require
some sort of door. Pricewise there
is little to choose between a free-
standing shower enclosure or one
built into an alcove – the cost of a
tiled wall being similar to the cost of
a glazed side panel. The alcove option
usually looks the most professional;
you finish the opening with either a
pivot or a bi-fold door Matching side
panels tend to be 60-80% of the door
price. If your shower is incorporated
with your bath, then you have a
choice of a simple shower curtain
hung from a rail or a glazed shower
screen.

various sticky tapes which combined AVOIDING LEAKY SHOWERS


WET ROOMS with cementitous goop give you In theory, this is no problem; in
What price open showers running waterproof walls and upstands. practice, tiled shower cubicles often
into a floor drain? It’s a detail Having fitted it all, you can then tile ship water where they shouldn’t and
regularly seen on the Continent and over it to get the desired wet room tiled floors will tend to fare even
has been widely specified in this look. worse. It really is worth paying a lot of
country in special needs bathrooms. You don’t have to enclose the attention to the construction of shower
You dispense with the conventional shower at all as the tray is designed enclosures generally because their
shower tray and your enclosure need to drain away any water falling on failure is one of the commonest faults
only be a shower curtain, though a the floor, but open showers are not in new buildings. Don’t skimp on the
screen looks much better. without their issues. Like it or not, you linings – use a waterproof plywood
The usual routine with wet rooms end up with a wet floor after using or a waterproof board like Knauf ’s
is to buy a kit which comes with a the shower and subsequent bathroom Aquapanel or Hardie Backerboard
pre-formed tray with a fall built in users don’t really appreciate wet floors, rather than regular plasterboard – and
and a hole for the drain. Some also especially if they are wearing shoes or use the best adhesive you can afford to
come with shower screens. There are socks. fix ceramic tiles with.

HOUSEBUILDER’S BIBLE l 13th EDITION 253


Chapter 11

The key failure point, however, is restricted to 12lts per minute. But house, but it is doubtful whether
the joint between the walls and the they have chosen a more complex they will check its veracity. For one
floor (or more likely tray) and with route whereby you have to fill in your thing, it can be hard to find out
most designs you are dependent on a projected water use into the water what the flow rate on individual
bead of silicone mastic to stop water calculator (basically a horrible looking taps and showers actually is as
finding a route through the defence. spreadsheet) and left it for you to the manufacturers don’t always
Your silicone sealant will stand a justify your choices of taps, loos and publish this information, or they
much better chance of success if the showers. say it depends on the overall water
joint is tight and even, something You can find versions of the Water pressure, which is not in your control.
that usually depends on how good Calculator online as well as lots of But you should pay attention to it
your carpentry is. But failures can also useful advice on how to fill it in. and someone in your team needs to
occur in the tile grouting and around n Showers: You need to find showers check that it’s at least been filled in.
the shower fitting itself. that have a flow rate below 12lts per
minute, preferably even 10lts per
THE WATER CALCULATOR minute. This isn’t very much flow, in
In 2010, a new building regulation the great scheme of things, as most BEDROOMS
was introduced (in England only) power showers like to deliver well For developers, bedroom space is
which for the first time set out to over 20lts per minute. cheap space. All that really has to be
limit the amount of water we use in n Baths: Specify a bath less than provided is enough room to fit a bed
our new homes. When building a 175lts capacity if possible. and an item of furniture plus enough
new home (and only when building a n Toilets: All new ones are now dual space to manoeuvre about between
new home) Part G requires us to put flush and have a maximum flush of them – the technical term for this is
all our water-using devices through 6lts or less, so these are generally fine. swinging a cat.
a Water Efficiency Calculator which n Taps: You are looking for taps with
assesses how much water we will a flow rate of 6lts or less; it can be DESIGN CONSIDERATIONS
use on a daily basis. The hurdle rate hard to find any information on tap You can of course give far more
has been set at a notional 125lts per flow rates at all. This may change as consideration to the whole issue.
person per day and the combined Part G begins to bite over the coming It’s worth visualising the layout
effect of our choices should not be years. of the bedroom furniture so as to
greater than this. n Washing machines have a default work out where to place radiators
Now this doesn’t actually mean we score of 8.17lts per kg dryload. You and power sockets. Also it’s a nice
have to use this much water, but it may find better, but it’s not going to touch to arrange light switching
sort of imagines that if Mr and Mrs make a lot of difference. so that it can be reached easily
Average were to live in the house, n Dishwashers have a default score from the bed. On the other hand,
this is what they would use. By and of 1.25lts per place setting. Again, it if you want to maintain maximum
large, it’s not that difficult to meet doesn’t make a big difference if you flexibility, then fit power sockets on
the hurdle rate if you pay attention to beat this. every wall so you can accommodate
your bath size and, in particular, your n Waste disposal units. They don’t various layouts. In reality there may
shower flow rate. like these – they all score 3lts per only be one sensible place where a
It might have been easier if they person per day. bed can go, but there may be other
had just said that, in future, baths Your building inspector will considerations. What is appropriate
can only be of a certain size (say request sight of your water as a nursery for a toddler is unlikely
max 200lts) or showers should be calculations in order to pass the new to suit a teenager and you should

254 13th EDITION l HOUSEBUILDER’S BIBLE


ROOM BY ROOM

consider how the uses a bedroom A space-saving


gets put to will change over the idea is the bed
years. Don’t always assume that a that folds up
bedroom will remain a bedroom. into a wall, also
known as a
Hideaway Bed.
SIZE As our homes
It is conventional to rank bedrooms are tending
by size. Now, you might think that to get smaller,
in a four-bedroom house you would this design is
provide a double bedroom for mum migrating from
caravans and
and dad (or whoever tickles your mobile homes
fancy) plus three smaller but similar into the study-
sized rooms for the children. But no; bedroom. Also
the British way of doing it is to build useful in spare
bedrooms in ever decreasing sizes. rooms with
It’s also the British way of multiple uses.
doing things to rank – and price
– houses according to the number
of bedrooms they have. Almost
all developers switch to four
bedrooms when the overall floor
size creeps over 110m2. When you
are working with relatively tight
floor areas, which goes for 90% of
UK housebuilding, squeezing an
extra bedroom in is a seen as a vital
sales booster, even if the resulting
bedrooms are horribly cramped.

WARDROBES
Not usually included by developers as zero-rated for VAT purposes. consuming and therefore expensive.
and not usually included in any Typically you would design your The average house needs rather more
summary of building costs, the bedroom wall partitions with various wardrobe/cupboard space than it
wardrobe is, nevertheless, a near strategically placed kinks into which needs kitchen unit space and the
essential item in any bedroom. There you slip a hanging rail and a few open cost is pretty similar, whether you
are basically three approaches to shelves and then hang a door or two build it in or buy it as furniture. As a
creating bedroom storage space: in front. It’s probably the cheapest rule, every adult needs about 2.5m3
n Use free-standing furniture: it costs option for new housebuilders as of storage space and children not
but you can take it with you the cupboards can be created as much less. At the budget end of
n Use specialist bedroom fittings you go rather than being added on things you can supply this space at
n Make your own. afterwards. around £1,000/m3 and at the top end
The last method has one major Building your own wardrobes may anything upwards of £3,000/m3.
advantage in that it is regarded sound straightforward but it’s time

HOUSEBUILDER’S BIBLE l 13th EDITION 255


Chapter 11

way of infrastructure – although word of contemporary planning,


THE HOME OFFICE extra power points and phone sustainability, is on your side here.
Pick up any paper or magazine and sockets would certainly come in For decades the planning system has
you’re likely to find articles about handy. worked to separate the residential
working from home, as if it had just zones from the industrial zones on
been discovered as the panacea of the premise that the two don’t mix
all modern ills. This is completely PLANNING ISSUES well, but as much of our working
daft. Working from home is what However, for many others, working activities have become cleaner and
most of us always did, long before from home will need considerably quieter, the wisdom of this zoning
they invented factories and offices, more thought. You may require has been called into question.
and there are still loads of trades meeting space or consultation rooms Now the boot seems to be on the
and businesses which have always which are best kept quite separate other foot because the car – more
worked from home. What is new is from the rest of the household in particularly the car journey – has
that there is a whole host of office order to maintain a professional become the bête noire of planning
workers, who would previously have atmosphere: sometimes this can departments. Anything that can be
commuted some distance to work, be quite neatly achieved with an done to reduce the number of car
now padding a few feet down the additional ground floor room which journeys is said to be sustainable,
passageway. Journalists in particular has its own external entrance. which is planning speak for a good
are able to work from home which On the other hand, you may need thing.
is, just possibly, why you read so workshop space which will create
much about it in the newspapers dust or noise or smell and which is
and magazines. But my farming ideally situated in a separate building. LIVE-WORK UNITS
friends just scratch their heads and These are specialised concerns and Most spec housing continues to be
wonder what everyone is talking really no one is going to understand built without dedicated office space
about. them better than yourself, so it is although this changes as you move
What’s the upshot of all this? pointless me wittering on. What up market. In London and some
Well, what most people think I should point out though is that other metro areas, you occasionally
when they think of working from the more specialised and separate come across live/work units that are
home is that they need an office, your workspace becomes, the more designed to appeal to singletons.
or at least some office space. The problems you are likely to encounter You might be tempted to use this
physical requirements for all this are at the planning stage. home working scenario to gain a
remarkably small, usually satisfied These problems are likely to hinge little planning leverage – reducing car
by a few shelves and a working on whether you can extend the journeys, etc – but do bear in mind
space serviced by a couple of power terms of the planning permission to that there are potential tax traps.
outlets, a telephone socket and a include non-residential uses. Solo The house may be deemed to be
broadband router. There really isn’t home office working is frankly not partially commercial space which will
much designing to be done, you going to be an issue but anything mean that part of it becomes exempt
just take over the box bedroom and that a) makes a lot of noise or smell from your principle private residence
have done with it. Even if you are or b) attracts a lot of visitors is not tax shelter and that you may be
inclined towards the hi-tech office going to be passed through on the assessed for commercial rates.
with PCs, printers, scanners, copiers, nod; in fact, it’s probably unlikely to
routers and the like, you still don’t get passed at all if the area is zoned
really need anything more in the purely residential. However the buzz

256 13th EDITION l HOUSEBUILDER’S BIBLE


ROOM BY ROOM

conclusion that what you need is a live in a garage for a few months –
GARAGES larger utility room or a basement, not certainly not much worse than the
Before you commit yourself to a garage. average caravan.
spending good money on garage Garages are obviously valued by
space consider for a moment whether a great number of people otherwise SITING
it is really necessary. Although speculative developments wouldn’t By and large, house designers do not
current fashions in house styles include them as a matter of course, like garages. They are difficult. On
tend towards the traditional, there but don’t just fall into the trap of most sites, access demands that they
is absolutely nothing traditional assuming that a house must have a are located somewhere prominent
about a garage. Its nearest equivalent garage because it’s not a proper house near the frontage and yet, by their
in pre-20th century housing is the without one. Having said all that, you very nature, they are more akin to
stable or, perhaps, the cowshed; but still want a garage. Next question is... outbuildings and sheds. Now, polite
the housing of cars is an altogether architectural convention dictates that
different affair. Furthermore, whilst WHEN TO BUILD IT? you don’t put a humble shed in the
thirty or forty years ago it was a good You can, of course, decide to leave front garden and so you are left with
idea to keep vehicles undercover to the construction of a garage until the problem of having to make the
facilitate winter starts and to stop an unspecified later date, provided garage look good without costing too
rust, cars these days are made to that it’s not integral to the house. much.
very much higher standards and it If it is included on your planning One way around this conundrum
is really not necessary to keep them permission drawings, the right to is to have an integral garage, one that
undercover. build it cannot be taken away once is built into or at least attached to the
Nowadays, security is often cited you have started the main house. NB main house. The points for this are:
as a reason for building garages – but This ruling goes for conservatories, n It makes for a more effective utility
does this really justify spending as swimming pools and any other fancy room-type garage, if that’s what you
much on a garage as it costs to buy accoutrements that you aspire to but have in mind
a small car? And for many practised can’t afford. Therefore just drawing n You can use it to house boilers and
car thieves, a locked garage doesn’t the plans might represent a good freezers
really represent much of an obstacle compromise solution for those who n The arrangement fits better on
in any event, especially as people tend don’t really need a garage but worry narrow fronted sites (under 12m
to be much less security conscious on that the house might be difficult to wide).
outbuildings. sell without one. Against this, you Against this, it doesn’t usually do
Of course, garages have many other should be aware that any building much for the look of a house. Most
uses besides providing undercover car work that takes place after you move garage doors are better suited to
parking, as is shown by the numbers into a house will not be exempt from largely unseen parts of your estate –
of people who have them but never VAT, so it will cost you 20% more to i.e. they are naff – and placing one
park their cars inside them. Solid construct. Also, it is worth pointing prominently in your front elevation
fuel, tools, lawnmowers, gardening out that many people find it very can be very ugly. The problem of
equipment, bicycles, golf clubs, baby useful to build the garage before the garage door is particularly acute
buggies, deep freezes, paddling pools, the rest of the house as it provides when you are building in a traditional
paint, you name it, it gets stored a useful and secure store-cum-site style. One way of alleviating it is
out there, and very useful it is too. hut whilst the main construction to have an ‘L’ shaped house and to
But if you are designing a house forges ahead. Indeed, with a bit of tuck the garage into the bit of the
from scratch, you may come to the adaptation, you could just about L that projects forward towards the

HOUSEBUILDER’S BIBLE l 13th EDITION 257


Chapter 11

road. This softens the impact of the CAR PORTS GARAGE DOORS
integral garage on the all important One alternative approach is just to For many designers, the problem with
kerb appeal. build a lean-to car port or undercover garages begins and ends with the
Given a site without space car parking bay. You need some form garage door. Until the 1970s garage
constraints, most builders will plump of hard standing for the car and then doors were strictly functional and
for a detached garage. The main the rest is up to you. The finished utilitarian, often made of steel with
attraction of this arrangement is result could be anything from a no attempts at embellishment. Since
that it maintains the integrity of the flimsy timber construction which then, a large number of imitation
house design but, even so, the siting might look better as a garden pergola traditional door styles have sprung
of the garage can still overwhelm to a fully-fledged garage without a up, aping the move back to other
this. Ideally, it will be well away to door. traditional forms. The trouble is,
one side but most plots these days that whilst a window or a front door
are not large enough to make this a can be made in styles copied from
viable option and so very often the PREFABRICATED old doors, there are no old garage
house is half-hidden by the detached There are several small manufacturers doors to copy from. Hence a mock
garage in front of it. Effectively, who produce prefabricated garages Georgian or mock Tudor garage door
this means that the garage plays a at prices way below standard looks more than faintly ridiculous.
crucial role in people’s initial views construction costs. But what you are Double doors, over 4 m wide, look
of a house, and developers have buying is probably little different in particularly strange and attempts to
responded to this by spending quality to a garden shed. That may be mould classical patterns on them
more and more money on external exactly what you are looking for of merely emphasise how strange and
appearance, commonly including course. They are very utilitarian and out of place they look.
fancy roofing effects not seen on the would probably be best sited away If there is a traditional British
main house. from the main house. garage door it is the side opening
style that you see on houses built
BUILDING COSTS in the 1920s and 1930s, made from
Many of the costs of building a garage UNDERGROUND solid timbers and lit by small square
– whether integral or detached – are An underground garage is unlikely frosted-glass panels, sometimes called
no different from the costs of building to be a cost-effective option unless a Pattern 301 door.
the main house. Garages do not space is at a premium. Access ramps Garage doors are large and
have to meet the standard building (budget £8,000) and potential therefore tend to get pricey. It’s a
regulations as regards insulation drainage problems make the totally specialist business and your best bet
and damp penetration and this underground garage an expensive is to Google ‘Garage Doors’ and seek
allows them to be constructed with luxury. However, the economics quotations from there. Steel is much
thinner, single-skin walls. However, look far friendlier when sorting out the cheapest material but also the
groundwork costs and roofing costs sloping ground. least attractive. Timber and GRP
are basically identical, and despite There are instances where burying are around twice the price. GRP
the fact that garages are rarely fitted car parking below ground can doors are usually produced to look
out with all the paraphernalia of a actually free up ground elsewhere like timber – in fact they can look
finished house, the construction costs for more cost-effective uses (like incredibly realistic. They can also be
of a garage are still as much as 60% building extra houses), but this is stained; their main advantage over
of those of a finished house when unlikely to be relevant to many single timber is that they are (hopefully)
compared on a floor area basis. housebuilders. maintenance-free, yet many people

258 13th EDITION l HOUSEBUILDER’S BIBLE


ROOM BY ROOM

will prefer to stick with timber. through 90°, these doors roll up like control unit which you can keep inside
If you don’t like any of the a carpet. They look like steel shutters, the car. They are not cheap – coming
commercially available doors yet still which is what they are, and so kerb in at around £400 which includes a
crave the convenience of an up-and- appeal is limited. remote control device (or two if you
over door, then check out Hormann’s are lucky) – but they do make a lot of
sub-frames that you can fill in with HOW WIDE? sense when you consider the hassle
your own designs at your leisure. They The traditional width for a single involved in opening garage doors
are called Open-for-Infill doors. garage door in the UK has been 7 manually. All the garage door suppliers
ft (2134mm). It’s mean. There are sell these and they come in varying
OPENING MECHANISMS an awful lot of cars around that will levels of sophistication. Hormann and
As already stated, most garage doors struggle to get through such a gap, Bosch market multi-function ones that
these days open vertically. But it’s not particularly so if the entry angle isn’t can switch on welcome lights and open
quite that simple. There is vertical and dead straight. If you have the room, entrance gates as well. However, even
vertical. The simplest type of opening go for doors that are 7 ft 6 in wide the most basic ones come with timed
is the canopy or up-and-over door; (2286mm). If space is very tight, welcome lights that come on whenever
when open, about a third of the door you can usually gain a crucial few the door is opened: this is very useful.
protrudes outside the frame, forming inches by locating the supporting Electric operators also come in
a canopy. They are usually hand frame behind the walls rather than different flavours. Most work with
operated and canopy double doors are between them. Height is also an a geared chain but there are some
something you could live without as issue. Some big cars won’t fit under a (Hormann’s SupraMatic) that work on
they can get very heavy and awkward 7 ft doorway. a Kevlar belt which promise virtually
to lift. If you are planning a double garage, silent opening. They tend not to work
As its name suggests, the fully you have the choice of a double door on the basic canopy up-and-over doors
retractable door glides all the way or two singles. Two single doors although Cardale’s Autoglide is an
back into the garage on a set of usually work out cheaper; although exception: in fact it can be retrofitted
tracks. These are much more suitable you have to build a dividing pillar, onto existing doors. If you are going
for double doors and for remote the cost of this is offset by the extra to spend £12,000 plus on a garage,
operators. cost of a 4.5 m lintel to cross the then it’s probably worthwhile spending
The North Americans like to fit gap above a double door opening. the extra on an operator so that you
sectional garage doors. These split Opening double doors by hand can actually get to use the garage for its
into, typically, four panels which slide also be quite a hassle, particularly if intended purpose.
up a set of vertical tracks and then, the spring mechanism works out of
one panel at a time, turn through 90 adjustment. On the other hand, if you
degrees and end up under the garage plan to use an electric door operator
roof. The advantage of this is that the you save yourself the cost of installing
door doesn’t protrude when opening a second one.
so that you can park hard up to both
the inside and outside face and still REMOTE CONTROL
open the door. OPERATORS
Finally, there are various makes of An increasingly popular item which
Roller Doors around which perform allows you to open and close your
in much the same way as sectional garage door automatically from both a
doors. However instead of turning switch inside the garage and a remote

HOUSEBUILDER’S BIBLE l 13th EDITION 259


Chapter 12

12
ADDING SPACE
For every new house built in Britain,
there are something like three or four
homes extended and/or improved.
enormous, far bigger relative to the
overall population than anywhere else
in the world. This chapter looks at
n 4. Extend the existing structure
n 5. Excavate a basement
Is it possible to put sensible
The exact figure can only be guessed the options facing you if you are out prices onto these? Let’s ignore the
at but it’s a huge industry in the UK, to extend rather than to build from fitting out costs. Not that these
more so than in other countries. scratch. Many of the techniques are aren’t considerable, it’s just that they
Why? no different, but the ways of going shouldn’t vary an awful lot whichever
In most other countries, the rate about things are. method you use to gain space, i.e. a
of new housebuilding per head of Here, ranked in cost order, with the kitchen or an office fit-out shouldn’t
population is way higher than it is in cheapest first, is a summary of ways be that different in cost wherever you
the UK. And the ones we do build you can gain extra living space. choose to put it.
are depressingly small – our average n 1. Convert existing floor space I would have said that there is a
house size is just 75m2, the smallest into habitable space, such as a garage range of costs between £400/m2 for
in the EU. conversion upgrading existing space to meet
Consequentially, the home n 2. Convert existing loft space building regs standards for habitable
improvement market in the UK is n 3. Build an outhouse in the garden rooms and £5,000/m2 for creating

260 13th EDITION l HOUSEBUILDER’S BIBLE


ADDING SPACE

new cellar space under an existing Typical Extension Costs


house. The bulk of this sort of work 2 2 2 2
£400/m 2 £600/m £700/m £800/m
clusters around the lower end of these £500/m

two extremes. Anticipate simple loft LOFT CONVERSION


conversions to cost around £500/
GARDEN STUDIO
m2, extensions from £500 and £800/
m2. And once again, don’t forget I
GARAGE CONVERSION
am ignoring fit out costs which can
sometimes double the basic build cost. SINGLE STOREY EXTENSION
What I am trying to say, politely, is that
there is a huge range of costs likely to DOUBLE STOREY EXTENSION
be encountered in this sort of work and
it’s possibly not that helpful to attempt BASEMENT
to boil it all down to “£xx/m2.”

DESIGN £16,000 £20,000 £24,000 £28,000 £32,000


Many of the important things that
are to be said about design have Shell-build costs for an area of 40m2 . Fit-out can easily double the finished cost
already been said. But there are one
or two salient points to be boned the building work. In other words, Having done that, it’s a much smaller
up on when you are just mapping it may not be much more than a step to using this same person to
out small pieces of a house or an glorified shopping list. put together tender documents for
outbuilding. Which probably isn’t much help to builders to quote from.
How much individual design, you. You instinctively know this stuff The main alternative option is
let alone flair, is required to turn already. What isn’t always clear is to work with a builder from the
an idea and some money into a when to go straight to a builder and off, to create a design and build
usable structure is dependent almost when to go to a designer for some contract, where the builder also
wholly on what you are trying to interpretation of your requirements becomes responsible for undertaking
achieve. The projects covered by this and some professional help in turning the design and maybe sorting out
chapter include many where the them into a building contract. Where planning permission for you. It can
design comes with the product: I do you draw the line? work well even on relatively large
am thinking here of garden sheds, For what it’s worth, I reckon that a and complex jobs: it really does
stables and sometimes conservatories. requirement for planning permission come down a lot to personalities and
At the other end of the scale are also acts as some sort of litmus test capabilities.
projects every bit as complicated as here. By and large, it’s the larger jobs
a new house where a good design is that require planning permission. PLANNING AND RED TAPE
required to gain planning permission And, by and large, it’s the larger jobs Whereas a new house always requires
and to add value to the works. And, that require a little bit more from the planning permission, a large amount
in between, will be many projects design department. For a start, your of remodelling in an existing house
like simple loft conversions and work is unlikely to gain planning doesn’t, which is good news for
extensions, where the constraints of permission without some form of remodellers. The bad news is that it’s
the site are such that what design is technical drawings and so there is often far from clear just what you
required is needed simply to facilitate a natural reason to hire a designer. can and can’t do without going cap

HOUSEBUILDER’S BIBLE l 13th EDITION 261


Chapter 12

in hand to the local planners. First, trouble the planners. This provision relevant web page.
I’ll try and give some guidance on has come to be known as our The advice must always be to run
just what you might expect to be able Permitted Development Rights, PD your project past the planners. They
to do without planning permission Rights for short. It applies to houses should be able to give you a clear
and then I’ll discuss what to do if at their built-shape in 1948 and it indication about whether planning
your proposed work does require applies to houses constructed since permission is required. In fact, you
permission. 1948, although there are one or two can apply for a Lawful Development
exceptions. It wouldn’t be planning if Certificate to make it clear to all and
PERMITTED DEVELOPMENT there weren’t one or two exceptions. sundry that what you are about to
RIGHTS To make things even more undertake doesn’t require planning
The basis of our planning regime complicated, the system of PD permission. The current fees for
is the Town & Country Planning rights that existed merrily since minor planning applications are
Act, which came into effect in 1948, 1948 was rewritten in 2008, so that £172 , so even if you do have to apply
part of the post-war Old Labour several of the old conventions, which it’s not a ruinous amount although
‘rebuilding Britain’ package that also everybody in planning was familiar it may well take months to sort
saw the introduction of the NHS with, were obliterated and replaced through.
and the nationalisation of much of with even more complex rules. This
our industrial backbone. Before that, is particularly true of extensions and PLANNING PORTAL
you didn’t have to apply to anyone outbuildings where the rules have In England and Wales: www.
for permission to build, or so rumour undergone some subtle changes. planningportal.gov.uk > Go to
has it. And then the Coalition Chancellor, General Public Area, then household
This 1948 date has become a cut- George Osborne, sought to relax the planning rules. Visit the interactive
off point. Whatever had been done rules in 2012 for a period of three houses so you can figure out just
to your house before 1948 was said to years in order to try and stimulate what you can and can’t do without
be ‘existing’: whatever has been done growth. Since then there have been planning permission.
to it since is said to be ‘extending’. It’s further moves to loosen PD Rights Remember, you may have already
a long time ago now and the chances so as to make office space and barns used up some of your PD rights if the
are that the house you live in was easier to convert to residential. house has been extended after 1948.
built long after 1948 but nevertheless And of course, this being the For the other territories in the UK,
it’s still a point in time worth being United Kingdom, you can count on start by Googling the name of the
aware of. the fact that Wales, Scotland and country followed by Permitted
The Town & Country Planning Ireland all have their own versions Development Rights. That short cuts
Act sought to control what and of permitted development rights. you to the relevant pages with the
where we could build. Its intention Broadly speaking, they are very most up to date rules.
wasn’t to prevent development, similar, but they are different enough
merely to enhance it and to to make things very awkward for PD TIPS
ensure it took place in everybody’s books trying to explain what is what. If planning permission for what you
interest. So that the local planning The good news, as far as I am want to do is at all contentious, you
department didn’t grind to a halt – concerned, is that the internet is now can occasionally get cute with your
that took another 50 years – the Act a repository of knowledge on these PD rights and use them to try and
incorporated a provision that allowed matters and that rather than me run rings around the planners.
you to extend your home up to a trying to point out what you can and n If you apply for planning
certain amount without having to can’t do, I will simply point you to the permission to extend above and

262 13th EDITION l HOUSEBUILDER’S BIBLE


ADDING SPACE

beyond what the PD Rights give you, in the book. It affects all properties off. Should you not at least include a
you don’t get to keep the unused PD in England & Wales but is only paragraph on these inspections, when
Rights to use elsewhere. likely to have any bearing on your they have to start, what they include
But just suppose you want to project if you have close neighbours, and the end inspection which, I believe,
extend in two directions, say sideways as you would expect to find if you is a sign off of the building? I can’t find
and backwards. Assume that your live in a semi or a terraced house, or mention of these statutory visits, and
PD Rights are still intact but that an apartment. Do be aware that it if I was doing a DIY job and didn’t
the additional size of both extensions comes into effect if you are planning have all the inspections and the sign off
exceeds the permitted limits. Decide to build off a neighbours wall, as well at the end surely the whole job could go
which of the two extensions is the you might when undertaking a loft seriously awry?
more controversial and apply for conversion, and that it also kicks in if Also, given the proliferation of
planning permission to build the you excavate new foundations, deeper ‘cowboy’ builders wouldn’t the building
other bit. If this is granted, you can than your neighbour’s, within 3m of control officer pick up that a job wasn’t
then use your virgin PD Rights your neighbour’s foundations. being done properly before too much
to build the controversial bit first This might easily be the case work had gone ahead?
without compromising your already with an extension, especially if the We managed to build a boarding
granted planning permission. neighbour’s property is over 100 years cattery in Cambridgeshire without
n You can reclaim your PD Rights old, before the time that excavations consulting Building Control (through
by demolishing something built after were dug deep. ignorance, no one told us we should be
1948. Say you have a particularly There is a good explanatory booklet using them) and almost didn’t get a
naff attached garage put up in the downloadable from the building regs regularisation certificate as one of the
1960s without planning permission. website, which will tell you more buildings was, in theory, too close to a
If the extension you would like to than you would ever really want to farmers barn. Hence how I know about
build takes you over the amended PD know. Note that this really should building control. So if I were using
Rights limits, because the garage eats be sorted out two months before the your book as my ‘bible’ I am not sure I
up most of the allowed volume, you building work starts: otherwise you would know that I had to use Building
can reclaim the rights by taking down are courting delay. Control, and at what stages.
the garage. Yours
n PD Rights are also useful when BUILDING REGS Carole Cooke
negotiating a replacement dwelling. In April 2010, I received the I thought the best thing was to
Often local councils have guidelines following email: include the text in full, as I couldn’t
restricting the size of the new Dear Mr Brinkley, make the point any better. In my
dwelling, relating to the size of the I have just read your latest book on defence, I touch on building control
existing. Galling when you have a house building as we are having a in much more detail in the chapter on
tiny bungalow on an acre plot. If the kitchen extension done. I am a little Project Management, forgetting that
old bungalow had never used up its disappointed in your lack of information many people would be dipping into
PD Rights, be sure to include them about Building Control. The book makes this chapter alone because they are
in your calculations. little mention of Building Control other only doing an extension or something
than the costs. I spoke to East Cambs similar. So if that means you, then
PARTY WALL ACT Building Control yesterday and they told heed this warning now and bear in
More information on the workings me that there are statutory visits that mind that Chapters 4 and 5 are just
of the Party Wall Act is included in they must make when a house/extension as much for you as this one.
the main section on Planning, earlier is being built. I have just printed them But, to re-iterate Carole Cooke’s

HOUSEBUILDER’S BIBLE l 13th EDITION 263


Chapter 12

point, if you are carrying out An application needs to be explanatory booklet from the
substantial building works, you need submitted when you intend to: building regs website. This tends to
to get the building inspectors on n Erect a building such as a new reside under the planning services
board although they no longer have dwelling part of your local authority website.
to be local council building inspectors n Extend an existing building.
– you can use other approved n Make structural alterations to a
inspectors, if you can find them. building, such as removing a load-
It’s true that there are some minor bearing wall or a chimney stack, or EXTENSIONS
works that don’t require inspection, forming an opening in a structural or Building an extension is like building
but generally, the larger the job, the fire-protecting wall a mini-house and essentially the
more chance there is of building regs n Underpin all or part of a building very same processes have to be gone
being required: extensions and loft n Convert a loft into living space through. In some ways, extensions are
conversions always require building n Install services and fittings such as actually harder than houses to build
control approval. On renovation replacement glazing, central heating because there is always the matter
and alteration work, the picture systems, boilers, flues, laying new of tying onto the existing structure,
isn’t as clear although the tentacles drains or altering electrics. (Some which frequently creates little
of building control have a habit of of these may be controlled under teething problems.
spreading wider and wider. competent persons schemes)
For instance, the introduction n Change the use of a building such BUILDING REGS
of Part P in England & Wales in as converting it into a house or flats The building regs are essentially
2004 brought almost all electrical or to make more than one dwelling. no different for extensions than
work within building control n Erect a large conservatory, one for whole houses but in one or two
for the first time, even when it with a floor area greater than 30m2. A instances they are made a lot simpler
is carried out in structures like conservatory less than 30m2 is exempt because it is inappropriate to use
conservatories and outbuildings provided at least 75% of the roof and them for only part of the house. In
which are normally building control 50% of the walls are of translucent particular:
exempt. And changes to Part L, material and it is thermally separated
the energy efficiency regs, have from the dwelling by walls, windows PART M – THE DISABLED
brought replacement windows and and doors with U-values and draught ACCESS REGS
replacement boilers within building stripping provision at least as good as These are designed to be applied to new
control. elsewhere in the dwelling. houses and the essential aspects of Part
The trend is clear. The government n Carry out work to the thermal M, being level thresholds, maximum
doesn’t want to hire thousands more elements of a house such as re- and minimum socket heights, wider
building inspectors to cover all these plastering, replacing a roof, or doors and a downstairs WC, don’t
extra items: it wants the tradesmen undertaking external rendering or make any sense when applied to just
carrying them out to be competent cladding. the extension of an existing house. The
and certified, and for them to sign n Make alterations or extensions one aspect of Part M which may be
off their work and for you, the to commercial premises, schools, applied to an extension is if you are
homeowner, to keep the guarantee for hospitals. somehow contriving to make matters
when you come to sell the house. n Carry out work to improve access worse for disabled visitors. Thus if your
Generally, you are required to or provide facilities for disabled access was level and you were about to
apply for building regulations for the people. make it stepped, or you were to remove
following works: You can find an up-to-date a downstairs WC.

