CARBON PORTFOLIO - PERU 2010

Energy, Industry and Others

PIAS I Hydroelectric Power Project H25


Description: The project consists of a new hydropower plant connected to the grid with an installed capacity of 12.6 MW and a projected yearly
average generation of 91,700 MWh. It will be located in the department of La Libertad, province of Pataz.

Current Status: Projects Benefits:


Earliest project start date: July 2007. Number of direct and indirect jobs generated:
Operation start date: August 2010. It generates 250 direct and 1250 indirect jobs.
Project lifetime: 40 years. Sustainable development contribution:
Current Status: Feasibility study is completed. Energy and Water con- It supports local development creating new and better roads and com-
cessions have been already given. PDD is under validation. Definitive munication.
engineering are in process. It helps local communities supporting fishery activities and the conser-
vation of hydro-biologic resources.
It reduces GHG emissions from thermal generation.
Estimated Annual Emission Reductions (tCO2/year):
An average of 56,604 tCO2-equivalent per year. CER´s negotiation:
Open
Project Participant and Financing
Total project cost: US$ 18,239,101
Contact Information:
Name: Carlos Cavallero B
Sources of finance to be sought or already identified: Company: Aguas y Energía Perú S.A.
Equity: 25 % Title: General Manager
Debt: 75 % Phone: (51-1) 618-1000
E-mail: ccavallero@cmh.com.pe

HUANZA Hydropower Project H26


Description: The project consists of a new hydropower project connected to the grid with an installed capacity of 90.6 MW with an average energy
generation of 430 GWh per year. The project will be located in the department of Lima, provinces of Huarochirí, district of Huanza.

Current Status: Projects Benefits:


Earliest project start date: 2009. Number of direct and indirect jobs generated:
Operation start date: 2013. It will generate 404 direct and 200 indirect jobs during the construction
Project lifetime: 40 years. period.
Current Status: Environmental Impact Assessment was approved by the Sustainable development contribution:
Ministry of Energy and Mines. Letter of DNA approval was obtained. It will help to change the energy matrix reducing the oil imports used for
PDD is under validation. electricity generation.
It would contribute to the economic growth of the country by supplying
Estimated Annual Emission Reductions (tCO2/year): low cost energy to the national grid when operational.
An average of 235,494 tCO2-equivalent. per year It will generate energy without emission of Greenhouse Gases.
It improves local education and technical training opportunities.
Project Participant and Financing CER´s negotiation:
Total project cost: US$ 151,715,591 Open

Contact Information:
Sources of finance to be sought or already identified:
Name: Carlos Gálvez
Equity: 35% Company: Consorcio Energético de Huancavelica S.A. - CONENHUA
Debt: 65% Title: Manager Director
Phone Number: (51-1) 4192540
E-mail: cgalvez@buenaventura.com.pe

www.fonamperu.org

National Environmental Fund - Peru