Beruflich Dokumente
Kultur Dokumente
PROJECT
SOLAPUR SUPER THERMAL POWER
PROJECT (2x660 MW)
PACKAGE STEAM GENERATOR (SG) PACKAGE
SG CONTRACTOR
BGR ENERGY SYSTEMS LIMITED
DOC. NO.
JV COMPANY
CHENNAI – INDIA
Auxiliaries
5.0 FANS
5.1 Performance data for Fans
5.2 Characteristic Curves
6.0 APH
6.1 Performance data for PAPH & SAPH
7.0 SCAPH
7.1 Performance data for Primary SCAPH & Secondary SCAPH
8.0 Mill
8.1 Mill Design Data
8.2 Mill & Burner Designation
8.3 Performance data for Mill
Fuel Firing
10.0 Burner
10.1 Burner Design Data
10.2 DS-X Burner - Overview
10.3 Furnace Geometry
11.0 Coal Firing
11.1 Coal Firing System Details
Salient Features
Steam Generator
Tower Type
Spiral Walls
Wall Burners
Regenerative Bi-Sector Air Preheaters
FD Fans - 2 no.
PA Fans - 2 no.
ID Fans - 2 no.
PAPH - 2no.
SAPH - 2no.
SCAPH - 4 no.
Steam flow at
1 T/hr 2120.0 2060.2 1918.6
Superheater Outlet
Pressure at Superheater
3 kg/cm²(a) 256.0 255.5 254.4
Outlet
Temperature at
4 °C 568.0 568.0 568.0
Superheater Outlet
Steam Pressure at HP
6 kg/cm²(a) 63.6 58.1 56.0
turbine Exhaust
Steam Temperature at HP
7 °C 353.0 347.8 336.7
turbine Exhaust
Steam Temperature at
8 °C 596.0 596.0 596.0
Reheater Outlet
Total Pressure drop of RH
System inclusive of cold
9 kg/cm² 5.7 5.8 5.3
reheat and hot reheat
piping
Ambient temperature 6 27 50 °C
Category of Terrain 2
Criteria for earthquake and wind resistant design of structures and equipment:
Please refer to ANNEXURE-V and ANNEXURE-VI
of the Tender “Technical Specification Section-VI
BID DOC.No.:CS-9575/9571/0370/0360/9586-102(R)-2”
and to the document
“Design Criteria for Boiler House Steel Structure” (NTPC Doc. No. 9571-102-PVC-U-0694).
3.4 HP Diagram
HP System
Reference Documents: Best/Design/Worst coal for variable pressure operation at 50, 60, 80, 100, 105% TMCR and 60, 100% BMCR load – HP heaters out of operation (9571-102-PVM-Y-
0012,Rev-09)
3.2 Cold Start Up Diagram
VWO
transfer operation completed
turbine rolling
100 600
270 593 °C
565 °C HPT temp. inlet
90 540
240 247 kg/cm ²
IPT temp. inlet
80 480
temperature, speed [°C] [rpmx10]
210
steam pressure (abs.) [kg/cm²]
422 °C
70 circulation
420
390 °C
180
150
311 °C 3000 rpm
50 300 IPT inlet steam pressure
120
38,7% TMCR
40 240 102 kg/cm ² 2190 rpm turbine speed
Steinmetz
90 160 °C
30 180
turbine load
Revision AF
20% BMCR
60 54,3
20 120
120 °C
name
temp. at separator
15 % BMCR
10 30 Bensonpoint at
checked: 60
Busekrus/SG1
13,5 kg/cm ² 35% BMCR =
38,7 % TMCR
0 0 0
resp.: 0 0 50
0 50 60 100 100 120 150 150
180 200 200
240 250 300 250 300 360 300
Zimmer/SG1
t el.: start 1 st mill time [min]
The following table shows the sequence of the oil burner level/ coal mill cut-in points with respect to
the firing rate and time. Furthermore the switch over from light diesel oil (LDO) to heavy fuel oil (HFO)
is included.
VWO
synchronize
start of turbine
100 600
boiler load (HP steam flow ), firing rate [% of TMCR]
270
593 °C HP steam flow
565 °C
90 540
240 247
HPT temp. inlet
480 °C
80 480
475 °C
temperature, speed [°C] [rpmx10]
210
steam pressure (abs.) [kg/cm²]
IP T temp. inlet
422 °C
70 420
180
IP T inlet steam pres sure
60 360
150 311 °C
3000 rpm circulation
50 300
120 280 °C
40 HPT inlet steam
240 pressure
90
30 180 turbine speed
30% TMCR
60 54,3
20 120 turbine load
name
10 30 8,7 % Bensonpoint
checked: 60
15 kg/cm ² at 35 % BMCR
Busekrus/SG1
= 38,7 % TMCR
0 0 0
0 0 20 0 20 40 30 40 60 60 60 80 90 80100
120 120
100
150 140
120
180 140
210 160 180
240 160 270 180
Zimmer/SG1
start 1 st mill time [min]
Seite/Page 2 von/of 21
Reference Documents: Start-up Diagram Warm Start: 9571-102-PVM-N-0009
Kennwort / Code Word
Start-up Diagram Warm-Start Solapur
Dok-Nr. / Doc-No. Proj-Nr.:/ Job No.:
N-100131-0-051-IB06-00002 N100131
The following table shows the sequence of the oil burner level/ coal mill cut-in points with respect to
the firing rate and time. During warm start-up procedure only HFO burners are in use.
Table 1: Sequential cut in for mills & oil burner level during warm-start
Start-up step Firing capacity Firing capacity Time
[-] [% BMCR] [% of TMCR] [min]
1. oil burner level 0 0,0 0
2. oil burner level 2 2,2 28
3. oil burner level 4 4,4 38
4. oil burner level 6 6,6 46
5. oil burner level 8 8,8 52
6. oil burner level 10 11,0 58
1. mill 20 22,1 78
2. mill 20 22,1 78
3. mill 25 27,6 84
4. mill 30 33,1 154
5. mill 45 49,7 173
6. mill 60 66,3 192
7. oil burner level 75 82,9 211
7. mill 75 82,9 211
SH and RH drains
controlled closing
former editions:
transfer completed
synchronize
firing rate
105 %
HP steam flow
565 °C
90 535 °C 247
540
240
530 °C HPT temp. inlet
start of turbine
80 480
temperature, speed [°C] [rpmx10]
210
steam pressure (abs.) [kg/cm²]
TMCR
422 °C
70 420
180
IPT inlet steam pres sure
60 360
150 318 °C
circulation
50 290 °C 3000 rpm
300
120
38,7 % TMCR 112 kg/cm ² HPT inlet steam pressure
40 240
Steinmetz
90
30 30 % TMCR turbine speed
180
AF
60 54,3
20 120 turbine load
revision
name
Bensonpoint at
in
10 30
checked: 60 8,7 %
14,3
35% BMCR =
Busekrus/SG1 38,7 % TMCR
0 0 0
resp.: 0 0 20 0 20 40 20 40 60 60 80
40 60100
80 120
100
80 140
120100 160
140 120 180 140
160 180
Zimmer/SG1
start of 1st mill
tel.: time [min]
Seite/Page 2 von/of 18
Reference Documents: Start-up Diagram Hot Start: 9571-102-PVM-N-0010
Kennwort / Code Word
Start-up Diagram Hot-Start Solapur
Dok-Nr. / Doc-No. Proj-Nr.:/ Job No.:
N-100131-0-051-IB06-00003 N100131
The following table shows the sequence of the oil burner level/ coal mill cut-in points with respect to
the firing rate and time. During hot start-up procedure only HFO burners are in use.
