Issue 02 • 2010

energıze
GL Noble Denton www.gl-nobledenton.com

e n e r g y. e f f i c i e n c y. e n g i n e e r i n g .
oil & gas

Dynamic Positioning
pipeline Ensuring Reliability
due diligence Building Confidence
transport Hauling a Colossus

01-GL-energize022010-U1-U4-olgmfholfh.indd 3 01.10.10 14:13


Energise advert 1:Layout 1 16/09/2010 15:44 Page 1 Energ

The global independent


technical advisor

A global network with a local presence

Assurance
Advanced Engineering
and Consulting
Marine Operations
Project Execution
Software Solutions

15915_NS 16.09 2010


15915_NS 16.09 2010

www.gl-nobledenton.com Email: glnobledenton@gl-group.com

© GL Industrial Services UK Ltd. All rights reserved.

01-GL-energize022010-U1-U4-olgmfholfh.indd 4 01.10.10 14:13


e d i t o r ia l

To Our Readers
The Deepwater Horizon case in the Gulf of Mexico has been dominating the headlines in
the past few months. With the successful reestablishment of well integrity in mid-July, the off-
shore oil and gas industry is now actively analysing the causes of the loss of life and oil spill,
considering the lessons learnt and looking at how similar occurrences can be prevented.
At GL Noble Denton we are assessing how we can best support our industry beyond this event
and have initiated programmes to enhance the risk management of offshore drilling operations
and well construction. It is clear that as our industry moves forward there will need to be greater
rigour around assurance and verification activities associated with critical aspects of design and
operation of wells and well control equipment. One of the biggest lessons we have all learnt is
that implementation and assurance of any offshore operation requires unrelenting focus.

We are keen to assist our industry to improve performance levels. Given the
combination of skills that exist in our organisation we are uniquely placed to assist our custom-
ers with evaluating risks, setting practical performance standards and providing the assurance
John Wishart and verification support to ensure those performance standards are delivered. Our heritage in
developing class rules, operations guidelines and warranty stands us in good stead to assist our
industry in a practical way to ensure that the effort the industry expends in design does indeed
pay off through assured implementation.

The rules that GL already have cover “Drilling, Work Over, Production Systems and
Process Systems”, “Principles for the Construction of Underwater Working Devices and Under-
water Working Machines”, “Control System, Instrumentation” and “Safety Systems”. In the on-
going exercise of lessons learnt it seems obvious that much more testing of critical equipment
will be necessary to minimize failure. To fulfil this objective, while providing the much needed
operational assurance that plans are indeed implemented with rigour, we will be issuing guide-
lines for the industry during the fourth quarter of this year.

The current edition of energize oil & gas gives an excellent insight of what
GL Noble Denton can do for our customers as an independent advisor. As our industry moves
into more technically challenging areas we see the need for even more sophisticated offshore
service vessels. This issue addresses dynamic positioning, highlighting the breadth of experi-
ence we have. In this edition you can also discover how mooring integrity for FPSOs can be en-
hanced, full-flow high-pressure testing of equipment can be undertaken in the UK, and how GL
Noble Denton engineers helped transport a 28,000-tonne MOPU from Abu Dhabi to Norway.

Yours sincerely,

John Wishart
President, GL Noble Denton

02/2010 3

003-Editorial-fh.indd 3 01.10.10 14:27


c o n t e n t s 0 2 /2 0 1 0

26 44 52 58 18
DP I FPSO TESTING CONVERSION EGYPT
Regulatory Integrity of Flow Centre – Elongation Burullus –
changes for mooring a world-class of a cable drilling in
S
GA

Miramar
L
RA
TU

MOZAMBIQUE
NA

DP projects systems facility laying vessel deep water


NATURAL GAS
Komatipoort
METHANE RICH GAS Matsulu

Middelburg
Pretoria Witbank
Maputo
Randfontein
Badplaas

Johannesburg
Lenasia
SWAZILAND
Secunda

29 32 8 14 40 10
Vanderbijlpark

ME
Volksrust TH
AN
ER
ICH
GA
S
Newcastle

DP II DP III INTERVIEW CRANES SASOL INSTALLATIONRichards


Bay

Dynamic Decisions and Paul Shrieve Convincing Ensuring gas Long-legged


positioning choices – updat- about technical performance at supply reliability
SOUTH AFRICA Durban
hauling service
rules in the US ed GL rules assurance crane inspection in South Africa for wind turbines

4 energıze

004 Inhalt-fhHSfhgmfh.indd 4 01.10.10 14:14


prof
in br
ile
ief

GL Noble Denton in Brief


GL Noble Denton is a TECHNICAL ADVISOR AND TRUSTED PARTNER
for the oil and gas industry.
The oil and gas business segment of the GL Group helps to design,
build, install and operate oil and gas onshore, maritime and
offshore assets to ensure SAFETY, SUSTAINABILITY AND
SUPERIOR VALUE.
GL Noble Denton is the MERGER BETWEEN GERMANISCHER LLOYD’S
(GL) OIL & GAS BUSINESS AND NOBLE DENTON, a premier provider of
life cycle marine and offshore engineering services. Since January
2010, they have been offering their services as GL Noble Denton.

GL Noble Denton is a full-service provider with broad upstream and


midstream competence FOR THE COMPLETE ASSET LIFECYCLE.
GL Noble Denton combines excellent engineering and analytical skills
with operational experience of offshore, maritime and onshore oil and
gas assets. The oil and gas business segment of GL employs MORE THAN
3,000 ENGINEERS AND EXPERTS IN 80 COUNTRIES.
We have strong expertise in complex oil and gas assets such as
MODUs, FPSOs, pipelines, subsea systems, OSVs – and assurance, asset
integrity, safety and risk, marine operations, project management and
software services to match. The scope of technical services includes safe-
ty, integrity, reliability and performance management.
GL Noble Denton is A TRULY INDEPENDENT ADVISOR without any vested
interest in selling a design, installation, fabrication or equipment.
GL Noble Denton services oil and gas clients in onshore production,
MOPU
Transfer of a onshore pipelines, storage, import terminals, LNG, refineries and pet-
jack-up plat- rochemicals, distribution networks as well as mobile offshore drilling

54 form – how to
haul a colossus
units, mobile offshore production units, fixed platforms, subsea, risers
and flowlines, offshore support vessels, tankers and shipping and off-
shore pipelines. We oversee and support the full lifecycle of an asset
from project concept to decommissioning. The business segment has
A GLOBAL REACH IN THE OIL AND GAS CENTRES of the world.

36 20 48
INTERVIEW PIPES DUE DILIGENCE
Bob Thomson,
Group Director Dy-
Managing pipe-
work vibration –
Confidence
builders for pro-
GL Noble Denton
www.gl-nobledenton.com
namic Positioning a challenge ject financing

02/2010 5

004 Inhalt-fhHSfhgmfh.indd 5 01.10.10 14:14


technical
o i l & g a s m e rg e r

assurance

Photo: iStockphoto

6 energıze

006 GL-energize-TechnicalAssurance-olHSolgmfh.indd 6 01.10.10 14:15


Assurance under-
pins everything
GL Noble Denton
offers. Our
experienced
multi-skilled
teams and our
proven software
solutions provide
certification,
Photo: iStockphoto

verification
and inspection
services.

02/2010 7

006 GL-energize-TechnicalAssurance-olHSolgmfh.indd 7 01.10.10 14:15


t e c h n i c a l a s s u ra n c e interview

“Our Advantage is the Range


of Technical Competences”

Paul Shrieve heads GL Noble Denton’s global business stream “Technical Assurance”.
energize spoke with him about what he and his team have on offer

ENErGizE: Paul, what do you do when you independent role as we do in the above verification/certi-
offer “technical assurance”? fication process.
PAuL ShriEvE: The Technical Assurance busi-
ness stream really consists of the traditional “core GL” ENErGizE: What are GL Noble Denton’s largest or most
services. It is predominately related to certification or veri- important technical assurance contracts or projects?
fication of oil and gas assets, whether they are onshore, ShriEvE: It’s fair to say that technical assurance projects
offshore or pipelines, and also associated inspection activi- are now being undertaken by GL Noble Denton in all the

SErvicE ties. This is during the design, fabrica- key oil and gas locations globally. We can now make this
tion, construction, installation and op- statement, as I am pleased to say, that we have recently
GL Noble Denton’s Techni-
cal Assurance services are in erational phases of the asset lifecycle. been awarded our first major technical assurance project in
compliance with agreed codes
The inspection can take one of Houston. We will act as the independent verification body
and standards such as:
GL Rules and Guidelines many different forms. The verification/ of a new installation being project-managed from Houston.
National and international certification process requires the wit- The majority of our projects have traditionally come
standards nessing and auditing of the fabrication from the Middle East and Asia Pacific regions. A good ex-
Rules and guidelines of
other third party institu-
and installation process of the select- ample is our project for Burullus which spanned many phas-
tions ed critical elements. These critical ele- es of the field’s development. As a result of our excellent
Statutory requirements ments are, as a minimum, selected due delivery and customer relationships we continue to support
to their criticality to the safety of the the project today. Other Middle East clients include the Ad-
asset, although business and environmentally-critical fac- noc Group and its various subsidiaries, Qatar Petroleum and
tors play in increasingly important rule. Dolphin Energy.
We also undertake projects were we act as the client In Asia Pacific, our clients include Daewoo, Talisman,
representative in more of a QA/QC role, possibly during the PetroVietnam, PTT Thailand, Carigali-Hess and Shell, and in
construction of assets or even during the operational phase. the Americas we have been working with PEMEX in Mexico
This is “second-party inspection” since do are not fulfill an for a number of years. From Hamburg, we provide support

8 energıze

008 Shrieve-olHSolfhgmfh.indd 8 01.10.10 14:15


Profile
PAuL ShriEvE is a technical engineer and
a proven manager in the energy sector
with business development, operations
management, and key account manage-
ment experience within the fields of safe-
ty, integrity and performance improve-
ment. In 2007 he joined Advantica as
Executive Director for the UK and Europe.
In 2008 he became Senior Vice-President
of Global Business Management for GL
Industrial Services and following the
reorganisation Senior Vice-President of
to assist our GL colleagues worldwide to deliver technical Technical Assurance for GL Noble Denton
assurance services, and also as deliver projects directly as at the beginning of 2010.
was the case in the classification of the Sakhalin II project
for SEIC.

ENErGizE: in what regulatory environment do you however they chose to as it is recognized as an industry
operate and who makes the rules? best practise.
ShriEvE: In some parts of the world there is a legal re-
quirement that the duty holder, generally the oil company, ENErGizE: Why do clients commission GL Noble Denton
has to employ the services of an independent verification to perform technical assurance services?
body (IVB). For example, in the UK sector of the North Sea, Technical assurance is a fairly well-defined and accepted
the offshore industry is operated in compliance with safety service. Our advantage is the range of technical compe-
case legislation. tences. For example the pipeline expertise, the marine op-
Within this legislation there is the requirement to im- erational and the structural expertise and the core inspec-
plement a verification process which should be verified by tions competences that came into GL with the acquisitions.
an IVB. This is the role undertaken by GL Noble Denton. When you put all that together, there is a very deep and
This is a requirement during both the CAPEX and OPEX broad technical knowledge base that we can avail our-
phase. What we undertake is directly associated with the selves of. I don’t think that any of the other traditional
duty holders’ ability to obtain and maintain their licence certification and verification companies can outdo us in
to operate. that respect.
There are different regulatory bodies globally who cre- Furthermore we can complement our technical assur-
ate the framework within which the industry must oper- ance services with specialist consulting support from other
ate. In some cases this framework does not oblige the duty areas of the company, to undertake detailed assessments,
holder to implement a verification or certification scheme, and problem solving of identified plant issues. LB/SNB

02/2010 9

008 Shrieve-olHSolfhgmfh.indd 9 01.10.10 14:15


t e c h n i c a l a s s u ra n c e j a c k -u p p l a tfo r ms

Huge dimensions. Down the River Elbe, just before Stade: First
The transportation
you see the four long columns reaching high
team aboard the
“Thor” platform.
up into the air, 82 metres long and almost 4
metres in diameter each. They belong to the jack-up plat-
form “Thor”, named after the Nordic god of thunder. The
floating crane platform, 70 metres in length and 40 metres
in width, is on the way to Hamburg for its naming ceremony.
Shortly before reaching its destination, it has to pass under
two high-voltage lines spanning the Elbe. Here “Thor” pulls
its legs in a little and moves along the outermost edge of
the river – where the cables do not hang quite as low as in
the middle of the faiway. The manoeuvre is successful; the
way to the port of Hamburg is now free.

Photo: Jörn Iken

10 energıze

010 Thor-fhHSfhgmolfh.indd 10 01.10.10 16:13


Long-Legged Haulage Service
The greatest potential for wind energy is to be found on the high seas. over the
coming years, thousands of wind turbines will be erected here – viable technical
solutions for ocean installation are already available

“Thor” is one of the world’s largest jack-up platforms for


the erection of wind turbines on the high seas. The vessel
is owned by the construction company Hochtief AG, which
plans to install a whole series of offshore wind farms in the
coming years. “Thor” was classified by Germanischer Lloyd.
“We have been occupied with this project since 2007,” says
Jochen Künzel, the GL Group’s project manager in charge.
“We were entrusted with the assessment and approval of
the design and responsible for monitoring the entire con-
struction process.”
Profile. The crane is able to lift 500 tonnes with an
Major Challenges outreach of 15 metres.

