Beruflich Dokumente
Kultur Dokumente
BUMI ARMADA
Level 21, Menara Perak,
24, Jalan Perak, PICTURE
50450 Kuala Lumpur, Malaysia
Tel: +603-2171 5799
Fax: +603-2164 1700
Email: KL.Chartering@bumiarmada.com
GENERAL SPECIFICATION
Official No : 3360 ACCOMMODATION OTHER ACCOMMODATION FACILITIES
IMO No : N/A 1 Man Suite Cabin x 4 : 4 Offices : Barge Master Office, Client Office,
Call Sign : V7SI5 1 Men Cabin x 6 : 6 PM Office, Site Manager Office,
Port of Registry : Majuro 4 Men Cabin x 88 : 352 Maintenance Office, Camp Boss Office
Flag : Marshall Islands Total Persons On Board : 362 Conference Room : Provided on office deck
Year Delivered : 2009 Hospital Room : 2 Bed Mess Room : Accommodate up to 150 men
Hull No : SD-H802-AB Medic Room : 1 Bed Officer Mess Room : Accommodate up to 20 men
Builder : Oriental Precision Engineering, Korea Recreation Room : 2 on B Deck and 1 on Office Deck
Designer : Wartsila Ship Design (Formerly Conan Wu) [FULLY AIR-CONDITIONED] Auditorium : Provided on B deck
Classification : American Bureau Of Shipping Recreation Room : 2 on B Deck and 1 on Office Deck
Notation : ABS + A1 +, Barge Gymnasium : Provided on Office Deck
Internet Room : Provided on Office Deck
Waiting Room : Provided on Office Deck
Water Ballast Tanks (m3) Drill Water Tanks (m3) ANTI ROLLING Tanks (m3)
1 No.1 WB (P) 162.7 1 DW (P) 631.5 1 Anti Roll Fwd (C) 1285.3
2 No.1 WB (S) 162.7 2 DW (S) 631.5 2 Anti Roll Aft (C) 1580.9
3 No.2 WB (P) 1204.8 TOTAL: 1263 TOTAL: 2866.2
4 No.2 WB (S) 1144.2
5 No.3 WB (P) 217.5 Fresh Water Tanks (m3) Fuel Oil Tanks (m3)
6 No.3 WB (S) 215.4 1 No.1 FW (P) 419 1 FO DAY (P) 75.4
7 No.4 WB (P) 639.9 2 No.1 FW (S) 419 2 FO DAY (S) 75.4
8 No.4 WB (S) 639.9 3 No.2 FW (P) 639.9 3 FO (P) 829.5
9 No.5 WB (P) 301.6 4 No.2 FW (S) 639.9 4 FO (S) 829.5
10 No.5 WB (S) 301.6 TOTAL: 2117.8 TOTAL: 1809.8
11 No.6 WB (P) 208.6
12 No.6 WB (S) 208.6 Cooling Water Tanks (m3) Misc Tanks (m3)
13 No.7 WB (P) 297.4 1 Cooling FW Fwd (P) 89.2 1 Sewage Tank (C ) 33.5
14 No.7 WB (S) 297.4 2 Cooling FW Fwd (S) 89.2 2 Bilge Holding Tank (P) 8.4
TOTAL: 6002.3 3 Cooling FW Aft (P) 89.2 3 Dirty Oil Tank (S) 8.4
4 Cooling FW Aft (S) 89.2 TOTAL: 50.3
TOTAL: 356.8