Table 1: Sequential cut in for mills & oil burner level during hot start
Start-up step Firing capacity Firing capacity Time
[-] [% BMCR] [% of TMCR] [min]
1. oil burner level 0 0,0 0
2. oil burner level 2 2,2 12
3. oil burner level 4 4,4 16
4. oil burner level 6 6,6 20
5. oil burner level 8 8,8 24
6. oil burner level 10 11,0 27
1. mill 20 22,1 45
2. mill 20 22,1 45
3. mill 25 27,6 53
4. mill 30 33,1 67
5. mill 45 49,7 82
6. mill 60 66,3 96
7. oil burner level 75 82,9 111
7. mill 75 82,9 111
closed
HP s team bypas s s ys tem on control
closed
LP s team bypass s ys tem on control
100,0 %
100 300 600 585 °C 581°C
596 °C
fire off
568 °C 568 °C
modified sliding
60 180 360
pure sliding 317 °C
50 150 300
40 120 240
35,0 %
99,0 kg/cm²
99,0 kg/cm²
30 90 180
27,0 %
58,4 kg/cm²
20 60 120
20,0 %
12,0 %
10 30 60 21,7kg/cm²
0 0 0
0 0 -10
0,2 0,2 0,4 0 0,4 0,6 10 0,6 0,8 20 0,8 1 30 1 1,2 40 1,2 45
temp. at seperator life steam pressure. firing rate HP steam flow
100%BMCR =2120 t/hr
Live Steam temp. HRH temp. circulation turbine load VWO =2060,2 t/hr
HRH press. live steam pressure (pure sliding) turbine speed 100%TMCR =1918,6 t/hr
The following table shows the sequence of the oil burner level/ coal mill cut-out points with respect to
the firing rate and time. For detailed information please refer to document no. 9571-102-PVM-X-0069.
Table 1: Sequential cut out for mills & oil burner level
4000
2400
enthalpy [ kJ/kg ]
70 %
2300
2200
60 % Evaporator wall spiral
2100
2000 50 %
1900
40 %
1800
1700
30% 350 °C
1600
1500 20 % ∆ = 19 K
∆=9K
1400 Economiser
300 °C 300 °C
10 %
1300
1200
1100 250 °C
1000
900
200 °C
800
700
150 °C
600
500
100 °C
400
300
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
220
230
240
250
260
270
280
290
300
310
320
330
340
350
pressure [ bar a ]
Date: 11.11.2013
REV.: AA Reference Issued:
Documents:
Denis HP-Diagram: 9571-102-PVM-Y-0362 Page: 9 / 92
3.5 HP Sliding Pressure Curve
Pure Sliding Pressure Curve HP Proj.: NTPC Solapur
Proj. No.: N-100131
N-100131-S-HA_-IB06-00001
300,0 Design Pressure and Set Pressure Spring Loaded Safety Valve Seperator (297,8kg/cm² abs )
Design Pressure MS (272,5 kg/cm² abs). Set Pressure Spring Loaded Safety Valve MS (270,1kg/cm² abs)
270,1 266,7 kg/cm²a
264,0 kg/cm²a
256,0 kg/cm²a
Set Pressure Electro
250,0 Matic Relief Valve
200,0
150,0
107,0 kg/cm²a
100,0
99,0 kg/cm²a
50,0
50% MCR (257,1 kg/s)
0,0
0 20 40 60 80 100
100% BMCR =110,5% TMCR
Boiler Load [%]
2/14
3/14
Modified Sliding Pressure Curve HP Proj.: NTPC Solapur
Proj. No.: N-100131
N-100131-S-HA_-IB06-00001
Design Pressure and Set Pressure Spring Loaded Safety Valve Seperator (297,8kg/cm² abs)
300,0
Design Pressure MS (272,5 kg/cm² abs). Set Pressure Spring Loaded Safety Valve MS (270,1kg/cm² abs)
270,1 266,7 kg/cm²a
264,0 kg/cm²a
Set Pressure Electro 256,0 kg/cm²a
Matic Relief Valve
250,0
modified sliding
pressure boiler outlet
200,0
150,0
107,0 kg/cm²a
100,0
99 kg/cm²a
50,0
Benson Minimum Load
0,0
0 20 40 60 80 100
4/14
Reference Documents: Diagram for Sliding Pressure Curve HP: 9571-102-PVM-N-0055
Diagram for Sliding Pressure Curve HP Proj.: NTPC Solapur
Proj. No.: N-100131
*please refer to HBDs of Alstom (modified sliding pressure operation with 5% reserve in MCV)
**Data interpolated because no HBD for modified sliding pressure between 80% LOAD and BMCR available
5/14
3.5 RH Sliding Pressure Curve Proj.: NTPC Solapur
Sliding Pressure Curve RH Proj. No.: N-100131
N-100131-S-HAJ-IB06-00001
Set Pressure CRH Spring Loaded Safety Valve (71,1 kg/cm² abs)
70,0 Opening Set Pressure HRH Spring Loaded Safety Valve ( 68,0 kg/cm² abs)
67,0 kg/cm²a
64,1 kg/cm²a
Set P EMRV
Set Pressure LP
Bypass Station
50,0
Hot Reheat Pressure [kg/cm² abs]
40,0
31,0 kg/cm² a
30,0
28,1 kg/cm² a
24,1 kg/cm² a
21,7 kg/cm² a
20,0
10,0
53,5% BMCR
58,0% BMCR
96,4% BMCR
72,0% BMCR
85,8% BMCR
43,8% BMCR
0,0
0 20 40 60 80 100
Boiler Load [% of BMCR]; 100% BMCR = 2120 t/h main steam flow
2/11
Reference Documents: Sliding Pressure Curve RH: 9571-102-PVM-N-0056
Sliding pressure curve RH Proj.: NTPC Solapur
Proj. No.: N-100131
25.07.2014
Operating p boiler outlet Operating P Boiler Outlet according
Opening Set P Opening Set P Opening Set P Opening Set P
Boiler Load Denomination of load case according to simplified to HBDs of Alstom for modified &
LPB EMRV HRH Safety Valve CRH Safety Valve
approach pure sliding pressure
% of BMCR - kg/cm² abs kg/cm² abs kg/cm² abs kg/cm² abs kg/cm² abs kg/cm² abs
0,0 - 21,7 24,1 28,1 31,0 68,0 71,1
35,0 Bensonpoint 21,7 24,1 28,1 31,0 68,0 71,1
43,8 50% TMCR* 26,9 29,1 33,1 36,0 68,0 71,1
53,3 60% TMCR* 32,5 34,4 38,4 41,3 68,0 71,1
53,5 60% TMCR** 32,6 34,5 38,5 41,4 68,0 71,1
58,0 65% TMCR** 35,3 37,3 41,3 44,2 68,0 71,1
71,8 80% TMCR* 43,4 45,4 49,4 52,3 68,0 71,1
72,0 80% TMCR** 43,6 45,6 49,6 52,5 68,0 71,1
85,8 95% TMCR** 51,7 53,8 57,8 60,7 68,0 71,1
96,4 *** 57,9 60,1 64,1 67,0 68,0 71,1
100,0 BMCR 60,1 60,1 64,1 67,0 68,0 71,1
opening set pressure LPB = operating pressure boiler outlet + 4 kg/cm²