The new jack-up rig is needed urgently. Hochtief expects


that 800 offshore wind turbines will be installed annually in growing market for offshore wind turbines, we are now
Europe as of 2012. These units will be erected in the North better positioned than ever before.”
Sea, in water depths ranging up to 50 metres. Depending The installation of the foundation structures is Thor’s
on the depth in each case, there are different concepts first task and erecting the turbine it-
for the foundation structures to be used in anchoring the self will be the next major challenge. ABSTrACT
wind turbines on the seabed: The nacelle of a 5-MW turbine, which “Thor” is one of the
world's largest jack-up
monopiles are driven into has to be lifted 100 metres into the air, platforms for the erection
the ground, lattice struc- weighs almost 300 tonnes. Depositing of wind turbines

tures – known as jackets this load onto the tower flange is as The platform must be able
to carry heavy loads and to
– or tripods that look like much precision work as the pulling and withstand giant waves
enormous camera sup- erection of the rotor star with blades of Safety and efficiency:
GL is responsible for
ports, are deposited and 50 to 60 metres in length.
Thor’s certification
fixed to piles in the sea- To complete this demanding assign-
bed. “Thor” is equally well suited ment, the crane, which is able to lift 500 tonnes with an
to all concepts. Martin Rahtge, Chairman outreach of 15 metres, needs a stable base – which brings
of the Management Board of Hochtief’s Civil En- us back to the legs. This involves some heavy hydraulics, ex-
gineering and Marine Works division, is pleased: “In the tending to the current limits of what is technically fea-

02/2010 11

010 Thor-fhHSfhgmolfh.indd 11 01.10.10 16:13


t e c h n i c a l a s s u ra n c e j a c k -u p p l a tfo r ms

sible today, says Künzel. “Thor” can push its legs right Jochen Künzel first had to come to an agreement with the
down to the seabed, thus lifting itself out of the water. The responsible authority, BG Verkehr, on the right instrument
load to be borne here is 10,000 tonnes. Once it has been to be used for the certification. “The regulatory situation
elevated, the crane then has a fixed platform from which it remains rather unclear. In the end, we agreed on the Code

TAXING Work. can perform its work precise to the millimetre. for the Construction of Mobile Offshore Drilling Units,”
The hydraulics must Despite all the enormously heavy compo- says Künzel. “Strictly speaking, it doesn’t really fit, because
lift 10,000 tonnes nents, the jack-up platform is independent of no drilling takes place on “Thor”. But the characteristics
out of the water –
the weather. “In operational mode, the signifi- of a jack-up platform – which is therefore a ‘self-elevating
and the tilting
effects produced by cant wave height can be 2.5 metres and the platform’ in terms of the Code – are so dominant that
the wind and waves wind is allowed to reach a maximum of 12 m/s. there were no objections.”
are substantial.
As long as these limits are not exceeded, the
crane is able to do its work perfectly.” Impressive Technical Solutions

“Thor” has its own propulsion unit, enabling it to move Challenging operational situations will certainly be en-
autonomously from one plant to the next within the off- countered by “Thor”, Künzel explains. Much depends on
shore wind farm, and to take up the correct position at the the composition of the seabed on which the gigantic legs
erection site. “However, this is only a positioning system have to support the vessel. “After all, the hydraulics must
using thrusters and developing an output of 3,000 kW,” lift 10,000 tonnes out of the water. In addition, the tilting
Jochen Künzel points out. “This means ’Thor‘ is far from moments produced by the wind and waves are substan-
being a ship, and so SOLAS does not apply.” tial,” is how he describes the possible risks. The situation

Impressive.
Photo: Jörn Iken
The jack-up platform
“Thor” on its way up
the Elbe towards
Hamburg – where
the new installation
platform for wind
turbines had its
naming ceremony.

12 energıze

010 Thor-fhHSfhgmolfh.indd 12 01.10.10 16:13


Perpendicular. The 82-metre legs of the
jack-up platform were visible from afar.

could become critical in the event of a “punch through” –


when one leg of the platform sinks into a part of the sea-
bed falsely considered to be hard enough. “For this rea-
son, the platform conducts a preloading test, in which it
puts down two diagonally opposed legs on the seabed and
presses itself up. In this way, we can simulate the worst
possible operating case,” says Künzel. Certification of the
vessel includes the appraisal of such conditions by means
of global strength analyses. This also applies to the “sur-
vival mode”: the platform must be able to withstand giant
Photo: Jörn Iken

waves. For the North Sea, this is equivalent to a significant


wave height of 10 metres – which corresponds to a maxi-
mum wave height of 17 metres.

Thor: Facts & Figures The technical solutions to be seen on board “Thor” are
not the only impressive features it has to offer; the work-
The vessel is one of the world’s largest jack-up platforms for the ing and accommodation facilities are also exceptional. “We
erection of wind turbines. “Thor” was built at the Crist shipyard carried out the certification of the living and sleeping quar-
in Gdańsk; THE oWNEr IS HoCHTIEF. The construction company ters according to the Norwegian standard NORSOK,” Jo-
intends to push forward the development of offshore wind farms chen Künzel emphasizes. The members of the installation
in the North Sea through the use of the new jack-up platform crew, who work in shifts and remain on board for one to
which was classified by GL. Initially, “Thor” will be deployed in two weeks at a time, are even able to make use of a fitness
the erection of BARD Offshore 1, northeast of the island Borkum. centre – assuming they still have the energy after finishing
a hard day’s work.
Technical Data The reasons for the high-quality outfitting of the ac-
CLASSIFICATIoN: cans): 7.4 m; operating depth: commodation and leisure area is that “Thor” is also de-
GL 100 A5 Self-Elevating 50.0 m; payload: 3,300 t; signed for purposes other than the installation of offshore
Unit, A - MC AUT deck load: 15.0 t/m²; wind farms in the North Sea and the Baltic. No one thinks
HULL DIMENSIoNS: hoisting capacity: 10,000 t it is likely, but if gaps arise in the orderbook as a result of
length: 70 m; width: 40 m; GEAr: heavy-lift crane delays in the planned expansion of offshore wind farms,
height: 60 m Liebherr BOS 14 000, “Thor” is also fully fit for service in the conventional off-
LEG DIMENSIoNS: capacity: 500 t/15 m shore business. JI

length: 82 m; diameter MoorING WINCHES:


(spudcans): 3.7 m (8.5 m) 4 single winches, GL GROUP EXPERT:
Jochen künzel
oPErATIoNAL CoNDITIoNS: each pulling 30.0 t
offshore Installation
draught (without spudcans): PoWEr SUPPLY: Diesel/electric, Phone: +49 40 36149-7424
3.5 m; draught (with spud- total output: 5,010 kW E-Mail: jochen.kuenzel@gl-group.com

02/2010 13

010 Thor-fhHSfhgmolfh.indd 13 01.10.10 16:13


t e c h n i c a l a s s u ra n c e c ra n e i n s p e c ti o n

Convincing
Performance
a recent landmark project with a cOscO
subsidiary enabled GL Noble Denton’s
shanghai-based industrial inspection
team to intensify its activities in the
port machinery market

In a project involving the construction of three


ship-to-shore (STS) container cranes to be in-
stalled at the Greek port of Piraeus, GL No-
ble Denton’s Shanghai team had submitted a proposal for
quality assurance services last February, and won the con-
tract. “This is an important milestone for us, because for
the first time ever, we secured a contract with a COSCO
affiliate,” says Manfred Bernitt, Technical Assurance Man-
ager at GL Noble Denton’s Shanghai office.
The project also holds significance for Piraeus Container
Terminal S.A. (PCT), the buyer of the three STS container
cranes: PCT is the wholly-owned overseas container ter-
minal operation of COSCO Pacific whose ultimate parent
company is China Ocean Ship-
abstract ping (Group) Company (COSCO).
Shanghai Zhenhua Heavy Industry COSCO Pacific holds a conces-
Co., Ltd.(ZPMC) is the manufac- sion to operate Piers 2 and 3 of
turer of three cranes for Piraeus
the terminal facility at the Pirae-
Container Terminal S.A.
GL Noble Denton's Shanghai office us port, which serves as a bridge-
provided reliable services head in COSCO’s strategy to ex-
pand its global terminal network.
Shanghai Zhenhua Heavy Industry Co., Ltd (ZPMC) is the
manufacturer of the Piraeus cranes. “We have enjoyed an
excellent business relationship with ZPMC for some time and
Photo: Mondhe

were able to demonstrate our qualification and expertise in


a number of other projects in the past,” Bernitt explained.
“This is why ZPMC provided GL Noble Denton with the

14 energıze

014 ZPMC Kräne-fhHSfhAKfhgmfh.indd 14 01.10.10 15:52


Inspection. ZPMC,
the manufacturer of
the Piraeus cranes,
commissioned
GL Noble Denton to
perform quality
assurance services.

02/2010 15

014 ZPMC Kräne-fhHSfhAKfhgmfh.indd 15 01.10.10 15:52


t e c h n i c a l a s s u ra n c e c ra n e i n s p e c ti o n

opportunity to participate in the call for bids.” Earlier monitoring the workmanship, materials, procedures, fab-
GL assignments with ZPMC ranged from supervising the con- rication, assembly, packing and preparation for shipment
struction of a 4000-t/h shiploader for the port of Fujairah in of the cranes as well as on-site testing and commissioning
the United Arab Emirates to material verifaction of steel struc- in accordance with the buyer’s specifications and contract
tures for the Koniambo Mine Development Project in New requirements. Fabrication and assembly were completed
Caledonia. Another recent project the team was contracted on schedule at the ZPMC facilities in China, and so was
for covered the supervision of the construction of two ship- GL Noble Denton’s inspection work at the manufacturing
scheDuLe. to-shore cranes for the Egyptian port of Damietta. plant. The cranes are now on their way to Greece by ship.
An ambitious This first-ever contract from PCT provided GL ensured timely and successful delivery “thanks to the
five-month time limit
GL Noble Denton with an excellent opportunity combined efforts of all the team members and their volun-
was set for completing
the project. GL to build recognition with the Greek customer. tary overtime work,” said Wei.
ensured timely and An ambitious five-month time limit was set for
successful delivery.
completing the project. “For a project of this
scale, we would have normally estimated seven months,” STS Cranes for Piraeus –
says Bernitt. “But we made good on our commitment.” Key Specifications
type Of structure: ship-to-shore
Combined Efforts of the Experts
container crane
Three engineers were dispatched to the manufacturing site, rateD capacity: under telescopic spreader: 65 t
each one focusing on his specific field of expertise: mechan- type Of cONtaiNers tO be haNDLeD:
ical, electrical and steel structure engineering. David Chang 20’/40’/45’
Wei, non-destructive testing expert and project manager raiL GauGe: 30.5 m Lift: 46 m (above
Photos: Mondhe

with GL Noble Denton, said he felt the GL team did an Outreach: 65 m rail top), 17 m
excellent job in providing reliable, independent services. In backreach: 22 m (below rail top)
the contract, GL Noble Denton accepted responsibility for

16 energıze

014 ZPMC Kräne-fhHSfhAKfhgmfh.indd 16 01.10.10 15:52


On-Site Service. Fabrication and assembly were completed on schedule at the ZPMC facilities in China, and so was
GL Noble Denton’s inspection work at the manufacturing plant.

“The inspections went very well. The owner is satisfied sonnel lift while acquiring know-how they will benefit from
because we showed the necessary amount of flexibility in future projects,” Wei explained.
while strictly adhering to the set principles,” Wei added.
He mentioned discussions regarding welding standards that Final Spurt in Greece

arose when the Greek engineer representing the owner When the completed cranes arrive in Greece this October,
spelt out requirements the supplier found overly rigorous. GL Noble Denton engineers will do their operational in-
“We sat down to discuss this with the engineer and finally spections on site in Piraeus, including all crane commission-
agreed to the generally-recognized AWS D 1.1 standard,” ing tests, load tests, passenger lift load tests and service
Wei recounted. “I was impressed by the smooth handling load tests. It will be the first time for GL Noble Denton’s
of the communication process and the exchange of ideas.” Shanghai team to conduct a cross-border operation inde-
As a technical consultancy, GL Noble Denton is dedi- pendently. The next phase of PCT’s Piraeus construction
cated to offering suppliers a variety of options in dealing plans involves eight rail-mounted gantry cranes that will
with specific challenges. At the same time, GL Noble Den- expand the handling capacity of the container terminals.
ton ensures strict compliance with all contractual stipula- -“We have just learnt this contract has been awarded to GL
tions. When it was determined that the personnel lift of Noble Denton, too,” Wei proudly announced. ZL

the Piraeus cranes did not meet the noise and vibration
requirements of the relevant standards, Wei and the other
team members were able to offer diagnostic suggestions,
drawing on their experience and know-how. “We recom- GL NOBLE DENTON EXPERT:
Manfred bernitt
mended having the rack and pinion teeth re-grounded and
technical assurance Manager shanghai
then cleaned. By following this advice, the manufacturer phone: +86 21 2308 3868
was able to deliver what is probably the best-possible per- e-Mail: manfred.bernitt@gl-group.com

02/2010 17

014 ZPMC Kräne-fhHSfhAKfhgmfh.indd 17 01.10.10 15:52


t e c h n i c a l a s s u ra n c e b u ru l l u s

Drilling in Deep Water


As an Independent Verification Body and Quality Surveillance Provider, GL Noble
Denton has been supporting various Burullus development projects since 2003

Sienna
Solar
Simian Serpent Cairo

Scarab Sapphire

Saffron

Saurus Sequoia Successful Exploration.


A total of nine gas fields
have been discovered
off the Egyptian coast.