264 13th EDITION l HOUSEBUILDER’S BIBLE


ADDING SPACE

If your house was built after 1999, with scaffolding, especially if you correct. Your building inspector will
then it should already be Part M are building on the boundary. Your advise and is likely to require you to
compliant – you will be able to tell neighbours may or may not take hire a structural engineer to prove the
from the socket heights. If it is, then kindly to your building work but even beam size.
any additional work on the house if they do, it can be difficult to even The new structure will have to be
will be expected to also be Part M locate scaffolding sometimes. tied into the existing. If the structure
compliant. As a rule of thumb, difficult access is brick or block, then this can be
may well add up to 20% to building done carefully by toothing out the
PART L – THE ENERGY work costs. Extensions can be built existing and building into the gaps, or
EFFICIENCY REGS from inside if external scaffolding you can cheat and use stainless steel
The regs apply to extensions and can’t be provided, but this is slow and profiles which you just screw into the
to some renovation work but in a tedious and will add to costs as well. existing.
much-simplified format. Gone is the Generally it is worth pointing out Some people are snobby about
requirement for whole house SAP to your neighbours, that a brick wall profiles and suggest that the
calculations and pressure testing. looks far better when it is built from traditional and therefore better
Instead, you can just design your the correct side! method is always to tooth into the
walls, floors and roofs to meet certain existing brickwork. But the existing
U values, in the traditional method. OPENING UP WALLS brickwork isn’t always as good as you
Note that boiler replacement and The typical extension job requires might hope for and sometimes the
window replacement, two common that you break a hole into the existing existing brick courses are unequal,
restoration tasks, are required to meet structure and use this to form the which makes tying in a minor
Part L standards. Your boiler will access to the extension. If it’s a two- nightmare.
have to be a condensing one and your storey extension, then the hole will
replacement windows will have to be open both storeys of the house. FLASHINGS AND
FENSA approved to show that they Knocking down walls is an art WATERPROOFINGS
comply with the maximum U values. in itself and most builders are very Obviously where the roof of the
familiar with such a task. The key extension abuts the existing, you have
ACCESS point to understand is that the to make some provision for rainfall
Access for building work is likely structure which depended on the to be collected and channelled away.
to be much more restricted than it walls you are about to knock down However, if the wall you are abutting
is for a new build. This is one of the has to be supported both during the is a cavity wall, you have an additional
factors that often makes extensions demolition and building work and and extremely fiddly piece of work
much more expensive to build on a permanently thereafter. to undertake, namely the insertion of
per square metre basis. Specifically, The standard procedure is to cavity trays.
you are often unable to get large support the floor joists, if they run
plant around the back of an existing into the soon-to-be-demolished wall, FLOORS
house and you therefore find that in so a beam, usually steel, gets inserted The section on floors covers the
consequence foundations may have to to provide permanent support. If you actual floor construction options. But
be hand dug and materials may well are just having a door between the extensions have one extra problem up
have to be purchased in small loads extension and the existing, then there their sleeves, which is the matching
and barrowed or handballed around is unlikely to be any problem but up of floors between the old and
the building. for any opening over 2m wide, you new. Normally, it’s just a question of
You may also have problems need to be sure that the loadings are planning ahead carefully and deciding

HOUSEBUILDER’S BIBLE l 13th EDITION 265


Chapter 12

what level the finished floor should your house: the regs regarding mains Again the most useful thing to do
be and sort of working backwards sewers are much tighter. here is to get the existing installation
from there. Just occasionally you will surveyed prior to work starting out on
find that the existing floor is not level ADDITIONAL HEATING the extension.
and you get left with an awkward The extension will require heating Note that electrical work is now
decision about how best to get the in one form or another. Just how covered by the building regulations
two floors to match up. this can best be achieved depends and has to be certified by an approved
largely on what heating you already installer, although if the electrical
MOVING DRAINS have in the existing and whether it is work forms part of a much bigger job,
One frequent problem which arises man enough to carry the extra load like an extension, you don’t have to
when working on extensions is imposed by the additional space. make a separate application. Indeed,
drains. Normally drains exit the Really only a survey of the existing you can ask your building inspector to
house as quickly as possible, typically arrangements will reveal this and it’s include the inspection of the electrics
at the back of the house or into a pretty pointless to speculate about as part of their service.
side passage. But in many older that here. But note that if the boiler is
properties, especially in terraces, the old and requires replacing, the latest ENERGY EFFICIENCY
drains are shared with a number of regulations require that you use an MEASURES
other houses. You can in fact build energy-efficient condensing boiler in During the last three consultations
over domestic drains: the standard its place. over energy efficiency regulations,
routine is to bridge the existing drains Condensing boilers themselves there has been a proposal put forward
when you place the foundations require a drain off point to collect the to insist that anyone doing work on
so as to ensure that the drains are condensate. This isn’t always possible their home which required building
not damaged. If there is a manhole in conventional boiler locations regs approval should be required to
or inspection chamber under the and you may be able to argue for a spend an additional amount, possibly
floor of your proposed extension, dispensation to use a non-condensing as much as 10% of the overall budget,
you have a problem but it’s rarely boiler instead. on improving energy efficiency in
insurmountable. You may be able to However you do it, the chances the existing structure. Typically,
cover it over and to replace it with a are that the work will involve some the householder would have been
new one outside the extension. You disruption to the existing house. required to:
may even be able to keep it there n undertake cavity wall insulation
and to have it accessed through the EXTENDING ELECTRICS n replace the old boiler with
floor, although this is far from ideal. The issues with extending electrics something more efficient
It’s a principle of good drain design are similar in many ways to extending n add extra loft insulation
that you don’t want to have to access the heating and maybe plumbing. n add draft proofing to windows and
drains from indoors! The newer the house is, the less doors
Finally, you may be able to re-route likely it will be to require a complete There is logic in this proposal. All
the existing drains around the outside rewire, but there is a chance that the the energy efficiency regulations
of the extension. There are problems installation you already have in place that have been introduced since
if the drain runs along one of your will not be adequate to handle the 1976 have been aimed at new build
foundation trenches, but there are extra load imposed on it by the new or extensions to existing builds. The
often solutions. The one situation that extension, especially if the extension situation has now come to pass that
can cause major difficulties is if there houses power hungry appliances like new builds are reasonably low in
is a mains sewer running close to cookers and hobs. energy demands and it has become

266 13th EDITION l HOUSEBUILDER’S BIBLE


ADDING SPACE

increasingly difficult to introduce


cost-effective ways of improving
matters still further. However,
older housing stock remains largely
untouched by the energy efficiency
drives and it’s an anomaly that is
beginning to irk our energy-saving
boffins.
However, to date this proposal
had been edited out by various
housing ministers, and most recently
by the then Prime Minister, David
Cameron, who called such a proposal
“bonkers” in April 2012. Since when
there has been a deafening silence on
the matter.
By and large the building regs have
been very careful not to interfere with The author in a fink truss loft assessing the head height. Barely enough. This loft
remains unconverted to this day.
existing structures and having flirted
with this idea they decided that this country, so the pressure on space has space or quieter hobby rooms or
was not perhaps the best time to start. increased. And, as moving on to a home offices.
But the ‘consequential improvements’ larger house has become more and
debate hasn’t gone away and one or more expensive, people’s attention INITIAL ASSESSMENT
two local authorities have started has turned to making the most of All loft conversions start with an
introducing something similar via what they already have. Increasingly, initial assessment. The first thing to
their planning departments, so you that has meant utilising the dead look out for is the head room. You
may yet be faced with demands to space in the roof. need to be able to stand up in the
undertake works you hadn’t originally It’s little wonder that the past middle of the existing loft and ideally
envisaged. thirty years has witnessed an you should be struggling to touch the
explosion in the number of loft ridge plate running along the top of
conversions being carried out in the roof. The things which determine
the UK. However, it’s important the space you have in a loft are the
LOFT to bear in mind that the loft span between the eaves and the pitch
CONVERSIONS conversion is not always the best or slope of the roof. Most detached
The loft conversion is a thoroughly or most appropriate solution. This and semi-detached homes have a
modern phenomenon. A generation is especially true with single-storey wide enough span and, if the slope
ago, nobody thought to extend their dwellings that appeal largely to or pitch is more than 35°, then you
living space into the roof. People who older people who value not having should have enough volume to make
wanted more space generally moved to negotiate stairs. The stairs are a a decent-sized room. It’s something
house. Their lofts sat gathering dust, limiting factor, which means that you can tell easily enough just by
holding old photograph albums lofts are generally not best suited for getting up into the loft space. You
and abandoned suitcases. But as dayrooms and kitchens. In contrast, need to be looking for a minimum
land values have risen across the they are excellent for extra bedroom distance of 2.3m between the

HOUSEBUILDER’S BIBLE l 13th EDITION 267


Chapter 12

underside of the ridge and the ceiling ROOF STRUCTURE nailed together. They frequently have
below. Another important factor to consider supporting beams called purlins
If you haven’t got this space in is how the roof is built. There are two located midway under each rafter,
your loft, you can’t have a useful loft main methods of building roofs. The running along the length of the roof.
conversion without some alterations traditional method was prevalent Unlike traditional cut roofs where
to your roof shape, which will on all roofs until the 1960s and is the individual timber rafters are
obviously be much more expensive. the easiest to convert. It involves load bearing, the roof truss derives
The next step is to have a look carpenters cutting the roof timbers on its strength from the combination
at the shape of the roof. Generally, site – it is sometimes referred to as a of all the small pieces of timber
the simpler the roof-shape, the cut roof – and fixing the timbers one- working together as one. Altering a
better. What loft converters love by-one to make up the roof structure. truss roof is possible but is a much
above all else is a straightforward This method was to a large more involved process than adapting
pitched roof with gable walls at extent replaced by a system of a traditional roof although recently
either end. These allow you to engineered roof trusses, developed there has been a lot of interest in this
easily transfer all the roof loadings in America, which swept through field and a number of specialist firms
onto beams stretching between the the housebuilding industry in the are offering trussed roof conversions
gable ends. 1960s because they were quicker and at prices not substantially more than
A hipped roof presents cheaper to erect. traditional cut roof conversions.
problems but not insurmountable A trussed roof arrives on site on In more recent years, truss designs
ones. Similarly with roofs which the back of a lorry in large triangular have grown more complex and you
form an L-shape. If the upper floor sections. These are hauled up onto the can now have a house built with attic
of your house is built partly into roof and nailed in place side-by-side. trusses which are designed specifically
the roof (the so-called one and a It’s very much quicker than doing a to leave usable space in the loft
half storey house is a case in point) cut roof and also much less skilful. but you are very unlikely to have
then a loft conversions is likely to Because their strength is derived attic trusses in your home without
be a non-starter as there is rarely from the fact that the sections are knowing about it – it’s a major selling
enough headroom left above the already triangulated, you can use point.
ceiling to make any usable loft much smaller pieces of timber to
space. make a truss roof. Once you know STAIRS
The presence of a chimney may what you are looking for, it’s easy to If you have established that your
present problems, depending largely tell a trussed roof from a traditional loft can be converted, the major
where it’s located. Anything central is one. Look out for thin sections of internal design issue is access. One
likely to be difficult: it’s hardly worth planed wood, typically no more than of the largest areas of extra expense
generalising about this because it’s 75mm or 3 inches deep. There will when considering loft living is the
likely to be obvious from a cursory be a number of these small timbers fitting of a staircase. In three storey
inspection whether the chimney is an running from the top of the truss to designs, because of fire regulations,
obstruction or not. the bottom and joined onto the outer you ideally want to position the
If it is, and you no longer use the timbers by tell-tale rectangular metal top staircase close to the lower one
chimney, it is usually quite acceptable plates, easily visible from the side. and this can rather limit your room
to take it down during the course In contrast, a traditional or cut layouts. When converting loft space
of the works, although planners and roof uses larger sections of sawn (not in an existing house, the normal
listed building officers might just planed) timber (often 50x150mm) staircase regulations are relaxed
have a different opinion. and these are cut on site and usually somewhat to allow for various space

268 13th EDITION l HOUSEBUILDER’S BIBLE


ADDING SPACE

saving designs such as the alternate PLANNING PERMISSION and there are various ways of beefing
tread staircase which work with a The guidelines about what can and them up. The normal method is to
much steeper pitch than regular can’t be done without planning leave the existing joists in place – so
stairs. However, where you have permission have already been dealt as to cause minimum disruption to
the space available, a traditional with earlier in the chapter in the the ceiling below – and place larger
staircase is the preferred option – it’s section on Design. It’s all a question joists by their side in order to take
both cheaper and far more practical. of whether or not you have used your the added weight of the new floor.
It is not always an easy matter to PD Rights. Currently, the planning The roof carpentry will also have to
design a traditional staircase under fee for all domestic alterations, be carefully designed to ensure that
a sloping roof – you may well find including loft conversions, is £172 it stays in place whilst the structural
that the top of the staircase ends in England. Don’t press ahead alterations are undertaken and is then
up slap in the centre of your loft with a loft conversion if you are adequate for the open roof space you
living space, which may make the in any doubt about whether you need. This may require the insertion
subsequent room division tricky. need planning permission. You will of steel beams to support the new
Each case needs to be examined on undoubtedly be asked about this loadings. Alternatively support can
its merits but, as with so many other if and when you come to sell the sometimes be provided by knee walls,
issues with house design, the more house and it may prove very costly tying the rafters to the new floor
space you have at your disposal, the to obtain it retrospectively. It costs joists. The important points to bear
greater are the number of workable nothing to check with your local in mind are that the new structure
solutions. planning department and, if you are must be strong enough to bear the
Occasionally, you will be faced in any doubt about whether you need weight of the new loads and also be
with a situation where the disruption permission or not, it is the obvious rigid enough to stop the roof shape
caused by fitting a second staircase is first port of call. deflecting. The building inspector will
so great that it outweighs the benefit want to see that some calculations
from converting the loft. If you feel BUILDING REGULATIONS have been carried out to ensure that
this to be a significant stumbling Whilst the planning angle is fairly these aims have been met.
block, you would be well advised to straightforward, the building
hire a professional designer to look regulations covering loft conversions INSULATION
at the problem because there are are something of a minefield. Some Another area that causes considerable
often many ways of fitting staircases simpler storage-only loft conversions headaches for loft builders is
that are not at all obvious. An are undertaken without any reference rearranging the insulation so that it
experienced professional may be able to building regulations but if you follows the roofline, rather than just
to see solutions which evade you. It intend to use the new rooms as being laid along the ceiling joists.
is often surprising just how many habitable space you should ensure The required U value (as of 2015) has
variations you can work into a small that the work is carried out in fallen to 0.15 which translates as a
floor plan. accordance with the regs. minimum 200mm of foam insulation
There are many other issues to If you are altering the timbers in such as the type made by Celotex and
be resolved but generally they are a roof space, you need to be satisfied Kingspan. There are more options if
of a relatively minor nature. If you that the new design will be strong you chose to re-roof at the same time
have the headroom and you can enough to bear the new loads. as this allows you to use a breathable
fit a staircase, then the two biggest Usually your existing ceiling joists felt which gives you a little extra
obstacles to converting your loft are will not be strong enough to act as room for insulation – you can avoid
out of the way. floor joists for the loft conversion the requirement to maintain a 50mm

HOUSEBUILDER’S BIBLE l 13th EDITION 269


Chapter 12

ventilation gap on the immediate in almost every conceivable case, it around the staircase or find another
underside of the roof. But generally will now protrude beneath the rafter route down to the ground (such as an
it is felt that whereas once you could line and consequently there will be external fire escape).
get away with just placing insulation some lofts where this loss of height
between the rafters, now you have is critical, surely an unintended side SERVICES AND FINISHES
to combine this approach with extra effect of the new regulations. More often than not, there will be
layers of insulation on the underside water storage tanks in the existing
(room side) of the rafters. This has FIRE SAFETY loft that will have to be moved
the advantage of providing better But perhaps the biggest hurdle faced or replaced. Normally these are
insulation – the cold bridge caused by by loft converters is meeting the located in the middle of the loft and
the rafters themselves is eliminated onerous fire safety regulations. When sometimes there is enough room to
– but there is some resulting height you create habitable space more than relocate them to the eaves or against
loss in the room; this may be critical 4.5m above ground level, you must an end wall. However if you plan
in smaller lofts and is something to allow for the fact that people will to have plumbing in the loft space,
consider carefully. You also now need not be able to climb out of a window either a wet radiator or perhaps a
to plan for that 50mm ventilation to escape a fire below. You have to bathroom, you have to raise the tanks
gap to be left to the underside of provide at least one window that you above the level of the outlets which
the rafters in order to get adequate can escape from via a fireman’s ladder may involve putting the tanks on
insulation in. – known as an egress window – but in raised platforms.
One popular method of addition to this, you need to provide a As an alternative, you can switch to
insulation is to use a multifoil type fire-proofed route from the loft down a more modern pressurised plumbing
insulation such as Actis Tri-Iso to the front door. Half-hour fire- system which doesn’t require separate
Super 10 combined with a high proofing is not particularly difficult to tanks: a pressurised cylinder can be
efficiency foam. The acceptability achieve but it will require additional located anywhere in the house and
of these multifoils is still a matter work to be carried out on the can supply central heating as well as
of contention. A few private doorways leading onto your escape hot water. The downside on switching
building inspectors are happy with route – typically the bedroom doors to a pressurised system is the cost: the
them, but the great majority aren’t. opening onto a landing. These doors cylinders alone cost around £600 and
However, as they are only 25mm will have to be treated (either with the additional plumbing needed to
thick they do make it very easy fire resistant paint or some fireproof install one can be complex.
to insulate a loft with a restricted board) and they were once required to
head height. have self-closing mechanisms as well. HEATING
The definitive word on whether The requirement for fitting these was With such high levels of insulation
multifoils really work is still relaxed (in England) in 2007 because now required the additional heat
awaited but the weight of evidence so many people disabled them once required to keep the new loft space
so far makes it look like the the building inspector had finaled the warm is minimal and it will almost
more extravagant claims of their loft conversion. always be possible to add a small
manufacturers are just that — i.e. You may face additional problems radiator or two without having
extravagant claims – but there is if your existing stairwell exits into a to upgrade the existing boiler.
clearly a place for multifoils when living room or kitchen, rather than Alternatively you can fit underfloor
used in conjunction with more an enclosed hallway. This sort of heating – either warm water or
conventional insulation. arrangement is not acceptable and electric – or small electric storage
However you design the insulation, you might have to build an enclosure heaters or convector heaters.

270 13th EDITION l HOUSEBUILDER’S BIBLE


ADDING SPACE

Electric heating systems are SOUNDPROOFING by the builders on site. On the other
invariably cheap to install but Soundproofing may be an issue hand, a good designer with a feel
expensive to run, but you are likely you wish to consider, particularly if for the job can produce an elegant
to find that the heat loss is so small there are bedrooms below. There are solution in the tiniest of spaces, a
that they may only ever be needed some very expensive floor/ceiling skill not to be sniffed at. As ever in
as a back-up heating system on the solutions on the market that may be these instances, if you have someone
coldest nights: most of the loft’s quite impractical for your loft unless recommended to you, whether
heating needs will be met from you have a great deal of headroom architect, designer or builder, you
background sources such as electric available. These solutions usually work would probably do well to seek them
lights, sunshine and heat rising up by adding cushioning layers between out.
from the house below. the floor joists and the floor covering Loft conversions are usually tackled
and, additionally, fixing a false ceiling from the outside via scaffolding.
ELECTRICS AND LIGHTING underneath the existing one. In Not only does this make it easier
Electrical alterations can usually be practice, in domestic situations, you and cleaner to get materials up into
fairly easily accommodated, provided would be far better advised to use a the loft but it means that the messy
the new loads are generally limited thick carpet as your floor covering in process of breaking through into
to lights and a few sockets. One the loft space. the existing living space can be left
feature that may cause problems is towards the end of the job when
the use of recessed downlighters. BUILD ROUTE the staircase comes to be fitted. The
Whilst this may seem an ideal Few people would feel competent to complexity of the job often depends
way to provide light when ceiling undertake a complete loft conversion on whether the windows are roof-
height is restricted, the physical without some professional help. But lights (which run along the pitch of
breaching of the vapour barrier whether you go with a full-blown the roof ) or dormers (which stick
conventionally placed behind the architect service or stick with a out from the roof ). Dormers are
plasterboard ceiling is likely to competent builder is a matter of time consuming to construct and
cause condensation problems in the debate. There are lots of builders expensive to build in comparison
roof space behind the fitting. It is specialising in loft conversions — but in certain roofs they may add
generally best to try and separate they now have their own section significantly to the overall roof-space.
the internal air from that within the in Yellow Pages, quite distinct Many lofts are designed with full
roof construction, wherever possible. from ordinary builders – and for width dormers on one side and this is
Therefore spotlights and wall lights straightforward conversions where a good way to get extra space.
are a better solution for lofts. If you there is often not a great deal of
must go for recessed downlighters, intricate design involved a good BUDGETING
make sure they are good ones – look builder should be fine. One way to budget for loft
for fireproof ones, or acoustically The scale of the works may be conversions is to take the foot print
rated ones. quite small compared to building area of the loft (ie the ceiling area
Wall and floor finishes for lofts a house or even a large extension, of the storey below) and use this as
are not otherwise affected though but the placing of staircases and the a multiplier to get a budget figure.
because you are working with a rearranging of the roof structure, Very simple lofts with roof-lights and
timber framed backing it makes especially when dormer windows an easily fitted staircase tend to cost
good sense to stick with relatively are involved, is never easy and it’s around £400/m2 (making a minimum
lightweight coverings, such as not unknown for a set of expensively cost on a terraced house of £16,000).
plasterboard or timber boarding. drawn plans to have to be reworked This figure can double as the shape

HOUSEBUILDER’S BIBLE l 13th EDITION 271


Chapter 12

exceptions to these rules. ‘Very if your planned conservatory falls


of the loft becomes more complex: rarely’ doesn’t mean ‘never’. Sir Cliff outside building regs, you are still
full width dormers, balconies, hipped Richard, no less, was ordered to pull required to comply with the safety
roofs, plus expensive fittings such down a conservatory he built in glazing directives (in Part K of the
as bathrooms will all tend to push Virginia Water because his Permitted building regs) and also if you have
the unit area cost up beyond £500/ Development Rights had been any electrics installed, it becomes a
m2. So a largish loft conversion in a removed without his knowledge. notifiable event, if not carried out
detached 1930s house could easily In fact the Permitted by a competent electrician who can
cost upwards of £25,000, still cheaper Development Rights routines used sign it all off against his insurance.
than an extension. to control regular extensions apply There is also a potentially nasty little
to conservatories in exactly the problem to do with conservatories
same way. That is to say that you being located under means-of-
probably won’t need permission escape or egress windows, which
unless you have already built a some local authorities seem to be
CONSERVATORIES substantial extension or maybe a more concerned about than others.
The conservatory industry exists in large loft conversion. The situation This is a complicated area because
its own little bubble. It’s obviously with building regs is rather more first-floor windows have only had
related to mainstream building, to complex. Most conservatories to be egress windows since 2002,
home improvements and the world don’t need to trouble the building so it cannot logically be applied to
of extensions, but it is the province control department but there the 95% of the UK housing stock
of specialists who, by and large, don’t are some aspects of conservatory that was never built with egress
do much else. There are enormous building which will come into windows. It is the sort of grey area
numbers of new conservatories built the building regs ambit, forming where you might want to think
in the UK each year — at its peak it a nice grey area (shall I? shan’t about installing mains-operated
was well over 200,000 and even today I?). To avoid having to apply for smoke detectors in the house, which
it’s still going to be an impressively building regs: is in fact the single most effective
high number. n the floor area must be less than fire safety measure you can make to
The question is why? There are 30m2 (though it’s only 8m2 in an existing dwelling.
one or two things that conservatories Scotland) There is no requirement for
have going for them which can make n the conservatory must not form conservatories to be double-glazed.
them a very cheap way of gaining part of the ‘heated envelope’ of the However, if you want to make
extra space. One is that they very house – ie there must be separating the conservatory a ‘walk-through
rarely require planning permission. doors feature with no dividing doors,
Another is that they very rarely n the roof is at least 75% glass or then the price you have to pay
require building regulations. Thus the polycarb sheeting is that the conservatory will be
two big administrative heavyweights n the walls are at least 50% glass or assessed as part of the normal
designed to send us bonkers are, at polycarb sheeting living space and it will have to
a stroke, banished from the world of n the conservatory must all be at meet exacting energy efficiency
conservatories. least 1m from the garden boundary standards, which will certainly
You can just go and order one n it must be at ground level. include double glazing.
and you don’t have to bother with Now that does cover the great So much for red tape. The
red tape. Of course, Britain being bulk of bolt-on conservatories, but bigger question is, why bother to
what it is today, there are numerous it might not cover yours. But even fit a conservatory at all? If you

272 13th EDITION l HOUSEBUILDER’S BIBLE


ADDING SPACE

like gardening, why not build a


greenhouse? If you like light, why
not build an extension with lots of
glazing? If you like sunbathing, why
not buy a timeshare in Tenerife? Or
a sunlamp? Why are there so many
conservatories added onto existing
homes each year? Could it be that, for
most people, it’s seen as a cheap way
of getting an extension? Yes, I think it
just might.
For whilst there are the odd
aspirational companies around like
Amdega who sell a very up-market
product (probably referred to as an
orangery) at prices way in excess of
normal extensions, the great bulk of
the conservatory market is made up Conservatories don’t have to be “bolted on.” But too often they are. To my mind,
this one serves as a prime example of how not to do it.
of the sort of thing you can pick up
at Wickes for around £3,000. It’ll be
built-up off a brick plinth, itself built- You know it’s never going to feature This loosely means that glazing to
up off pretty minimal foundations, on Grand Designs, so what? have a maximum U value of 1.8,
and it’ll be stuck onto the back of which translates as argon-filled,
the house with a few screws and the THE UP-MARKET OPTIONS low-e coatings and large air gaps.
roof will have a stuck-on flashing There is a yawning gulf between The cost of the glazing jumps
connecting it to the main house. If it these bolt-on plastic extensions from around £25/m2 up to over
leaks, it’s really not a disaster, and if (95% of the market) and the £80/m2, which makes it more
there is a little subsidence, then that beautiful one-off designs you see expensive than conventional
won’t really matter that much either. in the magazine adverts. There is walling or roofing materials.
In fact, this sort of conservatory is a a surprising correlation with the Having spent all this money, you
throw back to how we used to build kitchen market where you can then have to think about having
in days of yore, and how they build easily put in a fitted kitchen into a a very cold space in winter (do
shanty towns today in Brazil. Bash it modest house for under £5,000, but you provide heating?) and a very
up – it’ll do. the top of the range can cost more hot space in summer (blinds?
Now it’s easy to be sniffy about than ten or twenty times as much. ventilation?).
this sort of building, but it does For a start, if the conservatory You can, of course, choose to
have a place. If you haven’t got a design tips into the zone where not use your conservatory when
lot of dosh and your house is just you have to have building control it’s either too hot or too cold or
too cramped, then a bolt-on uPVC involved – and it will if it is large or too dark, but that’s an awful lot of
conservatory may be just brilliant for there is no thermal break between times for a room that’s so expensive
you, especially as you don’t have to the house and the conservatory – to build, and it makes little sense
be bothered with the boys from the then the full weight of the energy when you consider the size of the
council crawling all over your house. efficiency regs comes into effect. initial investment.

