Description .............................. 1 3.6 Shutting down ................... 8
3.6.1 Shutting down for a short
1. Safety................................. 2 period .....................................8
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 0
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
Description
The inverted drying box in base frame BG
10 (last printing position) enables an
increase in the length of the drying path of
the hot air drying unit. An increased
drying path length may be necessary when
using certain inks or varnishes to enable
these to be completely dried.
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 1
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
1. Safety
Please observe the general safety
instructions at the beginning of this
manual. In addition, please observe the
safety instructions of drying unit BG 14.
Caution:
Risk of cutting injury through exposed
running edges of web.
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 2
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
2. Technical Data
• Optional items:
- Fitting a UV drying unit (type MD4, GEW company)
- Fitting a water-cooled cooling roller (∅∅ 122 mm)
- Fitting an air-cooled cooling roller (∅
∅ 122 mm)
- Adding a rail system
- Fitting deflection rollers with anti-adhesive coating
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 3
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
2. Technical Data
2.1 Pneumatic supply connections
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 4
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
3. Operation
3.1 Operating elements
9 guide strip
10 regulating flap
12 drying box
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 5
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
3. Operation
3.2 Setting up
• Fit the deflection roller (122 mm
The inverted drying box is fitted within diameter) or cooling roller 2 into base
base frame BG 10 (overall lenght 610 frame BG 10 (15) (see operating
mm). when connecting the inlet and instruction "Cooling roller").
outlet air hoses, please observe the • Fit UV drying unit 5 (type MD4, GEW
following arrangement: company) into base frame BG 10 (15)
(see operating instruction "UV drying
• The inlet air hose (hot air) must be unit" of GEW company).
connected at the lower regulating flap
• The outlet air hose must be connected Note:
at the upper regulating flap The base for the insert cassette (UV
lamp) must be fixed to the rear plate of
3.2.1 Converting base frame to take a base frame BG 10 using four M10 bolts.
UV drying unit
• Insert the required deflection roller into
When carrying out the conversion, please base frame BG 10 (15).
proceed as follows:
When these steps have been completed,
• Loosen the inlet and outlat air hoses at the base frame is equipped for operation
drying box 12 with a UV drying unit.
• Loosen the four fixing screws of support
Rebuilding the unit (base frame with drying
frame "drying box" 20 at the front and
box) is carried out in the reverse order.
rear plates. Lift drying box 12 out of
base frame BG 10 (15).
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 6
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
3. Operation
3.3 Inserting web
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 7
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
Operation
3.4 Setting 3.6 Shutting down
3.4.1 Hot air drying unit 3.6.1 Shutting down for a short
period
Switching on and off and setting the
heating stage is carried out at the movable During a short interruption of the
operating panel at drive station BG 09 (see production process, no measures need to
operating instruction "Drying unit BG 14"). be taken or adjustments made.
Switching on and off and setting the 3.6.2.1 Hot air drying unit
heating power is carried out at the
operating panel of the UV drying unit (see At the end of the shift, the printing
operating instruction "UV drying unit", machine should be switched off (see
type MD4, GEW company). operating instruction "Drive station BG
09". This causes drying unit BG 14 to be
3.5 Starting up switched off as well, so that no further
measures need to be taken or adjustments
When all the necessary settings have been made.
made, the machine can be started in run
mode. 3.6.2.2 UV drying unit
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 8
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
3. Operation
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 9
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
3. Operation
3.7 Malfunctioning
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 10
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
Caution:
Risk of damaging the drying boxes. These
must never be cleaned with sharp or
pointed objects. To remove remnants of
ink or web materials, use a soft cloth
soaked in solvent.
arsoma
TN_ _0104/Operating instruction 09^ 10 S78-e /18.04.01Version:/ 11
★
EM 260/340/410/510 Base frame BG 10 with drying box; prepared
for fitting a UV drying unit (type MD4, GEW company)
4.3.1 Weekly maintenance work The oil in the phase shifter gearbox 11
must be changed at the following
The following maintenance work must be intervals:
carried out weekly, i.e. after every 40
operating hours: 1st oil change after 500 operating hours.
2nd and subsequent oil changes after
Check oil level of phase shifter gearbox every 2000 hours.