Some 90 kilometres from the Nile Delta shore- la. Meanwhile, geologists believe the Delta and its adjacent
line, in water depths of 250 to 1,250 metres, offshore area are analogous to other gas and petroleum-
lies West Delta Deep Marine (WDDM), Egypt’s rich deltas, such as those in Indonesia, the Niger River Delta
largest gas field development area. The region and its geo- in West Africa and the Gulf of Mexico.
logical horizons for natural gas came to attention in 1990,
when researchers discovered rich, high-quality gas deposits Ambitious Aims for all Participants

in late Tertiary sands 2 to 5 million years West Delta Deep Marine is owned by the Burullus Gas
ABSTRACT old, mainly in the Pliocene horizons, in Company consortium, a joint-venture company comprising
GL Noble Denton has pro- the Nile Delta. the Egyptian General Petroleum Corporation (EGPC),
vided technical assurance
services to the Burullus These horizons extend far into the Egypt’s national oil company, British Gas (BG) and Petronas.
projects since 2003 deep waters of the Mediterranean Sea Successful exploration and appraisal wells since 1997 have
GL Noble Denton is in
to the north and north-west of the Del- resulted in the discovery of nine gas fields: Scarab/Saffron,
charge of independent
verification and quality ta and the Western Desert, including Simian, Sienna, Sapphire, Serpent, Saurus, Sequoia, Solar
inspections
the offshore north of the Sinai Peninsu- and Sienna Up. The first WDDM fields – Scarab/Saffron in

18 energıze

018 Burullus-fhHSAKfhgmol.indd 18 01.10.10 14:17


Case Study
THE WEST DELTA DEEP MARINE (“WDDM”) Concession, located
approximately 90 kilometres off the north-western margin of the Nile
Delta, is being developed progressively to maintain current and future
gas supplies to the Egyptian domestic and export markets.
WDDM Phase VIII comprises an estimated 33 wells to be
developed in three stages; Phase VIII a, VIII b and VIII c, for comple-
tion during 2011, 2013 and 2015 respectively. Burullus appointed
GL Noble Denton to provide Independent Verification Authority
enna offshore facilities consist of eight subsea wells tied into
(IVA) and Quality Surveillance (QS) services. The challenge:
the existing WDDM gas gathering network. In addition there
INDEPENDENT VERIFICATION AUTHORITY is a shallow water control platform.
The scope of verification scheme includes design, fabrication, Independent verification services for the development
manufacture, offshore installation and commissioning. It will be projects were placed into the hands of GL Noble Denton.
applied to all offshore facilitys SCEs (Safety Critical Elements) The next development phases of the West Delta Deep Mar-
associated with the WDDM Concession development projects, such ine area, called Phase IV, comprised eight additional wells,
as subsea production trees, pipelines, jumpers, subsea manifolds five of them in the Scarab/Saffron area, two in the Serpent
and structures, control systems and umbilical incl. flying leads. field and one in the Sinbad field.

QUALITY SURVEILLANCE (INSPECTION): Subsea Equipment


Provision of all quality disciplines
With two manifolds already in place and flowline termina-
Quality Co-coordinator
tion (PLET) and umbilical termination (UTA) points for each
Senior Quality Surveyors at vendors and manufacturers of subsea
of the eight existing wells located close to the respective
production trees, pipelines, bends, umbilicals, controls, valves,
manifolds, the area is congested. The closest possible loca-
welding, NDT, coating, AUT.
tion for the new northern manifold is more than 50 metres
Quality audits / surveillance programme, including Quality Sur-
Photo: NASA

away from either existing tie-in hub.


veillance HSE Expediting.
The subsea equipment for WDDM IV includes eight
CLIENT REPRESENTATIVES horizontal subsea trees, two manifolds with subsea control
GL Noble Denton can mobilize Vessel / Barge Rep’s during the modules with 20-inch future connections, and four tie-in
installation of equipment such as subsea production trees, spool bases (TSBs) with hubs for 23 jumpers and a 66-kilo-
pipelines, umbilicals, control systems and sub-sea structures, as metre, 10-inch diameter flowline. Each Scarab/Saffron man-
well as for surveys and pre-commissioning. ifold contains a 20-inch connection hub for the tie-in of
further wells. 68 kilometres of installed umbilicals deliver
power, low and high-pressure hydraulic oil and communi-
cations services to the subsea facilities.
123 kilometres. 600 to 800 metres of water – started production Furthermore, the equipment for WDDM IV includes
The fields set
in March 2003. The daily contract quantity is 633 one new subsea distribution assembly, eight wet gas flow-
records for the
longest direct- million standard cubic feet per day (mmscfd) over meters and at least 18 flying leads. Well drilling was com-
to-beach tie- a period of at least 17 years. pleted in 2007 and gas has been flowing ever since. ZL
backs. In 2005 the Simian, Sienna and Sapphire fields
were added to increase production to the Liquefied Natural GL NOBLE DENTON EXPERT:
Hisham El-Grawany
Gas (LNG) plant at Idku on the Egyptian coast. Both of these
Country Manager Egypt
fields set records for the longest direct-to-beach tie-backs, Phone: + 202 25287295/6/7/8
with Simian being 123 kilometres in length. The Simian/Si- E-Mail: hisham.el-grawany@gl-group.com

02/2010 19

018 Burullus-fhHSAKfhgmol.indd 19 01.10.10 14:17


t e c h n i c a l a s s u ra n c e p i p e s

Managing Pipework Vibration


Vibration is a significant threat to the integrity of process pipework, yet identifying
plant at risk can be a challenge for operators of large diverse assets

Data published by the UK’s Health & Safety and maintenance, vibration and noise problems, as well as
Executive (HSE) for the offshore industry in penalty clauses and other contractual obligations associ-
the North Sea has highlighted that vibration ated with failure to supply.
induced fatigue can be a major threat to pipework integrity,
concluding that fatigue/vibration was the primary cause of Screening Methodology

over 20% of all hydrocarbon releases. In addition to the Tackling this issue on a process plant can be a significant
health, safety and environmental concerns associated with undertaking, with many kilometres of process piping and
any process fluid release, the consequences for plant oper- numerous welded and mechanical connections potentially
ations and business performance due to pipework integrity at risk. A structured screening methodology is therefore
issues can be significant, including unplanned shutdowns essential to:

Typical approach for implementing a pipework vibration screening methodology

STAGE 1 STAGE 2 STAGE 3

Photo: Dreamstime
Site measurements Detailed investiga-
Initial and assessment of tions and develop-
screening risk to pipework ment of solutions

20 energıze

020 PipeVibes-fhHSfhgmfh.indd 20 01.10.10 14:17


ABSTRACT
Pipework vibration can be
a significant threat to the
integrity of process plants
Implementation of a struc-
tured screening programme
allows high priority areas to
be identified and addressed
identify the sources of vibration excitation; During the initial screening, plant
Detailed assessments are
identify pipework at risk and assess the relative areas that are likely to experience vi- used to understand any
problems identified and to
risk; bration problems are identified by
develop solutions
pioritize effort on areas of most concern; pinpointing the main vibration sourc-
consider the possible effects of changes in plant es while assessing the relative risk for
operation. planning subsequent investigations. Stage 2 then covers
investigation of these key areas, including vibration mea-
An outline of the approach used by GL Noble Denton to surements and a review of the as-installed pipework design
address the risk of pipework vibration issues on a large di- and condition. The final stage concentrates on the loca-
verse asset, such as a gas processing plant, is shown below. tions which are of most concern. Detailed vibration

Risk. Vibration induced fatigue can be a major threat to pipework integrity


– it was the primary cause of over 20 per cent of all hydrocarbon releases.

02/2010 21

020 PipeVibes-fhHSfhgmfh.indd 21 01.10.10 14:17


t e c h n i c a l a s s u ra n c e p i p e s

measurement studies may be undertaken that cover an understanding of the cause of any failures. Recently this
a range of plant operating conditions if necessary. Solutions expertise has been applied to screening of vibration prob-
can then be developed to address the issues highlighted, lems on several gas-fired power stations, and a strategy
and validated experimentally or theoretically. is in the process of being implemented for an operator in
The approach defined in the publication from the En- North Africa with onshore and offshore gas production fa-
ergy Institute – “Guidelines for the avoidance of cilities.
MANAGEMENT.
GL Noble Denton vibration induced fatigue failure in process pipe-
implemented a work” – provides a framework for this screen- Case Study: Offshore and Onshore
structured ing methodology and is starting to be accepted For one UK client with onshore and offshore facilities, this
assessment
across the oil and gas industry as best practice. expertise was used to satisfy the requirement to manage
methodology to
identify problem However, these guidelines are primarily targeted the risk of potential vibration problems in response to rec-
areas and define at offshore installations and process plants, and ommendations by the safety regulator. To meet this objec-
subsequent
therefore require further refinement in some ap- tive, GL Noble Denton implemented a structured assess-
mitigation actions.
plications to account for specific issues, such as ment methodology to identify problem areas and define
assessment of the vibration risk on gas transmission facili- subsequent mitigation actions for the main pipework and
ties and pipework. small bore connections.
GL Noble Denton has a team of engineers based in their The initial site survey consisted of a walk-round visual
Loughborough office in the UK who carry out review of the site processes and pipework, fol-

Photo: Dreamstime
these assessments, and utilize a range lowed by basic vibration measurements
of vibration measurement equip- and assessment of the likelihood of
ment for detailed studies to gain failure of any connections. This

22 energıze

020 PipeVibes-fhHSfhgmfh.indd 22 01.10.10 14:17


Fatigue Failure

A B

Figure 1 shows an example of a failure on a small bore exercise identified key problem areas for immediate reme-
connection on the PIPEWORK OF A GAS COMPRESSOR . The dial action and further investigation, allowing effort to be
failure was detected by the release of gas into the com- focused on the highest-risk areas in subsequent stages.
pressor building through the crack in the weld between Immediate recommendations included improvement of
the upper flange and pipe section. The subsequent inves- ineffective pipework supports, addressing maintenance is-
tigation confirmed that this was a fatigue failure DUE TO sues, and design changes for vulnerable small bore con-
EXCITATION of the second mode of vibration of the small nections that were highlighted to be at risk of failure. Sub-
bore connection by forces relating to the blade passing fre- sequent detailed assessment to analyse the problems and
quency of the compressor at certain operating speeds. This develop solutions included installation of monitoring equip-
problem had evidently been occurring over a long period, ment to assess the behaviour of the compression plant over
as corrosion on the fracture face suggested the crack had its full operating range, and during transient events such as
been growing intermittently. pipeline cleaning sphere arrival.
This ongoing project is successfully demonstrating to
Stress. Fatigue failure at
the upper flange of a the UK HSE that the risk of vibration-related pipework fa-
small bore connection. tigue failure is being adequately managed across the cli-
A Crack evident at weld ent’s facilities. TM/PI
toe
B Fracture face showing
GL NOBLE DENTON EXPERT:
growth of fatigue crack
Dr Toby Miles
C Small bore connection Senior Consultant – Asset Management
with blank flange Phone: +44 1509 282284
E-Mail: toby.miles@gl-group.com

02/2010 23

020 PipeVibes-fhHSfhgmfh.indd 23 01.10.10 14:17


dynamic
o i l & g a s m e rg e r

positioning

Photo: NASA

24 energıze

024 GL-energize-DP-olHSgmfh.indd 24 01.10.10 14:17


Dynamic Positioning (DP) is a
computer-controlled system that
automatically maintains a vessel’s
position and heading.
GL Noble Denton provides DP assurance
services, including failure mode and
effects analyses (FMEA) and failure
mode, effects and criticality
analyses (FMECA).

02/2010 25

024 GL-energize-DP-olHSgmfh.indd 25 01.10.10 14:18


d y n a m i c p o s i ti o ni n g o v e rvi e w

Very Dynamic Progress


the year 2010 sees some fundamental regulatory changes for dynamic positioning

The use of of dynamic positioning in offshore at the regulatory framework. Classification societies are
projects is growing. An increased number of publishing updates to their dynamic positioning (DP) rules
DP vessels are already operating in the Gulf of as they do on a regular basis, but some of this year’s chang-
Mexico and will be required for offshore wind farm instal- es go a bit further than usual. The effects of changes to the
lation in Europe and Asia. In addition, vessels and rigs are relevant classification society rules normally have a limited
becoming larger. The industry is increasingly approaching impact because they tend to affect ships in that class only.
dynamic positioning operations from a risk awareness per- However, changes in class rules can level the playing field,
spective. A number of organizations are taking a close look thus providing the DP vessel owning community with more

26 energıze

026 Overview-olHSolfholfhgmolfh.indd 26 01.10.10 14:18


Magical Precision.
Dynamic Positioning
enables float-over
installations of top-
sides in a fraction of
the usual time. choice. 2010 also sees the first steps in a potentially radi-
cal approach to create a government-run regulatory and
inspection regime for DP applying to all DP vessels operat-
ing within a certain jurisdiction. This is happening in the
United States. The scope is wide and encompasses design
and engineering standards for DP vessels, DP operating
standards and DP training standards. These rules will fall
within the United States Coast Guard’s (USCG) scope of
inspection for vessels sailing under the US flag as well as
foreign flags.
We should also turn our attention to abstract
the International Marine Contractors As- With the growing use of
DP and a rising market
sociation (IMCA) who will, as usual, be demand, DP moves into the
publishing new guidance documents for centre of attention
This year, several changes
the DP sector as well as revising existing
to regulatory documents
guidance, including the M103 “Guide- have taken place or are
being made
lines for the Design and Operation of DP
Vessels”. IMCA are also reviewing and
updating their guidance on Annual DP Trials. This is likely to
reflect changing patterns and the increasing importance of
annual DP trials in the DP sector.

Required Reference Standards

Over the past twenty years, the international trade associa-


tion representing offshore, marine and underwater engi-
neering companies has built up a valuable source of guid-
ance documents for the DP sector, accessible to members
and non-members alike. Much of the IMCA guidance is
referenced in company management systems and is found
on the bookshelves of a large number of DP vessels regard-
less of flag or location. Oil and gas companies frequently
use IMCA guidance as required reference standards

02/2010 27

026 Overview-olHSolfholfhgmolfh.indd 27 01.10.10 14:18


d y n a m i c p o s i ti o ni n g o v e rvi e w

Inspection. A US Coast Guard Officer


inspects the emergency alarms during
an annual inspection of a foreign
vessel.

average chance of succeeding with its guidance. This is a


new venture for the MTS DP Committee and, if successful,
Photo: USCG could lead on to more.