opening set pressure EMRV = opening set pressure LPB + 2,9 kg/cm²
3/11
4.0 Pressure Parts Details
ECO2 Inlet Header 457 70 - - SA-106M Gr. C 290.6 307.1 325.8 365.8
ECO2 Bundle Part 1 44.5 7.2 120 80 SA-210M Gr. C 290.6 307.1 334.1 385.1
ECO2 Bundle Part 2 44.5 6.5 120 80 SA-210M Gr. C 290.6 307.1 342 393
ECO2 Outlet Header 457 74 - - SA-106M Gr. C 290.6 307.1 342 382
Evaporator system
Evap. Inlet Header 323.8 55 - - SA-106M Gr. C 292.7 309.2 342 382
Evap. Spiral Part 1
38 7.1 - - SA-213M T12 292.3 308.8 359 449
(Hopper)
Evap. Spiral Part 2 38 7.1 - - SA-213M T12 292.3 308.8 395.1 485.1
Evap. Spiral Part 3 42.2 8.1 - - SA-213M T12 292.3 308.8 399 489
Intermediate Header 273 52 - - SA-335M P12 284.5 301 415 455
Evap. Vertical Part 1 38 6.8 - 60 SA-213M T12 284.3 300.8 421 511
Evap. Vertical Part 2 42.2 7.1 - 120 SA-213M T12 284.3 300.8 427 506
Evap. Outlet Header
273 40 - - SA-335M P91 282 298.5 427 467
(FW/RW)
Evap. Outlet Header
457 58 - - SA-335M P91 282 298.5 427 467
(LSW/RSW)
Superheater system
SH1 Inlet Header 406.4 55 - - SA-335M P91 278.7 295.2 427 467
SH1 Bundle Part 1 44.5 6.3 960 60 SA-213M T91 271.2 287.7 459.5 549.5
SH1 Bundle Part 2 44.5 7.2 960 60 SA-213M T91 271.2 287.7 480 570
SH1 Outlet Header 273 36 - - SA-335M P91 268.2 284.7 480 520
SH2 Inlet Header 406.4 56 - - SA-335M P91 263.1 279.6 469 474
SH2 Bundle Part 1 38 4.6 120 70 SA-213M T91 262.8 279.3 486.8 525.8
SH2 Bundle Part 2 38 5.1 120 70 SA-213M T91 262.8 279.3 517.1 556.1
SH2 Outlet Header 406.4 63 - - SA-335M P91 262.1 278.6 517.1 532
SH3 Inlet Header 406.4 52 - - SA-335M P91 261 277.5 504 509
SH3 Bundle Part 1 44.5 6.7 960 80 SA-213M T91 259.1 275.6 527.7 577.7
SA-213M UNS
SH3 Bundle Part 2 44.5 5.5 960 80 259.1 275.6 548.8 598.8
S30432
SA-213M UNS
SH3 Bundle Part 3 44.5 5.7 960 80 259.1 275.6 567.1 617.1
S30432 SP
SH3 Outlet Header 457 78 - - SA-335M P91 255 271.5 568 568
Reheater system
2
Size (mm) Pressure (kg/cm (g)) Temperature (°C)
ST SL Material
Description Out
thick (mm) (mm) Specification Operation Design Operation Design
dia.
RH1 Inlet Header 610 30.96 - - SA-106M Gr. C 60.6 70.1 353 358
RH1 Bundle Part 1 44.5 3.6 120 80 SA-213M T12 60.6 70.1 493.3 532.3
RH1 Bundle Part 2 44.5 3.6 120 80 SA-213M T22 60.6 70.1 511 550
RH1 Bundle Part 3 44.5 3.6 120 80 SA-213M T91 60.6 70.1 518.4 557.4
RH1 Outlet Header 660 35 - - SA-335M P91 60.6 70.1 518.4 528
RH2 Inlet Header 660 28 - - SA-335M P91 60.6 70.1 495 500
RH2 Bundle Part 1 63.5 3.6 240 105 SA-213M T91 60.6 70.1 534.4 584.4
SA-213M UNS
RH2 Bundle Part 2 63.5 3.6 240 105 60.6 70.1 596 646
S30432 SP
RH2 Outlet Header 711 63 - - SA-335M P91 60.6 70.1 596 596
G.A. Drawing for FD ,ID & PA Fan with Foundation Plan and 9571-102-PVM-B-0220,9571-102-PVM-B-
1 221,
Loading Details
9571-102-PVM-N-0231,9571-102-PVM-N-
2 Performance Curve For FD , ID, PA & Seal air Fan
0232,9571-102-PVM-N-0233,9571-102-PVM-
N-0234
9571-102-PVM-Y-0385,9571-102-PVM-Y-
3 Data sheet of FD , PA & ID Fan
0386,9571-
102-PVM-Y-0387
Installation and O&M Manual for Seal Air Fan for Mill (Refer O&M Manual Solapur)
4 Process Description - Seal air system Mill & Feeder 9571-102-PVM-X-0952
5.2 Characteristic Curves
SOLAPUR 2 X 660 MW
FD Fan 50 Hz
PERFORMANCE CHART PF= CODE FOR PROPELLER FAN
PFSH-224-112-02 S=CODE FOR SINGLE STAGE
Single stage V-blade+IGV H=CODE FOR BLADE DESIGN
224=CODE FOR IMPELLER DIAMETER (cm)
Duty Point 1 2 3 4
Load BMCR DC TMCR DC VWO DC DP1 60% BMCR BC
Actual Flow [m3/s] 208,63 180,76 199,3 362,87
Total Pressure Rise [mbar] 33,5 25,7 30,8 58,7
Inlet Temperature [degC] 27 27 27 50
Inlet Density [kg/m3] 1,101 1,102 1,101 0,992
Fan Total Efficiency [%] 78 70,1 75,7 83,6
Shaft Power (incl. bearing loss) [kW] 886 657 803 2499
8050
Bearing loss (estimated) [kW] 3 3 3 3
Compressibility Factor 0,989 0,992 0,990 0,981
Isentropic Head [Nm/kg] 3043 2332 2797 5917
Duty Point 5 6 7 8
Load 60% BMCR BC DP2 100% BMCR BC 80% MCR DC 60% MCR DC 6881
Actual Flow [m3/s] 306,13 331,91 179,92 162,02
Total Pressure Rise [mbar] 47 68,4 28,2 28,3
Inlet Temperature [degC] 27 50 27 27
Inlet Density [kg/m3] 1,096 0,994 1,102 1,077 5950
Fan Total Efficiency [%] 79 88,7 73,8 74,7
Shaft Power (incl. bearing loss) [kW] 1792 2501 681 608
Bearing loss (estimated) [kW] 3 3 3 3
Compressibility Factor 0,984 0,977 0,991 0,991
Isentropic Head [Nm/kg] 4288 6881 2559 2628 4540
Duty Point 9
Load 50% MCR DC
Actual Flow [m3/s] 157,27
Total Pressure Rise [mbar] 22,5
Inlet Temperature [degC] 27
Inlet Density [kg/m3] 1,077
Fan Total Efficiency [%] 67,1
Shaft Power (incl. bearing loss) [kW] 524
Bearing loss (estimated) [kW] 3
Compressibility Factor 0,993
Isentropic Head [Nm/kg] 2089
Isentropic Head (Nm/kg) = Total Pressure Rise (mbar) / Inlet Density (kg/m3) * 100 (mbar to Pa)
Shaft Power (kW) = Compressibility ( - ) * Actual Flow (m3/s) * Isentropic Head (Nm/kg) * Inlet Density (kg/m3) / Fan Total Efficiency ( - ) / 1000 (W to kW)
The formulae above can be obtained from BS-848, Section 14.8, especially 14.8.1 and 14.8.2.
