INSPECTION REPORT
DATED: May 26, 2016 NAME OF OMC: OilCo Petroleum Private Limited
Ref: Oil & Gas Regulatory Authority Letter No./Dated: OGRA-(Oil)-19-3(82)/2014 Dated: May 2, 2016
The site of storage facility/oil terminal was leased out from M/s Saba
power Pvt. Ltd. The civil, mechanical and electrical works already existed in
leased out facility for storage of High speed Diesel (HSD) and
Refined Furnace Oil (RFO). The licensee will be using Tank 01 for HSD
which was previously used for RFO storage and Tank 03 for Superior
Kerosene Oil (SKO) which was used for HSD storage. Tank 02 will continue
to be utilized for RFO storage. Apart from the construction of boundary wall
the licensee/operator has not carried out any major works in M/s Saba
power storage facility. Some major works are required to be carried out as
per plot plan which are mentioned below.
The licensee has provided plot plan duly approved by CIE and DCO
NOCs for the storage facility that already exist for M/s Saba power Pvt. Ltd.
The licensee has applied for NOC from Ministry of Defense and is getting
necessary amendments in NOCs issued by Civil defense and Environment
Protection Agency (EPA).
Page 1 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Plot plan was approved by Chief Inspector of Explosive (CIE), however
construction of the facility was incomplete as per plot plan. Following
observation of electrical, mechanical and civil works which is required for
the completion of facility were not started at time of inspection.
Construction of Motor Sprit (MS) above ground storage tank i.e. all
civil, mechanical and electrical works from foundation, ring wall,
shell, bottom to roof structure
Dike walls for MS storage tank
Dike wall between HSD and RFO storage tank
Link Roads for MS storage tank and others as per plot plan
Pumping Station for MS storage tank
Control room/panel of the facility
Pathways for pedestrians along the road
Canopy over loading/unloading facility
Loading facility for MS, SKO, HSD and RFO
Unloading facility for MS and SKO
Construction of Water tank/storage, accessory pipes, Water
pumping station and new Hydrants at different locations for
firefighting system
Oily drains, trenches and pits in dike area of HSD and RFO.
Re-routing/installation of existing/new piping systems and
electrical cables
Following observations were observed w.r.t electrical, mechanical and
civil works in already existing infrastructure of the facility that may be
updated or modified or rectified for completion.
The wall around one side of the gate of facility need to be
constructed
Hazardous area classification drawing of the facility was not
prepared. New hydrants may be installed area classification so as
to stop Domino effect. Electrical system should to
installed/upgraded according to the classification.
The fire extinguishers found in the dike area were expired
Non-compliance of safety standard of Electrical wiring/equipment
around the dike area i.e. open electric wiring and unsafe insulation
Page 2 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
of electrical equipment. The electrical system should be in
accordance with NFPA 30, Chapter 7 and S.R.O 624(1)/2009
Steam tracing lines, steam traps and heater were found on inlet
and outlet pies in HSD Storage tank - TK-01. Since the storage was
utilized for RFO storage by M/s Saba power, the tank should be
modified/upgraded for the storage of HSD like heater should be
removed and steam tracing lines should be blinded
Vegetation was found on the foundation and dike area of all three
tanks foundation
Some of the steam pipes, fitting, valves and traps were heavily
corroded and should be replaced
One separate ‘single breather valve’ were installed on the roof of
each storage tanks which can only save tanks from excess vapor
pressure. In order to save tank from imploding, either ‘double
breather valve’ may be installed or free vent may be provided on the
roof of HSD and RFO above ground storage tank. At time of
inspection, blind flanges were installed on vent of these tanks
Calibration certificates of Pressure relief valves, Thermal relief
valves, pressure gauges/indicators, breather valves and auto-tank
gauge (radar gauge) were not provided
The licensee claimed that last out of service inspection date was
2015. However, inspection details/reports were not provided. It is
recommended that Vacuum Box Test of bottom, Oil Chalk test or
DPT of bottom-shell weld joint, Ultrasonic Test of shell plates
mentioning Thickness Measurement Locations and holiday testing
for coating should be carried out on all above ground storage tanks
leased from M/s Saba Power Pvt. Ltd. before commissioning of
facility
Facility Details are attached as Annexure-A, Storage Tanks Detail are
attached as Annexure-B, Percentage wise completion of site as per OGRA
Performa is attached as Annexure-C and Pictures are attached as Annexure-
D. Layout Plan approved by CIE, DCO NOC and lease agreement of land are
attached as reference.
Conclusion:
On basis of physical verification/visual inspection/observations at the time of
inspection, documents provided by the licensee, and OGRA criteria of percentage in
each field of works for completion, HDIP is of the view that M/s Oilco Petroleum
(Pvt.) Ltd has completed only seventy two percent (72%) of overall works.
Page 3 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Inspection Team:
Disclaimer
HDIP bears no responsibility for findings which could only be ascertained by information
not available to the Inspectors. HDIP offers no warranty and guarantee for correctness of
the data provided by the licensee mentioned in this report. Hence, HDIP shall not be
responsible for any direct or indirect, tangible or intangible damages arising out of the use
of the data and information provided in this report.
Page 4 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Annexure-A
Page 5 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Annexure-B
GENERAL
Tank Number: T-01
Tank Type: Above Ground - Vertical
Design Standard: AP1-650
As Built Drawings Available: Yes
Construction Date: 1998
Designed by Zishan Engineering Pvt. Ltd.
