Sie sind auf Seite 1von 2

PVT Laboratory Analysis and Their Practical Applications in Solving Oil

Field Problems

Introduction
The training program explains the types of reservoirs and discusses the PVT analysis of
each type. Each analysis embraces the validity check of samples, constant mass depletion (CMD)
to determine the bubble point or dew point pressure, flash liberation stage, constant volume
depletion (CVD) stage, differential liberation stage and separator test. The calculation techniques
and development of empirical correlations were also outlined. The trainee is also enable to
understand the quality control of the PVT data. The duration of the course is 5-days: 2-days
for reviewing the background of PVT analysis and 3-days for practical training in Central
Petroleum Laboratories (CPL).
Who Should Attend?
The course is designed for:
 Reservoir Engineers, Production Engineers, Chemical Engineers
 Senior Operators Who Work in The Field of Fluid Analysis and Simulation
Course Topics
Introduction to PVT Analysis Program
 Types of Reservoirs and Their Characteristics
 Sampling Procedure
o Bottom Hole samples
o Surface Separator Samples
PVT Analysis Procedure
 Bottom Hole samples
 Surface Separator Samples
Practical Training for Validity Check and Primary Study
 Validity Check
 Primary Study
 Calculation Techniques
Practical Training for CMD-Stage and CVD-Stage
 CMD- Stage
 CVD-Stage
 Calculation Techniques
Practical Training for Separator test
 Single Stage Test
 Multi-stage Test
 Optimizing the Separation conditions
Lecturer
Prof. Dr Saad Desouky is head of Production Department, Egyptian Petroleum Research
Institute and manages PVT Analysis Center. He holds B.sc, M.sc and Ph.D in Petroleum
Engineering. He participated in teaching several petroleum courses in two colleges of
engineering, Al-Azhar University (Egypt) & King Saud University (Saudi Arabia). He also
participated in teaching training courses for engineers and operators of different oil companies:
SUCO -Egypt, SPC -Syria, KOC - Kuwait, ARAMCO -Saudi Arabia. He published 65 papers in
the international recognized journals and conferences.
Date Title Time
Introduction to PVT Analysis Program 10:00-11:00
Types Of Reservoirs and their Characteristics 11:00-12:00
Coffee Break 12:00-12:30
1st Day
Sampling Procedure
 Bottom Hole Samples 12:30-2:30
 Surface Separator Samples
PVT Analysis Procedure
10:00-12:00
nd Bottom Hole Samples
2 Day
Coffee Break 12:00-12:30
Surface Separator Samples 12:30-2:30
Practical Training for Validity Check and Primary Study 10:00-11:00
Validity Check 11:00-12:00
3 rd Day Coffee Break 12:00-12:30
Primary Study
12:30-2:30
Calculation Techniques
Practical Training for CMD-Stage and CVD-Stage
10:00-12:00
CMD- Stage
4th Day Coffee Break 12:00-12:30
CVD-Stage
12:30-2:30
Calculation Techniques
Practical Training for Separator Test
10:00-12:00
Single Stage Test
5th Day Coffee Break 12:00-12:30
Multi-Stage Test
12:30-2:30
Optimizing The Separation Conditions

Das könnte Ihnen auch gefallen