HOUSEBUILDER’S BIBLE l 13th EDITION 273


Chapter 12

protected. A good 5-lever lock is


essential and also think about using
laminated glass in the windows as
this will deter casual thieves.
Adding an alarm is probably
over the top but a passive infra-red
switched external light will be a boon
both for you on those dark winter
evenings and for deterring unwanted
visitors. Alternatively, use a passive
motion detector set to alert you in the
house.
If you plan to use a computer, opt
for a laptop which you can take into
the house at night. If you go away
An existing garden on holiday, bring the most valuable
shed in Cambridge
items from the garden room back
was converted into
a home office by into the house and leave the windows
insulating, double uncovered so that ne’r-do wells can
glazing and running see that there is nothing inside worth
an electric cable down nicking.
the length of the You will probably want some form
garden
of heating to make the room pleasant
to work in. You will also want to keep
GARDEN log cabins through to the hi-tech the night time temperature above
WORKSPACES insulated panel systems. They have
the advantage of you having both a
12°C inside if you want to prevent
condensation and mould growth.
The growing trend for home working design and a price on the table so you Assuming that you aren’t able to add
combined with the relaxed planning can window shop the various systems onto the hot water system in the main
rules has led to a mushrooming before committing to spending any house, your options as regards heating
demand for garden workspaces. money. are rather limited to electricity which
Many people will be upgrading If you do decide to build a is always expensive to run. And of
existing structures for a few thousand garden structure, make sure that course the key to doing this at a
pounds but others will be looking it is adequate for the job in hand. reasonable cost is to insulate the office
to build new structures. These can In particular, if you wish to work really well: I would take the insulation
vary from the utilitarian through to in there during winter and you use standards used for new housing and
individually designed, hand crafted sensitive equipment like computers, apply them to the office.
architectural gems. Prefabricated the structure will need to be both Night storage heaters are a good
offices are becoming increasingly secure and warm. method of supplying heat to garden
popular, mirroring the growth in the Garden offices are easily and often rooms. They are cheap to run, if you
kit homes market. Most modules broken into and if you plan to leave use an Economy 7 tariff, they are
use some form of timber framing expensive equipment in there think good at combating condensation
and this can vary from traditional carefully about how it can best be damage and they provide the best of

274 13th EDITION l HOUSEBUILDER’S BIBLE


ADDING SPACE

their output during the daytime when Well, relaxed for Britain! Provided Canada, many new homes are
the room is probably most likely to the structure isn’t too high (i.e. regularly constructed with basements.
be being used. However, they do it’s single storey), you can cover a In some areas, such as the mid-
have their drawbacks, principally that large area with buildings. Rules for west Tornado alley, they are built as
they are very inflexible: you can’t turn conservation areas are of course much storm shelters as much as anything.
them up if there is a sudden cold snap stricter and Scotland and Ireland But other parts of North America
and you really need to leave them on have different legislation as well. The just value the amenity benefits of a
all winter whether you are using the best advice is always to check with basement, a room which is usually
room or not. your local planning department. used as a utility and storage area.
Other options include electric Germany is another country with a
underfloor mat heating, convector strong basement culture: here at least
heaters and fan heaters. None of these part of the reason is that the planning
has the thermal mass advantages BASEMENTS regime is very strict about house
of storage heaters (I am assuming One of the most significant recent sizes and ridge heights but discounts
here that the structure is likely to changes in the selfbuild market basement space from the overall
be lightweight) and they are likely has been the rise and rise in the living area and so immediately there
to leave you with a very cold office popularity of the basement. It’s gone is a strong incentive for Germany’s
overnight, which will be bad news on from being an expensive problem huge number of selfbuilders to start
the condensation front. Either that waiting to trap the unwary, into off by building down. Whilst the
or you leave background heating on something approaching a must- number of basements being built
all night during the winter, which I have item, an aspirational choice to in the UK is measured in hundreds
wouldn’t recommend. rank alongside the hardwood floor, per year, in Germany the figure is in
If you do install electric heating, the underfloor heating system and tens of thousands. Not surprisingly,
you will need to lay a on a supply, the kitchen range. Suddenly the the Germans have the developed a
usually via a buried armoured cable basement is a selfbuild fashion item. number of advanced techniques for
between the house and the garden What’s going on? building basements some of which
structure you are building. The load A little history is in order. There are now beginning to appear in the
will be determined by what you are have been periods in our history UK.
proposing, and it’s likely that the when basement building has been The renaissance of the British
heating load will be the significant common place: you only have to visit basement seems to be coming about
feature. Although a structure up to many of the 18th and 19th century partly through high land prices
30m2in your garden isn’t covered inner city areas of our major cities to (which make it worthwhile spending
by regular building control, note see plenty of examples of homes built extra money on construction) and
that laying on an electrical supply with basements or cellars, as they partly through the advantages of
is a different matter and this work were called in those days. However basements becoming more widely
would have to comply with Part P with the coming of the railways and known. Selfbuilders in particular
in England & Wales. This means the opening up of the suburbs and want larger than average homes and
broadly speaking that the work would the countryside to housebuilding, planning constraints often prevent
have to be undertaken by a suitably building land became cheap and them from building out sideways, so
qualified electrician. plentiful and the basement fell from the German idea of building down
The planning rules are surprisingly fashion. starts making a lot of sense. What
relaxed about what they will allow In other countries the basement every new home in Britain has had
you to put up in your back garden. has prospered. In the USA and for the past 40 years is a garage yet we

HOUSEBUILDER’S BIBLE l 13th EDITION 275


Chapter 12

increasingly use garages for storage Type A waterproofing is often interestingly, not kitchens) then you
and park cars outside. The penny has thought of as being the simplest and must have more than one fire exit
dropped for many selfbuilders who cheapest to undertake. This involves route from the basement. This is easily
realise that the typical family home adding a waterproof membrane accommodated on a sloping site but
is built with far too little space and around the basement, which is will require an escape window or a
adding a basement is an entirely usually applied externally but can door on a fully below ground basement.
sensible response to this issue. also be sandwiched inside the walls. Ventilation is another key issue;
The waterproofing element is Typically this would involve some basements have a reputation for being
the key issue in basement design. form of membrane laid under the dank and mouldy; this is due as much
The structural matters relating to floor and sealed to a tanking layer to poor ventilation as it is to damp
the foundations and the strength or sheet running up the basement penetration. The solution is to install
of the retaining walls are rarely walls. It is commonplace as well to a background ventilation system
anything out of the ordinary for build in some french drains at the which removes the stale air — this is
experienced engineers and ground- external base of the walls to aid particularly important when building
workers. However the requirement the removal of groundwater. If the a Type C basement which allows
to build a waterproof tank – a reverse basement is on a sloping site, these water to penetrate the external walls.
swimming pool as it’s sometimes drains can be directed around the
called – calls for careful design and basement and on down the hill, but ESTIMATING THE COST
painstaking installation. In certain on a flat site the collected water One of the major factors holding
conditions, high water tables will would have to be pumped away at back the construction of basements
exert considerable hydrostatic some point. is the presumption that they are very
pressure on the basement walls and Whereas a Type A basement wall expensive to build. Evidence from
any weakness in the tanking details can be built out of blockwork, a Type recent basement studies suggest
will soon be exposed. B basement has to be built from a that basement building costs are
Just how you go about water-resistant concrete because little different to above ground
waterproofing the basement depends the walls themselves become the costs although the finished costs are
on a number of factors. These are main barrier to water penetration. usually very dependent on just what
detailed in a publication called the Actually many basement builders the basement area is used for and
Approved Document: Basement for choose to combine Types A and B so how it is finished. Recent British
Dwellings that defines four grades of that there are effectively two water experience suggests that our new
waterproofing. Which grade you go barriers, the reinforced concrete walls build basements are costing between
for depends on how you plan to use and the external tanking. Type C £500 and £800/m2, not dissimilar
the space, whether it is acceptable to basements are most frequently seen to building on the equivalent extra
be musky and occasionally damp or in retrofit basements, dug out from space as an extension or as a detached
whether it needs to be as dry and airy under an existing house. Here, any garage block.
as above ground living areas. What water penetrating the external walls is On the one hand a basement
measures are necessary to achieve channelled away to a sump where it is involves specific costs not found in
your chosen grade depend on a close later pumped off site. above ground construction such as
analysis of the ground conditions you There are several other design reinforcement in the walls, floor rafts
are faced with. However they broadly considerations to take on board if and waterproofing: on the other hand
fall into three categories which you are considering a basement. For there are a number of obvious savings
Basements for Dwellings defines as habitable rooms (usually defined as such as not having to build an external
Types A, B and C. either bedrooms or living rooms but, skin and not having to build a roof.

276 13th EDITION l HOUSEBUILDER’S BIBLE


ADDING SPACE

PLANNING PERMISSION may be enough to break these space estate agent’s fees combined mean
Many people wrongly assume that guidelines. It’s a strange and, to that it can cost almost as much to
because a basement is barely visible it many, an intrusive aspect of our move somewhere new. The London
won’t need planning permission. This planning system that gives local Borough of Kensington & Chelsea
is not the case. Neither is obtaining authorities such arbitrary powers is where it is mostly happening and
planning permission a routine matter. but it is remains a fact of life that, in 2013 there were no less than 450
Attitudes to basements appear to vary at the present time, some planning retrofit basements built there, some of
considerably in different planning departments are not basement them ginormous, creating so-called
authorities. friendly. Indications are however that iceberg homes with swimming pools
At one extreme, Surrey selfbuilder this attitude is rapidly changing as and gymnasiums located far below
Richard Evans commented to me: ‘I everybody begins to appreciate the ground level. In late 2014, the council
was told any ‘underfloor’ habitable space need to use our available building there approved new rules restricting
would be deducted from my above floor land more effectively. these beasts to one storey deep and no
plans and that if I went ahead after Another aspect worth bearing more than 50% of the garden area.
planning was agreed they would slap an in mind is the use to which the It’s such a specialised area that
enforcement notice on me’. basement will be put. Planners are it would be pointless to go into
Contrast this with Richard Owen’s less happy with additional bedrooms the subject here in any depth. The
experiences building a basement or living space, seeing this as businesses that have got into this
in Gwent. ‘You could put six cars unjustifiable over development. But market tended to have started
or a light industrial unit in the uses such as utility areas, garages, life doing underpinning; there is
basement space we are building. The hobby rooms, gyms and swimming in fact a great deal of similarity
planners didn’t even blink. The only pools are harder to argue against as between the two techniques. One
concerns the planners raised were these could alternatively be placed in of the advantages of this is that
that the patio doors became French independent buildings in the garden, the bulk of the work can be carried
Windows and that they reserved the often without the need for any out without breaking through into
right to approve the colour of the planning permission. the existing house: the external
balustrading. I have to say that I was walls are underpinned and then
surprised and amazed.’ RETROFIT BASEMENTS the ground is excavated. Most
Several selfbuilders have been Most basements are constructed under homes with a suspended ground
stymied in their attempts to add a new housing. Yet in London, land floor are technically able to have
basement to their house plans. No prices are so high and loft conversions retrofit basements, but cost-wise, it
planning department seems to regard so widespread, a number of companies really only makes sense in the most
this as a minor amendment – all want have sprung up offering to build a expensive areas where land prices are
an entirely new submission that not basement under your existing house. at a premium.
only involves much extra cost but They are known as retrofit basements
also a potential delay of months. The and they are not for the faint-hearted:
crucial point of dispute seems to be it’s very much an extension of last
how the local authority regards the resort, expensive and difficult to
extra space added by the basement. achieve. And whilst £200,000-plus
Many authorities have guidelines for a basement under a terraced house
about just what size of house should may sound like an awful lot of money,
be permitted on each individual when the housing is worth two or
plot and the addition of a basement three million, the stamp duty and

HOUSEBUILDER’S BIBLE l 13th EDITION 277


Chapter 13

13 SHOPPING
If you love shopping, it’s a given that worth studying the buying process. to controlling costs and is one of
you’ll love housebuilding. One of This is the logic of this chapter. It the major benefits to derive from
the secret joys of building homes is doesn’t cover everything, but it does having a properly designed, properly
that you can indulge yourself on the cover important areas that have been specified job. Many times in the past
greatest shopping trip of your life. But otherwise ignored up to this point. I have measured off plan to estimate
successful housebuilders are always a cost and then gone and measured
canny shoppers, not spendthrifts, again on site to order materials. I
and there are a few basic lessons to must also admit to having measured
be learned before you launch into TAKING OFF three or even four times when the bit
it. Firstly, do not simply get carried QUANTITIES of wood I write the measurements
away and choose items way beyond A bill of quantities is a fancy, on gets nailed into some studwork or
your budget. Secondly, know where construction professional’s term gets painted over. If I had taken the
to look. And thirdly, know how to for a shopping list. Making a advice that I’m offering now I’d be a
shop, how to strike a bargain. It’s well comprehensive one is fundamental little bit richer and a little bit fatter.

278 13th EDITION l HOUSEBUILDER’S BIBLE


SHOPPING

Now, serious construction quite capable of generating accurate ties at max 900 mm horizontally
professionals will engage the services results from a basic set of plans and and 450 mm vertically and at every
of a quantity surveyor (known on elevations. block course adjacent to openings.
site as ‘the QS’) to work out what is Additional 55m2 x 105 mm skin
needed. However, QSs don’t come of face brickwork (bricks to client’s
cheap and many small builders work TRADITIONAL ROUTE choice) forming plinth wall and
on their own rules of thumb for Let’s compare it with the traditional tied to blockwork with 130No. s/s
estimating the right quantities. These way of doing a take-off. Traditional butterfly ties as described above.
are not usually as accurate as a QS here means that your source Plinth wall extends 10 courses above
would get them but they are much document is a written schedule of DPC.
better than nothing. works (often known as the spec), You don’t need any specialised
If you are a selfbuilder or a rookie not the plans. You use the plans to equipment. All you need are your
builder, I’d strongly advise you use calculate the areas and volumes but finished plans, a decent ruler, a
a QS to price up your project at an you work methodically down the calculator and a pencil and paper
early stage, preferably before planning written list so as not to miss anything (rubber would be handy). And bags
permission goes in, because it’s a out. To give you a flavour of what I’m of common sense. If you’ve got a
lot cheaper and quicker to make on about, here is a clause taken from computer and you know your way
the changes on paper (if you need a house built in 2005. around a spreadsheet you’ll save
to) before you have a full planning n External (house) walls of 275mm yourself a bit of work, but not that
permission. If the project is unusual, 3.5N clinker blockwork cavity work much.
the QS bill is likely to be in four incorporating 100 mm Rockwool or
figures, but I still think this is worth similar full fill cavity insulation and MEASUREMENTS TO TAKE
it. 200 mm s/s butterfly brick ties at Take your measurements from
max 900 mm horizontal and 450 mm your detailed plans (which are now
FREE TAKE-OFFS vertically and at every block course conventionally drawn in metric scale
However you may decide that your adjacent to openings. Additional 105 which makes scaling up a damn sight
project is straightforward and you mm skin of face brickwork (bricks easier). If the distance you want is
want to develop your own bill of to client’s choice) forming plinth referred to on the drawings then
quantities. Many builder’s merchants wall and tied to blockwork with s/s use it, otherwise you must measure
offer a free or at least cheap take-off butterfly ties as described above. off plan in millimetres and scale up
service, ideally suited to the needs of Plinth wall extends 10 courses above to get actual sizes; thus, if drawings
rookie builders. Or check out one of DPC. are 1:50, then you multiply your
the very cheap internet estimating Hardly a riveting read, but it’s clear measurement by 50 to get the actual
services, like Estimators Online – enough. The job of the QS is, if you measurement.
around £150 for a house, £90 for an like, to rewrite this specification with Many of the dimensions you need
extension. the quantities added in so that it will be written in on the plan so you
Much of the repetitious grind of might read: won’t need to measure. Where an area
measuring and recording is carried n 158m2 double skin external is needed you multiply the two sides
out by computer and, provided the (house) walls of 275mm 3.5N clinker together, but when this area is not a
job is relatively straightforward, they blockwork cavity work incorporating simple rectangle you must split the
are pretty accurate. The closer you 145/m2 x 100 mm Rockwool or overall area into a number of smaller
stick to industry standard solutions, similar full fill cavity insulation and rectangular boxes and add these
the better the outcome and they are 580No. 200 mm s/s butterfly brick together. Remember that the area of a

HOUSEBUILDER’S BIBLE l 13th EDITION 279


Chapter 13

triangle equals half base x height. Model House Quantities table in using a set of plans without a written
For all but the very largest houses Chapter 1 to give you a flavour of spec can be a bit like trying to cook
all this measuring should take about it. You then have to sweep through a new dish for which you have a list
four to six hours. Complicated the whole thing a second time to of the ingredients but no instructions
building details like split levels, generate a shopping list; some of on how they go together. Arguably
curved work, dormer windows or the things you have quantified will it doesn’t matter which order you
raked ceilings make the measuring have to be amalgamated with other measure quantities in but the danger
much more complex too and it is well sections, others will have to be broken is that if you don’t work methodically
worth double-checking as a mistake down still further. through a list, you will miss whole
here will have costly ramifications on Blockwork is a good example. It chunks out. If you have skimped on
down the line. Oh, and don’t forget usually appears in several different this stage of the design process, then
to write the answers down where you places, such as external walls, garage this is where your chickens come
won’t lose them. walls, some internal walls, around home to roost.
I also find it incredibly handy chimneys and sometimes in the floor
to make little notes next to the (as in beam and block flooring). APPLYING MEASUREMENTS
calculations, which remind me what Presuming that they are all the same From all these measurements plus
assumptions I have made when doing species of block (unlikely), add them various details drawn in on the plans
the calculations. Typically these all together to get an overall total you should be able to construct a
read as ‘have assumed no skirtings for blockwork. And then consider reasonably accurate bill of quantities.
in conservatory’ or ‘have allowed for that blockwork includes not just the You may not actually want to make
three courses of face brickwork below blocks themselves, but the sand and up a shopping list for paint at
DPC.’ It’s a good idea to decide cement making up the mortar, not to the planning stage, but the point
whether your derived quantities are mention the labour to lay them with. is that by having taken all these
‘as measured’ or whether you have These totals have to be extracted from measurements you shouldn’t have
added an allowance for waste. It really the blockwork total and added to the to keep taking them throughout the
doesn’t matter which method you brickwork total which, to add to the job. You have the figures. From these
employ but you must be consistent confusion, will have different square figures plus a little close scrutiny of
otherwise you will end up adding metre labour rates and uses different your house plans you can work out
15% to the quantities several times volumes of mortar. quantities for:
over and you will over-order by miles. n Excavation
The further your house gets away WRITTEN SPECIFICATIONS n Concrete (approximate)
from the good old box-shape, the Well, that’s the traditional route. n Flooring materials
more complicated it gets to measure It’s time consuming but it works. n Walling materials
out and, if a feature like a bay window If you plan to do your own project n Roofing materials
or a fancy chimney is difficult to management it may even be worth n Insulation
quantify, then you can bet that it will going through this exercise to n Plasterboarding and plastering
also be difficult to build. familiarise yourself with the job in n Decorating materials
hand. However, many housebuilders n Skirting and architrave
WORKING THROUGH THE never bother with anything so n Scaffolding
SPEC elaborate as a written specification n Guttering and downpipes
You work methodically through the of works but just make do with plans n Whole house heat-loss
spec quantifying everything that on a couple of A1 sheets. This is fine calculations.
is quantifiable. Have a look at the if you know what you are doing, but Joinery is treated rather differently.

280 13th EDITION l HOUSEBUILDER’S BIBLE


SHOPPING

If you’ve got a pukka written spec,


there will be a joinery schedule
where labour can be just as pricey.
My prices are intended only as a
ENTERING THE
attached that will list all the opening guideline by which you can compare BAZAAR
sizes and the window and door your own quotations, so bear in mind The British consumer is used to being
styles which will fit in the openings. that the indicative labour rates here able to see what something costs.
I find it helpful to start with the may have to be adjusted up or down Visit any high street or supermarket
joinery: I work out the overall areas considerably depending on where you and the price you pay will be clearly
and use this sum to subtract from are building. labelled on the goods or, at least, on
wall areas. The joinery schedule the shelf underneath. Haggling over
can also be used to calculate the price is something that you might
approximate quantities for glazing, do on holiday in Morocco or Turkey
lengths for lintels and cavity breaks ALLOWING FOR WASTAGE but it’s thought not to be part of the
and a subsidiary schedule for door If you manage to work out the British way of life.
furniture. theoretical quantities of just about This is far from the truth. Step off
everything you need, you are still the high street and into the world of
faced with the problem of knowing commerce (or house buying or even
AVERAGE PRICES how much extra to order to cover car purchase) and we Brits are out
The rates I quote throughout the wastage. there haggling with the best of them.
book are all rates current for building Wastage is a wonderfully vague Generally speaking, when there are
work in southern England in 2018, term that covers just about any three or more zeros on the end of
especially around my home town and every mishap that can occur the price tag, the gloves come off and
of Cambridge. The key rate is £22 on a building site from defective any pretence at civilised shopping
per hour, equivalent to around £180 materials being delivered to perfectly goes out of the window. Anyone
per day, £900 a week, or just over adequate materials apparently responsible for purchasing building
£40,000 per annum, typical wage walking off site. materials would do well to bear this
for good tradesmen. Your area may There’s really no way of knowing in in mind because a well-organised
(almost certainly will) have different advance what your wastage rate will buyer can achieve savings of 20% or
prices in operation by the time you be, but experience suggests that you’d more over the unprepared novice.
start building, but bear in mind that be wise to over-order by between 8 It helps to be an established
Cambridgeshire is quite a bit above and 10% on heavyside materials like builder. To have a proven trading
the national average on building bricks, blocks, sand and cement and record stretching back over some
costs. also plastering materials. years and, better still, to have had
Early editions of this book (it You should be able to work out a record as a prompt payer will
first appeared in 1994) were able to timber quantities exactly, but here you stand anyone in good stead with
neatly summarise both material and will probably be blighted by timber their suppliers. But, these days,
labour costs right across mainland quality not being what you require merchants are keen to attract any
Britain – only Ireland diverged and again you would do well to add custom (except the doubtful payers)
significantly. But since then, labour extra lengths to your totals. and if you can establish your credit
rates in boom areas seem to be up by Buying more than you actually worthiness and the fact that you
50 to 100% whilst slack areas are little need is, of course, expensive but might be a substantial customer, if
changed from the 1990s. London so are the frequent shopping trips only temporarily, then you will have
in particular is very expensive but that happen when you buy too a strong bargaining chip. Also bear
there are other parts of the country little. in mind the proliferation of internet-

HOUSEBUILDER’S BIBLE l 13th EDITION 281


Chapter 13

based merchants which makes price match the prices offered by the large records) and every month you are
comparison and checking a whole lot chains. sent a statement of account which
easier. A general merchant will hope – summarises all the invoices you
indeed need – to make an average have run up on your account in the
INSIDE A BUILDER’S MERCHANT mark-up in excess of 50% to stay in previous calendar month. Normal
Like any business, builder’s merchants business. Thus, if they purchase some terms are that you must pay off the
and all the related building trade paint for, say, £100 then they will outstanding balance on your account
suppliers are buying in goods and need to sell it for £150. An awful lot at the end of each subsequent month,
selling them on at a mark-up. The of their business is conducted with so if you spent £500 on account with
services that a merchant provides for preferred clients at mark-ups much Jewsons during April, you would be
this mark-up are: lower than this 50% and so to balance required to give them a cheque for
n accessibility this out they must sell a great deal £500 at the end of May. In effect you
n delivery (usually free) at mark-ups of 70, 80 or even 100%. get between 30 and 60 days’ credit
n advice. So, one of the keys to getting good depending on whether your purchase
After a round of take-overs prices from a builder’s merchant is to happened at the beginning of the
and mergers, there are only three become known as a preferred client. month or the end of the month.
national chains left. Jewson is the Step one is to open an account. Sometimes postponing a purchase
largest: it took over Harcros in To set up an account with a by a day or two – so as to avoid the
1997 and Grahams in 1999, and builder’s merchant, you would month end – can get you an extra
was itself taken over by the French normally be asked for a bank 30 days’ credit. Builders merchants
conglomerate St. Gobain in 2000. reference and two trade references. know all about these tricks and they
Travis Perkins (which swallowed The bank reference shouldn’t be consistently get more sales in the first
Keyline in 1999 and Wickes in 2005) a problem (depending on your week of a month than they do in the
is No 2 and Builder Center (part of relationship with your bank, of last week.
the giant Wolseley group) comes in course) but trade references could Don’t just open an account and
a distant third. In addition there are prove difficult if you’ve never had a start purchasing materials as and
around thirty regional operations trading account. Instead, write a letter when you need them – you’ll pay
(typically with five to ten outlets) of introduction saying who you are top whack this way. If you’ve got the
and still a fair number of small and what your project is. This will whole job priced up you know that
independents, one- or two-branch carry far more clout if you include you will have some serious prices
outfits which may well turn over less a copy of the plans, which they may back because they suspect you will
than £1 million per annum. well offer to quote on. have got prices from the competition.
There are also many specialist If you’ve never had a trading You may well be able to improve on
trade outlets dealing with account (and if you are not in these quoted prices.
plumbing, electrics, roofing, joinery, business on your own account there A question you occasionally get
ironmongery and glass. Whether is no particular reason to have had asked over the phone by a builder’s
they are any good or not depends one), they operate under a very merchant is ‘Is this a job you are
an awful lot on the quality of the simple code. When you pick goods actually doing?’ Probably sounds
staff working in any particular up or have them delivered you get rather silly but they are sounding
branch and, especially, the branch a dispatch or delivery note. The tax you out: if you’re just estimating
manager. Needless to say, the smaller invoice arrives a few days later by you get one price, if you are buying
operations tend to give a more post or, increasingly, by email (this you get a better price. They quite
personalised service but can’t always is the one you must keep for VAT expect you to go the rounds of local

282 13th EDITION l HOUSEBUILDER’S BIBLE


SHOPPING

suppliers and they want to have a


bit of fat they can lose on the next
call.
This practice of haggling over
prices is common to almost all areas
of building supplies except the DIY
sheds (Homebase, B&Q, etc.). It’s
partly volume driven (that is, if you
buy 150 sheets of plasterboard you’ll
get a better rate than if you buy just
one), but it also has much to do with
the cosy understanding that exists
between builders and their suppliers,
which goes to make builders’ rates
look cheaper than they actually are –
or to put it another way, to discourage
the DIY enthusiast from getting out
of bed.
The levels of discount vary from
product to product and just to make Endless shopping may sound like fun, but sifting through trays of cupboard handles
it complicated some merchants at B&Q, looking for the perfect ones, begins to make Sudoku look exciting.
operate two, three or even four levels
of discount off the retail price. Some talk to are only too willing to supply BUYING DIRECT
products are sold with a list price one-off builders at somewhere near This whole question of who supplies
from which you have to negotiate the their best prices. They have had too whom is still a pretty murky area.
biggest discount you can get; other many cosy relationships with ‘trusted Most manufacturers take the
products have no list prices and the trade customers’ turn horribly sour view that they should support the
prices paid for them just come down and now the order of the day is to do established distribution channels
to negotiation. Purchasing well is an any business which pays. (i.e. the general merchants) and
art. Get too pushy and the merchants One further point. Don’t assume consequently you will have to
will get annoyed and shut up shop. that your work is done after you have shop there for the product. For
Too relaxed and they’ll squeeze agreed some good prices. You have to instance, you can’t buy plastic drain
whatever extra they can get out of check that you are invoiced correctly: ware direct even if you are Barratt
you. builder’s merchants, large and small, Homes. On the other hand, there
Now, once upon a time, what have an annoying little habit of are manufacturers like Ryton’s (who
I have just written would have ignoring agreed prices and invoicing produce roof ventilation) who readily
practically barred me from ever you at top whack. Keep your quotes sell via mail order to all comers
setting foot in a builder’s merchant somewhere handy and cross check but who, consequently, tend to get
again. But slowly the worm is turning against them when the invoices blackballed by builder’s merchants so
and the trade merchants are far more arrive. To hazard a guess, I would that their product is little known.
aware of a) the competition from the reckon that 10% of invoices from As a general rule, manufacturers
DIY sheds and b) the growth of the builder’s merchants come with prices do not deal direct with end users
selfbuild market. Most merchants I higher than agreed – never lower! except where they set up their

HOUSEBUILDER’S BIBLE l 13th EDITION 283


Chapter 13

Toolstation materials but tend to be pretty good


tends to open on the finishes, provided you are not
branches looking for anything fancy.
within eyesight
of Screwfix.
One exception is Wickes, whose
Whether this prices are keen right across the
makes Screwfix board. Wickes is a hybrid between a
happy is builder’s merchant and a DIY shed;
doubtful, but the prices are close to (and sometimes
it keeps prices better than) a regular builder’s
keen and it’s
convenient for us
merchant’s trade prices but they are
shoppers also on full display – a big advantage
to rookie builders. Wickes have been
taken over by Travis Perkins but
they continue to run quite separately
to the main chain. Don’t pull up
to a Wickes branch and expect to
put things on your Travis Perkins
account. Wickes is a cash business,
just like B&Q.
Screwfix is another outlet to be
aware of – you can hardly ignore it
anymore, it’s everywhere. It started
life as a mail-order ironmongery
specialist founded by Mark Goddard-
Watts. It grew and it grew and
in 1999 it was bought out by the
Kingfisher Group, owners of B&Q.
own distribution channels, such as the perceived unfriendliness of the Since then, it has expanded both its
Magnet. To make the whole picture builder’s merchant to non-trade remit and its way of selling, so that
thoroughly confusing, you will find customers. The Saturday afternoon they now have 300+ trade counters
that some distributors (notably patio-building brigade have long dotted around the country. Although
Jewsons) will have own brand items felt that they have been treated as it’s not the place to buy heavyside
on sale, which suggests that they are second-class customers at trade materials, it’s prices for everything
manufacturers. Just like Sainsburys outlets and, what is worse, have been else are always keen and it’s range is
are farmers. But this doesn’t mean forced to pay over the odds for this surprisingly large. If it fits in a van,
you are buying direct. What really dubious privilege. How much more it’ll be there.
matters is not which brand or where convivial to shop at a place where Four years after selling Screwfix,
you bought it from but was it cheap the prices are actually displayed, even Goddard-Watts started out all
and was it any good? if they aren’t particularly cheap, and over again and beget Toolstation,
where the staff probably know even which has a natty habit of opening
THE DIY SHEDS less than you do. its branches next door to Screwfix.
One of the reasons for the success As a rule the DIY sheds are not Toolstation tends to stock a little
of the edge of town DIY sheds is very competitive on heavyside, bulky less than Screwfix but tends to be a

284 13th EDITION l HOUSEBUILDER’S BIBLE


SHOPPING

little cheaper. Goddard-Watts then changed. are good for Osma and Burdens
sold Toolstation too, this time to The general builder’s merchants do are good all round groundworks
Travis Perkins (who already owned still get a look in. They are particularly suppliers.
Wickes). Having two rivals trading strong when it comes to supplying n Joinery: mass-produced joinery is
side-by-side certainly keeps the prices cement, drains, timber, plastering usually best sought out via the general
keen, but behind all these brands materials and joinery, but they tend merchants. Magnet Joinery, which is
are a decreasing number of mega- to be out-priced by specialists in characterised by being ‘good value’, is
businesses. most other areas. However, do bear alone amongst the major producers
in mind that whilst the general in being only available from its own
SPECIALISTS merchants are to some extent geared depots, which run a sketchy delivery
The general builder’s merchant to Wallies asking stupid questions, service.
is to the building trade what a the specialists usually expect you to n Timber and timber boards: general
convenience store is to the high know what you are talking about. Ask merchants tend to do well here
street shopper. You can get just about a steel stockholder what you should although some are conspicuously
anything you want there and the use to reinforce your garage floor and better than others. There are some
prices are reasonable. However, for you’ll probably get told some crap specialist timber merchants and these
the serious shopper, intent on sniffing mother-in-law joke. are the places to look for unusual
out bargains, there are any number of If you want to look for specialists, species. We like Vincent Timber,
specialist suppliers who can usually here are some leads to search on: based in Birmingham.
undercut the general merchants in n Sand and aggregates: buy direct n Roof trusses: many timber
their own areas. The trouble is they straight from quarries or via specialist merchants run up roof trusses as
take some hunting out, and often hauliers.. a sideline and this is a good line
they don’t want to be bothered by n Cement, lime: general merchants of approach. There are specialists
small fry, one-off housebuilders, let are usually the best place to buy although they are few and far
alone amateurs. You could spend unless you want one of the speciality between.
an awful lot of time tracking down limes in which case you want either a n Insulation: there are many
specialist suppliers and not save more local producer or an eco-merchant. specialist suppliers in this field and
than a few hundred quid overall, and n Bricks, blocks, pavings: besides they usually undercut the general
it may well be that you decide the the general merchants, there are a merchants. Sheffield and Encon are
convenience (and often helpfulness) number of specialist brick wholesalers big names here.
of a local builder’s merchant is worth (or factors) who specialise in n Roofing: another area where
hanging on to. supplying full loads direct to site. specialists reign supreme as both
However, I would not be doing my Look out for Brickability, particularly suppliers and subcontractors.
duty if I weren’t to make you aware good for sourcing facing bricks. n Guttering: buy from general
of how the professionals do it. Where n Building stone: either direct merchants unless you want
do they go shopping? Anyone with a from quarries or via brick or stone something better than the industry
broadband connection (does anyone merchants. standard uPVC fittings.
not have one now?) will probably n Readymix concrete: buy direct n Lintels: again buy from general
head straight for Google and start from Readymix outfits. merchants.
their enquiries there. In the old days, n Drainage: general merchants n Steel beams, reinforcing: usually
you would have started by opening do well, although there are some the steel stockholders offer the best
the Yellow Pages: the principle is specialists who are worth checking value.
the same, only the technology has out. John Davidson Pipes (now JDP) n Glass: these days normally bought

HOUSEBUILDER’S BIBLE l 13th EDITION 285


Chapter 13

with doors or windows, so specialist far from a tile outlet and online sales has been a flight to quality in this
glass suppliers don’t interact with are significant too. market and these days you are much
builders. But if it’s architectural or For items like central vacuum more likely to be sniffing around
structural glass you are after, then cleaners, underfloor heating and heat expensive architectural gems which
specialists rule the roost. Good recovery units, where there may well you probably won’t be able to afford.
contacts here are Cantifix, IQ Glass be no local agents, the obvious place to If you are seriously into using
and Glazing Vision. start looking is online, but also check salvaged building materials, you
n Plumbing: plumbers buy from out the selfbuild shows where you get would do well to identify as early
specialist plumber’s merchants. Every to meet the people behind the products, as possible what exactly it is you are
town has a selection of specialists but which may or may not be a comfort. going to get because incorporating
also look online. changes to materials specification
n Electrics: similar story as plumbing ONLINE during construction can be very costly.
supplies. The internet is an incredible source of There are hundreds of reclaimed
n Kitchens: as the section on materials and a great place for smaller building materials yards all over the
kitchens, hopefully, makes clear, your suppliers to access the national country, varying in size from a couple
kitchen could come from any one of market, rather than staying local. of sheds in a back garden to multi-
a huge number of sources: joinery You’d struggle to build a whole house acre sites better equipped than the
shops, general merchants, kitchen from online suppliers, but when it average builder’s merchant. If you
specialists, you name it. There are comes to finishing materials, it’s often want to look further afield than your
also worktop specialists, appliance hard to beat. hood, search on Salvoweb who keep a
wholesalers and more than 1,000 There are downsides. One is good database of material recyclers all
kitchen unit manufacturers, many that you frequently get hit by over the UK.
supplying direct to the public. high delivery charges, something
n Plastering: general merchants pick the local suppliers tend not to do.
up the great bulk of sales to plasterers. Sometimes there are also minimum TRUCKING
Floor screeding is increasingly done order quantities which can be very Moving materials around the country
by specialists, as are one coat renders. awkward if you are only building one is expensive. A lorry with an off-
n Paints, stains: Decorators’ house. And of course incorrect orders loading crane (usually a HIAB,
Merchants are in every town but or damaged goods are not so easy pronounced high-ab) and driver will
for many a DIY shed will be just as to deal with when the conversation cost around £250-£400 to make a trip
cheap and more convenient. takes place via email. of more than half a day – although
n Ironmongery: there are specialist Having said that, on my recent this will be less with an ordinary flat-
stockists offering wholesale prices selfbuild I used around 40 different back truck without a crane. This sum
but a one-off housebuilder is still online suppliers — everything from will be the same whatever the load
going to do better by buying the window film to door mats — and and so from the buyer’s point of view
right amounts rather than chasing all but one came up trumps. I was it makes good sense to get as near
extra keen prices. General merchants impressed by how little grief we had. to a full load as possible. The best
discount heavily on bulk orders economies come when ordering 20
and do well here, but Screwfix and SALVAGE tonnes, which is usually a full payload.
Toolstation pick up lots of orders One other important area I’ve not What’s in a Full Load? A 20-tonne
as well. Ironmongery Direct have a touched on is the salvage yard. Time lorry can shift:
smaller range but are better at it. was when salvage yards were a source n about 8,000 standard bricks
n Ceramic tiles: Again, you are never of cheap building materials, but there n or 7,200 block pavers (144m2)