Duty Point 1 2 3 4
Load 100% BMCR DC 100% TMCR DC 105% VWO DC 60% DP 1 WC
Actual Flow [m3/s] 514,32 461,93 497,54 893,27
Total Pressure Rise [mbar] 29,4 26,1 28,3 50,4
Inlet Temperature [degC] 127 125 127 150
Inlet Density [kg/m3] 0,8123 0,8189 0,8132 0,7346
Fan Total Efficiency [%] 80,4 74,6 78,9 86,7
Shaft Power (incl. bearing loss) [kW] 1862 1603 1770 5110
Bearing loss (estimated) [kW] 6 6 6 6 8553
Compressibility Factor 0,99 0,992 0,992 0,984 8440
Isentropic Head [Nm/kg] 3619 3187 3480 6861
Duty Point 5 6 7 8
7503
Load 60% BMCR WC Design Point 2 WC 80% MCR DC 60% MCR DC
Actual Flow [m3/s] 751,77 813,2 424,82 357,06
Total Pressure Rise [mbar] 44,9 55 22,8 18,7 6861
Inlet Temperature [degC] 125 150 125 125
Inlet Density [kg/m3] 0,8022 0,733 0,8209 0,8241
Fan Total Efficiency [%] 86,5 89,1 67,7 56,7
Shaft Power (incl. bearing loss) [kW] 3848 4929 1421 1172
Bearing loss (estimated) [kW] 6 6 6 6
Compressibility Factor 0,986 0,982 0,993 0,995
Isentropic Head [Nm/kg] 5597 7503 2777 2269 4643
Duty Point 9
Load 50% MCR DC
Actual Flow [m3/s] 325,4
Total Pressure Rise [mbar] 17,1
Inlet Temperature [degC] 125
Inlet Density [kg/m3] 0,8253
Fan Total Efficiency [%] 51,8
Shaft Power (incl. bearing loss) [kW] 1070
Bearing loss (estimated) [kW] 6
Compressibility Factor 0,996
Isentropic Head [Nm/kg] 2072
Isentropic Head (Nm/kg) = Total Pressure Rise (mbar) / Inlet Density (kg/m3) * 100 (mbar to Pa)
Shaft Power (kW) = Compressibility ( - ) * Actual Flow (m3/s) * Isentropic Head (Nm/kg) * Inlet Density (kg/m3) / Fan Total Efficiency ( - ) / 1000 (W to kW)
The formulae above can be obtained from BS-848, Section 14.8, especially 14.8.1 and 14.8.2.
Duty Point 1 2 3 4
Load BMCR DC TMCR DC VWO DC DP 1 WC
Actual Flow [m3/s] 135,99 131,18 134,34 236,79
Total Pressure Rise [mbar] 115,6 106,3 112,5 156,5
Inlet Temperature [degC] 27 27 27 50
Inlet Density [kg/m3] 1,101 1,102 1,101 0,993
Fan Total Efficiency [%] 86,5 84,5 85,9 86,4
Shaft Power (incl. bearing loss) [kW] 1748 1594 1696 4079
Bearing loss (estimated) [kW] 3 3 3 3
Compressibility Factor 0,962 0,966 0,964 0,951
Isentropic Head [Nm/kg] 10500 9646 10218 15760 19385
19375
Duty Point 5 6 7 8
Load 60% BMCR WC Design Point 2 WC 80% MCR DC 60% MCR DC
Actual Flow [m3/s] 201,96 233,61 110,69 88,8
17299
Total Pressure Rise [mbar] 141 172,3 102,2 92,8
Inlet Temperature [degC] 27 50 27 27
Inlet Density [kg/m3] 1,0963 0,996 1,103 1,104
15760
Fan Total Efficiency [%] 86 87,1 82,3 75
Shaft Power (incl. bearing loss) [kW] 3162 4372 1329 1068
Bearing loss (estimated) [kW] 3 3 3 3
Compressibility Factor 0,955 0,946 0,967 0,972
Isentropic Head [Nm/kg] 12861 17299 9266 8406
Duty Point 9
Load 50% MCR DC
Actual Flow [m3/s] 73,08
Total Pressure Rise [mbar] 93,2
Inlet Temperature [degC] 27
Inlet Density [kg/m3] 1,104
Fan Total Efficiency [%] 68,8 9990
Shaft Power (incl. bearing loss) [kW] 963
Bearing loss (estimated) [kW] 3
Compressibility Factor 0,973
Isentropic Head [Nm/kg] 8442
Isentropic Head (Nm/kg) = Total Pressure Rise (mbar) / Inlet Density (kg/m3) * 100 (mbar to Pa)
Shaft Power (kW) = Compressibility ( - ) * Actual Flow (m3/s) * Isentropic Head (Nm/kg) * Inlet Density (kg/m3) / Fan Total Efficiency ( - ) / 1000 (W to kW)
The formulae above can be obtained from BS-848, Section 14.8, especially 14.8.1 and 14.8.2.
PERFORMANCE CURVE
Type : Bi sector
Model : 28 VI R 80 (92’’ casing)
Equipment supplier : Arvos Group,USA
Project : NTPC Solapur 2x660MW
Quantity : 2 Nos Per Boiler.
Reference Documents: APH - Data Sheet (PAPH & SAPH) (9571-102-PVM-U-0966, Rev - 06)
6.1 Performance data for secondary Airpreheater
Type : Bi sector
Model : 31.5 VI R 68 (80’’ casing)
Equipment supplier : Arvos Group.USA
Project : NTPC Solapur 2x660MW
Quantity : 2 Nos Per Boiler.