Target Date 2012

Finally, 2010 sees the continuation of the process at IMO


to include DP training and experience standards in the on-
in pre-contract selection processes. For example, the going comprehensive review of STCW. It is expected that
IMCA CMID inspection process is currently regarded by standards for DP will be included in Part B, and hence will
clients, including most oil companies, as the preferred in- not be mandatory. Each administration will, as ever, inter-
spection tool for DP and other vessels. However, 2010 has pret its responsibilities in its own way and will source.
seen the implementation of an alternative process. This is develop its own response, whether it be in the The industry uses
the OCIMF initiative – OVID – (Offshore Vessel Inspection form of regulation, guidance or some other IMCA guidance
as required
Database) which is now gaining a foothold among oil com- measure. The target date for completion of the
reference
panies. Whether two different inspection processes can co- revision of STCW is the summer of 2012. standards in
exist comfortably in the future and still meet the industry’s It is too early at this stage to determine pre-contract
selection
apparent need for a common standard is yet to be seen. what effect the inclusion of DP in STCW will
processes.
have on the DP sector. Many in the sector are
Truly Independent Nature already suspicious of STCW certification and are likely to
IMCA’s pre-eminent position as a principal source of DP op- remain suspicious after the inclusion of DP.
erational guidance to the industry may soon be challenged: With the increasing use of dynamic positioning and a
The US-based DP Committee of MTS (Marine Technology rising market demand, dynamic positioning moves into the
Society) is set to publish wide-ranging guidance on DP op- centre of attention of a number of organizations. This year,
erations. This is planned to be presented at the MTS DP several updates and changes to DP regulatory documents
Conference in Houston in October this year. This MTS ini- have taken place or are still being made. An intensive dia-
tiative is quite independent from what is happening at the logue within the industry is currently going on, advancing
USCG although there is some cross-fertilization of ideas technological development and enhancing safety.
between the two groups. The truly independent nature of
MTS, it is after all a non-profit technological society serving This text is based on a paper presented at the
no particular special group, should give it a better-than- European Dynamic Positioning Conference in May 2010.

28 energıze

026 Overview-olHSolfholfhgmolfh.indd 28 01.10.10 14:18


dyn amic posit ion in g us rul es

Growth of
Activity
Probably the most radical development
with the greatest potential to affect the
DP community in the us, also potentially
worldwide, is currently taking place in
the united states

The proposed rule-making covers three areas:


DP design and engineering, DP operations and
DP training. The process has begun and there
appears to be a tight timetable for its development and in-
corporation as a “Code of Federal Regulation” (CFR). This
2010 initiative is a reinstatement of the stalled 1999 ef-
fort to regulate DP in the US. A limited measure was put
in place in 2003 by the USCG. Penalties for contravening

abstract a CFR are scaled depending on the se-

The NOSAC prepares recom- verity of the contravention and extend


mendations for rule-making from financial penalties (fines) through
in design and engineering,
operations and training to seizure of the vessel and on to im-
The DP sector should watch prisonment.
developments in the US Since 2003 the USCG has witnessed
and be prepared for other
coastal states following suit an almost exponential growth of activi-
ty in the DP sector offshore, particularly
on the OCS (Outer Continental Shelf) of the Gulf of Mexico.
In 2010 almost every OSV that attends rigs and platforms
in the Outer Shelf is DP Class 2 and even in the shallow
waters of the inner shelf the number of DP OSVs is increas-
Photo: iStockphoto

ing. This is in addition to the rapid rise in the number of DP


drillships and MODUs, accommodation units, construction
vessels, pipelayers and decommissioning vessels, etc.,

02/2010 29

026 Overview-olHSolfholfhgmolfh.indd 29 01.10.10 14:18


d y n a m i c p o s i ti o ni n g u s ru l e s

Photo: USCG
Results. During the annual inspection marine safety officers inspect all parts of a
vessel for safety regulations and also look for environmental hazards.

almost all of which are DP-classed. This has given ommendations are being considered by the USCG. Now,
rise to a situation where the USCG inspectors, who are the real process will start towards creating the rules and
charged with the responsibility for maintaining safety and their incorporation into a CFR. That process will include
environmental standards in US waters through regulatory review opportunities for industry and other special groups
compliance inspections, are not in a position to properly do and interests, including environmental groups and Wash-
so, since they have no regulatory basis for DP ington lobbyists.
uscg.
The US inspection inspections. This absence of a regulatory basis
regime requires all in DP is a hole that the USCG is intent on fill-
vessels to be ing. The US inspection regime requires all ves-
subjected to
annual Coast
Guard inspection.
sels, whether under the US or foreign flags, to
be subjected to annual Coast Guard inspection Infos & Events
prior to issuance of a COI (Certificate of Inspec-
oVID www.ocimf-ovid.com/microsite
tion) for US-flagged or a COC (Certificate of Compliance)
ocIMF www.ocimf.com
for foreign-flagged vessels.
IMca www.imca-int.com/
The USCG has entrusted the National Offshore Safety
DP www.dynamic-positioning.com/
Advisory Committee (NOSAC) with preparing recommenda-
tions for rule-making in the three designated areas: design relateD eVents
and engineering, DP operations and DP training. Mts DP Houston 12–13 October
NOSAC delivered their recommendations to the US IMca annual MeetIng 23–24 November
Coast Guard at the end of June 2010. NOSAC were re- aDIPec 1–4 November
quired to deliver their recommendations to the Coast
Guard by the end of June 2010. Currently, NOSAC’s rec-

30 energıze

026 Overview-olHSolfholfhgmolfh.indd 30 01.10.10 14:18


Photo: Dreamstime (l); Marcusroos (r)

Safety. The rapid rise in the number of DP drillships and MODUs, accommodation units,
construction vessels, pipelayers and decommissioning vessels call for a new regulatory basis.

NOSAC consists of industry-wide interests and is not training it is likely that existing training and certification ar-
limited to US based representatives. These industry-wide rangements, such as the internationally recognized NI DPO
interests include oil companies, drilling contractors, ves- certification scheme, are included in NOSAC’s recommen-
sel owners, equipment manufacturers, technical societies, dations, along with additional recommendations for vessel-
training institutions, trade associations and consultants. specific familiarization and training and for extending the
The work of the NOSAC working groups has been con- scope to cover engineering and electrical disciplines.
fidential in its detail. However, in broad terms there appears It should be emphasized that this current DP rulemak-
to be a move towards recognizing a considerable amount ing initiative pre-dated the Deepwater Horizon disaster by
of DP guidance already in the public domain, as well as in- many months. The path towards DP rulemaking in the US
dustry practices that have proven to be successful in con- as described above appears to be unstoppable. The DP sec-
trolling and mitigating DP incidents. For example, it is likely tor should watch developments in the US and be prepared
that the NOSAC working group on DP design and engineer- for other coastal states, especially those that have deepwa-
ing recommended to the Coast Guard that they adopt large ter oil and gas fields and rely on DP drillships and MODUs,
tracts of IMO MSC/Circ 645. DP construction and other DP applications, to follow the
American example.
Extending the Scope

The group that deals with DP operations is also likely to rec-


ognize existing industry wide guidance as well as existing
oil company practices which may exceed or differ from the GL NOBLE DENTON EXPERT:
cpt. Joe Hughes
provisions of industry-wide guidance and classification so-
Dynamic Positioning
cieties. For example, this may be the case with the NOSAC Phone: +1 281 6101090
recommendations in relation to annual DP trials. In DP e-Mail: jhughes@nobledenton.com

02/2010 31

026 Overview-olHSolfholfhgmolfh.indd 31 01.10.10 14:18


d y n a m i c p o s i ti o ni n g g l ru l e s

Decisions and
Choices

classification society germanischer lloyd (gl) has updated


its dynamic positioning rules. a brief description of the
amendments and changes

A new version of the Rules for Dynamic Pos- conditions and operational modes for DP operation,
itioning Systems was published by Germa- e.g. by means of a DP capability analysis.
nischer Lloyd in May 2010. The updated rules The owner / operator must specify the period for ter-
account for latest experience in DP projects. In addition, minating a DP operation safely after a single failure.
they highlight the importance of the redundancy concept, The operating area for the vessel must be defined as
a design requirement for class notations DP 2 and DP 3. a prerequisite for determining the DP Class Notation.
The GL DP Rules are based on IMO MSC/Circ. 645 The DP class notation required for a particular opera-
“Guidelines for Vessels with Dynamic Positioning Systems” tion should be agreed upon between the owner of the ves-
dated 6 June 1994, which still applies unchanged. The sel and the charterer, based on an analysis of the conse-
Photo: iStockphoto

owner or operator of a DP vessel has to make several deci- quences of loss of position during the operation. Depend-
sions and choices in preparing for DP classification: ing on the specific dynamic positioning operational require-
The owner / operator must define the environmental ments, one of the DP notations (DP 0 to DP 3, related to

32 energıze

026 Overview-olHSolfholfhgmolfh.indd 32 01.10.10 14:18


Rough sea. High
safety standards
and clear rules
help seamen to
master difficult
situations.

the respective IMO equipment class acc. to MSC/Circ. 645) does it specify any conditions the system must fulfil. Accu-
may be assigned by Germanischer Lloyd. racy typically depends on optimal adjustment of all involved
DP 0 anD DP 1: Loss of position is possible after a sin- DP system components, which is primarily achieved by fine-
gle failure. tuning the software in the DP control system.
DP 2: Loss of position will not occur after a single fail-
ure in any active component or system. The Redundancy Concept

DP 3: Loss of position will not occur after a single fail- To save time and money during the construction phase, it
ure in any active or static component or system. This in- is essential to define the redundancy concept as early as
cludes the loss of one compartment due to fire or flooding. possible during the design phase.
The class notation only relates to the loss of position It makes sense for the redundancy concept and the
after a single failure as defined above. It is not linked di- worst-case failure design to account for the operating
rectly to the accuracy of the positioning of the vessel, nor modes (e.g. the work to be carried out, such as pipe

02/2010 33

026 Overview-olHSolfholfhgmolfh.indd 33 01.10.10 14:18


d y n a m i c p o s i ti o ni n g g l ru l e s

laying, crane work, supply, transit, etc.) and the op- reDunDancY concePt: The means whereby
erating conditions (e.g. environmental conditions for work, the design intent for coping with a worst-case failure is im-
lifting, etc.) during the design phase to allow for appropri- plemented.
ate design modifications. In the new GL Worst-case FaIlure DesIgn Intent (WcFDI):
abstract DP Rules, this is supported by the early The worst-case failure design intent of a DP system is the
The GL DP Rules 2010 ac- approval of the redundancy concept. single assumed failure that serves as a basis for defining the
count for latest experience
in DP projects design and operating conditions. It usually involves simulta-
One of the DP notations 0
Defining Technical Challenges neous failure of several thrusters and generators.
to 3 may be assigned by GL
The first section of the new rules pro- sIngle FaIlure concePt: The single failure concept
During the service life of
the vessel, the DP system vides many definitions to form a com- assumes one single failure as the initiating event of an un-
must be tested annually mon basis of understanding in this spe- desired occurrence. Simultaneous occurrence of several in-
cial field of shipbuilding. The following dependent failures is not considered. However, common
definition updates may serve as examples: mode failures are to be examined.
DP caPabIlItY analYsIs: A theoretical calculation and Worst case FaIlure (WcF): The single failure mode
a polar plot representing the vessel’s capability to main- identified in the DP system that would have the great-
tain position under specific wind, wave and current condi- est conceivable effect on DP capability. It is determined
tions and directions. These conditions should be consid- through FMEA.
ered separately for different thruster combinations, e.g. all The definitions of the documents required for approval
thrusters, loss of the most effective thrusters, WCF. have been modified and extended, especially so for nota-

34 energıze

026 Overview-olHSolfholfhgmolfh.indd 34 01.10.10 14:18


full integration test may be required by GL, depending on
the degree of technical innovation and the complexity of
the DP system. Apart from the standard survey, a heat run
for all thrusters and an endurance test of no less than four
hours of continuous operation are required.
The main practical verification for DP 2 and DP 3 sys-
Classic. Light taut
tems is done in an FMEA proving trial pursuant to an ap-
wire, the oldest posi-
tion reference system proved trial programme. This trial serves to verify the theo-
used for DP is still retical results of the FMEA document.
Photos: BoH

very accurate in rela-


During the service life of the vessel, the DP system must
tively shallow water.
be tested annually. DP annual trials may be conducted in-
dependently from the annual class surveys. It is sufficient
to submit the documentation of the DP annual trial to GL.
For the class renewal survey due every five years, the
tions DP 2 and DP 3. These modifications af- FMea. complete FMEA proving trial has to be repeated in the pres-
The Failure
fect the area of redundancy, i.e. the redundan- ence of a GL surveyor. Upon any major modifications of the
Mode and Effects
cy concept and the Failure Mode and Effects Analysis is one DP system, a test of either the modified parts or the entire
Analysis (FMEA), including the trial programme. of the main system is required, depending on the given circumstances.
The FMEA and related trial documentation are approval For DP 2 and DP 3 vessels, the FMEA is a critical safety
documents.
the main approval documents required for class item and therefore a “living” document that must be up-
notations DP 2 and DP 3. They can be prepared by a body dated as necessary. As a key document, it provides the DP
such as GL Noble Denton. operator with guidance on corrective action in case of fail-
A novelty in the GL DP Rules is the option to assign ure. It also allows engineers to determine how temporary
both notations (DP 3 / DP 2) to a vessel so that either no- removal of a component or system, e.g. for planned main-
tation may be used in specific DP operating configurations tenance, will affect redundancy. US

as appropriate. This enables operators to ensure efficient,


optimal power output and distribution as required for the
given operating parameters.