286 13th EDITION l HOUSEBUILDER’S BIBLE


SHOPPING

n or 1,440 dense blocks (144m2) PLASTERBOARD you were faced with the unenviable
n or 2,400 clinker blocks (240m2). The plasterboard manufacturers all task of returning them to base in
Aerated blocks (like Thermalite or pack in the same sizes. Better prices order to get the deposit back. And
Celcon) are so light that the capacity are usually negotiable on full packs. to reclaim the deposit, you needed to
constraint on haulage tends to be A 22-tonne direct load would be have your invoices sorted out to show
volume rather than weight. 20 tonnes enough for three or four large timber that you had actually had said pallets
of super-lightweight blocks would be frame houses – probably a bit too from said supplier. It was a hassle but
about 6,000 blocks, which would be much for your average individual it was one of the few green aspects of
36 double packs. builder – however, by buying in full buying building materials.
There are no industry standards pack sizes you should be able to make But note how I am writing in
as to how masonry materials should savings. the past tense here. On my recent
be packed, although there is a n 1200 x 2400 x 9. 5 mm selfbuild, only one supplier, Travis
tendency to use shrink-wrapped plasterboard comes in packs of 80 Perkins, charged a pallet deposit and
plastic (which keeps watertight) and (1.76 tonnes) that only seemed to be occasionally.
to pack in weights and quantities n 1200 x 2400 x 12. 5 mm The practice has all but died. Instead
that fit on to a pallet. A forklift can plasterboard comes in packs of 60 we ended up putting twenty or more
handle more than two tonnes and (1.66 tonnes). pallets into a skip and had to pay
a common pack size is around one for their collection. At least they
tonne (which allows two packs to be TIMBER will have been recycled by the skip
lifted at once). When ordering direct Timber has to be purchased in operator (at least I hope they were).
loads, you’ll have to accept the nearest 20m3 lots to take advantage of bulk
pack size quantity so if, for instance, discounts. 20m3 is an awful lot of
you wanted 8,000 bricks and your timber. Furthermore, studwork,
selected brick is packed in 410s (as which is perhaps the commonest CONCRETE
many are), you would have to settle size of timber used in timber One person working with an electric
for either 19 packs (19 x 410 = 7,790) frame buildings, has to be ordered or diesel mixer will mix 1m3 of
or 20 packs (20 x 410 = 8,200). in 40m3 lots. The average timber concrete in about an hour. That’s fine
Packs will either come palletted frame house uses around 1,000m for odd bits and pieces but hopeless
or with fork holes for forklift off- of studwork – a paltry 5m3! Full for major projects like foundations.
loading. The chances are a fully laden loads of timber can undercut As a rule, readymix will be cheaper
20-tonner will not be able to get off merchants’ best prices by as much when more than 2.5m3 is needed.
the road, so hire of a rough-terrain as 30%, but you have to have some Readymix loads are always going
forklift may be the best solution for site going to justify such orders. By to be preferable where consistent
unloading. A rough-terrain forklift and large, you’d do better to try and concrete strength is important. Really,
and driver should be available at concentrate on buying good rather for anything other than laying the
around £150 for a half day and is than cheap timber. odd patio, it has to be site-delivered
usually money well spent if the site readymix concrete every time.
is big enough to warrant one. Bricks
and blocks can (sometimes) be set PALLETS STRENGTHS
around site, making labouring much Builder’s merchants once routinely Traditionally the design strengths of
quicker and easier. A JCB with forks charged a £15 deposit on pallets used concrete have been expressed in ratios
can be used as an alternative to a to supplied heavy goods to site. A pile of volumes cement:sand:gravel (as in
rough-terrain forklift. of pallets would soon mount up and 1:3:6). However, things are stirring

HOUSEBUILDER’S BIBLE l 13th EDITION 287


Chapter 13

When you add water to readymix,


you weaken it. It often leaves the
readymix yard in a perfect condition
and is watered on site, making a joke of
its original spec. Watered concrete is the
biggest single cause of concrete failure.
If you take any of this on board you
will already be ahead of the game. My
friendly local readymix supplier, Allen
Newport, told me: “99 people out of a
100 who phone up here haven’t got a
clue what type of concrete they want.
Even with the professionals, it’s only
about 50% who know what they need.”

CONCRETE PUMPS
To hire a concrete pump, allow
around £200-£250 per session. They
Concrete pumps greatly reduce the amount of labour required to pour readymix
pump a full load (6m3) in 20 minutes,
about three times quicker than three
men barrowing might do. Concrete
pumps make financial sense on jobs
in the sleepy world of concrete and traditional for on-site batched with more than 30m3 of concrete to
there are now at least three other concrete. In readymix terms, this is be poured but there are other reasons
labelling systems in operation. If you now known as a GEN 1 mix. for using them, notably when speed
are mixing concrete on site, the old Floor slab mix: 1:2:4 is the is important or access is difficult.
ratio system, as described, is fine and traditional volume way of looking If using a pump be sure to let the
is actually very useful as you can use at it – it’s a bit stronger than the readymix supplier know, because the
it to gauge how many shovels need foundation mix. The readymix mix design is wetter and the through-
to go into the mixer, although note equivalent is usually referred to put of lorries is much faster than on
that it is usually most convenient as a GEN 3. If you are screeding a normal job. It’s also a little more
to have a sand and gravel mixture over your slab, you may be able to expensive.
delivered to site – ask for ‘all-in use a GEN 1 instead of a GEN 3.
ballast’. If, however, you phone up for Basically, the lower the GEN number,
a readymix delivery you may do well the cheaper the mix. GEN 3 and
just to explain what it is you want GEN 4 are about 5 to 10% more STEEL
the concrete for and let them work expensive than GEN 1. There are Steel can be used in a wide
out which mix it is you need. If you lots of other more specialised mixes variety of applications in new
have employed a structural engineer around. Reinforced work requires housebuilding and there are moves
to design your foundations, then reinforced mixes, designated RC. afoot to introduce steel framing as
the concrete mix should be in their Driveways and paths have their own an alternative to timber framing.
instructions. mix known as PAV 1. If in doubt, ask However, most housebuilders use
Foundation mixes: 1:3:6 is the readymix rep. it sparingly, preferring to use the

288 13th EDITION l HOUSEBUILDER’S BIBLE


SHOPPING

traditional materials brick, concrete


and timber wherever possible. Steel is
the No 1 choice for standard fixings
like nails and screws but elsewhere its
use is restricted to a few specialised
areas.

REINFORCING
The commonest form of steel
reinforcing used in housebuilding
is A142 anti-crack mesh, which is
often set in concrete floor slabs to add
strength. Note that you’ll need bolt
croppers on site in order to cut it. It is
usual (though by no means universal)
to lay this in garage floor slabs. It
needs to be located towards the
bottom of the concrete layer in order
to do its work properly. There are Even in timber frame houses, steel usually plays a part somewhere. You would
many other forms of steel reinforcing be very unlikely to buy the steel separately as it comes with the rest of the
used in concrete but you are unlikely superstructure.
to come across them in housebuilding
unless you have to lay specialised
foundations. steel businesses, Catnic and IG, and tend to be the preferred choice
designers still routinely specify their to bridge internal doorways in
LINTELS products. But Catnic is now part of masonry work only. Here the lintel is
Even though reinforced concrete Tata Steel and IG was taken over by completely covered and the heat loss/
is much cheaper, for many years Irish competitor Keystone, so the way condensation issue is irrelevant. The
now steel has been the preferred is open for alternative suppliers. steel lintel manufacturers do produce
material for bridging the openings in The most commonly used IG lintel an internal door lintel but it is not
outer walls made by doorways and is the L1/S, very suitable for bridging widely used. Timber framers tend
windows. The problem with concrete openings in cavity work with cavities to use timber lintels, but note that
is that, in insulated new houses, it up to 100 mm. There is a heavy duty where a brick skin is specified for the
remains a large cold bridge through version, known as the L1/HD. They external wall, there are special steel
the wall, which is bad news thermally are made in lengths from 600 mm to lintels designed to do the job of just
and attracts condensation. Also, when 4800 mm and they increase in 150 supporting the outer skin.
viewed from outside, concrete lintels mm increments. The minimum end
look crude and cheap. In contrast, bearings must be 150 mm so that
steel can be insulated and the outer an opening of 900 would need to be CAVITY WALL TIES
leaf support is hidden seamlessly over bridged by a lintel of 900 + 150 + 150 Where the facing material is brick,
the top of the window or door. The = 1200 mm. block or stone you need approx 3.5
market was dominated by two Welsh In contrast, concrete lintels still wall ties/m2. If the inner skin of the

HOUSEBUILDER’S BIBLE l 13th EDITION 289


Chapter 13

cavity is timber frame rather than with a nasty change in mortar in a mixer to be used without any
blockwork, the wall ties are a different colours. A detached four-bedroomed additional additives. One brickie I
shape and you need slightly more house, built of brick and block, will know is very uncomplimentary about
(about 4/m2). Since 2004, you have require something like 6 tonnes of them, to the extent that if I were to
had to use stainless steel wall ties cement (excluding concrete) so, with print his comments, all you would see
rather than the cheaper galvanised. a total value of under £1,200, cement would be a whole bunch of asterisks.
Wall ties are seen as a significant purchase is never going to be a bank- Look for names like Mastercrete and
cold bridge and moves are now breaker. Multi-cem.
afoot not to use steel. The Passivhaus Another option is to use a pre-mixed
builders seem to be using the Teplo MIX DESIGNS mortar (i.e. even the sand is mixed in
Wall Tie from Magmatech, made of How strong do you want it? Strong for you) – RMC (OK, Cemex) can
basalt fibre and therefore not a cold mixes (one part cement to three parts supply these either in skips or tipped
bridge. sand, henceforth 1:3) are used where off lorries or in small bags.
the mortar must stand on its own (a
floor screed) or is likely to get very LIME
wet (underground work); for brick There is no compulsion to use
and blockwork and for wall renders, it cement for the construction of
is important not to get an over-strong new buildings and there are many
MORTARS mix and also to get some plasticity restoration projects where it would
The standard building cement, into the mix. be advisable to avoid it altogether.
packed in 25kg bags, is known as This is usually accomplished by The use of cement in housebuilding
OPC, which stands for Ordinary using additives (such as Femi or did not become widespread until
Portland Cement, and sometimes this Cementone) or by substituting lime the 1920s. Before that, people used
is referred to as Portland Cement. for some cement. Given the choice, lime-only mortars which never set as
The cement (and concrete) market many bricklayers like to work with hard as cement, and one of the big
is dominated by a small number hydrated lime in the mortar but it’s not advantages of lime mortars is that
of firms, once all British, now all universally admired; it’s bulky and easily the mortar can be cleaned from the
foreign owned. RMC is now Cemex wasted and transporting split bags is a brick, making it possible for some
(from Mexico), Blue Circle is now pain. Also mixing has to be carried out bricks to be reused in other buildings.
Lafarge Holcim (French Swiss), more accurately as the addition of a In contrast, most cement mortars
both ARC and Castle Cement are third ingredient adds to the likelihood cannot be removed from bricks and
now Heidelberg (Germany). It being of changes in mortar colour. cement-bedded bricks are good for
a mature industry, you’ll find that nothing more than hardcore. Another
there is remarkably little variation MASONRY CEMENTS advantage is that lime mortars remain
in cement prices – although cynics There are several other options slightly plastic and this provides a
may have an alternative explanation available, all designed to make on-site certain amount of flexibility to walls,
for this. By all means shop around – gauging a little easier and a little which helps to withstand subsidence
2019 prices are hovering around £200 more accurate. Masonry cements and cracking.
per tonne (£4.60 per 25kg bag) – but add fillers to the mix which take the However, it’s not that simple just
note that it is worth sticking with place of plasticisers and can be used to switch to lime as a replacement for
the same manufacturer once you’ve in all the major cement applications cement. The really traditional limes,
made your decision; cement colours (concrete, brick mortars, renders and sold in liquid ‘putty’ format in tubs,
vary and you can ruin face brickwork screeds) and will go fatty enough are around six times as expensive as

290 13th EDITION l HOUSEBUILDER’S BIBLE


Porous
Flexible
Easily eroded
Pu
hyd re lim
rat e p
ed utt
lim ies
e w an
Hy ith d ba
dra san gg
ulic d ed
lim
es
wit
Ge hs
nt
1 M le m
an
d
1 O aso ix:
PC nry
: 2 cem
lim
e: ent: 6
9s
an sand
d or
No
1 M rmal
1 O aso NHB
Mortar Mix Chart

PC nry C a
: 1 cem pp
lim ro
e: ent: 5 ved
Se
v 6s m
gro ere and sand ix:
san und: xpo e or
d 1 M sure
aso or
Sc nry belo
ree ce w
1O dm me
nt:
PC ix: 3
ce

HOUSEBUILDER’S BIBLE
me

l
nt:
3s
Brittle

an
d
Durable
Waterproof
SHOPPING

13th EDITION 291


Chapter 13

OPC cement and cannot readily be in-off-the-street customers and large joists, studwork walls and roofs.
used below temperatures of 10°C: orders will get another 5 to 10% off Low moisture is defined as having
use that on your external brickwork the regular trade prices. The way to a moisture content below 20% and
and you’ll be hanging around get good prices is invariably to send in effect this means using kiln-dried
forever waiting for the stuff to set. your (hopefully) large order in for timber.
Alternatively, there are different types quotation at least two weeks before The advantage of kiln dried timber
of bagged lime available which you you require it. By all means include is that it is dimensionally stable – it
can use as an alternative to putty. second-fix items like skirting boards will not twist or warp as cheaper
Hydrated lime is essentially dried which you may not need for several timber will, especially if it’s been
lime putty and readily available months; it makes you look more like treated – and that it is regularised,
from builder’s merchants but lacks a serious customer. which means that it has all been
strength without a little cement to milled to an accuracy of 1 mm. It is
bind it, whilst hydraulic limes can be CARCASSING thus very much quicker and easier
used instead of cement and having Most construction grade timber to put up accurate studwork and to
once been difficult to obtain is now is spruce, usually referred to as fix flooring joists; non-regularised
also widely available from builder’s carcassing, whitewood or deal — timber can sometimes vary in depth
merchants. presumably because it’s a good deal. by 5 mm or more and this is very
Hydraulic lime mixed with a sharp It is relatively cheap and easy to work noticeable when flooring is being laid
sand gives a lovely natural colour to but it suffers from being one of the over it.
a mortar which goes down well with least durable timbers available. Of Having said that, there is a lot of
conservation officers, but it can be more interest to the builder is the supposedly regularised timber around
very slow to lay and bricklayers will strength of any particular piece of which varies by plus or minus 5mm,
probably not love you for specifying timber and there are several grading sometimes even more, so the term is
it. systems run by the timber trade for regularly abused. And in truth, 20%
If you want the lime look without assessing this. The commonest form moisture content is still much higher
the lime hassle, then you can cheat of grading at present is to see timber than the final settlement level reached
and use white cement, sold as labelled as SC3 or SC4. SC4 timber in a centrally heated house (about
Snowcrete. It’s over twice the price is the stronger and the advantage of 8%), so shrinkage still takes place. But
of OPC but still a little cheaper than paying the 5% more for SC4 timber kiln-dried timber is still a step in the
using lime. is that you are allowed to use them right direction.
over longer spans. For instance the
longest distance you can bridge with TIMBER TREATMENT
a 50x175 mm section of timber is Spruce is not classified as a
3170 mm in SC3, but this length durable timber and this means
rises to 3380 mm in SC4. SC3 and that it is liable to rot if exposed to
TIMBER SC4 are British Standards and moves continuous damp. This has led to the
You rarely see the price of timber are afoot to replace them with Euro increasingly widespread use of timber
advertised and you rarely see it gradings, C16 and C24 respectively. preservatives to add durability. These
on display in timber yards. This is preservatives can be applied by brush
because there is a wide range of KILN-DRIED TIMBER on site but more normally the timbers
prices charged for timber. The regular In 1995, it became compulsory to use are immersed in a vacuum-pressure
trade prices are usually around 33% low moisture timber in all internal tank, which leads to them being
less than those charged to casual structural applications – which means referred to as having been ‘vacuum

292 13th EDITION l HOUSEBUILDER’S BIBLE


SHOPPING

treated’. There are two rival systems in matchboard walling. It is more easily durable and is very prone to buckling.
regular use in the UK, Tanalising and worked than spruce and it is most
Protimising. There is little to choose frequently seen in timber yards with HARDWOODS
between them in price – they add a planed finish, usually referred to as Generally, hardwoods are not an
around 10% to the cost of the raw Planed All Round (PAR) or Planed alternative to softwoods. Rather,
timber – but they do perform rather Square Edge (PSE). Scandinavia is they tend to get used in particular
differently. the major supplier of redwoods. applications like flooring and kitchen
Tanalising is a water-based You can use cheaper whitewoods worksurfaces where softwoods are
treatment which tends to dye the for internal applications but they not commonly used. Joinery is the
wood a light green colour although suffer from having what are called obvious exception to this rule: see the
there is now a brown-dye version as dead knots, which tend to work loose section ‘Joinery’ in the Superstructure
well (useful if you plan to use brown and fall out with time. Your mice may Chapter 7, where the pros and cons
or black stains). Protimising is spirit- appreciate the odd dead knot in your are examined. Also check the chapter,
based and usually leaves the wood skirting board but you will probably ‘Green Issues’, for the low down on
uncoloured, although sometimes a prefer to have timber with live knots tropical hardwoods.
red dye is added. You can usually that move with the timber as it
tell if timber has been Protimised expands and contracts.
from the pungent, petrol-like smell.
Generally tanalising is preferred in SPECIALIST SOFTWOODS
applications where there is contact There are a number of more
with the ground, like fencing, and specialised softwoods:
protimising is preferred for structural n Douglas Fir is particularly resinous
timber (and joinery) because it is and durable and it performs as well as
less likely to cause the timber to many hardwoods. It is a favourite in
twist. Tanalising used to use arsenic high specification windows although
as one of its ingredients; it has been one problem is that it doesn’t hold
reformulated to avoid this particular paint well: wood stains are the
gremlin and is sometimes referred to solution.
by a different name, such as AC500. n Hemlock is another North
However, it will take a good few years American speciality softwood that is
before British builders get around mostly used in door construction.
to calling it anything other than n Cedar is particularly durable and
tanalising really doesn’t require any sort of on
site treatment at all. However, its use
JOINERY GRADE REDWOOD is limited, tending to be restricted
The other commonly used wood to external claddings such as garage
in UK housebuilding is pine, or doors, and roofing, and increasingly,
redwood as it is known. This is a weatherboarded exteriors.
denser and slightly more durable n Parana Pine. This is a lovely
timber than spruce, and it is looking South American timber,
commonly used to manufacture popular in several internal
windows and internal applications applications such as window boards
like skirting boards, floorboards and and staircases. It is anything but

HOUSEBUILDER’S BIBLE l 13th EDITION 293


Chapter 14

14
GREEN ISSUES
Most of the interest in this field – and
indeed, most of this chapter – is to do
with saving energy. Our fascination
a very large finger of suspicion is
pointing at us and, in particular, our
dirty habit of burning masses and
emissions, the effect of these
undertakings has for many years
been trickling down to the Building
with this topic really began during masses of fossil fuels and thereby Regulations in the hope that stricter
the 1974 oil crisis when people releasing carbon dioxide (CO2) into codes for new building will bring
assumed – incorrectly – that we were the atmosphere. about some reduction in our energy
facing a permanent fuel shortage Reckoning that it is probably consumption. Hence many of the
and consequentially rocketing fuel better to be safe than sorry, changes to the building regs are to do
prices. However, in more recent times, many governments have been directly with reducing CO2 emissions.
concern has grown that the ambient signing accords to reduce levels Energy saving is, however, not the
temperature of the entire planet of carbon emissions although, as be-all and end-all of environmental
Earth is increasing rather rapidly, a environmentalists point out, not by concerns and I’ll start the chapter by
phenomenon known to us all now as very much and sometimes by nothing taking a look at some of the other
global warming or climate change. at all. And then there’s Trump... issues, including an assessment of
Despite many people claiming that As private households contribute how much energy is used in actually
this could be a natural phenomenon, about a third of our national CO2 constructing a new house.

294 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

CONSTRUCTION Building Bible which covers the


materials and technology in greater
agenda is subtly shifting so that at
last we are beginning to worry about
AUDIT depth than I have here. what it is that we are building. Is it
This book may be green-tinged but it Whatever your personal views on any good? How much damage does it
is not what anyone would call an eco- green issues, what can’t be denied cause in order to get built? How long
handbook. If you want to know more is that the green perspective has will it last? Can it be safely disposed
about green options then there are caused mainstream housebuilding to of when we’ve finished with it? In
dozens of other titles available and I examine just what it does, and to look a word, sustainability. How does a
can especially recommend The Whole at ways it could be improved. typical new house stack up?
House Book by Pat Borer and Cindy For most of the 20th century
Harris, which gives a good overview housebuilding in Britain was driven TRADE BALANCE
of the many different ways there are by the desire to make houses cheaper Materials going into a masonry-
to build and Tim Pullen’s Sustainable and easier to construct. Now the built detached house, such as our

MODEL HOUSE Construction Audit


Material Quantities and Embodied CO2 Used to Construct Benchmark House
Embodied Upgrading a new build to
MATERIAL DENSITY WEIGHT (in CO2 (in Passivhaus standard saves
MATERIAL QUANTITY MULTIPLIER tonnes) Kg CO2e/kg tonnes) just over a tonne of CO2 per
annum, at an additional load of
Concrete 25 m3 2.3 60 0.10 6.0
around 4-5 tonnes embodied
Bricks 12000 No 0.003 36 0.23 8.3
CO2 (mostly insulation and triple
Aerated Blocks 255 m 2 0.1 26 0.30 7.7 glazing).
Concrete Floor Beams 95 m 2 0.15 10 0.10 1.0
Sand 15 t 15 0.01 0.1 Switching away from masonry
Cement 5 t 5 0.73 3.7 construction and plastic
Natural Slate 122 m2 0.05 6 0.06 0.4 insulation towards timber and
Concrete Paving 35 m2 0.15 5 0.10 0.5 other natural materials has the
Hardcore and Gravel 50 m3 1.6 80 0.01 0.4 potential to halve embodied
Timber 12 m 3 0.5 6 0.30 1.8 CO2.
Chipboard/Plywood 5 m3 0.5 2.5 0.40 1.0
But in the long run energy
Plasterboard 500 m2 0.01 5 0.38 1.9
efficiency still trumps embodied
Acosutic Insulation 10 m3 0.04 0.4 1.40 0.6 energy as a way of reducing
Foam Insulation 36 m3 0.05 2 3.50 7.0 CO2 usage. As long as the
Steel 1 t 1 1.50 1.5 house survives longer than 25
Double Glazing 35 m2 0.03 1.1 0.80 0.9 years.....
Plastic/uPVC 0.25 t 0.25 2.70 0.7
Sanitaryware 0.4 t 0.4 1.50 0.6 PV panels have a 3 - 4 year
Others Materials 1 t 1 1.00 1.0 energy payback.
TOTAL 260 0 45
COMPARISONS kWh/annum Tonnes CO2
Annual energy use A: Benchmark House Built to 2013 standards 14,000 3.1 20% elec: 80% gas
B: Same House Built to Passivhaus standards 8,000 2.0 30% elec;70% gas
C: Same House Built to 1975 standards 24,000 5.3 10% elec: 90% gas
Family Car Doing 12,000mls/annum 3.5
Family of 4 flying to Spain and back 2.0
16 PV panels saving 1 tonne CO2 per annum 3.6

HOUSEBUILDER’S BIBLE l 13th EDITION 295


Chapter 14

model house in Chapter 2, would table summarises the energy used transportation and in kiln-drying, but
weigh around 260 tonnes, the vast in constructing the model house it’s also partly explained by the carbon
majority of which will have been and it is based on the following present in the timber itself. Many
produced within 200 miles of the figures, taken from Craig Jones’s ICE sources regard this as sequestered
house. Timber (6 tonnes) is the (Inventory or Carbon & Energy) or captured carbon and go as far as
only significant import by weight, project. claiming that timber as a product is
although copper (used extensively in Natural materials take the least therefore carbon positive. ICE takes
plumbing and wiring) and kitchen energy to produce. Sand, stone, and a different view and suggests that
appliances are also imported. gravel come into this group: energy it ignores the fact that eventually
Traditional housebuilding remains an used in production is typically under this carbon will be released into the
overwhelmingly British business. It is 100kWh/tonne. atmosphere. Furthermore, they take
low-tech and uses a lot of very bulky Cement is a relatively high energy a view that on a global scale timber is
materials that are costly to transport. consumer but it is never used on its still being used faster than its being
Even where foreign companies own. Cement-based products like replaced, so that it’s just plain wrong
achieve market penetration in Britain, concrete and render are surprisingly to count it as a renewable material.
production is usually UK based. low on energy use because they have You can see that this embodied
As a rule, Britain runs a trade a high proportion of natural sand energy stuff is not straightforward.
deficit in building materials. We are or stone mixed in with the cement. Not straightforward at all.
net exporters of steel, wallpapers, Concrete products consume around Timber products like chipboard,
paints, sanitaryware and even a few 300 – 500 kWh/tonne. OSB and plywood score even worse
bricks (mostly to Japan), whilst In contrast, clay-baked products than sawn timber. However, bear
timber accounts for around 90% of like bricks and clay roof tiles in mind that timber is relatively
our net imports, with heating and use around three to five times as lightweight so a tonne goes a long
plumbing gear being the only other much energy in production, 1500– way.
significant contributor on this side of 2000kWh/tonne. They have to be Other typical scores include:
the account. Take away timber from fired at very high temperatures and n Plasterboard, around 800kWh/
the equation and everything else this is the main reasons they are more tonne
pretty much balances out. expensive than concrete imitations. n Glass: uses 5,000 kWh/tonne
Aerated concrete blocks (i.e. n Steel: uses around 7,000 kWh/
EMBODIED ENERGY Celcon, Thermalite) use much more tonne
Energy use involved in building energy to produce than standard n Copper, brass, zinc: use between
any house can be divided into three concrete products, between two and 10,000 and 15,000kWh/tonne
areas: material production, transport three times as much. But because n Aluminium: uses 40,000 kWh/
and construction. Broadly speaking, they are pumped full of air, they are tonne
the less a material is processed, the much lighter and so a tonne of these n Plastic (including uPVC): uses
less energy it takes to produce, and blocks goes a lot further – two to 20,000 kWh/tonne – but a tonne
the less distance a material travels three times further, neatly cancelling goes a long way.
the less energy is used in getting it out the difference in energy A word about these figures. I
there. On-site construction energy consumed in manufacture. have used the kWh/tonne figures
use is remarkably low, unless heating Timber is an interesting case. The unchanged since the first edition
and lighting are employed, and ICE project reckons on a figure of of the book back in 1995. In this
even this is unlikely to make a huge around 2000kWh/tonne. Part of this edition, I have, in addition, converted
difference. The Construction Audit is explained by the energy costs in the kWhs to tonnes CO2 released,

296 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

which is arguably the whole point overall national carbon emissions. n Logging often has more in
of this embodied energy exercise. Bear in mind, finally, that when common with mineral extraction
However, the conversion rate is also a we hear talk about our housing than agriculture; even so-called
matter of guesswork as we really have stock producing 30% of our national sustainable sources are often
little idea just how the goods were CO2 emissions, it’s not actually our permanently damaged after the virgin
actually made. I have assumed that all housing stock but the people who live crop is removed to be replaced by
the fired products (i.e. cement, bricks, in our housing stock. Left to its own monotonous, species-thin plantations.
glass, steel) will have been cooked devices – i.e. empty – our housing n Almost all structural timber has to
with gas. It’s probably safe to assume stock doesn’t produce anything. be imported into Britain, making it
they didn’t use a microwave. My big the one major building component
point is, however, all these figures ENVIRONMENTAL AUDIT not to be sourced in the UK.
should be treated with caution. EXTRACTION OF AGGREGATES
Although this is The Housebuilder’s Around 90% by weight of the model TROPICAL HARDWOODS
Bible, they are not gospel! house is composed of sands and The problem with using tropical
gravels and clays, much of it bound hardwoods is to do with the way
COMPARISONS together with cement. With 180,000 in which they are harvested (or
The table breaks down the embodied new houses being built in the UK plundered) with acres of virgin
energy that went into the model each year, something like three cubic rainforest being destroyed often
house, which I calculate at around miles of materials are being extracted to fell just one particularly nice
180,000 kWh, equivalent to 36 annually to meet this demand. mahogany tree. By and large this
tonnes of CO2. This sounds like a That’s an awful lot of holes in land is then cleared and used for
lot but let’s put the figure in context. the ground and it’s one area where rather poor cattle grazing. This sort
36 tonnes of CO2 equates to around new house building is particularly of wanton destruction is going on
ten years motoring in a family car, greedy. Quarries pose no long-term all over the tropics and, in truth,
or flying the family to Australia and health risks and, arguably, the scars is as much to do with burgeoning
back three times. of quarrying are actually healed population growth as it is with
More pertinently, the UK releases remarkably quickly. However, that extracting hardwoods, but there is no
around 10 tonnes of CO2 per head doesn’t make quarries attractive to doubt that the hardwood trade plays
per annum, and the model house, nearby residents and new quarrying a significant part.
with three residents, will be expected proposals are always hotly disputed. However, the environmental
to release about four tonnes. In it’s problems resulting from using these
older, pre-insulated state, this four TIMBER hardwoods in new housebuilding
tonnes would be as much as 15 The weight of timber used to should not be exaggerated: their
tonnes so a new house is saving a construct houses is minute in use is rare precisely because of their
lot of CO2 compared to the older comparison with masonry/concrete expense. Brazilian mahogany is
housing stock. products. The model house uses specified as standard as a cill detail
Were it to be a replacement about 12m3 (6 tonnes) of wood and on timber door frames but otherwise
dwelling, it would claw back the 36 wood-based products. Were it a you have to go looking for materials –
tonnes of CO2 released by building it timber-frame build, this figure would chiefly joinery – made out of tropical
within four years. But of course, it’s probably double. On the face of it, hardwoods. Another area where
not a replacement dwelling so even building with timber would seem to you may stumble across them is as
though it is relatively energy efficient, be very desirable but there are a few constituents of better-grade plywoods
its very existence is still adding to the snags: (Far Eastern) and blockboards, but