Temperatures: °C
Pressure differentials: mm wc
Reference Documents: APH - Data Sheet (PAPH & SAPH) (9571-102-PVM-U-0966, Rev - 06)
7.0 SCAPH
Total coal flow kg/s 131.400 127.700 119.300 158.500 153.900 143.200 100.300 97.400 91.600
Grinding Data
Mills in operation 7 7 7 8 8 7 7 7 7
Raw coal flow per mill kg/s 18.771 18.243 17.043 19.813 19.238 20.457 14.329 13.914 13.086
Max mill throughput kg/s 27.948 27.948 27.948 25.506 25.506 25.506 30.294 30.294 30.294
Mill load % 67 65 61.0 77.7 75.4 80.2 47.3 45.9 43.2
200 mesh % 70.0 70.0 70.0 70.0 70.0 70.0 70.0 70.0 70.0
R0,2 % 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
50 mesh % 99.4 99.4 99.4 99.4 99.4 99.4 99.4 99.4 99.4
R 0,09 % 23.3 23.3 23.3 23.3 23.3 23.3 23.3 23.3 23.3
Moisture p,f, dust % 1.7 1.7 1.7 2.3 2.1 2.5 1.3 1.3 1.3
Mill pressure drop mbar 57.7 56.9 55.0 62.2 61.3 63.3 49.1 48.5 47.3
Power mill kW 527.1 519.2 501.2 571.1 561.7 581.7 443.9 438.2 426.8
Drying Data
Pressure loss p,f, pipe mbar 36 36 34 38 38 35 30 30 30
Raw coal temperature °C 15 15 15 15 15 15 15 15 15
temperature °C 320.0 315.0 307.0 330.0 334.0 326.0 330.0 328.0 324.0
Hot gas mass flow kg/s 35.990 35.759 34.744 38.143 37.666 38.631 25.543 25.108 24.220
volume flow m³/s 57.584 56.775 54.611 61.678 61.367 62.164 42.135 41.303 39.621
temperature °C 40 40 40 40 40 40 40 40 40
Cold gas mass flow kg/s 1.564 1.395 1.501 0.200 0.241 0.200 8.645 8.766 9.027
volume flow m³/s 1.321 1.179 1.273 0.168 0.203 0.168 7.404 7.512 7.744
Sealing air kg/s 0.812 0.812 0.812 0.812 0.812 0.812 0.812 0.812 0.812
Purge air feeder kg/s 0.380 0.380 0.380 0.380 0.380 0.380 0.380 0.380 0.380
temperature °C 309 305 296 329 332 325 258 255 248
Primary gas mass flow 37.554 37.154 36.245 38.343 37.907 38.831 34.188 33.874 33.247
volume flow m³/s 58.933 57.978 55.909 61.850 61.575 62.336 49.668 48.943 47.490
temperature °C 105 105 105 101 105 97 105 105 105
Classifier mass flow kg/s 41.096 40.629 39.570 42.317 41.829 42.861 36.930 36.571 35.854
volume flow m³/s 45.865 45.318 44.165 46.907 46.811 47.170 41.094 40.676 39.838
mass related kg/kg 0.400 0.393 0.377 0.402 0.395 0.411 0.346 0.339 0.326
Coal/air ratio
vol, related kg/m³ 0.358 0.352 0.338 0.363 0.353 0.374 0.311 0.305 0.293
Mill 20 40 Mill
Furnace
Mill 30 10 Mill
Mill 70 50 Mill
Front Wall
11 12 13 14
24.5 m
Level 10
30.08 m
Level 30
35.66 m
Level 50
41.24 m
Level 70
8.3 Performance data for Mill
Mill
Make HPE
Type Babcock roller bowl Mill
No. of Mills 8
Mill size MPS 255 S
Gear unit Planetary-type bevel gear unit KPV 1500
Grinding force Hydro-pneumatically
Rejects 1 outlet port
Classifier type Static classifier SLK 410
P.F. pipes 4 pulverized fuel coal dust pipes per mill
Number of grinding rollers 3
Shape of grinding track dished
Lifetime of mill grinding elements hr 5500 to 8000
Turn down ratio of mill 4:1
Input coal size up to mm 50
Classifier
Type and size SLK410
Type of vane adjustment manually
Number of p.f. discharge pipes qty 4
Gearbox
Type Bevel Planetary
Size KPV 1500
Input speed rpm 990
Output speed rpm 28
Reduction-gear ratio 35.4
Gearing manufacturer HPE
Mill Motor
Make ABB, Vadodara, India
Motor Type Squirrel Cage Motor
Rated output KW 770
Mains voltage V 3300
Nominal frequency Hz 50
Rated Speed rpm 990
Efficiency at 100% Load % 94.8
Reference Documents
1. Process Description Firing System, NTPC Doc. No - 9571-102-PVM-X-0069
2. Design Report - MPS Mill, NTPC Doc. No - 9571-102-PVM-X-0159
3. Data Sheet for Burner Design Data, NTPC Doc. No - 9571-102-PVM-Y-0065
9.0 Raw coal (RC) Feeder
Reference Documents
1. Process Description Firing System, NTPC Doc. No - 9571-102-PVM-X-0069
2. Design Report - MPS Mill, NTPC Doc. No - 9571-102-PVM-X-0159
3. GA of Gravimetric Feeder and Associated Vendor Drawings,
NTPC Doc. No - 9571-102-PVM-B-0240
10.0 Burner
Reference Documents: Data Sheet for Burner Design Data (9571-102-PVM-Y-0065, Rev-05)
10.2
10.3
Coal Burner
Type Ds-x Burner (Swirl stage, Low Nox type)
No per each pulveriser 4
Reference Documents
1. Process Description Firing System, NTPC Doc. No - 9571-102-PVM-X-0069
2. Design Report - MPS Mill, NTPC Doc. No - 9571-102-PVM-X-0159
3. Data Sheet for Burner Design Data, NTPC Doc. No - 9571-102-PVM-Y-0065
12.0 Oil Firing
Reference Documents
1. Process Description Firing System, NTPC Doc. No - 9571-102-PVM-X-0069
2. Process Description Oil Firing System, NTPC Doc. No - 9571-102-PVM-X-0068
3. Data Sheet for Burner Design Data, NTPC Doc. No - 9571-102-PVM-Y-0065
12.2 HFO Firing System Details
Reference Documents
1. Process Description Firing System, NTPC Doc. No - 9571-102-PVM-X-0069
2. Process Description Oil Firing System, NTPC Doc. No - 9571-102-PVM-X-0068
3. Data Sheet for Burner Design Data, NTPC Doc. No - 9571-102-PVM-Y-0065
12.3 Fuel Oil Forwarding System
HFO/HPS/LSHS PUMPS
HFO/HPS/LSHS MOTOR
LDO PUMPS
CONDENSATE TANK
SUMP PUMP
ACCUMULATOR
STEAM TRAPS
2 3
Separator Operating
Pressure 282,9
281,3 278,2
280,0 281,3
1
274,7
Lift Pressure Difference SV
(3%)
272,5
Lift Pr. Difference
270,0 Separator outlet 270,1 EMRV (3%)
conn.pipe
266,7
Operating Pressure ReseatPressure Reseat.Pr.