Manufacturer SEFEC Engineering Pvt. Ltd.
Client: Babcock & Wilcox International Inc.
Page 6 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Top Curb Angle Dimension: 80 mm / 80 mm / 3/8”
Internal Coated? No
BOTTOM
Main Material A-36
Installed Date: 1998
Nominal Thickness: 10 mm
Construction: Welded Lap
Cone: Up
Sump Location: East side near shell Location of sump was not accessible. Open
pit/trench was not found in dike area.
Page 7 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
ABOVE GROUND STORAGE TANK 02 DETAILS TABLE
GENERAL
Tank Number: T-02
Tank Type: Above Ground- Vertical
Design Standard: AP1-650
As Built Drawings Available: Yes
Construction Date: 1998
Designed by Zishan Engineering Pvt. Ltd.
Manufacturer SEFEC Engineering Pvt. Ltd.
Client: Babcock & Wilcox International Inc.
Page 8 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Internal Coated? No
BOTTOM
Main Material A-36
Installed Date: 1998
Nominal Thickness: 10 mm
Construction: Welded Lap
Cone: Up
Sump Location: East side near shell Location of sump was not accessible. Open
pit/trench was not found in dike area
Page 9 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
ABOVE GROUND STORAGE TANK 03 DETAILS TABLE
GENERAL
Tank Number: T-03
Tank Type: Above Ground - Vertical
Design Standard: AP1-650
As Built Drawings Available: Yes
Construction Date: 1998
Designed by Zishan Engineering Pvt. Ltd.
Manufacturer SEFEC Engineering Pvt. Ltd.
Client: Babcock & Wilcox International Inc.
Wind Stiffener Installed? Wind girder was not installed outside of the
No shell structure.
Page 10 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Main Material A-36
Installed Date: 1998
Nominal Thickness: 10 mm
Construction: Welded Lap
Cone: Up
Sump Location: South side near shell
Annular Plates Installed: No
Annular Plates Nominal Thickness: N/A
Internal Coated? No
FOUNDATION
Type: Ring Foundation Concrete
Foundation Height: 2 meter
Construction: RCC
Anchored? No
Leak Detection Present? No
OPERATIONAL
Product Stored: SKO
Product Gravity: 0.7978
Storage Temperature: Ambient
Pressure / Vacuum Rang: Atmospheric
Product Inflow Rate: 36 [m3/hr]
Product Outflow Rate: 53 [m3/hr]
CATHODIC PROTECTION
Cathodic Protection Installed? No
Type: N/A
Last Inspection Date: N/A
COATED
Last External Coating Application Date: 2009
Last Internal Coating Application Date: N/A
Page 11 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Annexure-C
Completion
Maximum% age
%age
Only approved
CIE layout Plan
and DCO NOC
submitted.
1. NOCs Status 15 10
EPA, Ministry
of Defense
NOC not
provided
Lease
agreement of
9 KM Shiekhupura- Procurement of Land with M/s
2. 25 20
Sargodha Road, Resources/land Saba Power
Punjab (Pvt.) Ltd is
Farooqabad, Machike,
Shiekhupura attached.
Details are
3. Civil Works 15 12 provided in the
report.
Details are
4. Electrical Works 20 13 provided in the
Report
Details are
5. Mechanical Works 25 17 provided in the
Report
Page 12 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Annexure- E
OVERVIEW OF OILCO PETROLEUM (PVT). LTD
Oilco
Petroleum
(Pvt.) Ltd
Depot
SKO
Tank
Unloading RFO
via
Railway Tank
Track
Main
Entrance
for Oilco
Pvt. Ltd
Site for Loading/
Unloading for
Oil Tankers
Trucks
HSD
Tank
Site for MS
Storage tank (not
constructed)
M/s Saba
Power Pvt.
Ltd
Page 13 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Main
Entrance
Gate
HSD Tank
and RFO
Tank
Page 14 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Proposed site
for Loading /
Unloading
Facility
Railway
Track for
Unloading
Page 15 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Specification plate
of Storage Tank
for SKO. M/s
Saba Power Pvt.
Ltd previously
used for HSD
Vegetation at
Storage Tank
03- (SKO
Storage)
Page 16 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Vegetation at
foundation of
Storage Tank
03- (MS
Storage)
Page 17 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Storage Tank
02
specification
plate for
RFO
specification
plate of
Storage Tank
01for HSD
storage. M/s
Saba Pvt. Ltd
previously
used it for
RFO Storage
Page 18 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Vegetation
in Dike
area
Page 19 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Dike wall shall be
constructed to separate
HSD and RFO dike area
Tank 01
for HSD
Tank 03
for SKO
Tank 02
Boundary
for RFO
wall
between
M/s Oilco
and M/s
Saba power
Page 20 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Monkey
ladder at
RFO tank
Disconnected
pipes of RFO
tank
Page 21 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Radar/Auto-
tank gauge on
roof of RFO
storage
Dip on
Storage
tank for
RFO
Page 22 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Single
Breather
Valve on
HSD Tank
Blind
Flange on
vent
Page 23 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Tank 03
for SKO
storage
Step ladder
for both
RFO and
HSD
storage
tanks
Page 24 of 25
18, H-9, Islamabad. TELEFAX No. 9257470 PH: 9257821-24, E-mail: hdipcng@apollo.net.pk
Site of Water
tank and
water
pumping
system
Page 25 of 25