HOUSEBUILDER’S BIBLE l 13th EDITION 297


Chapter 14

these are more commonly used for carried out on old houses, but a if the design detailing is good then
shelving than construction; MDF can great deal of new timber gets pre- the timber does not need preserving,
be used as a cheaper substitute. treated with either water-based but preservation is now an industry
tanalith or solvent-based protim. standard. Note that timber frame kit
HEALTH RISKS The tanalising treatments used to houses tend to come with pre-treated
FORMALDEHYDE be based on the copper-chrome- timber specified everywhere, whether
This glue is used to bind timber arsenic compounds (CCAs) whilst it’s actually needed or not.
panel products, chiefly chipboards, the spirit-based systems use a
MDF and plywoods. Some people cocktail of chemical nasties such as ASBESTOS
are known to react badly to the fumes lindane, pentachlorophenol (PCPs) Asbestos was widely used in the UK
that are released very slowly over a and tri-butyl-tin-oxide (TBTOs). building industry through most of
period of months after manufacture, Neither is particularly pleasant and the last century. It was only during
a process known as off-gassing. the tanaliths have been reformulated the 1980s that it started to become
However, adverse reactions are rare to be less toxic to us. They serve a blacklisted and it was still being used,
and exact causes are difficult to dual purpose: one is to reduce risk of mixed with cement, through till 1999.
pinpoint. Almost all volatile organic fungal infestations such as dry rot, The danger from asbestos relates to
compounds (VOCs) have come under the other is to reduce risk of insect breathing in the dust. In its solid
suspicion – including carpets and attack such as woodworm and death format, it doesn’t represent a threat
clothes – and it remains a complex watch beetle. The idea is that treated (unless you start bashing it about,
and poorly understood area. You can, timber will taste so foul that insects thus releasing the dust).
of course, build and furnish a house and fungus will steer well clear: the It was used in all kinds of places:
from entirely natural materials but it danger is that these chemicals won’t Artex (which was 2% asbestos until
is an expensive option and it’s still not do us much good either. 1984), asbestos-cement roofing
guaranteed to avoid VOCs. External joinery is pre-treated sheets, inside airing cupboards
as a matter of course and NHBC and around stoves and boilers,
SOLVENTS regulations require that timber in pipe lagging, ironing boards, night
Solvents are used in oil-based paints, exposed walls is treated. There is a storage radiators, fire doors, artificial
stains and varnishes, as well as potential long term hazard, although slates, wall boards. One of the most
adhesives and mastics. Many people this is rather along the lines of the dangerous formats was a fire-proof
actually like the smell of solvents but formaldehyde and VOC threat – i.e. board called Astbestolux, later
long-term exposure to them has been no one can say what it is – but there replaced by an asbestos-free version
linked with brain damage. Occasional is also a more immediate danger called Supalux. There is a lot of
users probably need not be alarmed, to site carpenters who inevitably asbestos about and if you get involved
but be aware that solvents are likely come into physical contact with with demolition or renovation of an
to be far more damaging to young treated timbers. Wearing gloves is old building, you need to know how
children than to adults; if youngsters not really an option for a chippie: to handle the risk.
(and pregnant women) are present then the best precaution is to ensure that There are some fairly exacting
you would do well to consider using the timber is dried properly before requirements in place for commercial
water-based paints and stains indoors. it is worked; sometimes it arrives on enterprises, including builders
site still dripping with the chemical and demolition contractors. Every
WOOD PRESERVATIVES preservatives, having just come out of commercial building is now meant to
One normally associates timber the vacuum tank. have an Asbestos Register detailing if
treatment with remedial work Some commentators maintain that and where asbestos is located. But the

298 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

situation with private householders is GLASS FIBRE one that deals with energy efficiency
still largely unregulated, which means Glass fibre insulation, together with and Part L is now a complex beast
that if you have asbestos in your the closely related mineral wool, are which has been through many
house you can more or less dispose unpleasantly itchy on skin, and eyes changes. Part L used to have a table
of it as you wish. Except you can’t like it even less. Thought by some to in it that told you what U values you
just take it to any old tip, but to one be similar to asbestos in effect, others needed to meet, and it was a fairly
designated to take hazardous waste. claim that the fibres are generally simple calculation to get from that to
My local council, South Cambs, too large to cause lethal irritation. a particular depth of insulation. No
offers sealable sacks to householders Whoever proves to be correct, it more.
in which to place their own asbestos makes sense not to be macho about In its sixth iteration, the 2006
remains and there is one tip in the it. Wear gloves and a mask when version, it moved everything across
county you can take it all to, for insulating. Or use sheep’s wool, if you to a whole house heat calculation
which there is no additional charge. can afford it. approach and asked for the sum of
I guess they have to consider the the heat loss for the whole house
alternative: fly tipping. UPVC to be no more than a certain figure,
The use of uPVC has been growing known as the Dwelling Emission
MDF steadily in housebuilding. You will Rate. Technically, this is a superior
The problems related to formaldehyde find it in plastic guttering and method of going about things
have already been touched on and drainage pipes, in electric cable because it allows you to trade off one
are not unique to MDF. However and, of course, uPVC windows and poorly performing element against
MDF is the board that gets worked doors. However there is a vociferous a better one somewhere else in the
most and it tends to produce the campaign (led in this country by design. But from the point of view of
finest dust which sails through the Greenpeace) against the use of simple comprehension, it is a disaster
average dust mask as if it’s not there. uPVC, principally on the grounds because no one really knows how to
This combination is reckoned (by that its production is a dirty, polluting meet the regs anymore, and they have
some) to make MDF a hazard on business leading to the release of to hire expensive consultants to work
a par with asbestos and moves are dioxins and the dumping of chlorine. it out.
afoot to produce a similar board made What is not clear is whether uPVC In 2010, Part L included for the
with safer resins. Passive consumers manufacture is any worse than the first time a Fabric Energy Efficiency
of MDF products are unlikely to be rest of the chemicals/plastics industry. Standard (or FEES) as an approach
at risk but you should look out if you to meeting the regs. This is very
work with a lot of MDF dust. similar to miles per litre or gallon on
a car and for the first time gives some
CEMENT THE ENERGY indication of how much fuel a home
Human skin does not react well EFFICIENCY REGS is likely to burn. The idea was that
with wet cement and concrete mixes; The building regulations regarding a very exacting standard would be
there is no instant sign that burning energy efficiency in the home have imposed by the time the 2016 version
is taking place and many people grown progressively more complex of Part L came into effect.
assume that it is therefore harmless. over the years. In England & Wales 2016 was critical because this was
It’s not; prolonged exposure will cause building regs are broken up into Parts the point when we were meant to be
very nasty burns. Bear in mind, that that are lettered from A through to building nothing but zero-carbon
much the same thing happens with R (with the odd confusing letter like homes. But since the zero-carbon
lime as well. I and O missed out). Part L is the house was first mentioned back in

HOUSEBUILDER’S BIBLE l 13th EDITION 299


Chapter 14

2006, the exact definition of what it build is 6% more energy efficient better is difficult to tell. Gone are the
meant was the subject to hot debate. than the version you would have built days when we could safely say ‘stuff
The Labour government flunked before 2013. It leaves it up to you 80mm on mineral wool in the wall
it and left office in 2010 without how to do that, but your design has cavity and you’ll be fine’. But when
ever having resolved this issue. The to be measured against a document all is said and done, there will end up
Coalition never really got to grips known as SAP (Standard Assessment being standard solutions – probably
with it and for five years it stayed on Procedure) which indicated the likely about 150mm of mineral wool
the back burner. But when the Tories energy loss from all manner of details. insulation in the walls.
were unexpectedly re-elected in 2015 Once upon a time, you could go L1B is a bit different. As it deals
without the LibDems to keep them through this exercise with a pencil, with how you insulate an existing
in check, they dropped the zero- filling in values into boxes, but structure, you can’t really go around
carbon proposals like a hot brick. now it’s all done by spreadsheet. doing whole house heat loss calcs.
Out went many of the renewable Every aspect of the build, from the So it’s rather more like the older
energy subsidies, the Code for shape and dimensions, through the versions of Part L in this respect. In
Sustainable Homes (of which the orientation and the shading, to the fact, lurking inside Part L1B is the
zero carbon home target was the way its actually built and heated, table that tells you what U values you
clowning glory) and any aim to gets fed into the spreadsheet, and should be using, the one that is so
further tighten the energy efficiency the answer has to be below ‘x’ to get annoyingly hidden from view in Part
regs. Part L was last tightened in a pass. If your answer doesn’t meet L1A. It goes like this:
2013 and that looks like it will be the target, then you have to go back n Walls – U value 0.18
where it will stay, especially as Brexit and redesign the house until it does. n Roofs – 0.13
now looms large on the horizon. Not You get penalised if you plan to n Floors – 0.13
that Part L had an awful lot to do burn anything other than mains gas n Windows – 1.4
with Europe (building regs are still or biomass, and therefore have to n Solid doors – 1.0
steadfastly national), but I suspect make the structure even more energy n Air tightness – 5 air changes per
our government will have its focus on efficient. And there is still a table hour
other matters for the next few years. with limits on your design standards: There was once a move
The real deal, in terms of energy n The roof must have a U value of to introduce consequential
efficiency, is being left to a German 0.2 or less improvements for home extenders,
performance standard known as n The walls must have a U value of so that you would be forced to spend
Passivhaus. More on this later. 0.3 or less additional money on upgrading the
So what’s in Part L, the 2013 n The floor must have a U value energy performance of the rest of
version? It’s split into four sub-parts, of  0.25 or less the house, but this has never been
known as L1A, L1B, L2A and L2B. n Any party wall must have a U value implemented, due to fear of negative
The L1s deal with housing, the L2s of 0.2 or less ‘Daily Mail’ type publicity.
with everything else. The 1s deal n Windows, roof lights and doors
with new builds and the 2s deal must have a U value of 2.0 or less PERFORMANCE METRICS
with renovations and conversions. n Air permeability must be 10 air A word about how these energy
You can download them for free at changes an hour under pressure or better efficiency standards are measured.
the Planning Portal website (Celtic Now these are not the standards. If Back in the old days (before 2006),
territories have their own websites too). you were to build to these levels, you we were used to talking about
So L1A (new homes) basically wouldn’t meet Part L 2013. You have walls with such and such a U value.
requires that any new house you to be better, but exactly how much Generally, the lower the U value, the

300 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

more energy efficient the house was moral value which you either have or Our best insulators, things like
likely to be, as the way to lower the U haven’t got; it’s actually a scientifically polyurethane foams, have a lambda
value is to stuff insulation everywhere. derived measurement and knowing value of 0.025watts whilst a poor
But whereas U values can be a your U values will help you make insulator like granite has a value
good indicator of how individual a whole lot more sense of your of 2.9watts. From which you can
elements, like walls, behave, they don’t decisions about how to build and heat deduce that polyurethane is around
tell you an awful lot about whether your house. 100 times better than granite as an
the whole house is energy efficient or A U value is a measurement of insulator or, put another way, a 1mm
not. So the move is now underway to the heat flow (measured in watts) strip of polyurethane would keep you
describe the energy efficiency levels through a square metre (m2) of a as warm as a 100mm wide granite
in terms of how many kilowatt hours building element for every 1°C block.
a year (expressed as kWh/m2/annum) temperature difference between the The final U value of a material is
it takes to keep a house warm and inside and the outside. That reads like found by dividing the lambda value
comfortable. the horrible sort of definition you had of the material by its actual width
These metrics are known as Fabric to learn for science A-levels, which in metres. Thus 50mm (or 0.05m)
Energy Efficiency Standards or is why you never did one. It’s actually of polyurethane foam (lambda value
FEES. At the moment, it is reckoned got three different bits to it and in 0.025 remember) has a U value of
that the 2013 building regs will come an algebra lesson they’d call them 0.025 ÷ 0.05 = 0.5.
out at around 60kWh/m2/annum: the a, b, and c and make it even more Now that’s all fine and dandy but
PassivHaus standard looks to score unintelligible. However the point that there is a mathematical problem to be
no more than 15kWh/m2/annum. it’s trying to make is dead simple: faced here. A wall is conventionally
some things are better at retaining made up of maybe four or five
heat than others. It’s something different elements. Each one has its
you know instinctively without ever own U value and each contributes
UNDERSTANDING having to ascribe a value to it – after in some way to the insulating
U VALUES all you know just how many clothes capabilities of that wall. In order to
You can’t really get to grips with the you need to wear to feel comfortable. work out the cumulative U value of
concepts behind energy efficiency The U value is just some poor sod’s the wall you need some method of
in buildings without having an attempt at quantifying this fact. combining these values. You can’t
understanding of what a U value is. In fact the U value of just about just add the U values together or
So now is a good place to digress into everything you could ever think subtract them from one another; you
the world of building science and to of using to construct a house has get a nonsensical answer. The trick
try and establish just what a U value been worked out under laboratory is done by switching U values into
might be. conditions. What they do is R values, resistance values. R values
Like most of the other values in establish how quickly heat leaks out are a mirror image of U values – the
our society, U values are declining; of any given material – the boffins higher they go, the more they resist
however, in this case, declining values call this thermal conductivity. The the passage of heat.
are broadly welcomed. You see, a U answer is expressed as a value, To switch between U values and R
value is a measure of heat loss and a known as the lambda value, which is values you always divide the number
material with a low U value loses less in fact the same as the U value for a you are working with into 1. So a U
heat than one with a high U value. one metre thick slab of this material. value of 0.5 is an R value of 2.0 (i.e.
In many ways, that’s all you need to The better the insulator, the lower 1 ÷ 0.5 = 2). And an R value of 4 is
know. However, a U value is not like a the heat leakage rate. the same as a U value of 0.25 (i.e.

HOUSEBUILDER’S BIBLE l 13th EDITION 301


Chapter 14

R Values for Common R Values into U Values and dividing 1 by the result.
Building Materials Element R Value I have used the most regular
TH
ER External Surface Resistance 0.06 thicknesses, but if you are not using
MA
LC DE Brickwork 0.12 one of these, remember that R values
ON PT
DU HI
CT Nm RV 150mm Cavity Insulation 3.66 can be scaled up or down directly
IVI m ALUE
TY 100mm Blockwork 0.30 in proportion to the thickness of
Plaster 0.12 the material so that you can readily
Internal Surface Resistance 0.12 calculate your own. And also bear in
Combined Total of R Values 4.38 mind that in more complex layers,
U value = 1/R value U Value
such as a timber stud wall where
U Value of Wall 0.23
the voids are filled with insulation,
you have to work out the average R
value based on the proportions of the
1 ÷ 4 = 0.25). Unlike U values, you area that are timber and insulation
can add R values together and get a – typically 20% is timber and 80% is
coherent answer. When you’ve added insulation.
all the R values together to give you Eagle-eyed readers will be asking
a cumulative R value figure, you can ‘Where’s the glass?’ Glass is a special
then convert this total back to U case; when it’s sunny, it gains heat.
values. It’s not that difficult. Windows tend to get attributed U
Interestingly, the Americans prefer values depending on the performance
to work everything in R values and of the overall glass and frame combo;
you rarely see them refer to U values. they also get marked up or down
Note, however, that if you get hold of depending on the orientation.
some US building literature and you
think their R values look amazingly GROUND FLOORS
high, it’s not because they only build U values for ground floors are also
eco-cabins but because they use a special case and the process for
imperial measurements. A metric R calculating them is a little different,
value is worth 5.68 imperial ones. R partly because heat has a reluctance
values are arguably a simpler concept to travel in a downwards direction.
than U values – the higher the More importantly, the cold bridging
better – but U values are more useful effect around the edges of the floors is
because you can use them for whole pronounced and so a key calculation
house heat calculations. is concerned not only with the R
values of all the bits of the floor but
COMMENTARY in establishing a ratio of the edge or
The R value table covers most of the perimeter of the floor with the area of
regular building elements that you the floor. You measure the length of
might meet in constructing a new the perimeter walls (heated area only)
house. You can use it to roughly work in metres and divide the result by the
out your own construction’s U values area of the floor (heated area only) in
by adding all the R values together square metres. It makes no difference

302 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

Ground Floor R values some licence. I then compare the this you need to know the volume
building standards. of the heated air space in the house
The 1975 house reflects how we in cubic metres. And you need to
built homes then, with little or no factor in the number of air changes
insulation. As you might suspect, it per hour. This used to be very hit
leaks heat. and miss affair but the last (2013)
The 2013 house is built to the changes to the building regs bring air
standards in place in England and tightness to the fore and require you
Wales at the time of going to press to undertake an airtightness test, even
(2019). though the standard required is not
The Eco House or Passivhaus very exacting.
if your ground floor is suspended or standard is an example of an ultra- If you are building a new home you
ground bearing, timber or concrete. low energy dwelling which requires could probably hazard a guess that
On the model house the calculation very little heating. The principles you would get to around the half air
looks like this: are always the same. Increase the change per hour mark. Multiply the
n Perimeter walls of house are 40m insulation levels to such a degree air changes per hour by the volume
long; ground floor (heated area only) that lightbulbs, appliances and body and you get the volume of new air
is 80m2. Calculation is 40÷80 = 0.50. heat (the so-called incidentals) passing through the house every
This ratio has to be looked up cover the vast bulk of the heat loss hour. Multiply this figure by 0.33
on a table from which the R value for the house, right down to your Watts, the specific heat of air (or
and the U value can be read off - designed-for minimum external the heat required to lift 1m3 of air
remember the U value = 1 ÷ R value. temperature. through 1°C) and you have a specific
Deconstruct the table and you can The calculations work as follows: heat figure for your ventilation
see that the bigger and squarer the n 1. You start with measuring the requirements.
building, the less heat it loses through areas of the different parts of the n 6. You then add all these figures
the ground floor. house fabric - i.e. walls, roof, floors, together to give you a specific heat
joinery. NB The walls and roof figure loss for the whole house. This is
should exclude the area taken up by the amount of heat, in watts, that it
the joinery. takes to lift the entire house through
n 2. You then attribute a U value to 1°C. This is the critical figure in the
each of these areas. calculations, known as the specific
HEAT CALCS AND n 3. You multiply each area by its U heat loss. It’s sort of a sum of all the
ENERGY RATINGS value. The result is the specific heat U values. The lower the specific heat
So if we are required to undertake loss (SHL) for each area. loss, the better insulated the structure
a heat loss calculation by the n 4. You add a bit on to account is.
building regs, let’s look at what for thermal bridging – that is As it’s a measurement in watts, you
this involves. I have run some unanticipated losses through bits of can easily apply a multiplier to it to
simplified heat calculations through the structure which are not quite so find out how much heat you need to
the spreadsheet showing how it’s well insulated as you might hope: for keep the house warm on the coldest
all done. The measurements are instance, through wall ties, lintels, day.
taken for one of my old benchmark junctions, meter boxes. Normally we work to a design
houses but the U values and the n 5. You then work out the specific temperature of -1°C in England
ventilation rates are adjusted with heat loss for the ventilation. To do and Wales and -4°C in Scotland.

HOUSEBUILDER’S BIBLE l 13th EDITION 303


Chapter 14

ENERGY RATINGS
Energy ratings take the heat loss
calcs one stage further and attempt
to speculate about how much energy
you will actually burn in your home
each year. A full-blown energy
rating on a house is a complex beast
involving many different interlinked
calculations. The standard one used by
the powers that be is the SAP Rating.
Its full title is the Government’s
Standard Assessment Procedure
for Energy Rating Dwellings, and
it’s forever being tweaked here and
there as new products come on
to the market. From these figures
it’s possible to make a stab at your
probable energy usage per annum
expressed in units of energy, financial
cost and CO2 emissions.
It’s very easy to pull holes in energy
ratings, if you want to. Much of it is
incredibly detailed to an altogether
anal degree. Yet other bits use broad-
brush assumptions that can only ever
approximate real energy use. For
instance, hot water use is estimated
to rise in proportion to the house
floor area. Anyone can see that it’s
actually more likely to be affected
by the number of people living in
the house but a dumb spreadsheet
Although you are under no obligation temperature of around 18°C, maybe can’t speculate about that, can it? So
to stick to them, the industry 19°C if you’re a bit of a wuss. In in order to be able to compare one
standards for desired temperature in order to keep our homes say 18°C house with another, floor area is used
each room are as follows: warmer than the minimum design a lot. Yet energy ratings are a useful
n Living rooms/kitchen 21°C temperatures you would multiply the exercise if only to help us understand
n Bedrooms 18°C SHL by 19°C in England & Wales just how houses work and how they
n Hall/stairs 16°C and 22°C in Scotland. The results do and do not burn energy.
n Bathrooms 22°C are always surprisingly small. Try Rather than go through the SAP
To make the calculations a bit and persuade your plumber that you calculations step-by-step, I have
simpler, you can even out all these only need a 5kW boiler in your five built a very dumbed down version
temperatures to get an average bedroom house! in the table ‘Model House: Energy

304 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

Ratings’ which shows the basics.


The big variables are the Specific
Heat Loss (worked out for three
different standards in the other
table), the fuel used and the boiler
efficiencies. Common sense really.
Here are a few notes on the
table to help make sense of it.
n A: Specific Heat Loss (SHL).
This is calculated in the table
‘Model House: Specific Heat
Loss.’ It is the basis of the energy
rating. Normally it’s expressed
in watts but here I’ve divided
the watts by 1,000 to express it
kilowatts because it makes better
sense later on in the table.
n B: Incidentals. This is the heat
that you pump inadvertently
into the house by way of lights,
appliances, solar gains from
sunshine, all those standby lights
on computers and TVs and, of
course, body heat. A person at
rest gives off just over 100 Watts,
whilst moderate physical exercise
gives off around 400 Watts. In all,
incidentals probably contribute
between 2,000W (2kW) and
3,000W (3kW) to a typical
household. Like much in the
world of energy rating, incidentals
are very variable and so a vague
approximate figure is used. Gains
from the residents themselves are
ignored.
n C: Incidentals divided by the
20°C warmer than the outside, then Specific Heat Loss. Why? The
you will require twenty times more SHL represents the rate of heat
heat than the SHL to achieve this. loss from the house for every 1°C
But if your incidentals are already temperature difference between
providing some of this heat, then you inside and outside. If you wish
need to subtract this amount from to keep the inside of the house

HOUSEBUILDER’S BIBLE l 13th EDITION 305


Chapter 14

degree days total. In Britain it varies SHL. In the extremely well insulated
from 1,800 DD at Land’s End to Eco House, you need just over
3,000 at John O’Groats. The figure 1kW of incidental heat to cover the
of 2,500 DD is taken here, just above anticipated heating requirements for
average. It’s the figure embedded the whole house whereas in the 1975
within the SAP calculations – a sort house the same amount of incidental
of national average. heat is (I can’t resist it) virtually
n E: Reduction due to incidentals. incidental.
Now here’s a tweak and a half. Read Back to the task in hand.
this one carefully. If your incidentals n H: Domestic Hot Water (DHW)
can be expressed in degrees of heating requirements. As already discussed,
(see above), then it follows that they this part of the calculation is largely
can be subtracted from the number guesswork. But 4,000kWh is enough
of degree days you need to cover. In for 180lt of hot water every day of
effect, they lower your 15°C base the year, about 2.5 bath fulls. That’s
temperature. Each degree less heat probably what four people would use.
required because of your incidentals I have given the Eco House some
amounts to roughly 200 degree credit (2,000 kWh) for having half
days less over a year - in fact the their hot water being supplied by
relationship isn’t directly proportional solar panels.
but this is a dumbed-down table – n I: Combine space heating and
what did you expect? DHW and you have an estimate of
n G: Having done this calculation, annual energy demand (in kWh).
you can then have a healthy stab n J and K: Boiler efficiency. Now
your overall heating requirement. So at how much heat you will actually boilers are not a 100% efficient. They
this figure tells you how much of your need in your home to keep it warm have been getting more efficient and
heating load will be accounted for throughout the heating season. You the latest, state of the art, condensing
by your incidentals. And the answer take the adjusted degree days, you boilers have broken through the 90%
can be expressed in degrees Celsius multiply by 24 because there are efficiency barrier, but you still need
because each SHL unit is 1°C. Neat, 24 hours in every day and then you to factor the boiler efficiency into
isn’t it? multiply this by your SHL figure. the calculations. I have included a
n D: Degree days, which are an Voila. You have an answer in kilowatt separate calculation for electric heat
indicator of how much heat we need hours (kWh) used per annum. pumps which I have assumed work at
to get us through a winter heating What is fascinating here is to 300% efficiency, which is what a CoP
season. Every day it goes below an momentarily reflect on the role of 3.0 look like when expressed as an
agreed temperature (15°C) counts of incidental heating in all this. efficiency ratio.
towards the annual total, and the Although the actual amount n L and M: Fuel costs. Now we have
lower it gets, the more it counts. For of incidental heat doesn’t alter a figure for consumption, we can
instance, if it gets down to zero, then a great deal between the three calculate a fuel cost.
that day would clock up a degree different houses I have examined, n N to Q: Carbon emissions. Each
day score of 15, because it was 15°C the reduction in degree days rises fuel has a carbon emission factor.
below the trigger. Total it up for the dramatically as you increase the From this you can readily work out
whole year and you get an annual insulation levels, thereby reducing the the total CO2 release for each house

306 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

type, by fuel type. And divide by the well able to satisfy the insulation the depths of winter. Trying to
floor area to get a kg of CO2/m2, standards of 2013. With the timber impose Scandinavian levels of air
which is how the Dwelling Emission frame industry now switching over tightness on us is seen as somehow
Rate (DER) is worked out. The from 90mm to 140mm wall studs, alien and just possibly unhealthy.
SAP worksheets have used several this is only about 25mm more than But from an energy saving point of
targets over the years. Originally, a timber frame wall with a brick view, airtightness is critical because
the final sum was known as a SAP facing skin. Timber frame can get an extra 50mm of insulation in the
rating and this was based on likely external wall thicknesses down below walls and the roof is utterly pointless
fuel costs. Then came the Carbon 250mm overall but only by switching if the occupants subsequently leave
Index in 2002, which has now been to a lightweight cladding such as the windows open. There is little
abandoned: just as well because no weatherboarding or render. the legislators can do about this but
one understood it. Now it’s down But this is an argument about they can insist that buildings are
to CO2 emissions per m2 of internal wall thicknesses, not energy constructed in such a way that they
floor area, similar to the Passivhaus efficiency. Insulation levels are don’t inadvertently leak. To this end,
standard although the current regs are critically important when it comes in 2006 the energy efficiency regs
of course nothing like so exacting. to determining energy efficiency but introduced an airtightness test for
they are not the be all and end all. As new houses. The required standard
LIGHTWEIGHT V HEAVYWEIGHT our insulation standards have risen is not very onerous: in fact, it would
CONSTRUCTION over the years, it has become apparent have to be a very poorly built house
Is timber frame more energy efficient that other factors play a crucial role to fail the test, but it was a marker for
than masonry build? It’s a selfbuild as well. And because insulation the future, and it may be made more
perennial, this one, and there really thickness is subject to the laws of stringent as time moves on.
isn’t a simple answer to it. diminishing returns, these other So how do the two building
The one big plus that timber frame factors have become more significant systems compare on air tightness?
has going for it is that it is largely as we have now moved to a world Generally speaking, it’s not the
hollow and this provides lots of where the building regulations walling systems that are the issue
space in which to stuff insulation. In demand that all new buildings are with air tightness. Rather, it’s the
contrast, masonry is invariably solid, well insulated, at least by historical insertions that puncture them and
which means that the insulation has standards. the junctions that enclose them.
to be placed either inside, outside or, We are talking about ill-fitting
more commonly, within the cavity AIR TIGHTNESS windows, doors, meter boxes and
between the two skins. Whilst this One factor that has leapt to the loft hatches and poorly detailed
isn’t necessarily a problem, it means forefront is air tightness. The British eaves. Paradoxically, one of the most
that masonry walls tend to be a little have never been overly concerned significant causes of air leakage is
thicker overall, and this is generally about air tightness. In Canada and the connection between timber and
regarded as a bad thing because thick Sweden this issue is taken very masonry elements. Not only do
walls eat floorspace. seriously but then they regularly get they have differing rates of thermal
However, even this point is winter temperatures of minus 25°C expansion but timber tends to shrink
contentious because it is possible, and consequently unwanted drafts are significantly as it dries out to the
by judicious substitution of one a matter of life and death. In contrast, background moisture levels in the
insulating material for another, we have grown up in a culture where building as a whole. This means
to build brick and block walls it remains commonplace to sleep that gaps can appear around joists
no thicker than 375mm that are with the windows open, throughout built into masonry walls and at

HOUSEBUILDER’S BIBLE l 13th EDITION 307


Chapter 14

This is the blower whether it is a high or low thermal


door test in
mass. Once the heavy masonry house
operation. The front
door is removed has achieved equilibrium, which may
and this temporary involve storing as much as 500kWh
fan door is set in its of heat within the structure, it motors
place. The house along all winter, evening out the
is then pressurised warm and cold periods. But high
and you can then
thermal mass houses have a trick
measure how much
air is required to up their sleeve here in that, if the
meet the pressure interrelationship of the glazing and
standard. It’s one of the high thermal mass elements is
the very few tests correct, they can absorb significant
you can carry out amounts of free radiant heat from the
on an as built house
sun during the daytime. This is the
to see if it performs
as designed. effect known as passive solar heating.
How much heat can be absorbed
this way? In some climates where
there is an abundance of clear
sunny days in winter, passive solar
design can provide the bulk of a
house’s heating load. Unfortunately,
the British Isles rarely enjoy such
weather and so passive solar heating
is realistically only ever going to
contribute a small proportion of what
a lot of heat – typically around is required to keep warm.
wallplate level under roofs. A house 60kWh/m3 – whilst lightweight But it’s a plus for the masonry
built entirely of timber or entirely of materials, like timber frame walls house builders. And in the see-saw
masonry wouldn’t suffer air leakage covered in plasterboard, store as little arguments that rage over which
in this way but such houses are as 2kWh/m3. Masonry homes have system is better, the masonry boys are
extremely rare: in reality our timber high thermal mass and because of quick to crow about this benefit.
frame homes tend to use a lot of this they take much more energy But there is a downside to
masonry and our masonry homes use to warm up from cold. But having high thermal mass homes as well,
a lot of timber. warmed up, they have become like which they are much less likely to
giant night storage heaters and will acknowledge. This concerns the
THERMAL MASS keep warm much longer than a lifestyles of the occupants or, to put
The other energy saving issue lightweight house because of all this it another way, how a house is driven.
bubbling away in the background extra heat stored within the walls and High thermal mass homes work
surrounds the concept of thermal floors. best when the building is constantly
mass. Put quite simply, thermal mass Now if a house is kept at a constant occupied, as there is always someone
is the capacity of a material to store background temperature throughout there to enjoy the heat radiating from
heat. Heavy materials, like concrete, the winter, it shouldn’t really make the walls and floors. But a typical
brick and cement screeds, will store any difference to energy consumption DINKY (Double Income No Kids)

308 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

household may spend less than a


third of their waking hours in their
home and for them all this thermal
mass is largely wasted, keeping an
empty house warm. For them, the
extra heat required to get the house
warm in the evenings will more than
cancel out any free heat gained from
passive solar. And if you go away for
a week’s winter break and turn the
heating off, the stored heat in the
walls and floors will leak away and
you will have to replace all 500kWh
on your return. The heavier the house,
the longer it takes to return to a
comfortable temperature.
You can build a low energy
structure using either masonry or
framed building methods. And I One of the advantages of selfbuilding from new is that you can build-in items
don’t think one system is inherently like solar PV. Redland PV tiles are integrated within the Stonewold roof cover, a
much better look than bolted-on roof panels.
more energy efficient than the other.
If anything, heavy structures have an
edge when the buildings are occupied technologies themselves, and the Heat Incentive. Now the Feed-in-
during the daytime. Lightweight decision about what if anything to Tariff has been axed (as of April
structures will do slightly better when specify on your build is now largely 2019) and, at time of writing, it’s not
occupation is intermittent. And the down to how much money is on clear whether it will be replaced by
average house? Probably somewhere offer. Which I don’t like. For one anything at all. On the other hand,
between the two! thing, I end up having to write about the Renewable Heat Incentive is still
the subsidies in more detail that going strong. Who knows how long
the technology, and the capricious that will last. It’s been a sorry story.
government has, in any event, a nasty
RENEWABLE habit of changing the subsidies at
TECHNOLOGIES a whim, so that anything I write is RENEWABLE HEAT INCENTIVE
I can’t have a chapter on green issues almost bound to be out of date before The Renewable Heat Incentive (the
without mentioning renewable this edition leaves the shelves. RHI) sets out to do make no and
energy. But renewable energy isn’t The Seventh edition had the Clear low-carbon heating more attractive.
central to the issue of green building, Skies grants. This was replaced in the The technologies subsidised are
despite what you might think, so I Eighth edition by the Low Carbon biomass heating, heat pumps and
am not going to labour the topic too Buildings Programme grants (with solar hot water. Arguably, it’s of
much. different versions for Scotland and more interest to selfbuilders because
Besides, it’s a topic which has N Ireland). That went as well. The it concerns heating systems, which
become as much about harvesting Ninth edition had to take on board aren’t optional. Without subsidy,
subsidies as it has about the the Feed-In Tariff and the Renewable these heating methods are at best

HOUSEBUILDER’S BIBLE l 13th EDITION 309


Chapter 14

The Solar PV Home


Power rating Annual output
Power rating of 1 PV Panel 280w 270 kWh
Power rating of 16 PV Panels 4500w 4320 kWh

ANNUAL electrcity demand for efficient appliances Demand No of panels required


LED lighting scheme (80 lamps for 1500hrs) 1000kWh 4
Dishwasher 500kWh 2
Washing Machine 400kWh 2
Tumble Dryer 250kWh 2
Electric Cooking 1200kWh 5
TVs/computers/chargers 500kWh 2
Hot water demand for two people 3000kWh 12
Space heating demand for Passivhaus via GS Heat Pump 1000kWh 4
Overall electricity demand for eco home 10,000kWh 33

Full charge on an expensive Tesla 100kWh does 335ml


Annual demand for a Tesla (12,000mls) 35 full charges 3500kWh 14
Full charge on a Renault Zoe 40kWh does 300mls
Annual demand for a Renault Zoe (12,000mls) 40 full charges 1600kWh 6

People get very excited about the possibilities of But how much solar PV do you need to run a house?
producing enough onsite electricity to power their That all depends on the house and what you might
homes. It’s a sexy idea, in a way much of the rest of want from it. The accompanying table gives you a
green building isn’t. But is it wishful thinking? How good idea of what common appliances use. Some
much power can we produce? How can we store it? of them work well with PV as they can be used in the
And how much do we need? daytime, but most demand comes at night when PV
isn’t available and you would have to use a battery
As far as production is concerned, there is really back-up. Here it starts to get murky.
only one game in town now and that is solar
photovoltaics, or PV. Other contenders such as The Tesla Powerwall is the most advanced domestic
windpower and combined heat and power have battery. It costs over £5,000 and lasts maybe ten
fallen by the wayside in the domestic arena. PV years, so it’s more expensive than a standard-sized
achieved an enormous boost when it attracted PV system. Fully charged it holds 13kWh: that sort
government subsidy (the Feed in Tariff) during the of matches the anticipated daily output from a 16-20
2010s, but that is now a thing of the past. panel array. You could run the lights and the appliances
in a house on this, but it wouldn’t be enough to run a
But such has been the global success of PV that heat pump for heat and hot water and neither would it
the installation costs of a rooftop system have fallen be enough to charge a small electric car, like a Leaf or a
to such an extent that it’s now not far from being Zoe. For that you would need far more panels than you
competitive with other roof covers, so new builders could fit on your roof plus another couple of batteries.
can consider it as an alternative to zinc or Welsh
slate. A roof-integrated 16 panel, 4.5kW solar array In short, PV without subsidy is marginally attractive to
would cover 24m2 of roof and would hopefully cost homeowners, but the typical rooftop set-up will only
around £5,000-£6,000. If you can get a quote for ever deliver around a quarter of your energy demands
integrated rooftop PV for under £200/m2 whilst you in the UK.
are recovering a roof, or building from scratch, then
it’s looking attractive in its own right.