Difference SV (5%) Difference
260,0 EMRV (3%)
258,7
256,0 256,6
Superheater Outlet Operating Pressure
255,1
254,7
SEPARATOR SEPARATOR Pressure drop up to EMRV
250,0 SYSTEM PRESSURE DROP Pressure drop up to SV
OUTLET CONN. Main Steam Line
Separator Main Steam Safety
Safety Valve Valve Main Steam EMRV
Separator
SH - 3 Outlet Headers
SH - 2 Outlet Headers
SH - 1 Outlet Headers
SH - 3 Inlet Headers
SH - 2 Inlet Headers
SH - 1 Inlet Headers
Figure 1: Safety Valve Setting Diagram at Superheater System. 1, 2 Safety Valve; 3 EMRV Reference Documents: Safety Valves Sizing & Selection:
9571-102-PVM-Y-0047
Ersteller / Prepared by Geprüft / Checked by: Datum /Date: Rev.:
Name: Zimmer Name: Busekrus 18.12.2013 AJ
Seite/Page 6 von/of 36
15.2 RH Safety Valve Setting Diagram
Kennwort / Code Word
Safety Valves Sizing & Selection Solapur
Dok-Nr. / Doc-No. Proj-Nr.:/ Job No.:
N-100131-S-LBA-IB02-00001 N100131
80,0
73,2
2 3
Lift Pressure Difference SV (3%)
71,1 71,1
71,1
70,0 70,0
Lift Pressure Lift Pressure
ReseatPressure Difference SV (5%) 69,0
Difference SV (3%) Difference EMRV
Pressure [kg/cm²(a))
68 (3%)
67,5
67 Reseat Pressure
ReseatPressure
1 Difference EMRV
65,0 Difference SV (5%)
64,6 65,0 (3%)
Operating Pressure RH
55,0
50,0
Hot Reheat Hot Reheat
Cold Reheat Safety EMRV
Safety Valve
Valve
RH - 1 Outlet Headers
RH - 2 Outlet Headers
RH - 1 Inlet Headers
RH - 2 Inlet Headers
Hot Reheat Hot Reheat
Cold Reheat Safety
Safety Valve EMRV
Valve
Reference Documents: GA Drawing & Data sheet of LRSBs and Wall Blowers - "9571-102-PVM-B-1486"
17.0 Furnace Instrumentation
10HBK01CT003/10HBK70CT003
3 Tag Nos:
20HBK01CT003/20HBK70CT003
2 Quantity 30 No's
M530/VTP/AIN/ CEI/CCV/L42
High temperature camera-
1 The M530 Lynx(R) Camera is an air-purged, visible light camera. This camera is best suited
Model No
for hightemperature viewing applications. Four Cameras are provided for viewing one Boiler.
AC-Q-M353/AL30/RL54
Pneumatic retract system
2 The Pneumatic Retract System ensures that the camera retracts automatically in certain
Model No
conditions
2 Quantity 4 Nos
Local Control Cabinet is mounted in the field, one for each Camera and placed within 1..3
5 Camera control box
meters of the Camera.
Armored FRLS Coaxial video cable RG11U is laid in the field for connection of Camera to
6 Video cables
VPU installed in Control Panel of CER.
Magnetic lock is a Mechanical device used to hold the camera in the retract position by
7 Magnetic lock
magnetic force during prolonged absence of air supply.
8 Video connector kit For connection of the video cables to the CCTV equipment in field / Control room.
This Panel is provided for mounting Remote Retract Actuator, Digital Video Recorder (DVR),
9 Control panel in CER
Video Distribution Unit & Monitor in the control equipment room (CER).
Remote Retract Actuator is mounted in Control Panel in Control Equipment Room, one for
10 Remote retract actuator
each Camera & it permits operator to control the Camera position from Remote
The Pelco high performance, color Digital Video Recorder utilizes the latest in digital video
11 Digital video recorder processing technology, providing high quality multi camera displays in multiplexed mode up
to 4 cameras
This TIPL Video Distribution Unit is placed inside the Control Panel in CER & utilizes the
12 Video distribution unit latest in digital color video processing technology, providing high quality multi camera
displays in multiplexed mode up to 4 cameras.
Reference Documents: Furnace Flame Monitoring System: GA/Write up/ Scheme/ Data sheet/
Interconnection diagram -9571-102-PVI-Y-0799
17.5 Performance data for Flame scanner
2 Quantity 32 No's
4 Location Burner
8 Quantity 32 No's
10 Location Burner
Reference Documents: Data Sheet & GA drg. of Fuel Oil Igniters and Scanners-9571-102-PVM-B-0538
18.0 Control & Instrumentation
18.1 Metal Temperature Measurement Points
18.1 Metal Temperature Measurement Points
The number of the single tube temperature measurements is given in the table below:
Evaporator spiral 64
Evaporator vertical 36
Sum 100
The number of the single tube temperature measurements is given in the table below:
SH-1 Platen 88 20
SH-3 44 20
RH-2 126 20
SH-2 112 20
RH-1 136 0
Sum 506 80
Zimmer
1 2 3 4 5 6 7 8
4.1
left side wall
1 0HAD11 CT001-CT016
83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164
● ● ● ● ● ● ● ●
9 10 11 12 13 14 15 16
Ersteller / Prepared by
165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246
● ● ● ● ● ● ● ●
1 2 3 4 5 6 7 8
front wall
1 0HAD13 CT001-CT016
247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328
● ● ● ● ● ● ● ●
9 10 11 12 13 14 15 16
329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410
Busekrus
● ● ● ● ● ● ● ●
1 2 3 4 5 6 7 8
right side wall
1 0HAD12 CT001-CT016
NTPC DRG NO.
VENDOR DRG NO.
411 412 mme414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492
● ● ● ● ● ● ● ●
493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574
● ● ● ● ● ● ● ●
1 2 3 4 5 6 7 8
rear wall
9571-102-PVM-B-0054
1 0HAD14 CT001-CT016
575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656
● ● ● ● ● ● ● ●
9 10 11 12 13 14 15 16
N-100131-S-HA_-ID16-00013
11.03.2016
Datum /Date:
Evaporator Spiral Thermocouple Arrangement
General Design Drawing for SH and
RH Temperature Measurement Points
AI
N-100131
Rev.:
Proj-Nr.:/ Job No.:
Kennwort / Code Word
NTPC Solapur
Page: 7 / 36
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82
● . ● ● ●
Zimmer
1 2 3 4
4.2
left side wall
1 0HAD21 CT001-CT09
83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165
● ● ● ● ●
5 6 7 8 9
Ersteller / Prepared by
166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247
● . ● ● ●
1 2 3 4
front wall
1 0HAD23 CT001-CT09
248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330
● ● ● ● ●
5 6 7 8 9
331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412
Busekrus
● . ● ● ●
1 2 3 4
right side wall
1 0HAH22 CT001-CT009
NTPC DRG NO.
413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495
VENDOR DRG NO.
● ● ● ● ●
496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577
● . ● ● ●
1 2 3 4
rear wall
9571-102-PVM-B-0054
1 0HAH24 CT001-CT009
578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660
● ● ● ● ●
5 6 7 8 9
N-100131-S-HA_-ID16-00013
11.03.2016
Datum /Date:
General Design Drawing for SH and
AI
N-100131
Rev.:
Proj-Nr.:/ Job No.:
Kennwort / Code Word
NTPC Solapur
Page: 8 / 36
Kennwort / Code Word
General Design Drawing for SH and
RH Temperature Measurement Points NTPC Solapur
VENDOR DRG NO. Proj-Nr.:/ Job No.:
N-100131-S-HA_-ID16-00013
NTPC DRG NO. N-100131
9571-102-PVM-B-0054
rear wall
tube no. tube no.