New Details for Innovations GL MARITIME EXPERT:


uwe supke
Section 3 of the GL Rules explains surveys and tests to be
automation, germanischer lloyd Maritime
carried out during construction. A factory acceptance test Phone: +49 40 36149 9200
for the DP control system has been added. Furthermore, a e-Mail: uwe.supke@gl-group.com

02/2010 35

026 Overview-olHSolfholfhgmolfh.indd 35 01.10.10 14:18


d y n a m i c p o s i ti o ni n g interview

”Nowadays almost every


new Offshore Vessel
has DP Capability“
bob thomson, gl noble Denton’s group Director Dynamic
Positioning, about the challenges with DP and when vessels
are “fit for purpose”

energIZe: Dynamic Positioning (DP) is the using anchor chains, because the water is too deep. So he
hot topic at the moment. What does uses a DP unit which automatically and very precisely holds
gl noble Denton offer? its position to allow drilling operations to be undertaken. It
tHoMson: GL Noble Denton offers DP auditing and en- is not connected to the seabed and just keeps its position
gineering consultancy associated with new designs and for weeks at a time.
upgrades. We also perform float-overs with dynamic po-
sitioning. The auditing involves annual audits, suitability energIZe: What is the actual the challenge with DP?
inspections and FMEAs – Failure Mode and Effects Ana- tHoMson: There are many, but one is certainly whether a
lysis audits. We also provide specialist consultancy related vessel is “fit for purpose”. Let me give you an example: A
to feasibility, design and upgrades/refurbishment. It is a shipowner wins a long-term contract and goes to a ship-
growing market. The vessels are larger, more capable and yard and orders an expensive DP vessel. The shipyard will
more complicated than ever. Nowadays almost every new build it, complying with the general standards of class and
offshore vessel has DP capability. other statutory bodies, but often this may not involve a
specialist DP audit company at the outset to check the de-
energIZe: to which vessels does dynamic positioning sign.The shipowner is reliant on the capability of the ship-
apply? yard and his own experience. The shipowner’s client will be
tHoMson: Today, basically every offshore service vessel the oil company who will have specific tasks in mind for
uses dynamic positioning. This is especially relevant for the vessel and will generally demand an independent audit
windfarm installation vessels. But it’s not just ships. There from a trusted service provider such as GL Noble Denton to
are also DP semi-submersibles and drillships. Why the lat- make sure that the ship will be fit for purpose.
ter? If an operator wants to drill in 5,000 feet of water, Prior to the contract, or perhaps on delivery, the vessel
he can’t possibly use a conventional mooring arrangement will be given a full third-party audit, normally an FMEA, to

36 energıze

026 Overview-olHSolfholfhgmolfh.indd 36 01.10.10 14:18


Dynamic Positioning
Consulting & Assurance
Bob Thomson.
GL Noble Denton’s
Group Director
GL Noble Denton’s global DP team provides
Dynamic
Positioning. first-class support in oil and gas wherever you
are. Our services include design and analysis of
redundancy concepts for Class 2 & 3.
GL Noble Denton’s FMEA & FMECA is used on
all types of offshore support vessels around the
world – from drillships to offshore supply
vessels including: diving equipment, ballast
systems, pipelay equipment, bow loading
systems, heavy lift cranes.
GL Noble Denton provides global DP support
make sure the vessel is compliant with the specifications of with local resources in all regions supported
the contract. There is definitely a cost benefit of involving from a “Centre of Excellence” in Aberdeen,
a specialist DP consulting company at the outset to ensure Scotland.
that the vessel they build is going to meet the demanding
standards of the international market. SNB

GL NOBLE DENTON EXPERT: Performance


robert W. thomson
Dynamic Positioning In addition to the many feasibility studies,
Phone: +1 832 3006718
e-Mail: bob.thomson@gl-nobledenton.com GL Noble Denton has performed these float-overs
to date:
Photo: Ken Doerr

Photo: Ali Badri

Bunga Orkid A.
Bunga Raya A topside (DP assistance)
Bunga Raya E topside (DP assistance)
Rong Doi topside (DP)
EGP-3A topside (moored)
Rong Doi.
Bunga Orkid A topside (DP)
Umm Shaif CSP-1 topside (DP)
Photo: Daejoo

Umm Shaif UAP topside. Maersk.


Umm Shaif UAP topside (DP)
Umm Shaif CP-1 topside (moored)
Maersk Oil Qatar – BG topside (DP)
Maersk Oil Qatar – BE topside (DP)

02/2010 37

026 Overview-olHSolfholfhgmolfh.indd 37 01.10.10 14:18


consulting
o i l & g a s m e rg e r

Offering consulting across the entire


asset lifecycle, GL Noble Denton
combines exceptional engineering
and analytical skills with operational
experience of offshore and onshore
Photo: iStockphoto

oil & gas assets.

38 energıze

038 GL-energize-Consulting1-olHSolgmfh.indd 38 01.10.10 14:19


02/2010 39

038 GL-energize-Consulting1-olHSolgmfh.indd 39 01.10.10 14:19


c o n s u l t i ng s a s o l

S
GA
L
RA
TU
NA
NATURAL GAS
Komatipoort
METHANE RICH GAS Matsulu

Middelburg
Pretoria Witbank
Maputo
Randfontein
Badplaas

Johannesburg
Lenasia
SWAZILAND
Secunda

Vanderbijlpark

ME
Volksrust TH
AN
ER
ICH
GA
S
SOUTH AFRICA
Newcastle

Richards
Bay

AFRICA Connection. The South African


national transportation network
with more than 2,000 kilometres
of high-pressure gas pipelines.

MAP SECTION

Durban
40 energıze

040 Sasol-fhHSfhgmololfh.indd 40 01.10.10 14:19


S
GA

Miramar

MOZAMBIQUE

Ensuring Gas Supply


Reliability in South Africa
By implementing a software solution tailored to the client’s needs, Gl noble Denton
enabled South african Sasol Gas to operate its pipeline network reliably, safely
and efficiently

Sasol Gas operates and maintains the South ing similar systems for major gas pipeline clients throughout
African national gas transportation network the world, GL Noble Denton was able to demonstrate it was
with more than 2,000 kilometres of high- the right partner for this project.
pressure gas pipeline, including the 865-km cross-border Working together with Sasol Gas, GL Noble Denton en-
pipeline linking the gas fields in Mozambique to the Sasol gineered a solution that not only meets the current require-
Gas network in South Africa. Currently the network deliv- ments of the growing Sasol Gas gas transmission network
ers more than 120 million gigajoules of gas per year to over but will also handle its future needs. GL Noble Denton’s gas
541 customers in the industrial regions management system is based on the Stoner Software suite.
aBStraCt of Gauteng, Mpumalanga, KwaZulu- The accuracy of simulation provided by the SPS/Simulator
A dynamic gas transmis- Natal and Northern Free State. Sasol is unsurpassed by any other product available today. A real-
sion network requires a Gas markets two separate types of gas time, simulation-based solution is particularly suited to the
state-of-the-art pipeline
management system through their gas transmission network: dynamic operating nature of gas transmission networks. GL
GL Noble Denton engi- natural gas produced in Mozambique, Noble Denton’s SPS software suite supports a wide variety
neered a sustainable and methane-rich synthetic gas manu- of applications that can provide major benefits throughout
solution
factured in the Sasol Synfuels plant in a gas pipeline company’s organization. Sasol Gas identified
Secunda. Sasol gas realized that manag- a number of key business issues which required addressing
ing a growing, complex gas transmission network effectively in order to operate the pipeline network in a safe and ef-
requires state-of-the-art pipeline management systems. ficient manner. These included:
With a software portfolio based on world-leading pipeline balancing the volume of gas across the entire value chain;
simulation technology and broad experience in implement- managing unaccounted-for gas;

02/2010 41

040 Sasol-fhHSfhgmololfh.indd 41 01.10.10 14:19


c o n s u l t i ng s a s o l

managing a rapidly developing gas network; instruments which are used to drive the real-time, fully-
optimally utilizing the existing infrastructure to service transient mathematical simulation model of the pipeline
existing customers; network. The results from the simulation model are used
Quantifying of spare capacity. for a wide range of pipeline applications supporting all ar-
Sasol and GL Noble Denton worked together to define the eas of the gas pipeline business.
requirements for the new system, ensuring that the needs Gas capacity or line pack is one of the key parameters
of all stakeholders were met. The resultant solution was that gas controllers require in the daily operation of the
a totally integrated gas management system consisting of gas network, however it is through the use of advanced
identical on- and offline simulation tools using common predictive simulation tools that the gas controller can gain
simulation engines. Access to the system is through a web- the greatest benefits. The operations department also uti-
based graphical user interface that provides data access lize the online and predictive functions of the SPS model to
across the whole Sasol Gas organization. The main users of carry out the following operations:
the system were identified as follows: leak detection;
pressure monitoring;
Engineering operational forecasting;
SPS offline was utilized by the engineering department for line pack analyses;
piping design, station design, as well as meas- operational optimization;
SCaDa.
Supervisory Control urement station design. Typical engineering ac- composition and quality tracking;
and Data Acquisition, tivities would include: pig and scraper tracking.
a technology using
pressure and throughput analyses;
software to enable
velocity analyses/pig tracking; Marketing/System Support
realtime monitoring
and control of gas temperature analysis, heaters/conden- The marketing department uses SynerGEE Gas for long-
infrastructure
sate prediction. range planning to validate potential new business and con-
systems, industrial
plants and facilities. duct what-if studies regarding debottlenecking solutions
Gas Planning for future gas delivery needs. Marketing is also concerned
SPS on-line and predictive functions are used by the planning with identifying customers who could take gas at rates be-
department to undertake network analysis, cost analysis, as yond what their current contracts and nominations mandate
well as intermediate and long-term gas planning including: which may be difficult to recognize using current methods.
throughput a pressure analysis;
multiple scenario capability; Software Solution

contract compliance monitoring; The pipeline management system that was installed at
availability and survival analysis; Sasol Gas combined two products from GL Noble Denton’s
scheduling. Stoner family of pipeline simulation software.
SynerGee GaS is a simulation package with multiple
Operations modules which is used extensively in the design and plan-
The Operations Group is the primary user of the on-line ning of gas pipeline systems. It is used for both transmis-
pipeline management system. The system resides in the gas sion pipelines and distribution networks.
control centre where it is connected to the pipeline SCADA Stoner PiPeline Simulator (SPS), a fully-transient
system and gathers information from the field measuring simulation package with multiple modules, is used for on-

42 energıze

040 Sasol-fhHSfhgmololfh.indd 42 01.10.10 14:19


line and offline simulations of gas pipeline systems, primari-
ly transmission pipelines. The application modules selected
for the Sasol Gas project included Leak Finder, Look Ahead
Model, and Planning Predictor. The SPS Operational Inter-
face is a web-enabled graphical user interface allowing in-
formation to be displayed directly through a web browser
on any PC connected to the Sasol gas network. Access is Transmission Networks. The basic challenge for operators is
balancing the changing conditions of supply and demand.
tightly controlled through a comprehensive security system

Stoner Software by
built into the operational interface.

Project Implementation

A project team of Sasol Gas, Sastech, BCX (the Sasol Gas GL Noble Denton
IT consultant) and GL Noble Denton was established and a
number of key project stages were defined: SynerGee GaS – netWorK moDellinG anD analy-
meterinG StuDy – The need for a detailed study on SiS – SynerGEE® Gas, a general-purpose modelling tool for
the existing high-pressure fiscal metering system was iden- gas piping networks, models and analyses complex, closed-
tified. GL Noble Denton validated the systems, identifying conduit transmission and distribution pipeline systems consist-
potential areas of improvement. ing of pipes, regulators, valves, compressors, storage fields and
DetaileD DeSiGn – A detailed system design study production wells. Used extensively in the design and planning
was undertaken to define the required system functionality of gas pipeline systems, SynerGEE combines the features of the
and architecture. Interfaces with other corporate systems, most advanced pipeline simulation software commercially avail-
including SCADA, metering systems, the ERP environment able with the ease and familiarity of a Windows-based operat-
etc. had to be defined to allow the systems to exchange ing system. These modules include the Customer Management
data. All of the project stakeholders were engaged in a se- Module to link SynerGEE with the existing Customer Informa-
ries of workshops to ensure that all of the system require- tion Services, Model Builder which lets you import, filter and
ments were included in the final, detailed design. query data from multiple external GIS sources, and the Area
imPlementation – A truly multinational team from Isolation Module which allows you to choose an area to isolate
GL Noble Denton Software Solutions were involved in the for emergency planning, maintenance or other scenarios.
project, including resources in the UK as well as Mecha- Stoner PiPeline Simulator (SPS) – GL Noble Denton’s
nicsburg and Houston. Final acceptance testing took place Stoner Pipeline Simulator is the worldwide leader in transient
towards the end of 2009, followed by an intensive training flow simulation for liquid and gas pipelines. The GL Noble
programme for system users. AW Denton pipeline simulation suite provides a complete range
of simulation solutions from the design and planning desktop
through operator training and qualification, and into online
systems including leak detection and predictive simulation.
GL NOBLE DENTON EXPERT: Using new technologies and innovative architectures, SPS
andrew Wilde
easily handles any combination of scenarios including control
Software Solutions
Phone: +44 1509 28 2381
system analyses, equipment performance analyses and pressure
e-mail: andrew.wilde@gl-group.com flow capacity analyses with user-defined levels of complexity.

02/2010 43

040 Sasol-fhHSfhgmololfh.indd 43 01.10.10 14:19


c o n s u l t i ng fp s o

Integrity is Crucial
The durability of FPSO mooring systems can be improved by optimizing the de-
sign and integrity management. The results of a joint industry project (JIP) were
presented at the Offshore Technology Conference (OTC) in Houston last May

“The challenge of achieving consistent moor- Floating, production, storage and offloading (FPSO)
ing integrity for FPSOs requires operational ex- systems are used for offshore oil and gas exploration and
perience and stringent analysis of all available development. These floating systems allow access to deep-
data,” says Martin Brown, FPSO expert at GL Noble Den- water and remote reserves.
ton in Aberdeen. “Improvements are necessary in the areas In 2009 about 130 FPSO units were operating world-
of design and integrity management.” wide and many more are planned. “A floating rather than
ABSTRACT This is one of the results of Phase 2 of fixed asset is a major integrity step change,” says JIP man-
FPSO mooring systems are a joint industry project on mooring in- ager Brown. Floating hulls often have additional and com-
subject to high loads and
tegrity. The project has again brought plex interacting systems, some of which are linked to the
constant fatigue loading for
an extended duration to the fore the importance of mooring safety-critical issue of station-keeping. “The project ad-
Improved inspection and integrity, which has led to improved dresses a number of areas that are of particular concern
condition monitoring offshore inspection and condition mon- with regard to mooring/station-keeping integrity, and is
ensures integrity
itoring. feeding the results back to the operators,” Brown adds.
The OTC paper presents the steps that
have been initiated to improve mooring durability in terms Failure Detection System

of both design and integrity management, based on opera- “For the first time, the JIP has introduced a method to evalu-
tional experience. ate the extent of combined wear and corrosion affecting

44 energıze

044 MooringIntegrity-fhHSol_e2_AKolfhgmolfh.indd 44 01.10.10 14:21


GL Noble Denton FPSO Achievements
GL Noble Denton has been involved newbuilding projects, 20 conver- Noble Denton takes on all phases
with more than 100 mobile off- sions and 65 studies. With experts of the project from conceptual
shore production units since the on hull, structural, mooring, turret and front-end engineering design
first FPSO unit ever built, Petrojarl 1 and marine systems, living quarters, to detail design, site management
in 1984, including more than 15 and safety and utility modules, GL and asset integrity management.

chains over time, based on the predicted motion of the ac- says Brown. Nevertheless, detecting failures, particularly for
tual floating structure,” says the FPSO expert. This “Comley” existing units with internal turrets, represents a major chal-
model (named after the project engineer) allows a more ac- lenge. More field testing is required to come up MIC.
curate assessment to be made of the accumulated effects with improved and reliable designs. Microbiologically
of wear and corrosion. It is important to be able to evaluate An investigation has been carried out into influenced corrosion
on mooring
the loss of steel, since this will influence when a mooring the phenomenon of microbiologically influ- components can
is no longer fit for purpose. “Some mooring systems are enced corrosion (MIC) on mooring components, be a problem for
designed for 25 years or more of continuous opera- which can accelerate local corrosion signifi- operators.

tion. This is a tough challenge for any mechanical cantly. For the first time, it has been shown that MIC can
system,” says Brown. be an issue, but much more data is needed to define
More and more FPSO operators are realizing the extent of the problem; operators need to be
the commercial and safety benefits of a mooring
line failure detection system which helps to assess
whether all mooring lines are properly intact at Growth. In 2009 about
Photo: Dreamstime

any given time. The project reviewed the state of 130 FPSO units were
operating worldwide
the art in line failure detection systems. “The sta-
– and many more are
tus and maturity of the technology has improved,” planned.