310 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

marginal choices; none of them have The Solar iBoost


a sensible payback against mains is a diverter. It
gas condensing boilers, but they all switches any
unwanted electrical
start to look more interesting when current from your
compared to the more expensive oil- PV panels away
boiler systems that you would have from the grid and
to chose if you live off the mains gas into your domestic
grid. hot water tank. It
The technologies covered by the has the potential to
make solar thermal
RHI are all dealt with in Chapter 8, a redundant
Plumbing & Heating, and so I won’t technology as it
touch on them any further in this does the same
section. job (heats hot
water) without any
additional rooftop
PHOTOVOLTAICS OR PV
panels.
PV arrays convert sunlight into
electricity. They normally sit on the
roof, although they can be mounted to the falling cost of the PV panels The domestic wind turbine is the
in arrays on the ground or built into themselves. The panels themselves junior relation, which sits in your
wall claddings. (conventionally around 1.0m x 1.6m) garden or, more likely, your paddock.
A PV cell consists of two layers of have been falling in cost and are It is connected to a generator which
a semi-conductor, invariably silicon, now available for under £250 each. produces direct electricity but at a
and when exposed to sunlight, Although the panels themselves are price now more expensive than solar
electrons start flowing between the the largest cost, there are not the only PV. Like PV cells, domestic wind
layers creating a small electrical ones and a fully installed system still turbines have an anticipated lifespan
current. The current is direct and costs about £4,000 and up, depending of around 20 years.
has to be converted to AC for on the ease of the work and the size They may be of interest to people
normal domestic use, which includes of the installation. A single panel living in remote areas where the wind
exporting to the grid. This is done is usually rated at around 250watts blows and neighbour are few, but the
with a bit of kit called an inverter. — that’s the theoretical maximum normal domestic market has moved
The reliability of PV cells is good as power it can produce on a cold, sunny on.
there are no moving parts. However day — and the annual output from
it is reckoned that the potential to one of these is around 200-300kWh, COMBINED HEAT & POWER
produce electricity will decline over depending partly on where you live At a community level, combined heat
time and cautious observers reckon — southern Britain gets rather more and power plants (CHP)make sense.
that they may need replacing after sunshine than Scotland. In Denmark, spiritual home of CHP,
just 20 years if they are to continue to around 50% of all homes have a
perform adequately. piped hot water supply from a district
The PV market was expanding grid, and small grid systems are now
quite rapidly thanks in good part WIND TURBINES being built into innovative estates in
to the success of the Feed in Tariff. We are all familiar with the huge the UK.
Now that that’s gone, the hopes are windfarms, which cause so much But at a domestic level? What
that the industry can prosper due controversy around the countryside. you have in effect is a very expensive

HOUSEBUILDER’S BIBLE l 13th EDITION 311


Chapter 14

However, every new home ends up


being stuffed with appliances so,
if you have the money, it is worth
buying kit that is at the efficient end
of the spectrum.
Problem is that all modern kits
claims to be energy-efficient and
many of them also claim to save
water as well. For most selfbuilders,
these issues are of minor issues,
ranked behind price and usability.
Who buys a TV based on its energy
performance? How do you even find
out what the energy performance is?
Being told it has an A rating isn’t
even that helpful as over the years
everything has migrated to A ratings
and the ratings agencies have moved
onto A+ and A++ and even A+++.
Take tumble dryers. Here’s a bit of
A homemade heating coil rigged kit that a lot of people do without, as
up to a mechanical ventilation heat Victorian times. It’s also very green in all it actually does is dry your clothes
recovery system to boost warm air
supply to a low energy house. MVHR that it’s all powered by gravity. and a washing line or a clothes horse
doesn’t qualify for any grant aid, which However its use in the domestic will do just as well. However, for
paradoxically encourages innovation sphere is limited by the requirements many people a tumble dryer is near
like this. for falling water on site, not essential as they don’t have a garden
something widely seen in many new or any space for a clothes horse. Turns
boiler that produces some electricity estates although it may well suit some out tumble dryers come in different
as well as your satisfying your heating remote off-grid sites. If you have a flavours at different price points.
and hot water demand. British site that’s suitable for hydropower, The cheapest and simplest is the
Gas tried and failed with their there are a number of commercial vented tumble dryer which throws
Whispergen, Baxi tried with their businesses which can build and install the moist air out the back into a
Ecogen, but even with a hefty subsidy plant for you and the costs per peak flexible duct and there out into
the uptake was minimal. Now the kW are reckoned to be as little as the big outdoors. Then comes the
Feed in Tariff has gone, don’t expect £500. Check out www.british-hydro. condensing tumble dryer which
to hear much more from this sector. org. draws out the moisture and drops it
into a tank or down the waste pipes.
HYDROELECTRICITY The heat generated inside the tumble
Water mills, by any other name. dryer stays in the room. At the top of
This is of course another very the range comes a heat-pump tumble
well established technology – APPLIANCES dryer which is the more expensive
hydroelectric damns and electricity Are there even such things as because it has an energy-efficient
generation have been around since green appliances? Just possibly not. heat pump instead of just an electric

312 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

heater. Each machine on the market, Energy use for household appliances
and there are many, comes with a
Mains gas LPG Electricty
product data sheets which allows you Fuel costs in pence per kWh 4.6 6.6 16.0
to look at the energy performance.
rating in Hrs used per kwh used
Thanks to AO (Appliances Online) Appliance watts annum per annum Annual running costs
for the info trawl here: Hobs 2000 200 400 £ 18 £ 26 £ 64
n £169 4kg Indesit vented dryer uses Oven 2000 300 600 £ 28 £ 40 £ 96
330kWh/annum Microwave 2000 100 200 £ 32
n £199 9kg air vented Candy uses Dishwasher 1200 400 480 £ 77
630kWh/annum Washing Machine 1200 350 420 £ 67
n £200 8kg Candy condensing dryer Tumble Dryer 1000 300 300 £ 14 £ 20 £ 48
uses 561kWh/annum Small fridge (120lt) 25 8760 220 £ 35
n £500 9kg Beco heat pump dryer Fridge/freezer 50 8760 440 £ 70
uses around 176kWh/annum Kettle 3000 100 300 £ 48
Whilst you can see that in general Iron 2000 50 100 £ 16
TV 100 1500 150 £ 24
the more you pay, the less energy you
Computers 150 1500 230 £ 37
consume, it is also dependent on the
Stand-by equipment/chargers 10 8760 90 £ 14
drum size and a smaller drum will
Heavy use GLS lightbulb 60 1500 90 £ 14
call for less heat. On the other hand, Heavy use LED lamp 8 1500 10 £2
a tumble dryer with a large drum (i.e. Typical LED lighting scheme 80 lamps 1000 £ 160
9kg) will dry the same load better and
with fewer creases and may thereby
save on your ironing. And guess how
much power an iron uses?
It’s complicated. I wouldn’t blame n Volume charge for sewage disposal.
you if you just tuned out and bought SAVING WATER Properties that dispose of waste
the best you could afford. Nobody Although most UK property is still by other means (usually onsite
wants an energy inefficient tumble charged for water and sewage by a treatment tanks) will have other costs
dryer, but in reality it’s just one of rating system, newly constructed to pay instead of sewage charges –
a number of factors people use to housing in England & Wales see section on Drains, Chapter 6,
decide on what to buy. is invariably metered (not so in ‘Groundworks’.
If price is no object, you can of Scotland and N. Ireland). Living with
course really get into it and spend a metered water supply is a novel METERING: HOW IT WORKS
over £1400 on a Miele heat pump experience for many of us and it Only the water supply is metered. The
tumble dryer which is not only very takes some getting used to. If you are volume of discharge you pour back
energy efficient but is wi-fi connected connecting your drains into the main down the drains is worked out from
so you can control it from your smart drains as well as tapping into the the amounts of water you consume:
phone (really?) and has a steam cycle local water supplies, your bills will be some companies reckon it to be
to reduce creasing, not to mention broken down into four sections: 100%, some 95% and some 90%. If
two fragrance capsules you can set to n Standing charge for water supply yours works on a 95% figure then, if
make your laundry smell just so. You n Volume charge for water supply you were to consume 100m3 of water,
may not be saving the planet, but at n Standing charge for sewage you would be charged for 95m3 of
least you will leave it smelling nice. disposal sewage.

HOUSEBUILDER’S BIBLE l 13th EDITION 313


Chapter 14

compared to how much is consumed


largely to keep us and our homes
clean and hygienic. Part of the
justification for higher water prices
is the cost of maintaining drinking
water standards but, on reflection, it
seems extraordinary that we should
go to such trouble to purify our water
supplies in order to pour 97% back
down the drains. In theory, at least,
there is ample scope to use non-
potable water (ie non-drinking), and
ample savings to be made by avoiding
relatively expensive metered supplies.

USE LESS
Before delving into esoteric water-
saving schemes, there are a number
of common sense ways that water
consumption can be reduced without
making you smell:
n Don’t stand under the shower for
ten minutes every day
A four-person household will underestimate a typical user. Heavy n Check out lo-flow shower heads.
typically use and discharge 185m3 users with swimming pools, water 8lts/minute is fine. You really don’t
water/annum (equivalent to 2300 features and garden sprinklers and need upwards of 15lts/min.
baths, that’s just over six baths a day). the like would propel your annual n Fit the smallest WC cisterns
This 185m3 figure is very much an usage way over even these suspect possible – the industry standard is
average and a new house with lots of usage figures. now down to 6lt/ flush, thanks to a
thirsty appliances like dishwashers recent change in the water bylaws,
and power showers, not to mention COMPARISONS but you may be able to source even
children, could easily use 50% more. The charges for average water usage smaller cisterns. Dual flush at 4lt/6lt
When I was living in a house with are larger than the anticipated are widely available
three teenage sons, we used as much heating bills for a new home. n Buy A+ rated appliances. A
as 365m3/annum. The main culprit, Assuming an average of 250m3/ water-efficient washing machine will
I believe, was my teenagers love of annum is consumed by our notional use around half as much as an older
power showers lasting ten minutes four-person household, the average model. Same goes for dishwashers
at a time, consuming around 20lt/ bill, including standing charges, will n Don’t run washing machines and
minute, maybe 400lt/day or 150m3/ be over £650/annum. dishwashers unless they are full
annum. I don’t think our family was What immediately stands out n Look to fit water efficient taps to
that unusual and I suspect that the about these figures is how little water basins and kitchen sinks
quoted average figures probably actually passes into our bodies (3%) n Don’t water lawns; water plants in

314 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

the evening to avoid evaporation 0.75m of rainfall per annum (that’s problems you are likely to have with
n Use water butts (although 30 inches) then you might hope construction and maintenance.
attractive ones are hard to find) to collect 75m3 of water. Actually, Rainwater harvesting has become
n Don’t build a swimming pool. rather less, because inevitably a quite trendy in no time at all and a
significant amount gets spilled or surprising number of selfbuilt homes
PART G lost via evaporation. In wetter areas are fitting tanks, filters and pumps so
The building regulations now make to the north and west this figure that they can reuse at least some of
water efficiency mandatory – in could easily double as rainfall levels their free rainfall in a similar fashion.
England the relevant section is Part are so much higher. The potential is Prices quoted are between £2,000 and
G. This requires us to undertake a there; the problem is that rainfall is £4,000: for this you get underground
water calculation when designing not only unpredictable but sporadic storage tanks (either plastic or
the house to show that our overall whereas household usage is basically concrete), filters to take out most of
consumption shouldn’t average more quite constant. You need to build a the leaves and twigs and a pump to
than 125lt/day, a feat achieved largely reservoir capable of holding enough lift the water back up to the house.
through specifying small baths and/or rainwater to supply basic household Most people use it just for flushing
low-flow showers. There is more on needs, which is exactly what your loos, installing a second plumbing
Part G and the water calculator in the own water company does on a much system supplying the cisterns from the
Bathrooms section in Chapter 11. larger scale. Starting your very own storage tanks, but there is no reason
water supply business may be an you can’t supply the bulk of your taps
WATER SAVING appealing prospect for some but it is with rainwater. You can rig it up so
Water-saving schemes are sommat likely to prove expensive to build and that the storage tanks never empty
else. They can be divided into two time-consuming to run. The bigger – the mains water cuts in when the
areas: rainwater collection which your reservoir, the more effective your level falls too low. More sophisticated
replaces water you’d normally buy own supplies will be in replacing arrangements allow rainwater to
through your water meter, and grey your metered supply, but the more be used as drinking water, but this
water collection which recycles some
of the water you have already used. Rainwater harvesting
tanks are usually buried
underground but if
RAINWATER HARVESTING you have space and
Even in dry lowland England don’t mind the slightly
(average rainfall equals 750mm/ agricultural feel, you
annum) a four-bedroom house plus can save money by
detached garage will get around 60- housing them in the
75m3 of rain falling on to it during garden.
the course of a year. That sounds like
a lot but it’s probably only around
what one person consumes in a year,
or enough for a household of four or
five to flush the loos. The calculation
is as follows: take your average annual
rainfall in metres and multiply it by
your catchment area in square metres.
So if you have a 100m2 roof and

HOUSEBUILDER’S BIBLE l 13th EDITION 315


Chapter 14

requires on site treatment which is a infrastructure charges – and that water pollution was something of an
more complex affair. is to sink your own borehole and overstated problem and that when he
Whether it is really worth doing from draw your own water supply up did come across it, it was very often
an economic perspective is debatable. from under the ground. It’s where the house itself that was the cause of
It only makes sense if you have a water most of the water comes from in SE the pollution; he advised not to use
meter, for a start. Even then, a 1,000lt England and in many other areas ground water supplies in conjunction
of water, which is by definition a cubic besides and, whereas your local water with a septic tank. Obvious really.
metre, is currently charged at anywhere company has a monopoly on piped
between 80p and £1.20, depending on supplies, there is nothing to stop you PAYING FOR LEAKS
your water company, so your maximum tapping into the enormous natural Whilst the problem of a dripping
saving is unlikely to be more than about groundwater reservoir directly. That’s tap is well known (and costly
£80 a year. an oversimplification; there is the for metered households), it pails
small matter of installation costs that into insignificance compared
GREY WATER can vary from £2,000 to £20,000, to the potential nightmare of
Grey water is the term given to waste depending on such matters as the an underground leak. You, the
water which is reusable, notably depth of the borehole and the water householder, are responsible for all
the waste from baths, showers and pressure. You will also need a licence water consumption downstream
wash basins. There is potential to from the Environment Agency. from the water meter – which is
recycle this water in the garden and For most people, that makes it an conventionally located outside, close
especially for flushing loos. Because extremely expensive way of going to the plot boundary. Spring a leak
the waste from baths and washing is about getting water and sends them underground between the meter and
much more regular than rainfall, the straight back into the arms of their your internal stop tap and you may
storage facilities do not have to be local water company. know nothing about it until a massive
nearly as large to be effective. A large If you are one of the small number water bill arrives on your doormat
bath-sized tank will be enough to who plan to draw their own water (as much as six months later); if you
flush ten loos and should get refilled supply from under the ground, then are lucky, the water company will let
most days. you will be responsible for your water you off paying the sewage charge, but
As with rainwater harvesting, there quality. That’s not to say that you even so a bad leak might lose as much
has been a flicker of interest in grey won’t have to submit your water for as 20m3 of water a day which would
water recycling and there are now analysis to the local Environmental cost £1,500 by the time you get your
proprietary systems available using Health Inspector: indeed most water bill. Be warned that sloppy
pumps and a small holding tank that councils will be around testing you installation (and loose connections)
can be placed in the loft. The grey every couple of years or so. Simple of metered mains supplies can be very
water has to be treated with cleaning bacteria tests tend to be done in expensive.
agents and passed through a carbon local hospitals and cost around £30;
filter so it’s not for the faint hearted, however tests for pollution are more
especially as the resulting water is not expensive – I was quoted £100 for
always as clear as we have come to a nitrate test. The Environmental WATER TREATMENT
expect. Health Inspector has the power to There are two very distinct processes
condemn your supply but this rarely here. You soften (or condition)
BOREHOLES happens because almost everything water in an attempt to prolong the
There is another way of avoiding can be filtered out – at a cost. My life of your domestic appliances,
water company charges – and local inspector reckoned that ground whereas you filter water in an attempt

316 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

to prolong your own life. Both the hard bits in the water, exchanging sold in conjunction with combination
techniques are surrounded by a veil them for softer sodium bits. The boilers and/or mains pressure hot
of mystery and intrigue which is hard box needs an electrical supply and a water cylinders. You will see them in
to penetrate, and the whole subject is drain-off point. It also needs, ideally, plumber’s merchants – look for names
so rife with claim and counterclaim to be located somewhere close to the like Combimate and Combicare.
that it makes the job of the humble rising main so that it’s relatively easy They work by adding phosphate
commentator akin to negotiating a to plumb in. ‘Under the utility sink’ solution to the incoming water, which
minefield. is an obvious place but, be warned, inhibits scale formation – they don’t
most water softeners require a fair ‘soften’ the water as such but they
SOFTENING bit of space around and above them are reckoned to prolong the life of
If you live in a soft water area (which in order to be got at for maintenance water-heating equipment in hard
includes most of Britain above a and weekly salt refills. You may have water areas.
line drawn between the Humber to adjust your utility worktop to suit. They cost around £80 and they
and the Severn) then this section is The long-term benefits include don’t need power or drainage facilities
one to miss. If in doubt, phone your reduced water heating bills and but the phosphate cartridges need
water company to get figures on local savings on soap powders (combined replacing every year (cost £15 a time).
conditions. unlikely to be worth more than about Again the treated water is not ideal
Even if you live in a hard water £25/annum). for drinking but these conditioners
area there is no need to panic. Evidence that water softeners are normally only fitted to water
Households have been known to increase the lifespan of hot water heating devices.
function quite adequately for years appliances is – careful now –
without so much as a hint of any inconclusive but almost everyone INHIBITORS
water softeners about. However, who has one reckons they do make Unlike the two preceding methods,
many sane people swear by water the water feel softer and the laundry which are chemical treatments,
softeners and insist that they produce appears cleaner. inhibitors act by passing a magnetic
tangible benefits – even if it’s only to In 2005, I installed a water softener, or an electrical charge through
reduce the amount of soap powder never having had one before: I actually the water which – it is claimed –
they use in their washing machines didn’t like the ‘feel’ of the water as prevents the hard bits in the water
much as genuine soft water, but one from sticking to the pipes. They are
TRADITIONAL SOFTENERS place where the chemically softened relatively cheap (£30-£60), easy to
For between £600 and £1,000 you water was really appreciated was in the install and need no maintenance., and
get a big box into which you add salt bathrooms where limescale became they don’t affect the quality of the
– you need around three 25kg bags a thing of the past, making cleaning drinking water. Some need electrical
of salt per person per annum, so this a doddle. If you plan to install glazed power, most operate without. But do
alone will cost you £15 each every shower screens in a hard water area, they work?
year. then you will really appreciate a water You may figure they are so cheap
As these boxes actually chemically softener. that there is nothing to lose in trying
change the water supply, their output and you may well be right. But how
should not be drunk or cooked with. PHOSPHATE CONDITIONERS will you know that your investment
Design your plumbing so that the These are a sort of junior version does the biz? Another thing to ponder
kitchen tap, at least, comes direct of the big water softeners. They are on during those long dark nights.
from the mains. designed to stop hot water appliances In 2018, I was persuaded to fit yet
Softeners work by separating out from scaling up and they are usually another type of device, an Aquabion,

HOUSEBUILDER’S BIBLE l 13th EDITION 317


Chapter 14

which though small in size was working in this field is Culligans which is more than probably why it
also rather expensive. I don’t begin who supply the whole range of water got jettisoned once the Tories had
to understand how it works, but it treatment gizmos from softeners and themselves jettisoned the troublesome
appears to do something. It doesn’t scale reducers to filters and ultra- LibDems in 2015.
exactly prevent limescale but it does violet disinfection units. The Code was split into six levels,
make it easy to remove what limescale If you remain unconvinced but each one greener than the one below.
forms. After trialling it for a year, I would still like a source of filtered Code Level 6 was the ultimate in
have still to decide whether it was water, you could do worse than snap eco homes and included the zero
worthwhile. That’s perhaps the nature up a Brita Filter kettle for about £40. carbon house, which only ever got
of inhibitors. built as a demonstration level. Parts
of the Code survive within the
FILTERING building regulations. The energy
In the last few years, there has been CODE FOR efficiency regs, Part L, 2013 version,
an enormous growth of interest in the SUSTAINABLE are roughly equivalent to Code Level
subject of tap water quality. HOMES 4 and buried within Part G is a water
Whereas the Victorians basked calculator which determines how big
in the glory of the technical In December 2006, the then Labour a bath you can have and how much
achievement of providing clean government created the Code for water can flow through your taps.
drinking water to all homes, we have Sustainable Homes. And in 2015, the Only the water calculator never got
now become blasé about this and Conservative government abolished to a level where it would begin to
tend to worry that much of this water it. I could just leave it at that, but in become challenging for installers or
runs through lead pipes and, in any its time it had enormous influence homeowners.
event, doesn’t taste very good. Added over the way we build homes. The fate of the Code also
to which there are fears (in lowland The Code didn’t arrive out of the demonstrates just how fragile
England at least) that we are now blue. It built on something similar government initiatives are. Virtually
getting nitrate and pesticide residues called Eco Homes which, like the the whole building industry was
in our tap water. Code, came out of the resources of gearing up for the implementation
There is a huge choice of water the Building Research Establishment of Code Level 6 in 2016 and was
filters available, ranging from the free in Watford. These are essentially busy re-inventing itself for a green,
standing plastic jug affairs which can checklists with which to measure just sustainable future. But at the stroke
be picked up in Boots for a few quid how eco your eco house actually is. of a pen, the whole edifice was
to expensive, in-line purifiers. Points were awarded for all kinds of consigned to history.
There are no British Standards for green features, and although energy What happens next depends on
water purifiers (‘tap water’s just fine, saving grabbed the headlines, there how Brexit plays out and at time of
old boy’) and there is little concrete was also water saving to be done, writing it looks most unclear. But the
evidence on the effectiveness of the recycling and various other good government needs to come up with
various methods. There is also concern design features. some solution to climate change and
that many filters may themselves be Planners started insisting on its just leaving everything to the building
health hazards, providing spawning use for all manner of new housing regulations seems a little arbitrary.
grounds for bacteria. developments, including selfbuilds, In the absence of any government
Nevertheless, interest in water and because of this it started running initiatives on how we might build
filters continues to grow and one into heavy opposition from the more sustainably, the way has been
of the more innovative companies influential housebuilder’s lobby., left open for alternative standards

318 13th EDITION l HOUSEBUILDER’S BIBLE


GREEN ISSUES

to act as beacons, and none more so


that the internationally recognised
Passivhaus standard.

PASSIVHAUS
Many forward thinking builders
are starting to concentrate on The Passivhaus standard is far more exacting than our building regulations.
the Passivhaus standard as a Whereas our current FEES standard for space heating is around 60kWh/
viable alternative to this Code for m2/annum, the Passivhaus standard sits at just 15kWh/m2/annum
Sustainable Homes. Passivhaus is
an demanding technical standard
which more or less guarantees not
only very low energy consumption German version of the Code for of inspection and auditing some way
but very high building standards. It Sustainable Homes. But in fact in advance of what happens with
just concentrates on energy use and the Passivhaus Institute is a private our common or garden building
comfort. If people want to add water organisation based in Darmstadt in regulations. This auditing comes at a
efficiency measures or renewable Germany. For a house to qualify as cost, but is seen as an essential part of
energy devices, that is up to them, but a certified Passivhaus, the builder the process.
it’s not part of the classic Passivhaus must not only meet the required
standard. standards, but also undergo a degree
The three pillars of Passivhaus
are demanding insulation levels,
The Denby Dale Passivhaus was built
close attention to the details of in 2010, one of the first to be built
achieving airtightness and a reliance in the UK. Although Passivhaus is
on mechanical ventilation with sometimes criticised for encouraging
heat recovery. A Passivhaus is “the box format”, this design shows
characterised by almost always having that boxes don’t have to be boring
triple glazing and very little in the
way of space heating. They aim to
be warm and comfortable all year
around with an absolute minimum
of space heating required. However
there is no insistence on any of the
other ecological measures which
make up the Code for Sustainable
Homes, though recently the
Passivhaus Institute has introduced
new standards which incorporate
renewable technologies as well.
You might think that Passivhaus
is a national standard, perhaps a

HOUSEBUILDER’S BIBLE l 13th EDITION 319


Chapter 15

15 APOCRYPHA
The original Apocrypha were written
at the same time as the Holy Bible
but were felt by the editors to be
what. So these are the bits to go into
the Aprocrypha. All essential stuff
of course, but it just doesn’t fit neatly
online (search on Jewson Build Cost
Calculator) and it will give you an
“average” build cost for a given square
not quite up to the mark, so they into the jigsaw. meterage. The results are remarkably
published them separately. This low. Persimmon maybe able to build
Bible’s Apocrypha is a little different at these prices, but I very much doubt
because it’s just a late chapter which a selfbuilder will either be able to
consists of a few odds and ends that BEWARE BUILDING match these rates, or indeed even
simply don’t fit into the rest of the COSTS want to match them
book. You may have a very good idea of But ballpark figures stick in
Analysing housebuilding as an what you can afford but, unless you the mind, and it’s very easy to get
activity is a bit like trying to figure are an experienced developer, you are attached to them early on in a project.
out where every strand of spaghetti unlikely to have much idea of how What I want to look at here is not
begins and ends. Some are easy to much and what sort of house that so much how much you may or may
spot, some take some figuring out money will build. not spend on a project, but just what
and some you just can’t do, no matter You can quickly unearth data exactly is meant by the “/m2” bit.

320 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

One bungalow, three


Which Method of Measuring? different methods of
12.000 m measuring it.

The net area – I think this is


the correct one – shows a
Add garage
Gross Area =
area – floor area of 60.6m2 .
2
70.3 m
14 m2
The gross area adds the
5.300 m

Net Area = external walls and comes out


2
60.6 m at 70.3m2 .

5.860 m
Whilst the third way adds
11.440 m
the 14m2 attached garage,
making the floor area total
nearly 40% more than the
External walls here are 280mm thick, usually 12-15% of the gross floor area net area.

What exactly defines a build cost? measurement commonly in use, Again, there is no check other than
There is no British Standard and the gross floor area, which includes you and your ruler and you need to
there isn’t really such a thing as an the area of the external walls. The be very careful when evaluating sales
industry standard either. Neither is effect of including the external wall literature of kit home suppliers to
there complete agreement on just areas in the calculation is to increase see that any integral garage is not
how floor areas of houses should the apparent size of the building included in the overall floor area.
be measured. Different businesses by up to 15% as external walls are, In contrast, detached garages are
use different methods and this these days, usually constructed at unlikely to be included as part of the
makes a minefield out of the task of thicknesses of 300mm – 400mm. floor area of a house in such literature,
comparing costs and setting budgets. On the Continent, it’s the gross but here the trick is to exclude their
floor area that people usually refer to building costs from any overall
MEASURING FLOOR AREAS and many of the kit home suppliers budget calculations. As a garage will
The most widely used floor area use gross floor areas in their sales typically cost anything upwards of
measurement in Britain is the one literature without being explicit £10,000 to build, either its inclusion
which refers to the internal floor area about the fact and there is often in floor areas or its exclusion from
of the house. It expressly excludes the no way of telling which area they building costs will have a dramatic
area of the external walls, although are talking about other than by (and wholly misleading) effect on
(largely for convenience when measuring it up yourself with a ruler. apparent unit area cost.
carrying out the measurements) the Using a gross floor area will appear Added to possible confusion over
area taken up by the internal partition to reduce unit area costs by 15%. net and gross floor areas, the lack of a
walls is included. This measurement is consistent benchmark for measuring
also known as the net floor area. GARAGES floor areas means that a four-bedroom
Garages should not be regarded house with an integral garage could
GROSS V NET as living space, even when they are be given as 150m2 by one method and
There is another floor area integral to the rest of the house. as much as 200m2 by another.