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
horizontal vertical
● 33 44 ● 44 ● 12
● 32 43 ● 43 ● 11
● 31 42 ● 42 ● 10
● 30 41 ● 41 ● 9
● 29 40 ● 40 ● 8
● 28 39 ● 39 ● 7
● 27 38 ● 38 ● 6
● 26 37 ● 37 ● 5
● 25 36 ● 36 ● 4
● 24 35 ● 35 ● 3
● 23 34 ● 34 ● 2
● ● ● ● ● ● ● ● ● ● ● 1
17 (50) 18 (51) 19 (52) 20 (53) 22 29 (50) 30 (51) 31 (52) 32 (53) 33 (54)
21(54)
● 16 22 ● ● 16 22 ● 1
2
3
4
● 15 21 ● ● 15 21 ● 5
6
7
8
● 14 20 ● ● 14 20 ● 9
10
11
12
● 13 19 ● ● 13 19 ● 13
14
15
16
● 12 18 ● ● 12 18 ● 17
18
19
20
● 11 17 ● ● 11 17 ● 21
22
23
● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 24
1 (23) 3 (25) 5 (27) 7 (29) 9 (31) 1 (23) 3 (25) 5 (27) 7 (29) 9 (31)
2 (24) 4 (26) 6 (28) 8 (30) 10 (32) 2 (24) 4 (26) 6 (28) 8 (30) 10 (32)
1 0HAH71 CT001-CT022 1 0HAH72 CT001-CT022
Ersteller / Prepared by
● 28 35 ● 42 ● 49 ● 56 ● 63 ● 1
● 27 34 ● 41 ● 48 ● 55 ● 62 ● 2
● 26 33 ● 40 ● 47 ● 54 ● 61 ● 3
● 25 32 ● 39 ● 46 ● 53 ● 60 ● 4
● 24 31 ● 38 ● 45 ● 52 ● 59 ● 5
● 23 30 ● 37 ● 44 ● 51 ● 58 ● 6
● 22 29 ● 36 ● 43 ● 50 ● 57 ● 7
● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 8
1 (64) 2 3 4 (65) 5 6 7 (66) 8 9 (67) 10 11 (68) 12 13 (69) 14 15 (70) 16 17 (71) 18 19 (72) 20 21 (73)
Busekrus
1 0HAJ31 CT001-CT063 1 0HAJ31 CT064-CT073
NTPC DRG NO.
VENDOR DRG NO.
● 28 35 ● 42 ● 49 ● 56 ● 63 ● 1
● 27 34 ● 41 ● 48 ● 55 ● 62 ● 2
● 26 33 ● 40 ● 47 ● 54 ● 61 ● 3
9571-102-PVM-B-0054
● 25 32 ● 39 ● 46 ● 53 ● 60 ● 4
RH-2 Thermocouple Arrangement
● 24 31 ● 38 ● 45 ● 52 ● 59 ● 5
● 23 30 ● 37 ● 44 ● 51 ● 58 ● 6
● 22 29 ● 36 ● 43 ● 50 ● 57 ● 7
N-100131-S-HA_-ID16-00013
● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 8
1 (64) 2 3 (65) 4 5 (66) 6 7 (67) 8 9 (68) 10 11 (69) 12 13 (70) 14 15 (71) 16 17 18 (72) 19 20 21 (73)
11.03.2016
Datum /Date:
1 0HAJ32 CT001-CT063 1 0HAJ32 CT064-CT073
General Design Drawing for SH and
RH Temperature Measurement Points
AI
N-100131
Rev.:
Proj-Nr.:/ Job No.:
Kennwort / Code Word
NTPC Solapur
Page: 11 / 36
Kennwort / Code Word
General Design Drawing for SH and
RH Temperature Measurement Points NTPC Solapur
VENDOR DRG NO. Proj-Nr.:/ Job No.:
N-100131-S-HA_-ID16-00013
NTPC DRG NO. N-100131
9571-102-PVM-B-0054
● 32 ● 40 9
● 31 ● 39 8
● 30 ● 38 7
● 29 ● 37 6
● 28 ● 36 5
● 27 ● 35 4
● 26 ● 34 3
● 25 ● 33 2
● ● ● ● ● ● ● ● ● ● ● ● 1
1 2 3 (97) 4 5 (98) 6 7 (99) 8 9 (100 10 11 12 (101)
● 48 ● 56 9
● 47 ● 55 8
● 46 ● 54 7
● 45 ● 53 6
● 44 ● 52 5
● 43 ● 51 4
● 42 ● 50 3
● 41 ● 49 2
● ● ● ● ● ● ● ● ● ● ● ● 1
13 14 (102) 15 16 (103) 17 18 (104) 19 20 (105) 21 22 (106) 23 24
1 0HAH52 CT0001-CT056
1 0HAH52 CT097-CT106
32 ● ● 40 9
31 ● ● 39 8
30 ● ● 38 7
29 ● ● 37 6
28 ● ● 36 5
27 ● ● 35 4
26 ● ● 34 3
25 ● ● 33 2
● ● ● ● ● ● ● ● ● ● ● ● 1
1 2 3 (97) 4 5 (98) 6 7 (99) 8 9 (100) 10 11 (101) 12
● 48 56 ● 9
● 47 55 ● 8
● 46 54 ● 7
● 45 53 ● 6
● 44 52 ● 5
● 43 51 ● 4
● 42 50 ● 3
● 41 49 ● 2
● ● ● ● ● ● ● ● ● ● ● ● 1
13 (102) 14 15 16 (103) 17 18 (104) 19 20 (105) 21 22 (106) 23 24
1 0HAH51 CT001-CT056
1 0HAH51 CT097-CT106
● 35 ● 46 12
● 34 ● 45 11
● 33 ● 44 10
● 32 ● 43 9
● 31 ● 42 8
● 30 ● 41 7
● 29 ● 40 6
● 28 ● 39 5
● 27 ● 38 4
● 26 ● 37 3
● 25 ● 36 2
● ● ● ● ● ● ● ● ● ● ● ● 1
1 2 3 4 5 6 7 8 9 10 11 12
● 57 68 ● 12
● 56 67 ● 11
● 55 66 ● 10
● 54 65 ● 9
● 53 64 ● 8
● 52 63 ● 7
● 51 62 ● 6
● 50 61 ● 5
● 49 60 ● 4
● 48 59 ● 3
● 47 58 ● 2
● ● ● ● ● ● ● ● ● ● ● ● 1
13 14 15 16 17 18 19 20 21 22 23 24
1 0HAJ12 CT001-CT68
35 ● ● 46 12
34 ● ● 45 11
33 ● ● 44 10
32 ● ● 43 9
31 ● ● 42 8
30 ● ● 41 7
29 ● ● 40 6
28 ● ● 39 5
27 ● ● 38 4
26 ● ● 37 3
25 ● ● 36 2
● ● ● ● ● ● ● ● ● ● ● ● 1
1 2 3 4 5 6 7 8 9 10 11 12
● 57 68 ● 12
● 56 67 ● 11
● 55 66 ● 10
● 54 65 ● 9
● 53 64 ● 8
● 52 63 ● 7
● 51 62 ● 6
● 50 61 ● 5
● 49 60 ● 4
● 48 59 ● 3
● 47 58 ● 2
● ● ● ● ● ● ● ● ● ● ● ● 1
13 14 15 16 17 18 19 20 21 22 23 24
1 0HAJ11 CT001-CT68
2 No.of valves 4 4 4 1 1 1 1 1 1 1 1 1 2 1
3 Type of valve Angle Angle Angle Straight Way Straight Way Straight Way Straight Way Straight Way Straight Way Straight Way Straight Way Straight Way Angle Straight Way
4 Type of Actuation Pneumatic Diaphragm Pneumatic Diaphragm Pneumatic Diaphragm Pneumatic Diaphragm Motorised Pneumatic Diaphragm Pneumatic Diaphragm Pneumatic Diaphragm Pneumatic Diaphragm Motorised Pneumatic Diaphragm Electro Hydraulic Electro Hydraulic Motorised
5 Design Pressure (Kg/cm2 (a)) 310.9 310.9 249 71.1 71.1 71.1 30.6 30.6 71.1 71.1 30.6 309.2 302.9 359.96
6 Design Temperature (Deg. C) 301 301 203 358 358 358 350 350 500 500 500 347 347 215
Max. Operating Pressure (Kg/cm2
7 292 292 131 61.5 61.5 61.5 19.9 21.6 60.4 60.4 17.2 149 145.5 113.9
(a))
Max. Operating Temperature (Deg.