02/2010 45

044 MooringIntegrity-fhHSol_e2_AKolfhgmolfh.indd 45 01.10.10 14:21


c o n s u l t i ng fp s o
OTC. Members of the
Mooring Integrity
Session at the Offshore
Technology Conference
in Houston.

more prepared to share data. The project has pro-


duced guidance on selecting optimal materials for long-
term mooring components, accounting for hardness, sur-
face properties, chemical composition and microstructure.
In addition, mooring system inspection guidance has been
developed for non-mooring specialists, enabling them to
glean as much insight as possible from remotely operated
vehicle (ROV) inspection videos.
There is a vast array of ROVs available for survey work.
Selecting the right type for a particular survey is a complex
task that not only needs to consider the scope of work

SERVICE. but also the general availability of ROVs and need to be improved. Monitoring campaigns offer verifica-
A guidance the suitability of the vessel used to deploy the tion of design and analysis assumptions, correlation of fa-
document on ROV. Smaller ROVs can now be launched over tigue analyses plus instantaneous and continuous integrity
monitoring and
recording systems the side of the actual FPSO unit itself, and some monitoring. “The most important message is probably to
helps to maximize are now sufficiently powerful to clean off ma- plan what you intend to do with the data beforehand and
the benefit of rine growth. This can help reduce the cost of then to follow through with the process so that maximum
recording data.
inspection operations significantly. The guid- benefit can be obtained from the data,” JIP project man-
ance document includes specifications for lights and cam- ager Brown sums it up. “Collecting data without interpreta-
eras, which can influence the quality of the recorded im- tion and checking for trends is a wasted opportunity. Thor-
ages considerably. ough examination allows potential issues to be detected
A guidance document on monitoring and recording sys- early before they develop into very expensive problems.”
tems produced by the project assists operators by maximiz- Brown continues: “The JIP has demonstrated that
ing the benefit gained from recording data. This data helps through close collaboration between all sides of the supply
to improve mooring response prediction tools, which still chain it is possible to accelerate the mooring integrity learn-

The 25th FPSO Research Forum


GL Noble Denton will host the 25th (JIP) Steering Committee meet- tackle these issues for the com-
FPSO Research Forum in Aberdeen, ings. The mission of the forum is mon good of the industry. As a
UK in October. More than 150 ex- to identify the common techni- public event, the FPSO Forum on
perts will meet for the four-day cal issues facing those involved Wednesday, 13 October will discuss
conference, which will include a in designing, fabricating and op- “Human, System and Ageing
number of “Joint Industry Project” erating FPSOs and to foster JIPs to Effects on FPSO Integrity”.

46 energıze

044 MooringIntegrity-fhHSol_e2_AKolfhgmolfh.indd 46 01.10.10 14:21


Photo: Film-Ocean
Inspection.
Remotely operated
vehicles are in use for
failure detection.

ing process and, at the same time, tackle areas of key expo- proceedings, was written by Martin G. Brown, Andrew P.
sure, such as mooring line failure detection and MIC. Our Comley and Morten Eriksen from GL Noble Denton, as well
work on improving inspection strategies for mooring systems as Ian Williams, Wood Group Engineering (North Sea) Ltd;
should help to identify anomalies before they get a chance Philip Smedley, BP Exploration Operating Company Limit-
to become safety-critical”. ed and Subir Bhattacharjee, ExxonMobil Production Engi-
neering. Phase 1 of the mooring integrity JIP highlighted a
Summary of Findings number of important mooring integrity challenges for the
This JIP has attracted the support of 38 organizations. GL offshore industry. Phase 2 was launched to address these
Noble Denton runs the present JIP and reports to a steering challenges. A third JIP phase is in the planning stage. MB

committee made up of world experts including operators,


regulatory authorities, classification societies, designers GL NOBLE DENTON EXPERT:
Martin Brown
and manufacturers plus service and inspection companies.
Consultant Naval Architect
The full paper, titled “Phase 2 Mooring Integrity JIP - Phone: +44 1224 289 108
Summary of Findings”, which is part of the OTC conference E-Mail: martin.brown@nobledenton.com

Contents of the Summary Paper


Definition of a practical method to estimate wear/cor- Review of the effects of Microbiologically Influenced
rosion based on calibration using field measurements Corrosion (MIC)
Feedback on the break testing of worn components Guidance on how to monitor station-keeping perfor-
The influence of proof load on fatigue endurance mance and what to do with the data received
Photo: Dreamstime

Material compatibility guidance Summary of mooring line failure detection options


Inspection guidance for ROV operators www.gl-nobledenton.com

02/2010 47

044 MooringIntegrity-fhHSol_e2_AKolfhgmolfh.indd 47 01.10.10 14:21


c o n s u l t i ng d u e d i l i g e n c e

Photo: BP
Drilling Rig. Emerging markets need energy to fuel their growth, driving developments both onshore and offshore.

Technical due diligence is a process carried Russia, India and China need energy to fuel their growth,
out by independent, third-party experts to driving developments both onshore and offshore. Rising oil
identify, mitigate and control technical risks prices further boost this trend. Rowan said the recovery
throughout a project, from its concept to completion. from the global recession will free up capital for project
During the Beijing workshop, which was chaired by Dav- funding.
id Rowan, Managing Director Execution Services at GL
Noble Denton, senior GL Noble Denton executives and The Offshore Promise

senior executives from West LB and Standard Chartered “There has been a huge boom in the construction of jack-up
Bank provided in-depth information on the subject. The rigs around the world, and there is a continuing need to
workshop was attended by over 40 representatives from replace retired units,” said David Rowan, assessing the po-
leading Chinese banks, financial institutions, energy tential for the offshore exploration market. As the offshore
companies and the media. industry goes into deep water, semi-submersibles and drill
“Currently the offshore industry is a very healthy area ships will be needed for exploration and development. An-
to do business in,” said David Rowan. Countries like Brazil, other factor is offshore renewable energy, such as wind

48 energıze

048 DueDilligence-fhHSfhfhgmfh.indd 48 01.10.10 14:21


The Confidence Builders
Technical due diligence is indispensable for project financing, especially for offshore
projects that are technically sophisticated. In a joint one-day workshop in Beijing
on 27 April, GL Noble Denton, West LB and Standard Chartered Bank explained keys
for for successful project financing

farms, where specialized installation and maintenance Finance, West LB AG, said that the biggest part of the capi-
ships are needed. tal is raised in the form of debt or construction loans from
banks. “Typically you can raise up to 80% of the project
Project Finance cost in debt,” he said. Equity accounts
Project finance is a method of raising long-term debt for 10% to 30% in typical deals. ABSTrACT
financing for major projects, based on lending against the Hertel continued that a project The financing of major off-
shore projects is big business
cash flows generated by the project alone. “It is tied to a budget needs to be mapped out care-
GL Noble Denton provides
specific asset whose repayment source comes from its cash fully before approaching the financial project structure reviews,
flow,” explained Paul Clifford, Director and Head of Project markets. “The crucial role of the inde- yard audits, design, speci-
fication reviews and execu-
Finance, Standard Chartered Bank. “In 2009, almost 300 pendent engineer during the due-dili- tion plan reviews and other
billion US dollars of project finance capital was raised gence phase is to demonstrate that the due diligence services

globally across about 700 different transactions.” assumptions underlying the proposed
Photo: BP

In his presentation on capital structures for project fi- project are conservative and feasible and will support the
nance, Claus Hertel, Executive Director – Energy Structured budget,” said Hertel.

Offshore Trends
According to Claus Hertel, West LB AG, ence in the marine and offshore industry,
offshore oil production has increased expects A 40% INCreASe IN offShore
by 22% and GAS proDuCTIoN By 55% rIG DemAND over the next five years.
since 2000. Floating Production and Storage Units
Annual offShore expLorATIoN AND (FPSO) have experienced mASSIve
proDuCTIoN expenditure is expected GroWTh over The LAST TeN yeArS ,
to increase from 250 billion US$ in 2007 with more growth predicted. Five large Growth. A great
number of new
to over 350 billion US$ in 2012. projects are to be initiated this year, and
FPSOs will be
GL Noble Denton’s David Rowan, an in- up to 75 new FPSOs will be needed over
needed over the
dustry veteran with over 40 years experi- the next five years. next years.

02/2010 49

048 DueDilligence-fhHSfhfhgmfh.indd 49 01.10.10 14:22


c o n s u l t i ng d u e d i l i g e n c e

Podium. Expert
David Rowan
(l.) at the Off-
shore Industry
Technical Due
Diligence
Workshop at
the Raffles
Beijing Hotel
close to the
Forbidden City.

Paul Clifford of Standard Chartered Bank addressed given purpose and their conformance with contract require-
a different aspect of the due-diligence process. “The due ments. In addition, the IE assesses the technical expertise of
diligence requirements serve to assure that the project can the proposed shipyard.
be completed on time and on schedule, will operate as In the second phase, independent engineers monitor
expected and will generate cash flow as projected,” he the ongoing works at the shipyard, preparing progress re-
said. A thorough feasibility study and a reasonable allo- ports based on site visits and document reviews. Once the
cation of the project risks are keys for successful project equipment is in operation, the independent engineers verify
financing, he added, listing five risk areas for whether it performs properly and lives up to expectations.
Due DILIGeNCe.
GL Noble Denton project finance: construction and completion
supports clients in risks, project contract risks, operational risks,
their assessment of
legal, social and environmental risks, and finan-
technical and Platform.
commercial risks of cial and commercial risks.
Large-scale
major oil and gas projects need
projects on- and Independence Is Key sound
offshore. financing.
“Project finance typically requires assessment by
an Independent Engineer (IE) or Technical Advisor (TA) as
an inherent requirement of the funding,” said David Row-
an. The independent engineer works under the direction of
the lender but keeps in close contact with the owner. His
work is subdivided into two main phases: due diligence
and monitoring.
Photo: Gazprom

The due diligence phase takes place once the project


has been set up and structured. The independent engineer
scrutinizes the design of specific units, their fitness for the

50 energıze

048 DueDilligence-fhHSfhfhgmfh.indd 50 01.10.10 14:22


The key requirement for all technical due diligence are investing heavily in offshore development, and Chi-
work is independence and impartiality. Rowan said that his nese yards have displayed increasing competence in semi-
creed has always been: “We have to say what we believe submersible and drill ship construction. Rowan belives ten
to be the truth.” years from now China may take the lead in this area. On
John Tate and Paul Braden, two Directors of Technical the other hand, there may be overcapacities, in which case
Due Diligence at GL Noble Denton, went into further detail a qualified independent engineer can help lenders and
concerning the work of independent engineers. Mr Tate owners identify the best contractors.
discussed project planning and research in view of mar- GL Noble Denton has facilitated the financing of several
ket fundamentals, technology, project execution philosophy, projects launched in China, drawing on its offshore exper-
planning, initial risk and cost control. He also addressed tise. For example, GL Noble Denton provides project struc-
items an independent engineer must review in a shipyard ture reviews, yard audits, design reviews, specification re-
audit, such as shipyard capabilities, management issues, views, execution plan reviews, milestone confirmations, and
yard facilities, production control, quality assurance, secu- other due diligence services for the construction of several
rity, etc. Mr Braden elaborated on three financial criteria drillships and semi-submersibles in Yantai.
an independent engineer must keep in mind: revenue gen- The workshop was wrapped up by David Rowan who
eration, costs and financial performance. In two additional conveyed the essence of technical due diligence by quoting
presentations, Braden discussed design issues in technical Ronald Reagan as saying “You hope for the best, but you
due diligence as well as items to consider when reviewing plan for the worst”. zL

shipyard and charter contracts.


GL NOBLE DENTON ExPERT:
Promising Chinese Market David rowan
managing Director execution Services
The offshore industry in China is relatively young, but its phone: +713 5434319,
potential for growth is tremendous. Chinese shipyards e-mail: david.rowan@gl-group.com

Project Finance
Project finance is a method of raising long-term developed in the Texas oilfields in the 1930’s, and
debt financing for major projects, based on LeND- later in the DeveLopmeNT of NorTh SeA fIeLDS
ING AGAINST The CASh fLoWS generated by the in the 1970’s.
project. Project finance has accelerated its development over
Project finance is not a new concept. In the 19th the past 20 years. In 2009, almost 300 BILLIoN uS
Century, the English road system and numerous rail- DoLLArS of projeCT fINANCe CApITAL was raised
way, water, gas and electricity projects were funded globally across about 700 different transactions.
uSING prIvATe SeCTor moNey . Most of the capital raised is used to fund EPC con-
Finance for natural resources projects, from which tracts (eNGINeerING, proCuremeNT AND CoN-
many modern project finance techniques are drawn, STruCTIoN) and Owner Furnished Equipment (OFE).