HOUSEBUILDER’S BIBLE l 13th EDITION 321


Chapter 15

GREY AREAS then measure straight through on usually ignored from a building costs
There are a number of other features both floors; if the open area extends perspective, but all costs you will have
worth examining. When you get beyond the immediate staircase, then to face when it comes to turning a
into the swing of measuring house you must exclude the entire stairwell house into a home.
sizes off plan, you will undoubtedly area from the upper floor area. Of course, you can reduce costs
come across features which are not by undertaking some of the work
clear cut. Again there are no hard BUILDING COSTS yourself. But all of this will pale into
and fast rules but I would suggest the So much for defining the internal insignificance if you fail to budget
following assumptions are fair. floor area. The ‘building costs’ are the project correctly in the first place;
n Cupboard space: storage space even harder to define. There is to achieve significant savings, you
such as under-eaves cupboards which no official standard but there is need to buy and develop your plot
are common when your upper storey a sort of British way of defining appropriately, be very organised and
is built into the roofspace, should building costs. Making long lists able to stick tightly to a budget.
be excluded from internal floor and producing definitions is all very My advice is to hire a quantity
area. However, built-in full height well, but what I am trying to get at surveyor once the initial plans are in
wardrobes should be included as is that building costs are really just place, especially if you are proposing
normal living space. a subgroup of development costs to build something a little unusual.
n Utility Areas: normally these and that to concentrate on building The online services will be fine if the
would be included as part of the costs to the exclusion of other costs is house is very conventional, but not
living space. Sometimes it is hard potentially disastrous. Like building if you want to try something a bit
to judge where a utility/storage area costs, development costs can vary different. Spend the money to see if
ends and a garage begins; if you’re in enormously and in this respect there you plans are buildable at your budget
this position don’t worry too much is no greater variant than the price and, if they are not, change the plans
because at least you understand what paid for your building plot. Some before you put them in for planning
the issues are. building plots are far more expensive permission. The later you make
n Internal Walls: conventionally, to develop than others; problems can changes, the more it will cost.
these are measured straight through arise with bad ground, slopes, difficult
and they are included as part of the service connections, difficult access,
internal area. trees, legal covenants, intransigent
n Stairwells: normally measured planners – you name it! Now, the ACCESSIBILITY
straight through on both floors and art of property developing is to be Provision for disabled access in
therefore included as internal floor able to predict these problems and housing became part of the building
area as if it was regular circulation to negotiate a price on the land that regulations in 1999 – in England it’s
space. The exception comes when you reflects the cost of getting around all in Part M. Part M was greeted
have a large open plan arrangement, them. with enthusiasm by disability
not often seen in new houses And you also have to consider campaigners but has had a lukewarm
but common in barn conversions what a building cost leaves out at reaction from both the housebuilders
where large openings have to be the other end of the process, namely and the general public who felt that
preserved. How do you decide when the finishing details. Normally it was political correctness run riot.
your ordinary stairwell becomes floor finishes are included, but not Personally, I’m torn between the
extraordinary? The rule is that if the always. Landscaping? Driveways? extremes.
upper floor opening is restricted Window dressings? Wardrobes and The little Tory in me reacts
to just the functioning stairwell, cupboards? Bathroom storage? All negatively to having meddlesome

322 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

legislation shoved across my soon- n This doorway should have a was simply a detail that had evolved,
to-be-levelled doorstep; then a few minimum clearance of 775mm primarily as a way of keeping water
days later I find myself talking with between frame and opened door, from flowing in under the door. The
a builder whose wife is confined to a which translates as having to use an level threshold requires the doorstep
wheelchair and, as he describes the 838mm door. to be re-engineered and to have a
struggles they both have in coping n A level threshold is defined as one level or ramped access as well.
with her disability, I suddenly chide which has a bump of no more than Traditionally front doors open
myself for being so mean-spirited and 15mm under the door. inwards and traditionally floor covers
wish that the regulations went much n This entrance should be easily have not been an issue because of the
further than they do. approachable from the outside. In step. But level thresholds force you
Although Part M is phrased in practise this means there should be to consider carefully how you will
such a way as to make you think they no steps and no incline of more than finish the floor internally. Consider it
are designed solely for wheelchair 1:20. carefully. A sunken matwell covering
users, the groups who benefit from n Every home must have a then area where the door opens seems
the regulations are far reaching, downstairs toilet. This room to be a good solution for many.
including the blind and partially doesn’t have to be big enough to
sighted and families with pre-school accommodate a wheelchair. It’s just LIFETIME HOMES
children. the door has to be wide enough to get From the point of view of the
Part of the problem is that there a wheelchair through (838mm again). disabled, Part M is very tame. It
are actually very few severely long- n Ground floor corridors and concentrates on making new homes
term disabled people around, so doorways must be wide enough to ‘visitable’ but it does little to make
making every new house conform allow wheelchair users easy access. them more ‘usable.’ The future would
to a rigid set of standards in order There is a trade-off here; wider seem to lie with a more advanced
to meet their requirements seems corridors can have narrower doors version of what is already in Part
both expensive and illogical. Perhaps. but the rule of thumb that seems to M, known as the Lifetime Homes
Perhaps not. It actually costs have developed is to have all ground standard, developed by the Joseph
very little extra to build a Part M floor doors 838mm wide and to have Rowntree Foundation in 1991.
compliant house – in contrast it’s corridors at least 1050mm wide. In 2016, Part M was expanded to
always frighteningly expensive to n Power sockets and switches must include many of the Lifetime Home
retrofit such measures into an existing be placed no lower than 450mm provisions, but on the understanding
house. We are building homes that and no higher than 1200mm above that they would only apply to homes
may well have a life expectancy finished floor level throughout the specifically designed for people with
stretching well into the 22nd century house. impaired mobility.
and during this lifespan there is every What would turn a Part M
chance that several occupants will LEVEL THRESHOLDS compliant home into a Lifetime
come to appreciate some aspect of The standard (pre-1999) British Home? It’s a set of 16 features
Part M. front door involved stepping up from intended to make homes readily
the ground into the house – indeed adaptable for disabled users.
WHAT’S IN PART M? the internal floor level is typically n 1 Car parking space should be
n To comply with Part M every 150mm – that’s two brick courses easily capable of enlargement to
house has to have one level threshold – higher than the external ground attain a width of 3300mm.
— ideally, but not necessarily, the level. Like many standards, this front n 2 The distance from the car parking
front door. step had never been a regulation but space to the home should be kept to

HOUSEBUILDER’S BIBLE l 13th EDITION 323


Chapter 15

a future stair lift and a suitably


identified space for a through-the-
floor lift from the ground to the first
floor.
n 13 Walls in the bathrooms and
toilets should be capable of taking
adaptations such as handrails.
n 14 The bathroom should be
designed to incorporate ease of access
to essential amenities such as the
bath, basin and WC.
n 15 Living room window cills
should be no more than 800mm from
the floor and be easy to open.
Level threshold
with matwell.
n 16 Switches, sockets, ventilation
It looks very and service controls should be
simple here situated between 450mm and
and it’s not 1200mm from the floor.
that difficult, Whilst many people bridle at the
but care has thought of being told how their
to be taken to
ensure that house should be designed, most of
rainwater drains these steps are easily incorporated
away from the into a new house and cost either very
doorway little or nothing at all. They really
only become difficult to incorporate
a minimum and should be level or circulation space for wheelchair users. in smaller homes where some of the
gently sloping. n 8 The living space should be at the space requirements become hard to
n 3 The approach to all entrances level of the entrance. meet, in particular the requirement
should be level or gently sloping. n 9 If homes have two or more for a downstairs bathroom to be
n 4 All entrances should be storeys, there should be space at capable of adaptation for wheelchair
illuminated and the main entrance entrance level which could be used as users, plus the requirement for a
should be level and covered. a convenient bed space. shower drain in the downstairs
n 5 Communal stairs should provide n 10 There should be a WC at the bathroom.
easy access and where levels are entrance level of the property and,
reached by lift, the lift should be fully in larger properties, there should be
wheelchair accessible. drainage provision enabling a shower
n 6 Doorways and hallways have to to be fitted in the future. SECURITY
be at least 750mm wide, or at least n 11 The design of the property Just as disabled access arrangements
900mm wide when the approach is should provide for a reasonable route have been subsumed into our
head-on. for a potential hoist from a main building regulations (via Part M),
n 7 Dining and living areas should bedroom to the bathroom. improved security standards have
have space for turning a wheelchair n 12 The design of the property also become standard regulations as
and there should be adequate should incorporate a provision for well. Part Q, as it is known, came

324 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

into effect in 2015 and, as with all it is common sense but it’s still very BURGLAR ALARMS
the building regs, is available for handy to have it summarised in one There is a huge variety of different
free download. At just ten pages, place. alarm systems out there and it’s not
it’s an amazingly short document, easy deciding what to fit, if anything
and it largely consists of guidance PREVENTING BREAK INS. at all. A wired system is particularly
on windows and external doors Whilst Part Q compliant windows well suited to new housing as the
and the ironmongery that should and doors make it harder for a wiring can be concealed during
be fitted to them to make them burglar to gain entry, they won’t stop first-fix stage. Installation quotes for
Part Q compliant. A secure doorset someone really determined to get in, a four-bedroom house are likely to
and window should meet a well especially if the doors or windows are vary from £500 for a basic system
established British Standard, PAS left open. The rear of the house is the based on a mixture of internal
24, which formed the backbone of a preferred area of entry for burglars. infrared detectors and contact points
once aspirational building standard This is largely because the back of to over £1,000 for external vibration
known as Secured by Design. PAS 24 the house is almost always more detectors which are triggered by
is a test involving using jemmies and private and is often screened from interference with doors and windows.
crowbars to try and break through neighbours. A burglary often starts Should you not want to go to the
doors and windows and a Pass now with a casual casing of the front of expense of installing an alarm, as an
means that your chosen door/window the house; if it looks as though there alternative, the wiring can be first-
fits the bill. Just as Lifetime Homes is no one at home, the second stage fixed in a day for between £100 and
gave birth to Part M, Secured by will be to go round the back and £200, so that the intruder detectors
Design became Part Q. take a closer look. Only when they’re can be fitted at a later date without
In order to meet Part Q, you convinced the coast is clear will the disruption to the decorations. Burglar
simply have to ensure that your break-in proceed. If access to the alarms are eligible for zero-rating of
external joinery is Part Q compliant. back of the house is impeded, then VAT when building a new home.
There is more to Secured by Design the would-be burglar may abort the Fixing a burglar alarm should
than simply having good doors and job at this early stage in the hope of not be beyond the capabilities of
windows. It was a project started there being easier pickings further up a competent DIYer and there are
by the police in 1989 in response to the road. a number of systems designed for
crappy new building standards where A 2m fence and a stout gate, just this. DIY alarms usually consist
it was possible to break into a house even without a bolt, will provide a of a control panel, the detectors
simply by taking out a double glazed considerable measure of defence and an external siren. The wired
sealed unit, held in by no more than against unwanted prowling. A systems are the most reliable and are
a few screws. It includes advice on tip from my 2010 Milton Keynes probably best suited to new builds.
estate layouts and the like, but this benchmark house is to use a 2m fence However, wireless alarms have their
is unlikely to be of much interest but to have the top 300mm made up advocates and are easily fitted as an
to selfbuilders. However, they do of a see-through trellis which is just afterthought. The standard wireless
publish a useful guide, updated every as difficult to get over but allows you systems still need mains connections
two or three years, which is available to see who is walking along behind for both the control panel and the
for free — search on Secured by it. Back gardens can be protected, to siren but the latest generation work
Design>Design Guides. There is a a lesser extent, by walling or hedging entirely on radio signalling: the
lot of useful background information them in. Plan in any obstructions that siren and the control panels are solar
here on what makes a secure house will at least slow down the progress of powered and you activate the alarm
and even a secure garden. Much of a potential burglar. by using a remote control.

HOUSEBUILDER’S BIBLE l 13th EDITION 325


Chapter 15

More features tend to add to the bulbs (sometimes 500W) can be so months usage at time of writing) is
cost but it is still possible to get a bright that you dazzle passers-by that they are anything but convenient.
well-featured wireless system for and tend to make them think you By the time the remote connection
under £200. Zones are the areas live in a high-security prison. There is up and running, the driver has
covered by individual detectors and are some very cheap versions on the long since given up and moved onto
most burglar alarms allow you to market (at around £10-£15) which the next drop. The times it does
arm or disarm any of your zones are best avoided; at around £30 you get through, we end up having this
individually. This is useful if you start to get ones where it is possible strained conversation which neither
have pets or if you want only the to change the bulb. Better forms of of us can understand. Maybe it’s the
downstairs armed when you are external lighting exist that can be solution to a problem we don’t really
upstairs at night. Better systems wired to PIR switches, as well as have.
have a capability of checking that manual override switches, which give
all component parts are working – a pleasant external illumination as well CCTV
feature sometimes referred to as a 24 as some form of security . I also have recent experience of
hour zone. There are also a number of external CCTV, mounted on a
products that can be used to give the neighbour’s gable end wall, watching
MOVEMENT SENSORS effect of occupation when the house over our urban construction site
Alarm systems don’t have to just is empty. For around £20, you can which was guarded by nothing more
concern themselves with making buy a gizmo which fits in between elaborate than standard security
loud noises or sending messages off a lightbulb and its lamp holder that fencing (aka Heras). During the
to police stations. You can also rig acts as a light-sensitive switch, useful groundworks stage, we had a break-
up detector beams running across for simulating occupation when you in from under the Heras fencing.
the front and the back of your house are away. The guy took some hand tools from
which set off a buzzer inside when back of the site and a lawn mower
they are crossed. SAFES from the neighbour’s shed. I spent
They vary in sophistication from Home safes are available from £150 around two hours looking through
simple passive infrared beams like the for a wall fitting one and from £200 the recordings and finally tracked the
ones used to trip lights, to multi- for one bolted to the floor. Placing event down to 6am in broad daylight,
height beams running between two a safe in an existing house can be with our burglar wearing a hi-viz
concealed posts which aim to be cat awkward but in a new house it’s a jacket, pretending to be a building
and fox proof. The well designed doddle – if you’ve planned ahead for it. worker on an early call. He even said
systems will give you fairly reliable hello to one of the other neighbours,
intruder alerts: a poor system, VIDEO DOOR BELLS who didn’t suspect a thing. He was on
tripping out every time a bird flies by, There are various video doorbells site for 40 minutes, checking things
will just make you paranoid. — the best known is the Amazon- out and helping himself to stuff like
owned Ring — you can fit which nails and hammers — there wasn’t
SECURITY LIGHTING give you the ability to interview the much else there — total value about
Passive Infrared (PIR) detectors, caller without having to open the £45 quid.
similar to the ones used on internal door. They sell themselves on being I sent the tape to the police who
movement sensors in burglar alarms, able to talk to delivery drivers when were delighted to have such evidence.
are also used on external lighting. you are far, far away, provided you They put some stills on their
These can be very useful around have a good wi-fi or 4G connection. Facebook Crimestoppers page and
dark entrances although the halogen My experience of Ring (based on 9 our man was shopped within half an

326 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

hour (apparently by an old girlfriend). report back whilst this edition is been a number of timber framed flats
This open and shut case took still in circulation, but the finger of which have been arsoned at this stage,
about ten months to wind its way suspicion pointed at certain aspects but I’ve never heard of it affecting a
to court and of course it turned out of the tower refurbishment which selfbuild.
he’d been doing this sort of stuff for had happened a year or two before You can switch to mineral wool
years and then selling the loot at car the fire. In particular, the plastic- insulation but, although it won’t catch
boot sales. His house was stuffed with based insulation which had been fire, it has its own issues. For a start,
incriminating evidence, including employed to make the tower more it’s not as energy efficient so you need
stolen car number plates. He pleaded energy efficient and therefore more more of it, which means wider walls
guilty, got a suspended sentence and comfortable to live in had caught and ceilings, which eats up valuable
had to wear a tag for a year. End of. fire big time and had melted in the internal space. Then it has a habit of
No fine, not even community service. extreme heat, causing the fire to slumping in situ which means its as
Neither we nor the neighbour saw a spread quickly and giving off toxic built performance rarely matches the
bean in compensation. fumes in the process. designed for standard. And it’s also
In theory, CCTV acts as a fantastic None of this is particularly relevant harder to get a tight fit which means
deterrent, especially during the oh- to the world of low rise detached there tend to be rather more cold
so-vulnerable construction phase. housing. The main reason so many bridges in a mineral wool structure.
But when you see how the law deals died at Grenfell was because of the There are reasons why plastic foam
with such cases, you wonder why you height of the tower which exacerbated insulation has become so popular.
bother. the chimney-updraft effect of the There are other alternatives,
On the other hand, how do you flames and also made it impossible including a range of natural
deal with persistent petty thieves like to reach the residents from ladders. insulations like hempcrete and
this? I feel this is perhaps another What hasty changes that have been wood wool. Problem here is that
book altogether. made to Part B as yet only concern organic materials also tend to be
buildings higher than 18m. flammable and many of them have
You might think that the Grenfell binders added to them which make
after effect has caused people to give them more flammable. Given a
plastic-based insulation a wide berth, high enough temperature, almost
FIRE SAFETY but that’s not really happened, as you everything burns and the issue
In June 2017, Grenfell Tower went can’t really build a house without becomes somewhat academic.
up in flames, killing 72 people in using some inflammable materials The plastics themselves vary in
the process. Part B of the building and there is no particular reason to their fire performance. The cheapest
regulations, which deals with fire, think that plastic insulation is going and worst is expanded polystyrene
went from being an obscure reference to be either the cause of a blaze or which we are all pretty familiar
work to front page news overnight. will make a fire much worse. with. It starts to melt at 100°C and
Everyone wanted to know how The possible exception to this is ignites at around 360°C. Phenolic
it had happened and what exactly in timber-framed housing during foam (marketed largely as Kingspan
went wrong. Were the building regs the construction phase when there Kooltherm) is the best (ignition
stuck to or ignored? Or were the regs are usually a few weeks when the point about 550°C) but also the most
themselves inadequate? What should insulation (conventionally plastic) is expensive.
we do to stop it happening again? placed in situ but not covered over by Getting to the bottom of this story
There is an interminable enquiry plasterboard on the inside. During is still some way off and in time I
underway which may or may not the past ten or fifteen years there have have no doubt that Part B will be

HOUSEBUILDER’S BIBLE l 13th EDITION 327


Chapter 15

re-written with much sensible advice by flaming fires, such as chip pans, open plan kitchen and/or living
about how we should be constructing and will detect this type of fire before room, then you can expect to have
our buildings. Until then, I wouldn’t the smoke gets too thick. But you your upstairs bedrooms deemed to be
over worry about your build choices can also specify optical ones which inner rooms.
in a low rise house. are more effective at detecting This means in effect that you not
larger particles of smoke produced only have to have an egress window
WHAT THE REGS REQUIRE by slow-burning fires, such as (you do anyway), but that it has to
The purpose of the fire safety smouldering foam-filled upholstery lead to a potential escape route if
regulations is, in any event, not to and overheated PVC wiring. Optical there was to be a fire down stairs. On
stop buildings burning down but detectors are more prone to going off two story houses, this escape route
rather to allow the occupants time in error; either the mirror gets dirty can simply be down to the ground
enough to escape from them if a fire or thunderflies get in. below, but on three storey homes
starts. A third and possibly more useful it gets more complicated because
The main danger in house fires type is the heat sensor which gets the fall is too great. Note that inner
occurs when soft furnishings catch triggered when temps reach around rooms can appear on the ground floor
fire, and the smoke quickly engulfs 55°C. These are placed in the in some open-plan configurations, so
the occupants. Whilst there has kitchen but not too near the cooker. ensure that you always have an egress
been a steady introduction of non- Whatever you choose, they have to window in every bedroom.
flammable materials into the home be interconnected so that when one
furnishing market, the biggest step is triggered, they all go into action. THREE STOREY HOMES
forward in the world of fire safety Some smoke alarms have additional There is a critical safety level, defined
came in 1992 when smoke detectors capabilities, such as emergency lights as having a floor 4.5m above ground
became mandatory. Since then, all and silence buttons to override false level, when it becomes necessary
new homes have been required to alarms. to beef up your escape procedures.
have smoke detectors not just fitted Other safety features you might One of the principal requirements
but mains-operated with a battery choose to look at are the provision relates to how your main staircase
backup as a fail safe. of fire blankets in the kitchen runs through the house. Ideally,
Smoke detectors cost around £30 and extinguishers in garages and the staircase should lead directly to
and should be wired in in all new near open fires. Your best bet is to the front entrance door within an
homes. Electricians are all au fait stick with local firms which offer enclosed hallway: what is frowned
with what’s required. The regs are maintenance. upon are open-plan arrangements,
that there should be smoke alarms on particularly when the staircase exits
each storey and that they shouldn’t be INNER ROOMS via the kitchen (reckoned to be the
further than 3m from any bedroom If your house design is such that you highest risk area).
door, so that some larger designs will have to pass through another room You also need to consider how
require two or more on the upstairs to get to an external door, then you to protect the stairwell from
landing. are deemed to have created an inner encroaching fire. You have to make
What the regs don’t go into is the room and an inner room is required the entire stairwell what is called a
different types of smoke detector to have a secondary means of escape. fully protected enclosure; this means
you can choose. The cheapest and Just what is meant by passing that the walls around the landing and
commonest are the ionisation through another room is open to stairwell must be rated at 30 minutes
detectors which are very sensitive to interpretation but generally speaking fire resistance and the doors opening
small particles of smoke produced if your staircase takes you into an onto the landing must be rated at 20

328 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

minutes. You also need to consider Part B, the


the floor construction which also Fire Regs, is
full of virtually
needs to meet the 30 minute fire
incomprehensible
rating. diagrams like this
If you are undertaking a new build one. Someone,
or a major renovation, it’s not difficult somewhere, has
to meet these standards; in fact in calculated the
terms of walls and floors it’s quite risk of fire on a
boundary wall where
difficult not to meet them. The only
the material used
place where you are likely to come is deemed to be
unstuck is on the doors that need to unprotected.
be uprated to fire door standard.

SPRINKLERS
In 2014, Wales broke ranks with
the rest of the UK by introducing
a requirement for sprinklers in all
new homes. Thus far, no one else has
followed suit. Whilst sprinklers are
proven to reduce serious burns and is close to a boundary and might,
other injuries, and to decrease fire teed off the rising main. Ideally they therefore, be a pathway for a fire to
damage generally, their mandatory require a 32mm cold feed into house spread from another building, even
imposition is not without its critics as the systems need a good flow. if that building has yet to be built.
because — at between £3,000 and Sprinklers can be a God send in You can use combustible claddings
£5,000 — they are an expensive way certain situations (it’s that open plan, on or near to boundaries, but you are
of addressing a very small problem. again) when other options for meet- restricted as to how much, depending
New housing generally is much safer ing Part B cannot be satisfied. But on the distance involved. It covers
than old housing and many feel otherwise, it tends to be a very Welsh most single dwellings, less than 24m
that resources would be better spent problem. in length and not more than three
elsewhere. If you decide to install a sprinkler storeys high.
Fire sprinklers are only activated system at home, do ensure that the A similar reg also relates to
when the temperature in the room company you choose is working to windows on a boundary. There are
in which a fire is burning exceeds the the industry standard (BS9251) and size limits to boundary windows
preset temperature of the sprinkler is preferably FIRAS accredited. A which are referred to here as
head — nominally 68°C. Sprinklers useful starting point of contact is Unprotected Areas. This is an area
operate as individual heat sensors, the Fire Sprinkler Association www. where adding sprinklers to your home
meaning that water is only released firesprinklers.info. helps because this enables you to relax
in the area where there is a fire. They the unprotected area rules. No one
are not activated by smoke. Sprinklers NEIGHBOURING BUILDINGS said it would be easy.
typically deliver 60lts/minute Part B is full of hard to interpret
(compared to 1000lts/min from a fire diagrams and there is one to do with FIRE ENGINE ACCESS
hose): systems are usually plumbed using combustible materials like There are regs too about access tracks
with copper pipe or rigid cPCV pipe, timber on an external wall when it for fire engines which can sometimes

HOUSEBUILDER’S BIBLE l 13th EDITION 329


Chapter 15

throw a spanner in the works, than just frequency and volume but sound gets absorbed by the wall and
especially on isolated rural sites. The we’ll concern ourselves with just the amount of sound absorbed by the
driveway needs to be at least 3.7m these two, as it’s their interplay that wall is said to be so many decibels of
wide, and capable of taking 12.5 makes much of the debate about sound reduction. Thus, if a wall is said
tonnes. There must be a passing point soundproofing so intriguing. to have an airborne sound reduction
every 20m and a turning point on Frequencies are measured in level of 40dB, it means that, should a
drives over 20m long. The fire engine hertz (Hz) and kilohertz (kHz): 60dB conversation be taking place on
needs water and you may even have these correspond to the wavelengths the other side of it, you would only
to fit a fire hydrant outside the house that various sounds travel at. Low hear about 20dBs on your side.
to fulfil this demand. Negotiations frequency sound has a very long But sound is capable of travelling
with the building inspector and the wavelength; high frequency sound through solids as well. In certain
planning authority are likely to tease consists, conversely, of energy moving instances, walls and, in particular,
out these issues at an early stage, at very short wavelengths. Humans floors have a nasty habit of not
but be aware they may cause issues. tend to hear sounds between 50 Hz absorbing sound at all but instead
Once again, specifying sprinklers in and 15,000 Hz (15 kHz); this upper acting as a conduit for sounds.
the house should relax some of these limit reduces with age. Impact sounds, as we call them, are
requirements. Sound energy is measured in usually mechanical in origin: tapping,
decibels, routinely written down as hammering, drumming or just
dB. The decibel scale is non-linear: walking across floors with hard heels.
it doubles every 3dB. However, The actual volume of the sound may
SOUND ADVICE what we perceive as sound is a little not be that high but a floor without
This section of the Apocrypha different: humans perceive a doubling adequate impact sound insulation can
looks at the background behind or halving of volume roughly every be very annoying.
sound reduction measures for 10dB. Thus a 60dB noise would The third method of noise transfer
builders. Guidance on how to achieve sound, subjectively, twice as loud as is called flanking sound. It occurs
better soundproofing is to be found a 50dB one, which, in turn, sounds when airborne or impact sounds get
lodged in two earlier sections on roughly twice as loud as a 40dB one. to you via an indirect route. Consider
internal walls and internal floors, Whilst the ability to hear sounds a wall between two adjacent rooms.
both back in Chapter 7. But do try to is regarded as one of life’s more Now suppose that you soundproofed
wade through this section before you pleasurable experiences, we also worry this wall so well that no noise was
decide what to do about your walls inordinately about hearing noises we capable of travelling through it. You
and floors; I think it will be worth it, don’t want to hear. Noise is defined as would still be able to hear noise in
if only to learn what the hell a decibel unwanted sound. As regards building the other room because sounds can
is. design, our concerns are usually to travel via other routes. Maybe via
minimise sound transfer through the corridor shared by the doorways
ACOUSTICS FOR BEGINNERS walls and floors. of these two rooms, or via their
Sound is a form of energy. It moves Sound energy transfers through windows, or transmitted through the
in waves through the air and it can buildings in three different ways. ceiling overhead. These are flanking
be absorbed and transmitted through The easiest to understand is airborne sounds.
solids as well. The human ear is adept sound. This is how sound gets to us Another way of looking at
at picking up sound in a range of when we speak to one another. If flanking sound is that is represents
frequencies and at different volumes. there is a wall between us when we the difference between the sound
There are more qualities to sound speak, then some of the airborne reduction performance of an element

330 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

(i.e. a wall or a floor) tested in a the receiving room, each taken from MEASURING UP
laboratory and the as-built situation. two different locations for the pink The equipment that measures sound
There is a close parallel here with noise box in the room above. – or noise, as it would be referred to
what happens with thermal insulation Impact noise is measured in a in this instance – is expensive and
when the designed-for U value of different way. The noise is made by a sophisticated. Paul Goring used
an element is compromised by cold series of hammers inside a wooden a Danish system costing around
bridging. box, resembling a mechanical drum £15,000. It measures sound at 16
It wasn’t until I spent an afternoon machine, which you sit on the floor different frequencies and gives
witnessing an acoustic test that above and then let rip. Impact noise 16 different readings that have to
I really began to understand the is conventionally measured directly: be interpreted and analysed. This
difference between the different you don’t subtract the noise made in is where things start to get very
sorts of sound transfer. Paul Goring, one room from the noise received complicated. Legislators want a yes
once NHBC’s head of acoustics, was in another: you just make a British or no answer to the question, ‘Does
testing a floor between two flats in a Standard sort of impacty-noise from this floor or wall meet a defined
newly built nurses’ hostel and it took the drum machine and measure how sound reduction standard?’ The regs
him a good couple of hours to do it. much gets through the floor. Impact invariably hone in on a pass rate
On floors, it is routine to test for both noise is only ever considered on floors. expressed in decibels but the data
airborne sound and impact sound and So there is an important comes in measured over 16 different
the procedure for testing them is a distinction here. When you see frequencies, some of which may look
little different and worth describing. decibel-rating tables, the airborne OK and others not.
To measure airborne sound decibel ratings are for sound What has evolved over the years is
transmission through a floor, he reduction capabilities. Therefore the a number of calculations that offer a
placed a multidirectional loudspeaker higher the decibel rating on airborne ‘best fit’ answer to the riddle of how
in the upper room and set it to pump sound reduction, the better: a 50dB- much noise is being made at any one
out 100db of noise: ‘pink noise’ it is rated floor is much better than a time. None of them are perfect and
referred to as, a horrible cocktail of 45dB-rated one. But for impact there are big debates about which
every audible frequency you can think sound ratings, the reverse is true. The measuring systems should be used.
of. At 100db you really don’t want rating just tells you how much sound Normally, this really wouldn’t be
to be in that room for a moment got through the floor: the lower the of concern to anyone outside the
longer than you have to be: even figure here, the better. cosy world of acoustics but during
with ear defenders on, it’s physically Flanking sound isn’t measured 2003 this debate took centre stage
unpleasant. directly, but it contributes to the overall in the formulation of the latest set
The measuring equipment was scores and makes significant differences of building regulations, because the
in the room below. Airborne sound to the scores between lab tests and field different ways of sampling decibels
insulation is measured by taking tests. You don’t experience flanking give some widely different results.
the difference between the output sound as something different to There are four main methods of
from the pink noise and the sound airborne sound or impact sound but measuring sound reduction used in
in the receiving room. Your decibel when there is a lot of noise being made, Britain. If proof were needed that
rating for the floor in question is you can sometimes be aware of it. In acousticians do not come from this
the difference between the two my case, I was able to actually feel the planet, these different methods are
measurements. Straightforward walls vibrating when the pink noise referred to by a complex sequence of
enough. The airborne tests consist of machine was on. This was flanking letters and punctuation marks, some
five different samples from around sound in action. italicised, some suffixed. When they