8 293 293 187 351.1 351.1 351.1 250 250 500 500 320 336.7 337 140
C)
Line Size (mm) OD 219.1 x Thk. 15.09 / OD 219.1 x Thk. 15.09 / OD 141.3 x Thk. 12.7/ OD 168.3 x Thk. 14.27/ OD 168.3 x Thk. 14.27/
9 OD 114.3/ Thk. 17.12 OD 114.3/ Thk. 17.12 OD 141.3/ Thk. 21 OD 141.3 x Thk. 12.7 OD 114.3 x Thk. 8.56 OD 88.9 x Thk. 11.13 OD 406.4 x Thk. 55 OD 323.8 x 43 Thk. OD 114.3 x Thk. 17.12
(Inlet/ Outlet) OD 273.0 x Thk.18.26 OD 273.0 x Thk.18.26 OD 168.3 x Thk. 14.27 OD 219.1 x Thk. 18.26 OD 219.1 x Thk. 18.26
11 Pressure Rating 2500# 2500# 1500# 600# 600# 600# 300# 300# 900# 900# 600# 2500# 1803 # SPl Int. Class 2500
12 Valve Material A 217 Gr. WC9 A 217 Gr. WC9 A 216 Gr. WCC A 217 Gr. WC9 A 217 Gr. WC9 A 217 Gr. WC9 A 217 Gr. WC9 A 217 Gr. WC9 A 217 Gr. WC9 A 217 Gr. WC9 A 217 Gr. WC9 A 217 Gr. WC9 A182-F22 A217 WC9
13 Valve Characteristic Mod. % Mod. % Mod. % Mod. % Mod. % Mod. % Equal % Equal % Mod. % Mod. % Equal % Mod. Linear % Mod. Parabolic % Mod. Equal %
14 Leakage Class V V V V V V IV IV IV IV IV V V V
Electrical/ Control Signal - Air/Control Signal - Electrical/ Control Signal - Electric Power/ Hydraulic/ Control Electric Power/ Hydraulic/ Electric Power/ Control Signal -
16 Failure condition Air/Signal - Open Air/Control Signal - Open Air/Control Signal - Open Air/Control Signal - Open Air/Control Signal - Open Air/Control Signal - Close Air/Control Signal - Open Air/Control Signal - Open
Stay Put Close Stay Put signal - Open Control signal - Close Stay Put
Valve Opening and Closing Time
17 <10 <10 <10 <10 <16 <10 <10 <10 <10 <16 <10 <40 <10 <30
(Sec.)
Inter Coolers:
1) Type : Water cooled, shell and tube with removable bundle
2) Make : Elgi
3) Tube Inlet air temperature : 190 °C
4) Tube Outlet air temperature : 40 °C
5) Tube cooling media pressure : 3 kg/Sq.cm
After Coolers:
1) Type : Water cooled, shell and tube with removable bundle
2) Make : Elgi
3) Tube Inlet air temperature : 190 °C
4) Tube Outlet air temperature : 44 °C
5) Tube cooling media pressure : 3 kg/Sq.cm
Sl.
No. NTPC-Comments BGRB-Replies
Solapur - NTPC Written comments dated – 14.06.2016
1 Refer comments marked up Noted
It is seen that only scope related to BGRB & HPE is
covered, however ceratin area like fuel oil sizing and
eqpt data related to FUEL OIL PUMP HOUSE, Included.
2
aux.PRDS sizing and major valves of boiler integral Please refer revised
Fuel oil equipment like fuel document.
oil skids in boiler area,main
mechanical and control valves in boiler area,
piping etc. are not covered. This may also be suitably accumulator (LDO&HFO), drain oil pump and fuel oil
included. condensate tank in boiler area are not covered. Also
include details of oil burner,HFO steam atomizing skids,
Preliminary comments given. Other comments,shall be LDO air atomizing skids,Burner valves etc.Please
3 Noted
given shortly. Please include details of coal firing system, coal burner, include the same
soot blowing details,gates and dampers, SH&RH spray
Please includesystem
all performance related data
and control valves,separator for major
and atmospheric
instrumentation, C&I equipment coming pump
flash tank, condensate flash tank, condensate inside
details, expansion joints,oxygen dosing system etc.
furnace and related to measurment and control for
boiler like all coal and oil flame scanners,acoustic
Included.
4 pyrometers, ASLD, flame viewing camera etc. similar
Please refer revised document.
to data covered for furnace temeprature probe ,which
are important measurment and control tools inside
furnace and pressure parts in general ,whether they
are in scope of HPE OR BGRB or BGRE
Please note that there is no new data
provided in this document. The data
provided in this document is an
extract from approved MDL
5 Document to be veted by QSGM
document.
Sl.
No. NTPC-Comments BGRB-Replies
Solapur - NTPC Written comments dated – 30.11.2016
It is seen that BGR/HPE has not included much The performance data and specific
information as commented in last revision. It is seen boiler drawings for the respective
that BGR has not included all boiler related sizing components have been already
2 calculations, performance related data, specific furnished in the revised document.
boiler drgs and vendor related boiler auxiliaries GA The sizing calculations, and vendor
drg.,as commented earlier ,which are essentially to related boiler auxiliaries GA drg
be a part of boiler design dossier.This has been have already been covered in the
followed by other SG contractors also for SG respective MDL document .
packages, including BHEL. Refer earlier comments
marked up at rev0.
Please include data for mill seal air fan and also
Details Included.
8 for Seal air fan for ID FAN
12.0 Oil Firing Datas for Plug valves, control valves &
9 trip valves can be referred from the
Please include data for plug valves, control Respective MDL document.
valves,trip valves etc.in FOPH &firing floor
12.1 LDO Firing System Details Details for drain oil tank has been
included. The reference of vendor drgs
Please include data for drain oil pump, drain oil & datas of accumulators, plug valves,
10 tank in boiler area with reference of vendor drgs. strainers and steam traps can be
data of accumulators, plug valves, strainers, referred from the respective MDL
steam traps in boiler area supplied by document.
BGRB/HPE.
HFO/HPS/LSHS PUMPS & DRAIN OIL PUMPS
SUMP PUMP
19 Please include capacity in LPM also Details Included.
SUMP PUMP MOTOR
Please include frame size also Details Included.
20
Please include reference drg of all equipment in
FOPH i.e. DS/GA drg of LDO pump, HFO pump, Applicable drawings of all equipment in
HFO heaters &coolers, Drain oil pump, sump pump FOPH can be referred from the
21
and their respective motors, strainers etc. respective MDL documents.
ACCUMULATOR
22 Please include qty provided for HFO&LDO Details Included.
accumulators in FOPH& firing floor.
STEAM TRAPS
Details Included.
23 Please include qty provided
Dosing System
Please check whether now vendor is changed and
The given datas are as per the new
27 whether data given is specific to new vendor vendor.
or it is related to earlier vendor.
Please include relevant sizing data and Please refer reply of point no. 2
33 also refer our response to point no.6 above.
Sl.
No. NTPC-Comments BGRB-Replies
Solapur - NTPC Written comments dated – 19.04.2017