02/2010 51

048 DueDilligence-fhHSfhfhgmfh.indd 51 01.10.10 14:22


c o n s u l t i ng te s ti n g

A World-Class
Facility

GL Noble Denton’s Flow Centre is the


one facility where safety and financial
risk are mitigated in full-flow high-
pressure testing

“When you are standing in front of an attorney


who asks you what steps you have taken to
mitigate the risk of an accident and you can
say ‘Sir, we have taken this equipment to the only facility
on the face of the Earth that can reach the flow rates we
require’, you feel a darn sight more comfortable with your Unique Facility. The Flow Centre is the only vertical test

test programme.” This was the comment from the project rig in the world for full-flow high-pressure gas tests.

manager of a major sub-sea safety valve manufacturer fol-


lowing tests in the slam shut test rig at the GL Noble Den-
ton Flow Centre in County Durham, UK. During the test On even higher flows, this deficit will be significantly great-
work, the valve proved capable of shutting off a gas flow er – it doesn’t pay to gamble with your gas.
of 137 metres per second at 55 bar in It is an essential requirement that the measurements
abstraCt 3 seconds. This is the highest flow rate taken during a calibration can be traced to international

Manufacturers and op- available world wide for this type of test. standards. The Flow Centre uses several routes to trace-
erators of gas flow meters ability. The reference turbine flow meters used on site are
require calibrations to dem- Uncertainty and Traceability
onstrate that their products sent to Europe each year for calibration against the Inter-
are accurate Manufacturers and operators of gas national High Pressure Volume Flow Standard. In this way
The Flow Centre is the only flow meters require calibrations to dem- the meters are directly traceable to the lowest possible flow
facility for full-flow high-
pressure testing of sub-sea onstrate that their products are accurate uncertainty in the world. Temperature, pressure and electri-
safety valves and that the uncertainty can be quanti- cal calibrations are carried out on-site in the UKAS-accred-
fied. A small discrepancy in the indicat- ited Calibration Laboratory, which holds standards directly
ed flow may mean that significant differences are reported traceable to UK national standards. Using this facility has
between producers and buyers. For instance, an error of eliminated the dependency on external calibration labs and
0.1% on a typical flow of 5,000 actual cubic metres per hour reduced the uncertainty of the secondary instrumentation
(acmh) represents an annual deficit of 1.7 million euros. used on site. Laboratory activities also include a managed

52 energıze

052 Flowcenter Spadeadam-olHSfholgmfh.indd 52 01.10.10 14:22


Risk Assessment. Pipelines
are exposed to extreme
and potentially hazardous
physical forces.

orifice plate calibration and storage service to clients with a These effects can be captured in the high-speed data logging
diverse metering portfolio. Due to its quality and consisten- system for analysis and incorporation into future models.
cy, the calibration lab is the preferred choice for high-pres- GL will be commissioning an extra bank of VaLIDatION.
sure instrument manufacturers who are required to supply reference meters in the autumn to cope with Sand is fed into the
a calibration certificate with their equipment. the increased turn-down range of the latest ul- erosion rig in a single
pass which ensures
tra-sonic flow meters. This will ensure that the
that the particles are
Specialist Test Work site can maintain its position as the leading Eu- not rounded off,
With a flexible site layout and experienced technicians, the ropean test site for large meters and also allow ensuring that the GL
tests are as close to
Flow Centre is ideally suited to construct test rigs for a vari- the latest generation of sub-sea flow meters to
the operational
ety of high-pressure tests. In addition to sub-sea safety valve be accommodated in a purpose-built test line, scenario as possible.
testing, a sand erosion rig has been developed to test valves accessible with large-capacity cranes. This test
and piping geometry under real-life conditions. With the line will also be used to calibrate large mass flow meters
higher sand content found in the wells now being exploited, required when CO2 metering becomes an important indus-
there is an increased risk to the integrity of pipework and try requirement. DB

equipment. The effects can be modelled with CFD packages,


but the results need validation to ensure that the parameters
GL NOBLE DENTON EXPERTS:
and assumptions used in the model are correct.
David brown, General Manager spadeadam
Pressure drop trials on filter assemblies and pipework lay- test site & GL Flow Centre
outs can be conducted to endorse design calculations or pro- Phone: +44 1697 749138
E-Mail: david.brown@gl-group.com
vide data for more extensive arrangements. Whilst classical
alistair Milne
calculations and computer simulations are essential to devel-
Project Engineer, GL Flow Centre
op ideas, unexpected effects may occur due to complex fea- Phone: +44 1388 724039
tures or properties which may not be adequately modelled. E-Mail: alistair.milne@gl-group.com

GL Noble Denton Flow Centre


Experience.
The Flow
Centre has
been in oper-
Located near the UK National Grid the leading European test site for custody transfer meters are routine-
ation for over
Bishop Auckland compressor sta- large flow meters. Its capabilities in- ly calibrated by a team of highly- thirty years.
tion, the Flow Centre was originally clude calibration of HIGH-PrEssUrE qualified experts who know how to
a test facility for British Gas. The Gas FLOW MEtErs and a wide CONtrOL tHE EXtrEME aND PO-
Flow Centre has been in operation range of instruments, as well as tENtIaLLY HaZarDOUs PHYsICaL
for over thirty years. Today it is one tEstING PIPELINE COMPONENts in FOrCEs at work during these tests.
of the LEaDING CaLIbratION Lab- real operational conditions. In the Testing at the GL Flow Centre helps
OratOrIEs IN tHE WOrLD , and discrete, secure location, high-flow the clients to reduce financial risk.

02/2010 53

052 Flowcenter Spadeadam-olHSfholgmfh.indd 53 01.10.10 14:22


c o n s u l t i ng m o p u

54 energıze

054 Mopu-ol_e2_AKolHSfholfhgmfh.indd 54 01.10.10 14:37


The MOPUstor (Mobile Offshore Production
Unit and Storage) platform was built by SBM
Offshore, a subsidiary of GustoMSC, at Adyard
in Mussafah, Abu Dhabi, UAE. Completed in May 2010,
the platform weighs 12,500 tonnes. Upon its arrival in Nor-
way, its legs will be fitted at an in-shore location before
the unit will be taken to the offshore well site where it will
lower its legs onto the seafloor and jack itself up above
the water line. The oil from its subsea storage tank will be
transferred to tankers through a submerged loading sys-
tem (SLS).

How to Haul a Colossus


In Egersund Basin in the North Sea, 100 km off the coast of Norway, Talisman En-
ergy is about to install a MOPUstor jack-up platform to develop the YME oil field.
The catch: The unit was built in far-away Abu Dhabi. Experts from GL Noble Denton
made sure the challenging transfer from the yard to the dry-transport ship
went smoothly

The transport of the MOPUstor to its load-out location


and the load-out onto the dry-transport vessel for the voy-
age to Norway were technically very challenging and re-
quired utmost engineering skill. At the yard, the unit was
transferred onto a specially mod-
ABSTrAcT
ified bottom-reaction, semi-sub-
The MOPUstor jack-up platform mersible barge that had been fit-
for the YME oil field off Norway
was built in Abu Dhabi ted with side sponsons forward

The transfer from the yard to the and coupled with a large hinged
sea transport vessel was a major secondary support barge aft to
engineering challenge
partially support the weight of
GL Noble Denton played a key role
the module. With a final floating
in ensuring the safe transfer
Precision Job. displacement of 28,600 tonnes –
Manoeuvring the behe-
the complete unit was 139 me-
moth down Mussafah
Channel was a complex tres long and 85 metres wide at the water line (98 metres
challenge. overall) at a maximum draught of 5,20 metres and

02/2010 55

054 Mopu-ol_e2_AKolHSfholfhgmfh.indd 55 01.10.10 14:37


c o n s u l t i ng m o p u

with an air draught of 55 metres – this was by far the astrous consequences for the integrity of the module.
largest vessel ever built in Abu Dhabi. Furthermore, ongoing dredging operations for the near-
by new Mussafah Channel added to the complexity of
Narrow Channel the move because they had a continuously changing lo-
SBM Offshore called on the local knowledge and tow- cal effect on tidal time predictions. Tidal gauges were set
age expertise of GL Noble Denton’s Abu Dhabi office to up to monitor the change in tidal predictions and ensure
supply two tow masters for the voyage out, prepare a up-to-date data was available to the tow masters. SBM
concise towage manual and look after all marine aspects. Offshore gave invaluable support throughout this data
The tow masters faced numerous obstacles and chal- gathering process.

Off to Norway. Excellent sea


and weather conditions
were key requirements for
successful load-out.

lenges to complete this operation in a safe and efficient Additional complications resulted from ongoing con-
manner, given the draught and size of the MOPUstor struction work for a new bridge across the channel. Pre-
unit. It was also essential for the unit to clear the Mus- passage the channel lateral buoys required repositioning,
safah Channel, which is subject to very strong BAThYMETrIc and coordination and cooperation with the construction
tidal currents, by nightfall. SUrvEY. The contractors and port authorities was needed to ensure that
The initial, narrow section of the chan- water depths operations were shut down temporarily for transit. Maxi-
and ocean floors
nel had not been officially surveyed since were analysed to mum clearance through this area at water level was just
1986. A full bathymetric survey, study- ensure accurate 40 metres.
and reliable
ing the water depths and ocean floors, of For the day of the move the entire channel, which is
data.
the 18-mile channel was completed to en- critical for the supply of all Abu Dhabi offshore drilling op-
sure accurate and reliable water depth data. It was de- erations as well as various shipyards and EPC contractors,
termined that the transit was tide-bound and could was closed to all vessel movements to ensure that no traffic
only be completed safely during certain tidal win- would be encountered during the passage down the Mus-
dows. Any grounding of the barge would have had dis- safah Channel.

56 energıze

054 Mopu-ol_e2_AKolHSfholfhgmfh.indd 56 01.10.10 14:37


The MOPUstor, including all support barges, was to be carefully manoeuvred alongside and loaded out onto the
loaded out onto the semisubmersible dry-transport vessel “Mighty Servant 1”. This was reportedly the largest-dimen-
“Mighty Servant 1” for the voyage to Norway. Owned by sioned load ever carried on board this ship; its final deck
Dockwise, Mighty Servant 1 is one of the largest carrying clearance was less than one metre forward and zero aft
vessels on the market. The wind and sea conditions would with substantial overhangs either side. The load-out op-
be critical for open water towage and for the load-out op- eration took approximately five hours and followed a care-
eration. Two separate, independent weather forecasts were fully planned procedure. After deballasting for the voyage,
constantly monitored to ensure the stipulated weather cri- the final MOPUstor transport weight was approximately
teria would be adhered to. On 12 August 2010 at 06.05 23,000 tonnes.

Mighty Servant 1
OWNEr: Dockwise BEAM: 40 m (130 ft)
BUILDEr: Oshima Shipbuilding Co. DrAUGhT: 4 m (13 ft) (minimum)/
Ltd., Oshima, Japan 8.77 m (28.8 ft) (sailing)/
IMO NUMBEr: 8130875 26 m (85 ft) (submerged)/
TONNAGE: gross tonnage (GT) of 14 m (46 ft) (maximum cargo)
29,193 tonnes / 40,910 metric tonnes DEPTh: 12 m (39 ft)
deadweight (dwt) DEPTh OF hOLD: 50 x 16 x 7.5 m
LENGTh: 190.03 m (623.5 ft)/ [160 x 52 x 25 ft]
174.70 m (573.2 ft) b.p. hATch: 31 × 14.6 m [102 × 47.9 ft]

a.m., Captain David Wells, assisted by Captain Morvan Le This project has underlined the versatility of GL Noble
Dorven, Senior Surveyor from GL Noble Denton, as well as Denton in tackling all aspects of complex offshore opera-
five towing vessels, manoeuvred the complete unit from tions and in providing clients with comprehensive expertise,
Adyard Mussafah, completed a 180-degree turn and pro- and thereby, the level of comfort and confidence they need.
ceeded down the channel. The wind and tidal conditions The feedback GL Noble Denton received from its clients
were favourable. The 18-nautical-mile Mussafah Channel speaks for itself: “The operation was a great success and GL
transit was competed in less than 6 hours. The tow was Noble Denton was instrumental in this achievement.” MLD

then taken 20 nautical miles offshore to the “Mighty Ser- NOTE: GL Noble Denton’s sub-contractor Chris Lovett did all the lead-up
vant 1” load-out position. work but he was not able to attend during the tow.