HOUSEBUILDER’S BIBLE l 13th EDITION 331


Chapter 15

speak English, these labels roll off post 2003 regs require you to provide Floors and Internal Walls in back in
their tongues in capitals and don’t 45dB of airborne sound reduction Chapter 7.
sound so weird, so I will be anglicising (DnT,w + Ctr). It’s complicated, but
them, if only to help my typesetter. not that complicated, and if you look MINISTRY OF SOUND
The simplest rating, written at it long enough you can begin to You can, hopefully, see that sound
as Rw and referred to by all as see the funny side. The point about reduction levels expressed in simple
‘RW’, is derived from laboratory DNTW plus Ctr measurements is that decibels don’t actually mean very
measurements of airborne noise. it creates a higher standard to meet much unless you know which scale
It’s a useful tool for considering the because low frequencies are harder to they are referring to. The switch to
best performance you can get out block. However, the Ctr effect is not the added Ctr measurements has
of a particular construction detail uniform: on some structures, it may divided the acoustics community;
but it doesn’t look at the likely make the figure just 2 or 3dB lower; although everybody agrees that
performance of a wall or floor in a on others it may be as much as 10 or bass sounds are more prevalent,
building: flanking noises are ignored. 15dB lower. Our basic timber floor is not everyone agrees that this new
By way of example, the simplest (and particularly badly affected by Ctr bias: measurement system is the best way
cheapest) timber joist floor with its sound reduction rating, depending of approaching it.
18mm chipboard over it and 12.5mm on the low frequency performance, can When the building regs were
of plasterboard nailed under it, will fall to around 20dB. revamped in 2003, the actual sound
have an RW sound reduction rating There is a fourth measuring scale reduction levels demanded by the
of around 35-38dB. used solely for impact sound. It’s regulations appeared to get less but
The next sound reduction rating, written L’nT,w: gets called LNTW. this was because of the new method
written as DnT,w (known as Impact sound is only measured on of measuring them. However, the
‘DNTW’) is worked out from the floors and, as already discussed, is changes are not uniform and there
measured airborne sound reduction measured directly rather than being are some constructions that would
through a wall or floor element subtracted from a source sound, so have failed the old regs that now pass
on site, rather than in a lab. Not the lower the dB rating, the less noise the new ones, so the improvement
surprisingly, the DNTW ratings gets through the floor. in standards is neither consistent nor
tend to be lower than the Rw ratings, In summary, let’s take our very universal.
usually by around 5dB. That’s the basic floor and see how it stacks up However, it was another aspect of
flanking sound effect. DNTW ruled on the different scales. It’s a timber- the changes in regulations which took
the roost as far as the building regs joisted floor with just a chipboard centre stage in 2003. That was the
went until the 2003 changes. But cover and plasterboard nailed to it insistence that not only should party
because of various bits of research underneath. It scores: walls and floors be built to the new
undertaken in recent years, it was felt n 38db on the RW airborne scale standards but that they should be
simple DNTW didn’t adequately n 33db on the DNTW airborne tested on site to show that they had
reflect the types of noise that are scale, (roughly –5dB difference in fact achieved these standards.
currently being made through our between lab and field) But when the powers-that-be
party walls and floors so a variation, n 20dB on the DNTW plus CTR first ran their suggestions past the
giving far more emphasis to low airborne scale (Ctr of, say, -13dB) housebuilders, pandemonium broke
frequency sounds, has been unveiled, n 70dB on the LNTW impact scale out. Not only was acoustic testing
known as the Ctr or CTR bias. None of these are any good at all! reckoned to cost around £600 per
Ctr is additional to, not a To find out how to improve them, test, but also rectifying failures in
replacement for, DNTW so that the check the Sound sections on Upper already completed schemes would be

332 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

a nightmare. Years of acoustic testing


had shown that there is often a large
gap between the designed-for sound
reduction and that actually achieved.
The acousticians felt strongly that it
wasn’t enough simply to tighten the
old standards: to improve matters
significantly, you had to test, which,
coincidentally, was jolly good news
for acousticians.
Well a fudge was worked out.
After much badgering and a very
rushed research programme, the
government accepted a Super Level
sound proofing standard, to be
known henceforth as the Robust
Standard Details or RSDs. This sets
an airborne soundproofing target a
full 5dB better than that required just
to meet the regs for new party walls
and floors but – crucially – doesn’t
call for any testing.
So what emerged when the regs
were set in stone were four different
levels of soundproofing:
n Level 1: 40dB (Rw scale) airborne
sound reduction. Applies to internal
walls and floors within individual
homes. No testing required.
n Level 2: 43dB (DNTw + Ctr scale)
airborne sound reduction plus (floors
only) 64dB (LNTw scale) maximum
impact noise. Applies to party walls
and floors between flats and attached Acoustician Paul Goring pictured here with an impact sound testing device
houses when they have undergone
renovation. Requires testing. n Level 4: 50dB (DNTw + CTR Now currently these details
n Level 3: 45dB (DNTw + CTR scale) airborne sound reduction plus are available to download for free
scale) airborne sound reduction plus (floors only) 57dB (LNTw scale) — search on Robust Standard
(floors only) 62dB (LNTw scale) maximum impact noise. A series Details>Patterns. Take a brief look
maximum impact noise. Applies of approved robust standard details and you can see that the measures
to party walls and floors between (known as RSDs) that can be used required are very thorough and rather
flats and attached houses if they are by new builders (only) who wish to complicated.
newbuild. Requires testing. avoid the expense of testing. What is worth pointing out is

HOUSEBUILDER’S BIBLE l 13th EDITION 333


Chapter 15

that there is a big jump between home in a place you otherwise would doesn’t look a bit like a farm building,
Level 1 (detached homes) and Level not be able to. but it does make a very attractive
2 (everything with a party wall or Chief amongst these is the idea structure. In fact the barn conversion,
floor). It may look like a mere 5dB that what you build should continue particularly the timber barn
difference but notice that the scales to look like what was there before. conversion, has attained iconic status
are different and 40dB on the Rw And not in any way look like a as a fashion item in its own right.
scale is probably only about 30dB conventional house. This goes for Whilst the history of the original
on the more exacting DNTw + conversions of nearly all redundant barns has been documented by the
CTR scale. So there is lots of room buildings with some degree of likes of RW Brunskill, the history of
to improve the very basic standard historic interest; chapels, schools and barn conversions has yet to be written.
found in Part E2 of the regs, which pubs to name but three. But the bulk Barns tend to come in two distinct
applies to individual homes. of single home conversions are going flavours, timber and stone. Timber
Incidentally, if you are worried on in rural barns as these are by far predominates in the south and east
about sound proofing internally, the commonest rural structure up for where they tended to be built for
you should probably raise the issue conversion. threshing and storing corn. Stone
with your designer at an early stage. barns are more common in the
Having just completed a timber THE RULES north and the west – the Scots refer
frame/SIPS hybrid house, which n reuse existing doorways, even if to them as steadings – where they
meets the standard sound proofing they were designed for carts were most often used as cattle sheds.
routine (i.e. Level1), I don’t have a n don’t block up existing openings As cattle don’t like going up stairs,
problem with sound transfer. But n no masonry chimneys – stainless the stone barns tend to be single
then we are old and it’s a quiet home steel flues acceptable only if kept storey, the timber ones are routinely
with no teenagers. away from the ridge two storey or, more accurately, high
n as few new windows as possible – enough to accommodate a second
and any new windows should be as storey. There are of course masses
plain as possible of exceptions to this rule of thumb
BARN n no changes to the roof. Certainly and there are also masses of sheds
CONVERSIONS no dormers and preferably no and barns built of other interesting
The world of converting redundant rooflights. If rooflights, preferably on materials like cob and clay lump.
buildings is a little different to the side no one sees After a penal brick tax was
new housebuilding. You have to n repair the original material removed in 1857, a lot of brick barns
be prepared to have rules imposed wherever possible. were built which are also now ripe
on you which you might think are n if it simply has to be replaced, use for conversion. I have even seen steel
unreasonable and unfair. something similar. If it’s timber, it must framed agricultural buildings (you
The very fact that we are allowed be timber that matches the old style. can hardly call them barns) dating
to convert redundant buildings What a lot of barn designers end from the 1950s getting the modern
rather than just pulling them down up doing is building in a large glazed barn conversion treatment, complete
demonstrates that we are engaging screen area where once stood the main with stained weatherboard exterior.
with the British obsession of barn door. This is often inset into the
preserving the past, and the planners structure – this borrows a little extra PLANNING CHANGES
have a number of ways of making light for the rooms opening off the In 2014, the government made a
sure that certain rules are adhered to hallway behind the glazed screen. No change to the planning legislation
in exchange for the right to create a matter that what you end up with designed to make barn conversion

334 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

(in England only) a whole lot


easier. Before then, there had been
numerous hoops to have to jump
through to win permission to convert
agricultural buildings to residential
use. For instance, you had to carry out
an economic assessment that proved
there was no longer any commercial
use for the building.
The 2014 changes have put a
very different complexion on things
and more or less given the right
for farmers to convert redundant
buildings without even applying
for planning permission under
an extension of the Permitted
Development scheme normally used
for household extensions. Buildings
up to 450m2 in size can be converted
into a maximum of three dwellings The planners “Barn from Hell.” Almost everything that could upset a
per holding. That at least was the conservation officer is included in this design.
headline.
But of course it wouldn’t be shouldn’t be any need to alter what
planning if it didn’t have a few TIMBER BARNS exists. Given that the alternative is
exceptions and it turns out there One of the advantages of the underpinning and that underpinning
are so many exceptions that it’s old system was that it invariably is very expensive then it’s well worth
not altogether clear that it has required a detailed survey before an avoiding new foundations if possible.
made that much difference. For application could proceed. It’s still a So if you wish to build in an upper
instance, national parks and areas of great idea although and the earlier it storey, you have to find a way of
outstanding natural beauty will not is done the better, preferably before keeping the added load of this new
enjoy the new permitted development any sale is made. floor off the existing walls.
rights. Nor will barns which form Start with the foundations. Rarely The solution lies in building a
part of a listed farmhouse complex. will any of these buildings have what platform inside the barn; this can be
And stable blocks won’t be included. we now consider to be foundations achieved with stud walls underneath
And councils are still able to block in any shape or form. Stone or brick or, more commonly, using a series
development if they feel that the plinth walls just tended to spread a of beefy posts which themselves get
highway impacts are detrimental, little below ground; there were never bedded on concrete pads.
or they don’t like the look of it, or any attempts to dig down a metre Then consider the ground floor.
they simply don’t like it. So despite or so on to good bearing ground. The condition of these varies from
officially no longer requiring planning However these barns have stood the compacted earth through to level
permission, it seems that councils test of time so the principle to be concrete in good condition. Concrete
are still able to turn down a barn observed is that, if you don’t change sounds like an advantage but bear
conversion if they so wish. any of the loadings, there really in mind that in order to meet the

HOUSEBUILDER’S BIBLE l 13th EDITION 335


Chapter 15

latest U value requirement for put in a new one. underpinning situation – a couple of
floors you will almost certainly have There are two additional points exploratory test digs should reveal
to put insulation on top of it and to consider here. You don’t want to how far down your walls go under the
consequently you may be losing go down so deep that you expose ground.
significant height; sometimes it is the base of the walls otherwise you On the other hand, if you are
better to dig out an existing floor and will suddenly find yourself in an planning on building an upper
deck, you may find that you have to
negotiate a tie beam, tying the roof
trusses together. Ideally you want
your finished ground floor level to
be at least 4.5m below any tie beams
otherwise you will have to go on
hands and knees to get under the tie
beams when you want to go to the
bathroom.
Incidentally, there is no minimum
height for rooms or doorways
encoded in our building regs, but
realistically you need 2.1m clearance
on doors to make them comfortable
to pass through. If you haven’t got
a reasonable clearance there may be
ways around the problem by gaining
access to the different bays from half
landings or maybe installing a second
staircase.
It is perfectly acceptable to jack a
timber structure up when carrying
out restoration work. Expected
even. The procedure is to strip away
everything that you don’t intend to
keep. Often this means reducing the
barn to nothing more than a timber
skeleton. You then build an internal
scaffold cage and then place pins
under the header plates at the top of
the walls which take the weight of
the roof. The whole structure then
gets lifted gently off the supporting
walls at the bottom and this then
allows you to get to work restoring
these walls and go about replacing
Converting timber barns is far from straightforward. Here is a before and halfway-
through shot of a very dilapidated Cambridgeshire barn getting a makeover
the sole plates at the base of the

336 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

timber structure which are usually the conditions beneath. expensive to work with. Modern (brick)
timbers which have the worst signs An additional problem is to make barns will be cheaper because the
of rot. the structure watertight, something structure is usually in better condition.
If all the bottom joints between which it was probably never designed The more exceptional the barn, the
the sole plate and the wall studs have to be in the first place. A typical stone more it is likely to cost to convert.
rotted, it is standard practice to cut barn consists of two skins of sorted Most barns are not listed unless
the wall studs shorter and fix a new stone separated by a rubble filled they happen to be in the grounds
sole plate in a slightly higher position cavity. The existing walls will often be (or the curtilage, in planning speak)
than the old one. as much as 450mm thick so, on most of a listed farm in which case there
You will then have to add a couple barns, it’s quite impractical to build may well be extra features to consider
of courses of brick or stone onto another skin on the inside. So you (such as thatch). Generally speaking,
the plinth wall underneath to make have to work with what is there. It’s most barn conversions are undertaken
up the difference. At this point you difficult to install an effective damp by selfbuilders. Spec builders tend
would be expected to let the structure proof course and it can be difficult to shy away from them because
down again to sit on the repaired to stop rain penetration through the they don’t like the unpredictability
plinth. walls as well, so often the emphasis – although one or two plucky ones
From here on in, the timber barn is on creating structures which can will go as far as importing barns from
conversion becomes a new build. breathe (i.e. where building moisture France in order to get the right feel in
The walls will normally get covered can evaporate). a property.
in plywood or something similar The planners are unlikely to accept
and you need to add insulation a waterproof render being applied
to the structure – in this respect a to the outside face, the best you can
converted barn must perform to the realistically hope to do is to point up SNAGGING
same standards as a new house. In the gaps between the stones. And One of the many things that bedevils
timber barns, most people want to see accept, perhaps, that you are not building work is quality. If you buy
as much as possible of the original living in a new build and that you a new car or a computer, you can
timbers and therefore the tendency is may have to put up with the odd usually sort out any quality issues
to find insulation systems that wrap damp patch from time to time. at time of purchase or shortly
around the exterior. afterwards, under guarantee. But
COST with building work, it’s not quite so
STONE BARNS Barn conversions cost rather more easy because for starters it’s often
Stone barns pose rather different than new housing on a square metre quite hard to tell when a building job
problems. There will certainly be no basis. On a like-for-like basis, the unit has finished and even then there are
jacking up of the structure, rather area rate works out at between 30% often tell-tale snags which crop up
there may have to be a painstaking and 50% more than new builds. An at any point. Doors which fitted fine
repair of what is there. And the upper deck will be slightly cheaper initially start binding (sticking), stairs
requirement for good insulation to construct on a square metre basis develop a squeak, gaps open up, and
levels means that one face, usually the making two floor barns cheaper than things that looked good at first turn
inside, will have to be covered over. single storey ones. But the saving is out to be not so good when you live
You may need to underpin, especially not that great. with them for a while.
where new openings are formed Stone barns will tend to be a little With the best will in the world,
and the wall loadings are altered – it more expensive because stone is a good builder is still going to leave
very much depends on the ground always time consuming and therefore behind them a long list of items to

HOUSEBUILDER’S BIBLE l 13th EDITION 337


Chapter 15

be rectified, which is why building fuck out of you, simply makes other work of your subcontractors.
contracts have developed over the people question your sanity. There is enough information here
years to include a retention clause, Defects, supposed or otherwise, are for you to act as your own building
withholding some money for six a particular problem for professional surveyor, but you are most unlikely
months after completion. This homebuilders because they are in the to access it unless you have reason
call-back work is all part and parcel business of selling ‘the perfect home’ to doubt what is going on on your
of building work and is sometimes and common sense tells us that they project. But use it with care. As
referred to as third fixing. More often, are not really in the position to deliver the NHBC’s guide states: ‘This
it just gets called snagging. snag-free houses. The best builders guide is not intended to deal with
manage the buyer’s expectations and every situation that may arise and
DEFECTS ensure that any follow-on snags are discretion should be exercised in its
The bulk of snags tend to be little dealt with promptly but nevertheless application in specific circumstances’.
jobs that have just been overlooked the whole subject causes loads of What they are getting at here is
and are fairly easily remedied. The grief for both new home buyers and that their Consistent Approach to
usual way of dealing with this is their builders. A lot of this flack gets Finishes is not so much a checklist
to make a snags list and to work directed at the warranty providers, but a tentative rule book on what is
through it item by item. Snags list such as the NHBC, and even though or isn’t acceptable in terms of finish
have an annoying habit of growing, their warranties specifically exclude standards.
as you spot more and more items yet minor snagging, it still takes a lot of
to be completed. But eventually the their time and also causes a lot of bad GLAZING DEFECTS
snags list is finished and you reach a publicity. Take the thorny issue of damaged
stage where things start to go wrong glazing. Current practice is to install
and it becomes a repairs list. CONSISTENT APPROACHES glazed joinery early on in the build
But sometimes there are issues In an attempt to manage this program in order to make the site
which are not readily resolved. There process more systematically, the wind and watertight, not to mention
are sometimes more profound defects NHBC produce a document secure. The downside of this is that it
which will require time and money called a Consistent Approach to increases the risk of the glass being
to fix and then it can become difficult Finishes which sets about trying damaged whilst the scaffolding is
because you have to decide who is to define acceptable standards for still up and there is building work
going to pay for it. This of course all new housebuilding. It’s become so going on all around. But just what
depends on the contract you have important to them that it is now constitutes damage? And who is to
been working with. If you have hired incorporated into their general say whether blemishes are acceptable
a builder to do everything at a fixed building standards and has a chapter or not.
price, then the buck stops with the all to itself. As of 2019, the guidance The 2019 NHBC standards suggest
builder. If you’ve been acting as a has grown 24 pages in length. The the following.
project manager, things are murky NHBC, despite being viewed by n Glass should be free of unwanted
because it may not be clear who is many as an exclusive builder’s club, defects. So far so good, no one would
to blame for the issue, or if it was a makes its technical standards free argue with that. But how do you
subcontractor on a day rate, they may to view and you can find them by define defect?
well, all of a sudden, be rather hard to searching on NHBC standards and n next the ground rules for the
contact. then looking up Chapter 9. checking procedure. Glass should be
And there is the thorny problem If you are project managing, you checked in daylight, from within the
that something that might annoy the can also use this guide to look at the room and from a minimum distance

338 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

of 2m (3m for toughened, laminated


WHAT’S IN A TON? Crucial Measurements
or coated glass). From these distances,
Weight
you should not be able to see: Conventionally when the word is
1lb = 0.454kg
n bubbles or blisters written Ton it refers to an imperial
1kg = 2.2lbs
n hairlines or blobs ton. When it’s written Tonne, it’s a 1 imperial ton = 1016kg = 1.016 tonnes
n fine scratches not more than metric ton(ne). The old imperial ton Length
25mm long was 20 cwt (hundredweight): the 1 millimetre (mm) = 0.039 inches
n minute particles metric tonne is 1,000 kilogrammes. 1 metre (m) = 39.4 inches = 1.094 yards
n and that all of the above should The imperial ton is all of 1.6% 1 inch = 25.5mm
not be within 6mm of the edge of the heavier than the metric tonne 1 foot = 305mm
pane. and therefore, to all intents and 1 yard = 914mm = 0.914m
Don’t get me wrong. It’s a laudable purposes you can ignore the Area
idea to introduce some objective difference. 1 sq. metre (m 2 ) = 10.76 sq.ft (ft2 )
criteria by which to judge whether Not so the differences between 1 ft2 = 0.93m2
defects are real or imagined, but cubic metres and tonnes. Now 1 hectare = 10,000m 2 = 2.47 acres
this guidance is about as clear as the quarries or merchants can sell by 1 acre = 4047m2 = 0.4 hectare
Area of triangle = half base x height
offside rule in football. And why the using either method. In fact many
Volume
dispensation if the defect is within suppliers use both – volume up to
1 UK gallon = 4.5 litres
6mm of the edge? 10m3 and tonnes above that level.
1 cubic metre (m3 ) = 1000 litres = 220 gallons
Furthermore, I have seen damaged The conversion on sand is 1m3
1 m 3 of water = 1 tonne
sealed units — triple glazed ones, equals 1.6 tonnes but be warned Heat
no less — where the defect was a that sand is much heavier when 1 kiloWatt (kW) = 3410 British Thermal Units
strange discolouration that made wet and so you’ll be getting up 1 kilowatt hour (kWh) = 1 kW burned for one hour
the units look stripey. Clearly visible to 20% less if you are buying by 1 joule = 1 watt burned for a second
in daylight, but not covered by the weight in wet weather. However, 1 gigajoule (GJ ) = 278kWh
NHBC defects list. How do you at £6-£10/ for 10 tonne loads, it’s Specific Heat of Air = 0.33watts/m 3 /1°C
account for defects that are real cheap enough to not worry unduly Material Densities
enough but not on the defects list? over. Other important volume to 1m 3 water @ 4°C = 1 tonne (by definition!)
Hopefully with diplomacy and tact. weight conversions are noted in the 1m 3 of dry sand = 1.6 tonnes (+20% wet)
3
Material Densities section of the 1m of aggregate = 1.8 tonnes
3
adjacent table. 1m of cement = 1.4 tonnes
3
Note the critical one is water, 1m hydrated lime = 0.6 tonnes
1m 3 concrete = 2 tonnes
which is used to define the
1m 3 clinker blocks = 1.6 tonnes
relationships between metres,
1m 3 bricks = 1.2 to 1.6 tonnes
litres and tonnes. Materials with a 3
1m aerated blocks = 0.6 tonnes
density greater than 1 are heavier 1m 3 softwood = 0.45 tonnes
than water and will sink, whilst 1m 3 hardwood = 0.65 tonnes
materials with a density less than For more conversions, check out www.simetric.co.uk
1 will float. Try dropping a Celcon
aerated block in a bath full of water:
it will amaze the kids, if nothing
else.

HOUSEBUILDER’S BIBLE l 13th EDITION 339


Chapter 15

Boundary disputes 31 C
INDEX Brick 126, 199
Boundary walls 238 CAD packages 55
A buying 285 Capital Gains Tax 93
Brick factors 128 Caravans 65
Accelerator Mortgage 61, 63 Bricklaying rates 128 Carbon emissions 306
Accessibility 322 Brick slips 131 Carpentry
Actis 135, 270 Brinkley’s Slope Law 104 second fix 226
Aga 176, 248 British Thermal Units 167 Carpet 223
Aggregates 285 Broadband 211 Cashflow 65
297 connections 108 Cavity
Air Source Heat Pumps 189 builders insulation methods 119
Air tightness 141, 307 working with 5 CCTV 326
Appliances 181, 91, 199, 245 work with 5 CDM regs 84
Approved Documents 51 Builders Cedar 130
Architects 53, 70 profit margin 66 shingles 131
certificates 88 selecting 72 Ceilings 153
Architectural technologists 54 Builder’s merchants 282 Cellulose fibre 134
Architrave 226 building contracts 5 Cement 299
Asbestos 96, 298 Building Contracts 76 Chimneys 199
Attic trusses 152 Building control Chipboard 149
Auctions 29 fees 51 Circulation space 61
Building costs Clapboarding 130
B model house 16 Clayboard 106
Building Costs 320 Clay Plasters 217
Barn conversions 334 Building plots 27 Climate Change 294
Basements 275 Building regulations Code for Sustainable Homes 318
bathroom 206 Joinery 136 Combined Heat & Power 311
Bathroom lighting 209 Building Regulations 50, 87 Community Infrastructure Levy
Bathrooms 217, 232, 251 disabled access 264 12
Bay windows 132 energy efficiency 265, 299 Competitive tendering 70
Beam and Block 101 inspections 263 Computer Aided design 55
Beams 101 lighting 208 Concrete 287
Bedrooms 254 Building Research Establishment Condensation 157
Bi-fold doors 144 98 Conservation officers 47
Bill of Quantities 278 Building surveyors 54 Conservatories 272
Biomass 171 Burglar alarms 325 Consumer unit 110
Biomass boilers 190 Consumer Units 204
Blockwork 117 Contaminated Land 35
Boilers 173 Cookers
Boiling water taps 244 hoods 247
Book-keeping 88 Corten steel 131
Boreholes 186, 316 Covenants 31

340 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

Cross laminated timber 123 Excavations 96 Formaldehyde 298


Custom Build 12 Expanded polystyrene 134 Foundations 97
Cylinders 168 Extensions 264 Fridge 250
External lighting 209
D Extras 78 G
Extruded polystyrene 134
Datums 96 Garages 257
Daywork 75 F Garden design 239
Degree Days 306 Garden sheds 274
Demolition 96 Fabric Energy Efficiency Standards Gas 170
Design and Build 55 301 connections 108
Digital TV 211 Fans Glass
Disabled access 322 Kitchen and bathroom 195 blocks 221
DIY sheds 284 Fascias 164 buying 285
Domestic Hot Water 180, 306 Feasibility studies 43 structural 131
Doorbells 326 FEES 301 Glass fibre 299
Door Furniture 229 Fencing 238 Glazing
Door Linings 227 Safety 82 electrochromic 140
Doors FENSA 138 safety 137
doorsets 145 Fermacell 220 self-cleaning 141
external 144 Fibreglass Glazing defects 338
garage 258 insulation 133 Global warming 294
internal 227 Finance 63 Glulam beams 151
Dormer Windows 153 Fink trusses 151 Green electricity 194
Double glazing 138 Fire doors 228 Green oak 123
Downlighters 207 Fire engine access 329 Green roofs 162
Drains 110 Fires 192 Grenfell Tower fire 327
buying 285 Fire safety 327 Grey water 316
existing 33 Flat roofing 162 Ground floors 99
Driveways , 33 Flint 132 Ground source heat pumps 186
Drying Times 103 Floor Groundworks 94
Finished Floor Level 96 Guttering 163
E Floor area 321 Gypsum-based screeds 103
Floors 221
Earth Bonding 205 finishes 149 H
Earth-sheltered Homes 133 ground 99
Eaves 154 intermediate 145 Hardwood flooring 225
Electricity polished concrete 101, 224 Hardwoods 293
connections 108 Floor tiles 223 Heated towel rails 178
Electricity Distributors 33 Flue choices 176 Heating 166
Electrics 203 Flues controls 183
Embodied energy 296 Stainless steel 199 hot water 180
Energy rating 304 Folding sliding doors 144 supplementary 191

HOUSEBUILDER’S BIBLE l 13th EDITION 341


Chapter 15

underfloor 178 Landscaping , 234 N


warm air 194 Land to buy 28
Heat Loss Calculation 167 Larder 240 Neighbours 38
Heat pumps 186 Laundry 249 NHBC 87
Hobs 246 Lawful Development Certificate
Hollow core floors 102 262 O
Home offices 256 LEDs 206
Hydraulic lime 290 Level thresholds 323 Oak 123
Hydroelectricity 312 Lifetime homes 323 Oak frames 60
Lime 290 Off-mains drainage 112
I Lime render 129 Oil for heating 170
Lintels 117, 289 Open fires 191
I-beam floors 146 Liquid Petroleum Gas 170 Options 32
ICFs 124 Listed buildings 92 Ovens 246
Incidental Heat 169, 306 Live Work Units 256
Inner Skin 116 Loft conversions 267 P
Insulated Concrete Forms 124 Loft hatch 230
Insulation 133 Low-e glass 139 Package Build 52
acoustic 136 Low G Glass 140 Painting and decorating 217
fire rating 327 LPG 170 Pallets 287
floor 102 Parapets 155
lofts 269 M Party floors 148
Insurance 85 Party Wall Act 51, 263
Ironmongery 286 Mains Pressure Hot Water 180 Passive solar heating 308
Mastic 219 Passive stack ventilation 197
J Matwells 226 Passivhaus Standard 126, 303
MDF 299 Patch panels 213
Joinery 136 Metal roofing 160 Pattern Imprinted Concrete 236
buying 285 Meter boxes , 109 Paving 234
Joists 147 Meters Permitted Development Rights
smart 203 262
K Model House cost 16 Phenolic foam 134
Mortar 129, 290 Photovoltaics 311
Kitchen Mortgages 63 roofs 163
worktops 245 Movement sensors 326 Piling 107
Kitchens 240 Muck away 96 Planning
lighting 208 Mud rooms 240 appeals 50
MVHR consultants 42
L steel beams 150 fees 48
permission 46
Lambda values 301 Planning Permission 36
Laminated glass 137 barn conversions 334
Landfill Tax 97 basements 277

342 13th EDITION l HOUSEBUILDER’S BIBLE


APOCRYPHA

Planning Portal 262 Ranges 248 Security 324


Plasterboard 287 Ransom strips 32 Part Q 137
Plot finding 28 Readymix 287 Security lighting 326
Plot problems 34 Reconstituted Stone 132 Selfbuild mortgages 63
Plumbing tasks 199 Reed beds 113 Septic tank 112
Pocket doors 229 Reinforcing 289 Service connections 108, 33
Pods 124 Render 129 Shadow gaps 227
Polished concrete 104 Renewable Heat Incentive 169, Sheeps wool 134
Polished concrete floors 224 309 Shingles 159
Polyisocyanurate 134 Renewable Technologies 309 Shower pumps 181
Polystyrene 134 Renovations 37 Showers 252
Porches 132 Resin Bonded driveways 236 Sinks 244
Posi-Joists 146 Retention 78 SIPS 57, 122
Powerline networks 212 Ridge ventilation 156 Site Diary 88
Pre-application advice 44 Right to Build 35 Site fencing 82
Prefabs 124 Roofing Site Safety 83
Preliminaries 66 green and blue 162 SketchUp 55
Prime Cost sums 79 Rooflights 143 Skips 82
Professional fees 66 Roofs Skirtings 226
Profit 66 carcassing 151 Slate roofing 159
Programmers 183 covers 158 Slopes
Project Management 62 flat roofs 162 building into 104
Provisional Sums 80 trusses 285 Smart meters , 109
Pumps ventilation 155 Smoke detectors 328
drainage 111 Room in the roof 152 Snagging 337
Purlins 151 Rubble walls 132 Soakaways 114
R values 301, 302 Solar Control Glass 140
Q Solar panels
S hot water 183
Quantity surveyors 279 Sound insulation
Safety Fencing 82 floors 147
R Salvage 286 Sound proofing 330
Sand 285 floors 148
Radiant heat barriers 135 SAP calculations 137, 304 walls 150
Radiators 168, 177 Scaffolding 81 Soundproofing
Rafters 151 Scandinavia 60 insulation 136
Rafts 107 Scene Lighting 208 Specific Heat Loss 305
Rainscreens 131 Scotland 60 Sprinklers 329
Rainwater Screed 103 Stage payments 65
disposal 163 Screwfix 284 Stairs 231
drains 114 Second fix carpentry 226 loft conversions 268
harvesting 165, 315 Second-fix stage 214
Rainwater harvesting 115 Section 106 agreements 12

HOUSEBUILDER’S BIBLE l 13th EDITION 343


Chapter 15

Stamp duty 30 Trial pits 34 Waste pipes 200


Steel 289 Trickle vents 195 Water
Steel beams 150 Triple glazing 139 calculator 315
Stone Trussed roofing 151 connection 108
roofing 159 TRVs 184 treatment 316
walling 132 Tumble dryers 249 usage 313
Storm drains 114 Turfing 239 Water calculator 254
Stoves Wayleaves 32
Wood burning 192 U Weather compensation 185
Straw bale 125 Wet rooms 253
Structural engineer 45 Underfloor heating 178 Wickes 284
Structural glazing 141 controls 185 Windows 136
Subcontractors 74 U values 301 Wind turbines 311
SUDS 114, 235 Wiring 203
Sunpipes 154 V Wood burning stoves 192
Supply & Fix 74 Wood preservatives 298
Surveys Vacuums Worktops , 245
topographic 43 built-in 209
Sustainability 295 VAT 89 Y
flooring 223
T landscaping 239 YouGen 169
Velux rooflights 153
Taps Ventilation 195 Z
boiling water , 244 in roofs 155
Tarmac 235 Vinyl flooring 223 Zinc roofing 160
Tax 93 Zoned heating controls 184
Telecoms 210 W
Thatch 160
Thermal mass 308 Walls
Thermal stores 181 external 116
Thermostats 184 insulation 133
Thin-layer blockwork 119 internal 149
Three phase electricity 189 outer skin 126
Tiling 221 SIPS 122
Timber 292 steel frame 125
external cladding 130 timber frame 120
flooring 225 Wall Ties 117, 290
Timber Frame 57, 120 Wall tiling 221
Time penalties 78 Wardrobes 255
Tool Hire 80 Warm air heating 194
Toughened glass 137 Warranties 87
TracPipe 110 Waste disposal units 244
Tree roots 107

344 13th EDITION l HOUSEBUILDER’S BIBLE