Successful Finale GL NOBLE DENTON EXPERT:


Morvan Le Dorven
At first light the following morning, weather conditions
Marine Operations consultant and Surveyor
were acceptable for the load-out and, after rearrang- Phone: +971 2 44298704653
ing the towing vessel configuration, the MOPUstor was E-Mail: morvan.le-dorven@gl-nobledenton.com

02/2010 57

054 Mopu-ol_e2_AKolHSfholfhgmfh.indd 57 01.10.10 14:37


c o n s u l t i ng s h i p c o n v e rs i o n

Elongating of a
Cable Laying Vessel

Starting a new life: The cable laying vessel (CLV)


“Nexans Skagerrak” was recently relaunched after
a successful conversion and upgrade

The CLV “Nexans Skagerrak” was the first


purpose-built ship to be designed specifically
for the transport and installation of submarine
high-voltage cables and umbilicals. There are to date only
two vessels of this kind in the world. The conversion was
initiated by the owner, cable solutions supplier Nexans, to
increase the vessel’s capability to per-
abSTraCT
form more demanding cable and um-
The cable solution supplier
Nexans initiated the con- bilical installation tasks as well as to
version of its CLV “Skager-
provide a service life extension. Ready for Operation. The upgraded “Skagerrak”.
rak” to meet the changing
needs of customers Throughout its life, the vessel has
The owner engaged GL been constantly upgraded and new sys- ment, design and construction follow-up. The scope of the
Noble Denton to manage
the conversion
tems have been added, but this conver- conversion included improved loading condition, enhanced
sion is the largest and most complicat- deck facilities, as well as increased and upgraded accommo-
ed upgrade to date. The available time for the actual con- dation facilities. The loading condition enhancement was
version was limited due to the vessel’s busy schedule, so done by lengthening the vessel by 12.5 metres. The new
three months construction time had to suffice. hull section was prefabricated to save conversion time, and
the Cammel Laird yard Birkenhead, United Kingdom, had
Increasing Capability to prefabricate some 800 tonnes of steel before the vessel
Nexans engaged GL Noble Denton in Sandefjord to manage arrived for the actual conversion work. The work included a
this conversion, who provided a team for project manage- totally reworked global strength as well as stability calcula-

58 energıze

058 Skagerak-olHSgmfh.indd 58 01.10.10 14:22


Oxmx mxis. GLMillibus. Tin

nam latem eicto doluptae

idunto estenis est quam,

quaes inus et harumqui

Change. An additional
accommodation module
and a new work deck
have been installed.

tions and design of all steel structures for hull strengthen- and facilities that needed to be interfaced during the in-
ing in addition to the extension plug itself. The upgrade in- sertion of the new hull section, as well as the general
creased the ship’s deadweight from 7,886 to 9,373 tonnes. challenge to get new and old systems to fit together as
After the conversion, the vessel has a perpendicular one seamless unit.
length of 112.25 metres. A new 2,000-m work deck was
2
The GL Noble Denton team covered all the phases of
fitted on board to accommodate requirements for increased this conversion, namely the conceptual design and concept
storage and to accommodate additional cable selection, preparing yard specifications, evaluating a pro-
ProjeCT.
The first task for laying equipment. This work also included some posed yard, the naval, structural and marine systems design
the ”Skagerrak” modifications of existing cable laying equipment, as well as the safety systems design. GL Noble Denton pro-
is laying of
fitting new deck cranes and an upgrade of the vided the yard supervision and was responsible for all class
292 km of HVDC
cable for the BP on-deck safety systems, including fitting of two and as-built documentation. ØT

Valhall Power new lifeboats and lifeboat stations. Domestic This article was first published in “Ship + Offshore” magazine.
from Shore and service areas such as mess room, dayrooms
project in the
and galley were refurbished in addition to an
North Sea.
increased number of single cabins to 60, includ-
ing the fitting of one accommodation module with 17 sin-
gle cabins, which was prefabricated to save conversion time.
GL NObLE DENTON ExpERT:
Coordinating New and Old Systems Øyvind Thoresen
engineering Manager
The work performed was reported to be complex both Phone: +47 33 447051
due to the limited time and the large amount of systems e-Mail: oyvind.thoresen@nobledenton.com

02/2010 59

058 Skagerak-olHSgmfh.indd 59 01.10.10 14:22


o ro
a i l &ugnads xt xhxex xwo
x xrl
x xdx x x x x x x x x

projects in brief
Solitaire. The tubes
Nord Stream Gas for Europe will be welded aboard
the pipelay vessel.
baltic sea Pipe-laying operations for the
Nord Stream subsea gas pipeline project,
which will connect Russia and the European
Union via the Baltic Sea, have begun re-
cently. The 1,220-km pipeline will be capa-
ble of supplying enough gas for 26 million

Photo: Nord Stream AG


households in Europe. GL Noble Denton,
Department Plant and Pipelines in Ham-
burg has been tasked to conduct various
safety studies to ensure optimal pipeline
routing and maximum safety, including:
study of potential interference with ship- to maintain ease and safety of shipping; These studies have been of particular
ping, evaluating the probabilities of acci- assessment of possible interference with importance since the Baltic is a relatively
dents in close vicinity of the pipeline route; a planned offshore wind farm in the shallow, highly sedimented, largely en-
assessment of potential emergency an- “Adlergrund” area; closed sea. All parties involved are work-
choring and grounding near the pipeline; evaluation of military training areas in ing hard to assure that the Nord Stream
investigation on the optimal burial the course of the pipeline routing; pipeline, which is due to come fully on line
depth of the pipelines inside the Greifs- study of the draught of shipping traffic in 2012, will not inflict any further envi-
walder Bodden up to the border of the in the German EEZ and the risk of po- ronmental harm on the Baltic or interfere
German Exclusive Economic Zone (EEZ) tential interference with the pipeline. with ship traffic.

Oktopus Know-how to Investigate Deep Sea Areas

germany GL’s Pressure Vessels and Under- and tested by technical experts from the
water Technology department has recently Pressure Vessels and Underwater Technol-
certified a research vehicle for deep sea ogy department according to the new re-
use up to 6,000 metres. The epibenthos vised GL Rules for Underwater Technology,
sledge, built by Oktopus GmbH, Kiel, Ger- Chapter 3, Unmanned Submersibles (ROV,
many, consists of a towed steel frame AUV) and Underwater Working Machines.
equipped with searchlights, a camcorder, a The rapid increase in worldwide ener-
pressure-compensated battery as well as gy demand has been driving the explora-
testing equipment. The epibenthos sledge tion of new deep-sea energy resources
is now ready for deployment on deep sea such as gas hydrates, oil and gas. The in-
floor exploration missions. vestigation of deep sea areas in general
The Greek word “epibenthos” is a sci- and the exploration and mining of energy
entific term used for animals that live on or resources in particular require special
immediately above the seafloor. Some are know-how. The GL team for pressure ves-
attached to the substrate, others are mo- sels and underwater technology specializes
Epibenthos. The research vehicle is now bile. Examples are sponges, corals or star- in ensuring safe and reliable underwater
ready for deployment. fish. The epibenthos sledge was examined systems.

60 energıze

060 Projects-fhplfhgmfh.indd 60 01.10.10 15:41


Illustration: British Crown and SeaZone Solutions Ltd.
GLGH Research Report Marks London Array Service Contract for
Growth in Europe 630-MW Phase
London
europe GL Garrad Hassan has released a england London Array will be the
ArrAy
new edition of their “Offshore Wind Energy world’s largest offshore wind farm when
Market Report”. It shows that concerns over fully complete. Located around 20 km off
energy security, climate change and ambi- the British coasts of Kent and Essex, off-
tious European renewable energy targets shore construction on the first 630-MW
have led to an improved regulatory frame- phase of the project is due to start early
work, and increased industry action in Euro- next year. During the offshore installation
river
ThAmes
pean markets. Despite activities in other of the 175 turbines for phase one, GL 30 km
regions, the European offshore wind mar- Noble Denton will confirm that technical
Offshore Installation. London Array
ket is likely to outpace the rest of the world risks are kept within acceptable levels.
will serve 475,500 homes.
for some years to come, mainly because of The technical service provider to the
improved support mechanisms in the main energy industries has been contracted by of CO2 each year. “The transportation and
offshore markets identified. The new report London Array Ltd to perform Marine War- installation of huge, awkwardly shaped
provides detailed information on market ranty Survey services for the first phase of structures offshore involve risks that can
status, drivers and barriers, as well as a the project. The first 630-MW phase is only be mitigated by adhering to codes
regulatory framework and industry outlook. scheduled for completion by the end of and standards,” says Gabor Bohner, who
In addition, it includes exclusive in-house 2012. With its capacity it will generate heads GL Noble Denton’s Marine Opera-
wind resource maps that utilize GL Garrad enough energy to supply around 475,500 tions and Marine Warranty Survey
Hassan’s real project experience. homes and displace over a million tonnes department in Hamburg.

BEP GL Noble Denton Software Selected for Bunde-Etzel Pipeline Project

germany The pipeline management sys- Transport Services (GTS) entry point/exit ment system will use its industry-leading gas
tem for the Bunde-Etzel Pipeline (BEP) in point at Oude Statenzijl, which is part of modelling software, Stoner Pipeline Simula-
Western Europe will be provided by GL the gas transportation system of GTS in the tor (SPS), to provide advanced functionality
Noble Denton. The BEP project involves the Netherlands. This pipeline, covering a dis- for the safe and efficient operation of the
connection of a 48" pipeline from gas tance of 60 km, will become a major source pipeline. This includes real-time leak detec-
storage facilities, which are currently under of natural gas for Western Europe. tion and location, as well as predictive appli-
development in Etzel, Germany, to the Gas GL Noble Denton’s pipeline manage- cations to support pipeline operations. The
system will be integrated into IT company
Photos: Bunde-Etzel-Pipelinegesellschaft

Telvent’s supervisory control and data acqui-


sition (SCADA) system to provide a complete
control system for the pipeline that will
optimize security and operations as well as
help assure reliable supply.

Construction. The pipeline connects the


cavern facility in Etzel to the natural gas
grid in Oude Statenzijl in the Netherlands.

02/2010 61

060 Projects-fhplfhgmfh.indd 61 01.10.10 15:41


service

dates & rules


Conferences & Fairs IMPRINT
energize oil & gas, issue No. 02/2010,
October 2010 Frequency energize oil & gas
OCTOBER is published twice a year Published by
Germanischer Lloyd Aktiengesellschaft,
11. – 13.10.2010
Hamburg Editorial Director Dr Olaf
TEAM Europe 2010 Mager (OM), Corporate Communications
Edinburgh, UK Managing Editor Stefanie Normann-
Edinburgh. Scotland’s
Birkholz (SNB) Authors of this issue Lea
12. – 13.10.2010 capital with a fine tradition.
Behnsen (LB), David Brown (DB), Martin
MTS Society Dynamic
Brown (MB), Karsten Hagenah (KH), Joe
Positioning Conference
Hughes (JH), Jörn Iken (JI), Morvan Le
Houston, Texas, USA
Houston. The city of the Dorven (MLD), Zhang Li (ZL), Toby Miles
GL Noble Denton: booth 20 (TM), Stefanie Normann-Birkholz (SNB),
US oil and gas industry.
13.10.2010 Richard Palmer (RP), Uwe Supke (US),
Felix Weise (FW), Andrew Wilde (AW)
25th FPSO Research Forum
Cover photo iStockphoto Design and
Aberdeen, UK
Aberdeen. The so-called production printprojekt, Schulterblatt
26. – 29.10.2010 “oil capital of Europe”. 58, D-20357 Hamburg Layout Oliver
28th North Sea Flow Lohrengel Translations Andreas Kühner
Measurement Workshop Prepress Fire Department Printed by
Media Cologne Kommunikationsmedien
St Andrews, UK St Andrews. Location of
GmbH, Luxemburger Straße 96, D-50354
NOVEMBER Scotland’s first university.
Hürth Reprint © Germanischer Lloyd

Photos: AngMoKio, Jjhake, Urban, Nicolai Schäfer, Iardo, Hussain Al-Ahmed, Dave Wheeler
Aktiengesellschaft 2010. Reprinting
01. – 04.11.2010
permitted on explicit request – copy
ADIPEC 2010
requested. All information is correct to the
Abu Dhabi, UAE
Abu Dhabi. The capital of best of our knowledge. Contributions by
GL Noble Denton: booth 11430 the United Arab Emirates. external authors do not necessarily reflect
23. – 24.11.2010 the views of the editors or of Germanischer

International Marine Lloyd Enquiries to: Germanischer


Lloyd AG, Corporate Communications,
Contractors Association Dubai. Boomtown in the Brooktorkai 18, D-20457 Hamburg, Phone:
(IMCA) Annual Seminar Persian Gulf. +49 40 36149-4509, Fax: +49 40 36149-
Dubai, UAE
250, E-Mail: pr@gl-group.com
23. – 25.11.2010
Subscription service: for address
Asset Integrity Aberdeen. The Mercat changes and orders please send an
Management 2010 Cross in the town centre. e-mail to publications@gl-group.com
Aberdeen, UK

30.11. – 03.12.2010 This product was


printed on FSC
OSEA 2010 Singapore. Fascinating Certified Paper
Suntec, Singapore mega-city in Asia.

62 energıze

062 Messen-fhHSfhgmfh.indd 62 01.10.10 14:23


Energise advert 2:Layout 1 23/09/2010 16:51 Page 1

The global independent


technical advisor

The power of dynamic positioning

GL Noble Denton is a leader in the field of


dynamic positioning, a computer-controlled
system that automatically maintains a
vessels position and heading. Our services
include failure mode and effects analyses
(FMEA) and failure mode, effects and
criticality analyses (FMECA) on all types
of offshore support vessels around the
world – from drillships to offshore
supply vessels.

We also do FMEA/FMECA on:

• Diving Equipment

• Ballast Systems

• Pipelay Equipment
• Bow Loading Systems

• Heavy Lift Cranes

Contact us now to learn more


about how we can help you.
15915_NS 16.09 2010

www.gl-nobledenton.com Email: glnobledenton@gl-group.com

© GL Industrial Services UK Ltd. All rights reserved.

01-GL-energize022010-U1-U4-olgmfholfh.indd 5 01.10.10 14:13


GL Group
Head Office
Brooktorkai 18
20457 Hamburg
Germany
Phone: +49 40 36149-0 www.gl-group.com
Fax: +49 40 36149-200 www.gl-nobledenton.com
E-Mail: headoffice@gl-group.com www.gl-garradhassan.com

stavanger
Oslo
Aberdeen
Hamburg
London

Houston shanghai
Abu Dhabi
Cairo

Kuala Lumpur

singapore

Rio de Janeiro
Perth
The global independent
technical advisor

GL Noble Denton
Region Americas Region europe Region Middle east/Africa Region Asia/Pacific
0E713 2010-04-10

Suite 900 Brooktorkai 18 Zahret El-Maadi Tower Level 39, Menara Ambank
5177 Richmond Avenue 20457 Hamburg 66, Cornich El-Nile, El-Maadi No. 8, Jalan Yap Kwan Seng
Houston, TX 77056 Germany 35th Floor, Apartment 2 50450 Kuala Lumpur
USA Phone: +49 40 36149-7700 11431 Cairo Malaysia
Phone: +1 713 586 7000 Fax: +49 40 36149-1781 Arab Republic of Egypt Phone: +60 3 2160 1088
Fax: +1 713 586 7007 E-Mail: glis@gl-group.com Phone: +20 2 25287295 Fax: +60 3 2160 1099
E-Mail: glnobledenton@gl-group.com Fax: +20 2 25287294 E-Mail: glnobledenton@gl-group.com
E-Mail: glnobledenton@gl-group.com

01-GL-energize022010-U1-U4-olgmfholfh.indd 6 01.10.10 14:13